CN101050617B - Low span-depth path separate passing through inter change cross junction - Google Patents

Low span-depth path separate passing through inter change cross junction Download PDF

Info

Publication number
CN101050617B
CN101050617B CN2007100683906A CN200710068390A CN101050617B CN 101050617 B CN101050617 B CN 101050617B CN 2007100683906 A CN2007100683906 A CN 2007100683906A CN 200710068390 A CN200710068390 A CN 200710068390A CN 101050617 B CN101050617 B CN 101050617B
Authority
CN
China
Prior art keywords
road
passage
lanes
turn
belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100683906A
Other languages
Chinese (zh)
Other versions
CN101050617A (en
Inventor
倪既民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007100683906A priority Critical patent/CN101050617B/en
Publication of CN101050617A publication Critical patent/CN101050617A/en
Application granted granted Critical
Publication of CN101050617B publication Critical patent/CN101050617B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention provides a new design precept of low-span high-passageway separated through-intercommunication road intersection. Said design precept is aimed at resolving the urban traffic blockage problem. Said invention also provides the concrete structure of said road intersection and its concrete construction scheme and method.

Description

Low span-depth path separate passing through inter change cross junction
Technical field
The invention belongs to a kind of cross intersection and improve, especially low span-depth path separate passing through inter change cross junction.
Technical background
The development of human economy and technology participates among social production and the life automobile more and more in a large number, and it brings busy to urban road network traffic and blocks up.In the prior art; Urban road intersection also often adopts graded crossing when signal management can not adapt to busy stream of people's wagon flow; Existing graded crossing is provided with pedestrian or driving individual event construction; Genuine and the expressway overpass bridge etc. like the pedestrian's street crossing overline bridge also has the pedestrian to drive a vehicle and unifies the graded crossing of body.In the city; It is all quite busy that intersection is built dense stream of people's wagon flow; The unification graded crossing normally divides folded multilayer to set up and connects many built on stilts ring roads but existing pedestrian drives a vehicle; Not only the scale of construction, engineering and costly also makes pedestrian's loaded down with trivial details inconvenience of driving a vehicle, so although yet the bustling lively intersection in city quite has demand to be difficult to hold also rare application of seeing.Chinese patent " direct overrun flat tura city interchange cross road " (200410067097.4; 200420090955.2) design use straight-through stride bridge pacifically ring road combine effectively to simplify the road graded crossing, so be applied in the business district pedestrian and cross over the intersection and also have more inconvenience and conflict.Chinese patent " the high variable short slope road overpass bridge of main span " (200610052571.5; 200620105865.5) design utilization breaks through the existing road and bridge beam standard of striding and reduce the high thinking of clear span, opened up to stride the road and bridge beams and dwindle the occupation of land scale significantly and save cost, reduce the vehicular traffic climbing in a large number and consume the new way that reduces exhaust emission.
Summary of the invention
Order of the present invention ground is that a kind of low span-depth path separate passing through inter change cross junction will be provided; Optimize through innovation the dedicated channel position ingenious arrangement pedestrian path of driving a vehicle is set; Graded crossing structure is simplified take up an area of and is dwindled widely applicable economic environmental protection, let each to pedestrian and vehicle via rationally passing through easily and turning to the passage realization of taking their own roads unimpeded in order.
The objective of the invention is to realize like this: it is to form sidewalk, pedestrian's passage lanes, avris at vertical road of cross intersection to turn to passage, lowly stride that high passage lanes, centre turn to passage, lowly stride high passage lanes, avris turns to passage, pedestrian's passage lanes, sidewalk positional alignment for a low span-depth path separate passing through inter change cross junction; The level land ring road, is striden high passage lanes and is constituted with sidewalk and the roadway that People's Bank of China's passage lanes passes through the belt road that intersects from underground, semi-underground or ground by low to road and belt road around the inboard building of intersection corner or green land connection lengthwise.Said pedestrian's passage lanes is the passage of walking from pedestrian underground, semi-underground or that pass through on the ground intersect belt road sidewalk and roadway; Hang down and stride high passage lanes for pass through the high driving of the low clear span passage that is lower than the Overheight Vehicles elevation of intersect belt road sidewalk and roadway from underground, semi-underground or ground.It is to be positioned at sidewalk avris connection lengthwise to the driving passage of road with the belt road that intersects that said avris turns to passage; The centre turn to passage be in vertical road midfeather in two low connection lengthwise of striding between the high passage lanes to the driving passage of road with the belt road that intersects; The level land ring road is to the ground of road and belt road garage passage around the inboard building of intersection corner or green land connection lengthwise.At low span-depth path separate passing through inter change cross junction; Vertically road is to pass through belt road through pedestrian's passage lanes to the pedestrian directly; Craspedodrome motor vehicles and non power driven vehicle are striden high passage lanes and are passed through belt road through low; The right-hand rotation motor vehicles turn to the passage non power driven vehicle to turn to passage to turn to into belt road through avris and go through the centre, the motor vehicles that need and non power driven vehicle are striden high passage lanes and passed through belt road ring road detours and changes direction entering belt road and go through the level land again from low earlier.On belt road; Motor vehicles of keeping straight on and non power driven vehicle are kept straight on without hindrance; The right-hand rotation motor vehicles turn to the passage non power driven vehicle to turn to passage to turn to into vertical road driving through avris through the centre, the motor vehicles of left-hand rotation and non power driven vehicle are kept straight on and striden across vertical road ring road detours and changes direction and get into vertical road driving through the level land again.Low span-depth path separate passing through inter change cross junction has been realized the simple overpass intercommunication; But on belt road, also exist a little craspedodrome pedestrians and turn right motor-driven and bicycle and craspedodrome bicycle and right-hand rotation motor vehicle that the traffic skirmish of at grade intersection is arranged; Yet numerous branch roads intersection and cross walk need not to establish traffic administration in urban road, specially the road separate, sparse dispersion and the vehicle that turns to deceleration with pass through the pedestrian and all adopt active to dodge separately not hinder fully in unimpeded.
Low span-depth path separate passing through inter change cross junction is optimized through innovation dedicated channel position ingenious the arrangements pedestrian path of driving a vehicle is set, and makes cross graded crossing structure simplify the environmental protection of occupation of land reduction capability overall economic.It is to break through the existing high the principle of economizing of road and bridge beam standard reduction clear span of striding; The low rare Overheight Vehicles in high passage lanes restriction city of striding are set to be passed through; Shortened the ramp and reduced the grade separation scale and saved building costs and improved applicability, the exhaust environment pollution has been lowered in the climbing energy consumption that has more reduced countless vehicular traffic.It is used the level land ring road and makes the simple intercommunication in intersection; Turn to passage in the middle of in the middle of road, being provided with especially again; The motor vehicle of both having avoided turning right conflicts with the lane change of craspedodrome bicycle; Turn in the middle of can also making passage to become the occasional passage that idol has Overheight Vehicles, realize each to Pedestrians and vehicles take their own roads unimpeded.
Description of drawings
Be described further below in conjunction with the basic structure principle and the typical exemplifying embodiment thereof of accompanying drawing this patent design:
Fig. 1 is upright cross road mouth (underground passing through) basic structure of low span-depth path separate passing through inter change cross and intercommunication driving signal.
Fig. 2 is a kind of underground belt road part-structure example of passing through of low span-depth path separate passing through inter change cross junction.
Fig. 3 is a kind of underground belt road cut-away section signal of passing through of low span-depth path separate passing through inter change cross junction.
Fig. 4 is the semi-underground belt road part-structure example of passing through of low span-depth path separate passing through inter change cross junction.
Fig. 5 is that the semi-underground belt road cut-away section that passes through of low span-depth path separate passing through inter change cross junction is illustrated.
Fig. 6 is that belt road part-structure example is passed through in a kind of ground of low span-depth path separate passing through inter change cross junction.
Fig. 7 is that belt road part side-looking signal is passed through in a kind of ground of low span-depth path separate passing through inter change cross junction.
In the accompanying drawing: 1 is vertical road; 2 is belt road; 3 is the sidewalk; 4 is pedestrian's passage lanes; 5 turn to passage for avris; 6 is the low high passage lanes of striding; 7 turn to passage for the centre; 8 is the level land ring road; 9 is building; 10 is green land.Motor vehicle and direct of travel thereof are represented with arrow in the accompanying drawing, and bicycle is represented for the bicycle pattern.
The specific embodiment
Low span-depth path separate passing through inter change cross junction in force; Can select to build underground, semi-underground or the ground pattern according to the actual conditions of intersection; Underground or semi-underground pattern is very little to the environmental landscape influence, selects for use shallow-layer to pass through the downsizing general intersection of canalization to hold.In the restriction lorry city of going down town, lowly stride high passage lanes and can be arranged on only for the city motor bus through elevation, dwindle grade separation occupation of land scale and reducing the construction costs with more ramp length that reduce more.If bicycle and motor vehicle path are separated or separated constructions, it is wide not only can to reduce striding of motor vehicle path, also can lower the bicycle path and stride the height minimizing gradient.In the enforcement; Pedestrian's passage lanes can parallel connection or is separated the low high passage lanes construction of striding; The centre turns to passage that two tracks only are set less and goes to make things convenient for steered vehicle, and avris turns to passage as enough width are set, and treats also can hold concurrently after the non power driven vehicle rareness to supply special-purpose vehicle and emergency vehicles current or stop.The level land ring road is to utilize original or reconstruct newly-built ground runway around inboard building of intersection corner or greenery patches; It can be according to the intersection truth once or divide and to build up the optimal circle footpath that detours several times; Some intersection can not have the position of plane ring road at that time or forever in indivedual corner inboards; This can build and severally just build several ring roads and implement, the special occasions location also can certain section circle detour the road build in underground, built on stilts or shielding to satisfy view, function or environmental protection requirement.

Claims (1)

1. low span-depth path separate passing through inter change cross junction; Comprise low stride high passage lanes, the centre turns to passage, avris to turn to passage, pedestrian's passage lanes ring road pacifically; It is characterized in that: low span-depth path separate passing through inter change cross junction by low stride high passage lanes, centre turn to passage, avris turn to passage, pedestrian's passage lanes pacifically ring road constitute, the said low high passage lanes (6) of striding is for from underground, semi-underground or pass through the high passage of driving a vehicle of the low clear span that is lower than the Overheight Vehicles elevation of the belt road that intersects (2) sidewalk (3) and roadway on the ground; Said centre turn to passage (7) for be positioned at vertical road (1) midfeather in two low connection lengthwise of striding between the high passage lanes (6) to the driving passage of road (1) and the belt road that intersects (2); Said avris turns to passage (5) for being positioned at the driving passage of sidewalk (3) avris connection lengthwise to road (1) and the belt road that intersects (2); Said pedestrian's passage lanes (4) is the passage of walking from pedestrian underground, semi-underground or that pass through on the ground the belt road that intersects (2) sidewalk (3) and roadway; Said level land ring road (8) be around the inboard building (9) of intersection corner or green land (10) connection lengthwise to the ground circle of road (1) and belt road (2) around garage's passage; Low span-depth path separate passing through inter change cross junction turns to passage (5), lowly strides that high passage lanes (6), centre turn to passage (7), lowly stride high passage lanes (6), avris turns to passage (5), pedestrian's passage lanes (4), sidewalk (3) positional alignment to form sidewalk (3), pedestrian's passage lanes (4), avris at vertical road (1) of cross intersection; Level land ring road (8) to road (1) and belt road (2), is striden sidewalk (3) and roadway that high passage lanes (6) and pedestrian passage lanes (4) from underground, semi-underground or ground pass through intersect belt road (2) by low around the inboard building (9) of intersection corner or green land (10) connection lengthwise.Turn to passage (7) and belt road (2) to form the cross road surface of intersecting intercommunication by the centre in the middle of the width of cloth of vertical road (1) road; Constitute the pedestrian and pass through vertical road (1) via cross walk; Pass through belt road (2) via pedestrian's passage lanes (4); Vertically the through vehicles of road (1) is striden high passage lanes (6) and is passed through belt road (2) through low; The motor vehicles of right turn turn to passage (7) to turn to into belt road (2) through the centre; The non power driven vehicle of right turn turns to passage (5) to change belt road (2) the right skidding over to through avris and sails; The through vehicles of belt road (2) is without hindrance craspedodrome in the middle of road still, and the right turn motor vehicles of the right side turn to passage (7) to change vertical road (1) over to and go through the centre, and the right turn non power driven vehicle turns to passage (5) to change vertical road (1) over to through avris and goes; Vertically the left turning vehicle of road (1) and belt road (2) is all kept straight on and is passed through the road that intersects and accomplish the current arrangement of left-hand rotation, the cross intersection graded crossing intercommunication arrangement traffic that realization people car is taken their own roads after detoured by level land ring road (8).
CN2007100683906A 2007-05-08 2007-05-08 Low span-depth path separate passing through inter change cross junction Expired - Fee Related CN101050617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100683906A CN101050617B (en) 2007-05-08 2007-05-08 Low span-depth path separate passing through inter change cross junction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100683906A CN101050617B (en) 2007-05-08 2007-05-08 Low span-depth path separate passing through inter change cross junction

Publications (2)

Publication Number Publication Date
CN101050617A CN101050617A (en) 2007-10-10
CN101050617B true CN101050617B (en) 2012-03-07

Family

ID=38782198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100683906A Expired - Fee Related CN101050617B (en) 2007-05-08 2007-05-08 Low span-depth path separate passing through inter change cross junction

Country Status (1)

Country Link
CN (1) CN101050617B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103306175A (en) * 2013-05-13 2013-09-18 倪跃华 No-blocking driving method
CN105672073A (en) * 2016-01-18 2016-06-15 游洪臣 Highway
CN111815984A (en) * 2020-06-21 2020-10-23 王亚鹏 Vehicle height limit early warning method and system based on Internet of things and vehicle

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2313724A1 (en) * 1975-06-04 1976-12-31 Stepanovic Milovan Road traffic circulation system - with groups of traffic lanes restricted to different speed limits and separated by barriers
NL1027700C1 (en) * 2004-12-09 2006-06-12 Cornelis Zantman Transport system, comprises motorway and train track positioned above each other
CN1888316A (en) * 2006-07-20 2007-01-03 倪既民 Variable main span-depth lower auxiliary span short slope road crossing bridge
CN201031505Y (en) * 2007-05-08 2008-03-05 倪既民 Low

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2313724A1 (en) * 1975-06-04 1976-12-31 Stepanovic Milovan Road traffic circulation system - with groups of traffic lanes restricted to different speed limits and separated by barriers
NL1027700C1 (en) * 2004-12-09 2006-06-12 Cornelis Zantman Transport system, comprises motorway and train track positioned above each other
CN1888316A (en) * 2006-07-20 2007-01-03 倪既民 Variable main span-depth lower auxiliary span short slope road crossing bridge
CN201031505Y (en) * 2007-05-08 2008-03-05 倪既民 Low

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CN 1888316 A,说明书第1页第4行至第3页第26行及图1-7.

Also Published As

Publication number Publication date
CN101050617A (en) 2007-10-10

Similar Documents

Publication Publication Date Title
CN101781873A (en) Convenient and smooth flyover crossroad traffic building without traffic light
CN2832895Y (en) Multi-deck easily-dismountable full-stereo road traffic system
CN201050023Y (en) Overhead parking space
CN101225633A (en) City road constitution and automobile running method
CN1916281A (en) Underground system for dividing flow of vehicles and foot passengers at crossroad
CN104612011A (en) Cross-free continuous traffic system for T-junction lane and control method of cross-free continuous traffic system
CN202247573U (en) Urban crossroad flyover
CN2926299Y (en) Overpass with parking position
CN101050617B (en) Low span-depth path separate passing through inter change cross junction
CN201080584Y (en) All-communication single layer runway type crossroad
CN201031505Y (en) Low
CN100383340C (en) One-way gallop bridge
CN204530358U (en) Track, crossroad is without intersection current traffic system continuously
CN107988866B (en) Simple overpass
CN201605505U (en) Advanced overpass
CN103541285B (en) Conflict-free stereoscopic composite bridge
CN102900000B (en) Comprehensive complete straight-through direct left-hand rotation right lateral viaduct
CN1105084A (en) 4/4(4/3) lane double layer crossless stereo bridge on land
CN1344838A (en) Two-layer intercommunicated overpass with separated traffic lanes and pavements
CN102797207A (en) Urban two-layer interchange overpass formed by crossing one-way traffic and one-way traffic
CN1089390C (en) Overhead crossing bridge series
CN201010845Y (en) Simple vertical crossing T-shaped intersection
CN202688814U (en) Traffic light-free fast transportation system arranged on city crossroad
CN106958173A (en) Urban road is designed without traffic lights
CN1587522A (en) Direct overrun flat tura city interchange cross road

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120307

Termination date: 20150508

EXPY Termination of patent right or utility model