CH387917A CH7467159A CH7467159A CH387917A CH 387917 A CH387917 A CH 387917A CH 7467159 A CH7467159 A CH 7467159A CH 7467159 A CH7467159 A CH 7467159A CH 387917 A CH387917 A CH 387917A
Authority
CH
Switzerland
Prior art keywords
formwork
elements
formwork device
masonry
frame
Prior art date
Application number
CH7467159A
Other languages
German (de)
Inventor
J Dipl-Ing Kaegi Hans
P Dipl-Ing Bertschinger Hans
A Dipl-Ing Schmid Walter
Original Assignee
Locher & Cie Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Locher & Cie Ag filed Critical Locher & Cie Ag
Priority to CH7467159A priority Critical patent/CH387917A/en
Publication of CH387917A publication Critical patent/CH387917A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

  

      Schalungseinrichtung       Gegenstand vorliegender Erfindung ist eine     Scha-          lungseinrichtung,    insbesondere zur Herstellung von  Schächten, z. B. in Zellenbauwerken, wie     Silobauten,     Pfeilern usw.  



  Bei bekannten     Schalungseinrichtungen,    auch  wenn dieselben mit absatzweise weiterverstellbaren       Schalungsteilern    arbeiten, wurden dieselben z. B. bei  der Herstellung von Wänden durch sich gegenüber  liegende Elemente gebildet, welche zwischen sich  den durch Beton auszufüllenden Zwischenraum frei  liessen. Diese Elemente wurden durch Drähte, Stäbe  und dergleichen im Abstand voneinander gehalten  und gleichzeitig durch diese durch die Wand hin  durchgeführten Halteorgane in der Höhenrichtung  festgehalten.  



  Die erfindungsgemässe     Schalungseinrichtung    zeich  net sich dadurch aus, dass sie aus mehreren, ein in der  Gebrauchslage in sich selbst versteiftes     Schalungs-          gerüst    bildenden Elementen besteht, an welchem       Schalungsgerüst    Stützen zu seiner Abstützung auf  dem bereits hergestellten Mauerwerk angeordnet sind.  



  Der Grundgedanke der vorliegenden Erfindung  liegt nun darin, dass bei der Herstellung von Schäch  ten, Pfeilern,     Silobauten    usw. von beliebigem Quer  schnitt nicht durch die Wand hindurch miteinander  verbundene Schalungen verwendet werden, sondern  dass in jedem Schacht ein in sich selbst versteiftes       Schalungsgerüst    mit der zugehörigen Schalung an  geordnet wird, das sich mittels Stützen auf dem  bereits hergestellten Mauerwerk abstützt und dadurch  in der     Höhenrichtung    gesichert ist. Dieses     Schalungs-          gerüst,    von welchem im nachstehenden verschiedene  beispielsweise Ausführungsformen beschrieben sind,  kann bei der Herstellung von Zellenbauwerken, z. B.

    von     Silobauten,    absatzweise in der Höhe verstellt  werden, indem es nach dem Abbinden des Betons    gelöst, in der Höhe verschoben und alsdann wieder  in der neuen Höhenlage     gesichert    wird. Bei dieser  Bauweise entfällt jede Verbindung von einer Zelle  zur andern durch das Mauerwerk hindurch, so     dass     alle dadurch bedingten Nachteile, wie z. B. Ver  schleiss     zugeputzter    Stellen, zusätzliche Arbeit für  Abdichtung bei gasdichten Zellen usw., automatisch  vermieden werden.  



  In der beiliegenden Zeichnung sind mehrere bei  spielsweise Ausführungsformen der erfindungsge  mässen     Schalungseinrichtung    schematisch dargestellt.  Es zeigen:       Fig.l    ein     Ausführungsbeispiel    im Grundriss  und in       Fig.    2 im Schnitt nach der Linie     II-11    der     Fig.    1,       Fig.3    einen gleichen Schnitt in einer anderen  Arbeitsphase,       Fig.    4 einen Schnitt nach der Linie     IV-IV    der       Fig.    1,       Fig.        5'bis    7 je eine Variante,

         Fig.8    ein weiteres     Ausführungsbeispiel    im  Grundriss,       Fig.9    einen Schnitt nach     IX-IX    der     Fig.8     und die Pendelschalungen,       Fig.    10 einen Schnitt nach     X-X    der     Fig.    8,       Fig.    11 denselben Schnitt wie     Fig.    10, geöffnet.  Die in den     Fig.    1-3 gezeigte     Schalungseinrichtung     weist einen oberen     Schalungsgerüstteil    2 und unteren       Schalungsgerüstteil    3 auf.

   Die beiden     Schalungs-          gerüstteile    sind durch     Diagonalstreben    7, 8 versteift  und mittels     Versteifungsdiagonalstreben    4, 5, 6 mit  einander fest verbunden, so dass ein in sich selbst  versteiftes     Schalungsgerüst    1 gebildet wird. Die Ver  steifung kann auch durch andere Mittel erreicht wer  den. Am oberen     Schalungsgerüstteil    2 sind auf allen  vier Seiten     (Fig.    1) Lager 9 befestigt, an denen die      die ganze Höhe und annähernd die Breite des     Scha-          lungsgerüstes    einnehmende Pendelschalung 10  schwenkbar gelagert ist.

   An den äusseren Enden der       Diagonalstreben    7 und 8 des oberen     Schalungs-          gerüstteiles    2 sind Achsen 11 vorgesehen, um welche       Pendelschalungsstücke    12 schwenkbar sind.  



  Durch die Kreuzungsstellen 13 der Diagonal  streben 7, 8 ist eine in senkrechter Richtung ver  schiebbare Stange 14 geführt, an welcher Hebel 15       angelenkt    sind. Jedem Eckstück 12 der Schalung ist  ein solcher Hebel zugeordnet, wobei die Verbindung  zwischen diesen beiden Teilen ebenfalls gelenkig  ausgebildet ist.  



  Nahe den unteren Enden der     Schalungsteilstücke     12 sind auf deren Aussenseiten Stützen 16 befestigt,  deren Zweck weiter unten erläutert wird. Das gleiche  gilt für die oben an den Eckstücken angeordneten,  vorspringenden Formteile 17.  



  Beim Bau von Zellen, wie sie z. B. in einem Silo  vorhanden sind, wird vorerst auf dem Boden des  letzteren ein der Zellenanordnung und den Wand  stärken entsprechendes, verhältnismässig niedriges  Stück 20     vorbetoniert.    Nach dem Erhärten desselben       wird    bei jeder Zelle ein     Schalungsgerüst    1 auf  gesetzt, wie dies beispielsweise     Fig.    2 veranschaulicht.  Im folgenden soll überhaupt nur noch der Aufbau  einer einzelnen Zelle beschrieben werden, wobei der  Aufbau eines Schachtes selbstverständlich genau  gleich vor sich geht.

   Damit die Stützen 16 auf dem       vorbetonierten    Teil aufliegen, müssen die     Schalungs-          teilstücke    12 nach aussen gedrückt werden. Dies       erfolgt    einerseits durch Anheben der Stange 14,  welche über die Hebel 15 die     Schalungsteilstücke    12  so weit auswärts schwenkt, bis deren untere Enden  am Beton 20 anliegen. Um diese Lage zu sichern  und die Schalung satt anzupressen, werden zwischen       Schalungsteilstücke    und unterem Gerüstteil 3 Keile  18 eingetrieben.     Damit    sitzt das     Schalungsgerüst    1  fest auf dem betonierten Teil.

   Das Hochziehen der  Stange 14 erfolgt zweckmässig mit einer an sich  bekannten Winde. Anschliessend wird auch die Scha  lung 10     (Fig.4)    durch Eintreiben von Keilen 19  in ihrer Arbeitslage gesichert. Zur     überbrückung     der Lücken 21 zwischen Schalung 10 und     Schalungs-          stücken    12 dienen Blechstücke 22, die in irgendeiner  zweckmässigen Art in ihrer Lage festgehalten werden.  An Stelle der Keile können andere Spannvorrichtun  gen verwendet werden.  



       Damit    ist die     Schalungseinrichtung    zum Aufbau  eines weiteren Teilstückes 20' bereit. Zu diesem  Zweck stehen die Arbeiter vorzugsweise auf dem  oberen Rahmenteil 2, der nach dem Belegen mit  Brettern als Podium dienen kann. Sobald das Teil  stück 20' erhärtet ist, wird der Rahmen an einem  Hebezeug     fixiert,    vom Teilstück 20 gelöst und nach  Anheben auf das Teilstück 20' gestellt. Zu diesem  Zweck werden vorerst die Keile 18 und 19 entfernt.  Die Schalung 10 kann jetzt vom Beton gelöst werden  und schwenkt leicht einwärts, z.

   B. durch einen  Schlag auf die Stange 14 wird letztere abwärts ver-    stellt. über die Hebel 15 erfolgt dann ein     Verschwen-          ken    der     Schalungsteilstücke    12 in das     Schalungs-          gerüst    hinein, wie     Fig.    3 zeigt. Die Stützen 16 ver  lassen ihre Auflage, und das     Schalungsgerüst    hängt  damit an den Formteilen 17. Daraus ist auch er  sichtlich, dass das Gerüst dauernd gegen Absturz ge  sichert ist. Jetzt wird der Rahmen 1 so weit ange  hoben, bis die Unterkante der Stützen 16 über dem  Teilstück 20' liegt.

   Dann wird die Stange 14       wiederum    angehoben, und damit werden wie schon  beschrieben die     Schalungsteilstücke    12 an den soeben  betonierten Teil angedrückt. Der Rahmen 1 sitzt  in seiner neuen Lage fest, und die bereits beschrie  bene Arbeitsweise beginnt von neuem.  



  Auf diese Art können selbstverständlich auch  konische Zellen oder Schächte bzw. auch konisch aus  gebildete Zellenwände hergestellt werden. Bei der  Herstellung von Zellen und Schächten muss das       Schalungsgerüstdruckfest    konstruiert sein.  



  Die verschiedenen Gerüstteile können aus     Holz     oder Metall hergestellt sein.  



  In analoger Weise können bei nach einwärts  versetzten Schalungen und aussenliegender, zugfester  Verstrebung     (Fig.8    bis 11) auch Pfeiler betoniert  werden.  



  Dem oberen     Schalungsgerüstteil    2 der Aus  führungsform nach     Fig.3    entspricht der zugfeste  Gerüstteil 2     (Fig.    8), dem unteren     Schalungsgerüst-          teil    nach     Fig.3    der zugfeste     Schalungsgerüstteil    3       (Fig.    8, 10 und 11).  



  Den     Versteifungsstreben    4, 5 und 6 der     Fig.    3  entsprechen analog die Streben 5, 6, 7 und 8 der       Fig.    10.  



  Alle anderen Elemente der     Ausführungsform     nach     Fig.    8-11 sind der ersten nach     Fig.    3 analog  ausgebildet und sind mit denselben Bezugsziffern  bezeichnet.  



  Anstatt die Schwenkachsen für die Schalung  horizontal wie beschrieben anzuordnen, ist es mög  lich, wie die     Fig.5    und 6 zeigen, diese Achsen  auch vertikal vorzusehen. Die Schwenkachsen 25  gemäss     Fig.    5 sind an zwei einander diagonal gegen  überliegenden Ecken des     Schalungsgerüstes    ange  ordnet und je zwei zusammenstossende Schalungen  26 um diese Achsen schwenkbar. Selbstverständlich       sind        wiederum    Stützen und Mittel vorhanden, um  diese     Schalungsteile    in ihrer Arbeitslage zu sichern.  Die eingezeichneten Pfeile deuten die Schwenkrich  tung der     Schalungsteile    an.

   Bei der Variante nach       Fig.    6 sind die Schwenkachsen 27 an zwei einander  gegenüberliegenden Seiten des Gerüstes angeordnet.  Die punktierten Linien deuten die innere Lage der  Schalung an. Im übrigen sind auch hier Stützen zur       Sicherung    des     Schalungsgerüstes    vorhanden.  



  Das     Schalungsgerüst    könnte auch, wie     Fig.7     zeigt, zweiteilig ausgebildet sein, wobei die beiden  Teile 28, 29 in bezug aufeinander verstellbar sind.  In der Arbeitslage werden beide Teile durch mechani  sche Mittel voneinander weg gerückt, während sie  zum Loslösen vom Beton und Verstellen in eine      neue Arbeitslage gegeneinander zu verschoben  werden.  



  Bei allen Varianten sind natürlich zum Abdecken  allfälliger Fugen zwischen den verschiedenen Schal  tafeln sogenannte Schleppelemente, wie z. B. Über  brückungsbleche, vorgesehen.



      Shuttering device The subject of the present invention is a shuttering device, in particular for the production of shafts, e.g. B. in cell structures such as silos, pillars, etc.



  In known formwork devices, even if the same work with intermittently further adjustable formwork dividers, the same z. B. formed in the production of walls by opposing elements, which left the gap to be filled by concrete free between them. These elements were held at a distance from one another by wires, rods and the like and at the same time held in the height direction by these holding elements passed through the wall.



  The formwork device according to the invention is characterized in that it consists of several elements which form a formwork structure that is stiffened in the position of use, on which formwork structure supports are arranged to support it on the masonry already made.



  The basic idea of the present invention is that in the production of shafts, pillars, silo structures, etc. of any cross-section, interconnected formwork is not used through the wall, but that in each shaft a self-stiffened formwork frame with the associated formwork is arranged, which is supported by means of supports on the masonry already made and is thereby secured in the height direction. This formwork framework, of which various exemplary embodiments are described below, can be used in the manufacture of cell structures, e.g. B.

    of silo structures, can be adjusted in height step by step by loosening it after the concrete has set, shifting it in height and then securing it again at the new height. With this design, there is no connection from one cell to the other through the masonry, so that all disadvantages caused by it, such as. B. Ver wear plastered places, additional work for sealing gas-tight cells, etc., are automatically avoided.



  In the accompanying drawings, several embodiments of the formwork device according to the invention are shown schematically for example. They show: Fig.l an embodiment in plan and in Fig. 2 in section along the line II-11 of Fig. 1, Fig. 3 a same section in a different work phase, Fig. 4 a section along the line IV-IV 1, 5 'to 7 each have a variant,

         8 shows a further exemplary embodiment in plan, FIG. 9 shows a section along IX-IX of FIG. 8 and the pendulum formwork, FIG. 10 shows a section along X-X of FIG. 8, FIG. 11 the same section as FIG. 10, opened. The formwork device shown in FIGS. 1-3 has an upper formwork framework part 2 and a lower formwork framework part 3.

   The two formwork frame parts are stiffened by diagonal struts 7, 8 and firmly connected to one another by means of stiffening diagonal struts 4, 5, 6, so that a formwork frame 1 that is stiffened in itself is formed. The stiffening can also be achieved by other means. On all four sides (FIG. 1) of the upper formwork frame part 2, bearings 9 are attached to which the pendulum formwork 10, which occupies the entire height and approximately the width of the formwork frame, is pivotably mounted.

   At the outer ends of the diagonal struts 7 and 8 of the upper formwork frame part 2, axles 11 are provided about which pendulum formwork pieces 12 can be pivoted.



  Through the crossing points 13 of the diagonal strive 7, 8 a ver slidable rod 14 is guided in the vertical direction, on which lever 15 are articulated. Such a lever is assigned to each corner piece 12 of the formwork, the connection between these two parts also being articulated.



  Near the lower ends of the formwork sections 12, supports 16 are attached to their outer sides, the purpose of which is explained below. The same applies to the projecting molded parts 17 arranged on top of the corner pieces.



  When building cells, as they are e.g. B. are present in a silo, a relatively low piece 20 corresponding to the cell arrangement and the wall strength is first preconcreted on the bottom of the latter. After the same has hardened, a formwork framework 1 is placed on each cell, as illustrated, for example, in FIG. In the following, only the structure of a single cell will be described, whereby the structure of a shaft is of course exactly the same.

   So that the supports 16 rest on the pre-concreted part, the formwork sections 12 must be pressed outwards. This is done, on the one hand, by lifting the rod 14, which pivots the formwork sections 12 outward by means of the lever 15 until their lower ends rest against the concrete 20. In order to secure this position and to press the formwork fully, 3 wedges 18 are driven in between the formwork sections and the lower frame part. So that the formwork 1 sits firmly on the concreted part.

   The rod 14 is expediently pulled up with a winch known per se. Subsequently, the formwork 10 (FIG. 4) is secured in its working position by driving in wedges 19. To bridge the gaps 21 between the formwork 10 and the formwork pieces 12, sheet metal pieces 22 are used, which are held in their position in some expedient manner. Other clamping devices can be used instead of the wedges.



       The formwork device is thus ready for the construction of a further section 20 '. For this purpose, the workers preferably stand on the upper frame part 2, which can serve as a podium after being covered with boards. As soon as the part piece 20 'has hardened, the frame is fixed to a hoist, detached from the part 20 and placed on the part 20' after lifting. For this purpose, the wedges 18 and 19 are first removed. The formwork 10 can now be detached from the concrete and swivels slightly inwards, e.g.

   B. by a blow on the rod 14, the latter is adjusted downwards. The formwork sections 12 are then pivoted into the formwork framework via the levers 15, as FIG. 3 shows. The supports 16 leave their support, and the formwork frame thus hangs on the molded parts 17. It is also evident from this that the frame is permanently secured against falling ge. Now the frame 1 is raised so far until the lower edge of the supports 16 is above the section 20 '.

   Then the rod 14 is raised again, and thus, as already described, the formwork sections 12 are pressed against the part that has just been concreted. The frame 1 is stuck in its new position, and the method of operation already described begins again.



  In this way, of course, conical cells or shafts or also conical cell walls can be produced. When producing cells and shafts, the formwork scaffolding must be constructed to be pressure-resistant.



  The various frame parts can be made of wood or metal.



  In an analogous manner, pillars can also be concreted in the case of inwardly displaced formwork and external, tensile struts (Fig. 8 to 11).



  The upper formwork framework part 2 of the embodiment according to FIG. 3 corresponds to the tensile framework part 2 (FIG. 8), the lower formwork framework part according to FIG. 3 corresponds to the tensile strength formwork framework part 3 (FIGS. 8, 10 and 11).



  The stiffening struts 4, 5 and 6 of FIG. 3 correspond analogously to the struts 5, 6, 7 and 8 of FIG. 10.



  All other elements of the embodiment according to FIGS. 8-11 are designed analogously to the first according to FIG. 3 and are denoted by the same reference numerals.



  Instead of arranging the pivot axes for the formwork horizontally as described, it is possible, please include, as shown in FIGS. 5 and 6, to also provide these axes vertically. The pivot axes 25 according to FIG. 5 are arranged at two diagonally opposite corners of the formwork framework and each two colliding formworks 26 can be pivoted about these axes. Of course, there are again supports and means to secure these formwork parts in their working position. The arrows shown indicate the pivot direction of the shuttering parts.

   In the variant according to FIG. 6, the pivot axes 27 are arranged on two opposite sides of the frame. The dotted lines indicate the inner position of the formwork. In addition, there are also supports to secure the formwork scaffolding.



  The formwork framework could also, as FIG. 7 shows, be designed in two parts, the two parts 28, 29 being adjustable with respect to one another. In the working position, both parts are moved away from each other by mechanical specific means, while they are moved against each other to detach them from the concrete and adjust in a new working position.



  In all variants, of course, so-called dragging elements, such as z. B. About bridging plates, provided.

 

Claims (1)

PATENTANSPRUCH Schalungseinrichtung, insbesondere zur Herstel lung von Schächten, z. B. in Zellenbauwerken, Pfei lern usw., dadurch gekennzeichnet, dass sie aus mehreren, ein in der Gebrauchslage in sich selbst versteiftes Schalungsgerüst bildenden Elementen (2, 3, 4, 5, 6, 7 und 8) besteht, an welchem Schalungs- gerüst Stützen (16, 17) zu seiner Abstützung auf dem bereits hergestellten Mauerwerk angeordnet sind. PATENT CLAIM Formwork device, especially for the manufacture of manholes such. B. in cell structures, pillars, etc., characterized in that it consists of several elements (2, 3, 4, 5, 6, 7 and 8) which form a formwork frame that is stiffened in the position of use, on which formwork scaffold supports (16, 17) are arranged to support it on the masonry already made. UNTERANSPRÜCHE 1. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass am Schalungsgerüst vor springende Formteile (16, 17) für die Herstellung der die Stützen aufnehmenden Ausnehmungen im Mauerwerk angeordnet sind. 2. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass die das Schalungsgerüst bildenden Elemente um wenigstens eine vertikale Achse schwenkbar sind. SUBClaims 1. Formwork device according to patent claim, characterized in that on the formwork frame in front of jumping molded parts (16, 17) for the production of the recesses in the masonry that receive the supports. 2. Formwork device according to claim, characterized in that the elements forming the formwork framework can be pivoted about at least one vertical axis. 3. Schalungseinrichtung nach Unteranspruch 2, die einen wenigstens angenähert viereckigen Quer schnitt aufweist, dadurch gekennzeichnet, dass an einandergrenzende Schalungsgerüste bildende Ele mente um ihre gemeinsame Kante einschwenkbar sind. 4. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass die das Schalungsgerüst bildenden Elemente um ihre obere Kante umklappbar sind. 3. Formwork device according to dependent claim 2, which has an at least approximately quadrangular cross-section, characterized in that elements forming adjacent formwork scaffolding can be pivoted around their common edge. 4. Formwork device according to claim, characterized in that the elements forming the formwork framework can be folded over around their upper edge. 5. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass das Schalungsgerüst zwei teilig ausgebildet ist, wobei der gegenseitige Ab stand der beiden Teile bei der Bewegung in die Gebrauchslage vergrössert, bei der Demontage da gegen verkleinert wird. 6. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass die Stützen (16) in das Schalungsgerüst hinein und aus demselben heraus bewegbar sind. 5. Formwork device according to claim, characterized in that the formwork frame is formed in two parts, the mutual from standing of the two parts increased when moving into the position of use, when dismantling is reduced as against. 6. Formwork device according to claim, characterized in that the supports (16) can be moved into and out of the formwork framework. 7. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass mindestens einzelne der das Schalungsgerüst bildenden Elemente (16) in der Gebrauchslage mit ihrem unteren Rand gegen das bereits hergestellte Mauerwerk anliegen und durch mindestens eine Spannvorrichtung (19), z. B. einem Keil, an dasselbe angepresst werden. 7. Formwork device according to claim, characterized in that at least some of the formwork scaffolding elements (16) in the position of use rest with their lower edge against the masonry already made and by at least one clamping device (19), for. B. a wedge to be pressed against the same. B. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass wenigstens ein Teil der in bezug aufeinander verstellbaren, das Schalungs- gerüst bildenden Elemente durch je mindestens einen Lenker mit einem gemeinsamen Betätigungsorgan verbunden sind, derart, dass durch Betätigung des letzteren die Elemente gleichzeitig an das Mauerwerk angedrückt bzw. von demselben entfernt werden können. 9. Schalungseinrichtung nach Patentanspruch, da durch gekennzeichnet, dass die Fugen zwischen be nachbarten Elementen durch Schleppelemente, z. B. Bleche, überbrückt sind. B. Formwork device according to claim, characterized in that at least some of the adjustable with respect to each other, the formwork scaffolding forming elements are connected by at least one link with a common actuating member, such that by actuating the latter, the elements are simultaneously connected to the Masonry can be pressed on or removed from the same. 9. Formwork device according to claim, characterized in that the joints between adjacent elements be by towing elements, for. B. sheets are bridged.
CH7467159A 1959-06-19 1959-06-19 Formwork equipment CH387917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH7467159A CH387917A (en) 1959-06-19 1959-06-19 Formwork equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH7467159A CH387917A (en) 1959-06-19 1959-06-19 Formwork equipment

Publications (1)

Publication Number Publication Date
CH387917A true CH387917A (en) 1965-02-15

Family

ID=4533551

Family Applications (1)

Application Number Title Priority Date Filing Date
CH7467159A CH387917A (en) 1959-06-19 1959-06-19 Formwork equipment

Country Status (1)

Country Link
CH (1) CH387917A (en)

Similar Documents

Publication Publication Date Title
DE2123351B2 (en) FORMWORK EQUIPMENT FOR A REUSABLE FORMWORK FOR A COMPOSITE CEILING
EP0054131A1 (en) Shuttering system for floors
DE2410877C3 (en) Climbing formwork for erecting structures with angled concrete or reinforced concrete walls
DE1808989C3 (en) Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor
DE2126254A1 (en) Device for concreting building elements
DE2528715C3 (en) Prefabricated structural element made of reinforced concrete for the production of an angular retaining wall or the like.
DE202022102656U1 (en) Support structure for constructing the platform canopy
WO2014020009A1 (en) Device for producing a monolithic room module
DE2402683C3 (en) Climbing formwork
CH387917A (en) Formwork equipment
AT217082B (en) Device for concreting long components
EP0159467B1 (en) Platform for lifting persons
DE2805016C3 (en) Process and battery formwork for the production of precast reinforced concrete parts on the construction site
DE811292C (en) Formwork scaffolding for beamless ceilings
DE2136401C3 (en) Device for room-sized structures made of reinforced concrete standing on a formwork frame
DE1272519C2 (en) INTERNAL FORMWORK FOR CONCRETE SECTIONS OF TWO OPPOSING WALLS AND AN APPROPRIATE CEILING
AT356869B (en) FORMWORK FOR BLOCK-SHAPED CONCRETE CONSTRUCTION WITH THE SECTION OF A REVERSE U, IN PARTICULAR FINISHED GARAGES
DE1434362B1 (en) Wall formwork made of support grating
DE880057C (en) Steel formwork for the production of smooth walled walls
AT400465B (en) FORMWORK AND METHOD FOR POURING A CONCRETE CONTAINER
DE2141560C2 (en) External formwork for monolithic space cells made of reinforced concrete
DE1684394C3 (en) Mobile interior formwork for concrete and reinforced concrete structures
DE2621769C3 (en) Formwork for reinforced columns made of in-situ concrete
DE8118905U1 (en) WORKING DEVICE FOR MOLDING AND DEFORMING CONCRETE ELEMENTS
DE1862988U (en) REUSABLE FORMWORK FOR THE CONSTRUCTION OF BUILDINGS.