CH639447A5 - METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD. - Google Patents

METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD. Download PDF

Info

Publication number
CH639447A5
CH639447A5 CH1267078A CH1267078A CH639447A5 CH 639447 A5 CH639447 A5 CH 639447A5 CH 1267078 A CH1267078 A CH 1267078A CH 1267078 A CH1267078 A CH 1267078A CH 639447 A5 CH639447 A5 CH 639447A5
Authority
CH
Switzerland
Prior art keywords
building materials
augers
sections
slot
soil
Prior art date
Application number
CH1267078A
Other languages
German (de)
Inventor
Karlheinz Dr Ing Bauer
Original Assignee
Bauer Karlheinz
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bauer Karlheinz filed Critical Bauer Karlheinz
Publication of CH639447A5 publication Critical patent/CH639447A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/001Drilling a non circular hole

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

Die Erfindung betrifft ein Verfahren zum Herstellen von Schlitzwänden im Erdreich sowie eine Vorrichtung zur Durchführung des Verfahrens. Es handelt sich dabei insbesondere um Schlitzwände, die als Fundamente von Gebäuden oder als Stützwände für Baugruben dienen. The invention relates to a method for producing diaphragm walls in the ground and an apparatus for performing the method. These are, in particular, diaphragm walls that serve as foundations of buildings or as retaining walls for construction pits.

Es ist bekannt, Schlitzwände durch Aushub des Schlitzes mit einer Fräse oder mit Greifern herzustellen, wobei zum Stützen der Innenwände des Schlitzes eine Stützflüssigkeit, beispielsweise Bentonit verwendet wird und nach dem Erreichen der vorgesehenen Schlitztiefe der Schlitze - gegebenenfalls nach vorheriger Einbringung von Armierungen - mit Beton verfüllt und dadurch die Stützflüssigkeit verdrängt wird. Derartige Verfahren sind jedoch durch die Verwendung der schweren Stützflüssigkeit und die notwendige spätere Abfuhr und Beseitigung des Bentonit-schlammes sehr aufwendig. It is known to produce slotted walls by excavating the slit with a milling machine or with grippers, a supporting liquid, for example bentonite, being used to support the inner walls of the slit, and with concrete after reaching the intended slit depth of the slits - if necessary after prior installation of reinforcements backfilled and the supporting fluid is thereby displaced. However, such methods are very expensive due to the use of the heavy support liquid and the subsequent removal and removal of the bentonite sludge.

Es ist ferner bekannt, Stützwände durch sogenannten Berliner Verbau herzustellen, indem in bestimmten Abständen Träger in das Erdreich gerammt oder in zuvor hergestellte Bohrungen eingesetzt und die Zwischenräume im Zuge des Baugrubenaushubes von oben nach unten mit Holz, beispielsweise Eisenbahnschwellen oder Schalbeton ausgefacht werden. Derartige Verfahren sind langwierig und arbeitsintensiv, da nur schrittweise mit dem Aushub der Baugrube gearbeitet werden kann. It is also known to produce retaining walls by so-called Berlin sheeting, by ramming girders into the ground at certain intervals or inserting them into previously made bores, and filling the gaps with wood, for example railway sleepers or formwork concrete, from top to bottom in the course of excavation. Such methods are lengthy and labor-intensive, since excavation of the excavation pit can only be carried out step by step.

Es ist ferner bekannt, Stützwände aus nebeneinander oder ineinander geschnittenen Ortsbetonpfählen herzustellen, was insbesondere bei stark druckbelasteten Stützwänden notwendig ist. Diese Verfahren sind sehr zeitraubend und kostspielig. It is also known to produce supporting walls from side-by-side or interlocking in-situ concrete piles, which is particularly necessary in the case of supporting walls which are subjected to high pressure. These procedures are very time consuming and expensive.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zu finden, mit dem schmale und damit arbeits- und materialsparende Schlitzwände hergestellt werden können, die allein oder in Verbindung mit den bekannten Stützwandelementen, beispielsweise Trägern oder Pfählen als Stützwände verwendet werden können. Ferner soll eine Vorrichtung zur Durchführung des Verfahrens angegeben werden. The invention has for its object to find a method with which narrow and thus labor and material-saving diaphragm walls can be produced, which can be used alone or in conjunction with the known retaining wall elements, such as beams or piles as retaining walls. Furthermore, a device for performing the method is to be specified.

Die gestellte Aufgabe wird erfindungsgemäss durch die im kennzeichnenden Teil des Anspruchs 1 angegebenen Merkmale gelöst. The object is achieved according to the invention by the features specified in the characterizing part of claim 1.

Bei sandigen oder rolligen Böden ist es vorteilhaft, das aufgelockerte Erdreich ganz oder teilweise als Zuschlagsmittel für die erhärtenden Baustoffe zu verwenden, indem während oder nach der Auflockerung des Erdreiches im Schlitzbereich erhärtende Baustoffe in das aufgelockerte Erdreich injiziert und mit diesem vermischt werden. Um das Verfahren zügig von Schlitzabschnitt zu Schlitzabschnitt durchführen zu können, ohne das Aushärten der B austoffe abwarten zu müssen, ist es vorteilhaft, die einzelnen Schlitzabschnitte gegeneinander abzuschotten. Zum Abschotten können sowohl Mittel verwendet werden, die zugleich als Bestandteil der herzustellenden Stützwand dienen, als auch Mittel, die lediglich vorübergehend nur zur Abschottung verwendet werden. So können Fertigbetonpfähle, die mit einer Nut für den Eingriff der Schlitz wand versehen sind, oder Doppel-T-Träger, wie sie im Berliner Verbau verwendet werden, als Abschottungsmittel zur Anwendung kommen. In the case of sandy or uneven soils, it is advantageous to use the loosened soil in whole or in part as an additive for the hardening building materials, by injecting hardening materials into or loosening the loosened soil during or after loosening the soil. In order to be able to carry out the method quickly from slot section to slot section without having to wait for the plastics to harden, it is advantageous to partition the individual slot sections from one another. For partitioning, means can be used that also serve as a component of the retaining wall to be manufactured, as well as means that are only used temporarily for partitioning purposes. Precast concrete piles, which are provided with a groove for engaging the diaphragm wall, or double-T girders, such as those used in Berlin shoring, can be used as bulkheading agents.

Auf die Verwendung von Abschottungen kann allerdings verzichtet werden, wenn bis zum Abbinden gewartet wird, was durch die Verwendung von Abbindebeschleunigern abgekürzt werden kann. The use of bulkheads can, however, be dispensed with if there is a wait until setting, which can be shortened by using setting accelerators.

Um die dem seitlichen Erddruck ausgesetzten Stützwandabschnitte möglichst material- und raumsparend und damit dünnwandig auszubilden, ist es vorteilhaft, den Schlitzabschnitt gewölbeartig bogen- oder polygonförmig gegen das Erdreich anzuordnen , so dass die Stützwandabschnitte nur oder im wesentlichen auf Druck beansprucht werden. Dadurch kann eine Horizontalbewehrung der erhärtenden Baustoffe entfallen, während eine Vertikalbewehrung vor dem Erhärten leicht durch Einrammen von Bewehrungsstählen eingebracht werden kann, solange die Baustoffe noch plastisch sind. Die einzelnen Abschnitte untereinander werden gegen die als Abschottungsmittel dienen- In order to make the supporting wall sections exposed to the lateral earth pressure as material and space-saving as possible and thus thin-walled, it is advantageous to arrange the slot section in an arch-like or polygonal shape against the ground, so that the supporting wall sections are only or essentially stressed under pressure. This means that horizontal reinforcement of the hardening building materials can be omitted, while vertical reinforcement before hardening can easily be introduced by ramming reinforcing steel as long as the building materials are still plastic. The individual sections are used against one another against the

2 2nd

5 5

10 10th

15 15

20 20th

25 25th

30 30th

35 35

40 40

45 45

50 50

55 55

60 60

65 65

3 639 447 3,639,447

den Pfähle oder Träger abgestützt, die ihrerseits in bekannter Stützwand in ihrer Standfestigkeit durch plötzlich auftretende the piles or girders supported, which in turn in a known support wall in their stability by suddenly occurring

Weise durch Verankerungen im Erdreich gehalten werden. Druckveränderungen und Erdschichtverschiebungen zu beein- Be held in the ground by anchorages. Pressure changes and earth layer shifts

Die einzelnen Stützwandabschnitte können unter Verzicht auf trächtigen. The individual retaining wall sections can be pregnant without.

Pfähle oder Träger auch in Form einer Lisenenwand angeordnet Das erfindungsgemässe Verfahren und die Vorrichtung sind werden. 5 auch zur Abteufung von Schächten geeignet, in dem schrittweise Piles or beams also arranged in the form of a pilaster strip wall. The method and the device according to the invention are. 5 also suitable for the sinking of shafts, in the gradual

Die Vorrichtung zur Durchführung des Verfahrens ist durch zu einem Kreis oder polygon angeordnete Schlitzwandabschnitte die im kennzeichnenden Teil des Anspruchs 10 angegebenen hergestellt werden, so dass vor dem Beginn der Ausschachtungs- The device for carrying out the method is produced by diaphragm wall sections arranged in a circle or polygon, which are specified in the characterizing part of claim 10, so that before the excavation begins

Merkmale gekennzeichnet. arbeiten der Schacht vollständig gegen Einsturz gesichert ist. Characteristics marked. the shaft is completely secured against collapse.

Die beanspruchte Vorrichtung stellt im Prinzip ein Vielfach- Ferner sind Verfahren und Vorrichtung geeignet, den Einbau Schneckenbohrgerät dar, bei dem mehrere, an sich bekannte 10 von Spundwänden oder stählernen Ausfachungselementen dort Bohrschnecken nebeneinander linear, bogen- oder polygonartig zu ermöglichen, wo ein Einrammen oder Eindrücken und Einangeordnet sein können und jede Schneckenseele hohl als Injek- pressen von Trägern oder Elementen in das nicht gelockerte tionsrohr ausgebildet ist. Erdreich nicht mehr möglich war. The claimed device is in principle a multiple. Furthermore, the method and the device are suitable for the installation of auger drilling equipment in which several, known per se of sheet piling or steel infill elements, allow drilling augers to be arranged next to one another in a linear, arched or polygonal manner, where a ramming or Can be pressed in and arranged and each screw core is hollow as injection molding of carriers or elements into the non-loosened tube. Soil was no longer possible.

Ein solches Vielfach-Schneckenbohrgerät kann aus einem der Mit dem Verfahren und der Vorrichtung lassen sich ohne gewünschten Bohrtiefe oder den längsten Schneckenabschnitten 15 Beschränkung je nach Ausbildung des Gerätes beliebige Bohr- Such a multiple auger drilling device can be made from any of the drilling methods with the method and the device without a desired drilling depth or the longest auger sections.

angepassten hohen Mäkler, an dem ein Schneckenschlitten ge- tiefen erreichen, sofern die Schichten des Erdreiches für die führt ist, bestehen. Der Schneckenschlitten kann austauschbar Schnecken durchdringbar sind. adapted high leader, where a snail sled can reach, provided that the layers of the soil are for them. The worm sled can be exchangeable.

linear, bogenförmig oder polygonförmig ausgebildet sein. In dem Die erfindungsgemässe Vorrichtung zur Durchführung des Schlitten können Halterungen und Antriebe der Schnecken Verfahrens besteht aus einer an sich bekannten Bohrlafette, die vorgesehen sein. Die Schnecken können über ein Getriebe von 20 senkrecht an einem Hydraulikbagger aufgehängt sein kann, die einem oder mehreren auf dem Schlitten angeordneten, elektri- mit einer Vorschubeinrichtung versehen ist. An der Bohrlafette sehen oder hydraulischen Motoren angetrieben werden. Es ist ein mit der Vorschubeinrichtung beweglicher Kraftdrehkopf können aber auch für jede Schnecke Einzelantriebe vorgesehen angeordnet, der mit einer Mehrzahl von Halterungen zur Aufsein, die über ein leichtes Synchrongetriebe so aufeinander nähme von Bohrschnecken versehen ist. Die Bohrschnecken abgestimmt werden, dass alle Schnecken mit gleicher Geschwin- 25 haben eine hohle Seele und weisen an ihrem oberen Ende eine digkeit mitdrehen. Es ist vorteilhaft, die Schnecken gleichdre- Rotationsdurchführung und an ihrem unteren Ende eine oder hend anzuordnen. mehrere Austrittsöffnungen auf. be linear, arcuate or polygonal. In the device according to the invention for carrying out the slide, brackets and drives for the screw method can consist of a drill mount known per se, which can be provided. The worms can be suspended vertically from a hydraulic excavator via a gearbox of 20, which is electrically provided with a feed device for one or more arranged on the slide. Look at the drill carriage or drive hydraulic motors. There is a power rotary head that can be moved with the feed device, but individual drives can also be provided for each screw, which drives are provided with a plurality of brackets that take over one another via a light synchronous gear. The augers are matched so that all augers with the same speed have a hollow core and have a rotating head at their upper end. It is advantageous to arrange the screws with the same rotary rotation and one or the other at their lower end. several outlet openings.

Am unteren Ende des Mäklers ist vorzugsweise eine Führungs- Am unteren Ende der Bohrlafette ist vorzugsweise eine Füh- At the lower end of the leader there is preferably a guide. At the lower end of the drill carriage there is preferably a guide.

hülse für die Schnecke angeordnet. Bei grossen Bohrlängen ist es rungshülse für die Bohrschnecken angeordnet. Die Bohrschnek- sleeve arranged for the snail. In the case of large drilling lengths, the sleeve is arranged for the augers. The auger

vorteilhaft, im Bereich der unteren Enden der Schnecken diese 30 ken sind vorzugsweise an ihren unteren Enden mit einer Füh- advantageous, in the area of the lower ends of the screws these 30 ken are preferably at their lower ends with a guide

mit einer Führungsschelle miteinander zu verbinden, um ein rungsschelle verbunden. connect with a guide clamp to each other to connect a stake clamp.

Ineinanderlaufen der Schnecken zu verhindern. Es ist zweckmässig, die Austrittsöffnung am unteren Ende der To prevent the snails from running into each other. It is useful to have the outlet at the bottom of the

Für die Herstellung eines Berliner Verbaus unter Anwendung Bohrschnecken mit einem Rückschlagventil zu versehen, To provide a check valve for the production of a Berlin sheeting using augers,

des erfindungsgemässen Verfahrens werden zunächst die Dop- Der Kraftdrehkopf ist vorzugsweise so ausgebildet, dass alle pel-T-Träger in bekannter Weise durch Rammen oder Bohrun- 35 Bohrschnecken gleichläufig angetrieben werden. In the method according to the invention, the dopers are first of all designed so that all pel-T carriers are driven in the same way in a known manner by ramming or drilling.

gen eingesetzt. Der Abstand der Träger entspricht der Länge der Um entsprechend dem Verfahren bogen- und winkelförmige gene used. The spacing of the beams corresponds to the length of the um according to the process arc-shaped and angular

Sehne des Bogens eines Schlitzwandabschnittes. Sodann wird mit Schlitzwandabschnitte bohren zu können, ist der Kraftdrehkopf dem Vielfach-Schneckenbohrgerät der Schlitz in der Weise ge- vorzugsweise bogenförmig oder stumpfwinklig mit gleichlangen bohrt, dass die Schnecken im Vortrieb das durchdrungene Erd- Schenkeln ausgebildet. Tendon of the arch of a diaphragm wall section. Then, in order to be able to drill with diaphragm wall sections, the power turret for the multiple auger drilling device is drilled in the slot, preferably in an arcuate or obtuse angle with the same length, in such a way that the augers form the penetrated limb of the earth during driving.

reich lockern ohne es zu fördern, was durch Bremsen des 40 Zur weiteren Erläuterung der erfindungsgemässen Vorrich- loosen richly without promoting it, which can be achieved by braking the 40 to further explain the device according to the invention.

Schneckenvortriebes mit dem Schlitten geschieht. Reicht die tung wird auf das in der beigefügten Zeichnung dargestellte Worm jacking happens with the sledge. If the device is sufficient, it is shown in the attached drawing

Länge eines Schneckenabschnittes nicht aus, um die vorbestimm- Ausführungsbeispiel verwiesen. Es zeigen : Length of a screw section does not refer to the predetermined embodiment. Show it :

te Bohrtiefe zu erreichen, werden die Schnecken vom Schlitten Fig. 1 eine Seitenansicht der Vorrichtung; To reach te drilling depth, the worms of the slide Figure 1 is a side view of the device.

gelöst, ein weiterer Schneckenabschnitt aufgeschraubt oder auf- Fig. 2 eine Vorderansicht der Vorrichtung. solved, another screw section screwed on or Fig. 2 is a front view of the device.

gesteckt und mit dem in die Ausgangslage zurückgeführten 45 Die Vorrichtung besteht aus einer Bohrlafette 1, die in übli-Schlitten und dem Antrieb verbunden. Sodann wird bis in die eher Weise an einem nicht dargestellten Hydraulikbagger angevorgesehene Bohrtiefe weiter vorgetrieben. brachtist. Die Bohrlafette 1 weist eine Vorschubeinrichtung 2 inserted and with the 45 returned to the starting position The device consists of a drill carriage 1, which is connected in übli-slide and the drive. The drilling depth provided on a hydraulic excavator (not shown) is then further advanced. bratist. The drill carriage 1 has a feed device 2

Bei bindigen Böden werden nun erhärtende Baustoffe durch auf, die das Auf- und Abbewegen des Kraftdrehkopfes 3 mittels die hohle Schneckenseele, die an ihrem unteren Ende vor der der Vorschubeinrichtung 2 an der Bohrlafette 1 erlaubt. In the case of cohesive soils, hardening building materials are now on, which allows the power head 3 to be moved up and down by means of the hollow screw core, which at its lower end in front of the feed device 2 on the drill carriage 1.

letzten Windung der Schnecke seitliche Austrittsöffnungen auf- 50 Der Kraftdrehkopf 3 weist eine Mehrzahl von Halterungen für weist, ausgepresst, wobei die Schnecken gegebenenfalls unter die Aufnahme von beispielsweise 10 Bohrschnecken 5 auf. Die langsamem Antrieb durch den am Mäkler laufenden Schlitten Bohrschnecken 5 haben eine hohle Seele, die in ihrem oberen langsam gezogen werden. Bei sandigen oder rolligen Böden Ende in einem Rotationsanschluss 6 endet, an den ein Rohr oder werden die Schnecken so gezogen, dass durch die Drehbewegung Schlauch zum Einpressen des Injektionsgutes angeschlossen eine Vermischung des Injektionsgutes mit dem gelockerten 55 werden kann. Am unteren Ende der Bohrschnecke, unmittelbar Erdreich bewirkt wird. nach der ersten Windung ist eine Austrittsöffnung 7 vorgesehen, Sobald die Schnecken aus dem Schlitz gezogen sind, werden die mit einem Rückschlagventil 10, beispielsweise einer Gummigegebenenfalls Bewehrungsstähle in den Schlitz eingerammt. manschette, verschlossen ist. The rotary head 3 has a plurality of brackets for pressed out, the screws possibly being accommodated by, for example, 10 augers 5. The slow drive through the carriage augers 5 running on the leader has a hollow core, which is slowly pulled in its upper one. In the case of sandy or uneven soils, the end ends in a rotation connection 6, to which a pipe or the screws are pulled so that the rotary movement can be connected to a hose for pressing in the injection material, so that the injection material can be mixed with the loosened 55. At the lower end of the auger, soil is caused immediately. After the first turn, an outlet opening 7 is provided. As soon as the screws have been pulled out of the slot, the reinforcement steels are rammed into the slot with a check valve 10, for example a rubber, if necessary. cuff, is closed.

Nach dem Erhärten der Baustoffe kann ohne Unterbruch mit Um ein Auseinanderschlagen der Bohrschnecken zu vermei- After the building materials have hardened, they can be used without interruption to prevent the augers from breaking apart.

dem Aushub der Baugrube und abschnittsweise mit der zumeist 60 den, werden diese in einer am unteren Ende der Bohrlafette 1 excavation of the excavation pit and in sections with the mostly 60 den, these are in a at the lower end of the drilling mount 1

notwendigen Verankerung der Stützwand begonnen werden, fest angeordneten Führungshülse 8 geführt. Ferner ist es sinn- necessary anchoring of the support wall can be started, fixed guide sleeve 8 guided. Furthermore, it makes sense

ohne dass schritttweise die freiwerdenden Stützwandabschnitte voll, vor allem bei grossen Bohrtiefen, die unteren Enden der von oben nach unten ausgefacht werden müssen. Das Verfahren Bohrschnecken 5 durch eine Führungsschelle 9 miteinander zu hat bei einem Berliner Verbau vor allem bei rolligen oder verbinden. without the supporting wall sections becoming gradually full, especially in the case of large drilling depths, the lower ends of which have to be fanned out from top to bottom. The method of augers 5 by means of a guide clamp 9 has to be with a Berlin shoring, especially for rolling or connecting.

sandigen Böden den Vorteil, dass das Auslaufen von Material im «5 Zum Herstellen eines Schlitzabschnittes nach dem erfindungs- sandy soils have the advantage that the leakage of material in the

noch nicht ausgefachten, aber bereits ausgeschachteten unteren gemässen Verfahren werden die gleichläufigen Bohrschnecken 5 The worm gears 5, which have not yet been filled out but have already been excavated, become the co-rotating augers 5

Teii der Stützwand vermieden wird. Dadurch wird das hinter der mit der Vorschubeinrichtung 2 der Bohrlafette 1 so in das Part of the retaining wall is avoided. As a result, the back of the with the feed device 2 of the drill carriage 1 in the

Stützwand liegende Erdreich nicht gestört und vermieden, die Erdreich abgesenkt, dass der Vortrieb der Schnecken, der kor- Debris lying in the retaining wall is not disturbed and avoided, the soil is lowered so that the propulsion of the augers, the correct

639 447 639 447

kenzieherartig erfolgt, leicht gebremst wird. Dadurch wird das Erdreich nicht glatt durchfahren, sondern beim Durchfahren der Bohrschnecken gleichzeitig aufgelockert. Das aufgelockerte Erdreich dient gleichzeitig als Stützmittel anstelle der sonst verwendeten Stützflüssigkeiten wie Bentonit und verhindert ein Einstürzen des Schlitzes. is done like a clawscrew, is slightly braked. This means that the soil is not smoothly traversed, but is loosened at the same time as the augers are traversed. The loosened soil also serves as a proppant instead of the proppant fluids like bentonite and prevents the slot from collapsing.

Reicht die Höhe der Bohrlafette 1 für die vorgesehene Bohrtiefe nicht aus, so werden nach Erreichen des ersten Bohrungsabschnittes die Bohrschnecken 5 aus ihren Halterungen 4 im Kraftdrehkopf 3 gelöst, dieser mit der Vorschubeinrichtung 2 in die Ausgangslage zurückbewegt und weitere Bohrschneckenabschnitte auf die bereits im Erdreich sitzenden Bohrschnecken aufgeschraubt oder aufgesteckt und mit den Halterungen 4 verbunden. If the height of the drilling mount 1 is not sufficient for the intended drilling depth, the augers 5 are released from their brackets 4 in the power rotary head 3 after reaching the first bore section, this is moved back to the starting position with the feed device 2 and further auger sections are placed on the ones already seated in the ground Screw augers screwed on or attached and connected to the brackets 4.

In bindigen Böden, bei denen eine Vermischung des Injektionsgutes mit dem Erdreich nicht erwünscht wird, werden nach dem Erreichen der Bohrtiefe die Bohrschnecken 5 gleichzeitig langsam durch die Vorschubeinrichtung2 ohne Drehung oder mit geringer Drehung der Schnecken gezogen und gleichzeitig durch die Rotationsdurchführung 6 erhärtende Baustoffe aus der Austrittsöffnung 7 in den frei werdenden Schlitz gepresst. Durch das Ziehen der Bohrschnecken 5 in stillstehendem Zustand wird das aufgelockerte Erdreich vollständig aus dem Schlitz entfernt, während der Schlitz durch die injizierten Baustoffe gefüllt wird. Sobald die Schnecken vollständig aus dem Schlitz gezogen sind, wird das ausgehobene Erdreich durch gegenläufige Bewegung der Schnecken von den Windungen geschleudert. In cohesive soils where mixing of the injection material with the soil is not desired, after the drilling depth has been reached, the augers 5 are simultaneously slowly pulled through the feed device 2 without rotation or with little rotation of the augers and, at the same time, through the rotation duct 6 hardening building materials from the Outlet opening 7 is pressed into the free slot. By pulling the augers 5 in the stationary state, the loosened soil is completely removed from the slot, while the slot is filled by the injected building materials. As soon as the snails are completely pulled out of the slot, the excavated soil is thrown off the turns by counter-movement of the snails.

Bei sandigen oder rolligen Böden, bei denen das Erdreich als Zuschlagstoff zu den erhärtenden Baustoffen verwendet werden kann, werden beim Ziehen der Bohrschnecken 5 diese langsam rückläufig angetrieben, so dass gleichzeitig mit dem Einpressen 5 der erhärtenden Baustoffe Windung für Windung Erdreich mit diesen vermischt wird. Da die Bohrschnecken 5 rückläufig angetrieben werden, muss die Vorschubeinrichtung 2 den Rück-trieb der Bohrschnecke 5 bremsen, um eine gute Vermischung des von den Schneckenwindungen freiwerdenden Erdreiches mit io dem Injektionsgut zu erreichen. In sandy or uneven soils, where the soil can be used as an additive to the hardening building materials, when the augers 5 are pulled, they are slowly driven backwards, so that at the same time, the pressing of the hardening building materials is mixed with the soil, winding by winding. Since the augers 5 are driven in reverse, the feed device 2 must brake the backward drive of the auger 5 in order to achieve a good mixing of the soil freed from the screw turns with the injection material.

Sobald die Bohrschnecken 5 aus dem Schlitz entfernt sind, können Bewehrungsstähle in den Schlitz eingerammt werden, um den Schlitzwandabschnitt gegen vertikale Druckbewegungen nach dem Freiwerden der Schlitzwand zu verstärken. Eine 15 Bewehrung gegen horizontale Druckbewegungen ist nicht notwendig, wenn der Schlitzwandabschnitt im Bogen oder stumpfwinklig gegen den zu erwartenden Erddruck ausgebildet ist. Once the augers 5 are removed from the slot, reinforcing bars can be rammed into the slot to reinforce the slot wall portion against vertical pressure movements after the slot wall is released. Reinforcement against horizontal pressure movements is not necessary if the diaphragm wall section is curved or obtuse at the earth pressure to be expected.

Sollen die Schlitzwandabschnitte zur Ausfachung zwischen den Trägern eines Berliner Verbaus dienen, werden die Bohr-20 Schnecken vorzugsweise nach dem Einbau der Doppel-T-Träger zwischen den Doppel-T-Trägern angesetzt, die selbstverständlich in einem Abstand voneinander angeordnet sein müssen, der der Länge der Sehne des Schlitzwandbogens oder des Winkels entspricht. Die Doppel-T-Träger können aber auch nach dem 25 Herstellen eines Schlitzwandabschnittes an den jeweiligen Enden des Abschnittes durch die noch nicht ausgehärtete Schlitzwand bzw. das benachbarte Erdreich eingerammt werden, was den Vorteil hat, dass das Erdreich in diesem Bereich schon teilweise gelockert ist. Das gleiche Verfahren kann bei der 30 Verwendung von Betonpfählen angewandt werden. If the diaphragm wall sections are to be used for the infill between the beams of a Berlin sheeting, the Bohr-20 screws are preferably placed after the installation of the double-T beams between the double-T beams, which of course must be arranged at a distance from one another Corresponds to the length of the chord of the diaphragm wall arch or the angle. However, the double-T beams can also be rammed into the respective ends of the section through the not yet hardened diaphragm wall or the adjacent soil after the manufacture of a diaphragm wall section, which has the advantage that the soil in this area is already partially loosened . The same procedure can be used when using concrete piles.

M M

1 Blatt Zeichnungen 1 sheet of drawings

Claims (16)

639 447 PATENTANSPRÜCHE639 447 PATENT CLAIMS 1. Verfahren zum Herstellen von Schlitzwänden im Erdreich, dadurch gekennzeichnet, dass das Erdreich von der Erdoberfläche aus in voneinander getrennten Abschnitten bis in eine vorgesehene Tiefe aufgelockert und entweder unter gleichzeitigem Aushub des aufgelockerten Erdreichs von unten nach oben derfreiwerdenden Schlitzbereich mit erhärtenden Baustoffen verfüllt oder im Fall von sandigen oder rolligen Böden mindestens ein Teil des im Schlitz befindlichen aufgelockerten Erdreiches von unten nach oben mit erhärtenden Baustoffen vermischt wird. 1. A method for producing diaphragm walls in the soil, characterized in that the soil is loosened from the earth's surface in separate sections from one another to a predetermined depth and either filled with hardening building materials while simultaneously loosening the loosened soil from bottom to top with hardening building materials or in In the case of sandy or uneven soils, at least part of the loosened soil in the slot is mixed with hardening building materials from bottom to top. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass nebeneinanderliegende Schlitzabschnitte bis zum vollständigen Aushärten der Baustoffe gegeneinander abgeschottet werden. 2. The method according to claim 1, characterized in that adjacent slot sections are sealed off from one another until the building materials have completely hardened. 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass als Abschottungsmittel Fertigbetonteile verwendet werden, die an ihren den Schlitzabschnitten zugewandten Seiten mit einer Nut in Breite der herzustellenden Schlitzwand versehen sind. 3. The method according to claim 2, characterized in that precast concrete parts are used as partitioning means, which are provided on their sides facing the slot sections with a groove in the width of the slot wall to be produced. 4. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass als Abschottungsmittel Doppel-T-Träger verwendet werden. 4. The method according to claim 2, characterized in that double-T beams are used as a partitioning agent. 5. Verfahren nach Anspruch 2, dadurch gekennzeichnet, dass als Abschottungsmittel mit Bentonit gefüllte Fugenrohre verwendet werden, die nach dem Aushärten der Baustoffe benachbarter Schlitzabschnitte mit dem Bentonit gezogen werden und die freiwerdende Bohrung mit erhärtenden Baustoffen verfüllt wird. 5. The method according to claim 2, characterized in that joint pipes filled with bentonite are used as partitioning means, which are drawn after the hardening of the building materials of adjacent slot sections with the bentonite and the freed hole is filled with hardening building materials. 6. Verfahren nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass vor dem Aushärten der Baustoffe Bewehrungsstähle in die Schlitzabschnitte eingebracht werden. 6. The method according to any one of the preceding claims, characterized in that reinforcement steels are introduced into the slot sections before the building materials harden. 7. Verfahren nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Schlitzwandabschnitte bogenförmig angeordnet werden. 7. The method according to any one of the preceding claims, characterized in that the diaphragm wall sections are arranged in an arc. 8. Verfahren nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass die Schlitzwandabschnitte gewinkelt angeordnet werden. 8. The method according to any one of the preceding claims, characterized in that the diaphragm wall sections are arranged at an angle. 9. Verfahren nach einem der Ansprüche 1,2,5 oder 6, dadurch gekennzeichnet, dass mehrere Schlitzwandabschnitte lisenartig angeordnet werden. 9. The method according to any one of claims 1,2,5 or 6, characterized in that a plurality of diaphragm wall sections are arranged in a lise-like manner. 10. Vorrichtung zur Durchführung des Verfahrens nach einem der Ansprüche 1 bis 9, bestehend aus einer Bohrlafette mit Vorschubeinrichtung, gekennzeichnet durch einen an der Bohrlafette (1) angeordneten Kraftdrehkopf (3), der mit Halterungen (4) für die Aufnahme einer Mehrzahl von Bohrschnecken (5) versehen ist, die eine hohle Seele aufweisn und deren oberes Ende eine Rotationsdurchführung (6) und deren unteres Ende im Bereich hinter der ersten Schneckenwindung eine Austrittsöffnung (7) aufweist. 10. Device for performing the method according to one of claims 1 to 9, consisting of a drill carriage with feed device, characterized by a on the drill carriage (1) arranged rotary head (3) with brackets (4) for receiving a plurality of augers (5) is provided which has a hollow core and the upper end of which has a rotary feedthrough (6) and the lower end of which has an outlet opening (7) in the area behind the first screw turn. 11. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass am unteren Ende der Bohrlafette (1) eine Führungshülse (8) für die Bohrschnecken (5) angeordnet ist. 11. The device according to claim 10, characterized in that a guide sleeve (8) for the augers (5) is arranged at the lower end of the drill carriage (1). 12. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass die Bohrschnecken (5) an ihrem unteren Ende mit einer Führungsschelle (9) verbunden sind. 12. The apparatus according to claim 10, characterized in that the augers (5) are connected at their lower end to a guide clamp (9). 13. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass die Austrittsöffnung (7) mit einem Rückschlagventil (10) versehen ist. 13. The apparatus according to claim 10, characterized in that the outlet opening (7) is provided with a check valve (10). 14. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, dass die Bohrschnecken (5) im Kraftdrehkopf (3) im gleichen Drehsinn antreibbar sind. 14. The apparatus according to claim 10, characterized in that the augers (5) in the rotary head (3) can be driven in the same direction. 15. Vorrichtung nach Anspruch 10 zur Durchführung des Verfahrens nach Anspruch 7, dadurch gekennzeichnet, dass der Kraftdrehkopf (3) bogenförmig ausgebildet ist. 15. The apparatus according to claim 10 for performing the method according to claim 7, characterized in that the power turret (3) is arcuate. 16. Vorrichtung nach Anspruch 10 zur Durchführung des Verfahrens nach Anspruch 8, dadurch gekennzeichnet, dass der Kraftdrehkopf (3) in einem stumpfen Winkel mit gleichlangen Schenkeln ausgebildet ist. 16. The apparatus according to claim 10 for performing the method according to claim 8, characterized in that the power turret (3) is formed at an obtuse angle with legs of equal length.
CH1267078A 1977-12-14 1978-12-13 METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD. CH639447A5 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19772755677 DE2755677A1 (en) 1977-12-14 1977-12-14 METHOD AND DEVICE FOR MAKING SLITS IN THE SOIL

Publications (1)

Publication Number Publication Date
CH639447A5 true CH639447A5 (en) 1983-11-15

Family

ID=6026097

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1267078A CH639447A5 (en) 1977-12-14 1978-12-13 METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD.

Country Status (5)

Country Link
JP (1) JPS5490816A (en)
CH (1) CH639447A5 (en)
DE (1) DE2755677A1 (en)
ES (2) ES475957A1 (en)
GB (1) GB2010361A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3542313A1 (en) * 1984-12-06 1986-06-19 Funderingstechnieken Verstraeten B.V., Oostburg Method and apparatus for forming a sealing wall in the ground

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2563852B1 (en) * 1984-05-07 1987-06-26 Sif Entreprise Bachy PROCESS AND DEVICE FOR REALIZING IN STATION COLUMNS OF STABILIZED AND COMPACT SOIL.
FR2677385A1 (en) * 1991-06-05 1992-12-11 Labrue Jean Marie DEVICE FOR INJECTING AND CONTROLLING THE CONCRETE WORKING OF PILES WITH HOLLOW TARRIES.
FR2715177B1 (en) * 1994-01-14 1996-03-01 Sif Improved device for making in place columns of stabilized and compacted soil.
DE10252833B3 (en) * 2002-11-13 2004-07-15 Bauer Spezialtiefbau Gmbh Milling device for producing a cut in the ground comprises a force-transfer element having an adjusting device which changes the length of the force-transfer element to adjust the angle of incline of a milling strut
DE10320662A1 (en) 2003-05-08 2004-12-02 Bauer Maschinen Gmbh Soil cultivation method and apparatus
CN105625393A (en) * 2015-12-31 2016-06-01 宗琪 Fillet parallelogram drilling stirrer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51131117A (en) * 1975-05-12 1976-11-15 Koho Gijutsu Kaihatsu Method of forming water stopping wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3542313A1 (en) * 1984-12-06 1986-06-19 Funderingstechnieken Verstraeten B.V., Oostburg Method and apparatus for forming a sealing wall in the ground

Also Published As

Publication number Publication date
JPS5490816A (en) 1979-07-18
DE2755677A1 (en) 1979-06-21
ES481055A1 (en) 1980-01-16
ES475957A1 (en) 1979-10-16
GB2010361A (en) 1979-06-27

Similar Documents

Publication Publication Date Title
DE69214428T2 (en) Excavator and application processes
DE1634237A1 (en) Method for producing a tie rod in the ground
DE2318842A1 (en) DEVICE AND METHOD FOR THE FORMATION OF PILLARS IN THE SOIL
DE2751972A1 (en) METHOD OF MANUFACTURING REINFORCED UNDERGROUND BUILDING PANEL
DE10225980A1 (en) Method for securing underwater concrete sections using injection fitted anchor with top flange for embedding into cast concrete
DE2423163A1 (en) METHOD OF ERECTING A WALL IN THE SOIL
CH639447A5 (en) METHOD FOR PRODUCING SLOT WALLS IN THE GROUND AND DEVICE FOR IMPLEMENTING THE METHOD.
EP0509385B1 (en) Method for creating concrete bodies and cement bodies in the ground
DE3416679A1 (en) Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base
DE60002318T2 (en) METHOD FOR FORMING A WATERPROOF SECTION AND INCREASING THE CRACKING LIMIT
DE2824562A1 (en) ARTICULATED DEVICE FOR STRENGTHENING THE WALLS OF BUILDING DITCHES, PIPE DITCHES, etc.
DE4137541C2 (en) Tool for the production of in-situ concrete piles
EP2003251B1 (en) Holder stem
DE102016107899B4 (en) Method of making a sheet pile wall and support tube
EP0474204B1 (en) Process for the compensation of the inclination of slanting towers
EP0381665B1 (en) Process and apparatus for forming a strand of single elements under water
DE4035646A1 (en) Driving support into ground - involves H=section member with drill auger in each recess
DE3716750A1 (en) Method of constructing and sinking foundation structures
DE3941641C1 (en) Drive unit for foundation I beams - has ground drills within beams, retrieved after beams are properly installed
EP1553230B1 (en) Method for rehabilitating retaining walls
DE19729882C1 (en) Drilling for cast-in-situ pile
DE10207126A1 (en) Trench digging and lining machine for preparing foundations for buildings has chain scraping up soil from bottom of trench and carrying it up to surface
DE1658772B1 (en) Process for the production of galleries or tunnels from prefabricated concrete pipes
DE2942428A1 (en) New or existing harbour wall reinforcement - has submerged pile wall built from elements and intervening drilled tubes
CH634370A5 (en) Method of placing a pile, a girder or a sheet pile, use of the method, and drill for carrying out the method

Legal Events

Date Code Title Description
PL Patent ceased