CN105297766A - 可更换式预应力锚栓风机基础 - Google Patents
可更换式预应力锚栓风机基础 Download PDFInfo
- Publication number
- CN105297766A CN105297766A CN201510801296.1A CN201510801296A CN105297766A CN 105297766 A CN105297766 A CN 105297766A CN 201510801296 A CN201510801296 A CN 201510801296A CN 105297766 A CN105297766 A CN 105297766A
- Authority
- CN
- China
- Prior art keywords
- foundation
- bolt
- draught fan
- concrete
- anchor bolts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007789 sealing Methods 0.000 claims description 5
- 238000007906 compression Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000003487 anti-permeability effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 239000010949 copper Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Wind Motors (AREA)
Abstract
本发明公开了一种可更换式预应力锚栓风机基础,它包括混凝土基础、风机塔筒和预应力锚栓,其特征在于还包括:在混凝土基础与预应力锚栓中间以梁柱体系构成的操作井;分别与预应力锚栓上下面固定连接的上下法兰盘,上法兰盘的上面与风机塔筒固定连接;操作井的延伸至下法兰盘下方构成的换盘操作空间。解决了锚栓不可更换的问题,使锚栓因各种原因出现断裂后可及时更换新锚栓,保证风机正常、安全、稳定运行;可进一步推广锚栓式风机基础在我国乃至世界风电行业中的应用。
Description
技术领域
本发明涉及一种建筑物基础,尤其是风力发电机基础。
背景技术
当前我国风力发电机基础主要采用扩展式混凝土基础,通过在基础中预埋钢结构基础环再与风机塔筒连接,这种连接形式在风机运行一段时间后,基础环容易出现松动,影响风机安全稳定运行。为避免基础环式风机基础这种缺陷,近几年,又出现一种采用预应力锚栓连接风机塔筒的基础形式,该基础与风机塔筒的连接具有锚固可靠、施工速度快的优点,缺点是锚栓如果断裂,将不可更换或更换的代价较高,这个缺点制约了该基础形式在我国风力发电业上的使用和推广。
发明内容
本发明的目的是提供一种锚固可靠、施工速度快、可更换和更换成本低的可更换式预应力锚栓风机基础。
为达上述目的,本发明的技术方案为:
一种可更换式预应力锚栓风机基础,它包括混凝土基础与预应力锚栓,其特征在于还包括:
设在混凝土基础与预应力锚栓中心区域的操作井;
分别与预应力锚栓上下面固定连接的上下法兰盘,上法兰盘的上面与风机塔筒固定连接;
操作井的延伸至下法兰盘下方构成的换锚栓操作空间。
在操作井和混凝土基础底面与混凝土基础垫层之间,设有用于防水的止水片。
所述的操作井中间设有与在混凝土基础连接的十字形混凝土梁柱。
在所述的操作井中设有进人通道。
以上结构的可更换式预应力锚栓风机基础更换断裂锚栓的步骤如下:
1、断裂点以上部分可在基础顶面从锚栓套管中直接拔出;
2、断裂点以下部分,理论上锚栓会掉落至下法兰下方的操作空间,如果不自己掉落,则通过采用千斤顶辅助,将该段锚栓支顶掉落;
3、由于下法兰下方的操作空间较矮,有可能远比断裂锚栓下节的长度短,则可利用气焰割枪将出露的锚栓割断;
4、重复步骤2和3,直到断裂点以下锚栓全部取出为止;
5、在基础顶面将新锚栓从原套管中伸入至基础底面,安装新锚栓好底部与下法兰的紧固螺母;
6、从基础顶面对新锚栓施加预应力,达到设计值后,安装基础顶部新锚栓与上法兰的紧固螺母;
7、恢复基础顶面的相关保护设施。
本发明可更换式预应力锚栓风机基础的优点为:
1、更换断裂锚栓,对原有风机基础的扰动和影响很小,不破坏锚栓和风机基础的其它结构;
2、更换断裂锚栓操作简单容易、施工时间短,甚至不耽误风机的正常运行,保证风电场的运行时间;
3、更换成本费用低,降低风机基础的运行维护成本;
4、促进锚栓式风机基础在我国乃至世界风电行业中的应用。
附图说明
图1是本发明的主视结构示意图;
图2是图1沿A-A线剖视的结构示意图;
在图中,混凝土基础1,混凝土梁柱2,进人通道3,风机塔筒4,上法兰盘5,止水片6,换锚栓操作空间7,下法兰盘8,混凝土基础垫层9,预应力锚栓10。
具体实施方式
下面结合附图,对本发明作进一步说明。
图1所示,是本发明的主视结构示意图,它包括圆形混凝土基础1、十字形混凝土梁柱2、进人通道3、风机塔筒4和上法兰盘5;其中,进人通道3设置于混凝土梁柱2构成的操作井上,操作井中间设有与在混凝土基础1连接的十字形混凝土梁柱;上法兰盘5的上面与风机塔筒4的下面固定连接。图2是图1沿A-A线剖视的结构示意图,结合图2一起来看,预应力锚栓10预埋在混凝土基础1中;预应力锚栓10包括设在其外侧的套管,预应力锚栓10可在套管中活动。预应力锚栓10的上下面分别与上法兰盘5、下法兰盘8固定连接。在下法兰盘8的下方有操作井延伸至下法兰盘下方的换锚栓操作空间7,用于当锚栓断裂后,人通过进人通道3进入到换盘操作空间7。对于断裂的预应力锚栓下段用气焰割枪割断后逐段取出,直到预应力锚栓下段全部取出。新预应力锚栓从套管中插入,先安装底部螺母,在基础顶面施加完预应力后再安装顶部螺母,完成预应力锚栓的更换。
由于混凝土基础1、梁柱体系2和预应力锚栓10都埋置在地面以下,操作井底部容易出现渗水,影响预应力锚栓的防腐及更换,在操作井底部设置具有一层抗渗性能的混凝土基础垫层9,同时在混凝土基础1及其底部混凝土垫层9之间设置止水片6。所述的止水片6根据场地地下水的情况可采用橡胶、铜片或镀锌铁片。
为改善基础底面预应力锚栓法兰周边受力,在不影响预应力锚栓更换操作空间的前提下,在操作井中部设置一改善基础底面受力的梁柱体系。由于设置了操作井及操作空间7,减小了基础受力面积,使得操作空间7周边的基础及垫层混凝土压应力较大。如果上部结构传递过来的荷载较大,局部压应力超过混凝土抗压承载力,混凝土将出现受压破坏,影响基础结构安全,增设梁柱体系后,可将一部分上部结构荷载由混凝土基础转移至梁柱体系,再传递至地基,可改善操作空间7的局部应力集中及整个基础受力。如果上部结构传递过来的荷载较小,操作空间7周边的基础及垫层混凝土压应力在混凝土受压承载力范围之内,则可取消该梁柱体系,既可减少混凝土工程量和工程投资,也可加快工程施工进度,同时也为后期锚栓更换留下更大的操作空间。
Claims (4)
1.一种可更换式预应力锚栓风机基础它包括混凝土基础、风机塔筒和预应力锚栓,其特征在于还包括:
设在混凝土基础与预应力锚栓中心区域的操作井;
分别与预应力锚栓上下面固定连接的上下法兰盘,上法兰盘的上面与风机塔筒固定连接;
操作井的延伸至下法兰盘下方构成的换锚栓操作空间。
2.根据权利要求1所述的风机基础,其特征在于:
在操作井和混凝土基础底面与混凝土基础垫层之间,设有用于防水的止水片。
3.根据权利要求1所述的风机基础,其特征在于:
所述的操作井中间设有与在混凝土基础连接的十字形混凝土梁柱(取决于基础受力)。
4.根据权利要求1所述的风机基础,其特征在于:
在所述的操作井中设有进人通道。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510801296.1A CN105297766A (zh) | 2015-11-19 | 2015-11-19 | 可更换式预应力锚栓风机基础 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510801296.1A CN105297766A (zh) | 2015-11-19 | 2015-11-19 | 可更换式预应力锚栓风机基础 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN105297766A true CN105297766A (zh) | 2016-02-03 |
Family
ID=55195528
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510801296.1A Pending CN105297766A (zh) | 2015-11-19 | 2015-11-19 | 可更换式预应力锚栓风机基础 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105297766A (zh) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106049522A (zh) * | 2016-07-01 | 2016-10-26 | 瑞风能源(武汉)工程技术有限公司 | 一种中空的风力发电塔基础 |
| CN106523296A (zh) * | 2016-12-30 | 2017-03-22 | 北京金风科创风电设备有限公司 | 桁架式塔架及包括该桁架式塔架的风力发电机组 |
| CN106592622A (zh) * | 2016-12-19 | 2017-04-26 | 长安大学 | 一种基于环形砼带竖向预应力的风机基础结构 |
| EP3312416A1 (en) * | 2016-10-24 | 2018-04-25 | Acciona Windpower, S.A. | Wind turbine foundation |
| CN108397356A (zh) * | 2018-03-23 | 2018-08-14 | 健安诚(内蒙古)新能源科技有限公司 | 智能可更换锚栓的风机基础及智能取杆机器人 |
| CN113089738A (zh) * | 2021-03-30 | 2021-07-09 | 中国电建集团成都勘测设计研究院有限公司 | 己安装风机塔筒预应力锚栓基础的修复方法 |
| CN113123377A (zh) * | 2021-05-12 | 2021-07-16 | 中国十五冶金建设集团有限公司 | 一种开挖巷道更换风力发电机基础锚板螺栓的方法 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101063509A (zh) * | 2006-04-30 | 2007-10-31 | 通用电气公司 | 塔连接装置、生产塔基的方法和塔基 |
| US20100146890A1 (en) * | 2008-12-16 | 2010-06-17 | Vestas Wind Systems A/S | Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts |
| CN203452985U (zh) * | 2013-07-25 | 2014-02-26 | 北京金风科创风电设备有限公司 | 风力发电机组的锚栓式基础 |
| CN203783828U (zh) * | 2014-04-18 | 2014-08-20 | 北京金风科创风电设备有限公司 | 风力发电机组的塔架基础 |
| CN203925895U (zh) * | 2014-07-07 | 2014-11-05 | 闵怡红 | 用于风力发电塔的锚栓可更换式基础 |
| CN105002924A (zh) * | 2015-08-03 | 2015-10-28 | 瑞风能源(武汉)工程技术有限公司 | 一种空心地锚笼基础 |
| CN205205849U (zh) * | 2015-11-19 | 2016-05-04 | 中国能源建设集团广西电力设计研究院有限公司 | 可更换式预应力锚栓风机基础 |
-
2015
- 2015-11-19 CN CN201510801296.1A patent/CN105297766A/zh active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101063509A (zh) * | 2006-04-30 | 2007-10-31 | 通用电气公司 | 塔连接装置、生产塔基的方法和塔基 |
| US20100146890A1 (en) * | 2008-12-16 | 2010-06-17 | Vestas Wind Systems A/S | Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts |
| CN203452985U (zh) * | 2013-07-25 | 2014-02-26 | 北京金风科创风电设备有限公司 | 风力发电机组的锚栓式基础 |
| CN203783828U (zh) * | 2014-04-18 | 2014-08-20 | 北京金风科创风电设备有限公司 | 风力发电机组的塔架基础 |
| CN203925895U (zh) * | 2014-07-07 | 2014-11-05 | 闵怡红 | 用于风力发电塔的锚栓可更换式基础 |
| CN105002924A (zh) * | 2015-08-03 | 2015-10-28 | 瑞风能源(武汉)工程技术有限公司 | 一种空心地锚笼基础 |
| CN205205849U (zh) * | 2015-11-19 | 2016-05-04 | 中国能源建设集团广西电力设计研究院有限公司 | 可更换式预应力锚栓风机基础 |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106049522A (zh) * | 2016-07-01 | 2016-10-26 | 瑞风能源(武汉)工程技术有限公司 | 一种中空的风力发电塔基础 |
| EP3312416A1 (en) * | 2016-10-24 | 2018-04-25 | Acciona Windpower, S.A. | Wind turbine foundation |
| US20180112371A1 (en) * | 2016-10-24 | 2018-04-26 | Acciona Windpower, S.A. | Wind Turbine Foundation |
| US10941536B2 (en) * | 2016-10-24 | 2021-03-09 | Acciona Windpower, S.A. | Wind turbine foundation |
| CN106592622A (zh) * | 2016-12-19 | 2017-04-26 | 长安大学 | 一种基于环形砼带竖向预应力的风机基础结构 |
| CN106523296A (zh) * | 2016-12-30 | 2017-03-22 | 北京金风科创风电设备有限公司 | 桁架式塔架及包括该桁架式塔架的风力发电机组 |
| CN108397356A (zh) * | 2018-03-23 | 2018-08-14 | 健安诚(内蒙古)新能源科技有限公司 | 智能可更换锚栓的风机基础及智能取杆机器人 |
| CN108397356B (zh) * | 2018-03-23 | 2024-05-24 | 健安诚(内蒙古)新能源科技有限公司 | 一种包括智能可更换锚栓的风机基础及智能取杆机器人的装置 |
| CN113089738A (zh) * | 2021-03-30 | 2021-07-09 | 中国电建集团成都勘测设计研究院有限公司 | 己安装风机塔筒预应力锚栓基础的修复方法 |
| CN113123377A (zh) * | 2021-05-12 | 2021-07-16 | 中国十五冶金建设集团有限公司 | 一种开挖巷道更换风力发电机基础锚板螺栓的方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105297766A (zh) | 可更换式预应力锚栓风机基础 | |
| AU2011203191A1 (en) | Tower with tensioning cables | |
| CN204456167U (zh) | 预应力锚固风机基础 | |
| CN205242427U (zh) | 新型铁塔基础 | |
| CN201546227U (zh) | 用于支撑基坑围护桩墙和地下室结构外墙的钢支撑梁 | |
| CN107165039A (zh) | 悬挑大体积混凝土施工预应力锚固牛腿支架及其施工方法 | |
| CN102995655A (zh) | 筒型结构与群桩组合式海上风力机地基基础 | |
| CN202672766U (zh) | 砼杆修复加固抱箍 | |
| CN107740342A (zh) | 预制装配式钢筋混凝土桥梁挡块及其构造方法 | |
| CN110130424A (zh) | 预应力锚栓风机基础加固方法 | |
| CN107964978B (zh) | 风力发电机基础锚栓加固结构及基础锚栓断裂加固方法 | |
| CN205205849U (zh) | 可更换式预应力锚栓风机基础 | |
| CN211229458U (zh) | 一种用于圆柱墩混凝土浇筑施工的作业平台 | |
| CN101294388B (zh) | 用于超大面积深基坑的支撑局部早拆施工方法 | |
| CN108755739B (zh) | 一种风力发电机组基础环 | |
| CN106592622A (zh) | 一种基于环形砼带竖向预应力的风机基础结构 | |
| CN106438216A (zh) | 分段直塔筒预应力混凝土风机塔架及其安装方法 | |
| CN205046571U (zh) | 一种现浇式预应力锚索风机基础装置 | |
| CN205617413U (zh) | 一种带有铰接头的微型群桩基础桩 | |
| CN211037032U (zh) | 预应力锚栓风力发电机基础二次保护环结构 | |
| CN204783489U (zh) | 一种格构式风力发电机塔架 | |
| CN203755136U (zh) | 后加固抗震防落梁装置 | |
| CN204282394U (zh) | 一种风机基础及用于风机基础的预应力组件 | |
| CN212670351U (zh) | 铁路营业线上部桥梁拆除防护装置 | |
| CN208430522U (zh) | 钢桁架结构的风机基础 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160203 |