BE810600A - Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length - Google Patents

Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length

Info

Publication number
BE810600A
BE810600A BE2053402A BE2053402A BE810600A BE 810600 A BE810600 A BE 810600A BE 2053402 A BE2053402 A BE 2053402A BE 2053402 A BE2053402 A BE 2053402A BE 810600 A BE810600 A BE 810600A
Authority
BE
Belgium
Prior art keywords
tube
emi
steel
hot
steel tube
Prior art date
Application number
BE2053402A
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to BE2053402A priority Critical patent/BE810600A/en
Publication of BE810600A publication Critical patent/BE810600A/en

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • C23C2/0038Apparatus characterised by the pre-treatment chambers located immediately upstream of the bath or occurring locally before the dipping process
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • C23C2/024Pretreatment of the material to be coated, e.g. for coating on selected surface areas by cleaning or etching
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • C23C2/026Deposition of sublayers, e.g. adhesion layers or pre-applied alloying elements or corrosion protection

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Coating With Molten Metal (AREA)

Abstract

A steel tube with an exterior coating of a few to 100 mu thickness obtd. using the title process has a certain no. of hollows of a few to 100 mu depth and diameter formed evenly over the basic metal surface of the tube. This gives highly corrosion resistant coatings without gaps. Pref. the tube is precoated with a plastic film or paint.

Description

       

  .^Tube d'acier revêtu d'un métal par* immersion-3 chaud et  procédé pour sa fabrication continue en lignew   <EMI ID=1.1> 

  
chaud sont fabriqués en immergeant les tubes tronçonnés

  
au préalable dans un métal fondu ou en faisant passer..un.'  tube d'une longueur continue dans le bain de métal fondu.  La présente invention appartient au procédé cité en 

  
dernier lieu, dans lequel le tube sous la forme d'une longueur continue est revêtu d'un métal, par immersion à chaud, sur sa surface extérieure, et est ensuite tronçonné à la longueur désirée. Le tube d'acier est fabriqué à partir <EMI ID=2.1>  . Dans un procédé continu pour le revêtement métallique par immersion-à chaud d'un fil ou d'une t8le d'acier, l'entrée et la sortie du bain de métal fondu se situent toutes deux dans le sens vertical, car la tôle ou le fil peut être plié-aisément dans le bain. L'excès de métal fondu accroché à la tôle ou au fil retombe goutte à goutte dans

  
le bain, du c8té opposé de la tale ou du fil, à mesure que cette tale ou fil s'écarte du bain dans le sens ascendant

  
et qu'un revêtement métallique inég-al n'est donc pas produit sur la surface de la tale ou du fil.

  
D'autre paît, en revêtant de métal par immersion

  
à chaud une longueur continue de tube d'acier, l'égouttement de l'excès de métal fondu à partir de la surface du tube entraîne un revêtement métallique inégral sur la circonférence du tube, puisque le tube sort du bain de métal fondu dans une direction horizontale.

  
 <EMI ID=3.1> 

  
ment du métal fondu, l'excès de métal fondu doit être éliminé par soufflage au moyen d'un jet d'air ou de gaz immédiatement après la sortie du tube du bain de métal fondu. En raison  <EMI ID=4.1> 

  
plus élevée, car la surface du tube d'acier sortant est  trop lisse pour retenir une quantité suffisante de métal  fondu, sans provoquer l'égouttement de celui-ci.

  
La présente invention est relative à un tube revêtu  de métal par immersion.à chaud, dont l'aspect extérieur est  agréable et la résistance à la corrosion élevée, ainsi qu'à  un procédé de fabrication d'une longueur continue de tube d'acier à partir d'un feuillard d'acier quelconque en formant uniquement sur la surface un nombre de petits creux de plusieurs microns à une certaine de microns de profondeur et de plusieurs microns à des centaines de microns de diamètre, en vue d'obtenir un revêtement métallique plus lourd, ainsi que d'améliorer la force d'adhérence de la couche du revêtement.

  
En partant du point de vue précité, un but de la présente invention consiste à fabriquer un tube d'acier présentant une haute résistance à la corrosion et un aspect extérieur optiquement agréable, en formant sur la surface du tube d'acier un certain nombre de creux de plusieurs microns à une centaine de microns de profondeur et de plusieurs  microns à des centaines de microns de diamètre. La répartition uniforme de ces petits creux permet au tube d'accrocher plus de métal fondu sur sa surface pour former une  couche de revêtement épaisse à forte adhérence.

  
Un autre but de la présente invention est de mettre au point un procédé pour la fabrication du tube d'acier précité, revêtu d'un métal par immersion à chaud. 

  
Les figures 1 à 3 représentent une forme de réalisation du procédé de fabrication du tube d'acier de la présente

  
 <EMI ID=5.1>  la surface du tube d'acier. La figure 5 (a) est une photographie reproduisant une coupe transversale de la surface du tube d'acier qui a été galvanisée par immersion à chaud sans formation d'aucun creux sur le métal de base. La  <EMI ID=6.1>  vérsale d'une couche, galvanisée par immersion à chaud sur la surface d'un tube d'acier doté de creux, c'est-à-dire

  
 <EMI ID=7.1> 

  
6 est une photographie agrandie de la surface d'un tube d'acier galvanisé typique, obtenue grâce au procédé de l'invention. 

  
 <EMI ID=8.1>  un dérouleur rendant disponible un feuillard d'acier à partir d'un rouleau, par 3 une tête à souder les extrémités cisaillées du feuillard, par 5 un système de dérivation pour amener le feuillard en continu sans aucune interruption pendant que l'extrémité arrière du rouleau épuisé et l'extrémité avant d'un nouveau rouleau sont reliées par la tête 3 à souder les extrémités cisaillées des feuillards. La référence 7 désigne un dispositif de nettoyage du feuillard pour l'élimination des huiles, des taches, de l'eau, etc, présentes sur

  
le feuillard d'acier. La référence 9 symbolise un appareil

  
de projection de grenailles pour la formation d'un certain nombre de creux sur la surface du feuillard d'acier, cet

  
 <EMI ID=9.1> 

  
compartiment central 1_5 est une chambre à grenailler, dans laquelle des roues de projection de produit abrasif 17a,

  
 <EMI ID=10.1> 

  
et au-dessous du feuillard pour la projection de particules  abusives de part et d'autre de celui-ci. Les roues de 

  
 <EMI ID=11.1> 

  
en place à proximité de l'entrée et de la sortie de la chambre à grenailler 15, sont conçues pour projeter le.  produit abrasif dans la direction interne, en, vue d'empêcher  toute fuite de ce produit abrasif. 

  
 <EMI ID=12.1> 

  
 <EMI ID=13.1> 

  
à la vitesse de circulation du feuillard, à sa matière et 

  
aux conditions de sa surface. Pendant les périodes de transition démarrage-arrêt du feuillard d'acier, le ,flux abrasif est réglé par un système de commande automatique pour empêcher un grenaillage trop intense ou trop faible. 

  
Les compartiments avant et arrière'13 et 19 sont des

  
 <EMI ID=14.1> 

  
de sortir de l'appareil de projection de grenailles ^9. Le compartiment arrière 19 comprend un nettoyeur de feuillard

  
21 pour éliminer la calamine, les écailles et le fer en  poudre du feuillard d'acier, ainsi que pour empêcher l'entratnement du produit abrasif. Des guides de feuillard 

  
lla, b, c et d sont situés à l'intérieur de l'appareil .

  
de projection de grenailles 9 et à l'entrée et à la sortie

  
de celui-ci pour guider le feuillard se déplaçant rapidement 

  
à travers cet appareil de projection de grenailles, en lui permettant ainsi de recevoir des jets uniformes et efficaces

  
de grenailles sur la surface.

  
La référence 23 désigne un mécanisme de formage à

  
froid pour façonner sous une forme tubulaire la longueur continue de feuillard d'acier entraînée par ce mécanisme;

  
la référence 25a est une tête à souder les joints pour exé-  cuter une soudure sur la longueur entière du tube; et la  référence.27 symbolise un organe de contrôle ,de la température, dans lequel-le tube soudé est refroidi à une propre température' 

  
 <EMI ID=15.1> 

  
renée. 

  
 <EMI ID=16.1> 

  
Le tube d'acier est extrêmement chauffé au joint ; soudé après soudage et apporte ainsi une chaleur excessive

  
au dispositif de décapage subséquent, à moins qu'il soit refroidi par de l'eau avant le décapage. La répartition de chaleur sur la circonférence du tube est également corrigée pour réaliser un décapage uniforme sur la surface.

  
L'organe de contrôle fonctionne de façon à éliminer par lavage la calamine, les écailles et le fer en poudre formés  sur la surface du tube au cours de la projection des gre-

  
 <EMI ID=17.1> 

  
d'empêcher la pollution de l'acide et sa consommation élevée.

  
 <EMI ID=18.1> 

  
29 est prévue pour éliminer l'eau de la surface du tube d'acier, dans le but d'empêcher une dilution de la solution de décapage.

  
Le dispositif de décapage servant à éliminer le

  
film d'oxyde de la surface de l'acier est désigné par 31;

  
le dispositif de rinçage à l'eau, par 33; le dispositif

  
de préaddition de flux pour appliquer une solution de flux empêchant l'oxydation de la surface au cours des stades subséquents, par 35; le dispositif de chauffage ou préchauffage, par 37; le dispositif pour l'application d'un revêtement métallique par immersion à chaud, par 39; le dispositif d'insufflation d'air ou de gaz inactif pour éliminer l'excès

  
 <EMI ID=19.1> 

  
cher l'égouttement du métal fondu, par 41; le dispositif d'extinction à l'eau,par 49; le dispositif de mise à dimensions pour amener le tube par formage froid à la forme ou à la dimension de section droite désirée, par 45; le redresseur peur corriger la flexion du tube, par 47; le.  dispositif de traitement de surface, par 49; et la machine à tronçonner, par 51. 

  
Les fonctions des machines et dispositifs mentionnés 

  
 <EMI ID=20.1> 

  
Le feuillard d'acier provenant du dérouleur 1 passe  par le système de dérivation 5 et parvient au nettoyeur de feuillard 7 où l'huile, les taches et l'humidité sont éliminées. Après avoir traversé le nettoyeur 7, le feuillard .:  est introduit dans l'appareil de projection de grenailles 9 et est soumis à des jets de produit abrasif. Les dimensions particulaires et la quantité de mélange abrasif projetée 

  
 <EMI ID=21.1> 

  
la surface de la matière du feuillard et au poids du revêtement subséquent. Ensuite, un certain nombre de creux de  quelques microns à une centaine de microns de profondeur

  
 <EMI ID=22.1> 

  
diamètre, sont formés uniformément sur la surface du  feuillard d'acier et le mélange abrasif, les écailles, le fer en poudre, etc, accrochés à la surface du feuillard,  sont éliminés dans la chambre hermétique 19 par le nettoyeur de surface 21.

  
Le feuillard d'acier, doté d'un certain nombre de creux formés sur sa surface par l'appareil de projection

  
de grenailles, est introduit dans la machine à former 23

  
et façonné à froid en une forme tubulaire, dont le joint

  
est soudé sur la longueur entière du tube. Par suite de la chaleur de soudage, le joint et sa circonférence sont recouverts d'un film d'oxyde dont l'épaisseur est proportionnelle à la température de la surface et n'est pas unie sur  la circonférence du tube.

  
Le tube d'acier parvient ensuite à l'organe de contrôle de température 27 où la répartition de la chaleur

  
sur la circonférence du tube est contrôlée par un refroidis-' sèment à l'eau, de façon que. le décapage soit effectué uni-  ment sur la surface pendant la mené période de temps, sans

  
provoquer un décapage local trop faible ou trop fort. Le

  
tube d'acier, dont la température superficielle est contrôlée

  
 <EMI ID=23.1> 

  
31 après élimination de l'eau par la soufflante à air 29. Comme la vitesse de décapage est proportionnelle à la tempé-

  
rature superficielle du tube d'acier, il est nécessaire, pour une opération efficace, que le tube soit suffisamment chaud pour raccourcir la durée de déc-apage lorsqu'il entre dans le dispositif à décapera. D'autre part,si le tube <EMI ID=24.1>  tion de décapage et provoque ainsi une consommation excessive d'acide. La répartition de chaleur sur la circonférence du tube doit aussi être contrôlée de telle sorte que les parties plus épaisses du film d'oxyde soient nettement plus chaudes que ses parties plus minces, ce qui permet ainsi

  
au tube d'être décapé uniment sur sa circonférence pendant un temps prédéterminée

  
Le tube d'acier est ensuite rincé dans le dispositif de rinçage à l'eau 33, puis introduit dans le dispositif

  
de préaddition de flux 35. En raison du grand nombre de creux formés par la projection de grenailles, le tube d'acier peut recevoir un revêtement de flux plus épais sur sa surface, ce qui favorise la résistance à des.conditions de température plus élevée pendant un temps prolongé dans les stades subséquents.

  
Le tube revêtu de flux parvient ensuite au dispositif de chauffage ou préchauffage 37, suivi du dispositif 39 pour l'application du revêtement métallique par immersion à chaud

  
, dans lequel le métal fondu est déposé sur la surface

  
du tube d'acier. L'excès de métal fondu du tube d'acier est  <EMI ID=25.1> 

  
a une surface plus grande par suite des multiples creux,...

  
une quantité de métal fondu plus élevée peut être accrochée  à sa surface sans égouttement. Par conséquent, un revêtement métallique plus lourd est obtenu sans accroître la couche d'alliage. La couche de revêtement appliquée est. supérieure non seulement en ce qui concerne la résistance à la corrosion, mais aussi les propriétés physiques et mécaniques, car  l'accroissement de la couche d'alliage, dont les propriétés mécaniques sont pauvres, est maintenue au minimum, tandis

  
que l'adhérence de la couche de revêtement est renforcée par le grand nombre de creux du métal de base.

  
Au cours d'une galvanisation par immersion à chaude par exemple, le métal de base, c'est-à-dire la surface

  
du tube, est revêtu d'une couche d'alliage de fer et de zinc,  sur laquelle une couche de zinc pur est formée. Conformément

  
à la présente invention, un revêtement de zinc plus lourd

  
peut être obtenu sans augmenter l'alliage fer-zinc, car

  
 <EMI ID=26.1> 

  
principalement d'une couche de zinc pur sur une couche d'alliage relativement mince. Ceci permet de réduire la.. durée d'immersion et d'augmenter le rythme de production en fonction d'un équipement plus petit.

  
Le tube passe par le dispositif d'insufflation 41  où le poids du revêtement est contrôlé, et pénètre dans.le dispositif d'extinction à l'eau 43. Il est ensuite laminé

  
 <EMI ID=27.1> 

  
la forme ou la dimension de section droite désirée. Au cours de cette opération, la couche de revêtement plus tendre que le revêtement de base est soumise à une déformation plastique et adhère ainsi solidement au métal de base. Dès  <EMI ID=28.1> 

  
lors, la couche de revêtement finie a une structure solide 

  
et fine. En outre, la surface finie est lisse, lustrée et - 

  
 <EMI ID=29.1> 

  
Le tube d'acier pénètre ensuite dans le redresseur .
47 pour, corriger la flexion due à la mise a dimensions, puis parvient à la machine à tronçonner 51 où elle est coupée à la longueur spécifiée. 

  
 <EMI ID=30.1> 

  
Le feuillard d'acier est entraîné par la machine à former \2^ et est soumis à une tension propre et constante lorsqu'il

  
 <EMI ID=31.1> 

  
particules abrasives sont projetées sur le feuillard pour obtenir un certain nombre de creux uniment sur la surface.

  
Par suite de la tension appliquée au feuillard et en raison du système de guidage du feuillard, incorporé à l'appareil de projection de grenailles, la vibration et/ou la torsion du feuillard est réduite au minimum en dépit d'une grande vitesse de déplacement du feuillard. Le feuillard d'acier traité dans l'appareil de projection de grenailles est muni, sur sa surface, d'une grande quantité de creux répartis uniformément, dont la profondeur va de plusieurs microns

  
à une centaine de microns et dont le diamètre est également de plusieurs microns à des centaines de microns. 

  
Comme le montre la figure 4, les creux formés sur le feuillard diffèrent les uns.des autres au point de vue microscopique, alors que la rugosité superficielle du feuillard d'acier est uniforme au point de vue macroscopique.

  
A la figure 4, les références.! et .[pound] se rapportent aux creux formés par les premières particules projetées et la référence e montre les creux formés par les secondes parti-cules-projetées sur les creux précédemment déterminés par les  <EMI ID=32.1>  <EMI ID=33.1> 

  
sont obtenus sur la surface entière, comme le montre la <EMI ID=34.1> 

  
(2) L'élimination mécanique au moyen d'une brosse rotative ou autre est l'un des moyens permettant d'éliminer le film d'oxyde formé au cordon de soudure et.sur..sa cir-

  
 <EMI ID=35.1> 

  
connu, une opération d'élimination uniforme et sûre du film d'oxyde ne peut pas être garatie, en raison de l'usure de la brosse ou autre. Conformément au procédé de l'invention, l'élimination du film d'oxyde est réalisée par décapage,  tout en conservant la chaleur de la soudure du tube.

  
La température de la surface du tube d'acier, qui

  
a augmenté en raison du soudage, est contrôlée par l'organe

  
 <EMI ID=36.1> 

  
propre répartition de chaleur correspondant à l'épaisseur.  du film d'oxyde. Comme la vitesse de décapage est proportionnelle à la température, le tube est uniformément décapé

  
 <EMI ID=37.1> 

  
terminé, sans provoquer un décapage local trop faible ou trop fort, si la répartition de la chaleur dans le tube est correcte. 

  
 <EMI ID=38.1> 

  
un mélange abrasif est projeté sur la surface du feuillard d'acier pour former un certain nombre de creux de plusieurs microns à une centaine de microns de profondeur et de plusieurs microns à des centaines de microns de diamètre,-et ce uniment sur la surface du feuillard d'acier. Ces petits creux jouent un rôle important dans la séquence suivante 
(a) Dans le dispositif de préaddition de flux 35, le tube d'acier peut maintenir accroché un revêtement de flux uniforme et plus lourd, sans égouttement sur la surface, ce qui permet au tube d'être protégé contre l'oxydation pendant _ un temps prolongé à des conditions de température plus

  
élevées durant les stades subséquents.

  
(b) Dans le procédé de revêtement métallique par immersion à chaud, une plus grande quantité de métal fondu est maintenue sur la surface du tube d'acier, ce qui permet au tube d'être muni d'un revêtement métallique plus lourd, sans augmenter la couche d'alliage. Cette couche de revêtement est non seulement liée par alliage à la surface du tube d'acier, mais est aussi liée mécaniquement. En outre, la couche de revêtement présente une surface (véritablement <EMI ID=39.1> 

  
d'une manière uniment répartie sur la surface du tube d'acier.

  
Une forme de réalisation du tube d'acier fabriqué

  
à l'aide du procédé décrit ci-dessus, est expliquée ciaprès.

  
Conditions de projection de grenailles :
- Qualité du feuillard d'acier : feuillard a'acier laminé d chaud - SPHT 3
- Etat superficiel du feuillard :l'acier : de fortes écailles sont présentes par suite du laminage à chaud, mais aucune trace de rouille n'est visible à la surface
- Particules abrasives : grenailles S-60
- Vitesse de projection de l'abrasif : 88 m/seconde <EMI ID=40.1> 



  . ^ Hot Dip-3 Metal Coated Steel Tube and Process for its Continuous In-Line Manufacture w <EMI ID = 1.1>

  
hot are produced by immersing the cut tubes

  
beforehand in a molten metal or by passing ... a. ' tube of continuous length in the bath of molten metal. The present invention belongs to the process cited in

  
last, in which the tube in the form of a continuous length is coated with a metal, by hot dipping, on its outer surface, and is then cut to the desired length. The steel tube is made from <EMI ID = 2.1>. In a continuous process for hot-dip metal coating of a steel wire or sheet, the inlet and outlet of the molten metal bath are both in the vertical direction, as the sheet or the wire can be folded-easily in the bath. Excess molten metal clinging to the sheet or wire falls drip into

  
the bath, on the opposite side of the thread or thread, as that thread or thread moves away from the bath in an upward direction

  
and therefore an uneven metallic coating is not produced on the surface of the thread or wire.

  
On the other hand, by coating with metal by immersion

  
When hot a continuous length of steel tubing, the dripping of excess molten metal from the surface of the tube results in an uneven metal coating around the circumference of the tube, as the tube exits the bath of molten metal in a horizontal direction.

  
 <EMI ID = 3.1>

  
In the molten metal, the excess molten metal must be blown off with an air or gas jet immediately after the tube exits the molten metal bath. Due <EMI ID = 4.1>

  
higher, because the surface of the outgoing steel tube is too smooth to retain a sufficient quantity of molten metal, without causing the latter to drip.

  
The present invention relates to a hot-dip metal coated tube having a pleasant exterior appearance and high corrosion resistance, as well as a method of manufacturing a continuous length of steel tube. from any steel strip by forming only on the surface a number of small hollows from several microns to a certain microns in depth and from several microns to hundreds of microns in diameter, in order to obtain a coating heavier metal, as well as improve the adhesive strength of the coating layer.

  
Starting from the above point of view, an object of the present invention is to manufacture a steel tube having a high corrosion resistance and an optically pleasing exterior appearance, by forming on the surface of the steel tube a number of hollows several microns to a hundred microns deep and several microns to hundreds of microns in diameter. The even distribution of these small pits allows the tube to catch more molten metal on its surface to form a thick coating layer with strong adhesion.

  
Another object of the present invention is to develop a process for the manufacture of the aforementioned steel tube, coated with a metal by hot immersion.

  
Figures 1 to 3 show one embodiment of the method of manufacturing the steel tube of the present invention.

  
 <EMI ID = 5.1> the surface of the steel tube. Fig. 5 (a) is a photograph showing a cross section of the surface of the steel tube which has been hot dip galvanized without forming any indentations in the base metal. The <EMI ID = 6.1> versale of one layer, hot-dipped galvanized on the surface of a steel tube with hollows, i.e.

  
 <EMI ID = 7.1>

  
6 is an enlarged photograph of the surface of a typical galvanized steel tube, obtained by the method of the invention.

  
 <EMI ID = 8.1> an unwinder making available a steel strip from a roll, by 3 a head to weld the sheared ends of the strip, by 5 a bypass system to feed the strip continuously without any interruption during that the rear end of the spent roll and the front end of a new roll are connected by the head 3 to weld the sheared ends of the strips. Reference 7 designates a device for cleaning the strip for the removal of oils, stains, water, etc., present on

  
the steel strip. Reference 9 symbolizes a device

  
shot to form a number of hollows on the surface of the steel strip, this

  
 <EMI ID = 9.1>

  
central compartment 1_5 is a blasting chamber, in which abrasive product projection wheels 17a,

  
 <EMI ID = 10.1>

  
and below the strip for the projection of abusive particles on either side of it. The wheels of

  
 <EMI ID = 11.1>

  
in place near the inlet and outlet of the shot blast chamber 15, are designed to project the. abrasive product in the internal direction, in order to prevent any leakage of this abrasive product.

  
 <EMI ID = 12.1>

  
 <EMI ID = 13.1>

  
the speed of circulation of the strip, its material and

  
at its surface conditions. During the start-stop transition periods of the steel strip, the abrasive flow is regulated by an automatic control system to prevent too intense or too weak blasting.

  
The front and rear compartments '13 and 19 are

  
 <EMI ID = 14.1>

  
get out of the shot blasting apparatus ^ 9. The rear compartment 19 includes a strip cleaner

  
21 to remove scale, scale and powdered iron from the steel strip, as well as to prevent entrapment of the abrasive product. Strapping guides

  
lla, b, c and d are located inside the device.

  
shot 9 and at the inlet and outlet

  
of this to guide the fast moving strip

  
through this shot projection device, thus allowing it to receive uniform and efficient jets

  
shot on the surface.

  
Reference 23 denotes a forming mechanism

  
cold to form into a tubular form the continuous length of steel strip driven by this mechanism;

  
25a is a joint weld head for performing a weld over the entire length of the tube; and the reference 27 symbolizes a control organ, of the temperature, in which the welded tube is cooled to its own temperature '

  
 <EMI ID = 15.1>

  
renée.

  
 <EMI ID = 16.1>

  
The steel tube is extremely heated at the joint; welded after welding and thus provides excessive heat

  
to the subsequent stripping device, unless it is cooled with water before stripping. The heat distribution around the circumference of the tube is also corrected to achieve uniform pickling over the surface.

  
The control member operates to wash off scale, scale and powdered iron formed on the surface of the tube during the projection of the greens.

  
 <EMI ID = 17.1>

  
prevent acid pollution and its high consumption.

  
 <EMI ID = 18.1>

  
29 is provided to remove water from the surface of the steel tube, in order to prevent dilution of the pickling solution.

  
The stripping device used to remove the

  
oxide film of the steel surface is denoted by 31;

  
the water rinsing device, by 33; the device

  
flux pre-addition to apply a flux solution preventing oxidation of the surface in subsequent stages, by 35; the heating or preheating device, by 37; the device for the application of a metal coating by hot immersion, by 39; the device for blowing air or inactive gas to remove excess

  
 <EMI ID = 19.1>

  
expensive dripping of molten metal, by 41; the extinguishing device with water, by 49; the sizing device for bringing the tube by cold forming to the shape or dimension of cross section desired, by 45; the straightener can correct the bending of the tube, by 47; the. surface treatment device, by 49; and the cutting machine, by 51.

  
The functions of the machines and devices mentioned

  
 <EMI ID = 20.1>

  
The steel strip from unwinder 1 passes through bypass system 5 and arrives at strip cleaner 7 where oil, stains and moisture are removed. After having passed through the cleaner 7, the strip: is introduced into the shot projection apparatus 9 and is subjected to jets of abrasive product. Particle size and quantity of abrasive mixture projected

  
 <EMI ID = 21.1>

  
the area of the strip material and the weight of the subsequent coating. Then, a number of dips from a few microns to a hundred microns deep

  
 <EMI ID = 22.1>

  
diameter, are formed uniformly on the surface of the steel strip, and the abrasive mixture, scales, powdered iron, etc., clinging to the surface of the strip, are removed in the airtight chamber 19 by the surface cleaner 21.

  
The steel strip, with a number of hollows formed on its surface by the projection apparatus

  
shot, is introduced into the forming machine 23

  
and cold formed into a tubular shape, the joint of which

  
is welded along the entire length of the tube. As a result of the welding heat, the joint and its circumference are covered with an oxide film, the thickness of which is proportional to the temperature of the surface and is not united around the circumference of the tube.

  
The steel tube then reaches the temperature control member 27 where the heat distribution

  
around the circumference of the tube is controlled by water cooling, so that. stripping is carried out only on the surface during the period of time, without

  
cause too weak or too strong local pickling. The

  
steel tube, the surface temperature of which is controlled

  
 <EMI ID = 23.1>

  
31 after removal of the water by the air blower 29. Since the stripping speed is proportional to the temperature

  
Surface erasure of the steel tube, it is necessary for efficient operation that the tube be hot enough to shorten the pickling time when it enters the pickling device. On the other hand, if the tube <EMI ID = 24.1> tion pickling and thus causes excessive consumption of acid. The heat distribution around the circumference of the tube should also be controlled so that the thicker parts of the oxide film are significantly hotter than its thinner parts, thereby allowing

  
the tube to be stripped evenly on its circumference for a predetermined time

  
The steel tube is then rinsed in the water rinsing device 33, then introduced into the device.

  
35. Due to the large number of hollows formed by the projection of shot, the steel tube can receive a thicker coating of flux on its surface, which promotes resistance to higher temperature conditions. for a prolonged time in subsequent stages.

  
The flux coated tube then passes to the heater or preheater 37, followed by the device 39 for the application of the metal coating by hot dipping.

  
, in which the molten metal is deposited on the surface

  
steel tube. The excess molten metal of the steel tube is <EMI ID = 25.1>

  
has a larger surface due to the multiple hollows, ...

  
a higher amount of molten metal can be hung on its surface without dripping. Therefore, a heavier metal coating is obtained without increasing the alloy layer. The applied coating layer is. superior not only with regard to corrosion resistance, but also physical and mechanical properties, since the increase in the alloy layer, whose mechanical properties are poor, is kept to a minimum, while

  
that the adhesion of the coating layer is enhanced by the large number of pits in the base metal.

  
During hot-dip galvanizing, for example, the base metal, i.e. the surface

  
of the tube, is coated with a layer of iron zinc alloy, on which a layer of pure zinc is formed. In accordance

  
to the present invention, a heavier zinc coating

  
can be obtained without increasing the iron-zinc alloy, because

  
 <EMI ID = 26.1>

  
mainly of a layer of pure zinc over a relatively thin alloy layer. This makes it possible to reduce the immersion time and to increase the production rate according to the smaller equipment.

  
The tube passes through the insufflation device 41 where the weight of the coating is controlled, and enters the water extinguishing device 43. It is then laminated.

  
 <EMI ID = 27.1>

  
the desired cross section shape or dimension. During this operation, the coating layer softer than the base coating is subjected to plastic deformation and thus adheres firmly to the base metal. From <EMI ID = 28.1>

  
then the finished coating layer has a solid structure

  
and fine. In addition, the finished surface is smooth, lustrous and -

  
 <EMI ID = 29.1>

  
The steel tube then enters the straightener.
47 for, correcting the bending due to sizing, then reaches the cutting machine 51 where it is cut to the specified length.

  
 <EMI ID = 30.1>

  
The steel strip is driven by the forming machine \ 2 ^ and is subjected to a clean and constant tension when

  
 <EMI ID = 31.1>

  
abrasive particles are projected onto the strip to obtain a number of indentations evenly on the surface.

  
Due to the tension applied to the strip and due to the strip guide system incorporated in the shot blasting apparatus, the vibration and / or twisting of the strip is reduced to a minimum despite a high speed of movement. of the strap. The steel strip treated in the shot blasting apparatus is provided on its surface with a large number of evenly distributed hollows, the depth of which goes from several microns

  
to a hundred microns and the diameter of which is also several microns to hundreds of microns.

  
As shown in Fig. 4, the pits formed on the strip differ from each other microscopically, while the surface roughness of the steel strip is macroscopically uniform.

  
In Figure 4, the references.! and. [pound] refer to the hollows formed by the first particles projected and the reference e shows the hollows formed by the second particles-projected on the hollows previously determined by the <EMI ID = 32.1> <EMI ID = 33.1>

  
are obtained over the entire surface, as shown in <EMI ID = 34.1>

  
(2) Mechanical removal by means of a rotating brush or the like is one of the means of removing the oxide film formed at the weld bead and. On its circumference.

  
 <EMI ID = 35.1>

  
Known, uniform and safe oxide film removal operation cannot be guaranteed, due to brush wear or the like. According to the method of the invention, the removal of the oxide film is carried out by pickling, while retaining the heat of the weld of the tube.

  
The temperature of the surface of the steel tube, which

  
increased due to welding, is controlled by the body

  
 <EMI ID = 36.1>

  
own heat distribution corresponding to the thickness. of the oxide film. As the pickling speed is proportional to the temperature, the tube is uniformly pickled

  
 <EMI ID = 37.1>

  
finished, without causing too weak or too strong local pickling, if the heat distribution in the tube is correct.

  
 <EMI ID = 38.1>

  
an abrasive mixture is sprayed on the surface of the steel strip to form a number of hollows from several microns to a hundred microns in depth and from several microns to hundreds of microns in diameter, - and this even on the surface of the steel strip. These small hollows play an important role in the following sequence
(a) In the flux pre-addition device 35, the steel tube can hold a heavier, uniform coating of flux hanging, without dripping on the surface, which allows the tube to be protected against oxidation for a while. extended time at higher temperature conditions

  
elevated during subsequent stages.

  
(b) In the hot-dip metal coating process, more molten metal is maintained on the surface of the steel tube, which allows the tube to be provided with a heavier metal coating, without increase the alloy layer. This coating layer is not only alloy bonded to the surface of the steel tube, but is also mechanically bonded. In addition, the coating layer has a surface (truly <EMI ID = 39.1>

  
evenly distributed over the surface of the steel tube.

  
One embodiment of the fabricated steel tube

  
using the method described above, is explained below.

  
Shot projection conditions:
- Quality of the steel strip: hot rolled steel strip - SPHT 3
- Surface condition of the strip: steel: strong scales are present as a result of hot rolling, but no trace of rust is visible on the surface
- Abrasive particles: S-60 shot
- Abrasive blast speed: 88 m / second <EMI ID = 40.1>


    

Claims (1)

Conformément au procédé prédécrit, des creux d'environ 20 microns de profondeur sont formés sur la surface du feuillard d'acier, comme représenté à la photographie de la In accordance with the above-described method, valleys of approximately 20 microns deep are formed on the surface of the steel strip, as shown in the photograph of the figure 5 (b) et donnent ainsi un revêtement de tube d'acier d'une épaisseur de 33 microns. La photographie comparative de la figure 5 (a) montre la surface du tube d'acier fabri- qué à partir de tales d'acier laminées à froid, sans aucune <EMI ID=41.1> Figure 5 (b) and thus give a coating of steel tube with a thickness of 33 microns. The comparative photograph in Figure 5 (a) shows the surface of the steel tube fabricated from cold rolled steel plates, without any <EMI ID = 41.1> tions, sans projection de grenailles. Ainsi, le tube d'acier obtenu est muni d'une couche de revêtement d'une épaisseur d'environ 15 microns, qui est beaucoup plus mince que celle du tube d'acier conforme à l'invention. tions, without projection of shot. Thus, the steel tube obtained is provided with a coating layer with a thickness of about 15 microns, which is much thinner than that of the steel tube according to the invention. Dans la ligne de fabrication représentée à la <EMI ID=42.1> In the production line shown at <EMI ID = 42.1> dans la position comprise entre le dispositif de rinçage...- <EMI ID=43.1> in the position between the rinsing device ...- <EMI ID = 43.1> le montre la figure 2, un tube revêtu de métal par immer- sion à chaud, entièrement fini, à surface rugueuse et shown in figure 2, a fully finished hot dip metal coated tube with a rough surface and <EMI ID=44.1> <EMI ID = 44.1> Une autre forme de la ligne dejfabrication consiste Another form of the production line is <EMI ID=45.1> <EMI ID = 45.1> la figure 2 par un dispositif d'application de peinture ou de plastique 53. Cette disposition permet d'appliquer un film de peinture ou un film plastique sur la surface rugueuse du tube d'acier revêtu de métal par immersion à chaud, au cours d'un procédé continu en ligne. FIG. 2 by a paint or plastic application device 53. This arrangement makes it possible to apply a paint film or a plastic film on the rough surface of the steel tube coated with metal by hot immersion, during 'a continuous online process. REVENDICATIONS 1.- Tube d'acier dont la surface métallique de base 1.- Steel tube with basic metal surface <EMI ID=46.1> <EMI ID = 46.1> de plusieurs microns à une centaine de microns d'épaisseur, caractérisé en ce qu'un certain nombre de creux de plusieurs microns à une centaine de microns de profondeur et de plu- <EMI ID=47.1> from several microns to one hundred microns in thickness, characterized in that a number of pits from several microns to about one hundred microns in depth and greater than <EMI ID = 47.1> formés uniment sur la surface métallique de base du tube. formed evenly on the base metal surface of the tube. 2.- Tube d'acier immergé à chaud suivant la revendication 1, caractérisé en ce que lesdits creux sont formés sur le feuillard d'acier avant le façonnage en tube. 2. A hot-dipped steel tube according to claim 1, characterized in that said recesses are formed on the steel strip before shaping into a tube. 3.- Tube d'acier immergé à chaud suivant la revendi- cation 1, caractérisé en ce que le feuillard d'acier est revêtu de métal ayant le façonnage en tube. 3. A hot-dipped steel tube according to claim 1, characterized in that the steel strip is coated with metal having the shape of a tube. 4.- Tube d'acier revêtu d'un métal par immersion à chaud suivant la revendication 1, caractérisé en ce que lesdits creux sont formés après le façonnage en tube. 4. A hot-dip metal coated steel tube according to claim 1, characterized in that said hollows are formed after shaping into a tube. 5.- Tube d'acier immergé à chaud suivant la revendication 1, caractérisé en ce que le tube est revêtu, sur 5. A hot-dipped steel tube according to claim 1, characterized in that the tube is coated on . sa surface, d'un film de peinture ou d'un film plastique. . its surface with a paint film or plastic film. 6.- Procédé de fabrication continue en ligne d'un tube revêtu d'un métal suivant la revendication 1, caractérisé en ce qu'il consiste à amener en continu un feuillard d'acier; à provoquer l'entraînement du feuillard d'acier par une machine de formage à froid; à pratiquer de nombreux 6. A continuous in-line manufacturing process of a tube coated with a metal according to claim 1, characterized in that it consists in continuously supplying a steel strip; causing the steel strip to be entrained by a cold forming machine; to practice many <EMI ID=48.1> <EMI ID = 48.1> profondeur et de plusieurs microns à plusieurs centaines depth and from several microns to several hundred de microns de diamètre, uniment sur la surface du feuillard, microns in diameter, uniformly on the surface of the strip, par la projection d'un produit abrasif sur le feuillard by the projection of an abrasive product on the strip d'acier entraîné; à contrôler la répartition de la chaleur driven steel; to control the heat distribution de la soudure sur la circonférence du tube avant le décapage; à décaper le tube tout en maintenant la chaleur de la welding around the circumference of the tube before pickling; stripping the tube while maintaining the heat of the soudure correctement répartie et contrôlée comme mentionné ci-avant; et à munir le tube d'acier, par immersion à 'chaud, ' d'un revêtement métallique d'une épaisseur de plusieurs weld correctly distributed and checked as mentioned above; and providing the steel tube, by 'hot dipping', with a metal coating with a thickness of several nierons à une centaine de microns. deny to a hundred microns. 7.- Procédé de fabrication d'un tube d'acier immergé a chaud suivant..la revendication 2, caractérisé en ce que l'opération de mise à dimehsions, est réalisée avant l'immersion à chaud pour obtenir un tube à surface finie rugueuse, 7.- A method of manufacturing a hot-immersed steel tube according to Claim 2, characterized in that the dimehsions setting operation is carried out before hot-immersion to obtain a tube with a finished surface rough, <EMI ID=49.1> <EMI ID = 49.1> d'un revêtement plastique. a plastic coating. 8.- Tube d'acier revêtu d'un métal par immersion à chaud et procédé pour sa fabrication continue en ligne, substantiellement tels que décrits précédemment et illus- trés aux dessins annexés. 8. Hot dipped metal coated steel tube and method for its continuous in-line fabrication, substantially as previously described and illustrated in the accompanying drawings.
BE2053402A 1974-02-05 1974-02-05 Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length BE810600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE2053402A BE810600A (en) 1974-02-05 1974-02-05 Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE2053402A BE810600A (en) 1974-02-05 1974-02-05 Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length

Publications (1)

Publication Number Publication Date
BE810600A true BE810600A (en) 1974-05-29

Family

ID=3865197

Family Applications (1)

Application Number Title Priority Date Filing Date
BE2053402A BE810600A (en) 1974-02-05 1974-02-05 Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length

Country Status (1)

Country Link
BE (1) BE810600A (en)

Similar Documents

Publication Publication Date Title
EP1058588B1 (en) Installation for making cold-rolled stainless steel bands
CA1107577A (en) Method for high speed coating of a wire like element with a hot melt material, apparatus therefor, and wire like element thus coated
EP0011547B1 (en) Process and apparatus for producing a zinc plate or strip lightly coated on one or both sides, and product obtained by this process
CA1179169A (en) Continuous production of polished galvanized tubing
EP0896639B1 (en) Method and installation for metallizing cast-iron pipes
US3828723A (en) Galvanizing apparatus for wire and the like
US3809570A (en) Galvanizing technique for wire and the like
CA1215889A (en) Process and installation for the manufacture of overaged steel strip with zn, a1, alloy coating
EP0329611B1 (en) Process for continuously coating a filamentary steel article by immersing the article in a bath of the molten coating metal
BE810600A (en) Hot dip coating ferrous metal tube - by immersing continuous tube in molten metal to coat its outer surface and cutting to length
FR2460333A1 (en) METHOD AND APPARATUS FOR COOLING STEEL STRIPS DURING CONTINUOUS ANNEALING TREATMENT
FR2726578A1 (en) PROCESS FOR COATING A STEEL SHEET WITH A METAL LAYER BASED ON ALUMINUM OR ZINC
JPS6314848A (en) Method for coating material onto steel sheet
JPH05148607A (en) Manufacture of metal coated steel tube continuously applied with hot-dip metal coating
LU82208A1 (en) PROCESS FOR PRODUCING A COATED STEEL STRIP
JPS5933445B2 (en) Manufacturing method of molten metal plated steel pipe
EP0111039A1 (en) Process for the high speed continuous galvanizing and annealing of a metallic wire
US2068904A (en) Galvanizing process
FR2528876A1 (en) Internally coated metal pipe production - applies coating after welding of strip edges to form pipe
FR2534277A1 (en) PROCESS FOR THE CONTINUOUS PRODUCTION OF A COATED AND OPTIONALLY FORMED METAL STRIP
JPS6075568A (en) Production of metal hot dipped steel pipe
BE699498A (en)
BE543242A (en)
JPH03236457A (en) Surface coating method for wire rod, bar stock, or tube stock made of al or al alloy
JPH0716537A (en) Coating of wire

Legal Events

Date Code Title Description
RE20 Patent expired

Owner name: WESTERN TUBE & CONDUIT CORP.

Effective date: 19940205