CN108385667A - A kind of geotextiles anti-block water permeable pile driving construction device and method - Google Patents

A kind of geotextiles anti-block water permeable pile driving construction device and method Download PDF

Info

Publication number
CN108385667A
CN108385667A CN201810449351.9A CN201810449351A CN108385667A CN 108385667 A CN108385667 A CN 108385667A CN 201810449351 A CN201810449351 A CN 201810449351A CN 108385667 A CN108385667 A CN 108385667A
Authority
CN
China
Prior art keywords
pile
permeable
geotextile
casing
clogging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810449351.9A
Other languages
Chinese (zh)
Inventor
崔新壮
金青
张磊
王洁茹
王艺霖
李骏
崔社强
王忠啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201810449351.9A priority Critical patent/CN108385667A/en
Publication of CN108385667A publication Critical patent/CN108385667A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72Pile shoes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种土工布防堵塞透水桩施工装置及方法,它解决了现有技术中透水桩在施工过程中易堵塞、透水性能降低的问题,具有既能保证透水性能,又能降低土颗粒进入,避免透水桩堵塞的效果;其技术方案为:包括可拆卸连接的套管与桩尖,桩尖的顶部具有与套管相配合的凸起,凸起的周向间隔分布若干第一悬挂部;所述套管通过套设于其底部的土工布袋与桩尖相接,以防止施工过程中透水桩堵塞;所述土工布袋的底部具有与第一悬挂部相配合的第二悬挂部,保证土工布袋与桩尖紧密连接。

The invention discloses a construction device and method of a geotechnical anti-clogging permeable pile, which solves the problems in the prior art that the permeable pile is easy to be blocked and the water permeability is reduced during the construction process, and has the advantages of not only ensuring the water permeability, but also reducing soil particles to avoid the blockage effect of permeable piles; its technical scheme is: including detachably connected casing and pile tip, the top of the pile tip has a protrusion that matches the casing, and the circumferential interval of the protrusion is distributed with a number of first suspensions. part; the sleeve is connected to the pile tip through a geotextile bag set at the bottom to prevent the permeable pile from being blocked during construction; the bottom of the geotextile bag has a second suspension part that matches the first suspension part, Ensure that the geotextile bag is tightly connected to the pile tip.

Description

一种土工布防堵塞透水桩施工装置及方法Construction device and method of geotechnical cloth anti-clogging permeable pile

技术领域technical field

本发明涉及土木工程领域,尤其涉及一种土工布防堵塞透水桩施工装置及方法。The invention relates to the field of civil engineering, in particular to a construction device and method for geotextile anti-clogging permeable piles.

背景技术Background technique

随着基础设施的大力建设,复合地基技术在我国发展速度很快。近几年来地基处理发展的一个典型趋势就是在既有的地基处理方法基础上,不断发展新的地基处理方法,特别是将多种地基处理方法进行综合使用,形成了极富特色的复合加固技术。With the vigorous construction of infrastructure, composite foundation technology is developing rapidly in our country. A typical trend in the development of ground treatment in recent years is to continuously develop new ground treatment methods on the basis of existing ground treatment methods, especially the comprehensive use of various ground treatment methods, forming a very distinctive composite reinforcement technology .

复合地基竖向增强体从透水性角度粗略可以分为透水性和不透水性两种。透水桩兼顾快速排水与较高强度,用透水桩取代其他桩体,可以在保证透水性能的前提下,提高桩基的动态抗压和抗拉强度,从而加快由地震引发的地基内超静孔隙水压力的消散,提高地基的整体抗震能力。From the perspective of water permeability, the vertical reinforcement of composite foundation can be roughly divided into two types: water permeability and water impermeability. Permeable piles take into account both rapid drainage and high strength. Replacing other piles with permeable piles can improve the dynamic compressive and tensile strength of pile foundations on the premise of ensuring water permeability, thereby speeding up the ultra-static pores in the foundation caused by earthquakes. The dissipation of water pressure improves the overall earthquake resistance of the foundation.

但是,透水桩在施工过程中会遇到堵塞问题,导致其透水性能降低;在地基固结过程中,在足够大的渗透力作用下管涌性土中的可移动颗粒也会进入桩体材料孔隙,造成堵塞;地震时,地基液化使土体呈流动或半流动状态,土中细颗粒流动也会引起透水性桩的堵塞。However, permeable piles will encounter clogging problems during the construction process, resulting in a decrease in their water permeability; during the consolidation process of the foundation, the mobile particles in the piping soil will also enter the pores of the pile material under the action of a sufficiently large seepage force , causing blockage; during an earthquake, the liquefaction of the foundation makes the soil in a flowing or semi-fluid state, and the flow of fine particles in the soil will also cause the blockage of the permeable pile.

发明内容Contents of the invention

为了克服现有技术的不足,本发明提供了一种土工布防堵塞透水桩施工装置及方法,其具有既能保证透水性能,又能降低土颗粒进入,避免透水桩堵塞的效果。In order to overcome the deficiencies of the prior art, the present invention provides a construction device and method for a geotechnical anti-clogging permeable pile, which can not only ensure the water permeability, but also reduce the entry of soil particles and avoid the clogging of the permeable pile.

本发明采用下述技术方案:The present invention adopts following technical scheme:

一种土工布防堵塞透水桩施工装置,包括可拆卸连接的套管与桩尖,桩尖的顶部具有与套管相配合的凸起,凸起的周向间隔分布若干第一悬挂部;A construction device for a geotechnical anti-clogging permeable pile, comprising a detachably connected sleeve and a pile point, the top of the pile point has a protrusion matching the sleeve, and a plurality of first suspension parts are distributed at intervals in the circumferential direction of the protrusion;

所述套管通过套设于其底部的土工布袋与桩尖相接,以防止施工过程中透水桩堵塞;The casing is connected to the pile tip through a geotextile bag set at the bottom to prevent the permeable pile from being blocked during construction;

所述土工布袋的底部具有与第一悬挂部相配合的第二悬挂部,保证土工布袋与桩尖紧密连接。The bottom of the geotextile bag has a second suspension part matched with the first suspension part to ensure the tight connection between the geotextile bag and the pile tip.

进一步的,所述土工布袋采用经编复合土工布制成。Further, the geotextile bag is made of warp-knitted composite geotextile.

进一步的,所述第一悬挂部为挂钩,所述第二悬挂部为吊环。Further, the first hanging part is a hook, and the second hanging part is a ring.

进一步的,所述第一悬挂部为吊环,所述第二悬挂部为挂钩。Further, the first suspension part is a suspension ring, and the second suspension part is a hook.

进一步的,所述套管内部具有空腔,所述凸起的直径小于所述空腔的内径设定距离。Further, there is a cavity inside the sleeve, and the diameter of the protrusion is smaller than the inner diameter of the cavity by a set distance.

进一步的,所述桩尖呈倒锥形。Further, the pile point is in the shape of an inverted cone.

进一步的,所述桩尖材质为预制混凝土或钢材。Further, the material of the pile tip is prefabricated concrete or steel.

一种土工布防堵塞透水桩施工方法,包括以下步骤:A construction method for geotechnical deployment anti-clogging permeable piles, comprising the following steps:

步骤(1)施工装置安装:Step (1) Construction device installation:

将土工布袋套在套管的底端,土工布袋的第二悬挂部与桩尖的第一悬挂部配合后,将套管与桩尖卡合在一起;Put the geotextile bag on the bottom end of the casing, and after the second hanging part of the geotextile bag is matched with the first hanging part of the pile tip, the casing and the pile tip are snapped together;

步骤(2)沉管造孔:Step (2) sinking tube to make holes:

预先确定桩尖沉入深度,采用振动沉管机造孔,沉管达到设定标高后停止;The sinking depth of the pile tip is determined in advance, and the hole is made with a vibrating pipe sinking machine, and the sinking pipe stops after reaching the set elevation;

步骤(3)透水混凝土灌注及拔管:Step (3) permeable concrete pouring and extubation:

使用料斗将透水混凝土料加入套管内,至满足设计用量;沉管原地留振设定时间后,边振动边拔管,直至桩管全部拔出。Use a hopper to add permeable concrete material into the casing until the designed amount is met; after the immersed tube is vibrated on the spot for a set time, the tube is pulled out while vibrating until all the pile tubes are pulled out.

进一步的,所述步骤(3)中,透水混凝土料级配以粒径10-20mm碎石为主,并添加增强材料、外加剂。Further, in the step (3), the gradation of the permeable concrete material is mainly gravel with a particle size of 10-20 mm, and reinforcing materials and admixtures are added.

进一步的,所述步骤(3)中,在拔管过程中遇到套管内材料黏滞不出,通过捶击管壁,并进行反插,每次反插留振10s。Further, in the step (3), in the process of extubation, when the material in the casing is stuck, the wall of the casing is thumped, and the reverse insertion is performed, and the vibration is maintained for 10 seconds each time.

与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:

(1)本发明的桩尖顶部设置凸起及挂钩,凸起直径小于套管内径,且土工布袋底部具有吊环,保证在沉管过程中套管与桩尖连接紧密,不易脱落;(1) The top of the pile point of the present invention is provided with a protrusion and a hook, the diameter of the protrusion is smaller than the inner diameter of the casing, and the bottom of the geotextile bag has a suspension ring, which ensures that the casing and the pile point are tightly connected during the sinking process and are not easy to fall off;

(2)本发明使用经编复合透水土工布,其具有让水分通过而阻挡砂土颗粒的流失的功能;在施工过程中将透水混凝土桩体用土工布袋包裹,使透水混凝土桩体与土体中的土颗粒隔离开来,有效地较少土颗粒进入透水混凝土桩的空隙中,保证透水混凝土桩的渗透性。(2) The present invention uses warp-knitted composite permeable geotextiles, which have the function of allowing moisture to pass through and block the loss of sand and soil particles; The soil particles in the soil are isolated, effectively reducing the soil particles into the gaps of the pervious concrete piles, and ensuring the permeability of the pervious concrete piles.

附图说明Description of drawings

构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。The accompanying drawings constituting a part of the present application are used to provide further understanding of the present application, and the schematic embodiments and descriptions of the present application are used to explain the present application, and do not constitute improper limitations to the present application.

图1为本发明的桩尖主视图;Fig. 1 is a pile tip front view of the present invention;

图2为本发明的桩尖俯视图;Fig. 2 is a top view of the pile point of the present invention;

图3为本发明的整体安装示意图;Fig. 3 is the overall installation schematic diagram of the present invention;

图4为本发明的施工示意图;Fig. 4 is the construction schematic diagram of the present invention;

其中,1-桩尖,2-挂钩,3-凸起,4-套管,5-土工布袋。Among them, 1-pile tip, 2-hook, 3-protrusion, 4-sleeve, 5-geotextile bag.

具体实施方式Detailed ways

应该指出,以下详细说明都是例示性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.

需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and/or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and/or combinations thereof.

正如背景技术所介绍的,现有技术中存在透水桩在施工过程中易堵塞、透水性能降低的不足,为了解决如上的技术问题,本申请提出了一种土工布防堵塞透水桩施工装置及方法。As introduced in the background technology, there are deficiencies in the prior art that permeable piles are easily blocked during construction and the water permeability is reduced. In order to solve the above technical problems, this application proposes a construction device and method for geotechnical cloth anti-clogging permeable piles.

本申请的一种典型的实施方式中,如图1-图4所示,提供了一种土工布防堵塞透水桩施工装置,包括桩尖1、套管4和土工布袋5;套管4的内部中空,其整体呈圆柱形。In a typical implementation of the present application, as shown in Fig. 1-Fig. 4, a kind of geotextile anti-clogging permeable pile construction device is provided, including pile point 1, casing 4 and geotextile bag 5; Hollow, its overall shape is cylindrical.

所述桩尖1呈倒锥形,桩尖1的顶部表面具有圆柱形的凸起3,使桩尖1与套管4结合牢靠,避免在沉管过程中脱落而影响桩体质量。The pile point 1 is in an inverted cone shape, and the top surface of the pile point 1 has a cylindrical protrusion 3, so that the pile point 1 and the casing 4 are firmly combined to avoid falling off during the sinking process and affecting the quality of the pile body.

所述凸起3的直径小于桩尖1顶部直径,且同时小于套管4内径;在凸起3的周向间隔设置多个挂钩2。The diameter of the protrusion 3 is smaller than the top diameter of the pile tip 1 and smaller than the inner diameter of the casing 4; a plurality of hooks 2 are arranged at intervals in the circumferential direction of the protrusion 3 .

挂钩2的具体数量根据桩尖1顶部直径而定。The specific quantity of hook 2 is determined according to the diameter of pile point 1 top.

所述凸起3的高度为8-10cm,其直径小于套管内径1-3cm;使套管4在拔管过程中能轻易拔出,拔管后桩尖留在孔底。The height of the protrusion 3 is 8-10cm, and its diameter is 1-3cm smaller than the inner diameter of the casing; the casing 4 can be easily pulled out during the extubation process, and the pile tip remains at the bottom of the hole after the extubation.

所述桩尖1材质为预制混凝土或钢材。The pile tip 1 is made of prefabricated concrete or steel.

所述土工布袋5套设于套管的底部,且土工布袋套5底部具有与所述挂钩2相配合且数目相同的吊环,挂钩2钩住吊环,保证在沉管过程中土工布袋5与桩尖1连接紧密,不易脱落。The geotextile bag 5 is sleeved on the bottom of the casing, and the bottom of the geotextile bag cover 5 has the same number of suspension rings that match the hook 2, and the hook 2 hooks the suspension rings to ensure that the geotextile bag 5 is connected to the pile during the sinking process. Tip 1 is tightly connected and not easy to fall off.

所述土工布袋5采用经编复合土工布制成,具有让水分通过而阻挡砂土颗粒的流失的功能。The geotextile bag 5 is made of warp-knitted composite geotextile, which has the function of allowing water to pass through and blocking the loss of sand particles.

经编复合土工布不同于一般机织布,其最大特点是经线与纬线的交叉点不弯曲,各自处于平直状态;用捆绑线将两者捆扎牢固,可全面较均匀同步,承受外力,分布应力,且当施加的外力撕裂材料的瞬时,纱线会沿初裂口拥集,增加抗撕裂强度。The warp-knitted composite geotextile is different from ordinary woven fabrics. Its biggest feature is that the intersection of warp and weft is not bent, and each is in a straight state; the two are tied firmly with binding wires, which can be synchronized evenly across the board, withstand external forces, and distribute Stress, and when the external force is applied to tear the material, the yarn will gather along the initial crack to increase the tear resistance.

经编复合时,即利用经编捆绑线在经,纬纱与短纤针刺土工布的纤维层间反复穿行,使三者编结为一体。因而经编复合土工布既具有高抗拉强度,低延伸率的特点,又兼有针刺非织造布的性能。When warp knitting is combined, the warp knitting binding thread is used to repeatedly travel between the warp and weft yarns and the fiber layers of the staple fiber needle-punched geotextile to knit the three into one. Therefore, the warp-knitted composite geotextile not only has the characteristics of high tensile strength and low elongation, but also has the performance of needle-punched nonwovens.

因此,经编复合土工布是一种可用于加筋增强,隔离防护,并具有三维整体法向及水平均有较好的聚水,异水的作用。因其固体基质和气孔均呈连续相、成为多孔隙的过滤效应,是一种多功能的土工复合材料。Therefore, the warp-knitted composite geotextile is a kind of geotextile that can be used for reinforcement, isolation and protection, and has a three-dimensional overall normal and horizontal direction and has better water collection and different water effects. It is a multifunctional geotechnical composite material because its solid matrix and pores are continuous phases and have a porous filtering effect.

复合土工布制作成的土工布袋5,在施工过程中将透水混凝土桩体用土工布袋5包裹,使透水混凝土桩体与土体中的土颗粒隔离开来,这样就能有效地较少土颗粒进入透水混凝土桩的空隙中,保证透水混凝土桩的渗透性。The geotextile bag 5 made of composite geotextile wraps the permeable concrete pile body with the geotextile bag 5 during the construction process, so that the permeable concrete pile body is isolated from the soil particles in the soil, so that the soil particles can be effectively reduced Enter the gap of the pervious concrete pile to ensure the permeability of the pervious concrete pile.

土工布防堵塞透水桩施工过程可分为桩尖安装阶段、土工布安装阶段、沉管造孔阶段和透水混凝土灌注及拔管阶段。The construction process of the geotextile anti-clogging permeable pile can be divided into the pile tip installation stage, the geotextile installation stage, the sinking tube hole making stage, and the permeable concrete pouring and pipe pulling stages.

具体包括以下步骤:Specifically include the following steps:

步骤(1)桩尖安装阶段:Step (1) pile tip installation stage:

传统振动沉管的底部都安装有活动钢桩靴,但注浆后提升沉管过程中由于桩靴活动板受到淤泥土压力的限制以及水泥浆液流动性导致不能完全打开,致使活动桩尖方案的可行性大大降低。The bottom of the traditional vibrating immersed tube is equipped with movable steel pile shoes. However, during the process of lifting the immersed pipe after grouting, the movable plate of the pile shoe cannot be fully opened due to the limitation of the mud pressure and the fluidity of the cement slurry, resulting in the failure of the movable pile tip scheme. Feasibility is greatly reduced.

本申请采用一次性的桩尖1代替活动钢桩靴,桩尖1材质为预制混凝土或钢材;由于桩尖1顶部有凸起3,可以与套管4结合牢靠,避免在沉管过程中脱落,影响桩体质量。This application uses a disposable pile point 1 instead of a movable steel pile shoe. The material of the pile point 1 is prefabricated concrete or steel; since the top of the pile point 1 has a protrusion 3, it can be firmly combined with the casing 4 to avoid falling off during the sinking process. , affecting the quality of the pile body.

步骤(2)土工布安装阶段:Step (2) Geotextile installation stage:

传统布袋桩施工过程中常遇砂层塌孔或淤泥层颈缩等问题,导致很难将布袋置放到设计深度、桩径无法达到设计要求。During the construction of traditional bag piles, problems such as hole collapse in the sand layer or necking in the silt layer often occur, making it difficult to place the bag at the design depth and the pile diameter cannot meet the design requirements.

本申请将土工布袋5套在套管4外部,可以保证透水桩桩体更加规则,桩径能达到设计要求;在沉管前,预先将土工布袋5与套管4连接牢靠,再将套管4与桩尖1连接紧密,即:将土工布袋5套在套管4的底端,土工布袋5的吊环与桩尖1的挂钩配合后,将套管4与桩尖1卡合在一起。In this application, the geotextile bag 5 is set outside the casing 4, which can ensure that the pile body of the permeable pile is more regular, and the pile diameter can meet the design requirements; 4 is closely connected with the pile tip 1, that is, the geotextile bag 5 is placed on the bottom of the casing 4, and after the lifting ring of the geotextile bag 5 is matched with the hook of the pile tip 1, the casing 4 and the pile tip 1 are snapped together.

步骤(3)沉管造孔阶段:Step (3) immersed tube hole making stage:

用振动沉管机造孔,开机沉管前,必须根据本桩位地面标高及桩端设计标高确定该桩的桩尖沉入深度。When using a vibrating pipe sinking machine to make a hole, before starting to sink the pipe, the sinking depth of the pile tip must be determined according to the ground elevation of the pile site and the design elevation of the pile tip.

桩管(套管与桩尖安装后成为桩管)下沉过程及沉入设计深度后,都要及时检查桩管垂直度,垂直度偏差不大于1%。During the sinking process of the pile pipe (casing pipe and pile tip installed to become the pile pipe) and after sinking into the design depth, the verticality of the pile pipe must be checked in time, and the verticality deviation is not greater than 1%.

土工布袋5置套于套管4外,造孔过程中土工布袋随桩管下沉;沉管到达设计标高后开始进行透水混凝土灌注或碎石填筑。The geotextile bag 5 is placed outside the casing 4, and the geotextile bag sinks with the pile pipe during the hole making process; after the immersed pipe reaches the design elevation, permeable concrete pouring or gravel filling starts.

步骤(4)透水混凝土灌注及拔管阶段:Step (4) permeable concrete pouring and tube removal stage:

透水混凝土桩骨料级配以粒径10-20mm碎石为主,并添加增强材料、外加剂等。The aggregate gradation of permeable concrete piles is mainly crushed stone with a particle size of 10-20mm, and reinforcing materials, admixtures, etc. are added.

优选地,透水混凝土桩配合比为:Preferably, the permeable concrete pile mix ratio is:

水泥:水:骨料:减水剂:化学添加剂=325:95-105:1550-1650:11.2:6.4。Cement: water: aggregate: water reducer: chemical additives = 325: 95-105: 1550-1650: 11.2: 6.4.

待沉管打入地下至桩体设计长度后须尽快用料斗进行投入上述配合比的透水混凝土料,直到套管内混合料满足桩体设计用量。After the immersed tube is driven into the ground to the designed length of the pile body, the permeable concrete material with the above mix ratio must be input as soon as possible with the hopper until the mixture in the casing meets the design amount of the pile body.

投料完毕后,开动马达,沉管原地留振10s,然后边振动拔管,拔管速度控制在2.2~2.5m/min。After the feeding is completed, start the motor, leave the immersed tube in place for 10 seconds, and then pull out the tube while vibrating. The speed of tube pulling is controlled at 2.2-2.5m/min.

如遇淤泥或质土,拔管速度可适当放慢;在拔管过程中遇到管内材料黏滞不出,可捶击管壁,并进行反插,每次反插留振10s。In case of silt or textured soil, the extubation speed can be appropriately slowed down; in the process of extubation, if the material in the tube sticks out, the wall of the tube can be thumped, and the reverse insertion can be performed, and the vibration can be maintained for 10 seconds each time.

如此反复,直至桩管全部拔出,状体成型。Repeat this until all the pile tubes are pulled out and the shape is formed.

本申请使用复合透水土工布,通过改良后的振动沉管法,形成袋装防堵塞透水桩,既能保证透水性能,又能降低土颗粒进入,避免透水桩堵塞,对于地基处理具有极高的应用价值。This application uses composite permeable geotextiles to form bagged anti-clogging permeable piles through the improved vibration sinking method, which can not only ensure water permeability, but also reduce the entry of soil particles, avoiding clogging of permeable piles, and has a very high impact on foundation treatment. Value.

本申请的另一种实施方式中,包括桩尖、套管和土工布袋,所述桩尖呈倒锥形,桩尖的顶部表面具有圆柱形的凸起,在凸起的周向间隔设置多个吊环;所述土工布袋套设于套管的底部,且土工布袋套底部具有与所述吊环相配合且数目相同的挂钩。In another embodiment of the present application, it includes a pile point, a sleeve and a geotextile bag, the pile point is in an inverted cone shape, the top surface of the pile point has cylindrical protrusions, and multiple a lifting ring; the geotextile bag is set on the bottom of the casing, and the bottom of the geotextile bag cover has the same number of hooks that match the lifting ring.

其他结构与上述实施方式相同,此处不再赘述。The other structures are the same as those of the above-mentioned embodiment, and will not be repeated here.

以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, various modifications and changes may be made to the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.

Claims (10)

1.一种土工布防堵塞透水桩施工装置,其特征在于,包括可拆卸连接的套管与桩尖,桩尖的顶部具有与套管相配合的凸起,凸起的周向间隔分布若干第一悬挂部;1. A geotextile anti-clogging permeable pile construction device is characterized in that it comprises a casing and a pile point that are detachably connected, and the top of the pile point has a protrusion that matches with the casing, and the circumferential intervals of the protrusions are distributed several times. a suspension part; 所述套管通过套设于其底部的土工布袋与桩尖相接,以防止施工过程中透水桩堵塞;The casing is connected to the pile tip through a geotextile bag set at the bottom to prevent the permeable pile from being blocked during construction; 所述土工布袋的底部具有与第一悬挂部相配合的第二悬挂部,保证土工布袋与桩尖紧密连接。The bottom of the geotextile bag has a second suspension part matched with the first suspension part to ensure the tight connection between the geotextile bag and the pile tip. 2.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述土工布袋采用经编复合土工布制成。2 . The construction device of a geotextile anti-clogging permeable pile according to claim 1 , wherein the geotextile bag is made of warp-knitted composite geotextile. 3 . 3.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述第一悬挂部为挂钩,所述第二悬挂部为吊环。3 . The construction device for geotextile anti-clogging permeable piles according to claim 1 , wherein the first suspension part is a hook, and the second suspension part is a suspension ring. 4 . 4.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述第一悬挂部为吊环,所述第二悬挂部为挂钩。4 . The construction device for geotextile anti-clogging permeable piles according to claim 1 , wherein the first suspension part is a suspension ring, and the second suspension part is a hook. 5.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述套管内部具有空腔,所述凸起的直径小于所述空腔的内径设定距离。5 . The construction device of geotextile anti-clogging permeable pile according to claim 1 , wherein the casing has a cavity inside, and the diameter of the protrusion is smaller than the inner diameter of the cavity by a set distance. 5 . 6.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述桩尖呈倒锥形。6 . The construction device of a geotechnical anti-clogging permeable pile according to claim 1 , wherein the pile tip is in the shape of an inverted cone. 7 . 7.根据权利要求1所述的一种土工布防堵塞透水桩施工装置,其特征在于,所述桩尖材质为预制混凝土或钢材。7. A geotechnical deployment anti-clogging permeable pile construction device according to claim 1, characterized in that the material of the pile tip is prefabricated concrete or steel. 8.一种土工布防堵塞透水桩施工方法,其特征在于,采用如权利要求1-7任一所述的施工装置,包括以下步骤:8. A construction method for geotextile anti-clogging permeable piles, characterized in that, using the construction device as described in any one of claims 1-7, comprising the following steps: 步骤(1)施工装置安装:Step (1) Construction device installation: 将土工布袋套在套管的底端,土工布袋的第二悬挂部与桩尖的第一悬挂部配合后,将套管与桩尖卡合在一起;Put the geotextile bag on the bottom of the casing, and after the second suspension part of the geotextile bag is matched with the first suspension part of the pile tip, the casing and the pile tip are snapped together; 步骤(2)沉管造孔:Step (2) sinking tube to make holes: 预先确定桩尖沉入深度,采用振动沉管机造孔,沉管达到设定标高后停止;Predetermine the sinking depth of the pile tip, use a vibrating pipe sinking machine to make holes, and stop the sinking pipe after reaching the set elevation; 步骤(3)透水混凝土灌注及拔管:Step (3) permeable concrete pouring and extubation: 使用料斗将透水混凝土料加入套管内,至满足设计用量;沉管原地留振设定时间后,边振动边拔管,直至桩管全部拔出。Use a hopper to add permeable concrete material into the casing until the designed amount is met; after the immersed tube is vibrated on the spot for a set time, the tube is pulled out while vibrating until all the pile tubes are pulled out. 9.根据权利要求8所述的一种土工布防堵塞透水桩施工方法,其特征在于,所述步骤(3)中,透水混凝土料级配以粒径10-20mm碎石为主,并添加增强材料、外加剂。9. The construction method of a kind of geotextile anti-clogging permeable pile according to claim 8, characterized in that, in the step (3), the gradation of the permeable concrete material is mainly crushed stone with a particle size of 10-20 mm, and reinforced materials, additives. 10.根据权利要求8所述的一种土工布防堵塞透水桩施工方法,其特征在于,所述步骤(3)中,在拔管过程中遇到套管内材料黏滞不出,通过捶击管壁,并进行反插,每次反插留振10s。10. The construction method of a geotechnical cloth anti-blockage permeable pile according to claim 8, characterized in that, in the step (3), when the material in the casing is stuck during the extubation process, the pipe is thumped Wall, and reverse insertion, each reverse insertion stay vibration 10s.
CN201810449351.9A 2018-05-11 2018-05-11 A kind of geotextiles anti-block water permeable pile driving construction device and method Pending CN108385667A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810449351.9A CN108385667A (en) 2018-05-11 2018-05-11 A kind of geotextiles anti-block water permeable pile driving construction device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810449351.9A CN108385667A (en) 2018-05-11 2018-05-11 A kind of geotextiles anti-block water permeable pile driving construction device and method

Publications (1)

Publication Number Publication Date
CN108385667A true CN108385667A (en) 2018-08-10

Family

ID=63071615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810449351.9A Pending CN108385667A (en) 2018-05-11 2018-05-11 A kind of geotextiles anti-block water permeable pile driving construction device and method

Country Status (1)

Country Link
CN (1) CN108385667A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030649A (en) * 2020-09-07 2020-12-04 中国电建市政建设集团有限公司 A CFG pile construction method suitable for fluid plastic soil layer
CN112523206A (en) * 2020-11-17 2021-03-19 胡鹏 Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof
CN112649248A (en) * 2021-01-12 2021-04-13 天津大学 Soil water sampling and detecting equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008267016A (en) * 2007-04-20 2008-11-06 Hikari Kensetsu:Kk Ground improvement method
CN101343874A (en) * 2007-07-13 2009-01-14 陕西长嘉实业发展有限公司 Wrapping pile
CN201202116Y (en) * 2008-05-28 2009-03-04 徐立新 Geotextile bag bulk material follow-up grouting pile
CN101949150A (en) * 2010-10-15 2011-01-19 合肥工业大学 Prefabricated permeable thin-walled conical pile
CN104131555A (en) * 2014-07-21 2014-11-05 冠鲁建设股份有限公司 Covered water-permeable reinforced concrete pipe gravel grouting pile and construction method thereof
CN208167716U (en) * 2018-05-11 2018-11-30 山东大学 A kind of geotextiles anti-block water permeable pile driving construction device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008267016A (en) * 2007-04-20 2008-11-06 Hikari Kensetsu:Kk Ground improvement method
CN101343874A (en) * 2007-07-13 2009-01-14 陕西长嘉实业发展有限公司 Wrapping pile
CN201202116Y (en) * 2008-05-28 2009-03-04 徐立新 Geotextile bag bulk material follow-up grouting pile
CN101949150A (en) * 2010-10-15 2011-01-19 合肥工业大学 Prefabricated permeable thin-walled conical pile
CN104131555A (en) * 2014-07-21 2014-11-05 冠鲁建设股份有限公司 Covered water-permeable reinforced concrete pipe gravel grouting pile and construction method thereof
CN208167716U (en) * 2018-05-11 2018-11-30 山东大学 A kind of geotextiles anti-block water permeable pile driving construction device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭秉臣等: "《土工合成材料》", 30 April 2006, 国防工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112030649A (en) * 2020-09-07 2020-12-04 中国电建市政建设集团有限公司 A CFG pile construction method suitable for fluid plastic soil layer
CN112523206A (en) * 2020-11-17 2021-03-19 胡鹏 Prefabricated horizontal bearing type high-toughness concrete permeable pile and preparation method thereof
CN112649248A (en) * 2021-01-12 2021-04-13 天津大学 Soil water sampling and detecting equipment

Similar Documents

Publication Publication Date Title
CN108442365B (en) Anti-blocking reinforced permeable pile and construction method
CN107417182B (en) Intumescent high polymer cement slurry, grouting reinforcement device and grouting reinforcement method
CN101532290A (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN203924036U (en) A kind of pile for prestressed pipe of outsourcing active material pile body
CN103993598B (en) One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method
CN103437348A (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
WO2019169956A1 (en) Structured cemented gravel pile and construction method therefor
CN108677912A (en) A kind of CFG core sands stone built pile, its composite foundation constituted and construction method
CN108385667A (en) A kind of geotextiles anti-block water permeable pile driving construction device and method
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
CN107059849A (en) A kind of driven cast-in-place pile and its construction technology
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN203066064U (en) Double-layer plastic sleeve discrete material and concrete stiffening core combined pile
CN102409674B (en) Cloth bag wall protection micro pile and construction method thereof
CN108035344A (en) A kind of permeable rigid pile of high polymer rubble and its construction technology
CN102418337A (en) A new grouting method
CN104762957B (en) A kind of spiral pore-forming rams the construction method that expands CFG stake
CN104196013B (en) A kind of composite Y shape stake and construction method thereof
CN105625302B (en) A kind of variable cross-section strength core enhancing active material composite pile structure and construction method
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN208167716U (en) A kind of geotextiles anti-block water permeable pile driving construction device
CN113293754B (en) Slurry-solidified gravel-soil pile suitable for under-solidified soft soil foundation and reinforcing method
CN103981863B (en) The construction method of a kind of discrete material pile and the upper and lower consubstantiality compound pile of concrete pile
CN212248222U (en) A construction equipment for grouting thin-walled pipe piles
CN108914947A (en) Foundation pit anchor wall draws the construction method of anchor supporting and its supporting construction of drilling tool and formation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810

RJ01 Rejection of invention patent application after publication