CN101277049B - 大型电机液压顶升穿芯吊装方法 - Google Patents
大型电机液压顶升穿芯吊装方法 Download PDFInfo
- Publication number
- CN101277049B CN101277049B CN2007100385714A CN200710038571A CN101277049B CN 101277049 B CN101277049 B CN 101277049B CN 2007100385714 A CN2007100385714 A CN 2007100385714A CN 200710038571 A CN200710038571 A CN 200710038571A CN 101277049 B CN101277049 B CN 101277049B
- Authority
- CN
- China
- Prior art keywords
- rotor
- stator
- load side
- motor
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacture Of Motors, Generators (AREA)
Abstract
本发明涉及大型电机的安装方法,尤其涉及一种大型电机穿芯吊装方法,它包括下列各步骤:步骤一,现场勘查,确定液压顶升装置轨道安装位置、测试液压顶升装置的工作性能;步骤二,电机定子的吊卸,利用所述液压顶升装置把定子起吊,并定好定子负荷侧朝向;步骤三,电机转子吊卸及延长轴的安装,利用所述液压顶升装置起吊转子,利用行车在转子连轴器上安装一个延长轴;步骤四,穿芯,调整转子中心高度,移动吊着转子的起吊装置使转子穿入定子当中;步骤五,电机安装就位。本发明克服了车间行车起重能力不足和厂房净空高度不够的条件限制。克服了电机基础周边的空间限制,使吊装作业顺畅,省去在电机安装位置调整的工序。
Description
技术领域
本发明涉及大型电机的安装方法,尤其涉及一种大型电机穿芯吊装方法。
背景技术
使用大型电机的场合很多,比如轧钢生产线。随着变频调速技术在大型轧机主传动系统的广泛应用,交流变频电机单机功率已达到10000kW,电机转子起吊重量在70吨以上,电机定子重量在40吨以上,电机总重量在110吨以上。受运输重量的限制,这类电机一般采取电机定子、转子分件运输,在安装现场穿芯组装。现有穿芯组装技术一般采用厂房内桥式起重机或大型汽车吊进行吊装作业。但受厂房内起重机起吊重量限制,无法实现分件穿芯组装;而采用大型汽车吊吊装,所需施工作业场地大,厂房净空高度无法满足吊装需要时,上述两种方法不能实现电机穿芯吊装。
当出现行车起重能力不足、厂房高度不够时,一般是在厂房屋面结构施工时预留电机安装所需空间,采用大型汽车吊穿芯组装,待电机安装就位后,再进行厂房屋面封闭。其不足在于,对吊车操作人员、起吊指挥人员要求高;影响厂房屋面施工时间长(若干月),延长整个施工工期;电机露天组装、吊装受天气影响;由于电机处在露天、上方有厂房屋面安装施工,电机吊装就位后须作防水、防坠物措施。
发明内容
本发明旨在解决上述技术问题,提供一种大型电机液压顶升穿芯吊装方法。本发明克服了车间行车起重能力不足和厂房净空高度不够的条件限制。克服了电机基础周边的空间限制,使吊装作业顺畅,省去在电机安装位置调整的工序。
本发明是这样实现的:一种大型电机液压顶升穿芯吊装方法,它包括下列各步骤:
步骤一,现场勘查,确定液压顶升装置轨道安装位置,测试液压顶升装置的工作性能;
步骤二,电机定子的吊卸,
利用所述液压顶升装置把定子起吊,并定好定子负荷侧朝向;
步骤三,电机转子吊卸及延长轴的安装,
利用所述液压顶升装置起吊转子,利用行车在转子连轴器上安装一个延长轴;
步骤三,穿芯,
调整转子中心高度,移动吊着转子的起吊装置使转子穿入定子当中;
步骤四,电机安装就位,
同时起吊定、转子,钢丝绳挂在转子轴两侧,用顶升装置将转、定子同时起吊,向电机安装位置移动,当电机轴向中心与轴向安装中心位置重合时停止移动,缓慢下落起升装置,使定子底脚落在底座上,同时转子轴落在前后轴承座内。
所述的大型电机液压顶升穿芯吊装方法,步骤一中,待电机到达现场后,装载定子的拖车倒车至四台液压小车之间,移动两根横梁使其处于定子吊装环上方,利用所述顶升装置横梁上的四台可移动吊耳中的两个,挂好钢丝绳并将钢丝绳固定在定子的吊装环上,将电机定子带包装底座吊至电机横向中心线附近位置,并确定好定子负荷侧朝向;
所述的大型电机液压顶升穿芯吊装方法,步骤二当中,移动顶升装置的横梁使其处于转子两侧轴吊装位置的上方,调整横梁上四台可移动小车,利用顶升装置两个横梁下面的四个吊耳挂置钢丝绳,将转子设备箱以转子负荷侧朝向轧机侧的方向吊卸在钢板上,拆除转子包装箱,利用厂房行车,吊起负荷侧延长轴并组装于转子连轴器上;
所述的大型电机液压顶升穿芯吊装方法,步骤三中,利用顶升装置将转子起吊,在转子重量允许的情况下可将钢丝绳挂置两根横梁的两个吊耳上;起吊后调整转子中心高度与定子中心线保持一致,吊装设备向定子方向缓慢移动,当转子负荷侧轴的钢丝绳距定子绕组200mm左右时,停止移动,此时延长轴已穿过定子,在转子延长轴及非负荷侧轴下垫钢垫块支撑,支撑高度与吊装高度保持一致;拆卸转子负荷侧吊装钢丝绳,将转子负荷侧的顶升装置的横梁移至延长轴上方,将钢丝绳挂至延长轴端部,在保持转子磁中心与定子磁中心基本一致的情况下,起升装置两根横梁同时移动,缓慢将转子穿至定子内;当转子完全进入定子后,在转子负荷侧与非负荷侧的轴端用钢垫块进行支撑,用行车拆卸转子延长轴。
所述的大型电机液压顶升穿芯吊装方法,所述步骤二和步骤三当中的两个吊耳分别为1、3号吊耳或者2、4号吊耳。
所述大型电机液压顶升穿芯吊装方法,所述步骤四中,为防止安装过程中损坏定子绕组和转子绕组线圈,在电机负荷侧和非负荷侧转、定子顶部的气隙中垫10mm厚的橡胶板作为保护,就位后拆除转、定子间隙的橡胶板。
本发明利用液压顶升装置和延长轴,克服了车间行车起重能力不足和厂房净空高度不够的条件限制。克服了电机基础周边的空间限制,使吊装作业顺畅,省去在电机安装位置调整的工序。与利用车间桥式起重机方法比较,不受车间桥式起重机起重能力不足的限制。与利用大型汽车吊方法比较,不受厂房净空高度限制,可大幅度降低施工费用,大幅度缩短施工工期。液压顶升装置可实现六方向移动,并且移动速度可调(最小移动速度50mm/分钟),两根吊梁及四台液压装置即可同时控制动作也可实现单独控制动作。电机穿芯作业要求起吊控制精度高(毫米级),电机安装精度高,与其它安装技术比较,更容易控制穿芯吊装精度,不易发生设备碰撞损伤。
具体实施方式
下面,给出本发明的具体实施方式:
1.现场勘查,确定液压顶升装置轨道安装位置等事项,制定安装方案。
2.现场组装、测试液压顶升装置。
3.电机定子的吊卸:
待电机到达现场后,装载定子的拖车倒车至4台液压小车之间,移动两根横梁使其处于定子吊装环上方,利用此顶升装置横梁上的四台可移动吊耳中的两个(编号为1、3或2、4)挂好钢丝绳并将钢丝绳固定在定子的吊装环上,将电机定子带包装底座吊至电机横向中心线附近位置,并确定好定子负荷侧朝向轧机方向。
4.电机转子吊卸及延长轴的安装:
移动顶升装置的横梁使其处于转子两侧轴吊装位置的上方,调整横梁上4台可移动小车,利用顶升装置两个横梁下面的4个吊耳挂置钢丝绳,将转子设备箱以转子负荷侧朝向轧机侧的方向吊卸在钢板上,拆除转子包装箱,利用厂房行车,吊起负荷侧延长轴并组装于转子连轴器上。
5.穿芯:
利用顶升装置将转子起吊,为便于控制,在转子重量允许的情况下可将钢丝绳挂置两根横梁的两个吊耳上(1、3或2、4)。起吊后调整转子中心高度与定子中心线保持一致,吊装设备向定子方向缓慢移动,当转子负荷侧轴的钢丝绳距定子绕组200mm左右时,停止移动,此时延长轴已穿过定子,在转子延长轴及非负荷侧轴下垫钢垫块支撑,支撑高度与吊装高度保持一致。拆卸转子负荷侧吊装钢丝绳,将转子负荷侧的顶升装置的横梁移至延长轴上方,将钢丝绳挂至延长轴端部,在保持转子磁中心与定子磁中心基本一致的情况下,起升装置两根横梁同时移动,缓慢将转子穿至定子内。当转子完全进入定子后,在转子负荷侧与非负荷侧的轴端用钢垫块进行支撑,用行车拆卸转子延长轴。
6.电机安装就位:
因为电机转子重量远大于定子重量,所以定、转子同时起吊时钢丝绳挂在转子轴两侧。为防止安装过程中损坏定子和转子绕组线圈,在电机负荷侧和非负荷侧转、定子顶部的气隙中垫10mm厚的橡胶板作为保护。用顶升装置将转、定子同时起吊,向电机安装位置移动,当电机轴向中心与轴向安装中心位置重合时停止移动,缓慢下落起升装置,使定子底脚落在底座上,同时转子轴落在前后轴承座内。就位后拆除转、定子间隙的橡胶板。
Claims (3)
1.一种大型电机液压顶升穿芯吊装方法,其特征在于,它包括下列各步骤:
步骤一,现场勘查,确定液压顶升装置轨道安装位置、测试液压顶升装置的工作性能;
步骤二,电机定子的吊卸,
利用所述液压顶升装置把定子起吊,并定好定子负荷侧朝向;
步骤三,电机转子吊卸及延长轴的安装,
利用所述液压顶升装置起吊转子,利用行车在转子连轴器上安装一个延长轴;
步骤三,穿芯,
调整转子中心高度,移动吊着转子的起吊装置使转子穿入定子当中;
步骤四,电机安装就位,
同时起吊定、转子,钢丝绳挂在转子轴两侧,用顶升装置将转、定子同时起吊,向电机安装位置移动,当电机轴向中心与轴向安装中心位置重合时停止移动,缓慢下落起升装置,使定子底脚落在底座上,同时转子轴落在前后轴承座内;
步骤一中,待电机到达现场后,装载定子的拖车倒车至四台液压小车之间,移动两根横梁使其处于定子吊装环上方,利用所述顶升装置横梁上的四台可移动吊耳中的两个,挂好钢丝绳并将钢丝绳固定在定子的吊装环上,将电机定子带包装底座吊至电机横向中心线附近位置,并确定好定子负荷侧朝向;
步骤二当中,移动顶升装置的横梁使其处于转子两侧轴吊装位置的上方,调整横梁上四台可移动小车,利用顶升装置两个横梁下面的四个吊耳挂置钢丝绳,将转子设备箱以转子负荷侧朝向轧机侧的方向吊卸在钢板上,拆除转子包装箱,利用厂房行车,吊起负荷侧延长轴并组装于转子连轴器上;
步骤三中,利用顶升装置将转子起吊,在转子重量允许的情况下可将钢丝绳挂置两根横梁的两个吊耳上;起吊后调整转子中心高度与定子中心线保持一致,吊装设备向定子方向缓慢移动,当转子负荷侧轴的钢丝绳距定子绕组200mm左右时,停止移动,此时延长轴已穿过定子,在转子延长轴及非负荷侧轴下垫钢垫块支撑,支撑高度与吊装高度保持一致;拆卸转子负荷侧吊装钢丝绳,将转子负荷侧的顶升装置的横梁移至延长轴上方,将钢丝绳挂至延长轴端部,在保持转子磁中心与定子磁中心基本一致的情况下,起升装置两根横梁同时移动,缓慢将转子穿至定子内;当转子完全进入定子后,在转子负荷侧与非负荷侧的轴端用钢垫块进行支撑,用行车拆卸转子延长轴。
2.根据权利要求1所述的大型电机液压顶升芯吊装方法,其特征在于,所述步骤二和步骤三当中的两个吊耳分别为1、3号吊耳或者2、4号吊耳。
3.根据权利要求1所述大型电机液压顶升穿芯吊装方法,其特征在于,所述步骤四中,为防止安装过程中损坏定子绕组和转子绕组线圈,在电机负荷侧和非负荷侧转、定子顶部的气隙中垫10mm厚的橡胶板作为保护,就位后拆除转、定子间隙的橡胶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100385714A CN101277049B (zh) | 2007-03-28 | 2007-03-28 | 大型电机液压顶升穿芯吊装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100385714A CN101277049B (zh) | 2007-03-28 | 2007-03-28 | 大型电机液压顶升穿芯吊装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101277049A CN101277049A (zh) | 2008-10-01 |
CN101277049B true CN101277049B (zh) | 2011-10-05 |
Family
ID=39996142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007100385714A Active CN101277049B (zh) | 2007-03-28 | 2007-03-28 | 大型电机液压顶升穿芯吊装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101277049B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102820744A (zh) * | 2012-08-24 | 2012-12-12 | 中国华冶科工集团有限公司 | 大型同步电机转子的安装方法及装置 |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101549836B (zh) * | 2009-05-12 | 2012-05-02 | 中国一冶集团有限公司 | 封闭厂房内吊装超高超重设备的方法和专用吊具 |
CN102021277B (zh) * | 2009-09-22 | 2013-07-24 | 五冶集团上海有限公司 | 退火炉活套整体框架吊装方法 |
CN102044938A (zh) * | 2009-10-23 | 2011-05-04 | 中冶天工建设有限公司 | 利用扁担吊装转子穿芯法吊装大型电机的方法 |
CN101937768B (zh) * | 2010-09-13 | 2011-12-28 | 保定天威集团有限公司 | 一种电抗器铁心饼吊运装置及方法 |
CN101976913B (zh) * | 2010-10-29 | 2012-11-21 | 中国三冶集团有限公司电气安装工程公司 | 一种粗轧机主传动电机吊装方法 |
CN102030292A (zh) * | 2010-11-17 | 2011-04-27 | 广州广船国际股份有限公司 | 一种大型设备的翻身方法、结构及装置 |
CN102983684B (zh) * | 2011-09-07 | 2016-08-10 | 五冶集团上海有限公司 | 分体底座高速长轴大电机安装方法 |
CN102306979B (zh) * | 2011-09-10 | 2013-03-13 | 中国十七冶集团有限公司 | 一种用于大型电机检修的抽穿芯方法 |
CN102764972A (zh) * | 2012-07-18 | 2012-11-07 | 山东电力建设第二工程公司 | 分体式汽轮发电机内定子与外定子穿装方法 |
CN103862251B (zh) * | 2012-12-13 | 2016-08-10 | 中国二十冶集团有限公司 | 一种受三维空间约束的大型设备的吊装方法 |
CN103236764A (zh) * | 2013-05-08 | 2013-08-07 | 南车戚墅堰机车有限公司 | 专用和谐内燃机车交流牵引电机的横装工艺 |
CN106787532A (zh) * | 2015-11-23 | 2017-05-31 | 中冶天工集团有限公司 | 大型电机穿芯整体吊装法 |
CN106887928B (zh) * | 2015-12-16 | 2020-07-28 | 中国二十冶集团有限公司 | 用于大型主传动电机抽芯方法 |
CN109274232B (zh) * | 2018-11-30 | 2021-01-19 | 上海宝冶集团有限公司 | 用于大型电机的液压龙门吊穿芯安装方法 |
CN111490649B (zh) * | 2020-04-22 | 2022-07-12 | 中国能源建设集团天津电力建设有限公司 | 一种660mw级双水内冷发电机安装方法 |
CN115448155A (zh) * | 2022-08-18 | 2022-12-09 | 鞍钢建设集团有限公司 | 轧机主电机安装位置超出行车钩头行程极限的安装方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1699137A (zh) * | 2005-05-25 | 2005-11-23 | 中国人民解放军广州军区空军工程建设局 | 一种全程自控液压顶升装置及其顶升方法 |
CN2813574Y (zh) * | 2005-05-13 | 2006-09-06 | 郑州中铁大桥机械制造有限公司 | 一种液压顶升横纵运梁车 |
-
2007
- 2007-03-28 CN CN2007100385714A patent/CN101277049B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2813574Y (zh) * | 2005-05-13 | 2006-09-06 | 郑州中铁大桥机械制造有限公司 | 一种液压顶升横纵运梁车 |
CN1699137A (zh) * | 2005-05-25 | 2005-11-23 | 中国人民解放军广州军区空军工程建设局 | 一种全程自控液压顶升装置及其顶升方法 |
Non-Patent Citations (1)
Title |
---|
JP特开2006-50893A 2006.02.16 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102820744A (zh) * | 2012-08-24 | 2012-12-12 | 中国华冶科工集团有限公司 | 大型同步电机转子的安装方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN101277049A (zh) | 2008-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101277049B (zh) | 大型电机液压顶升穿芯吊装方法 | |
CN101976913B (zh) | 一种粗轧机主传动电机吊装方法 | |
CN201068369Y (zh) | 轮胎式全液压悬臂门架式起重机 | |
CN101880006B (zh) | 固定式回转起重机用滚装装置及滚装方法 | |
CN102306979B (zh) | 一种用于大型电机检修的抽穿芯方法 | |
CN102816891B (zh) | 一种转炉首段固定汽化烟道检修拆除的吊装方法 | |
CN101114786A (zh) | 采用c形梁穿芯吊装大型电机的吊装方法及其c形梁结构 | |
CN101486091A (zh) | 上方吊装空间有限的大包回转台整体更换方法 | |
CN107253673B (zh) | 一种建筑设备吊装装置 | |
CN114852883A (zh) | 一种吊运装置及其控制系统 | |
CN104291207A (zh) | 一种大型电机设备安装专用工具及其使用方法 | |
JP2001248161A (ja) | 法面へのコンクリートブロックの据え付け方法およびコンクリートブロック据え付け用の台車ならびに装置 | |
CN210418998U (zh) | 循环水系统大口径管道的运输装置 | |
CN112589421A (zh) | 一种辊压机用减速机的安装拆卸装置和安装拆卸方法 | |
JP3633483B2 (ja) | 連続圧延機駆動用電動機の交換方法 | |
CN109019468A (zh) | Acp1000核电站重型设备引入方法 | |
CN213795145U (zh) | 用于安装拆卸辊压机用减速机的辅助装置 | |
CN111470407A (zh) | 称杆式吊装组件及吊装设备和吊装方法 | |
CN218742419U (zh) | 一种高压辊磨机换辊设备 | |
CN218665046U (zh) | 一种狭小空间内的通用型辅助起重装置 | |
CN102785067A (zh) | 一种快速装卸重型液压缸的装置及其方法 | |
CN106787532A (zh) | 大型电机穿芯整体吊装法 | |
CN110294416B (zh) | 车间单梁行车控制方法及装置 | |
CN214321310U (zh) | 四辊轧机换辊装置 | |
CN210953657U (zh) | 单梁静载试验的加载装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |