CN101264837A - 绑线整理器 - Google Patents
绑线整理器 Download PDFInfo
- Publication number
- CN101264837A CN101264837A CNA2008100140016A CN200810014001A CN101264837A CN 101264837 A CN101264837 A CN 101264837A CN A2008100140016 A CNA2008100140016 A CN A2008100140016A CN 200810014001 A CN200810014001 A CN 200810014001A CN 101264837 A CN101264837 A CN 101264837A
- Authority
- CN
- China
- Prior art keywords
- wheel shaft
- reel
- break
- wheel axle
- winding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Storage Of Web-Like Or Filamentary Materials (AREA)
Abstract
本发明提供一种绑线整理器,包括底板,底板上安装绕线轮轴,绕线轮轴上安装绕线轮,绕线轮一侧安装变向轮轴,变向轮轴上安装变向轮,变向轮一侧安装第一导向轮轴,第一导向轮轴下部安装第二导向轮轴,第一导向轮轴上安装第一导向轮,第二导向轮轴上安装第二导向轮,绕线轮轴上安装旋转手柄。本发明可以将单股电线快速的收放线,保证电线不破损;在收线过程中可以将弯曲电线拉直,不会出现折痕。具有结构简单;成本低;效率高;体积小等优点。
Description
技术领域
本发明涉及电力线路施工工具领域,具体是一种绑线整理器。
背景技术
电力施工中,对于电线的使用中,放线和收线的方法一般有两种,一种是通过大型自动收放线装置;一种是通过人工用滚轮收放线。大型自动收放线装置需要受到电源或动力装置的限制,设备体积大,成本高,很多场合不方便使用,拉力大容易使电线破损。人工用滚轮收放线,效率低,费力,费时,电力线路导线的绑扎质量不高,松懈甚至出现错误,这些将直接影响到导线的抗震、抗风能力,加速导线的损耗。对电力线路的安全运行十分不利。电力施工中,所用电线可能会因各种原因变的弯曲不直,影响使用,以上两种方法只能进行简单的收放线,无法简单方便的拉直电线。结构复杂,体积大。
发明内容
本发明的目的是提供一种绑线整理器,它可以将单股电线快速的收放线,在收线过程中将弯曲电线拉直,结构简单,成本低,效率高。
本发明为实现上述目的,通过以下技术方案实现:绑线整理器,包括底板,底板上安装绕线轮轴,绕线轮轴上安装绕线轮,绕线轮一侧安装变向轮轴,变向轮轴上安装变向轮,变向轮一侧安装第一导向轮轴,第一导向轮轴下部安装第二导向轮轴,第一导向轮轴上安装第一导向轮,第二导向轮轴上安装第二导向轮,绕线轮轴上安装旋转手柄。绕线轮外周上开设固线孔。绕线轮外周上开设第一环形凹槽,变向轮外周上开设第二环形凹槽,第一导向轮外周上开设第三环形凹槽,第二导向轮外周上开设第四环形凹槽。固线孔位于绕线轮外周内侧。
本发明的优点在于:它可以将单股电线快速的收放线,保证电线不破损;在收线过程中可以将弯曲电线拉直,不会出现折痕;安装第一导向轮和第二导向轮保证收线整齐;安装变向轮保证收线紧固;收线后只需将电线取下既可以继续使用收线器。具有结构简单;成本低;效率高;体积小等特点。
附图说明
附图1是本发明的主视结构示意图;附图2是附图1的左视结构示意图。
具体实施方式
本发明的主体结构是:绑线整理器,包括底板11,底板11上安装绕线轮轴9,绕线轮轴9上安装绕线轮10。绕线轮10一侧安装变向轮轴7,变向轮轴7上安装变向轮6。变向轮6可以改变电线1的引线方向,使电线1更加顺畅平稳的引导向绕线轮10上。变向轮6一侧安装第一导向轮轴4,第一导向轮轴4下部安装第二导向轮轴2,第一导向轮轴4上安装第一导向轮5,第二导向轮轴2上安装第二导向轮3。第一导线轮轴4和第二导线轮轴2的中轴线的连线可以与水平面垂直,也可以与水平面成一定角度。第一导向轮5和第二导向轮3对电线1起导向作用,通过第一导向轮5和第二导向轮3限制电线1收放线时的走线方向为直线。绕线轮轴9上安装旋转手柄12,转动旋转手柄12可以带动绕线轮轴9,从而带动绕线轮10转动,进行收放线。为了携带方便并且易于取下已绕好的电线1,绕线轮轴9穿过底板11,在绕线轮轴9一端安装旋转手柄12,在绕线轮轴9另一端安装绕线轮10,旋转手柄12与绕线轮10分别设置在底板11两侧,绕线轮10与变向轮6同侧。为了将电线1更加牢固的固定在绕线轮10上,绕线轮10外周上开设固线孔8,收线时,将电线1的顶端插入固线孔8内,然后转动旋转手柄12使得绕线轮10旋转进行收线。
为了简化结构,绕线轮轴9可以和绕线轮10制作成为一体;变向轮轴7可以和变向轮6制作成一体;第一导向轮轴4可以和第一导向轮5制作成一体;第二导向轮轴2可以和第二导向轮3制作成一体。
本发明进一步特征是:为了防止电线1从绕线轮10上脱落,绕线轮10外周上开设第一环形凹槽16。为了防止电线1从变向轮6上脱落,变向轮6外周上开设第二环形凹槽14,电线1从第二环形凹槽14内变向,可以更加顺畅的传向绕线轮10。为了防止电线1从第一导向轮5和第二导向轮3上脱落,第一导向轮5和第二导向轮3外周上分别开设第三环形凹槽13和第四环形凹槽15。为了充分利用绕线轮10并且防止电线1在收线过程中乱线,固线孔8位于绕线轮10外周内侧,收线时,将电线1顶端插入固线孔8,电线1将从绕线轮10外周内侧开始收线,一圈圈向外收线,直到电线1绕到绕线轮10外周外侧。
本发明中,绕线轮轴9、变向轮轴7与第一导向轮轴4间可以有多种位置关系,例如:可以在底板11右侧安装绕线轮轴9,底板11左侧上部安装第一导向轮轴4,绕线轮轴9与第一导向轮轴4之间设置变向轮轴7;也可以在底板11中部安装绕线轮轴9,绕线轮轴9上侧设置变向轮轴7,变向轮轴7一侧设置第一导向轮轴4。
本发明进行收线时,将电线1一端从第一导向轮5和第二导向轮3间穿过,再沿变向轮6外周变向,然后将电线1一端插入固线孔8内,然后转动旋转手柄12使得绕线轮10旋转进行收线。收线结束后,将电线1从绕线轮10上取下,然后本发明可以继续重复使用。
本发明的技术方案并不限制于本发明所述的实施例的范围内。本发明未详尽描述的技术内容均为公知技术。
Claims (4)
1、绑线整理器,其特征在于:包括底板(11),底板(11)上安装绕线轮轴(9),绕线轮轴(9)上安装绕线轮(10),绕线轮(10)一侧安装变向轮轴(7),变向轮轴(7)上安装变向轮(6),变向轮(6)一侧安装第一导向轮轴(4),第一导向轮轴(4)下部安装第二导向轮轴(2),第一导向轮轴(4)上安装第一导向轮(5),第二导向轮轴(2)上安装第二导向轮(3),绕线轮轴(9)上安装旋转手柄(12)。
2、根据权利要求1所述的绑线整理器,其特征在于:绕线轮(10)外周上开设固线孔(8)。
3、根据权利要求1所述的绑线整理器,其特征在于:绕线轮(10)外周上开设第一环形凹槽(16),变向轮(6)外周上开设第二环形凹槽(14),第一导向轮(5)外周上开设第三环形凹槽(13),第二导向轮(3)外周上开设第四环形凹槽(15)。
4、根据权利要求2所述的绑线整理器,其特征在于:固线孔(8)位于绕线轮(10)外周内侧。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100140016A CN101264837A (zh) | 2008-01-18 | 2008-01-18 | 绑线整理器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008100140016A CN101264837A (zh) | 2008-01-18 | 2008-01-18 | 绑线整理器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101264837A true CN101264837A (zh) | 2008-09-17 |
Family
ID=39987570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008100140016A Pending CN101264837A (zh) | 2008-01-18 | 2008-01-18 | 绑线整理器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101264837A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104016188A (zh) * | 2014-06-11 | 2014-09-03 | 国家电网公司 | 一种绕线放线轮 |
CN105178686A (zh) * | 2015-08-17 | 2015-12-23 | 国网山东省电力公司泰安供电公司 | 一种新型拉线缠绕器 |
CN105170844A (zh) * | 2015-09-30 | 2015-12-23 | 国网山东宁津县供电公司 | 多功能矫直器 |
CN108046061A (zh) * | 2017-11-30 | 2018-05-18 | 郭正友 | 一种防绊倒的施工放线绑线器 |
CN109368417A (zh) * | 2018-10-23 | 2019-02-22 | 中国科学院苏州生物医学工程技术研究所 | 一种用于光学治疗仪的灯头导线整理装置 |
CN111725725A (zh) * | 2020-06-24 | 2020-09-29 | 广州坤开机电设备有限公司 | 一种用于配电箱装配的多功能理线工具车及其使用方法 |
-
2008
- 2008-01-18 CN CNA2008100140016A patent/CN101264837A/zh active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104016188A (zh) * | 2014-06-11 | 2014-09-03 | 国家电网公司 | 一种绕线放线轮 |
CN105178686A (zh) * | 2015-08-17 | 2015-12-23 | 国网山东省电力公司泰安供电公司 | 一种新型拉线缠绕器 |
CN105178686B (zh) * | 2015-08-17 | 2017-02-15 | 国网山东省电力公司泰安供电公司 | 一种拉线缠绕器 |
CN105170844A (zh) * | 2015-09-30 | 2015-12-23 | 国网山东宁津县供电公司 | 多功能矫直器 |
CN108046061A (zh) * | 2017-11-30 | 2018-05-18 | 郭正友 | 一种防绊倒的施工放线绑线器 |
CN108046061B (zh) * | 2017-11-30 | 2019-08-20 | 蔡雅婷 | 一种防绊倒的施工放线绑线器 |
CN109368417A (zh) * | 2018-10-23 | 2019-02-22 | 中国科学院苏州生物医学工程技术研究所 | 一种用于光学治疗仪的灯头导线整理装置 |
CN109368417B (zh) * | 2018-10-23 | 2024-03-22 | 中国科学院苏州生物医学工程技术研究所 | 一种用于光学治疗仪的灯头导线整理装置 |
CN111725725A (zh) * | 2020-06-24 | 2020-09-29 | 广州坤开机电设备有限公司 | 一种用于配电箱装配的多功能理线工具车及其使用方法 |
CN111725725B (zh) * | 2020-06-24 | 2022-06-14 | 广州坤开机电设备有限公司 | 一种用于配电箱装配的多功能理线工具车及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101264837A (zh) | 绑线整理器 | |
CN110047629A (zh) | 一种电缆校直绞合设备 | |
CN104743413A (zh) | 线材手动式收放装置 | |
CN105314472A (zh) | 一种电力线缆收线器 | |
CN204792417U (zh) | 改良型绕线机 | |
CN110329845A (zh) | 一种绕线装置及绕线车 | |
CN203794369U (zh) | 收绳器 | |
CN106743997B (zh) | 象鼻收线和工字轮收线一体的多功能收线机 | |
CN201254414Y (zh) | 一种电缆旋转收线装置 | |
CN104495502A (zh) | 一种收装工具 | |
CN208814414U (zh) | 一种用于缆绳收放线的绕线盘 | |
CN204324565U (zh) | 一种收装工具 | |
CN106953290B (zh) | 一种转台走线装置 | |
CN202584752U (zh) | 辐照束下系统的收放线装置 | |
CN109436976A (zh) | 一种建筑施工用水电安装无障碍线缆收卷器 | |
CN204624832U (zh) | 一种线材卷绕收集装置 | |
CN205610438U (zh) | 一种插入式绕线机 | |
CN202848747U (zh) | 电缆收线机 | |
CN107070131A (zh) | 一种定子绕线装置及其方法 | |
CN204857450U (zh) | 全自动绕线机 | |
CN102468050A (zh) | 环形线圈绕线机张力控制机构 | |
CN210735879U (zh) | 一种牵引绳盘 | |
CN1163397C (zh) | 平行钢丝束股圈收放束方法 | |
CN110950164A (zh) | 一种电力工程的绞磨机 | |
CN208723284U (zh) | 一种连接导线用电动绕线器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080917 |