CN201826258U - 一种钢支撑支墩的固定设备 - Google Patents
一种钢支撑支墩的固定设备 Download PDFInfo
- Publication number
- CN201826258U CN201826258U CN2010202926543U CN201020292654U CN201826258U CN 201826258 U CN201826258 U CN 201826258U CN 2010202926543 U CN2010202926543 U CN 2010202926543U CN 201020292654 U CN201020292654 U CN 201020292654U CN 201826258 U CN201826258 U CN 201826258U
- Authority
- CN
- China
- Prior art keywords
- steel support
- gusset plate
- fixing beam
- steel
- anchor ear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种钢支撑支墩的固定设备,包括:节点板、横稳固梁、斜稳固梁和环形抱箍,所述节点板连接环形抱箍,所述横稳固梁和斜稳固梁分别连接节点板。施工时,按照设计要求先将钢支撑本体垂直固定在基础梁上,抱箍安装到钢支撑本体上,节点板连接环形抱箍,横、斜稳固梁分别连接节点板。由于横、斜稳固梁仅仅与节点板焊接,避免了将横、斜稳固梁直接焊接到钢支撑本体上的弊病。这样,避免破坏钢支撑,提高钢支撑的再利用率和使用寿命,大大降低了后期的修理费用。
Description
技术领域
本实用新型属于建筑工程辅助设备,尤其涉及一种用于路桥支护工程的支撑设备。
背景技术
传统的高架桥混凝土模板支墩由大量脚手架组合而成,脚手架安装、拆卸全部手工操作,工艺繁杂,需要量达,安装周期长,浪费人力和物力,已经渐渐地被地铁专用的钢支撑组合支墩所取代。
现有高架桥混凝土模板支护工况图如图1所示,钢支撑11代替用于支撑模板的脚手架,相邻钢支撑之间焊接横稳固梁12和斜稳固梁13。在安装支墩时,先利用吊车分别把钢支撑吊装、固定在基础梁上,再将横、斜稳固梁焊接在钢支撑本体上,节省人力、物力和财力。
但是,在实际安装、拆卸过程中,采用横、斜稳固梁作为钢支撑支墩的方案还存在一定的缺陷,即横斜稳固梁直接焊接在钢支撑的本体上,严重损坏钢支撑,破坏钢支撑的机械强度,降低钢支撑的再利用率和使用寿命,而且后期修理费用很高。
发明内容
为了解决上述技术问题,本实用新型提供的一种钢支撑支墩的固定设备,防止损坏钢支撑本体,提高钢支撑的再利用率和使用寿命,降低钢支撑支墩的修复费用。
为了实现上述技术方案本实用新型提供一种钢支撑支墩的固定设备,包括:节点板、横稳固梁、斜稳固梁和环形抱箍,所述节点板连接环形抱箍,所述横稳固梁和斜稳固梁分别连接节点板。
优选的,所述抱箍包括:一对形状、大小相同的半圆形抱箍。
优选的,所述半圆形抱箍的两端设置有横向延伸的外耳,外耳上设置有安装孔。
本实用新型提供的钢支撑支墩的固定设备,钢支撑本体上固定环形抱箍,节点板连接抱箍,横稳固梁和斜稳固梁焊接在节点板上,组合成钢支撑支墩的固定设备。防止支撑钢支撑支墩时损坏钢支撑支墩本体,提高钢支撑的再利用率和使用寿命,降低后期修复钢支撑支墩的费用。
附图说明
图1为现有高架桥混凝土模板支墩工况图;
图2为本实用新型钢支撑的结构示意图;
图3为图2所示钢支撑的抱箍结构示意图。
具体实施方式
本实用新型钢支撑如图2所示,钢支撑本体11上固定多个抱箍21,节点板22连接抱箍21,横稳固梁12和斜稳固梁13分别焊接在节点板22上,避免横稳固梁12和斜稳固梁13直接连接钢支撑支墩。
在本实用新型的实施例中,如图3所示,环形抱箍21由一对形状、大小相同的半圆形抱箍组,半圆形抱箍的两端设置有横向延伸的外耳31,外耳31上设置多个安装孔。安装抱箍时,两个半圆形抱箍的外耳31相对,螺栓32穿过外耳31的安装孔,使抱箍21紧紧箍在钢支撑本体上。
本实用新型所提供的支撑设备,在固定钢支撑支墩时,环形抱箍21固定于钢支撑支墩上,节点板22连接环形抱箍21的外耳31,横稳固梁12和斜稳固梁13分别与节点板焊接;拆卸横稳固梁12和斜稳固梁13时,直接拆除节点板22即可。
因此,本项实用新型的技术性范围并不局限于说明书上的内容,还有很多根据其权利要求确定的具体的技术性应用方案。以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。
Claims (3)
1.一种钢支撑支墩的固定设备,其特征在于,包括:节点板、横稳固梁、斜稳固梁和环形抱箍,所述节点板连接环形抱箍,所述横稳固梁和斜稳固梁分别连接节点板。
2.根据权利要求1所述钢支撑支墩的固定设备,其特征在于,所述抱箍包括:一对形状、大小相同的半圆形抱箍。
3.根据权利要求2所述钢支撑支墩的固定设备,其特征在于,所述半圆形抱箍的两端设置有横向延伸的外耳,外耳上设置有安装孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202926543U CN201826258U (zh) | 2010-08-16 | 2010-08-16 | 一种钢支撑支墩的固定设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202926543U CN201826258U (zh) | 2010-08-16 | 2010-08-16 | 一种钢支撑支墩的固定设备 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201826258U true CN201826258U (zh) | 2011-05-11 |
Family
ID=43964805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202926543U Expired - Fee Related CN201826258U (zh) | 2010-08-16 | 2010-08-16 | 一种钢支撑支墩的固定设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201826258U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102864746A (zh) * | 2012-09-18 | 2013-01-09 | 浙江国盛钢结构有限公司 | 一种桥梁施工用承重架 |
CN102912739A (zh) * | 2012-10-16 | 2013-02-06 | 中铁十局集团有限公司 | 一种既有桥悬臂板下便梁支点支撑结构 |
-
2010
- 2010-08-16 CN CN2010202926543U patent/CN201826258U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102864746A (zh) * | 2012-09-18 | 2013-01-09 | 浙江国盛钢结构有限公司 | 一种桥梁施工用承重架 |
CN102912739A (zh) * | 2012-10-16 | 2013-02-06 | 中铁十局集团有限公司 | 一种既有桥悬臂板下便梁支点支撑结构 |
CN102912739B (zh) * | 2012-10-16 | 2015-08-26 | 中铁十局集团有限公司 | 一种既有桥悬臂板下便梁支点支撑结构的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075020B (zh) | 一种钢托盘支撑传力系统 | |
CN201567532U (zh) | 一种桥梁盖梁的新型支撑结构 | |
CN202672766U (zh) | 砼杆修复加固抱箍 | |
CN103982045A (zh) | 一种屋面网壳结构无支架悬挑安装施工方法 | |
CN104929148A (zh) | 风力发电塔基础环基础的倒装加固系统及其加固方法 | |
CN105297766A (zh) | 可更换式预应力锚栓风机基础 | |
CN201310072Y (zh) | 桥梁施工支撑托架 | |
CN202766972U (zh) | 圆形墩柱抱箍 | |
CN201826258U (zh) | 一种钢支撑支墩的固定设备 | |
CN102486051B (zh) | 大面积球形网架人工拆除方法 | |
CN103015330A (zh) | 顶升桥梁钢抱箍支架系统 | |
CN201554034U (zh) | 逆作施工后浇带水平嵌固支撑结构 | |
CN203160142U (zh) | 顶升桥梁钢抱箍支架系统 | |
CN201627352U (zh) | 贴壁式悬挑脚手架 | |
CN204418654U (zh) | 用于墙体之间的铝模板 | |
CN215629486U (zh) | 桥梁顶升托换装置 | |
CN202447878U (zh) | 可拆卸式设备安装中心线的简易找正线架 | |
CN101701498A (zh) | 一种跨越既有铁路线钢管套接防护棚施工方法 | |
CN202755982U (zh) | 一种铰接式针梁 | |
CN203006756U (zh) | 起重机轨道固定装置 | |
CN202644407U (zh) | 抱箍法施工盖梁底板托架脱模装置 | |
CN202165696U (zh) | 工字钢的电缆桥架固定架夹紧装置 | |
CN205153801U (zh) | 一种室外电梯防护门与防护架用可拆卸式连接器 | |
CN104358355A (zh) | 一种可拆卸柱脚固定装置及其施工方法 | |
CN204266127U (zh) | 大节段提升机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20180816 |