CN100485134C - 抱压式phc管桩桩端自引孔静压入岩施工工艺 - Google Patents

抱压式phc管桩桩端自引孔静压入岩施工工艺 Download PDF

Info

Publication number
CN100485134C
CN100485134C CNB200610124487XA CN200610124487A CN100485134C CN 100485134 C CN100485134 C CN 100485134C CN B200610124487X A CNB200610124487X A CN B200610124487XA CN 200610124487 A CN200610124487 A CN 200610124487A CN 100485134 C CN100485134 C CN 100485134C
Authority
CN
China
Prior art keywords
pile
pressure
rock
static
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB200610124487XA
Other languages
English (en)
Other versions
CN1916296A (zh
Inventor
刘小檀
钱勇
江守慈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIU XIAOTAN QIAN YONG JIANG SHOUCI
LIU XIAOTAN QIAN YONG JIANG SH
Original Assignee
LIU XIAOTAN QIAN YONG JIANG SHOUCI
LIU XIAOTAN QIAN YONG JIANG SH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIU XIAOTAN QIAN YONG JIANG SHOUCI, LIU XIAOTAN QIAN YONG JIANG SH filed Critical LIU XIAOTAN QIAN YONG JIANG SHOUCI
Priority to CNB200610124487XA priority Critical patent/CN100485134C/zh
Publication of CN1916296A publication Critical patent/CN1916296A/zh
Application granted granted Critical
Publication of CN100485134C publication Critical patent/CN100485134C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明涉及一种抱压式PHC管桩桩端自引孔静压入岩施工工艺,它是通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,先开启高压水泵和空压机,高压水流经高压输水胶管及喷水口,高压气流经高压输气胶管及多孔喷气口向下喷射并在桩尖的前端形成强力涡流冲击岩层,被粉碎的碎石、泥砂随高压水流和高压气流经桩尖侧面的回流孔,沿管桩的空腔向上经送桩器喷出地面;这样,依靠高压水流和高压气流冲击粉碎坚硬的砾砂层,连续不断形成孔隙,边冲压,即自引孔使空芯管桩穿透坚硬的砾砂层。本发明克服常规的干式静力液压入岩施工工艺不适应坚硬的砾砂层难题,具有穿透效果好、工效高和施工造价低的优点。

Description

抱压式PHC管桩桩端自引孔静压入岩施工工艺
技术领域
本发明涉及一种建筑基桩的施工方法,特别是一种抱压式PHC管桩桩端自引孔静压入岩施工工艺。
背景技术
高大建筑的发展大量的使用基桩。而PHC管桩系工业化生产,质量直观,成桩工艺质量易于保证,与其他砼灌注桩相比具有造价低廉,施工周期短,环保等优势而成为建筑用桩的发展方向。目前,管桩沉桩方式主要有锤击式和静压式两类沉桩工艺。锤击式沉桩工期长,振动、污染、沉桩过程不稳定、有噪音、不满足环保要求;静压式沉桩则需要大型的专业入岩的设备。传统的静力液压桩机的夹桩器与送桩器之间的紧配合压桩力一般不超过550吨,当遇到坚硬的地层,静压入岩比较困难,面临改变打桩方式或大量增加打桩成本的难题。
静压式沉桩在应用过程中,出现桩端难以穿透砾砂层到达强风化岩层。当桩端持力层选择在砾砂层时,普遍存在压桩时桩端阻力较大,但静载检测管桩承载力远小于沉桩时压桩力的现象,单桩承载力取值较低,无法充分发挥管桩的桩身强度。而锤击法施工又因振动与噪音无法满足环保要求,同时施工振动易对周边建筑物及地下构筑物造成破坏,而且因锤击振动及后期挤密作用很难使桩端全部进入同一持力层而结果产生长短桩现象,传统的锤击预制管桩技术落后,不适应坚硬的强风化岩等地层。
如何克服常规的干式静力液压入岩施工工艺不适应坚硬砾砂层的难题,是继续推广应用这种工效高、无噪音、沉桩稳定、符合环保要求的施工方法所面临的课题。
发明内容
本发明要解决的技术问题是提供一种抱压式PHC管桩桩端自引孔静压入岩施工工艺,它是采用增设环形防滑抱箍的抱压式PHC管桩静压送桩,使送桩时不易打滑,以提高压桩力并通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,连续不断形成孔隙,边冲边压,即自引孔使管桩穿透坚硬的砾砂层。
为解决上述技术问题,本发明的技术方案是:一种抱压式PHC管桩桩端自引孔静压入岩施工工艺,包括采用增设环形防滑抱箍的抱压式PHC管桩静压送桩工艺和桩端自引孔静压入岩工艺;
①在常规的全液压静力压桩机的液控夹桩器与送桩器之间增设环形防滑抱箍,将夹桩器与送桩器之间的最大紧配合压桩力,由传统的静力液压桩机的550吨,提高到600-1200吨,能使送桩时不易打滑,静压入岩比较容易,遇到坚硬的砾砂层面不需要立即改变打桩方式,能继续静压送桩进入砾砂层2m以内的深度,扩大静力液压桩机的工作适应范围,提高静压入岩管桩质量的可靠性。但超过此深度,常规的干式静压送桩入岩的方式已无能为力,可采用桩端自引孔静压入岩的施工工艺。
②桩端自引孔静压入岩施工工艺是通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,连续不断形成孔隙,边冲边压,即自引孔使管桩穿透坚硬的砾砂层;先开启高压水泵和空压机,高压水流经高压输水胶管及喷水口,高压气流经高压输气胶管及多孔喷气口向下喷射并在桩尖的前端形成强力涡流冲击岩层,被粉碎的碎石、泥砂随高压水流和高压气流经桩尖侧面的回流孔,沿空芯管桩的空腔向上经送桩器喷出地面;这样,依靠高压水流和高压气流冲击粉碎坚硬的砾砂层,连续不断形成孔隙,边冲压,即自引孔使空芯管桩穿透坚硬的砾砂层。
本发明的有益效果是:当传统的静力液压桩机遇到砾砂等坚硬的地层,常规的干式静力液压无法入岩穿透,面临改变打桩方式。此前只得采用工期长,振动、污染、沉桩过程不稳定、有噪音、不满足环保要求、古老的锤击式沉桩法,并将大量增加打桩成本。本发明采用增设环形防滑抱箍的抱压式PHC管桩静压送桩,使送桩时不易打滑,以提高压桩力;并通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,连续不断形成孔隙,边冲边压,即自引孔使管桩顺利地穿透坚硬的砾砂层,克服常规的干式静力液压入岩施工工艺不适应坚硬的砾砂层难题,具有穿透效果好、工效高和施工造价低的优点。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1为抱压式管桩桩端自引孔静压入岩施工设备的示意图。
图2为图1的A部放大图。
图3为与本发明配套的静力液压桩机示意图。
图4为倒置的空腔桩尖示意图。
图5为图4的俯视图。
图6为倒置的空腔桩尖的立体示意图。
具体实施方式
实施例1如图1-6所示:一种抱压式PHC管桩桩端自引孔静压入岩的施工设备,常规的全液压静力压桩机20的液控夹桩器11夹持送桩器12,后者套接固定在空芯管桩的外壁及桩端端顶钢板上;在常规的全液压静力压桩机20的液控夹桩器11和送桩器12之间增设环形防滑抱箍10。
本发明沿用申请号为200610052169.7“注浆自引孔PHC管桩尖防锈帽施工装置及其施工工艺”的发明专利中高压水、气注浆的部分设备。高压输水胶管8的一端贯穿空芯管桩13的内腔,到达空腔桩尖14;高压输气胶管7的一端贯穿空芯管桩13的内腔,到达空腔桩尖14;裸露在空芯管桩13外面、设有管接头9的高压输水胶管8的另一端通过输水阀门5及三通管4与高压水泵3连接;裸露在空芯管桩13的外面、设有管接头9的高压输气胶管7的另一端通过输气阀门17与空压机6连接。高压水泵3的进水口经吸水管2与水箱1连通,前者的出水口经三通管4及输水阀门5与高压输水胶管8连接,后者经管接头9插入空芯管桩13的内腔;三通管4的另一出口经回水管19和阀门18与水箱1连通。空腔桩尖14是由主板21围合成中空的棱台,主板21的侧面设有回流孔22;桩尖大端26与管桩13连接;与岩层接触的桩尖小端25焊有钢筋24,用以增强空腔桩尖14的刚度和防止大块岩石或土块堵塞桩尖小端25。位于空腔桩尖14空腔中的高压输气胶管7的端头设有多孔喷气口16,位于空腔桩尖14空腔中的高压输水胶管8的前端设置有喷水口15。
实施例2:一种抱压式PHC管桩桩端自引孔静压入岩施工工艺,包括采用增设环形防滑抱箍的抱压式PHC管桩静压送桩工艺和桩端自引孔静压入岩工艺;
①在常规的全液压静力压桩机20的液控夹桩器11与送桩器12之间增设环形防滑抱箍10,将夹桩器与送桩器之间的的最大紧配合压桩力,由传统的静力液压桩机的550吨,提高到600-1200吨,能使送桩时不易打滑,静压入岩比较容易,遇到坚硬的砾砂层面不需要立即改变打桩方式,能继续静压送桩进入砾砂层2m以内的深度;超过此深度,常规的干式静压送桩入岩的方式已无能为力,采用抱压式PHC管桩桩端自引孔静压入岩的施工工艺。
②抱压式PHC管桩桩端自引孔静压入岩施工工艺是通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,连续不断形成孔隙,边冲边压,即自引孔使管桩穿透坚硬的砾砂层;先开启高压水泵3和空压机6,高压水流经高压输水胶管8及喷水口15,高压气流经高压输气胶管7及多孔喷气口16向下喷射并在桩尖14的前端形成强力涡流冲击岩层,被粉碎的碎石、泥砂随高压水流和高压气流经桩尖侧面的回流孔22,沿空芯管桩13的空腔向上经送桩器12喷出地面;这样,依靠高压水流和高压气流冲击粉碎坚硬的砾砂层,连续不断形成孔隙,边冲压,即自引孔使空芯管桩13穿透坚硬的砾砂层。

Claims (1)

1.一种抱压式PHC管桩桩端自引孔静压入岩施工工艺,其特征在于:
①在常规的全液压静力压桩机(20)的液控夹桩器(11)与送桩器(12)之间增设环形防滑抱箍(10),将夹桩器与送桩器之间的的最大紧配合压桩力,由传统的静力液压桩机的550吨,提高到600-1200吨,能使送桩时不易打滑,静压入岩比较容易,遇到坚硬的砾砂层面不需要立即改变打桩方式,能继续静压送桩进入砾砂层2m以内的深度;超过此深度,常规的干式静压送桩入岩的方式已无能为力,采用桩端自引孔静压入岩施工工艺;
②桩端自引孔静压入岩施工工艺是通过高压水流和高压气流冲击和粉碎桩尖前端坚硬的砾砂层,先开启高压水泵(3)和空压机(6),高压水流经高压输水胶管(8)及喷水口(15),高压气流经高压输气胶管(7)及多孔喷气口(16)向下喷射并在桩尖(14)的前端形成强力涡流冲击岩层,被粉碎的碎石、泥砂随高压水流和高压气流经桩尖侧面的回流孔(22),沿管桩(13)的空腔向上经送桩器(12)喷出地面;这样,依靠高压水流和高压气流冲击粉碎坚硬的砾砂层,连续不断形成孔隙,边冲压,即自引孔使空芯管桩(13)穿透坚硬的砾砂层。
CNB200610124487XA 2006-09-06 2006-09-06 抱压式phc管桩桩端自引孔静压入岩施工工艺 Expired - Fee Related CN100485134C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB200610124487XA CN100485134C (zh) 2006-09-06 2006-09-06 抱压式phc管桩桩端自引孔静压入岩施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB200610124487XA CN100485134C (zh) 2006-09-06 2006-09-06 抱压式phc管桩桩端自引孔静压入岩施工工艺

Publications (2)

Publication Number Publication Date
CN1916296A CN1916296A (zh) 2007-02-21
CN100485134C true CN100485134C (zh) 2009-05-06

Family

ID=37737352

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB200610124487XA Expired - Fee Related CN100485134C (zh) 2006-09-06 2006-09-06 抱压式phc管桩桩端自引孔静压入岩施工工艺

Country Status (1)

Country Link
CN (1) CN100485134C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015423A (zh) * 2012-12-21 2013-04-03 广东永基建筑基础有限公司 静压射流桩墙成型设备及静压射流桩墙成型施工方法

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498129B (zh) * 2008-01-31 2011-04-27 黄秋生 沉桩用水气混合射流设备
CN102102364B (zh) * 2009-12-17 2012-07-04 黑龙江中古建筑节能科技股份有限公司 预应力空心管桩抱转顶压送桩器
CN102002949B (zh) * 2010-11-16 2012-08-29 江苏科技大学 地源热泵埋管装置及埋管方法
CN102828504A (zh) * 2012-09-10 2012-12-19 杭州南联地基基础工程有限公司 预制钢筋砼空腹抗侧向力桩及其植桩方法
CN103556636B (zh) * 2013-10-22 2016-03-02 中冶集团武汉勘察研究院有限公司 一种用于穿越深厚密实砂层的phc管桩沉桩装置
CN103898911A (zh) * 2014-04-16 2014-07-02 哈尔滨亿海管桩有限公司 粗细硬沙层混凝土管桩静压施工方法
CN106948346B (zh) * 2017-05-24 2018-12-21 中冶地集团西北岩土工程有限公司 一种适用于坚硬地质区的引孔式静压植桩装置
CN108755682A (zh) * 2018-05-08 2018-11-06 福建勘察基础工程公司南昌分公司 一种触探式管内引孔静压施工工艺
CN112854203A (zh) * 2021-01-18 2021-05-28 中煤江南建设发展集团有限公司 一种静压管桩桩端自引孔施工方法
CN117569742A (zh) * 2024-01-16 2024-02-20 浙江省第一水电建设集团股份有限公司 一种预冲孔气刀装置及钢管桩打设方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027490A (en) * 1975-09-10 1977-06-07 Heinrich Stade Self-sinking, axial passage foundation pile and method
CN1605684A (zh) * 2004-11-09 2005-04-13 李毓锦 新型phc桩及水冲气举静压沉桩法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4027490A (en) * 1975-09-10 1977-06-07 Heinrich Stade Self-sinking, axial passage foundation pile and method
CN1605684A (zh) * 2004-11-09 2005-04-13 李毓锦 新型phc桩及水冲气举静压沉桩法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015423A (zh) * 2012-12-21 2013-04-03 广东永基建筑基础有限公司 静压射流桩墙成型设备及静压射流桩墙成型施工方法

Also Published As

Publication number Publication date
CN1916296A (zh) 2007-02-21

Similar Documents

Publication Publication Date Title
CN100485134C (zh) 抱压式phc管桩桩端自引孔静压入岩施工工艺
CN102966128B (zh) 锚杆静压钢护筒水气合冲纠偏方法
CN102733389B (zh) 一种高压射流振动沉桩装置及沉桩工艺
CN102691296A (zh) 一种桩侧静压注浆桩底旋喷注浆的管桩基础及其施工方法
CN2915943Y (zh) 一种有利于抱压式管桩桩端自引孔静压入岩工艺的设备
CN102852141B (zh) 一种桩芯灌注混凝土桩侧静压注浆的嵌岩管桩基础及其施工方法
CN106522191A (zh) 一种变电站地基处理方法及其应用
CN201581394U (zh) 大桩尖注浆预制桩
CN111501781A (zh) 一种杂填土超深基坑固结注浆结合双排钢管桩支护方法及结构
CN101575855A (zh) 非取土引孔预应力管桩或预制方桩沉桩工艺
CN206090565U (zh) 混凝土桩的施工设备
CN204225100U (zh) 混凝土桩的施工装置
CN102518133A (zh) 一种预应力空心管桩随动套筒沉桩方法
CN102031780A (zh) 砂桩尖静压管桩水冲施工方法
CN204252120U (zh) 混凝土桩的施工装置
CN201288325Y (zh) 高压旋喷扩大头预应力管桩
CN204225101U (zh) 混凝土桩的施工装置
CN101565955B (zh) 一种采用微型应力隔离桩加固既有桩基的方法
CN102251518B (zh) 旋泵成孔桩机
CN101024957A (zh) 预应力混凝土管桩的复合处理的工艺
CN104895066B (zh) 超长旋喷劲芯组合桩的施工方法
CN203145005U (zh) 一种钢管护壁超强嵌岩灌注桩的成桩装置
CN202099803U (zh) 预应力混凝土管桩扩大头后注浆器
CN109667266A (zh) 自钻大直径管桩的施工方法、装置及其配套的专用管桩
CN202124857U (zh) 一种劈裂桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090506

Termination date: 20100906