超前双排注浆小导管施工工艺 Download PDF

Info

Publication number
CN101196118A
CN101196118A CNA200810055701XA CN200810055701A CN101196118A CN 101196118 A CN101196118 A CN 101196118A CN A200810055701X A CNA200810055701X A CN A200810055701XA CN 200810055701 A CN200810055701 A CN 200810055701A CN 101196118 A CN101196118 A CN 101196118A
Authority
CN
China
Prior art keywords
ductule
steel grating
slip casting
row
double rows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810055701XA
Other languages
English (en)
Inventor
孔恒
汪波
丁磊
祝显学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CNA200810055701XA priority Critical patent/CN101196118A/zh
Publication of CN101196118A publication Critical patent/CN101196118A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种超前双排注浆小导管施工工艺,其步骤为:先开挖结构竖井,安放首榀钢格栅,在钢格栅上打设双排注浆小导管,它与钢格栅轮廓线所构成弧面倾角分别为7~10°和30~60°,环向间距均为0.3~0.4m,然后向小导管中注浆,待注浆土体达到强度后,按钢格栅纵向间距要求开挖土体,安放下一榀钢格栅,再打设双排注浆小导管,直至安放末榀钢格栅为止。本发明的优点是:针对大断面暗挖隧道,尤其是穿越建筑物底部、隧道拱部处于无粘结、自稳能力差的砂层及砂砾(卵)石层等地层时,对地层打设双排注浆小导管,可对地层进行全面加固,在原有加固壳体的基础上形成第二层缓冲壳体,进一步减缓或避免地层破坏后的沉降及建(构)筑物的损坏。

Description

超前双排注浆小导管施工工艺
技术领域
本发明是指一种超前双排注浆小导管施工工艺。它作为施工防塌陷沉的必要有效手段,适用于大断面暗挖隧道,以及劣质土层中顶管(人工顶管)施工需要对土体进行预先加固的工程。尤其是穿越建筑物底部、穿越沉降要求控制严格的构筑物(如在铁路、桥梁等下方施工),隧道拱部处于无粘结、自稳力差的砂层及砂砾(卵)石层及松散地质土层。
背景技术
超前小导管注浆进行土体预加固在隧道工程领域内是一种现有的施工工艺。常规做法:一般选用φ32水煤气管制作注浆小导管,长度控制在2~3m,注浆小导管沿隧道周边单排布设,环向间距一般不大于400mm,导管插入角度控制在10~15°以内。其缺点是在大断面暗挖隧道穿越建(构)筑物底部及对应隧道拱部处于无粘结、自稳能力差的砂层及砂砾(卵)石层等地层以及劣质土层中,由于单层加固形成的注浆壳体封闭环较为薄弱,对地层的加固效果较差,沉降难以控制,如果土壤加固壳体达不到设计效果可能发生重大事故。
发明内容
本发明的目的是针对单层超前注浆小导管注浆效果不理想的现状,进行科学的理论分析、摸索,并且结合工程实体的实践,提供一种针对大断面暗挖隧道,尤其是穿越建筑物底部时,作为加固用的超前双排注浆小导管施工工艺。本发明采用双排加固,可在加固的基础上减缓地基沉降,上排受力对下排减缓压力,从而达到防止坍塌,保证安全的目的。
本发明的目的是由以下技术方案实现的。
一种超前双排注浆小导管施工工艺,包括以下步骤:
(1)开挖结构竖井,开挖至隧道口上方时做超前大管棚;
(2)开挖隧道沿纵向达规范要求进尺后,安放首榀钢格栅,钢格栅为拱形框架结构,其轮廓线与隧道开挖轮廓线相同;
(3)沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第一排小导管,它与钢格栅轮廓线所构成弧面倾角为7°~10°,小导管之间环向间距为0.3m~0.4m;
(4)沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第二排小导管,它与钢格栅轮廓线所构成弧面倾角为30°~60°,小导管之间环向间距为0.3m~0.4m;
(5)对上述双排小导管进行注浆,待注浆土体达到强度后,按钢格栅纵向间距设定要求开挖暗挖结构断面四周土体;
(6)再安放下一榀钢格栅拱架,采用钢筋及钢筋网片将前后钢格栅焊接牢固,按设计给定的暗挖初期支护厚度喷射混凝土至此榀钢格栅处;
(7)按钢格栅纵向间距设定要求开挖暗挖结构断面核心部分土体;
(8)在步骤(6)中的该榀钢格栅拱架上再按步骤(3)、步骤(4)分别打设第一排、第二排小导管,然后注浆,开挖土体,再安放下一榀钢格栅拱架,循环往复,直至安放末榀钢格栅为止。
钢格栅榀数的多少视暗挖隧道长度而定。
钢格栅纵向间距设定要求为0.5m(两榀钢格栅构件中心之间的距离)。
每排小导管均由多根大小、形状相同的小导管呈等间距立体平行排列,每排小导管的后端部分均与钢格栅固接。
根据地层土质的不同,小导管采用直径25~42mm的无缝钢管、水煤气管等,壁厚3.5~6.5mm,长度为2.25~3.5m,可视地层不同采用不同尺寸。
小导管前端为200~300mm长的圆锥状,在距后端1000mm不开孔(后端部分与钢格栅固接),剩余部分沿管壁间隔200mm梅花形设置溢浆孔,溢浆孔直径为6~8mm。将双排注浆小导管按规定角度打入地层,往小导管中注浆时,浆液从溢浆孔中溢出,渗入地层中,达到加固地层的目的。
依据暗挖断面所处的土层分布情况选择适合的注浆材料,常用的注浆材料有:改性水玻璃浆液、水泥水玻璃双液浆、水泥砂浆、水泥浆或超细水泥浆等。
本发明的优点是:本发明为超前双排注浆小导管施工工艺,是针对大断面暗挖隧道,尤其是穿越建筑物底部、隧道拱部处于无粘结、自稳能力差的砂层及砂砾(卵)石层等地层时,对地层打设角度不同的双排注浆小导管,可对地层进行全面加固,和传统注浆小导管相比较,在原有加固壳体的基础上形成第二层缓冲壳体,进一步减缓或避免地层破坏后的沉降及建(构)筑物的损坏。
附图说明
图1为超前双排注浆小导管纵断面设置立体结构示意图。
图2为超前双排注浆小导管横断面设置结构示意图。
图3为图2的A-A剖面图。
图4为小导管结构示意图。
图中:1.第一排小导管,2.第二排小导管,3.钢格栅,4.溢浆孔。
具体实施方式
实施例:北京地铁四号线工程动物园站(土建)的施工中,1#暗挖风道的施工。其风道为单层暗挖结构,风井四周距现有的建(构)筑物较近。在暗挖施工过程中,为了保护现有的建(构)筑物结构的安全,采用了本发明“超前双排注浆小导管施工工艺”。
本实施例所述的超前双排注浆小导管施工工艺用于暗挖隧道施工,它包括以下步骤:
(1)开挖结构竖井,开挖至隧道口上方时做超前大管棚;
(2)开挖隧道沿纵向达规范要求进尺后,安放首榀钢格栅,钢格栅为拱形框架结构,其轮廓线与隧道开挖轮廓线相同;
(3)沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第一排小导管,它与钢格栅轮廓线所构成弧面倾角为7°~10°,小导管之间环向间距为0.3m~0.4m;
(4)沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第二排小导管,它与钢格栅轮廓线所构成弧面倾角为30°~60°,小导管之间环向间距为0.3m~0.4m;
(5)对超前双排注浆小导管进行注浆,待注浆土体达到强度后,按钢格栅纵向间距设定要求的0.5m开挖结构断面周边土体;
(6)再安放下一榀钢格栅拱架,采用钢筋和钢筋网片将前后钢格栅焊接牢固;按设计给定的暗挖初期支护厚度喷射混凝土至此榀钢格栅处;
(7)按钢格栅纵向间距设定要求的0.5m开挖暗挖结构断面核心部分土体;
(8)在步骤(6)中的该榀钢格栅拱架上再按步骤(3)、步骤(4)分别打设第一排、第二排小导管,然后注浆,开挖土体,再安放下一榀钢格栅拱架,循环往复,直至安放末榀钢格栅为止,隧道工程暗挖结束。
超前双排注浆小导管管内注浆材料的选择,主要依据暗挖断面所处的土层分布情况选择适合的注浆材料,常用的注浆材料有:改性水玻璃浆液、水泥水玻璃双液浆、水泥砂浆、水泥浆、超细水泥浆等。本实施例中采用了PH=3~4的改性水玻璃浆液。
如图1、图2所示,钢格栅3上设置双排小导管,每排小导管均由多根大小、形状相同的小导管呈等间距立体平行排列,每排小导管的后端部分均与钢格栅3固接;钢格栅3为拱形框架结构,其轮廓线与隧道开挖轮廓线相同,第一排小导管1与钢格栅3轮廓线所构成弧面倾角为7~10°,第二排小导管2与钢格栅3轮廓线所构成弧面倾角为30~60°;小导管之间的环向间距均为0.3~0.4m。
双排小导管在钢格栅3上的设置范围以钢格栅中心线为对称中心150~180°夹角。
小导管采用直径25~42mm的无缝钢管,壁厚3.5~6.5mm,长度为2.25~3.5m,可视地层不同采用不同尺寸。
如图4所示,小导管前端为200~300mm长的圆锥状,在距后端1000mm不开孔,剩余部分沿管壁间隔200mm梅花形设置溢浆孔4,溢浆孔直径为6~8mm。
如图3所示,钢格栅3的框架结构为现有技术,每排小导管与钢格栅3固接部分为点焊连接。
开挖隧道时,钢格栅按隧道开挖轮廓线大小制作,将双排注浆小导管的后端部分与钢格栅焊接,当往小导管中注浆时,浆液从溢浆孔中溢出,渗入地层中,达到双层加固地层的目的。通常双排注浆小导管在施工中需安装多榀(一环钢格栅为一榀),故应确保前次注浆小导管未开挖部分水平长度1.0m以上,前后导管搭接1.0m以上。
小导管的打设可采用引孔顶入法,其步骤为:
(1)用YT-28风钻引孔,或用吹管将砂石吹出成孔,孔径50mm,孔深视导管长度而定;
(2)插入导管,如插入困难,可用带冲击锤的风钻顶入;
(3)用吹风管将管内砂石吹出,或用掏勾将砂石掏出;
(4)导管周围缝隙用塑胶泥封堵,并用棉纱将孔口堵塞。
在每根小导管内注浆,浆液从溢浆孔中溢出,渗入地层中;注浆材料可采用PH=3~4的改性水玻璃浆液,注浆过程中,压力逐渐上升,流量逐渐减少,当压力达到注浆终压,注浆量达到设计注浆量80%以上,可结束注浆;注浆终压为0.5~0.8MP,注浆扩散半径为0.5m,注浆速度为≤30L/min。

Claims (5)

1.一种超前双排注浆小导管施工工艺,其特征在于:它包括以下步骤:
①开挖结构竖井,开挖至隧道口上方时做超前大管棚;
②开挖隧道沿纵向达规范要求进尺后,安放首榀钢格栅,钢格栅为拱形框架结构,其轮廓线与隧道开挖轮廓线相同;
③沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第一排小导管,它与钢格栅轮廓线所构成弧面倾角为7°~10°,小导管之间环向间距为0.3m~0.4m;
④沿暗挖断面钢格栅中心线为对称中心150°~180°夹角范围,打设第二排小导管,它与钢格栅轮廓线所构成弧面倾角为30°~60°,小导管之间环向间距为0.3m~0.4m;
⑤对双排小导管进行注浆,待注浆土体达到强度后,按钢格栅纵向间距设定要求开挖暗挖结构断面四周土体;
⑥再安放下一榀钢格栅拱架,采用钢筋和钢筋网片将前后钢格栅焊接牢固;按设计给定的暗挖初期支护厚度喷射混凝土至此榀钢格栅处;
⑦按钢格栅纵向间距设定要求开挖暗挖结构断面核心部分土体;
⑧在步骤⑥中的该榀钢格栅拱架上再按步骤②、步骤③分别打设第一排、第二排小导管,然后注浆,开挖土体,再安放下一榀钢格栅拱架,循环往复,直至安放末榀钢格栅为止。
2.如权利要求1所述的超前双排注浆小导管施工工艺,其特征在于:每排小导管均由多根大小、形状相同的小导管呈等间距立体平行排列,每排小导管的后端部分均与钢格栅固接。
3.如权利要求1所述的超前双排注浆小导管施工工艺,其特征在于:小导管采用直径25~42mm的无缝钢管或水煤气管,壁厚3.5~6.5mm,长度为2.25~3.5m。
4.如权利要求1所述的超前双排注浆小导管施工工艺,其特征在于:小导管前端为200~300mm长的圆锥状,在距后端1000mm不开孔,剩余部分沿管壁间隔200mm梅花形设置溢浆孔。
5.如权利要求1所述的超前双排注浆小导管施工工艺,其特征在于:所用的注浆材料为:改性水玻璃浆液、水泥水玻璃双液浆、水泥砂浆、水泥浆或超细水泥浆。
CNA200810055701XA 2008-01-07 2008-01-07 超前双排注浆小导管施工工艺 Pending CN101196118A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810055701XA CN101196118A (zh) 2008-01-07 2008-01-07 超前双排注浆小导管施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810055701XA CN101196118A (zh) 2008-01-07 2008-01-07 超前双排注浆小导管施工工艺

Publications (1)

Publication Number Publication Date
CN101196118A true CN101196118A (zh) 2008-06-11

Family

ID=39546723

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810055701XA Pending CN101196118A (zh) 2008-01-07 2008-01-07 超前双排注浆小导管施工工艺

Country Status (1)

Country Link
CN (1) CN101196118A (zh)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798931A (zh) * 2010-03-12 2010-08-11 中铁隧道集团有限公司 一种隧道和地下工程无工作间超前大管棚施工工艺方法
CN101892844A (zh) * 2009-05-20 2010-11-24 深圳市海川实业股份有限公司 一种超前锚杆支护的隧道crd开挖方法
CN101906974A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道的支护结构及其施工方法
CN101906975A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道下穿铁路的支护结构及其施工方法
CN102606168A (zh) * 2012-03-16 2012-07-25 西安理工大学 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN102808627A (zh) * 2012-09-07 2012-12-05 中国建筑第八工程局有限公司 钢管棚暗挖施工方法
CN103161477A (zh) * 2013-02-04 2013-06-19 陕西煤业化工建设(集团)有限公司 砂层空间超前支护加固工艺
CN103374920A (zh) * 2012-04-27 2013-10-30 北京市政建设集团有限责任公司 一种竖井一衬结构及其施工方法
CN103374915A (zh) * 2012-04-27 2013-10-30 北京市政建设集团有限责任公司 一种锚喷倒挂连续封闭支护体系及其施工方法
CN103527202A (zh) * 2012-07-27 2014-01-22 中国有色金属工业第六冶金建设有限公司 一种在复杂地质条件下隧洞的施工方法
CN103615257A (zh) * 2013-11-29 2014-03-05 葛洲坝集团第五工程有限公司 长距离小断面ⅴ2类围岩水工隧洞小导管超前支护方法
CN104100280A (zh) * 2014-07-07 2014-10-15 中冶交通工程技术有限公司 一种双翼挑梁初期支护结构及其隧道施工方法
CN104533451A (zh) * 2014-12-05 2015-04-22 中国电建集团成都勘测设计研究院有限公司 在散体碎石土及破碎围岩中的隧道超前预支护技术
CN104612714A (zh) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 在穿越围岩较差地质条件下的矿山法隧道施工方法及结构
CN104632249A (zh) * 2014-12-05 2015-05-20 中国电建集团成都勘测设计研究院有限公司 在松散软弱破碎围岩中的隧道系统支护技术
CN104806267A (zh) * 2015-04-29 2015-07-29 中铁第一勘察设计院集团有限公司 卵石土地层超前大管棚的盾构端头加固体系及其施工方法
CN105781591A (zh) * 2016-01-26 2016-07-20 中铁二十二局集团第工程有限公司 一种管棚支护结构
CN106703063A (zh) * 2016-12-13 2017-05-24 中国地质大学(武汉) 一种加固软土地层中桩基础的顶管施工方法
CN107905219A (zh) * 2017-11-20 2018-04-13 江门市政企业集团有限公司 一种复杂地质条件下超深人工开挖桩孔的施工方法
CN109538236A (zh) * 2018-12-07 2019-03-29 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN110424971A (zh) * 2019-08-20 2019-11-08 中国电建集团成都勘测设计研究院有限公司 处理小断面隧洞塌方的方法
CN110552723A (zh) * 2019-09-16 2019-12-10 中国十九冶集团有限公司 小断面陡斜坡隧道持续性塌方冒顶的治理施工方法
CN110924984A (zh) * 2019-11-29 2020-03-27 北京中科中电电力工程管理有限公司 隧道注浆设备及工艺
CN114060060A (zh) * 2021-11-16 2022-02-18 中铁十八局集团有限公司 一种窄翼型超前小导管及其群管效应防坍塌施工工艺

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892844A (zh) * 2009-05-20 2010-11-24 深圳市海川实业股份有限公司 一种超前锚杆支护的隧道crd开挖方法
CN101798931A (zh) * 2010-03-12 2010-08-11 中铁隧道集团有限公司 一种隧道和地下工程无工作间超前大管棚施工工艺方法
CN101906974A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道的支护结构及其施工方法
CN101906975A (zh) * 2010-08-09 2010-12-08 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道下穿铁路的支护结构及其施工方法
CN102606168A (zh) * 2012-03-16 2012-07-25 西安理工大学 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN103374915B (zh) * 2012-04-27 2015-05-13 北京市政建设集团有限责任公司 一种锚喷倒挂连续封闭支护体系及其施工方法
CN103374920A (zh) * 2012-04-27 2013-10-30 北京市政建设集团有限责任公司 一种竖井一衬结构及其施工方法
CN103374915A (zh) * 2012-04-27 2013-10-30 北京市政建设集团有限责任公司 一种锚喷倒挂连续封闭支护体系及其施工方法
CN103374920B (zh) * 2012-04-27 2015-04-15 北京市政建设集团有限责任公司 一种竖井一衬结构及其施工方法
CN103527202A (zh) * 2012-07-27 2014-01-22 中国有色金属工业第六冶金建设有限公司 一种在复杂地质条件下隧洞的施工方法
CN102808627A (zh) * 2012-09-07 2012-12-05 中国建筑第八工程局有限公司 钢管棚暗挖施工方法
CN103161477A (zh) * 2013-02-04 2013-06-19 陕西煤业化工建设(集团)有限公司 砂层空间超前支护加固工艺
CN103615257A (zh) * 2013-11-29 2014-03-05 葛洲坝集团第五工程有限公司 长距离小断面ⅴ2类围岩水工隧洞小导管超前支护方法
CN104100280A (zh) * 2014-07-07 2014-10-15 中冶交通工程技术有限公司 一种双翼挑梁初期支护结构及其隧道施工方法
CN104632249A (zh) * 2014-12-05 2015-05-20 中国电建集团成都勘测设计研究院有限公司 在松散软弱破碎围岩中的隧道系统支护技术
CN104533451A (zh) * 2014-12-05 2015-04-22 中国电建集团成都勘测设计研究院有限公司 在散体碎石土及破碎围岩中的隧道超前预支护技术
CN104612714A (zh) * 2014-12-31 2015-05-13 上海市机械施工集团有限公司 在穿越围岩较差地质条件下的矿山法隧道施工方法及结构
CN104806267A (zh) * 2015-04-29 2015-07-29 中铁第一勘察设计院集团有限公司 卵石土地层超前大管棚的盾构端头加固体系及其施工方法
CN105781591A (zh) * 2016-01-26 2016-07-20 中铁二十二局集团第工程有限公司 一种管棚支护结构
CN106703063A (zh) * 2016-12-13 2017-05-24 中国地质大学(武汉) 一种加固软土地层中桩基础的顶管施工方法
CN106703063B (zh) * 2016-12-13 2017-08-25 中国地质大学(武汉) 一种加固软土地层中桩基础的顶管施工方法
CN107905219A (zh) * 2017-11-20 2018-04-13 江门市政企业集团有限公司 一种复杂地质条件下超深人工开挖桩孔的施工方法
CN109538236A (zh) * 2018-12-07 2019-03-29 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN109538236B (zh) * 2018-12-07 2024-04-02 中铁十局集团有限公司 一种隧道进洞结构及隧道进洞施工方法
CN110424971A (zh) * 2019-08-20 2019-11-08 中国电建集团成都勘测设计研究院有限公司 处理小断面隧洞塌方的方法
CN110552723A (zh) * 2019-09-16 2019-12-10 中国十九冶集团有限公司 小断面陡斜坡隧道持续性塌方冒顶的治理施工方法
CN110552723B (zh) * 2019-09-16 2021-01-26 中国十九冶集团有限公司 小断面陡斜坡隧道持续性塌方冒顶的治理施工方法
CN110924984A (zh) * 2019-11-29 2020-03-27 北京中科中电电力工程管理有限公司 隧道注浆设备及工艺
CN114060060A (zh) * 2021-11-16 2022-02-18 中铁十八局集团有限公司 一种窄翼型超前小导管及其群管效应防坍塌施工工艺

Similar Documents

Publication Publication Date Title
CN101196118A (zh) 超前双排注浆小导管施工工艺
CN108678776B (zh) 砂质黏土地质隧道冒顶处理方法
CN102606167B (zh) 浅埋暗挖隧道横向注浆导管沉降控制施工方法
CN103306687B (zh) 软岩隧道长悬臂水平旋喷变形控制施工方法
CN102562099B (zh) 黄土隧道双排小导管快速进洞施工方法
CN110878696B (zh) 上软下硬地层盾构法与矿山法交界处隧道段围岩加固方法
CN102606168B (zh) 防止浅埋暗挖隧道开挖时沉降变形的施工方法
CN104389628B (zh) 滑坡地段隧道加固装置及加固施工方法
CN110056369A (zh) 一种隧道进出口洞口的施工方法
CN104533446A (zh) 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的施工方法及其结构
CN109681210A (zh) 一种断面暗挖隧道施工的双侧壁导坑法
CN107965325B (zh) 一种小净距浅埋隧道初支拱架更换施工方法
CN205117357U (zh) 基于自钻式螺旋管棚的软弱围岩隧道超前支护结构
CN106869969A (zh) 一种软岩超大断面隧道的开挖支护施工方法
CN111502696A (zh) 暗挖隧道的密网式超前支护系统及施工方法
CN103321653A (zh) 地下洞室顶拱塌方后的衬砌处理方法
CN103758123A (zh) 人工挖孔灌注桩护壁衬的施工方法
CN106014449A (zh) 双线小净距大断面节理岩体地铁隧道的施工方法
CN107165661A (zh) 一种高地应力软弱围岩大变形隧道超长扩大头锚索施工方法
CN203321531U (zh) 地下洞室顶拱塌方后的衬砌处理结构
CN103089276A (zh) 深浅孔与高低压耦合注浆工艺
CN104612696A (zh) 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法
CN106837382A (zh) 一种地铁隧道围岩地面预注浆加固工艺
CN102128038B (zh) 一种隧道管棚快速施工方法
CN109184742B (zh) 一种高压富水软弱围岩山岭隧道的超前预注浆方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080611