CH591605A5 CH654375A CH654375A CH591605A5 CH 591605 A5 CH591605 A5 CH 591605A5 CH 654375 A CH654375 A CH 654375A CH 654375 A CH654375 A CH 654375A CH 591605 A5 CH591605 A5 CH 591605A5
Authority
CH
Switzerland
Prior art keywords
lifting
construction
lifting column
tubular
formwork
Prior art date
Application number
CH654375A
Other languages
German (de)
Original Assignee
Epitestudomanyi Intezet
Koennyueipari Szereloe Es Epit
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Epitestudomanyi Intezet, Koennyueipari Szereloe Es Epit filed Critical Epitestudomanyi Intezet
Priority to CH654375A priority Critical patent/CH591605A5/en
Publication of CH591605A5 publication Critical patent/CH591605A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3516Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by erecting a vertical structure and then adding the floors from top to bottom
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B2001/3588Extraordinary methods of construction, e.g. lift-slab, jack-block using special lifting or handling devices, e.g. gantries, overhead conveying rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The rig is for fitting formwork frames, three-dimensional lattice structures, and other auxiliary building elements, in the construction of multi-storey monolithic buildings with column supports. The floors are produced in sequence, from the top downwards. Each whole ceiling corresponds to the ground plan of the building, and is conceived as a cohesive slab structure and prefabricated all at once. This ceiling field is supported by means of a formwork skeleton which is supported at several points, movable, cohesive and of three-dimensional lattice type. Use is made of a hydraulic lifting unit, with a tubular lifting column (6) adjoining its working cylinder (3), built into a latticed frame (1) which is fitted with a grabbing head (2), enabling the lifting column to be set in any desired position, but at the same time preventing it from sliding back. No elaborate scaffolding is needed.

Description

  

  
 



   Die Erfindung betrifft ein Verfahren zur Herstellung   mehrgeschossiger    Massivbauten mit Stützen durch senkrechtes Bewegen von Bauhilfskonstruktionen mittels einer Hubvorrichtung. sowie eine Vorrichtung zur Durchführung dieses Verfahrens.



   In der Bauindustrie wird auch bei Anwendung vorgefertigter Konstruktionen in beträchtlichem Masse die herkömmliche, massive Bauweise angewendet, vor allem beim Bau von mehrgeschossigen Industrie-, Handels- und Privatbauten.



   Die herkömmliche massive Bauweise ist durch hohen Kostenaufwand sowie dadurch gekennzeichnet, dass sie die Verwendung grosser Mengen von Schalungs- und Gerüstmaterial erfordert. Die Gebäudekonstruktion besteht in jedem Geschoss aus den Pfeilern und der Eisenbetondecke. Der Bauprozess geht sehr langsam vonstatten, weil jedes einzelne Geschoss gesondert eingeschalt und eingerüstet werden muss.



  Das Ausschalen der fertigen Konstruktion kann im Hinblick darauf, dass beinahe in jedem Falle die Belastungen während des Baues massgebend sind, erst dann vorgenommen werden, wenn der Beton seine endgültige Festigkeit erreicht hat. Aus diesem Grunde ist immer eine grosse Menge Gerüst- und Verschalungsmaterial auf einmal im Gebrauch.



   Gemäss der üblichen Praxis wird nach dem Aufbau des Schalungsgerüstes, der Schalungen und des Stahls für den Beton die Decke betoniert und später, nach dem Abbinden des Betons, die Schalung für das nächstfolgende Stockwerk angefertigt, wobei die neuangefertigte Decke des vorhergehenden Stockwerkes als Stütze verwendet ist. Schalung und Gerüstkonstruktion, auf denen die Grundplatte der neuangefertigten Decke abgestützt ist, können bis zum völligen Abbinden des Betons nicht entfernt werden. Dies führt zu einem Kostenanstieg und verschlechtert den ohnehin nicht sehr günstigen Wirkungsgrad der massiven Bauweise noch mehr.



   Ziel der Erfindung ist, ein Verfahren vorzuschlagen, welches bei ebenen, kassettierten oder von unten mit Trägern versehenen Deckenkonstruktionen zur Anfertigung von Massivdecken grosser Oberfläche für mehrgeschossige Gebäude mit Pfeilerkonstruktion geeignet ist, das keine teure und ar   beitsaufwendige    Gerüstkonstruktionen erfordert. Ferner wird eine Vorrichtung zur Durchführung dieses Verfahrens   vorge    schlagen.



   Es ist bekannt, dass die wirtschaftlichste Konstruktion von hochbelastbaren Decken mit grossem Stützabstand die Kassettenbauweise ist. Die für die Ausführung der modernen Kassettendeckenbauweise erforderlichen Schalungsmaterialien   (Kunststoffkästen)    sind jedoch sehr teuer. Bei der herkömmlichen, arbeits- und   materialaufwendigen    Bauweise werden immer für mehrere Stockwerke gleichzeitig die zum Ausbilden der Kassetten notwendigen Schalungen gebraucht. Dadurch steigen die Baukosten ganz beträchtlich.



   Es wurde bekannt, dass - sofern die neugefertige Decke keine Nutzlast zu tragen hat - die zum Tragen der sich aus dem Eigengewicht ergebenden Deckenbelastung (die ungefähr   40%    der Gesamtbelastung ausmacht) erforderliche Betonfestigkeit innerhalb verhältnismässig kurzer Zeit erreicht werden kann und daher die Konstruktion früher ausgeschalt werden kann.



   Die Erfindung beruht ferner auf der Erkenntnis, dass beim Bau von hochbelastbaren Deckenplatten für mehrgeschossige Gebäude mit Pfeilerkonstruktion ein Verfahren angewendet werden kann, bei dem die Deckenkonstruktion sich auf die vorhergehend angebrachten Säulen stützt und von oben nach unten voranschreitend fertiggestellt wird, da in diesem Falle beim Ausschalen die Deckenkonstruktion nur ihr eigenes Gewicht zu tragen hat.



   Erfindungsgemäss wird demnach ein Verfahren eingangs beschriebenener Art vorgeschlagen, bei welchem die Decken des Gebäudes in der Reihenfolge von oben nach unten gefertigt werden, wobei das der Grundfläche des Gebäudes entsprechende Deckenfeld mittels eines an mehreren Punkten auf der Arbeitsebene abgestützten, beweglichen, zusammenhängenden, raumgitterartigen Schalungsgerüstes getragen und das gesamte Deckenfeld als zusammenhängende Plattenkonstruktion auf einmal angefertigt wird. Zweckmässigerweise kann das Schalungsgerüst unten auf der Arbeitsebene zusammen montiert werden.



   Die erfindungsgemässe Vorrichtung verfügt über ein hydraulisches Huborgan, an dessen Arbeitszylinder sich eine rohrartige Hubsäule oder ein Hubglied anschliesst, wobei die rohrartige Hubsäule bzw. das Hubglied in einem gitterartigen Stützständer eingebaut ist, welcher einen die Fixierung der rohrartigen Hubsäule bzw. des Hubgliedes in einer beliebigen Lage ermöglichenden und gleichzeitig das Zurückgleiten verhindernden   Greifkopf    aufweist.



   Die Erfindung kann vorzugsweise zur industriemässigen Herstellung von Massivdecken für Pfeilergebäude ungebundenen Rasters verwendet werden. Dabei ist es möglich, grossflächige (mehrere hundert Quadratmeter) Schalungsgerüste und Schalungen senkrecht in beiden Richtungen zu bewegen.



  Mit der vorgeschlagenen Lösung können die Schalungen mehrmals verwendet werden, ohne dass sie auseinander- und aufs neue zusammenmontiert werden müssen. Die Arbeitsund Materialaufwendigkeit der Massivbauweise, das Einschalen und Einrüsten kann auf diese Weise auf ein Minimum vermindert und dadurch der wirtschaftliche Wirkungsgrad bedeutend gesteigert werden.



   Die Erfindung wird anhand der Zeichnungen, auf denen einzelne Ausführungsbeispiele dargestellt sind, näher erläutert.



   Es zeigen:
Fig. 1 eine mit Rohrsäulen gestützte Vorrichtung und
Fig. 2 eine ähnliche, aber durch Gittersäulen gestützte Vorrichtung.



   Wie aus den Fig. 1 und 2 hervorgeht, weist die Vorrichtung durch versteifte Stände 1 abgestützte, das Abstürzen verhindernde   Greilköpfe    2 und einen hydraulischen Arbeitszylinder 3 auf, mit welchem ein auf der Arbeitsebene zusammenmontiertes Schalungsgerüst oder eine Gerüstkonstruktion 4 angehoben werden kann. Dabei ist eine aus geeigneten Raumelementen vom Modultyp zusammengebaute Gittersäule 5 oder eine rohrartige Hubsäule 6 zwischengeschaltet. Die an mehreren Punkten abgestützte raumgitterartige Schalungsbzw. Einrüstkonstruktion kann bis zu einem beliebigen Niveau gehoben werden bzw. in einer beliebigen Höhenstellung fixiert werden.



   Diese Hebevorrichtung bietet in jeder Hublage doppelte Sicherheit. Sollte der hydraulische Arbeitszylinder 3 einer Betriebsstörung unterliegen, so wird mittels des Greifkopfes 2 durch Fixierung der sich an den Arbeitszylinder 3 anschliessenden rohrartigen Hubsäule 6 oder eines Hubgliedes 8 die jeweilige Lage der Raumgitterkonstruktion beibehalten. Der   Greifkopf    2 ist zweckmässig mit Klemmbacken 12 ausgerüstet, die sich durch Reibung an die rohrartige Hubsäule 6 bzw. an das Hubglied 8 anklemmen. Dabei weisen die mit der rohrartigen Hubsäule 6 bzw. dem Hubglied 8 in Berührung kommenden Flächen der Klemmbacken 12 einen grösseren Reibungskoeffizienten auf als die mit dem   Greifkopf    2 in Berührung kommenden Flächen.

 

   Bei der in Fig. 1 gezeigten Ausführung mittels Rohrsäule werden die einzelnen Säulenteile 6 mittels einer hydraulischen Kippkonstruktion 7 auf folgende Weise eingesetzt:
Die Kippkonstruktion 7 kippt den hydraulischen Arbeitszylinder 3 in waagrechte Lage, in welcher Säulenteile 6 befestigt werden. Anschliessend erfolgt die Rückführung in die senkrechte Hublage.



   Bei der in Fig. 2 gezeigten Ausführung mit Gittersäule ge  schieht das Bewegen derselben mittels eines sich an den hydraulischen Arbeitszylinder 3 anschliessenden Hubgliedes 8, welches an seinem Ende einen Schwinghebel 9 beträgt. Mit 10 ist ein Seilzug bezeichnet. Zum Abstützen der Gitterhubsäulen 5 und deren Einstellung auf eine bestimmte Höhe dient eine in der Arbeitsebene angebrachte, über eine Schraubenspindel verfügende Spannkonstruktion 11.



   Das vorgeschlagene Verfahren wird beim Bau eines mehrgeschossigen Pfeilergebäudes wie folgt ausgeführt:
Im ersten Bauabschnitt wird ein Fundament in herkömmlicher Weise hergestellt, worauf die endgültigen Pfeiler des Gebäudes angebracht und entsprechend befestigt werden.



   Im zweiten Bauabschnitt wird unter Verwendung der beschriebenen Hebevorrichtung die Deckenkonstruktion angefertigt. Hydraulische Hubvorrichtungen werden an vorbestimmten Stellen aufgestellt, worauf unter Zwischenschaltung eines geeigneten Verbindungselementes 13 das Schalungsgerüst 4 zusammenmontiert wird. Das die Schalung haltende Schalungsgerüst 4 wird, nachdem es zusammengebaut wurde und auch die Schalungselemente angebracht sind, der Hubhöhe des hydraulischen Arbeitszylinders 3 entsprechend angehoben. Danach erfolgt die Montage der stützenden Gitterhubsäule 5 beziehungsweise der rohrartigen Hubsäule 6. Dann wird das Schalungsgerüst 4 auf die bereits vorbereiteten Hubsäulen 5 bzw. 6 gesetzt. Danach ist es möglich, den hydraulischen Arbeitszylinder 3 in die Ausgangsstellung zurückzuziehen und mit einem neuen Hebezyklus zu beginnen.

  Durch Wiederholung des beschriebenen Vorganges kann das Schalungsgerüst 4 in beliebige Höhe gehoben werden, wobei entsprechende Zwischenstücke, d. h. Säulenteile 5 oder 6, eingebaut werden.



   Die einzelnen Hubeinheiten werden zweckmässig mit einer zentralen Steuereinrichtung betrieben. Die Steuereinrichtung synchronisiert die Funktionen der einzelnen Hubelemente automatisch. Wird bei einer Hubeinheit die Hubhöhe eventuell überschritten, so bleibt diese Einheit automatisch stehen und beginnt erst wieder zu arbeiten, wenn die übrigen Hubeinheiten den Höhenunterschied ausgeglichen haben.



   Die Deckenkonstruktion wird vom obersten Stockwerk beginnend ausgeführt. Das angehobene Schalungsgerüst 4 wird bis zur Fertigstellung der Deckenkonstruktion provisorisch an den Pfeilern des Gebäudes befestigt. In dieser Lage ist die Verschalung bei der Anfertigung der Decke stets an mehreren Punkten unterstützt, wodurch die Gefahr zu grosser Form änderungen während des Betonierens stark vermindert wird.

 

   Nachdem die Decke fertiggestellt wurde und die zum Ausschalen erforderliche Festigkeit erreicht worden ist, kann das Schalungsgerüst 4 und mit diesem zusammen die gesamte Schalung auf das Niveau des nächstfolgenden Stockwerkes abgesenkt werden. Das Absenken beginnt damit, dass die hydraulischen Arbeitszylinder 3 unter Druck gesetzt werden.



   Dann wird die provisorische Befestigung des Schalungsgerü stes 4 gelöst, wodurch dieses mit seinem vollen Gewicht auf den Hubeinheiten lastet. Anschliessend kann das unterste
Glied der Hubsäule 5 bzw. 6 abmontiert und auf diese Weise das Schalungsgerüst 4 in dem gewünschten Masse abgesenkt werden. 



  
 



   The invention relates to a method for the production of multi-storey solid structures with supports by vertically moving auxiliary structures by means of a lifting device. and a device for performing this method.



   In the construction industry, even when using prefabricated structures, the conventional, solid construction method is used to a considerable extent, especially in the construction of multi-storey industrial, commercial and private buildings.



   The conventional massive construction is characterized by high costs and the fact that it requires the use of large amounts of formwork and scaffolding material. The building structure consists of the pillars and the reinforced concrete ceiling on each floor. The construction process is very slow because every single floor has to be shuttered and scaffolded separately.



  The stripping of the finished construction can only be carried out when the concrete has reached its final strength, in view of the fact that the loads during construction are decisive in almost every case. For this reason, a large amount of scaffolding and formwork material is always in use at one time.



   According to the usual practice, after the construction of the scaffolding, the formwork and the steel for the concrete, the ceiling is concreted and later, after the concrete has set, the formwork for the next floor is made, using the newly made ceiling of the previous floor as a support . The formwork and scaffolding on which the base plate of the newly manufactured ceiling is supported cannot be removed until the concrete has completely set. This leads to an increase in costs and worsens the already not very favorable efficiency of the massive construction even more.



   The aim of the invention is to propose a method which is suitable for flat, coffered or from below with beams provided ceiling constructions for the production of solid ceilings with a large surface for multi-storey buildings with pillar construction that does not require expensive and labor-consuming scaffolding structures. Furthermore, a device for performing this method will propose.



   It is known that the most economical construction of heavy-duty ceilings with large support spacing is the cassette construction. The shuttering materials (plastic boxes) required for the implementation of the modern cassette ceiling construction are very expensive. In the conventional, labor-intensive and material-intensive construction, the formwork necessary for forming the cassettes is always required for several floors at the same time. This increases the construction costs quite considerably.



   It became known that - if the newly finished ceiling does not have to carry a payload - the concrete strength required to carry the ceiling load resulting from its own weight (which makes up about 40% of the total load) can be achieved within a relatively short time and therefore the construction is removed earlier can be.



   The invention is also based on the knowledge that in the construction of heavy-duty ceiling panels for multi-storey buildings with pillar construction, a method can be used in which the ceiling construction is based on the previously attached pillars and progressing from top to bottom is completed, since in this case at Stripping the ceiling structure only has to bear its own weight.



   According to the invention, a method of the type described at the outset is proposed in which the ceilings of the building are manufactured in the order from top to bottom, the ceiling field corresponding to the base area of the building by means of a movable, contiguous, space-lattice-like formwork framework supported at several points on the working plane and the entire ceiling field is made at once as a cohesive panel construction. The formwork scaffolding can expediently be assembled together on the working level below.



   The device according to the invention has a hydraulic lifting element, the working cylinder of which is connected to a tubular lifting column or a lifting element, the tubular lifting column or the lifting element being installed in a lattice-like support stand which fixes the tubular lifting column or the lifting element in any Has position enabling and at the same time sliding back preventing gripping head.



   The invention can preferably be used for the industrial production of solid ceilings for pillar buildings with an unbound grid. It is possible to move large-area (several hundred square meters) formwork scaffolding and formwork vertically in both directions.



  With the proposed solution, the formwork can be used several times without having to be dismantled and reassembled. The labor and material costs of the solid construction, the shuttering and scaffolding can be reduced to a minimum in this way and the economic efficiency can be increased significantly.



   The invention is explained in more detail on the basis of the drawings, on which individual exemplary embodiments are shown.



   Show it:
1 shows a device supported with tubular columns and
Fig. 2 shows a similar device, but supported by grid columns.



   As can be seen from FIGS. 1 and 2, the device has gripping heads 2 which are supported by stiffened stands 1 and prevent falling, and a hydraulic working cylinder 3 with which a formwork scaffolding or scaffolding structure 4 assembled on the working plane can be raised. A lattice column 5 assembled from suitable room elements of the module type or a tubular lifting column 6 is interposed. The lattice-like formwork or lattice supported at several points. Scaffolding construction can be raised to any level or fixed in any height position.



   This lifting device offers double safety in every lifting position. Should the hydraulic working cylinder 3 be subject to a malfunction, the respective position of the space lattice construction is maintained by means of the gripping head 2 by fixing the tubular lifting column 6 or a lifting member 8 adjoining the working cylinder 3. The gripping head 2 is expediently equipped with clamping jaws 12, which clamp onto the tubular lifting column 6 or the lifting member 8 by friction. The surfaces of the clamping jaws 12 that come into contact with the tubular lifting column 6 or the lifting member 8 have a greater coefficient of friction than the surfaces that come into contact with the gripping head 2.

 

   In the embodiment shown in Fig. 1 using a tubular column, the individual column parts 6 are used by means of a hydraulic tilting structure 7 in the following way:
The tilting structure 7 tilts the hydraulic working cylinder 3 into a horizontal position, in which column parts 6 are attached. Then it is returned to the vertical stroke position.



   In the embodiment shown in Fig. 2 with a lattice pillar, the movement of the same happens by means of a lifting member 8 adjoining the hydraulic working cylinder 3, which is a rocker arm 9 at its end. With a cable 10 is designated. To support the lattice lifting columns 5 and to adjust them to a specific height, a tensioning structure 11 attached to the working plane and having a screw spindle is used.



   The proposed method is carried out as follows when building a multi-storey pillar building:
In the first phase of construction, a foundation is made in a conventional manner, after which the final pillars of the building are attached and fixed accordingly.



   In the second construction phase, the ceiling construction is made using the lifting device described. Hydraulic lifting devices are set up at predetermined locations, whereupon the formwork framework 4 is assembled with the interposition of a suitable connecting element 13. The formwork frame 4 holding the formwork is, after it has been assembled and also the formwork elements are attached, raised to the lifting height of the hydraulic working cylinder 3. The supporting lattice lifting column 5 or the tubular lifting column 6 is then assembled. Then the formwork framework 4 is placed on the already prepared lifting columns 5 and 6. It is then possible to retract the hydraulic working cylinder 3 into the starting position and start a new lifting cycle.

  By repeating the process described, the formwork framework 4 can be lifted to any height, with corresponding intermediate pieces, d. H. Column parts 5 or 6 can be installed.



   The individual lifting units are expediently operated with a central control device. The control device automatically synchronizes the functions of the individual lifting elements. If the lifting height of a lifting unit is exceeded, this unit stops automatically and only begins to work again when the other lifting units have compensated for the difference in height.



   The ceiling construction is carried out starting from the top floor. The raised formwork scaffolding 4 is temporarily attached to the pillars of the building until the ceiling construction is completed. In this position, the formwork is always supported at several points during the production of the ceiling, which greatly reduces the risk of excessive changes in shape during concreting.

 

   After the ceiling has been completed and the strength required for stripping has been achieved, the formwork framework 4 and, together with it, the entire formwork can be lowered to the level of the next floor. The lowering begins with the hydraulic working cylinders 3 being pressurized.



   Then the provisional attachment of the Schalungsgerü stes 4 is solved, whereby this is loaded with its full weight on the lifting units. Then the lowest
Member of the lifting column 5 or 6 dismantled and in this way the formwork framework 4 can be lowered to the desired extent.

 

Claims (1)

PATENTANSPRÜCHE PATENT CLAIMS I. Verfahren zur Herstellung mehrgeschossiger Massiv bauten mit Stützen, durch senkrechtes Bewegen von Bauhilfskonstruktionen mittels einer Hubvorrichtung, dadurch ge kennzeichnet, dass die Decken des Gebäudes in der Reihen folge von oben nach unten gefertigt werden, dass das der Grundfläche des Gebäudes entsprechende Deckenfeld mittels eines an mehreren Punkten auf der Arbeitsebene abgestützten, beweglichen, zusammenhängenden, raumgitterartigen Scha lungsgerüstes (4) getragen wird und dass das gesamte Dek kenfeld als zusammenhängende Plattenkonstruktion auf ein mal angefertigt wird. I. A method for the production of multi-storey solid buildings with supports, by vertically moving auxiliary construction structures by means of a lifting device, characterized in that the ceilings of the building are made in the order from top to bottom that the Floor area of the building corresponding to the ceiling field by means of a movable, coherent, space-lattice-like formwork scaffolding (4) supported at several points on the working level and that the entire ceiling field is made as a cohesive panel construction at once. II. Vorrichtung zur Durchführung des Verfahrens nach Pa tentanspruch I, dadurch gekennzeichnet, dass sie über ein hy draulisches Huborgan verfügt, an dessen Arbeitszylinder (3) sich eine rohrartige Hubsäule (6) oder ein Hubglied (8) an schliesst, wobei die rohrartige Hubsäule (6) bzw. das Hub glied (8) in einem gitterartigen Stützständer (1) eingebaut ist, welcher einen die Fixierung der rohrartigen Hubsäule (6) bzw. des Hubgliedes (8) in einer beliebigen Lage ermögli chenden und gleichzeitig das Zurückgleiten verhindernden Greifkopf (2) aufweist. II. Device for carrying out the method according to patent claim I, characterized in that it has a hy draulic lifting element, to the working cylinder (3) of which a tubular lifting column (6) or a lifting member (8) is connected, the tubular lifting column (6) or the lifting member (8) is installed in a lattice-like support stand (1), which enables a fixation of the tubular lifting column (6) or the lifting member (8) in any position and at the same time prevents sliding back gripping head (2). UNTERANSPRÜCHE 1. Verfahren nach Patentanspruch I, dadurch gekennzeich net, dass das Schalungsgerüst unten auf der Arbeitsebene zu sammenmontiert wird. SUBCLAIMS 1. The method according to claim I, characterized in that the formwork scaffolding is assembled together on the working level below. 2. Vorrichtung nach Patentanspruch II, dadurch gekenn zeichnet, dass der Greifkopf (2) sich durch Reibung an die rohrartige Hubsäule (6) bzw. das Hubglied (8) anklemmende Klemmbacken (12) aufweist. 2. Device according to claim II, characterized in that the gripping head (2) is clamped by friction on the tubular lifting column (6) or the lifting member (8) Has clamping jaws (12). 3. Vorrichtung nach Unteranspruch 2, dadurch gekenn zeichnet, dass die mit der rohrartigen Hubsäule (6) bzw. dem Hubglied (8) in Berührung kommenden Flächen der Klemm backen (12) einen grösseren Reibungskoeffizienten haben als die mit dem Greifkopf (2) in Berührung kommenden Flächen. 3. Device according to dependent claim 2, characterized in that the with the tubular lifting column (6) or the Lifting member (8) coming into contact surfaces of the clamping jaws (12) have a greater coefficient of friction than the surfaces coming into contact with the gripping head (2). 4. Vorrichtung nach Patentanspruch II, dadurch gekenn zeichnet, dass die senkrecht zu bewegende Bauhilfskonstruk tion mit auf der Arbeitsebene stehenden, vorzugsweise aus Raumgitterelementen vom Modultyp zusammengebauten Säulen (5) an mehreren Punkten unterstützt ist. 4. Device according to claim II, characterized in that the perpendicular to be moved Bauhilfskonstruk tion with standing on the working plane, preferably from Space lattice elements of the modular type assembled Pillars (5) is supported at several points. 5. Vorrichtung nach Patentanspruch II, dadurch gekenn zeichnet, dass sich an den Stützständer (1) eine zum Kippen der rohrartigen Hubsäule (6) in waagrechte oder senkrechte Lage geeignete Kippkonstruktion (7) anschliesst. 5. Device according to claim II, characterized in that on the support stand (1) one for tilting the tubular lifting column (6) in horizontal or vertical Suitable tilting construction (7).
CH654375A 1975-05-16 1975-05-16 Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton CH591605A5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH654375A CH591605A5 (en) 1975-05-16 1975-05-16 Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH654375A CH591605A5 (en) 1975-05-16 1975-05-16 Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton

Publications (1)

Publication Number Publication Date
CH591605A5 true CH591605A5 (en) 1977-09-30

Family

ID=4311246

Family Applications (1)

Application Number Title Priority Date Filing Date
CH654375A CH591605A5 (en) 1975-05-16 1975-05-16 Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton

Country Status (1)

Country Link
CH (1) CH591605A5 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005023488A1 (en) * 2005-05-21 2006-11-30 Plauen Stahl Technologie Gmbh Tower frame for a suspended coal-burning boiler, giving steam for electricity generation, is erected in segments by raising each installed segment assembly for the next prepared segment to be pushed in and secured below
CN114214950A (en) * 2021-12-21 2022-03-22 武汉市市政工程机械化施工有限公司 Emergency road bridge supporting structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005023488A1 (en) * 2005-05-21 2006-11-30 Plauen Stahl Technologie Gmbh Tower frame for a suspended coal-burning boiler, giving steam for electricity generation, is erected in segments by raising each installed segment assembly for the next prepared segment to be pushed in and secured below
DE102005023488B4 (en) * 2005-05-21 2009-12-03 Plauen Stahl Technologie Gmbh Lifting method for the cyclic erection of a framework for suspended boilers
CN114214950A (en) * 2021-12-21 2022-03-22 武汉市市政工程机械化施工有限公司 Emergency road bridge supporting structure
CN114214950B (en) * 2021-12-21 2022-10-21 武汉市市政工程机械化施工有限公司 Emergency road bridge supporting structure

Similar Documents

Publication Publication Date Title
DE2265460C2 (en) Height-adjustable support foot for formwork framework
WO2014067884A1 (en) Method for producing a tower construction from reinforced concrete
DE1807716A1 (en) Prefabricated, transportable room element for the production of buildings
DE1810310A1 (en) Process and device for the production of a reinforced concrete structure
DE902188C (en) Sliding circuit for concrete structures
CH591605A5 (en) Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton
DE1559585A1 (en) Formwork element for the production of concrete walls and method for erecting buildings using such formwork elements
DE2522158A1 (en) Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton
DE1584637C3 (en) Device for producing a large-format building board and use of the device
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE1534890B1 (en) Procedure for erecting multi-storey buildings
EP0645501B1 (en) Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul
DE1182411B (en) Method and device for erecting multi-storey buildings with basements
DE2037360A1 (en) Large area formwork and method for its formwork
DE2426999A1 (en) GIRDER-BASED SUPPORT SYSTEM, IN PARTICULAR FOR FORMWORK PRISM-SHAPED STRUCTURES AND PROCEDURES FOR PRE-ASSEMBLING THEREOF
DE1559082C (en) Process for the production of single or multi-storey buildings
DE2445029C3 (en) Method for producing the superstructure of a bridge or the like structure from prestressed concrete as well as supporting scaffolding for carrying out the method
DE1534890C (en) Procedure for erecting multi-storey buildings
DE1042871B (en) Building in which the supports are first erected and then the ceiling panels are made on the ground and pulled up into their final position
DE1559083C3 (en) Process for the production of single or multi-storey buildings
DE2035372A1 (en) Method and form for forming a shell of construction or structural parts made of concrete or reinforced concrete
DE1937365C3 (en) Method for erecting a multi-storey building and room cell for use in this method
DE1948985C (en) Method for erecting a multi-storey building according to the lifting ceiling construction method and device for carrying out the method
DE1277544B (en) Method of erecting multi-storey buildings