CN101787698A - Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof - Google Patents

Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof Download PDF

Info

Publication number
CN101787698A
CN101787698A CN 201010131342 CN201010131342A CN101787698A CN 101787698 A CN101787698 A CN 101787698A CN 201010131342 CN201010131342 CN 201010131342 CN 201010131342 A CN201010131342 A CN 201010131342A CN 101787698 A CN101787698 A CN 101787698A
Authority
CN
China
Prior art keywords
protection tube
concrete pile
corrosion
water proof
corrosion protection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010131342
Other languages
Chinese (zh)
Other versions
CN101787698B (en
Inventor
黄明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi long fine Construction Engineering Co., Ltd.
Original Assignee
SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd filed Critical SHAANXI CHANGJIA INDUSTRY DEVELOPMENT Co Ltd
Priority to CN2010101313429A priority Critical patent/CN101787698B/en
Publication of CN101787698A publication Critical patent/CN101787698A/en
Application granted granted Critical
Publication of CN101787698B publication Critical patent/CN101787698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to an anti-corrosion inclusion bored concrete pile used for saline soil foundations and a construction method thereof. The bored concrete pile comprises a concrete pile body in structure, wherein the inside of the concrete pile body is provided with a reinforcement cage, a flexible, watertight and anticorrosive protection tube is covered on the bottom and periphery of the concrete pile body; and the watertight and anticorrosive protection tube is formed by hot-pressing or welding n layers of polyethylene geotextile bags and n-1 layers of geomembranes, and n is not less than 2. The construction method comprises the following steps: injecting cement mortar between pile holes and the watertight and anticorrosive protection tube, then injecting water in the watertight and anticorrosive protection tube to ensure that the watertight and anticorrosive protection tube expands to the pile hole wall, then injecting concrete paste in the watertight and anticorrosive protection tube, discharging water from the watertight and anticorrosive protection tube by using the concrete paste, and obtaining the bored concrete pile when concrete is set. The invention solves the anticorrosive problem of the concrete pile in saline soil areas, effectively reduces the production cost of the anti-corrosion bored concrete pile and satisfies the strength requirements of projects. The anti-corrosion inclusion bored concrete pile of the invention is applicable to the concrete pile construction with anticorrosive requirements and is especially used in saline soil foundations.

Description

Anti-corrosion inclusion bored concrete pile and job practices thereof that brining ground foundation is used
Technical field
The present invention relates to a kind of cast-in-place concrete pile and job practices thereof.
Background technology
Steel work and concrete are that the builing industry personnel research and develop target in the anticorrosion problem of saline soil area always, and steel and concrete are the main bodys of present various important buildings.The structure of exposing on ground can reach anticorrosion by the various anticorrosive methods of regular brushing, and underground construction is anticorrosion just relatively more difficult.Because member directly contacts with bittern with the salinized soil of deep-etching, can't regularly brush anticorrosive, adopt following two kinds of methods to carry out preservative treatment so people are conventional in the actual engineering:
(1), with the cast-in-place concrete pile of thick walled steel tube parcel and protection, wall thickness is general 〉=10 ㎜.General stake is long at tens meters, 0.5~2.0 meter in stake footpath, and the steel material that this method is used is very big, and cost is very high; These steel are also eroded year by year simultaneously;
(2), adopt anti-corrosion concrete or add the cast-in-place concrete pile of anticorrisive agent material, anticorrisive agent material and anti-corrosion concrete price height, simultaneously concrete intensity reduces and does not reach engine request.
Above two kinds of methods have the cost height of cast-in-place concrete pile, concrete intensity may not satisfy shortcomings such as engine request simultaneously.
And northwest China is distributed with the large tracts of land salt lake, composes here and deposits abundant mineral resources and industrial chemicals, and the large tracts of land that also distributes is unfavorable for the brining ground foundation built.The mineral enterprises here, the industry of chemical enterprise and civilian construction, railway and high-grade highway will be built on these brining ground foundations.The salt marsh distribution area that is rich in bittern is wide, and thickness is big, and the mechanical strength of foundation soil is low, compressibilty is high, and all buildings must adopt artificial foundation or pile foundation; Important building and Rail Highway bridge must adopt the deposited reinforced concrete pile basis.Owing to contain in the brining ground foundation soil building materials such as steel, concrete had the sulfate radical of deep-etching and the bittern of chlorion.Seem particularly urgent so work out a kind of etch-proof pile body of high efficiency, low cost.
Summary of the invention
The purpose of this invention is to provide anti-corrosion inclusion bored concrete pile and job practices thereof that a kind of brining ground foundation is used, solve the preservative treatment cost height that has the saline soil area cast-in-place concrete pile now, the technical problem that might reduce concrete strength; And solve the problem of the concrete job practices of anti-corrosion inclusion bored concrete pile.
For achieving the above object, the present invention adopts following technical scheme:
The anti-corrosion inclusion bored concrete pile that a kind of brining ground foundation is used comprises the concrete pile body, in the concrete pile body reinforcing cage is arranged, and the bottom of described concrete pile body and periphery are surrounded by the water proof anti-corrosion protection tube of a flexibility.
Described water proof anti-corrosion protection tube is by the geotechnique's cloth bag therebetween n-1 layer geomembrane hot pressing of n layers of polyethylene or is welded n 〉=2.
Described geomembrane is polypropylene geomembrane or composite geo-membrane.
The job practices of the anti-corrosion inclusion bored concrete pile that brining ground foundation is used, step is as follows:
Step 1: rig is in place; And grouting pump and slip casting pump line are installed on the ground of stake design attitude, at the stake mouth casing is installed;
Step 2: boring; Adopt holing with slurry wall protection technology by designing requirement construction stake hole;
Step 3: the clear hole of rig; Start grouting pump, the mud in the stake hole is extracted out from the slip casting pump line;
Step 4: discharge pipe is installed; Remove rig, crane gear and slurry pump are installed on the ground around the stake hole, slurry pump is connected with discharge pipe, and discharge pipe is deep into the bottom in a hole;
Step 5: fixed weight, prepare water proof anti-corrosion protection tube down, be connected crane gear and balancing weight are vertical, the bottom of balancing weight with water proof anti-corrosion protection tube is connected;
Step 6: water proof anti-corrosion protection tube is installed; With crane gear balancing weight and water proof anti-corrosion protection tube are slowly put into the stake hole of having bored at the bottom of stake, then the oral area of water proof anti-corrosion protection tube is fixed;
Step 7: water proof anti-corrosion protection tube is expanded in the water filling plasma discharge; On the ground water injecting pump is installed around the stake hole, water injecting pump is connected with water injection pipe, and water injection pipe is deep in the water proof anti-corrosion protection tube in the hole;
Step 8: start water injecting pump, water filling in water proof anti-corrosion protection tube, start slurry pump simultaneously, discharge the outer cement paste that contains bittern of water proof anti-corrosion protection tube, mud has been arranged outside with water proof anti-corrosion protection tube, and the fresh water of filling with in the water proof anti-corrosion protection tube supports water proof anti-corrosion protection tube with till the stake hole wall engages;
Step 9: reinforcing cage is installed; In water proof anti-corrosion protection tube, be lowered to the reinforcing cage of making is installed;
Step 10: tremie is installed, and the fluid concrete pile; In reinforcing cage, put into tremie, concrete perfusion, the concrete that the fresh water in the water proof anti-corrosion protection tube is injected into squeezes;
Step 11: dismantling concrete conduit; After reaching the design elevation on castinplace pile top water proof anti-corrosion protection tube is closed up, wrapped concrete pouring pile head, and the dismantling concrete conduit, anti-corrosion inclusion bored concrete pile just formed after the concrete setting.
Described step 1 king-pile hole is cylindrical, and rig is spiral drilling machine or rotary disk driller.
Described step 2 holing with slurry wall protection technology is that grouting pump is set near rig, grouting pump is connected with rig by the slip casting pump line, along with the rig drill bit pierces ground, grouting pump injects the stake hole by the cement paste that the slip casting pump line will contain bittern, arrives the stake design attitude at the end until the rig drill bit.
In the described step 6, water proof anti-corrosion protection tube fixes on the ground with the oral area fastening devices through the casing upper edge.
The bottom of reinforcing cage is protected at the bottom of being provided with cage in the described step 7.
[0013]Compared with prior art the present invention has following characteristics and beneficial effect:
(1) anti-corrosion protection of cast-in-place concrete pile involved in the present invention is that a water proof anti-corrosion protection tube is set around it, and water proof anti-corrosion protection tube is to be composited n 〉=2 by n layers of polyethylene geotechnique cloth bag therebetween n-1 layer geomembrane; Braided geotextile bag intensity height, to contact frictional resistance big with ground, and the water proof geomembrane has good water proof function.Deep-etching bittern and salinized soil and the isolation of concrete pile body can be reached the purpose that makes pile body not be subjected to corrosiveness fully.
(2) the civil engineering material that adopted of water proof anti-corrosion protection tube involved in the present invention is domestic a large amount of productions, can acid and alkali-resistance in the stratum, not burn into intensity height, water proof, ageing-resistant, and low price, geotechnological cloth bag has ripe processing technology simultaneously.Its cost is 1/5~1/10 of the used anticorrosive cost of other cast-in-place concrete piles according to statistics, reduces construction costs and saves material.
(3) mechanical property of the cast-in-place concrete pile in the anti-corrosion inclusion bored concrete pile that uses of evidence brining ground foundation and the non-corrosive ground is identical.
(4) job practices of the mentioned anti-corrosion inclusion bored concrete pile of the present invention effluxes except that mud at water proof anti-corrosion protection tube, and the construction technology of injecting fresh water in the water proof anti-corrosion protection tube can guarantee that the bittern of deep-etching does not enter in the pile body; Guarantee that water proof geotechnique cloth bag is lowered to a bottom, hole; Guarantee that geotechnological cloth bag engages tightly with the stake hole wall; Guarantee that stake aperture, hole can be lowered to reinforcing cage and be installed to design attitude.Just can effectively stop source of corrosion in the construction stage.
The preservative treatment cost height that the present invention has overcome traditional saline soil area cast-in-place concrete pile might reduce the shortcoming of concrete strength, and solves the problem of the concrete job practices of anti-corrosion inclusion bored concrete pile.
The present invention can be widely used in having in the construction of concrete pile of requirement for anticorrosion, is particularly useful for using in brining ground foundation.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the schematic diagram that reinforcing cage is set during the present invention constructs.
Fig. 2 is the schematic diagram that water injection pipe and discharge pipe are set during the present invention constructs.
Fig. 3 is the schematic diagram of construction sequence one of the present invention.
Fig. 4 is the schematic diagram of construction sequence two of the present invention.
Fig. 5 is the schematic diagram of construction sequence three of the present invention.
Fig. 6 is the schematic diagram of construction sequence four of the present invention.
Fig. 7 is the schematic diagram of construction sequence five of the present invention.
Fig. 8 is the schematic diagram of construction sequence six of the present invention.
Fig. 9 is the schematic diagram of construction sequence seven of the present invention.
Figure 10 is the schematic diagram of construction sequence eight of the present invention.
Figure 11 is the schematic diagram of construction sequence nine of the present invention.
Figure 12 is the schematic diagram of construction sequence ten of the present invention.
Figure 13 is the schematic diagram of construction sequence 11 of the present invention.
Reference numeral: 1-stake hole, 2-water proof anti-corrosion protection tube, 3-reinforcing cage, 4-water injection pipe, 5-discharge pipe, 6-casing, 7-grouting pump, 8-slip casting pump line, 9-slurry pump, 10-rig, 11-crane gear, 12-water injecting pump, 13-balancing weight, 14-concrete pile body, 15-tremie, 16-oral area fastening devices.
The specific embodiment
Embodiment is referring to Fig. 1~shown in Figure 2; the anti-corrosion inclusion bored concrete pile that a kind of brining ground foundation is used; comprise concrete pile body 14, reinforcing cage 3 is arranged in the concrete pile body 14, the bottom of described concrete pile body 14 and periphery are surrounded by the water proof anti-corrosion protection tube 2 of a flexibility.
Described water proof anti-corrosion protection tube 2 is by the geotechnique's cloth bag therebetween n-1 layer geomembrane hot pressing of n layers of polyethylene or is welded n 〉=2.Described geomembrane is polypropylene geomembrane or composite geo-membrane.Polyethylene geotechnique cloth bag can be the woven high-strength geotechnological cloth bag of long filament, woven geotechnological antiseepage cloth bag, woven geosynthetics cloth bag or braided geotextile.Can be two cloth clamps, one films.
Referring to Fig. 3~shown in Figure 13, the construction sequence of above-mentioned anti-corrosion inclusion bored concrete pile is as follows:
As shown in Figure 3, step 1: rig 10 is in place; And grouting pump 7 and slip casting pump line 8 are installed on the ground of stake design attitude, at the stake mouth casing 6 is installed.
As shown in Figure 4, step 2: boring; Adopt holing with slurry wall protection technology by designing requirement construction stake hole 1.
As shown in Figure 5, step 3: the clear hole of rig; Start grouting pump 7, the mud in the stake hole 1 is extracted out from slip casting pump line 8.
As shown in Figure 6, step 4: discharge pipe 5 is installed; Remove rig 10, crane gear 11 and slurry pump 9 are installed on the ground around the stake hole, slurry pump 9 is connected with discharge pipe 5, and discharge pipe 5 is deep into the bottom in a hole 1.
As shown in Figure 7, step 5: fixed weight, prepare water proof anti-corrosion protection tube 2 down, with crane gear 11 and 13 vertical connections of balancing weight, the bottom of balancing weight 13 with water proof anti-corrosion protection tube 2 is connected.
As shown in Figure 8, step 6: water proof anti-corrosion protection tube 2 is installed; With crane gear 11 balancing weight 13 and water proof anti-corrosion protection tube 2 are slowly put into the stake hole 1 of having bored at the bottom of stake, the upper edge of casing 6 is passed through on water proof anti-corrosion protection tube 2 tops, fixes on the ground with oral area fastening devices 16.
As shown in Figure 9, step 7: water proof anti-corrosion protection tube 2 is expanded in the water filling plasma discharge; Water injecting pump 12 is installed on the ground around the stake hole, and water injecting pump 12 is connected with water injection pipe 4, and water injection pipe 4 is deep in the interior water proof anti-corrosion protection tube 2 in a hole 1, and the bottom of reinforcing cage 3 is protected at the bottom of being provided with cage.
As shown in figure 10; step 8: start water injecting pump 12; water filling in water proof anti-corrosion protection tube 2; start slurry pump 9 simultaneously; discharge the cement paste that contains bittern outside the water proof anti-corrosion protection tube 2; mud has been arranged outside with water proof anti-corrosion protection tube 2, and the fresh water of filling with in the water proof anti-corrosion protection tube 2 supports water proof anti-corrosion protection tube 2 with till the stake hole wall engages.
As shown in figure 11, step 9: reinforcing cage 3 is installed; In water proof anti-corrosion protection tube 2, be lowered to the reinforcing cage of making 3 is installed.
As shown in figure 12, step 10: tremie 15 is installed, and the fluid concrete pile; In reinforcing cage 3, put into tremie 15, concrete perfusion, the concrete that the fresh water in the water proof anti-corrosion protection tube 2 is injected into squeezes.
As shown in figure 13, step 11: dismantling concrete conduit 15; After reaching the design elevation on castinplace pile top water proof anti-corrosion protection tube 2 is closed up, wrapped concrete pouring pile head, and dismantling concrete conduit 15, anti-corrosion inclusion bored concrete pile just formed after the concrete setting.
Described step 1 king-pile hole 1 is cylindrical, and rig 10 is spiral drilling machine or rotary disk driller.
Described step 2 holing with slurry wall protection technology is that grouting pump 7 is set near rig, grouting pump 7 is connected with rig 10 by slip casting pump line 8, along with the rig drill bit pierces ground, grouting pump 7 injects stake hole 1 by the cement paste that slip casting pump line 8 will contain bittern, arrives the stake design attitude at the end until the rig drill bit.
More than be an exemplary embodiments of the present invention, enforcement of the present invention more than that.

Claims (8)

1. the anti-corrosion inclusion bored concrete pile used of a brining ground foundation; comprise concrete pile body (14); reinforcing cage (3) is arranged in the concrete pile body (14), it is characterized in that: the water proof anti-corrosion protection tube (2) that is surrounded by a flexibility in the bottom and the periphery of described concrete pile body (14).
2. the anti-corrosion inclusion bored concrete pile that brining ground foundation according to claim 1 is used is characterized in that: described water proof anti-corrosion protection tube (2) is by the geotechnique's cloth bag therebetween n-1 layer geomembrane hot pressing of n layers of polyethylene or is welded n 〉=2.
3. the anti-corrosion inclusion bored concrete pile that brining ground foundation according to claim 2 is used, it is characterized in that: described geomembrane is polypropylene geomembrane or composite geo-membrane.
4. the job practices of the anti-corrosion inclusion bored concrete pile that brining ground foundation according to claim 1 is used, it is characterized in that: step is as follows:
Step 1: rig (10) is in place; And grouting pump (7) and slip casting pump line (8) are installed on the ground of stake design attitude, at the stake mouth casing (6) is installed;
Step 2: boring; Adopt holing with slurry wall protection technology by designing requirement construction stake hole (1);
Step 3: the clear hole of rig; Start grouting pump (7), the mud in the stake hole (1) is extracted out from slip casting pump line (8);
Step 4: discharge pipe (5) is installed; Remove rig (10), on the ground crane gear (11) and slurry pump (9) are installed around the stake hole, slurry pump (9) is connected with discharge pipe (5), and discharge pipe (5) is deep into the bottom of a hole (1);
Step 5: fixed weight, prepare water proof anti-corrosion protection tube (2) down, with crane gear (11) and vertical connection of balancing weight (13), the bottom of balancing weight (13) with water proof anti-corrosion protection tube (2) is connected;
Step 6: water proof anti-corrosion protection tube (2) is installed; With crane gear (11) balancing weight (13) and water proof anti-corrosion protection tube (2) are slowly put into the stake hole (1) of having bored at the bottom of stake, the top of water proof anti-corrosion protection tube (2) is fixed; Step 7: water proof anti-corrosion protection tube (2) is expanded in the water filling plasma discharge; On the ground water injecting pump (12) is installed around the stake hole, water injecting pump (12) is connected with water injection pipe (4), and water injection pipe (4) is deep in the interior water proof anti-corrosion protection tube (2) in a hole (1);
Step 8: start water injecting pump (12), water filling in water proof anti-corrosion protection tube (2), start slurry pump (9) simultaneously, discharge the outer cement paste that contains bittern of water proof anti-corrosion protection tube (2), mud has been arranged outside with water proof anti-corrosion protection tube (2), and the fresh water of filling with in the water proof anti-corrosion protection tube (2) supports water proof anti-corrosion protection tube (2) with till the stake hole wall engages;
Step 9: reinforcing cage (3) is installed; In water proof anti-corrosion protection tube (2), be lowered to the reinforcing cage of making (3) is installed;
Step 10: tremie (15) is installed, and the fluid concrete pile; In reinforcing cage (3), put into tremie (15), concrete perfusion, the concrete that the fresh water in the water proof anti-corrosion protection tube (2) is injected into squeezes;
Step 11: dismantling concrete conduit (15); After reaching the design elevation on castinplace pile top water proof anti-corrosion protection tube (2) is closed up, wrapped concrete pouring pile head, and dismantling concrete conduit (15), anti-corrosion inclusion bored concrete pile just formed after the concrete setting.
5. the job practices of the anti-corrosion inclusion bored concrete pile that brining ground foundation according to claim 4 is used is characterized in that: described step 1 king-pile hole (1) is for cylindrical, and rig (10) is spiral drilling machine or rotary disk driller.
6. the job practices of the anti-corrosion inclusion bored concrete pile that brining ground foundation according to claim 4 is used, it is characterized in that: described step 2 holing with slurry wall protection technology is that grouting pump (7) is set near rig, grouting pump (7) is connected with rig (10) by slip casting pump line (8), along with the rig drill bit pierces ground, grouting pump (7) injects stake hole (1) by the cement paste that slip casting pump line (8) will contain bittern, arrives the stake design attitude at the end until the rig drill bit.
7. the job practices of the anti-corrosion inclusion bored concrete pile of using according to the described brining ground foundation of claim 4; it is characterized in that: in the described step 6; the upper edge of casing (6) is walked around on the top of water proof anti-corrosion protection tube (2), water proof anti-corrosion protection tube (2) is fixed on the ground with oral area fastening devices (16).
8. the job practices of the anti-corrosion inclusion bored concrete pile of using according to the described brining ground foundation of claim 4 is characterized in that: the bottom of reinforcing cage in the described step 7 (3) is provided with protection at the bottom of the cage.
CN2010101313429A 2010-03-24 2010-03-24 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof Active CN101787698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101313429A CN101787698B (en) 2010-03-24 2010-03-24 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101313429A CN101787698B (en) 2010-03-24 2010-03-24 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof

Publications (2)

Publication Number Publication Date
CN101787698A true CN101787698A (en) 2010-07-28
CN101787698B CN101787698B (en) 2011-08-03

Family

ID=42531065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101313429A Active CN101787698B (en) 2010-03-24 2010-03-24 Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof

Country Status (1)

Country Link
CN (1) CN101787698B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN103195057A (en) * 2013-03-27 2013-07-10 天津市市政工程设计研究院 Bridge substructure capable of preventing corrosion of high-concentration salt solution and construction method thereof
CN103603340A (en) * 2013-12-06 2014-02-26 中冶建工集团有限公司 Rotary drilling and pile filling construction method capable of preventing hole collapse through flexible protection
CN103953036A (en) * 2014-04-14 2014-07-30 国家电网公司 Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN103967006A (en) * 2014-04-16 2014-08-06 青岛理工大学 Prefabricated sleeve and cast-in-place pile combination used for highly-corrosive environment and construction method thereof
CN106320388A (en) * 2016-08-22 2017-01-11 中铁第勘察设计院集团有限公司 Construction process and method for erosion-resistant protective layer of concrete foundation in salty soil zone
CN106801416A (en) * 2017-02-09 2017-06-06 成都启立辰智科技有限公司 A kind of building pile structure
CN106958422A (en) * 2017-04-14 2017-07-18 河南省煤田地质局队 A kind of drill bit and boring method of sylvite ore drilling operation
CN113502841A (en) * 2021-08-17 2021-10-15 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6136418A (en) * 1984-07-27 1986-02-21 Nippon Kokan Kk <Nkk> Method of forming cast-in-place steel pipe concrete pile
JPS621923A (en) * 1985-06-27 1987-01-07 Tousen Asano Paul Kk Concrete pile and its manufacture
CN2104880U (en) * 1991-04-01 1992-05-20 顾尧章 Pile made of sand and crushed stone
CN101148874A (en) * 2007-10-11 2008-03-26 李树源 Construction method for increasing dry auger boring pouring pile bearing capacity
CN101343874A (en) * 2007-07-13 2009-01-14 陕西长嘉实业发展有限公司 Wrapping pile

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6136418A (en) * 1984-07-27 1986-02-21 Nippon Kokan Kk <Nkk> Method of forming cast-in-place steel pipe concrete pile
JPS621923A (en) * 1985-06-27 1987-01-07 Tousen Asano Paul Kk Concrete pile and its manufacture
CN2104880U (en) * 1991-04-01 1992-05-20 顾尧章 Pile made of sand and crushed stone
CN101343874A (en) * 2007-07-13 2009-01-14 陕西长嘉实业发展有限公司 Wrapping pile
CN101148874A (en) * 2007-10-11 2008-03-26 李树源 Construction method for increasing dry auger boring pouring pile bearing capacity

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《齐鲁石油化工》 20040830 王辉等 土工膜及其发展趋势 第199~202页 2 第32卷, 第03期 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942829B (en) * 2010-09-28 2011-10-19 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN101942829A (en) * 2010-09-28 2011-01-12 陕西长嘉实业发展有限公司 Implantable corrosion-proof preformed pile for use in salt oil foundation and construction method thereof
CN103195057B (en) * 2013-03-27 2015-04-22 天津市市政工程设计研究院 Bridge substructure capable of preventing corrosion of high-concentration salt solution and construction method thereof
CN103195057A (en) * 2013-03-27 2013-07-10 天津市市政工程设计研究院 Bridge substructure capable of preventing corrosion of high-concentration salt solution and construction method thereof
CN103603340A (en) * 2013-12-06 2014-02-26 中冶建工集团有限公司 Rotary drilling and pile filling construction method capable of preventing hole collapse through flexible protection
CN103603340B (en) * 2013-12-06 2016-03-09 中冶建工集团有限公司 Flexible protective prevents the spiral-digging pore cast-in-place pile construction method of collapse hole
CN103953036A (en) * 2014-04-14 2014-07-30 国家电网公司 Construction method of anticorrosion protective sleeve for pipe connection of offshore saline soil electric transmission line pile foundation
CN103953036B (en) * 2014-04-14 2016-01-20 国家电网公司 The anticorrosion sheath construction method of a kind of beach salty soil transmission line of electricity pile foundation pile extension
CN103967006A (en) * 2014-04-16 2014-08-06 青岛理工大学 Prefabricated sleeve and cast-in-place pile combination used for highly-corrosive environment and construction method thereof
CN106320388A (en) * 2016-08-22 2017-01-11 中铁第勘察设计院集团有限公司 Construction process and method for erosion-resistant protective layer of concrete foundation in salty soil zone
CN106320388B (en) * 2016-08-22 2018-05-01 中铁第一勘察设计院集团有限公司 Saline soil area concrete foundation LP blades protective layer construction technology and engineering method
CN106801416A (en) * 2017-02-09 2017-06-06 成都启立辰智科技有限公司 A kind of building pile structure
CN106958422A (en) * 2017-04-14 2017-07-18 河南省煤田地质局队 A kind of drill bit and boring method of sylvite ore drilling operation
CN113502841A (en) * 2021-08-17 2021-10-15 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile
CN113502841B (en) * 2021-08-17 2023-01-20 中铁二院工程集团有限责任公司 Integral cast-in-place construction method of bearing platform pile

Also Published As

Publication number Publication date
CN101787698B (en) 2011-08-03

Similar Documents

Publication Publication Date Title
CN101787698B (en) Anti-corrosion inclusion bored concrete pile used for saline soil foundation and construction method thereof
CN101614020B (en) Flexible bladder type anticorrosion device, anticorrosion pile and construction method using same
CN103422501B (en) Anti-floating anchor rod structure in sand seam geology and construction method thereof
CN202509532U (en) Multi-rib tension type anti-floating anchor
CN203846485U (en) Long pile percussion drill hole forming construction device
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN110409510A (en) A kind of interlocking pile and ground-connecting-wall seam crossing water sealing structure
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN110984221A (en) Construction method for reinforcing end socket at initial end of air shaft and guide wall structure
CN201520987U (en) Flexible bag-type corrosion prevention device and anti-corrosion pile using same
CN110409511A (en) A kind of interlocking pile and ground-connecting-wall seam crossing water-stopping method
CN104164895A (en) Basement generating no water buoyant force
CN117107749A (en) Construction method of large-diameter punched bored pile under influence of sea water seepage in sea-filling land-building area
CN101153491A (en) Borehole wall-protection back cover and method for manufacturing large diameter hollow concrete pile
CN101787696B (en) Pile filling technology of large-diameter bagged concrete
CN101603311A (en) The adopting heavy hammer-tamping compaction soil preformed hole jet grouting pile construction method
CN211171995U (en) Cold joint treatment structure for secant pile construction
CN209816867U (en) A supporting construction for peripheral foundation ditch of existing building
CN208668190U (en) A kind of quick prosthetic appliance of town road
CN103711115A (en) Foundation reinforcement and connector combination of integral floating water taking head and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160505

Address after: The 710001 Shaanxi Road, Beilin District Xi'an City, No. 88 Xinxing Hotel, room 711

Patentee after: Shaanxi long fine Construction Engineering Co., Ltd.

Address before: Ten in 710038 in Shaanxi province Xi'an City Shop No. 1 Bangzi

Patentee before: Shaanxi Changjia Industry Development Co., Ltd.