DE3226113C1 - Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process - Google Patents
Process for producing a waterproof wall of prefabricated components in the subterraneous curtain processInfo
- Publication number
- DE3226113C1 DE3226113C1 DE19823226113 DE3226113A DE3226113C1 DE 3226113 C1 DE3226113 C1 DE 3226113C1 DE 19823226113 DE19823226113 DE 19823226113 DE 3226113 A DE3226113 A DE 3226113A DE 3226113 C1 DE3226113 C1 DE 3226113C1
- Authority
- DE
- Germany
- Prior art keywords
- cement
- bentonite
- bentonite suspension
- producing
- suspension
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Abstract
Description
Patentansprüche: 1. Verfahren zur Herstellung einer wasserdichten Fertigteilwand im Schlitzwandverfahren, wozu Fertigteilplatten in einen abschnittsweise hergestellten, mit Bentonitsuspension gefüllten Bodenschlitz aneinandergereiht eingebracht werden und danach der im Bodenschlitz verbliebenen Bentonitsuspension ein Mittel zu ihrer Erhärtung beigemischt wird, dadurch gekennzeichnet, daß die Bentonitsuspension innerhalb eines SchlitzwandabschnittS in waagerechten Bereichen unterschiedlicher Höhenlagen durch ein Gemisch von Bentonitsuspension plus Mittel zu ihrer Erhärtung ersetzt wird, wozu in den einzelnen Bereichen die der dort zu erbringenden Endfestigkeit entsprechende Menge des Mittels zur Erhärtung beigemischt wird.Claims: 1. A method for producing a waterproof Prefabricated wall in the diaphragm wall method, including prefabricated panels in sections produced, filled with bentonite suspension bottom slot introduced in a row and then the bentonite suspension remaining in the bottom slot an agent is added to their hardening, characterized in that the bentonite suspension within a diaphragm wall section different in horizontal areas Altitudes by a mixture of bentonite suspension plus means for its hardening is replaced, including the final strength to be achieved in the individual areas The appropriate amount of the hardening agent is added.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Bentonitsuspension jeweils entlang der Unterkante des zu behandelnden Bereichs abgesaugt und nach Beimischung des das Erhärten bewirkenden Mittels entlang der Oberkante dieses Bereichs wieder eingeleitet wird. 2. The method according to claim 1, characterized in that the bentonite suspension sucked off along the lower edge of the area to be treated and after admixture the hardening agent along the upper edge of this area again is initiated.
3. Verfahren nach den Ansprüchen 1 und 2, dadurch gekennzeichnet, daß der Bentonitsuspension Zement als Mittel zu ihrer Erhärtung beigemischt wird.. 3. The method according to claims 1 and 2, characterized in that that cement is added to the bentonite suspension as a means of hardening it ..
Die Erfindung betrifft ein Verfahren zur Herstellung einer wasserdichten Fertigteilwand im Schlitzwandverfahren, wie sie als wasserdichte Stützwände gegen den anstehenden Erddruck, z. B. bei der Herstellung von Geländeeinschnitten, zum Durchführen einer Straße, von tiefen Baugruben etc. erforderlich sind. The invention relates to a method for producing a waterproof Precast wall using the diaphragm wall method as opposed to watertight retaining walls the upcoming earth pressure, e.g. B. in the production of terrain cuts, for Carrying out a road, deep construction pits, etc. are required.
Aus der AT-PS 358 997 ist es bekannt, bei der Herstellung einer Fertigungsschlitzwand nach der Fertigstellung des Aushubes ein Fertigteil in den Schlitz einzubringen und die Bentonitsuspension durch ein Füllmaterial zu ersetzen, das die Aufgabe hat, die kraftschlüssige Verbindung zwischen Boden und Fertigungsteil herzustellen. Als Füllmaterial ist ein Bentonitzementgemisch genannt. From AT-PS 358 997 it is known in the manufacture of a manufacturing diaphragm wall After the excavation has been completed, insert a prefabricated part into the slot bring in and to replace the bentonite suspension with a filling material that has the task of to establish the positive connection between the floor and the production part. as Filling material is called a bentonite cement mixture.
Die vorliegende Erfindung hat zur Aufgabe, ein Verfahren zur Herstellung einer Schlitzwand in Fertigteilbauweise zu erbringen, bei der das in den Bodenschlitz eingebrachte Füllmaterial hinsichtlich seiner Festigkeit den jeweiligen Erfordernissen von oben nach unten in Streifen variierend eingebracht werden soll. The object of the present invention is to provide a method of production to provide a diaphragm wall in prefabricated construction, in which the in the bottom slot introduced filling material with regard to its strength to the respective requirements should be introduced in strips varying from top to bottom.
Diese Aufgabe wird erfindungsgemäß mit den im Kennzeichen des Hauptanspruchs angegebenen Mitteln gelöst. Vorteilhafte Ausgestaltungen der Erfindung sind Gegenstand der Unteransprüche. According to the invention, this object is given in the characterizing part of the main claim specified means resolved. Advantageous embodiments of the invention are the subject of the subclaims.
Mit dem erfindungsgemäßen Verfahren ergibt sich als Vorteil, daß über die Höhe des Bodenschlitzes jeweils nur soviel das Erhärten der dort eingefüllten Bentonitsuspension bewirkendes Mittel verwendet wird, wie zum Erreichen der erforderlichen Festigkeit in den verschiedenen Höhenbereichen der Schlitzwand erforderlich ist. With the method according to the invention there is an advantage that over the height of the bottom slot only so much the hardening of the filled there Bentonite suspension inducing agent is used as required to achieve the required Strength in the various height ranges of the diaphragm wall is required.
Die Erfindung ist nachstehend anhand der Zeichnung beispielsweise beschrieben. Es zeigt F i g. 1 einen Längsschnitt durch die Schlitzwand, F i g. 2 einen Querschnitt durch die Schlitzwand. The invention is illustrated below with reference to the drawing, for example described. It shows F i g. 1 shows a longitudinal section through the diaphragm wall, FIG. 2 shows a cross section through the trench wall.
In den mit reiner Bentonitsuspension gefüllten Bodenschlitz 1 werden wandbildende Fertigteilplatten 2 eingehängt. Mit einer Dickstoffpumpe 3 wird aus der Unterkante 4 des zu behandelnden Bereichs 5, hier z. B. In the bottom slot 1 filled with pure bentonite suspension wall-forming precast panels 2 suspended. With a thick matter pump 3 is off the lower edge 4 of the area to be treated 5, here z. B.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19823226113 DE3226113C1 (en) | 1982-07-13 | 1982-07-13 | Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19823226113 DE3226113C1 (en) | 1982-07-13 | 1982-07-13 | Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3226113C1 true DE3226113C1 (en) | 1983-11-24 |
Family
ID=6168298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19823226113 Expired DE3226113C1 (en) | 1982-07-13 | 1982-07-13 | Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE3226113C1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3627872A1 (en) * | 1986-08-16 | 1988-02-18 | Zueblin Ag | Mixing apparatus for constructing a diaphragm wall |
DE19530827A1 (en) * | 1995-08-22 | 1997-02-27 | Bauer Spezialtiefbau | Slurry cutoff trenching as two-phase lift and binder-infilling operation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE869177C (en) * | 1951-08-02 | 1953-04-20 | Hans Dr-Ing Lorenz | Process for the production of watertight basic structures of all kinds |
DE2121893A1 (en) * | 1970-06-16 | 1971-12-23 | Soletanche, Paris | Method of making a sealed continuous wall |
DE2142894A1 (en) * | 1970-10-15 | 1972-04-20 | Soletanche, Paris | Sealed continuous wall as a foundation or civil engineering plant and process for their production |
DE1784137B2 (en) * | 1968-07-11 | 1976-02-12 | Grün & Bilfinger AG, 6800 Mannheim | PROCESS FOR PRODUCING SLOTTED WALLS FROM CONCRETE OR REINFORCED CONCRETE |
AT358997B (en) * | 1976-08-31 | 1980-10-10 | Mischek Fertigbau Aktiengesell | METHOD FOR PRODUCING A SLOT WALL |
-
1982
- 1982-07-13 DE DE19823226113 patent/DE3226113C1/en not_active Expired
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE869177C (en) * | 1951-08-02 | 1953-04-20 | Hans Dr-Ing Lorenz | Process for the production of watertight basic structures of all kinds |
DE1784137B2 (en) * | 1968-07-11 | 1976-02-12 | Grün & Bilfinger AG, 6800 Mannheim | PROCESS FOR PRODUCING SLOTTED WALLS FROM CONCRETE OR REINFORCED CONCRETE |
DE2121893A1 (en) * | 1970-06-16 | 1971-12-23 | Soletanche, Paris | Method of making a sealed continuous wall |
DE2142894A1 (en) * | 1970-10-15 | 1972-04-20 | Soletanche, Paris | Sealed continuous wall as a foundation or civil engineering plant and process for their production |
AT358997B (en) * | 1976-08-31 | 1980-10-10 | Mischek Fertigbau Aktiengesell | METHOD FOR PRODUCING A SLOT WALL |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3627872A1 (en) * | 1986-08-16 | 1988-02-18 | Zueblin Ag | Mixing apparatus for constructing a diaphragm wall |
DE19530827A1 (en) * | 1995-08-22 | 1997-02-27 | Bauer Spezialtiefbau | Slurry cutoff trenching as two-phase lift and binder-infilling operation |
DE19530827C2 (en) * | 1995-08-22 | 1999-04-01 | Bauer Spezialtiefbau | Method and device for producing diaphragm walls |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2142894B2 (en) | Circuit arrangement with chopper to bridge a potential difference | |
DE3226113C1 (en) | Process for producing a waterproof wall of prefabricated components in the subterraneous curtain process | |
EP0322667A1 (en) | Method for building a wall, construction element and connection slab for applying the method, and wall built by the method | |
DE2744277A1 (en) | PROCESS FOR NEUTRALIZING DISASTERING VIBRATION EFFECTS ON STRUCTURES IMMERSED IN LIQUIDS AND DEVICE FOR IMPLEMENTING THEM | |
DE1947249A1 (en) | Foundation or civil engineering structure and process for its production | |
DE2060367A1 (en) | Parking for motor vehicles | |
DE642894C (en) | Floatable form for the production, transport and sinking of building bodies | |
DE300294C (en) | ||
AT354032B (en) | CEILING STONE, AS WELL AS CEILING WITH SUCH CEILING STONES | |
DE7914845U1 (en) | CONCRETE BLOCK TO DIVIDE AREA AREAS | |
DE705419C (en) | Purification plant | |
DE571565C (en) | Device for the ventilation of liquids, in particular waste water | |
AT317092B (en) | Process for the production of a trough arranged in the ground below the groundwater level and for this purpose prefabricated reinforced concrete girders for their production | |
DE2021846A1 (en) | Process for producing a quasi-homogeneous structure | |
CH310185A (en) | Container made at least in part from molded concrete blocks. | |
AT66916B (en) | Process for the production of reinforced concrete under water. | |
DE2259462C3 (en) | Process for the production of a structure in the groundwater and crossbeams for the implementation of the process | |
DE730597C (en) | Grain cell silo made of brick walls with inlaid ring iron | |
AT204494B (en) | Process for the production of concrete vaults and formwork blocks for this | |
AT367131B (en) | FOUNDATION, ESPECIALLY FOR A DAM | |
AT305918B (en) | Sewage treatment plant for mechanical-biological wastewater treatment | |
DE2343394A1 (en) | PROCESS FOR MANUFACTURING A CONCRETE BODY WITH A DECORATIVE SURFACE | |
CH370555A (en) | Process for the production of a ceiling made of reinforced concrete without formwork, prefabricated element for carrying out the process, and ceiling produced according to the process | |
AT120591B (en) | Clarification room in fresh water treatment plants like the Emscherbrunnen. | |
CH492835A (en) | Process for the production of cesspools, caissons or shafts |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of the examined application without publication of unexamined application | ||
D1 | Grant (no unexamined application published) patent law 81 | ||
8364 | No opposition during term of opposition | ||
8320 | Willingness to grant licences declared (paragraph 23) | ||
8339 | Ceased/non-payment of the annual fee |