BR112014004851A2 - processo para a produção de balastro - Google Patents

processo para a produção de balastro

Info

Publication number
BR112014004851A2
BR112014004851A2 BR112014004851A BR112014004851A BR112014004851A2 BR 112014004851 A2 BR112014004851 A2 BR 112014004851A2 BR 112014004851 A BR112014004851 A BR 112014004851A BR 112014004851 A BR112014004851 A BR 112014004851A BR 112014004851 A2 BR112014004851 A2 BR 112014004851A2
Authority
BR
Brazil
Prior art keywords
nozzles
face
rails
region
charge transfer
Prior art date
Application number
BR112014004851A
Other languages
English (en)
Inventor
Grimberg Frank
Gross Thomas
Kleiner Thomas
Erwe Torsten
Original Assignee
Bayer Ip Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bayer Ip Gmbh filed Critical Bayer Ip Gmbh
Publication of BR112014004851A2 publication Critical patent/BR112014004851A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/02Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/44Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from other materials only if the material is essential

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Polyurethanes Or Polyureas (AREA)
  • Railway Tracks (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Other Resins Obtained By Reactions Not Involving Carbon-To-Carbon Unsaturated Bonds (AREA)

Abstract

resumo da patente de invenção para: “processo para a produção de balastro”. a presente invenção refere-se a um processo para a produção de regiões de transferência de carga num balastro de uma superestrutura de carris através da introdução de plástico líquido curável ou misturas de plásticos líquidos reativas desde uma unidade de mistura através de dois tubos distribuidores com bicos para as regiões de transferência de carga e deixando o plástico ou mistura de plásticos reativa curar nas referidas regiões de transferência de carga. os dois tubos com bicos são posicionados à esquerda e à direita a partir do exterior dos carris para uma região entre os dois carris de forma que os bicos estão localizados adjacentes um ao outro e com um espaçamento lateral relativamente à face frontal (3) da travessa (2) que contém a região de transferência de carga que se pretende reforçar. os dois bicos são abertos a fim de permitir a saída do plástico ou mistura de plásticos reativa a uma velocidade controlada. cada bico do tubo distribuidor está orientado para a respectiva face terminal (4,4') da travessa (2) desde o interior para o exterior, lateralmente em relação à face frontal (3) da travessa (2) e em torno da respectiva face terminal (4,4') da travessa (2) para a face traseira (5) da travessa (2). os bicos do tubo distribuidor estão orientados lateralmente ao longo da face traseira (5) da travessa (2) até à região entre os dois carris (9,9') de forma que os bicos ficam localizados adjacentes um ao outro e são espaçados lateralmente desde a face traseira (5) da travessa (2).
BR112014004851A 2011-09-01 2012-08-27 processo para a produção de balastro BR112014004851A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102011081991 2011-09-01
PCT/EP2012/066598 WO2013030149A1 (de) 2011-09-01 2012-08-27 Verfahren zur herstellung von schotterkörpern

Publications (1)

Publication Number Publication Date
BR112014004851A2 true BR112014004851A2 (pt) 2017-04-04

Family

ID=46963673

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112014004851A BR112014004851A2 (pt) 2011-09-01 2012-08-27 processo para a produção de balastro

Country Status (7)

Country Link
US (1) US9562332B2 (pt)
EP (1) EP2751337B1 (pt)
CN (1) CN103764912B (pt)
AU (1) AU2012301062B2 (pt)
BR (1) BR112014004851A2 (pt)
RU (1) RU2604749C2 (pt)
WO (1) WO2013030149A1 (pt)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012126145A1 (en) * 2011-03-24 2012-09-27 Bayer Materialscience Ag Process for production of ballast
CN106436492A (zh) * 2015-12-30 2017-02-22 中国铁道科学研究院铁道建筑研究所 一种crts ⅱ型板式无砟轨道底座板维修方法
US10071673B2 (en) * 2017-02-13 2018-09-11 Omix-Ada, Inc. Modular light and accessory bar for vehicles
RU178405U1 (ru) * 2018-01-19 2018-04-03 Акционерное общество "ОргСинтезРесурс" Система для нанесения двухкомпонентных реакционных смесей на зернистый сыпучий материал транспортных сооружений
AT520879B1 (de) * 2018-02-14 2020-08-15 Getzner Werkstoffe Holding Gmbh Schwellensohle
CN111218858B (zh) * 2020-02-10 2021-09-10 中国铁道科学研究院集团有限公司铁道建筑研究所 一种密贴式弹性固化轨道系统
CN116836504A (zh) * 2023-08-08 2023-10-03 镇江宇烨新材料科技有限公司 一种阻燃塑料及其制备方法

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD86201A (pt)
GB1022434A (en) 1961-11-28 1966-03-16 Union Carbide Corp Improvements in and relating to polymers
GB1053131A (pt) 1963-02-11
DE2063727A1 (de) 1970-12-24 1972-08-24 Michelfelder, Gerhard, 8000 München Verfahren zur Stabilisierung eines Schotterbettes
DE2305536A1 (de) 1973-02-05 1974-08-08 Sieke Helmut Verfahren zum heben von gleisen und von strassenbelagsstuecken, vorrichtung zum durchfuehren dieses verfahrens und gleisschwelle
DE3821963A1 (de) 1988-06-29 1990-01-11 Karl Reinhard Zeiss Verfahren zur verfestigung von schotterbetten und anderen haufwerkgebilden
AU633390B2 (en) 1989-12-02 1993-01-28 Koch Marmorit Gmbh Process and device for applying multi-component resins, and use of such resins
US5372844A (en) 1989-12-02 1994-12-13 Koch Marmorit Gmbh Process and device of applying multi-component resins and use of same
DE3941142B9 (de) 1989-12-02 2004-08-19 Marmorit Gmbh Belag aus einer Steinschüttung zum Erhöhen der Schallabsorption und/oder der Reinigungsfähigkeit eines Bahngleises und Verfahren zum Herstellen desselben
JPH08157552A (ja) 1994-11-30 1996-06-18 Sumitomo Bayer Urethane Kk 湿気硬化型ポリウレタン樹脂およびこの樹脂からなる道床安定剤
DE19631430C2 (de) * 1996-08-03 2000-03-23 Zueblin Ag Verfahren zum Einbringen von Füllmaterial unter eine feste Fahrbahn und Vorrichtung zur Durchführung des Verfahrens
DE19651755A1 (de) 1996-12-12 1998-06-18 Claus Dieter Ihle Verfahren zur Oberflächenstabilisierung von Schotterbetten und anderen Schüttgütern im Bahn-, Straßen- und Wegebau
DE69801421T2 (de) * 1997-02-11 2002-05-23 Huntsman Int Llc Isocyanatzusammensetzungen zur herstellung von polyurethanschaumstoffen mit geringer dichte
DE19711437C2 (de) 1997-03-19 1999-03-25 Krupp Ag Hoesch Krupp Gleisstopfmaschine zum Einbringen von Bindemittel in ein Schotterbett und Bindemittel hierfür
JPH10266105A (ja) 1997-03-27 1998-10-06 Railway Technical Res Inst 道床バラストの安定化装置
DE19811838A1 (de) 1998-03-18 1999-09-23 Max Knape Gmbh & Co Fa Einrichtung zum Verfestigen eines Schotterbetts und Betriebsverfahren für diese Einrichtung
ATE430837T1 (de) 2004-07-23 2009-05-15 Msb Man Gmbh Teilverschäumter gleisoberbau und verfahren für dessen herstellung
DE102006003033A1 (de) * 2006-01-20 2007-08-02 Bayer Materialscience Ag Schotterkörper sowie Verfahren zur Herstellung von Schotterkörpern
EP1982019B1 (de) 2006-02-10 2020-01-15 Hyperion Verwaltung GmbH Verfahren zur Herstellung eines teilverschäumten Schotterkörpers für einen Gleisoberbau
DE102007019669A1 (de) 2007-04-24 2008-11-06 Hennecke Gmbh Verfahren und Vorrichtung zum Ausschäumen von Schotterbetten
DE102007057064A1 (de) 2007-11-27 2009-05-28 Hennecke Gmbh Verfahren zum Verfestigen eines Schotterbetts und Vorrichtung zur Durchführung des Verfahrens
EP2730699A1 (de) * 2012-11-09 2014-05-14 Bayer MaterialScience AG Verfahren zum Verschäumen eines Schotterbetts einer Eisenbahngleisanlage

Also Published As

Publication number Publication date
RU2604749C2 (ru) 2016-12-10
US9562332B2 (en) 2017-02-07
CN103764912A (zh) 2014-04-30
EP2751337B1 (de) 2017-03-15
WO2013030149A1 (de) 2013-03-07
US20140300015A1 (en) 2014-10-09
AU2012301062B2 (en) 2017-02-02
RU2014111847A (ru) 2015-10-10
AU2012301062A1 (en) 2014-03-13
EP2751337A1 (de) 2014-07-09
CN103764912B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
BR112014004851A2 (pt) processo para a produção de balastro
BR112012030336A2 (pt) produção de composições líquidas para cuidados pessoais com fluxo de alimentação semicontínuo
BRPI0601109A (pt) máquina de lavar louças em esteira e seu respectivo tubo pulverizador
BR112013029306A2 (pt) painel compósito enrijecido nas duas faces e processo de realização de um tal painel
BR112015002265A2 (pt) injetores de combustível com face de entrada do bocal não estampada e tridimensional
AR088956A1 (es) Carenado aerodinamico para remolques
BR112014014542A8 (pt) montagem de suspensor de direção veicular
BR112014013166A2 (pt) formação de diferentes produtos plásticos a partir de uma única corrente de fusão
BR112014015315A2 (pt) sistema de moldagem com bico de sopro para limpeza
WO2010117614A3 (en) Fired heater for a hydrocarbon conversion process
MX362852B (es) Estructura auxiliar del vehiculo.
BRPI0818638A2 (pt) Dispositivo e processo de injeção de material líquido em um maçarico a plasma
BR112015002258A2 (pt) injetores de combustível com face de saída do bocal não estampada e tridimensional
PE20130728A1 (es) Complejo obtenido a partir de mezclas de acido hialuronico o una sal del mismo y sulfato de condroitina
BR112014027282A2 (pt) trocador de calor com canal de alimentação
BR112015009968A2 (pt) sistemas resfriadores de gás de reciclagem para processos de polimerização em fase gasosa
AR087983A1 (es) Dispositivo para mezclar y enfriar dos liquidos reactivos y metodo para hacer acido peroximonosulfurico con el mismo
MA33217B1 (fr) Procede et dispositif de production d'acide polyphosphorique
BR112014003668A2 (pt) conjunto de bocal de pulverização de indução de ar de descarga múltipla
BR112016007354A2 (pt) membro lateral, chassis e reboque de chassis providos com tal membro lateral
MX369482B (es) Resinas, compuestos de resina/fibra, métodos de uso y métodos de preparación.
BRPI0801218A2 (pt) mÉtodo para fabricaÇço de uma prÉ-forma, bem como um mÉtodo para formaÇço de fibra àtica a partir de uma tal prÉ-forma
GB201120008D0 (en) Heat exchanger
CN204585876U (zh) 复合材料格栅生产模具
CN206597004U (zh) 液滴捕捉器、干燥系统和洗碗机

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B11B Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements