Publication number
CN202124857U
CN202124857U CN2011201783725U CN201120178372U CN202124857U CN 202124857 U CN202124857 U CN 202124857U CN 2011201783725 U CN2011201783725 U CN 2011201783725U CN 201120178372 U CN201120178372 U CN 201120178372U CN 202124857 U CN202124857 U CN 202124857U
Authority
CN
China
Prior art keywords
pile
pile body
stake
splitting
left end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201783725U
Other languages
English (en)
Inventor
潘金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEOTECHNICAL TECHNOLOGY CO., LTD.
Original Assignee
HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd filed Critical HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN2011201783725U priority Critical patent/CN202124857U/zh
Application granted granted Critical
Publication of CN202124857U publication Critical patent/CN202124857U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种防止建筑物沉降的劈裂桩。所要解决的技术问题是提供的劈裂桩应具有较大承载力和摩擦力、结构简单以及适用范围广的特点。技术方案是:一种劈裂桩,包括桩体以及与桩体右端连为一体的桩尖,其特征在于:所述桩体左端制有注浆管,所述桩尖或/和桩体制有若干个与注浆管导通以使砂浆压入土中的出浆孔。所述桩体为钢管桩、混凝土管桩和预制桩。所述钢管桩中,桩体左端制有一桩盖,桩盖左端连有注浆管,桩体、桩尖和桩盖之间形成一密闭空腔。所述预制桩桩体内制有若干个注浆管,所述桩尖的若干个出浆孔与前述的若干个注浆管分别一一对应连通。

Description

一种劈裂桩
技术领域
本实用新型涉及一种建筑用桩,具体涉及一种防止建筑物沉降的劈裂桩。
背景技术
设置在地面上的建筑物等产生的荷载由地基支撑,因此一旦建筑物的重量超过地基的支撑力,建筑物通常就会出现不同程度的下沉,经过一段时间以后建筑物倾斜过度变得无法继续使用,导致较大的经济损失。我国东部沿海地区在工程施工中一直面临着软土地基加固处理的问题,尤其是在工程完工后,防止建筑物沉降的有效施工更是一个关键的问题。现常用的其中的一种方法就是将钢管桩等各类建筑用桩打入软土地基,但是现用的桩承载力和摩擦力不够大,因此效果不够好。
实用新型内容
本实用新型所要解决的技术问题是克服上述现有技术的不足,提供一种劈裂桩,该劈裂桩应具有较大承载力和摩擦力、结构简单以及适用范围广的特点。
本实用新型采用以下技术方案:
一种劈裂桩,包括桩体以及与桩体右端连为一体的桩尖,其特征在于:所述桩体左端制有注浆管,所述桩尖或/和桩体制有若干个与注浆管导通以使砂浆压入土中的出浆孔。
所述桩体为钢管桩、混凝土管桩和预制桩。
所述钢管桩中,桩体左端制有一桩盖,桩盖左端连有注浆管,桩体、桩尖和桩盖之间形成一密闭空腔。
所述预制桩桩体内制有若干个注浆管,所述桩尖的若干个出浆孔与前述的若干个注浆管分别一一对应连通。
本实用新型的有益效果是:本实用新型施工时采用高压注浆的方法,将泥砂浆从桩尖及桩体上预设的孔洞中压注进入四周土体中,泥砂浆凝固后与桩体本身形成一个共同受力结构,因而大大增加了承载力和摩擦力,且结构简单,适用于镀锌钢管桩、混凝土管桩及锚杆桩,可在常规桩施工、快速桩施工、桩基加固等工程中运用。
附图说明
图1是本实用新型的实施例一的主视结构示意图。
图2是本实用新型的实施例二的主视结构示意图。
图3是本实用新型的实施例三的主视结构示意图。
具体实施方式
一种劈裂桩,包括桩体1和与桩体右端连为一体的桩尖2,所述桩体左端制有注浆管;所述桩体可以为钢管桩、混凝土管桩和预制桩。
如图1所示,该劈裂桩为内部中空的钢管桩,桩体左端制有一钢制桩盖,桩体、桩尖和桩盖之间形成一密闭空腔,该桩盖左端连有一注浆管4,钢管桩桩体以及桩尖制有若干个使砂浆流动的出浆孔5。在施工过程当中,将桩体打入土中,待深入土中一定深度时,利用注浆机往注浆管里注入混凝土。由于钢管桩内部中空,注浆机的注射压力将未凝固的混凝土往桩体以及桩尖挤压,混凝土就从桩尖及桩体上预设的孔洞中压入四周土体中,待混凝土凝固成型后与桩体本身形成一个共同受力结构,因此大大增加了承载力和摩擦力。
如图2所示,该劈裂桩为混凝土管桩,包括桩体和与桩体右端连为一体的桩尖,所述桩体左端连有一注浆管,该混凝土管桩桩尖制有若干个与注浆孔相通的出浆孔。注浆方式与上述钢管桩类似。
如图3所示,该劈裂桩为预制桩,包括桩体和桩尖;所述预制桩桩体内制有若干个注浆管4(注浆管直接设置在桩体内),桩尖制有若干个分别与前述注浆管一一对应连通的出浆孔。注浆方式与上述钢管桩和混凝土管桩类似。
由于设置有出浆孔,将劈裂桩打入土中时难免会有部分土壤封堵住出浆孔,但是注浆机提供的压力能够通过混凝土顺利将土壤挤出出浆孔。

Claims (4)

1.一种劈裂桩,包括桩体(1)以及与桩体右端连为一体的桩尖(2),其特征在于:所述桩体左端制有注浆管(4),所述桩尖或/和桩体制有若干个与注浆管导通以使砂浆压入土中的出浆孔(5)。
2.根据权利要求1所述的一种劈裂桩,其特征在于所述桩体(1)为钢管桩、混凝土管桩和预制桩。
3.根据权利要求2所述的一种劈裂桩,其特征在于所述钢管桩中,桩体左端制有一桩盖(3),桩盖左端连有注浆管(4),桩体、桩尖和桩盖之间形成一密闭空腔。
4.根据权利要求2所述的一种劈裂桩,其特征在于所述预制桩桩体内制有若干个注浆管(4),所述桩尖的若干个出浆孔与前述的若干个注浆管(4)分别一一对应连通。 
CN2011201783725U 2011-05-24 2011-05-24 一种劈裂桩 Expired - Fee Related CN202124857U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201783725U CN202124857U (zh) 2011-05-24 2011-05-24 一种劈裂桩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201783725U CN202124857U (zh) 2011-05-24 2011-05-24 一种劈裂桩

Publications (1)

Publication Number Publication Date
CN202124857U true CN202124857U (zh) 2012-01-25

Family

ID=45487929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201783725U Expired - Fee Related CN202124857U (zh) 2011-05-24 2011-05-24 一种劈裂桩

Country Status (1)

Country Link
CN (1) CN202124857U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905223A (zh) * 2017-11-16 2018-04-13 中铁十六局集团第三工程有限公司 一种具有注浆功能的管桩桩尖
CN111119262A (zh) * 2019-12-30 2020-05-08 山东农业大学 一种基于可回收注浆管的对既有桩基进行加固的方法及其应用

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905223A (zh) * 2017-11-16 2018-04-13 中铁十六局集团第三工程有限公司 一种具有注浆功能的管桩桩尖
CN111119262A (zh) * 2019-12-30 2020-05-08 山东农业大学 一种基于可回收注浆管的对既有桩基进行加固的方法及其应用

Similar Documents

Publication Publication Date Title
CN102493437B (zh) 注浆式微型钢管桩及注浆加固方法
CN101761345A (zh) 一种隧道顶部土层的加固装置及其施工方法
CN207567757U (zh) 一种新型预制钢管桩
CN202324017U (zh) 注浆式微型钢管桩
CN207582459U (zh) 一种变截面预制钢管桩
CN201581394U (zh) 大桩尖注浆预制桩
CN104196013B (zh) 一种复合y形桩及其施工方法
CN202124857U (zh) 一种劈裂桩
CN202124863U (zh) 螺旋锚掏挖复合基础
CN208039239U (zh) 一种新型变截面预制桩
CN204662246U (zh) 陡坡桥梁墩台结构
CN103741682B (zh) 一种碳纤维布袋现浇反拱曲面组合异形桩的施工方法
CN204311454U (zh) 一种用于基础施工的桩端注浆装置
CN201520973U (zh) 一种带有注浆孔的预制桩
CN102493436A (zh) 矩形抗滑桩人工掘进新工法
CN102605775B (zh) 一种柔性桩与刚性桩上下同体组合桩及成桩方法
CN210086215U (zh) 一种加固软土地基的注浆桩
CN101793027A (zh) 一种桩心注浆静压锚杆桩
CN2730940Y (zh) 预制钢筋砼桩心后注浆桩
CN201857608U (zh) 合成桩
CN204475320U (zh) 一种螺丝桩
CN113789779A (zh) 一种应用于软土地基和珊瑚砂地基的桩基结构及施工方法
CN202099803U (zh) 预应力混凝土管桩扩大头后注浆器
CN201981530U (zh) 一种湿陷性黄土地区孔内深层强夯桩
CN207812476U (zh) 旋喷锚索复合基础

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GEOTECHNICAL TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: HANGZHOU GEOTECHNICAL ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 310024, Hangzhou, Zhejiang province Xihu District transferred to the streets of Liuzhou Wu Long Industrial Park

Patentee after: GEOTECHNICAL TECHNOLOGY CO., LTD.

Address before: City of Chao Wang Road 310014 Hangzhou city of Zhejiang province No. 59-1 East Verde writer Pavilion 2C

Patentee before: Hangzhou Geotechnical Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120125

Termination date: 20180524