CN100507211C - 炮采薄煤层轻型液压支架 - Google Patents
炮采薄煤层轻型液压支架 Download PDFInfo
- Publication number
- CN100507211C CN100507211C CNB2006100689607A CN200610068960A CN100507211C CN 100507211 C CN100507211 C CN 100507211C CN B2006100689607 A CNB2006100689607 A CN B2006100689607A CN 200610068960 A CN200610068960 A CN 200610068960A CN 100507211 C CN100507211 C CN 100507211C
- Authority
- CN
- China
- Prior art keywords
- hydraulic
- base
- back timber
- chassis
- spillplate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Body Structure For Vehicles (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
本申请公开了一种炮采薄煤层轻型液压支架,它包括底座,底座上安装有四个液压支柱,四个液压支柱上连接支撑着顶梁以及液压系统,其特征是:底座的结构是分体组装结构;顶梁为加筋箱体结构;在液压立柱的前面,从顶梁上向底板方向固接一抽拉叠合式挡煤板;后护板与摆杆的轴绞接结构为过盈配合,摆杆与底座的轴绞接结构也为过盈配合。本申请是一个适于炮采薄煤层的轻型液压支架,为炮采薄煤层工作面提供了机械化支护设备,提高了采煤安全。
Description
技术领域
本申请属于煤矿井下运输设备。
背景技术
在煤矿地下开采中,1米以下的薄煤层不适宜机械化开采,仍以爆破落煤、人工攉煤、单体支柱支护为主,技术落后。尤其是单体支柱支护,劳动强度大,支护效果不好,当遇到地质情况复杂时,易发生顶板事故,安全性差。目前的液压支架都是为中厚以上煤层设计的,以四柱式液压支架为例,它包括整体底座,底座上安装前后两对液压立柱,四个支柱上支撑着整体顶梁,顶梁前端铰接着前探梁,前探梁用千斤顶支撑着工作面,掩护着工作面的设备安全运行。顶梁后端固定有后护板,后护板与底座之间铰接有摆杆。防止采空区矸石进入支架,还包括液压操作系统。这种液压支架不能用于炮采薄煤层工作面,其原因是:1、支架前面无挡煤板,放炮落煤时容易将立柱砸坏,煤炭崩入支架中难以清出;2、后护板与摆杆的轴铰接结构为间隙配合(例于配装),这种配合适于不易变形的重型支架,用于轻型支架时,顶板作用在支架上的侧向分力容易使支架扭曲变形,失去支撑作用;3、前探梁和千斤顶始终暴露在外面,在1米以下的煤层中无安装空间和摆动空间;4、底座以及顶梁都是整体钢结构。所以将目前的四柱式液压支架仅减小高度尺寸,用于薄煤层是不可行的,其结构、材料强度、支撑自重、使用空间将受到制约,很需要一种适合薄煤层的轻型液压支架。
发明内容
本申请的目的是为解决炮采薄煤层的安全、有效的支护问题,提供一种炮采薄煤层轻型液压支架。
这种轻型液压支架的结构是:它包括底座,底座上安装有四个液压支柱,四个液压支柱上连接支撑着顶梁以及液压系统,顶梁后端固定有后护板,后护板与底座之间铰接有摆杆,其特征是:
1.底座的结构是分体组装结构,即分为前底盘和后底盘,前底盘上安装有左右两个液压支柱,后底盘上安装有左右两个液压支柱,前、后底盘之间用弹簧钢板连接成一体。
2.顶梁为加筋箱体结构,即顶梁是由上下两层钢板焊接而成,钢板之间焊接有加强筋,提高整体强度。在顶梁的箱体空间内安装有千斤顶和前探梁。前探梁由弹簧钢板组装而成,前探梁在千斤顶作用下,可伸出箱体,也可缩回在箱体内。
3.在液压支柱的前面,从顶梁上向底板方向固接一抽拉叠合式挡煤板,抽拉叠合式挡煤板的结构是由两块单块挡煤板滑动连接在一起的,每块挡煤板由弹簧钢板拼装成,随着支撑的升降,两块滑块可以抽拉成单层也可以重叠为双层。
4、后护板与摆杆的轴铰接结构为过盈配合,摆杆与底座的轴铰接结构也为过盈配合。
本申请的积极效果是:
1.支架上带有挡煤板,放炮落煤时保护立柱不受损坏,防止煤炭崩入架下。挡煤板为抽拉叠合式结构,两块挡煤板可重叠,不影响整架的降落。
2.后护板与摆杆以及摆杆与底座的轴铰接结构采用过盈配合,提高了整个架体的稳定性,因此整个架体的材料厚度可以减小,从而减少整架重量,实现轻型的目的,便于薄煤层安装和操作。
3.顶梁设计为加筋箱体结构,比整体结构减少重量三分之二以上,而且,千斤顶暗藏在箱体内不占空间,前探梁可向箱体内收缩不占空间,移架时只收缩不用上下摆动,适于在薄煤煤层中移架。
4.采用弹簧钢板连接的分体式底座结构,减轻底座的重量。
因此,本申请是一个适于炮采薄煤层的轻型液压支架,为炮采薄煤层工作面提供了机械化支架设备,提高了采煤安全。
附图说明
图1是本申请实施例的主视图,图中虚线部分表示支架下降收起时的情况,图2是前探梁和顶梁的俯视图;图3是后护板的结构示意图。
图中:1—前底盘;2—前液压支柱;3—弹簧钢板;4—液压操作系统;5—后液压支柱;6—后底盘;7—摆杆;8—销轴;9—后护板;10—千斤顶;11—箱式顶梁;12—前探梁;13—挡煤板;14—加强筋;15—轴套;16—摆杆支撑架。
具体实施方式
从图1、图2和图3可以看出:本发明包括底座,底座上安装有前、后四个液压支柱2和5,四个液压支柱2和5上连接支撑着箱体顶梁11以及液压操作系统4。其中:
1.底座的结构是分体组装结构,即分为前底盘1和后底盘6,前底盘1安装左右两个液压支柱2,后底盘6安装左右两个液压支柱5,前、后底盘1和6之间用弹簧钢板3连接成—体。
2.在四个液压支柱顶上连接有箱式顶梁,箱式顶梁11为加筋箱体结构,由上下两层钢板焊接而成,钢板之间焊接有加强筋14,用于提高整体强度。在箱式顶梁11的箱体空间内安装有千斤顶10和前探梁12。前探梁12在千斤顶10作用下,可伸出箱体,也可缩回在箱体内。前探梁12由六条弹簧钢板用螺栓组装而成。
3、在液压支柱2和5的前面,从箱式顶梁11上向底板方向固接一抽拉叠合式挡煤板13,抽拉叠合式挡煤板13的结构是由上下两个用弹簧钢板拼装成的上挡煤板和下挡煤板滑动连接在一起,随着支架的升降,两块可以抽出或重叠。滑动连接时,在上挡煤板上有拧动螺栓,在下挡煤板上有长孔,螺栓卡在长孔中即可。
4.后护板9上有轴套15,通过摆杆7用销轴8过盈配合铰接在一起(图3),摆杆7与摆杆支撑架16的轴铰接结构也为过盈配合。
Claims (1)
1、一种炮采薄煤层轻型液压支架,它包括底座,底座上安装有四个液压支柱,四个液压支柱上连接支撑着顶梁以及液压系统,顶梁后端固定有后护板,后护板与底座之间铰接有摆杆,其特征是:
(1)底座的结构是分体组装结构,即分为前底盘和后底盘,前底盘上安装有左右两个液压支柱,后底盘上安装有左右两个液压支柱,前、后底盘之间用弹簧钢板连接成一体;
(2)顶梁为加筋箱体结构,即顶梁是由上下两层钢板焊接而成,钢板之间焊接有加强筋;在顶梁的箱体空间内安装有千斤顶和前探梁,前探梁由弹簧钢板组装而成;
(3)在液压支柱的前面,从顶梁上向底板方向固接一抽拉叠合式挡煤板,抽拉叠合式挡煤板的结构是由两块单块挡煤板滑动连接在一起的,每块挡煤板由弹簧钢板拼装成;
(4)后护板与摆杆的轴铰接结构为过盈配合,摆杆与底座的轴铰接结构也为过盈配合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100689607A CN100507211C (zh) | 2006-09-28 | 2006-09-28 | 炮采薄煤层轻型液压支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006100689607A CN100507211C (zh) | 2006-09-28 | 2006-09-28 | 炮采薄煤层轻型液压支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1928323A CN1928323A (zh) | 2007-03-14 |
CN100507211C true CN100507211C (zh) | 2009-07-01 |
Family
ID=37858420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006100689607A Expired - Fee Related CN100507211C (zh) | 2006-09-28 | 2006-09-28 | 炮采薄煤层轻型液压支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100507211C (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101333929B (zh) * | 2008-07-31 | 2010-06-09 | 中国矿业大学 | 双层双叉型超静定液压支架 |
CN101333932B (zh) * | 2008-07-31 | 2010-06-02 | 中国矿业大学 | 双层超静定液压支架 |
CN102536284A (zh) * | 2010-12-09 | 2012-07-04 | 郑州四维机电设备制造有限公司 | 用于薄煤层的四柱式膏体充填支护液压支架 |
-
2006
- 2006-09-28 CN CNB2006100689607A patent/CN100507211C/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN1928323A (zh) | 2007-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100507211C (zh) | 炮采薄煤层轻型液压支架 | |
CN101182780A (zh) | 一种煤矿井下分体铰接式超前支护支架 | |
CN101725365A (zh) | 一种六柱支撑式采煤充填液压支架 | |
CN201915983U (zh) | 液压支架 | |
CN2893150Y (zh) | 组合式直线型液压支架 | |
CN201433762Y (zh) | 一种新型超前支护掘进机 | |
CN201232562Y (zh) | 双叉型超静定液压支架 | |
CN201254999Y (zh) | 炮采薄煤层轻型液压支架 | |
CN104018866A (zh) | 双四连杆机构低位放顶煤液压支架 | |
CN201554482U (zh) | 一种六柱支撑式采煤充填液压支架 | |
CN201137500Y (zh) | 一种煤矿井下分体铰接式超前支护支架 | |
CN102251790A (zh) | 双顶梁同轴铰接四连杆采充一体化液压支架 | |
CN101333933B (zh) | 超静定液压支架 | |
CN200999625Y (zh) | 掩护式液压支架 | |
CN2240607Y (zh) | 一种放顶煤液压支架 | |
CN201232565Y (zh) | 超静定液压支架 | |
CN1296116A (zh) | 一种低位放顶煤液压支架 | |
CN201273194Y (zh) | 组合液压机架 | |
CN101333930B (zh) | 双叉型超静定液压支架 | |
CN201391323Y (zh) | 一种轻型液压支架 | |
CN201314238Y (zh) | 大采高放顶煤液压支架 | |
CN210686023U (zh) | 大采高液压支架护顶护帮机构 | |
CN101906983B (zh) | 综采液压支架的一种防倒装置 | |
CN212867608U (zh) | 一种紧凑型超前支护液压支架 | |
CN202882955U (zh) | 炮掘工作面单柱式超前支护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090701 Termination date: 20110928 |