CN101260649B - 一种钢-混凝土组合结构连续梁桥施工工法 - Google Patents
一种钢-混凝土组合结构连续梁桥施工工法 Download PDFInfo
- Publication number
- CN101260649B CN101260649B CN2008100363461A CN200810036346A CN101260649B CN 101260649 B CN101260649 B CN 101260649B CN 2008100363461 A CN2008100363461 A CN 2008100363461A CN 200810036346 A CN200810036346 A CN 200810036346A CN 101260649 B CN101260649 B CN 101260649B
- Authority
- CN
- China
- Prior art keywords
- girder steel
- concrete
- jacking
- place
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种钢—混凝土组合结构连续梁施工工法,其特征在于:钢梁与混凝土桥面板在预制场地内形成单跨梁结构,将单跨梁结构整体吊装到位,进行钢梁连接接头施工、再施工墩顶区域混凝土桥面板,形成组合结构连续梁。本发明利用预制场地预制大部分构件,利用大型浮吊整段梁段吊装到位,利用墩顶支点升降法对墩顶段混凝土桥面板施加预应力,利用墩顶段底板双结合设计降低了该区域钢梁底板厚度,保证了施工质量,加快了施工进度,对今后类似工程的设计、施工具有广泛和深远的借鉴意义。
Description
技术领域
本发明涉及土木工程桥梁施工技术领域,具体涉及一种钢—混凝土组合结构连续梁桥施工工法。
背景技术
钢—混凝土组合结构连续梁桥的施工方法一般采用钢梁顶推或者吊装到位,形成连续结构,再现浇混凝土桥面板或安装预制混凝土桥面板,形成组合结构。
由于连续梁支点承受负弯矩,而钢—混凝土组合结构桥采用上混凝土下钢的布置方式,导致钢—混凝土组合结构连续梁桥在墩顶负弯矩区段混凝土桥面板受拉,钢梁受压,受力不利,这成为制约此种桥型发展和普及的重要因素。
早期的组合结构连续梁桥通常采取布置预应力筋对墩顶区域混凝土桥面板施加预应力的方式,但这种设计将导致钢梁顶板所承受压应力较大,而且随着混凝土徐变、收缩的发展,钢梁所承受压力将进一步加剧,与此同时混凝土桥面板预压应力损失较大,施加预应力效果不好。
显然钢结构的存在限制了预应力在组合梁中的应用,而不采用预应力的组合梁,对于简化构造、方便施工并降低造价具有很大的吸引力。因此随着对混凝土板损伤、破坏等方面认识水平的提高以及混凝土开裂对桥梁力学性能与耐久性的影响等方面研究的深入,人们开始转向允许混凝土板开裂,用混凝土裂纹宽度限值代替拉应力限值,通过提高普通钢筋配筋量来使混凝土保持较小的裂纹宽度的设计理念。这一设计原则与方法的改变是组合结构桥梁发展过程中的一项重要转变,它构造简单、施工方便、经济性好,促进了组合结构桥梁更大的发展。
结合上述设计理念,还可在施工过程中采取某些措施,对支点负弯矩区施加一定的预应力,主要措施包括支点顶升回落法和压重法。支点顶升回落法是指在梁体吊装到位并形成连续梁后,顶升中支点,然后浇筑墩顶混凝土桥面板,待混凝土桥面板与钢梁结合后再回落中支点,通过这种方法对支点混凝土桥面板施加预应力。压重法是指在钢梁跨中施加压重,待支点负弯矩区混凝土板与钢梁结合后在撤去压重,从而给支点混凝土施加压应力。
发明内容
本发明的目的在于提供一种钢—混凝土组合结构连续梁桥施工工法。
为了实现这一目的,本发明的技术方案如下:一种钢—混凝土组合结构连续梁桥施工工法,其特征在于:钢梁与混凝土桥面板在预制场地内形成单跨梁,将单跨梁整体吊装到位,进行钢梁连接接头施工、再施工墩顶混凝土桥面板,形成组合结构连续梁。
在预制场地分块预制混凝土桥面板,并存放4~6个月。钢梁分段制造,总拼形成单跨钢梁后,采用多点支撑方式,对中间支点进行额外顶升,将单跨钢梁跨中区域混凝土桥面板与单跨钢梁结合后撤出中支点,形成单跨梁。将单跨梁整体吊装到位后,在墩顶对相邻两个单跨梁的钢梁进行现场焊接连接,并在墩顶位置的钢梁底板上浇筑混凝土,底板混凝土厚度为30~50cm。采用支点升降法对墩顶混凝土桥面板施加一定的预应力。由跨中向两端依次连接各墩墩顶的单跨梁,最终形成组合结构连续梁。
本发明是世界范围内在开阔水域施工钢—混凝土组合结构连续梁结构的开创性工法,利用预制场地预制大部分构件,利用大型浮吊整段梁段吊装到位,利用墩顶支座升降法对墩顶段混凝土桥面板施加预应力,利用墩顶段钢梁底板双结合设计降低了该区域钢梁底板厚度,这些工法和措施保证了施工质量,加快了施工进度,对今后类似工程的设计、施工具有广泛和深远的借鉴意义。
附图说明
图1为本发明实施例步骤A的示意图
图2为步骤B的示意图
图3为图2的侧视图
图4为步骤C的示意图
图5为图4的侧视图
图6为步骤D的示意图
图7为图6的A-A剖视图
图8为步骤E的示意图
图9为图8的B-B剖视图
图10为步骤F的示意图
图11为步骤G的示意图
图12为步骤H的示意图
图13为步骤I的示意图
图14为步骤J的示意图
图15为步骤K的示意图
具体实施方式
本发明的实施例位于江海交汇处,水域宽阔,水深较深,适合大型浮吊整体吊装,且周边浮吊资源丰富,便于利用;同时考虑形成组合结构后整跨吊装到位、再施工支点混凝土桥面板,可使结构在一期荷载作用下为组合结构简支梁受力,最大程度地降低支点负弯矩水平并保证受力经济合理;因此,针对整体施工方案,采取了钢梁与混凝土桥面板在预制场地内形成单跨组合结构,整体吊装到位,进行钢梁连接接头施工、再施工墩顶区域混凝土桥面板,形成组合结构连续梁的方案。
混凝土桥面板采用预制板,结合时现浇纵横接缝;横向分块根据钢梁腹板布置尽量减少,纵向分块尺寸约5m,单块板吊装重量控制在50t以下;混凝土桥面板预制完成后搁置4~6个月,减少混凝土徐变、收缩的影响;钢梁分段制造,总拼形成单跨钢梁后,采用多点支撑方式,结合前对中间支点进行额外顶升,结合后撤出中支点,降低钢梁跨中底板拉应力,从而形成单跨梁。
对于墩顶负弯矩处理方案,采取了控制裂缝宽度法和支点升降法相结合的方案,墩顶底板区域采用双结合方案降低钢板厚度,降低墩顶现场环缝焊接难度。
在支点负弯矩区混凝土桥面板内不再布置纵向预应力筋,通过配置普通钢筋并限制裂缝宽度,普通钢筋配筋的标准是使受拉翼缘混凝土板在长期循环荷载作用下,裂缝宽度限制在规范允许范围内。
墩顶支点负弯矩区钢梁底板采用双结合方案,混凝土板厚度约30~50cm,钢梁底板厚度较薄,方便了现场焊接,简化了底板加劲肋系统。
对墩顶混凝土桥面板通过外加操作施加预应力的方案主要有压重法和支点升降法;压重法较为依赖钢梁自身刚度,钢梁刚度越大,要达到相同的效果,就需要施加更多的压重;支点升降法支点顶升和回落量可以自由选取,而且若采用整孔吊装方法,本身就需要布置千斤顶以进行梁体的精确定位,无需增加额外的施工设备;因此选择采用支座升降法对墩顶混凝土桥面板施加一定的预应力。
该施工工法的具体步骤包括:A、如图1所示,在预制场地分块预制混凝土桥面板中板1和混凝土桥面板边板2,并存放4~6个月;B、如图2和图3所示,分段预制钢梁节段3,然后将这些钢梁节段放置在钢梁拼装台座5上进行总拼,形成单跨钢梁4;C、如图4和图5所示,单跨钢梁采用四点支撑方案,在单跨钢梁4上搁置预制混凝土桥面板中板1,然后顶升中间两个支点6,顶升量计算可通过控制两边支点支反力为50t左右得到;D、如图6和图7所示,单跨钢梁4两端的混凝土桥面板边板2仅搁置于钢梁顶,通过钢扁担7与单跨钢梁4进行固定,不进行结合,单跨钢梁中间部分混凝土桥面板边板搁置到位后,现浇纵横接缝,接缝范围占梁跨比例约为90%;E、如图8和图9所示,待现浇缝强度、刚度达到要求后,撤除中间两个支点6,横向移梁,转换为梁端简支状态搁梁,成单跨梁9;F、如图10所示,利用浮吊8将上述单跨梁9吊装到位,利用三向可调临时支点将上述单跨梁9精确就位,临时支点标高需由设计根据桥面标高结合顶升回落量综合考虑确定,在墩顶对相邻单跨梁钢梁部分进行现场焊接连接;G、如图11所示,待所有单跨梁吊装到位并形成连续结构后,首先施工全桥中央一对中支点11的20%梁跨范围内的钢梁下缘现浇混凝土,即实施双结合10;H、如图12所示,待双结合10混凝土强度、刚度均达到设计要求后对中支点11实施顶升操作,顶升支点位置可选用临时支点,顶升量可控制在0.5~1.0m,具体数值可由设计确定;I、如图13所示,支点顶升到位后,实施该两支点范围内混凝土顶板现浇接缝12;J、如图14所示,待接缝强度、刚度均达到设计要求后实施回落操作,直接落至永久支座,撤销临时支点,回落量约为顶升量的80%;K、如图15所示,对于该对中支点两侧的两个支点实施双结合,并依次实施步骤H~J,顶升回落量均可控制在中支点顶升回落量的60%,并依次再施工再外围的中支点,顶升回落量可依次减小,形成组合结构连续梁13。
本发明的设计参考规范:
(1)《铁路桥涵设计规范》(TB10002.1-99~TB10002.5-99)
(2)《铁路组合梁设计规定》(TBJ 24-89)
(3)《钢桥、混凝土桥及结合桥》(BS5400)
(4)《美国公路桥梁设计规范》(AASHTO,2000)
(5)《上部构造设计基准·同解说》(日本本州四国联络桥公团,1989)
(6)《钢床版设计要领·同解说》(日本本州四国联络桥公团,1989)
施工规范:
(1)《公路桥涵施工技术规范》(JTJ041-2000)
Claims (1)
1.一种钢-混凝土组合结构连续梁桥施工工法,其特征在于:该施工工法的具体步骤包括:A、在预制场地分块预制混凝土桥面板中板和混凝土桥面板边板,并存放4~6个月;B、分段预制钢梁节段,然后将这些钢梁节段进行总拼,形成单跨钢梁;C、单跨钢梁采用四点支撑方案,在单跨钢梁上搁置预制混凝土桥面板中板,然后顶升中间两个支点;D、单跨钢梁两端的混凝土桥面板边板仅搁置于钢梁顶,通过钢扁担与钢梁进行固定,单跨钢梁中间部分混凝土桥面板边板搁置到位后,现浇纵横接缝,接缝范围占梁跨比例约为90%;E、待现浇缝强度、刚度达到要求后,撤除中间两个支点,横向移梁,转换为梁端简支状态搁梁,形成单跨梁;F、利用浮吊将上述单跨梁吊装到位,利用三向可调临时支点将上述单跨梁精确就位,在墩顶对相邻单跨梁的钢梁部分进行现场焊接连接;G、待所有组合结构单跨梁吊装到位并形成连续结构后,首先施工全桥中央一对中支点20%梁跨范围内钢梁下缘现浇混凝土,即实施双结合;H、待双结合混凝土强度、刚度均达到设计要求后对中支点实施顶升操作,临时支点即为顶升支点位置;I、支点顶升到位后,实施该两支点范围内混凝土顶板现浇接缝;J、待接缝强度、刚度均达到设计要求后实施回落操作,直接落至永久支座,撤销临时支点,回落量约为顶升量的80%;K、对于该对中支点两侧的两个支点实施双结合,待双结合混凝土强度、刚度均达到设计要求后对所述中支点两侧的两个支点实施顶升操作,临时支点即为顶升支点位置,并依次实施步骤I~J,顶升回落量为中支点顶升回落量的60%,并依次再施工再外围的支点,顶升回落量依次减小,形成组合结构连续梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100363461A CN101260649B (zh) | 2008-04-21 | 2008-04-21 | 一种钢-混凝土组合结构连续梁桥施工工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100363461A CN101260649B (zh) | 2008-04-21 | 2008-04-21 | 一种钢-混凝土组合结构连续梁桥施工工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101260649A CN101260649A (zh) | 2008-09-10 |
CN101260649B true CN101260649B (zh) | 2012-02-15 |
Family
ID=39961319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100363461A Active CN101260649B (zh) | 2008-04-21 | 2008-04-21 | 一种钢-混凝土组合结构连续梁桥施工工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101260649B (zh) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101694087B (zh) * | 2009-10-13 | 2011-05-11 | 毕承会 | 一种新型桥的建造方法 |
CN102094393B (zh) * | 2011-03-18 | 2012-10-10 | 重庆城建控股(集团)有限责任公司 | 钢与混凝土混合连续刚构桥钢混接头施工工艺 |
CN102425112B (zh) * | 2011-09-30 | 2013-08-28 | 李勇 | 预应力钢-混凝土组合桥梁制造方法 |
CN102605720B (zh) * | 2012-03-30 | 2013-12-11 | 中铁四局集团第一工程有限公司 | 连续梁钢筋骨架绑吊装一体化施工装备及施工方法 |
CN102877417B (zh) * | 2012-10-26 | 2014-12-03 | 中铁上海设计院集团有限公司 | 一种连续梁拱组合桥主梁吊杆的锚固方法 |
CN106192755A (zh) * | 2015-04-29 | 2016-12-07 | 江苏沪宁钢机股份有限公司 | 一种鱼腹式曲线型跨河双幅钢箱梁钢桥安装施工方法 |
CN106702876A (zh) * | 2016-12-14 | 2017-05-24 | 重庆交通大学 | 节段连续预制—顶推就位后联结的钢‑砼组合梁桥及其快速建造方法 |
CN108677714B (zh) * | 2018-05-21 | 2020-11-17 | 中铁大桥勘测设计院集团有限公司 | 新型钢砼组合梁混凝土板的内力调整方法 |
CN108708285B (zh) * | 2018-05-28 | 2019-09-20 | 北京市市政工程设计研究总院有限公司 | 通过调整临时支墩改善组合梁内力的成桥方法 |
CN111254836A (zh) * | 2020-02-18 | 2020-06-09 | 中交路桥建设有限公司 | 山区大跨径钢混组合梁现场拼装及架桥机架设施工方法 |
CN112482231A (zh) * | 2020-11-27 | 2021-03-12 | 上海宝冶冶金工程有限公司 | 一种高架桥通道上部结构预制段的施工方法 |
CN112853996A (zh) * | 2021-01-27 | 2021-05-28 | 广东省交通规划设计研究院股份有限公司 | 桥梁施工方法及桥梁 |
CN114703734B (zh) * | 2022-04-01 | 2024-02-02 | 山东高速集团有限公司创新研究院 | 钢混组合梁桥及施工方法 |
CN115125847A (zh) * | 2022-06-22 | 2022-09-30 | 保利长大工程有限公司 | 一种钢板组合梁安装施工方法 |
CN115233546B (zh) * | 2022-07-29 | 2024-09-03 | 四川省交通勘察设计研究院有限公司 | 一种连续钢混组合梁、桥梁及施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100650149B1 (ko) * | 2006-08-17 | 2006-11-30 | 현대엔지니어링 주식회사 | 밸러스트왜건을 이용한 연속 교량의 콘크리트슬래브 현장 타설 방법 |
CN1940183A (zh) * | 2006-08-04 | 2007-04-04 | 铁道第五勘察设计院 | 一种中跨连续梁造桥机及其造桥方法 |
-
2008
- 2008-04-21 CN CN2008100363461A patent/CN101260649B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1940183A (zh) * | 2006-08-04 | 2007-04-04 | 铁道第五勘察设计院 | 一种中跨连续梁造桥机及其造桥方法 |
KR100650149B1 (ko) * | 2006-08-17 | 2006-11-30 | 현대엔지니어링 주식회사 | 밸러스트왜건을 이용한 연속 교량의 콘크리트슬래브 현장 타설 방법 |
Non-Patent Citations (3)
Title |
---|
卢永成, 王天华.上海长江大桥设计技木简述.《上海公路》.2007,(第4期),27-30. * |
邵长宇.上海长江大桥的技木探索与经验.《第十八届全国桥梁学术会议论文集》.人民交通出版社,2008,58-65. * |
邵长宇.主跨105m连续组合箱梁桥设计构思.《第十七届全国桥梁学术会议论文集(上册)》.人民交通出版社,2006,273-278. * |
Also Published As
Publication number | Publication date |
---|---|
CN101260649A (zh) | 2008-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101260649B (zh) | 一种钢-混凝土组合结构连续梁桥施工工法 | |
CN101424075B (zh) | 混凝土箱梁桥拓宽加固结构及其施工方法 | |
CN204530418U (zh) | 一种钢板组合梁桥 | |
CN106638304A (zh) | Uhpc‑普通混凝土叠层复合桥面板构造及其施工方法 | |
CN101613997A (zh) | 一种钢-混凝土组合加宽方法 | |
CN101424073A (zh) | 整孔预制的钢-混凝土组合连续箱梁的桥面板与钢梁的二次结合方法 | |
CN106436591B (zh) | 一种钢悬臂组合桥面板加宽改造结构及其施工方法 | |
CN108867310A (zh) | 先张法预应力混凝土矮肋t梁桥及其施工方法 | |
CN204919302U (zh) | 波形钢腹板少主梁结构 | |
CN106012960A (zh) | 一种装配式高桩码头上部结构体系及其施工方法 | |
CN107988924B (zh) | 一种基于旧桥改建的钢-混组合梁桥体系转换系统及转换方法 | |
CN107587424A (zh) | 一种超高性能混凝土桥面板 | |
CN101469533A (zh) | 墩顶无支架临时固结工艺 | |
CN108999427B (zh) | 一种建筑物迁移就位时移动荷载的支撑结构及其施工方法 | |
CN108824211A (zh) | 一种桥梁的河道内桥墩基础施工方法 | |
CN105887648A (zh) | 一种采用分层开孔板连接件的钢-混凝土部分预制叠合梁结构及其制作工艺 | |
CN206655141U (zh) | 一种钢悬臂组合桥面板加宽改造结构 | |
Ingebrigtsen | Stolma bridge, norway | |
CN111186780A (zh) | 动臂式塔吊底架压重式基础及施工方法 | |
CN207597914U (zh) | 一种既有建筑群下加建多层地下空间的施工受力结构 | |
Hanswille | Composite bridges in Germany designed according to Eurocode 4-2 | |
CN111764291B (zh) | 一种分离式铁路桥梁钢混过渡段结构施工方法 | |
CN213896714U (zh) | 预制梁式拱桥 | |
CN109868744B (zh) | 免现浇铺装层的全预制混凝土桥面板 | |
CN209615940U (zh) | 一种适用软土地质的通用型预制梁台座 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |