CN202766972U - 圆形墩柱抱箍 - Google Patents

圆形墩柱抱箍 Download PDF

Info

Publication number
CN202766972U
CN202766972U CN2012202599555U CN201220259955U CN202766972U CN 202766972 U CN202766972 U CN 202766972U CN 2012202599555 U CN2012202599555 U CN 2012202599555U CN 201220259955 U CN201220259955 U CN 201220259955U CN 202766972 U CN202766972 U CN 202766972U
Authority
CN
China
Prior art keywords
anchor ear
hoop
junction plate
circular
pier column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012202599555U
Other languages
English (en)
Inventor
黄传庚
陈刚
孙永峡
孙生林
张海波
孙齐齐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ge Zhou Ba Group Is Second Project Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN2012202599555U priority Critical patent/CN202766972U/zh
Application granted granted Critical
Publication of CN202766972U publication Critical patent/CN202766972U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

一种圆形墩柱抱箍,包括两个对称的半圆形箍身,两箍身两端相对应位置上分别有连接板,两箍身上相应连接板上分别有多个连接孔,多个螺栓分别穿在两箍身上相对应连接板上的连接孔中后与螺母配合将两箍身连接。本实用新型结构简单,加工、安装、操作方便,适应强,施工周期短,投资费用低,能保证质量。

Description

圆形墩柱抱箍
技术领域:
本实用新型与主要用于桥梁工程中的可作为桥梁圆形墩柱上的盖梁支撑的圆形墩柱抱箍有关。
背景技术:
在近几年随着公路工程事业的发展,桥梁施工工艺的不断更新,在墩柱盖梁的施工中,常用的的传统施工方法有满堂脚手架法、预留孔横穿法和预埋法,这些方法因其各自的不足已逐渐慢慢被淘汰。盖梁的施工荷载(包括本身混凝土自重及钢模重量)主要通过底部钢模支架传给支撑系统,因上部荷载大及其重要性,从而对支撑系统的稳定性及刚度提出了更高的要求。
满堂支架法施工是一种长期被采用的方法,施工时需要大量的钢管支架,在盖梁底部地面上搭设支架,在支架上铺设钢模浇筑盖梁混凝土,待混凝土达到强度后拆除模板及支架,其不足之处就是支架消耗量大,工期长,同时对山区桥梁及高墩柱桥梁有很大的局限性。
预留孔横穿法施工是在墩柱顶下方某处预留φ100mm的横穿孔道,盖梁施工前将钢棒穿插预留孔道,盖梁施工荷载通过底模支架传至穿过预留孔道的钢棒,待混凝土达到强度后拆除模板,最后拆除钢棒,其不足之处是在墩柱预留孔道影响墩柱质量,又需要回填混凝土修补,从而影响墩柱的外观。
预埋法施工是在墩柱中预埋多块钢板,拆模后在预埋钢板上焊接斜向钢支撑,由它来承受模板支架及整个盖梁的重量,这种施工方法的不足之处就是需要消耗大量钢材,预埋件不能重复利用,很不经济,钢支撑的焊接工作量很大,且对焊接质量的要求也比较高,而且盖梁施工完后要对墩柱外观进行处理,不但费工费时而且较难保证质量。
实用新型内容:
本实用新型的目的是为了提供一种结构简单,加工、安装、操作方便,适应强,施工周期短,投资费用低,能保证质量的圆形墩柱抱箍。
本实用新型的目的是这样来实现的:
本实用新型圆形墩柱抱箍,包括两个对称的半圆形箍身,两箍身两端相对应位置上分别有连接板,两箍身上相应连接板上分别有多个连接孔,多个螺栓分别穿在两箍身上相对应连接板上的连接孔中后与螺母配合将两箍身连接。
    上述的连接板上装有加劲板。
本实用新型抱箍在可在专业的模板加工厂进行加工,抱箍箍身采用钢板用弯弧机冷弯的方式形成,箍身两端焊接连接板,连接板上焊接加劲板并钻连接孔。加工的箍身成对称结构,最后给每个抱箍外表刷防锈漆。抱箍拼装合格后,并且墩身混凝土达到一定强度后即可吊装抱箍,根据盖梁底部高程,扣除模板及工字钢支架厚度,预留千斤顶安装高度,即可确定抱箍安装的顶部高度。搭设简易脚手架操作平台,搭设高度为抱箍安装高度,用吊车或人力吊起箍身紧贴墩柱,用螺栓连接两片箍身成一个整体先进行预紧,抱箍与墩柱之间贴一层10mm的橡胶板。抱箍连接板处放在顺桥方向,然后用经校验过的带响扳手进行终拧,预紧及终拧顺序均为先内排螺栓后外排螺栓,以使各螺栓均匀受力并确保螺栓的拉力值。抱箍安装好后在桥墩上的抱箍下方做好标记,以便观测抱箍是否下沉。盖梁工字钢支架及底模安放到抱箍上以后,检查抱箍是否下沉,并再一次拧紧抱箍连接螺栓。若发现抱箍并未下沉,就可以吊装盖梁钢筋笼及盖梁侧模,此时需再检查抱箍是否下沉,并再一次拧紧螺栓,确认抱箍没有移动,最后就可以施工盖梁混凝土了。盖梁在浇筑混凝土过程中可安排人员观测抱箍是否下沉。在浇筑盖梁混凝土时,反复对抱箍的螺栓进行复拧,最好是每浇筑一层混凝土均应对螺栓复拧一次,以保证抱箍受力后产生变形而螺栓的拉力值不发生变化,确保抱箍的稳定性。盖梁浇筑完毕并达到一定强度后,先拆除盖梁外模及辅助材料,之后调节千斤顶降落并松懈盖梁底模及支架,接着拆除底模及支架,最后用吊车挂住(也可以用手拉葫芦悬吊),松懈抱箍螺栓,下放抱箍并拆除。抱箍拆除后可循环使用。
本实用新型结构简单,加工、安装、操作方便,适应强,施工周期短,投资费用低,能保证质量。
附图说明:
图1为本实用新型结构示意图。
图2为图1的俯视图。
具体实施方式:
参见图1、图2,本实施例圆形墩柱抱箍,包括两个对称的半圆形箍身1。两箍身两端相对应位置上分别有连接板2。两箍身相对应连接板上分别有多个连接孔3,多个螺栓4分别穿在两箍身上相对连接板上的连接孔中后与螺母5配合将两箍身连接。连接板上装有加劲板6。

Claims (2)

1.圆形墩柱抱箍,其特征在于包括两个对称的半圆形箍身,两箍身两端相对应位置上分别有连接板,两箍身上相应连接板上分别有多个连接孔,多个螺栓分别穿在两箍身上相对应连接板上的连接孔中后与螺母配合将两箍身连接。
2.如权利要求1所述的圆形墩柱抱箍,其特征在于连接板上装有加劲板。
CN2012202599555U 2012-06-05 2012-06-05 圆形墩柱抱箍 Expired - Lifetime CN202766972U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012202599555U CN202766972U (zh) 2012-06-05 2012-06-05 圆形墩柱抱箍

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012202599555U CN202766972U (zh) 2012-06-05 2012-06-05 圆形墩柱抱箍

Publications (1)

Publication Number Publication Date
CN202766972U true CN202766972U (zh) 2013-03-06

Family

ID=47773555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012202599555U Expired - Lifetime CN202766972U (zh) 2012-06-05 2012-06-05 圆形墩柱抱箍

Country Status (1)

Country Link
CN (1) CN202766972U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358355A (zh) * 2014-11-07 2015-02-18 浙江精工钢结构集团有限公司 一种可拆卸柱脚固定装置及其施工方法
CN105507609A (zh) * 2015-12-29 2016-04-20 上海建工四建集团有限公司 屋架木柱加固、固定装置及安装方法
CN105951599A (zh) * 2016-05-23 2016-09-21 中交第航务工程局有限公司 高立柱模架一体化施工工艺
CN109056556A (zh) * 2017-12-29 2018-12-21 中铁二局第工程有限公司 一种挂篮桁架系统整体预压结构及预压方法
CN109853977A (zh) * 2019-01-02 2019-06-07 华南理工大学 一种细长圆柱的加固装置及安装方法
CN111395175A (zh) * 2020-03-24 2020-07-10 武汉瑞锦丰路桥设备股份有限公司 路桥建筑用墩柱模板

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358355A (zh) * 2014-11-07 2015-02-18 浙江精工钢结构集团有限公司 一种可拆卸柱脚固定装置及其施工方法
CN105507609A (zh) * 2015-12-29 2016-04-20 上海建工四建集团有限公司 屋架木柱加固、固定装置及安装方法
CN105951599A (zh) * 2016-05-23 2016-09-21 中交第航务工程局有限公司 高立柱模架一体化施工工艺
CN105951599B (zh) * 2016-05-23 2018-10-09 中交第一航务工程局有限公司 高立柱模架一体化施工工艺
CN109056556A (zh) * 2017-12-29 2018-12-21 中铁二局第工程有限公司 一种挂篮桁架系统整体预压结构及预压方法
CN109853977A (zh) * 2019-01-02 2019-06-07 华南理工大学 一种细长圆柱的加固装置及安装方法
CN111395175A (zh) * 2020-03-24 2020-07-10 武汉瑞锦丰路桥设备股份有限公司 路桥建筑用墩柱模板
CN111395175B (zh) * 2020-03-24 2021-06-25 宁波谦屹节能科技有限公司 路桥建筑用墩柱模板

Similar Documents

Publication Publication Date Title
CN202766972U (zh) 圆形墩柱抱箍
CN104846744B (zh) 一种城市高架曲线式墩柱一次浇筑成型施工方法
CN104141383B (zh) 一种贝雷梁悬吊模板支撑体系及其施工工法
CN208543603U (zh) 预制预应力楼板生产模具和生产设备
CN201546435U (zh) 螺栓固定式斜拉悬挑脚手架
CN203947771U (zh) 一种贝雷梁悬吊模板支撑体系
CN109914244B (zh) 一种适用于高塔钢混结合横梁钢结构安装及底、顶板混凝土浇筑的弱支架系统及其操作方法
CN102900024B (zh) 大型混凝土结构翻升模板的使用方法
CN202937005U (zh) 现浇混凝土梁侧模板加固装置
CN105220619A (zh) 一种快速制造双线圆端实体墩的方法
CN108532968A (zh) 一种钢筋桁架楼承板组合楼盖的装配式支撑装置
CN103485574A (zh) 一种造粒塔塔顶钢筋混凝土结构施工方法
CN103572703A (zh) 外包混凝土斜拉扣挂和分环分段组合法施工方法
CN203795311U (zh) 多肢高墩同滑施工装置
CN204825652U (zh) 一种桥梁墩柱盖梁模板支撑装置
CN102677891B (zh) 现浇钢筋混凝土楼板无支撑模板系统
CN103993739A (zh) 造粒塔喷淋层劲性梁的施工方法
CN204299162U (zh) 悬挑工字钢梁锚固结构
CN104295082A (zh) 外挑架钢梁锚环重复利用的方法及所用锚环组件
CN110700112A (zh) 钢混叠合梁悬挑翼板混凝土施工用移动模架及施工方法
CN203361605U (zh) 一种锚环组件
CN103225396A (zh) 梁架式建筑模板系统
CN103669219B (zh) 多肢高墩同滑施工装置
CN203613464U (zh) 滑模施工物资运输装置
CN203613461U (zh) 滑模施工提升系统

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA GE ZHOU BA GROUP IS SECOND PROJECT CO., LTD.

Free format text: FORMER NAME: GEZHOUBA GROUP NO.2 ENGINEERING CO.,LTD.

CP01 Change in the name or title of a patent holder

Address after: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee after: China Ge Zhou Ba group is second project Co., Ltd.

Address before: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Patentee before: Gezhouba Group No.2 Engineering Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130306