CH105425A - Process for the production of concrete piles in the ground. - Google Patents

Process for the production of concrete piles in the ground.

Info

Publication number
CH105425A
CH105425A CH105425DA CH105425A CH 105425 A CH105425 A CH 105425A CH 105425D A CH105425D A CH 105425DA CH 105425 A CH105425 A CH 105425A
Authority
CH
Switzerland
Prior art keywords
concrete
ground
sinker
production
filled
Prior art date
Application number
Other languages
German (de)
Inventor
Tiefbau-Actiengesell Beton-Und
Original Assignee
Beton Und Tiefbau Actiengesell
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beton Und Tiefbau Actiengesell filed Critical Beton Und Tiefbau Actiengesell
Publication of CH105425A publication Critical patent/CH105425A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/42Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds by making use of pressure liquid or pressure gas for compacting the concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/44Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

  Verfahren zur Herstellung von Betonpfählen im Erdreich.    Die Erfindung betrifft ein Verfahren zur  Herstellung von Betonpfählen im Erdreich  unter Anwendung von Druck auf den im  plastischen Zustand befindlichen Beton und  Wiedergewinnung der in das Erdreich einge  triebenen Senkhülle, des sogenannten Vor  treibrohres.

   Dieses Wiederzugewinnen ist  nach den bekannten Verfahrensweisen kaum  ratsam, da bei dem     Herausziehen    des Vor  treibrohres aus dem Erdreich an einzelnen  Stellen des noch plastischen, d. h. in der  äussern Form dauernd veränderbaren Pfahl  körpers oft eine schädliche     Q,uerschnitts-          verminderung    - die     sob    nannte Taillenbil  dung - eintritt, durch die der Pfahl in un  zulässiger Weise geschwächt und sein fester  Sitz im Erdreich in Frage gestellt wird.  



  Dieser Nachteil wird gemäss der vorlie  genden Erfindung dadurch vermieden, dass  man während des     Herausziehens    des     Vor-          treibrohres    aus der Erde auf den plastischen  Beton in     irgend    einer geeigneten     Weise     zweckmässig einen möglichst starken Druck  ausübt.

   Die Wirkung     .dieses    Verfahrens be  steht darin,     dass    der auf den Beton ausgeübte    Druck auf die diesem benachbarten     Erd-          massen        übertragen    wird, die dadurch an sol  chen Stellen, wo sie locker geschichtet sind,  unter Bildung von Füllräumen für .den Be  ton verdichtet werden.

   Infolgedessen erhält  der zylindrische Betonkern     höckerförmige     oder ähnlich gestaltete Ausbauchungen, die  mit dem zylindrischen Kern des Pfahls ein  einheitliches Ganzes     bilden    und nach dem       Abbinden    des Betons den grossen Vorteil  bieten, dass ein solcher Pfahl sehr hohen Be  lastungen ausgesetzt werden kann, ohne     tie-.          fer    in das Erdreich     hineinzusinken.    Die  Tragfähigkeit dieser Pfähle wird auf diese  Weise tatsächlich sehr erheblich vermehrt.  



  Bei einer durch die Zeichnung veran  schaulichten     Ausführungsart    des Verfahrens  geschieht .die Unterdrucksetzung und Ver  dichtung des     Betons    während der Entfernung  des     Vortreibrohres    durch Anwendung hy  draulischer Pressung.  



       Fig.    1 ist ein     senkrechter    Schnitt durch  eine ins Erdreich eingetriebene, mit Beton  ausgefüllte und oben geschlossene Senkhülle,      die an eine Druckwasserleitung     angesehlos-          sen    ist:       Fig.    ? zeigt denselben Schnitt bei der aus  dem Erdreich     teilweiso    herausgezogenen  Senkhülle, und       Fig.    3 den     fertigen    Betonpfahl ebenfalls  im     senkrechten    Schnitt.  



       Gernä        l;    der     Zeielinung    soll     dieerstellun@     von.     Betonpfählen    in der     Z%"eise        dur < @hgefülirt     wurden, dass     man        zuniiehst    eine     zylindriselie          Senkhüllo        a.    deren Länge etwas grösser als       clie    Länge des Herzustellenden     Betortpfahls     ist, mit einer Spitze b, die     zweckmässig    aus  Holz hergestellt ist, leicht     lösbar    verbindet.

    Zur Erreichung einer solchen leicht lösbaren       Verbindung    besitzt die unten mit einem  Eisenteil bewehrte Spitze eine     Blechumhül-          lung-,    die in einen zylindrischen Endteil     c          släuft,    in den das untere Ende der Senk  <B>.</B> -tu,  hülle     eingeschoben    wird, worauf.' man Spitze  und Senkhülle gemeinsam in den Boden hin  eintreibt.  



       Darnach    beginnt man die     Herstellung    des       Pfahlkörpers,    indem man Beton in die     Senk-          hülle    einschüttet. Soll der Pfahl ein     veTstei-          fend.es        EisengErippe    erhalten, was meist der  Fall ist, dann wird vor dem Einschütten des       Betons    in die Senkhülle ein     solches        Eisen-          gi        i,ippe    hergestellt,

   indem man eine     Anzahl          vcn        -stabförmigen        Eiseneinlagen        d,    die mit  dem einen Ende an einer eisernen Platte     e          1>efesti;t    sind, in die Senkhülle einführt.

      Konzentrisch zu dieser Platte e ist ein an       (k        r    Senkhülle     a        befestigter    Eisenring     in    an  geordnet, dessen äusserer Durchmesser genau  der lichten Weite der Senkhülle entspricht,  und in den zwischen dieser und dem Teil c  liegenden Hohlraum ist ein aus Ton oder  einer andern geeigneten Dichtungsmasse her  gestellter ringförmiger Dichtungskörper x  eingeführt, um zu verhindern,     dü.ss    Glas Grund  wasser in den von der Senkhülle     a    umschlos  senen Hohlraum     eindringen    kann.  



       Nachdem    die Senkhülle fast ganz mit  flüssigem Beton ausgefüllt ist,     legt    man auf  die     B_;tonoberfläelie    eine den     gi-,nzen        Hohl-          cluerschnitt    der Senkhülle ausfüllende Gumini-    platte     /'    auf, an deren Stelle eine andere,       -ebenso        brosse,    dichtende Schicht, z. B. Ton,  treten kann. Es wird dann auf dem freien  Ende der     Senkhülle        a    eine Haube g dicht  schliessend befestigt, z.

   B. durch     Versehra.u-          ben,    die durch eine ungefähr der     Länbe        cler     Senkhülle     einsprechende        Sehl.auehleitung        1r.          r          mit;        einer        @\:asserdrtt.cl;humpe        i,    verbunden ist.

         Mittelst    dieser     Pumpe        wird    der durch die  Haube     g        abgedeckte    Hohlraum der     Senkhülle     mit     Druckwasser        angefüllt,    der     Druck        wird     nach Möglichkeit     Hochgetrieben    und     mittelst     der Pumpe i so     lange    aufrecht erhalten, bis  man die     Senkhülle        a    langsam .aus dem Erd  reich     lierausbezogen    hat.

   Es     bilden    sich  dann während des     Herausziehens    der Senk  hülle     Häcker   <B>7,</B> der     Betonsiiule   <I>1,</I> die dadurch       entstehen,    dass der     Beton        das    Erdreich an  solchen Stellen, wo es     na,cligiebib        geseliiehtet     ist, verdichtet und die dadurch gebildeten  Füllräume ausfüllt.  



  Die Senkhülle     a.    erhält eine solche     @än@e,          da.ss    sie eine für die Bildung dieser Höcker       ausreiehende        L"berschuss.menge    an Beton auf  zunehmen vermag. Die Spitze b bleibt, wie         die    Zeichnung zeit, im Erdreich sitzen



  Process for the production of concrete piles in the ground. The invention relates to a method for the production of concrete piles in the ground using pressure on the concrete in the plastic state and recovery of the sinking casing driven into the ground, the so-called pre-propulsion pipe.

   This recovery is hardly advisable according to the known procedures, since when pulling out the propulsion pipe from the ground at individual points of the still plastic, d. H. In the outer shape of the permanently changeable post body, a harmful reduction in cross-section - the so-called waist formation - often occurs, through which the post is weakened in an impermissible way and its firm seat in the ground is questioned.



  According to the present invention, this disadvantage is avoided by exerting the greatest possible pressure on the plastic concrete in some suitable manner while the driving pipe is being pulled out of the earth.

   The effect of this method is that the pressure exerted on the concrete is transferred to the earth masses adjacent to it, which are then compacted in places where they are loosely layered, forming filling spaces for the concrete .

   As a result, the cylindrical concrete core receives hump-shaped or similarly shaped bulges that form a uniform whole with the cylindrical core of the pile and, after the concrete has set, offer the great advantage that such a pile can be exposed to very high loads without being deep. fer to sink into the ground. The load-bearing capacity of these piles is actually increased considerably in this way.



  In one embodiment of the method illustrated by the drawing, the pressurization and compression of the concrete takes place during the removal of the jacking pipe by using hydraulic pressure.



       1 is a vertical section through a sinking casing driven into the ground, filled with concrete and closed at the top, which is attached to a pressurized water pipe: FIG. shows the same section with the sinker partially pulled out of the ground, and FIG. 3 shows the finished concrete pile, also in vertical section.



       Gernä l; the drawing should be created @ of. Concrete piles in which the concrete piles were filled so that a cylindrical sink shell a. The length of which is slightly greater than the length of the concrete pile to be produced, is easily detachably connected to a point b, which is suitably made of wood.

    To achieve such an easily detachable connection, the tip, reinforced with an iron part at the bottom, has a sheet metal casing which runs into a cylindrical end part c into which the lower end of the countersunk casing is inserted on what. ' the tip and the sinker are driven into the ground together.



       Then you start the manufacture of the pile body by pouring concrete into the sinker. If the pile is to be given a reinforcing iron structure, which is usually the case, then an iron structure is made before the concrete is poured into the sink cover.

   by inserting a number of rod-shaped iron inlays d, one end of which is fixed to an iron plate e 1, into the plummet.

      Concentric to this plate e there is an iron ring attached to (kr sinker a) whose outer diameter corresponds exactly to the inside diameter of the sinker, and in the cavity between this and part c there is a clay or other suitable sealing compound Introduced ring-shaped sealing body x in order to prevent dü.ss glass ground water from penetrating into the cavity enclosed by the sinker a.



       After the sinker has been almost completely filled with liquid concrete, a rubber plate filling the huge hollow section of the sinker is placed on the B_; clay surface, and in its place another, equally large, sealing layer, z. B. sound, can occur. A hood g is then fastened tightly to the free end of the sinker a, e.g.

   B. by Versehra.uben, which by a Sehl.auehleitung 1r approx. r with; one @ \: asserdrtt.cl; humpe i, is connected.

         By means of this pump, the cavity of the sink cover covered by the hood g is filled with pressurized water, the pressure is boosted if possible and by means of the pump i is maintained until the sink cover a has slowly been extracted from the earth.

   Cracks <B> 7, </B> of the concrete column <I> 1, </I> are then formed during the pulling out of the sinking shell, which are created by the fact that the concrete touches the ground in places where it is neatly cliggy is, compressed and fills the filling spaces formed thereby.



  The sinker a. receives such a change that it is able to absorb an excess amount of concrete sufficient for the formation of these cusps. The point b remains in the ground, as shown in the drawing


    

Claims (1)

PATENTANSPRITCH Verfahren zur Herstellung von Beton pfählen im Erdreich, dadurch gekennzeichnet, dass eine mit einer Spitze lösbar verbundene Senkhülle mit dieser in das Erdreich eing(1- trieben und dann mit Beton ausgefüllt wird, worauf man den noch im plastischen Zustand befindlichen Beton unter Druck setzt und die Senkhülle langsam aus dem Erdreich heraus zieht, PATENT CLAIM A process for the production of concrete piles in the ground, characterized in that a sinker, detachably connected with a point, is driven into the ground with this and then filled with concrete, whereupon the concrete, which is still in the plastic state, is put under pressure and slowly pulls the sinker out of the ground, während der Druck auf den Beton aufrecht erhalten wird. UNTERANSPRÜCHE: 1. Verfahren nach Patentanyprueh, dacl-ureh gekennzeichnet, dass die Senkhülle nach dem Eintreiben in das Erdreich und dem Ausfüllen mit Beton an ihrem freien Ende mittelst einer Haube verschlossen und in die H:aul)e vermöge einer Druckwasser leitung Wasser liineingepresst wird. 2. while maintaining pressure on the concrete. SUBSTANTIAL CLAIMS: 1. Method according to Patentanyprueh, dacl-ureh characterized in that after driving into the ground and filling in with concrete, the submerged casing is closed at its free end by means of a hood and water is pressed into the H: aul) e by means of a pressurized water pipe . 2. Verfahren nach Patentansprurh und Un- teranspru:ch 1, dadurch gekennzeichnet, dass nach dem Ausfüllen der Senkhülle mit Beton auf diesen eine den ganzen 11ohlquerschnitt der Senkhülle ausfüllende dichtende Schicht aufgelegt wird. Method according to patent claim and sub-claim 1, characterized in that after the sinker has been filled with concrete, a sealing layer filling the entire hollow cross-section of the sinker is placed on it.
CH105425D 1923-08-23 1923-08-23 Process for the production of concrete piles in the ground. CH105425A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH105425T 1923-08-23

Publications (1)

Publication Number Publication Date
CH105425A true CH105425A (en) 1924-06-16

Family

ID=4364302

Family Applications (1)

Application Number Title Priority Date Filing Date
CH105425D CH105425A (en) 1923-08-23 1923-08-23 Process for the production of concrete piles in the ground.

Country Status (1)

Country Link
CH (1) CH105425A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1129895B (en) * 1955-10-07 1962-05-17 Mueller Ludwig Method and device for the production of a foundation pile with concrete casing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1129895B (en) * 1955-10-07 1962-05-17 Mueller Ludwig Method and device for the production of a foundation pile with concrete casing

Similar Documents

Publication Publication Date Title
DE1634470A1 (en) Foundation stake
DE69419110T2 (en) Process for making thin walls in the floor
CH105425A (en) Process for the production of concrete piles in the ground.
DE2229383A1 (en) METHOD AND DEVICE FOR CONSOLIDATING THE SOIL, IN PARTICULAR FOR THE FOUNDATION OF PILES OR SIMILAR FOUNDATION STRUCTURES
DE69201409T2 (en) Method of making a foundation pile.
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE3210186C2 (en)
DE697655C (en) Process for lifting, lowering or straightening structures
DE702716C (en) Method and device for the production of in-situ concrete piles
DE609976C (en) Process for the production of a watertight construction pit enclosure
DE3226113C1 (en) Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process
DE387271C (en) Process for the production of long iron-reinforced concrete bodies
DE859878C (en) Method and device for the production of foundation piles from in-situ concrete
DE511365C (en) Process for lining concrete masonry with acid-resistant panels
DE2055955A1 (en) Process for the construction of wall constructions, especially tunnel walls, with constant loads subject to change
DE2108878C3 (en) Method for producing a deep foundation skörpe rs
DE616706C (en) Process for the production of plug-like concrete foundation bodies
DE694086C (en) Method and device for producing hollow rings
DE620781C (en) Formation of continuous stone iron ceilings in the area of negative moments
CH146798A (en) Method and device for producing a concrete pile foundation and concrete pile foundation produced according to the method.
DE521653C (en) Process for the production of cores for hollow blocks to be cast
DE721062C (en) Method and devices for overcoming the resistance when pulling out components, in particular jacking pipes, piles and the like. like
DE534086C (en) Process for the production of concrete or reinforced concrete pile foundations by means of driven piles of short lengths
DE574446C (en) Method for connecting solidified subsoil with an overlying component made of concrete, reinforced concrete or masonry
DE422123C (en) Process for the production of tower-like, seamless containers from plastic building material