CN101294388B - 用于超大面积深基坑的支撑局部早拆施工方法 - Google Patents

用于超大面积深基坑的支撑局部早拆施工方法 Download PDF

Info

Publication number
CN101294388B
CN101294388B CN200710040061A CN200710040061A CN101294388B CN 101294388 B CN101294388 B CN 101294388B CN 200710040061 A CN200710040061 A CN 200710040061A CN 200710040061 A CN200710040061 A CN 200710040061A CN 101294388 B CN101294388 B CN 101294388B
Authority
CN
China
Prior art keywords
support
early
super large
construction
dismount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200710040061A
Other languages
English (en)
Other versions
CN101294388A (zh
Inventor
毛子成
张翼德
丁利峰
熊玎玮
朱煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai No5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No5 Construction Co Ltd filed Critical Shanghai No5 Construction Co Ltd
Priority to CN200710040061A priority Critical patent/CN101294388B/zh
Publication of CN101294388A publication Critical patent/CN101294388A/zh
Application granted granted Critical
Publication of CN101294388B publication Critical patent/CN101294388B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明属于建筑施工技术领域,公开了一种用于超大面积深基坑的支撑局部早拆施工方法,包括如下步骤:(1)根据高层部分施工区域确定影响高层施工的具体地第一道水平钢支撑,将其作为需拆除对象;(2)在基础底板完成后,在需要拆除的水平支撑处的下方设置抛撑;(3)抛撑施加预应力后,拆除步骤(1)中需要拆除的相关第一道水平钢支撑。采用本发明施工方法可以均衡地下工程施工生产、节约资源、降低消耗的用于超大面积深基坑的支撑局部早拆施工方法,为按时或提前完成工期打下良好基础,为大面积深基坑局部高层的提前施工提供了可能。

Description

用于超大面积深基坑的支撑局部早拆施工方法
技术领域
本发明属于建筑施工技术领域,涉及一种施工方法,特别是用于超大面积深基坑的支撑局部早拆施工方法。
背景技术
目前,在建筑领域,经常遇到因地下结构的不同而需要分别施工的建筑,比较常见的建筑地下结构为地下车库与高层建筑地下室相结合,高层地下室必须在基坑第一道支撑拆除后才能施工,由于地下车库的建筑面积较大,从挖土到车库地下结构完成将花费相当长时间,势必影响高层建筑部分的施工进度。因此如何即能满足地下车库的正常施工,又能使大面积深基坑局部高层的提前施工,按时完成施工进度,成为本领域技术人员迫切需要解决的技术难题。
发明内容
本发明的目的在于提供一种可以均衡地下工程施工生产、节约资源、降低消耗的用于超大面积深基坑的支撑局部早拆施工方法,以满足建筑结构施工需要,按时完成施工进度。
本发明解决技术问题的技术方案如下:
一种用于超大面积深基坑的支撑局部早拆施工方法,其特征在于,包括如下步骤:
(1)、根据高层部分施工区域确定影响高层施工的具体地第一道水平钢支撑,将其作为需拆除对象;
(2)、在基础底板完成后,在需要拆除的水平支撑处的下方设置抛撑;
(3)、抛撑施加预应力后,拆除步骤(1)中需要拆除的相关第一道水平钢支撑。
由以上公开的技术方案可知,本发明根据基坑结构特点,通过对钢支撑的布置进行分析,对影响高层施工的高层部分钢支撑局部进行早拆,同时在相应的钢支撑下方设置抛撑,以满足基坑支撑需要,并保证高层施工进度,使其施工进度不受地下车库施工的影响。本发明为按时或提前完成工期打下良好基础,同时由于工期的节省大大降低了施工管理费用,也降低了高层建筑的施工周期,实现更为均衡的生产,避免了大量人力物力抢地下车库结构的现象,大大降低了施工组织的难度,使生产组织更加合理科学,从而降低管理成本和施工成本。
本发明为大面积深基坑局部高层的提前施工提供了可能。
具体实施方式
下面进一步详细说明本发明的具体实施方式。
本发明用于超大面积深基坑的支撑局部早拆施工方法,包括如下步骤:
(1)、根据高层部分施工区域确定影响高层施工的具体地第一道水平钢支撑,将其作为需拆除对象;
(2)、在基础底板完成后,在需要拆除的水平支撑处的下方设置抛撑,抛撑一端设置在混凝土围檩的预埋件上,一端设置在基础底板的钢筋临时支墩上;抛撑安装时,在钢筋临时支墩上设置安装活络头,单根抛撑安装后及时施加预应力,所述抛撑施加预应力采用活络头施加,分一次施加预应力,每根抛撑,所述抛撑安装施工时与压顶圈梁预先设置的预埋铁接触斜面使用型钢开斜面过度,型钢与预埋铁接触面满焊连接,同时考虑到单根抛撑长度较长,为加强抛撑的稳定性,抛撑安装完毕后利用槽钢将抛撑与相临的钢立柱连接牢固;
(3)、抛撑施加预应力后,拆除步骤(1)中需要拆除的相关第一道水平钢支撑。
所述抛撑为单管支撑,相邻抛撑间距为4~6m。

Claims (6)

1.一种用于超大面积深基坑的支撑局部早拆施工方法,其特征在于,包括如下步骤:
(1)、根据高层部分施工区域确定影响高层施工的具体的第一道水平钢支撑,将其作为需拆除对象;
(2)、在基础底板完成后,在需要拆除的水平支撑处的下方设置抛撑;
(3)、抛撑施加预应力后,拆除步骤(1)中需要拆除的相关第一道水平钢支撑。
2.如权利要求1所述的用于超大面积深基坑的支撑局部早拆施工方法,其特征在于,所述的步骤(2)中抛撑一端设置在混凝土围檩的预埋件上,一端设置在基础底板的钢筋临时支墩上。
3.如权利要求2所述的用于超大面积深基坑的支撑局部早拆施工方法,其特征在于,抛撑安装时,在钢筋临时支墩上设置安装活络头,单根抛撑安装后及时施加预应力。
4.如权利要求3所述的用于超大面积深基坑的支撑局部早拆施工方法,其特征在于,所述抛撑施加预应力采用活络头施加,分一次施加预应力。
5.如权利要求1所述的用于超大面积深基坑的支撑局部早拆施工方法,所述抛撑为单管支撑,相邻抛撑间距为4~6m。
6.如权利要求1所述的用于超大面积深基坑的支撑局部早拆施工方法,所述抛撑安装施工时与压顶圈梁预先设置的预埋铁接触斜面使用型钢开斜面过渡,型钢与预埋铁接触面满焊连接。
CN200710040061A 2007-04-27 2007-04-27 用于超大面积深基坑的支撑局部早拆施工方法 Active CN101294388B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710040061A CN101294388B (zh) 2007-04-27 2007-04-27 用于超大面积深基坑的支撑局部早拆施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710040061A CN101294388B (zh) 2007-04-27 2007-04-27 用于超大面积深基坑的支撑局部早拆施工方法

Publications (2)

Publication Number Publication Date
CN101294388A CN101294388A (zh) 2008-10-29
CN101294388B true CN101294388B (zh) 2010-05-19

Family

ID=40064899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710040061A Active CN101294388B (zh) 2007-04-27 2007-04-27 用于超大面积深基坑的支撑局部早拆施工方法

Country Status (1)

Country Link
CN (1) CN101294388B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161168B (zh) * 2013-02-22 2015-06-17 东通岩土科技(杭州)有限公司 一种可拆卸预应力支撑架系统
CN103603359A (zh) * 2013-11-14 2014-02-26 明业建设集团有限公司 一种深基坑斜撑支护结构拆除方法
CN106592599B (zh) * 2016-11-29 2020-03-27 上海市基础工程集团有限公司 快速控制基坑位移装置及施工方法
CN107761740A (zh) * 2017-12-04 2018-03-06 中铁十局集团城市轨道交通工程有限公司 一种基坑中横撑换斜撑的施工方法及斜撑结构
CN110158609B (zh) * 2019-05-28 2020-07-31 中铁十一局集团城市轨道工程有限公司 一种基坑内钢筋混凝土支撑梁的机械化破碎拆除方法
CN112609702B (zh) * 2020-12-01 2022-06-28 中国建筑第八工程局有限公司 早拆围护体系及其施工方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2254417C1 (ru) * 2003-12-15 2005-06-20 Басиев Асхар Николаевич Способ крепления ограждений котлованов и распорная система ограждения котлованов для этого способа

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2254417C1 (ru) * 2003-12-15 2005-06-20 Басиев Асхар Николаевич Способ крепления ограждений котлованов и распорная система ограждения котлованов для этого способа

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
杜有亮等.大空间深基坑钢混联合支撑体系施工工法.天津建设科技2006年 4.2006,2006年(4),22-27.
杜有亮等.大空间深基坑钢混联合支撑体系施工工法.天津建设科技2006年 4.2006,2006年(4),22-27. *
董力等.软土深基坑工程开挖与支撑施工技术.西部探矿工程11 S1.1999,11(S1),1,2,5.
董力等.软土深基坑工程开挖与支撑施工技术.西部探矿工程11 S1.1999,11(S1),1,2,5. *

Also Published As

Publication number Publication date
CN101294388A (zh) 2008-10-29

Similar Documents

Publication Publication Date Title
CN101294388B (zh) 用于超大面积深基坑的支撑局部早拆施工方法
CN103437567B (zh) 利用原有桩基础支撑既有建筑地下增层的方法
CN201546227U (zh) 用于支撑基坑围护桩墙和地下室结构外墙的钢支撑梁
CN102182325A (zh) 一种框架结构独立基础既有建筑物地下室增层方法
CN104563130B (zh) 一种十字型围护桩以及围护结构兼做主体结构的施工方法
CN104452812A (zh) 地下室外墙的施工方法
CN103912000A (zh) 可重复使用的复合材料土钉墙支护面板及其施工方法
CN201296994Y (zh) 多功能预制拱片
CN106245642A (zh) 一种预应力混凝土管桩基础及其施工方法
CN103924793A (zh) 老旧住宅加固结构及其加固方法
CN201794161U (zh) 现浇加腋梁的预制整浇房屋结构体系
CN114016552A (zh) 一种地下室顶板沉降后浇带预封闭施工方法
CN105297766A (zh) 可更换式预应力锚栓风机基础
CN102926408B (zh) 一种基础隔震结构及其托换处理方法
CN107100322B (zh) 后张法竖向预应力现浇混凝土柱结构及施工方法
CN101906775A (zh) 多功能预制拱片
CN112681340A (zh) 大面积深基坑分区施工斜抛撑支护装置及其施工方法
CN211115052U (zh) 一种井筒式地下立体车库结构
CN105019645A (zh) 逆作法中取土口处构建混凝土结构的模板系统及施工方法
CN104047381B (zh) 装配整体式少筋混凝土剪力墙结构
CN106088762B (zh) 一种插槽式外包钢板预制装配式圆形地下粮仓
CN215406639U (zh) 一种顶板回填土提前施工用后浇带预处理的预制钢板结构
CN201794215U (zh) 一种先张法预应力钢筋砼预制梁
CN213016369U (zh) 预埋钢板抗横椭圆变形盾构隧道加固结构
CN204703191U (zh) 一种兼做结构外墙的预制桩与顶板节点连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CONSTRUCTION NO.5 GROUP CO., LTD.

Free format text: FORMER NAME: SHANGHAI NO.5 BUILDING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200062 1000 Cao Yang Road, Shanghai

Patentee after: Shanghai Construction NO.5 (Group) Co., Ltd.

Address before: 200062 1000 Cao Yang Road, Shanghai

Patentee before: Shanghai No.5 Construction Co., Ltd.