BE539486A - - Google Patents

Info

Publication number
BE539486A
BE539486A BE539486DA BE539486A BE 539486 A BE539486 A BE 539486A BE 539486D A BE539486D A BE 539486DA BE 539486 A BE539486 A BE 539486A
Authority
BE
Belgium
Prior art keywords
pile
rod
shoe
driving
concrete
Prior art date
Application number
Other languages
French (fr)
Publication of BE539486A publication Critical patent/BE539486A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  "Pieu de battage" 
Pour la   construction   de fondations, on connaît des      pieux de battage 'dans lesquels un' sabot est   mônté     à     l'extrémité '   inférieure de la tige du pieu et dont   l'aire   de la section supé-' rieure est plus grande que celle de la section   de'la   tige creuse du pieu. Lors du battage du pieu, il se produit entre la tige et la masse de terre repoussée   par   le sabota un espace creux qu'on charge par le haut d'une matière de remplissage, par exemple du gra- vier ou dubéton, pendant l'enfoncement du pieu, pour   augmenter   le frottement entre le pieu et la masse de terre. 



     L'invention   a pour but   de .créer   un pieu de battage convenant à l'ancrage de   pièces   de construction, pouvant également   s'enfoncer   sans difficulté dans un terrain à bâtir parsemé de 

 <Desc/Clms Page number 2> 

 grosses pierres ou autres gros obstacles de pénétration, et dont l'enveloppe extérieure et le   remplissage   intérieur en béton peu- vent ttre exécutés immédiatement après le battage dans le terrain   à .bâtir   de façon rapide, bon marché et parfaite, en utilisant des outils simples de refoulement de béton. 



   L'invention consiste en ce que le sabot creux se terminant   en'ooin   vers le bas, porte à son extrémité supérieure des ouvertures de dégagement et en ce que le béton est refoulé sous pression dans le pieu par le haut, de manière telle qu'il sorte tout d'abord par les ouvertures de dégagement du cabot du pieu, pénètre par en dessous   daris   l'espace creux produit lors du battage du pieu tout autour de sa tige entre celui-ci et la masse de terre comprimée, et s'élève dans-cet espace creux autour de la tige du pieu, de manière telle que, par   suit.9   de la pression éle- vée du béton, la masse de terre entourant l'espace creux soit encore compriméed'avantage et que l'espace creux s'élargisse de façon irrégulière correspondant à la résistance variable des couches de terrain traversées. 



   Grâce à l'invention, on aboutit à une augmentation extraordinaire de la capacité de charge du pieu battu parce que l'enveloppe   en,,béton   produire dans le sol à bâtir et solidement liée à la tige du pieu, s'appuie sur le terrain sur toute sa longueur. 



   Le frottement'périphérique entre l'enveloppe en bé- ton et le sol à bâtir constituant essentiellement la force por- tante et la   résistance   à la traction du pieu battu, est particu-   lièrement   élevé dans un pieu battu construit conformément à l'in- vention, parce que   d'une'   parts la section irrégulière de l'envelop- pe en béton augmente considérablement, ses surfaces de glissement par rapport au terrain et d'autre part, parce que, grâce à la fort compression du terrain, il se produit en outre une résistance de glissement élevée (glissement d'adérence) antre la masse de terre 

 <Desc/Clms Page number 3> 

 et l'enveloppe en béton. 



   D'après une forme de réalisation avantageuse de l'invention, on dispose à l'extérieur par intervalles sur les parois de la tige du pieu, des taquets d'évacuation en forme de coins au moyen desquels, lors du battage de la tige du pieu, l'espace creux qui se forme autour de la tige est continuellement évacué des masses de terre et des pierres y pénétrant à nouveau. 



  En outre, les taquets produisent des fissures à différents endroits de la paroi extérieure de l'espace creux, ce qui favorise la for- mation irrégulière d'un bourrelet de l'enveloppe en béton et augmen- te ainsi de façon particulière la capacité portante du pieu. 



   D'autres caractéristiques de l'invention résultent de la description basée sur le dessin, dans laquelle on représente plusieurs exemples de réalisation de l'objet de l'invention. 



   En ce qui concerne l'exemple de réalisation repré- senté sur les Figs. 1 à 7, la Fig. 1 représente le pieu de battage entouré de béton jusqu'à son extrémité supérieure ; la Fig. 2, une vue de front du pieu de battage à .échelle agrandie ; la Figé 3, une- coupe longitudinale à travers le pieu de battage ; la Fig. 4, une vue en plan du pieu de battage ; - la Fig. 5, une coupe suivant la ligne   A-B ;   la Fig. 6, une coupe suivant la ligne C-D et la   Fig.   7 une coupe suivant la ligne E-F de la Fig.3. 



   Les   Figs   8 et 9 représentent un second exemple de réalisation suivant une coupe longitudinale verticale et en éléva- tion. 



   D'un troisième exemple de réalisation, la Fig. 10 représente en coupe longitudinale le pieu de battage muni d'une tige de battage qui y est Introduite; la Fig. 11, une coupe à travers la tête du pieu sui- 

 <Desc/Clms Page number 4> 

 van   ligne   1   il le   la Fig. 10; la Fig. 12, une coupe à travers la tige du pieu à hauteur d'une pièce intercalaire et d'une paire de taquets suivant la ligne   III-III   de la Fig. 10; la Fig.   13, une   coupe à travers la tige du pieu im- médiatement au-dessus du sabot de refoulement suivant la ligne 
IV-IV de la Fig.   10 ;   la Fig. 14, une coupe longitudinale à travers le sabot de refoulement du pieu, parallèle au trépan ; la Fig. 15, une coupe suivant la ligne   VI-VI   de la fig. 



   16 à travers le pieu en béton refoulé du pieu de battage terminé; la Fig. 16, une vue en élévation du pieu de battage et la Fig.   17,   une coupe d'une autre forme de   réalisation   de la tige de battage. 



   A   1'-extrémité   inférieure de la tige creuse du pieu construite en acier profilé, des Figs. 1 à 7, dont la longueur est choisie de façon correspondant à la profondeur de battage nécessai- re dans chaque cas particulier, et dont la section est mesurée d'après les sollicitations statiques prévues du pieu de battage en aciers. le   sabot,,.du   pieu 3 est soudé suivant   1'axe   à la tige du pieu 1 ou y est fixé d'autre   façon..La   tige du pieu 1 peut être constituée   de.plusieurs   aciers profilés' soudés ou consister encore uniquement en un profild'acier creux. 



   Dans le sabot 3 du pieu est fixé (soudé) le trépan 
2 dans le plan axial de la tige 1 de manière-telle que son extré- mité supérieure émoussée bute contre la tige 1 du pieu et que son extrémité inférieure   aiguisée .dépasse   librement vers le bas le sabot du pieu 3. Grâce au sabot construit de cette façon, le pieu est apte, au cours du battage, à casser de grosses pierres qu'il rencontre. 



   Le sahbot du pieu 3 est constitué soit d'aciers plats ou de tôles en acier découpées de.façon correspondante, 'soudées entre elles, comme on le voit sur les Figs. 2,3 et 7 du dessin, 

 <Desc/Clms Page number 5> 

 ou bien encore, il est constitua d'une pièce coulée en acier spécial quand un grand nombre de pièces identiques de pieux de battage en acier sont nécessaire à une fondation. 



   Le sabot du pieu 3 est creux et a une forme en coin telle que deux au moins de ses faces latérales opposées dépassent transversalement des deux côtés la section du pieu pour que, entre la tige 1 et les deux faces latérales, -plusieurs sections   ,   de passage Q1 et Q2 libres, suffisamment grandes existent pour l'évacuation du béton refoulé dans le pieu de battage en acier. 



   Dans les faces latérales, on prévoit également de préférence encore les orifices  Xàtravers   lesquels le béton refoulé peut également sortir du sabot 3 du pieu par le dessous. 



   La plus grande largeur y du sabot-du pieu est choisie d'après le terrain de fondation et le genre de sol des différentes couches qui doivent être traversées lors du battage du pieu en acier. 



   A l'extrémité supérieure de la tige 1 du pieu est soudée la tête du pieu 6 en   acier,   à l'intérieur de la tige. 



  Elle est forée longitudinalement suivant l'axe de la tige 1 du pieu, pour que, par son intermédiaire, le tube 5 d'introduction du béton refoulé puisse être-introduit dans la tige 1 du pieu. 



   Dans la tige creuse 1 du pieu sont soudés par inter,- valles des pièces intermédiaires 4. Celles-ci 4 sont également forées longitudinalement suivant l'axe de la -tige du pieu, pour. que le tube 5 d'introduction du béton refoulé puisse également      les traverser. A travers la tige 1 du pieu et les pièces inter- médiaires 4 sont'prévus perpendiculairement ou également oblique- ment par rapport à l'axe longitudinal de la tige du pieu, les orifices SZ1 et   Z   décalés à travers lesquels le béton refoulé provenant de la tige du pieu   1   peut pénétrer dans l'espace creux créé lors du battage du pieu par le sabot de refoulement 3 entre la tige du pieu et la masse de terre - qui l'entoure. 



   A proximité de l'extrémité supérieure est soudé 

 <Desc/Clms Page number 6> 

 extériterement tout autour de la tige du pieu 1, le bourrelet d'étanchéisation 9 dont la largeur et la position en dessous de l'arête supérieure du pieu, sont choisies également d'après le terrain à bâtir et la nature des couches de béton à travers      lesquelles le pieu en acier est battu. 



   A travers la tête 6 du pieu, le tube   5 d'introduc-   tion du béton refoulé pénètre profondéent vers le bas dans la tige du pieu et peut tourner à l'intérieur de celui-ci autour des deux axes longitudinaux communs. A l' extrémité supérieure du tube d'introduction 5 est soudée la tête de tube 7, et entre celle-ci et la tête du pieu 6 est :prévu le joint annulaire 8, Le tube 5 d'introduction du béton refoulé est interchangeable, c'est-à-dire qu'il n'est pas construit spécialement pour chaque pieu de battage en acier, mais qu'un élément unique suffit en général pour de nombreux pieux en acier de même longueur et de même section. le mode d'action et le but de la présente invention sont à présent les suivants :

   
Tout d'abord, le pieu de battage est battu dans le terrain à bâtir après en avoir retiré le tube d'introduction du béton refoulé. Lors  de'l'enfoncement   du pieu dans le sol de fondation, le sabot de refoulement 3, plus large, comprime, dans le sol de fondation la masse de terre autour'de la tige 1 et' crée par refoulement du sol, autour du pieu de battage en   acier'ou   de sa tige, un espace or-eux plus ou moins grand. 



   Celui-ci a en général une section se- rétrécissant vers le haut, et des essais ont'démontré qu'également, un sabot du   pieu 3   n'ayant que de deux   cotés   la forme d'un coin, comme il est représenté sur le dessin, creuse un espace approximativement de largeur égale tout autour de la tige du pieu, bien que   théori-   quement, un espace   creux   ne pourrait se produire que sur les faces en largeur du sabot en forme de coin, par refoulement de la masse 

 <Desc/Clms Page number 7> 

 de terre. Il suffit donc dans la plupart des cas, que le   nabot   du pieu 3 n'ait la forme d'un coin que de deux   cotes,   et non des quatre côtés.

   Peu avant la fin de l'opération, de battage, lors du dernier enfoncement du pieu de battage en acier, le bourrelet d'étanchéisation 9 prévu à l'extrémité supérieure du pieu, agit également .refoule devant lui sur un petit trajet la masse de terre sortant du bord supérieur du trou du pieu lors du battage et le comprime de telle sorte qu'il se forme   à   la partie supérieure du trou un bouchon de masse de terre qui obstrue vers le haut l'es- pace creusé autour de la tige 1 du pieu, au cours du battage. 



   Après le battage du pieu en acier, on introduit le tube d'amenée du béton refoulé 5 à travers la tête du pieu 6 dans la tige 1 et on l'appuie par sa tubulure 7 contre la tête du pieu 6 en intercalant un anneau servant de joint 8. Dans ce but, on utilise un dispositif de tendeur simple de genre connu comportant des taquets de retenue pouvant pivoter vers l'extérieur qui pénè- trent dans les deux orifices.11 de la tête du pieu 6.

   Au moyen d'outils de betonnage connus, on refoule ensuite du béton par le tube d'amenée 5 dans le pieu de battage en acier, tout d'abord, uniquement à la partie inférieure du   pi eu.   Le béton remplit ainsi la partie inférieure de la.,tige' du pieu 1 et le sabot 3 et sort   de celui-ci paroles sections d'évacuation Q1 et Q ainsi que par x les orifices/pour pénétrer !dans la masse de terre qui l'entoure.   



  Il forme ainsi le bourrelet   'de   pied représenté sur le dessin de , la Fig. 1 tout 'autour du sabot et de la partie inférieure de la tige, et s'élève ensuite également avec une résistance accrue dans l'espace creux formé autour de la tige 1 du pieu. Par l'aug- mentation de pression qui   -se'produit,   le tube d'amenée du béton tourne d'environ 60  dans la tige du pieu, de sorte que les ori- fices Zi existant à la partie inférieure de la tige et servant à la sortie du béton dans la masse de terre, sont libérés.

   Si alors la pression de refoulement augmente de nouveau, le tube d'amenée 5 tourne encore une fols d'un certain   angle.   Le béton 

 <Desc/Clms Page number 8> 

 sort alors par les orifices   Z   de la tige du pieu et s'élève dans l'espace creux qui l'entoure cette dernière jusqu'au bour- relet d'étanchéisation 9. Le tube d'amenée du béton 5 est alors retiré lentement de la tête du pieu 6 à une faible pression d'in- troduction du béton,; et le pieu de battage en acier est alors également rempli de béton à l'intérieur. Le pieu de battage en acier est à ce   moment   entouré de béton aussi bien à l'extérieur qu'à l'intérieur, de sorte qu'une corrosion de l'acier est exclue. 



    ±lois,   en même temps,l'enveloppe de béton   formée   autour du pieu de battage augmente de façon considérable la force portante du pieu par suite de l'augmentation notable de sa section et du frot- tement périphérique intense ainsi obtenu entre l'enveloppe en béton et la masse de terre. 



   Le remplissage progressif de l'espace creux autour de la tige du pieu 1 par le béton refoulé par les orifices Z1 et Z2 ou par des orifices supplémentaires, ne doit pas seulement garantir un entourage complet de la tige du pieu 1 au moyen de béton, mais également favoriser la formation de bourrelets sur l'enveloppe de béton, grâce auxquels la force portante du pieu de battage en acier peut de, nouveau être augmentée de façon non   négligeable.   



   Un seul tube d'amenée de béton 5. suffit au battage de nombreux   pieux,@de   mêmes dimensions, Il ne fait,pas partie constituante du pieu de battage en acier, mais sert seulement à la distribution par refoulement progressif du béton dans le pieu de battage en acier et: autour de celui-ci. 



   Par le battage'   de 'pieux   de battage en acier du genre de construction ici décrit dans des solo très denses   tenaces,     collants   tels que la terre-glaise,   l'argile,   et analogues, pour favoriser la formation uniforme d'un espace libre autour de la tige du pieu 1 (au moyen du sabot 3), on soude ou on fixe d'autre façon d'autres sabots   refouleurs   plus   petit;;,   en forme de coins, sur les faces 

 <Desc/Clms Page number 9> 

 étroites du sabot du pieu 3. 



   Dans l'exemple de réalisation des Figs. 8 et 9, sont montés extérieurement aux parois de la tige du pieu, par   intervalles,des   taquets d'évacuation   12   en   forme   de coins. 



   Cas taquets sont disposés dans l'exemple représenté, aux endroits où sont   prévus  desorifices   transversaux   de la tige du   pieu.   Des taquets ont 'une forme   anguleuse     'de.manière  à recouvir les ori-   fices     transversaux     à   la manière   d'un   toit. Ils   empêchent   une pénétration de la masse de terre dans l'espace creux du pieu   lundis   que le béton refoulé par   :Le     tube 9   peut sortir par les taquets ouverts sur le coté. 



   A la partie supérieure de la tige 1 du pieu est disposé un organe d'étanchéité   14'réglable   et amovible . 



     L'organe   d'étanchéité 14 est composé de deux moitiés et porte une saillie 15 en forme de collet serrée à la tige du pieu par les vis de raccord qui assemblent les deux moitiés de l'organe d'étanchéité. ' ' 
La tige de pieu de l'exemple de réalisation suivant les Fig.s 10 à 16 est constituée de quatre cornières en acier 1 raccordées entre elles par des pièces intermédiaires 24.

   La pièce intermédiaire   supérieure a     l'extrémité   supérieure de la tige du pieu, est notablement plus longue que les autres, pour que, à la    pièce intermédialire supérieure, un organe d'étanchéité, par exemple celui décrit auparavant à propos des Figs. 8 et 9, puisse être   monté sous forme d'un organe   d'étanchéité     Indivise   dans le sens'    longitudinal. A. l'extrémité supérieure de la pièce intermédiaire    24 la plus haute, est soudé un anneau de renforcement 6 formant la tête de pieu.

   Dans la   pièce   intermédiaire la lus basse,   qui   pénètre dans le sabot est soudée, une pièce   de'compression   17 sur laquelle, pendant le battage du pieu, s'appuie une tige de battage creuse 18   introduite     dans   la tige du   pieu. 'Sur     cella-ci   sont   appliqués,   de nouveau par   intervalles   les uns   au   dessus des 

 <Desc/Clms Page number 10> 

 aut-es, des taquets d'évacuation 12 en forme de coins, décales les uns par rapport aux autres. Sur les tôles en forme de coin du sabot du pieu sont montés des   taquets d'évacuation'13   qui empêchent la pénétration de la masse de terre paroles orifices latéraux de sortie du béton.

   Ce sabot creux 3 est recouvert au dessus par deux pièces en acier en forme de cornières 20 pour que, lors du battage, aucune   terre ne     par   le haut dans le sabot   -dU     pi eu.   



   Pendant le battage du pieu, 'le mouton de battage ' frappe sur la tige de battage   18   qui   dépasse-la   tête 6 du pieu et   transmet,la   force de battage par la pièce de compression 17 au trépan 2 et au sabot   3. 'La   tige du pieu constituée de quatre tiges en cornières d'acierr 1 et de pièces   intermédiaires   24, n'est par conséquent pas soumise à des efforts de compression pendant le battage, mais est tirée vers le bas-dans le sol à bâtir à travers- le sabot dupieu dans 1 'espace creux libéré par   celui-ci   dans la masse de terre, et n'est par conséquent soumise qu'à la traction. 



   Après le battage du pieu, on refoule par la tige de battage creuse 18 du béton sous pression élevée, d'abord dans le sabot creux et ensuite, en retirant progressivement la tige de battage 18 de'la tige du pieu, dans cette dernière et dans l'espace creux produit   autdur-     d'elle   dans la masse-de terre. 



   Au lieu des pièces intermédiaires   24 en   forme d'anneaux montées par intervalles sur la tige du pieu, on peut également choisir une armature en spirale en acier rond, plat ou en   ruban,   parcourant   toute'la   longueur de la tige du pieu ; elle est alors soudée   électriquement   ou raccordée d'autre façon aux tiges en acier profilé ou rond formant la tige du pieu, 
On peut aussi fixer à l'extrémité supérieure de la tige de battage 18 dépassant de la tête du   pieu,   un dispositif tendeur au moyen, duquel la tige du pieu constituée de barres d'acier rond légères peut être étirée par traction ou être tendue 

 <Desc/Clms Page number 11> 

 à l'avance.

   On peut alors, utiliser également à la construction de la tige du pieu de battage des aciers ronds ou fils d'acier   . minces,     c'est-à-dire   obtenir une sorte de b'éton précontraint dans dans le pieu de battage . rempli de   béton. '   
La tige de battage à introduire dans la tige du pieu peut égaiement est constituée d'un profil plein, ,par exemple un porte-brides disposé en largeur, représenté sur la Fig. 17. A une tige de battage   à   profil plein de ce genre, on peut raccorder sur toute sa longueur une ou plusieurs conduites d'amenée de béton 26 par lesquelles le béton est introduit sous pression dans le cabot et dans la tige du pieu.



   <Desc / Clms Page number 1>
 



  "Driving pile"
For the construction of foundations, piling piles are known in which a shoe is mounted at the lower end of the shaft of the pile and the area of the upper section of which is greater than that of the shaft. section of the hollow rod of the pile. During the driving of the pile, there is produced between the rod and the mass of earth pushed back by the sabota a hollow space which is loaded from above with a filling material, for example gravel or concrete, during the pile driving, to increase the friction between the pile and the mass of earth.



     The object of the invention is to create a driving pile suitable for anchoring construction parts, which can also sink without difficulty into a building site strewn with

 <Desc / Clms Page number 2>

 large stones or other large penetrating obstacles, and the outer casing and inner concrete infill of which can be carried out immediately after the piling in the ground to be built quickly, inexpensively and perfectly, using simple tools of concrete delivery.



   The invention consists in that the hollow shoe ending in 'ooin downwards, carries at its upper end clearance openings and in that the concrete is forced under pressure into the pile from the top, in such a way that it comes out first of all through the release openings of the pile of the pile, penetrates from below into the hollow space produced during the driving of the pile all around its rod between the latter and the mass of compressed earth, and s' raises in this hollow space around the shank of the pile, in such a way that, as a result of the high pressure of the concrete, the mass of earth surrounding the hollow space is further compressed and the space hollow widens irregularly corresponding to the varying resistance of the layers of land crossed.



   Thanks to the invention, this results in an extraordinary increase in the load capacity of the driven pile because the concrete casing produced in the building soil and firmly linked to the shaft of the pile rests on the ground. along its entire length.



   The peripheral friction between the concrete envelope and the building soil, constituting essentially the load-bearing force and the tensile strength of the driven pile, is particularly high in a driven pile constructed in accordance with the in- vention, because on the one hand the irregular cross-section of the concrete casing increases considerably, its sliding surfaces in relation to the ground and on the other hand, because, thanks to the strong compression of the ground, it furthermore produces a high sliding resistance (adhesion slip) between the earth mass

 <Desc / Clms Page number 3>

 and the concrete envelope.



   According to an advantageous embodiment of the invention, there are placed on the outside at intervals on the walls of the pile shank, wedge-shaped discharge cleats by means of which, when driving the shank of the pile. pile, the hollow space that forms around the rod is continuously evacuated from the masses of earth and stones entering it again.



  In addition, the cleats produce cracks at various places on the outer wall of the cavity, which favors the irregular formation of a bead of the concrete shell and thus particularly increases the load-bearing capacity. of the stake.



   Other characteristics of the invention result from the description based on the drawing, in which several exemplary embodiments of the object of the invention are shown.



   As regards the exemplary embodiment shown in Figs. 1 to 7, FIG. 1 shows the driving pile surrounded by concrete up to its upper end; Fig. 2, a front view of the driving pile on an enlarged scale; Figure 3, a longitudinal section through the pile driver; Fig. 4, a plan view of the driving pile; - Fig. 5, a section along line A-B; Fig. 6, a section along line C-D and FIG. 7 a section along the line E-F of Fig.3.



   Figs 8 and 9 show a second exemplary embodiment in vertical longitudinal section and in elevation.



   From a third exemplary embodiment, FIG. 10 shows in longitudinal section the driving pile provided with a driving rod which is inserted therein; Fig. 11, a cut through the head of the stake following

 <Desc / Clms Page number 4>

 van line 1 there the Fig. 10; Fig. 12, a cut through the stake shank at the height of a spacer and a pair of cleats along line III-III of FIG. 10; Fig. 13, a cut through the shank of the pile immediately above the discharge shoe following the line
IV-IV of FIG. 10; Fig. 14, a longitudinal section through the return shoe of the pile, parallel to the bit; Fig. 15, a section taken along line VI-VI of FIG.



   16 through the upset concrete pile of the completed driving pile; Fig. 16, an elevational view of the driving pile and FIG. 17, a section through another embodiment of the threshing rod.



   At the lower end of the hollow rod of the pile constructed of profiled steel, of Figs. 1 to 7, the length of which is chosen in a manner corresponding to the driving depth required in each particular case, and the cross section of which is measured according to the expected static stresses of the steel pile driving pile. the shoe ,,. of the pile 3 is welded along the axis to the rod of the pile 1 or is fixed thereto in some other way. The rod of the pile 1 may be made of several welded section steels or still consist only of a hollow steel profile.



   In the shoe 3 of the pile is fixed (welded) the bit
2 in the axial plane of the rod 1 in such a way that its blunt upper end abuts against the rod 1 of the pile and that its sharp lower end freely passes downwards the shoe of the pile 3. Thanks to the shoe constructed of in this way, the stake is able, during the driving, to break large stones which it encounters.



   The sahbot of the pile 3 is made either of flat steels or of steel sheets cut in a corresponding manner, welded together, as can be seen in Figs. 2, 3 and 7 of the drawing,

 <Desc / Clms Page number 5>

 or again, it is made of a special steel casting when a large number of identical parts of steel driving piles are required for a foundation.



   The shoe of the pile 3 is hollow and has a wedge shape such that at least two of its opposite side faces extend transversely on both sides of the section of the pile so that, between the rod 1 and the two side faces, several sections, of Q1 and Q2 free passage, sufficiently large exist for the evacuation of the driven concrete in the steel pile pile.



   In the side faces, there is also preferably still the orifices X through which the driven concrete can also exit the shoe 3 of the pile from below.



   The greatest width y of the pile shoe is chosen according to the foundation ground and the soil type of the different layers that must be traversed when driving the steel pile.



   At the upper end of the rod 1 of the pile is welded the head of the steel pile 6, inside the rod.



  It is drilled longitudinally along the axis of the rod 1 of the pile, so that, through it, the tube 5 for introducing the driven concrete can be introduced into the rod 1 of the pile.



   In the hollow rod 1 of the pile are welded by inter, - valles intermediate pieces 4. These 4 are also drilled longitudinally along the axis of the -tige of the pile, for. that the tube 5 for introducing the driven concrete can also pass through them. Through the rod 1 of the pile and the intermediate pieces 4 are provided perpendicular or also obliquely with respect to the longitudinal axis of the rod of the pile, the ports SZ1 and Z offset through which the upset concrete coming from the rod of the pile 1 can penetrate into the hollow space created during the driving of the pile by the discharge shoe 3 between the rod of the pile and the mass of earth - which surrounds it.



   Near the top end is welded

 <Desc / Clms Page number 6>

 externally all around the stem of pile 1, the sealing bead 9, the width and position of which below the upper edge of the pile, are also chosen according to the building site and the nature of the concrete layers to through which the steel pile is driven.



   Through the pile head 6, the upset concrete introduction tube 5 penetrates deep down into the pile shank and can rotate therein about the two common longitudinal axes. At the upper end of the introduction tube 5 is welded the tube head 7, and between this and the head of the pile 6 is: provided the annular seal 8, The tube 5 for the introduction of the upset concrete is interchangeable, that is, it is not built specifically for each steel driving pile, but a single element is usually sufficient for many steel piles of the same length and same section. the mode of action and the aim of the present invention are now as follows:

   
First of all, the driving pile is driven into the building site after having removed the tube for introducing the upset concrete therefrom. When driving the pile into the foundation soil, the wider delivery shoe 3 compresses the mass of earth around the rod 1 in the foundation soil and creates the soil around the steel piling pile or its rod, a space or them more or less large.



   This generally has a section tapering upwards, and tests have also shown that a shoe of pile 3 having only two sides in the shape of a wedge, as shown in Figure drawing, digs a space of approximately equal width all around the shank of the pile, although theoretically a hollow space could only occur on the width faces of the wedge-shaped shoe, by pushing back the mass

 <Desc / Clms Page number 7>

 earthen. It is therefore sufficient in most cases, that the dwarf of pile 3 has the shape of a wedge only on two sides, and not on all four sides.

   Shortly before the end of the driving operation, during the last driving-in of the steel driving pile, the sealing bead 9 provided at the upper end of the pile, also acts. Pushes the mass in front of it on a small path. of earth coming out of the upper edge of the hole of the pile during the driving and compresses it so that a plug of earth mass is formed at the top of the hole which obstructs the space dug upwards around the hole. rod 1 of the pile, during driving.



   After the steel pile has been driven, the delivery tube for the upset concrete 5 is introduced through the head of the pile 6 in the rod 1 and it is supported by its pipe 7 against the head of the pile 6 by inserting a ring serving 8. For this purpose, a simple tensioning device of a known type is used, comprising retaining tabs which can pivot outwards which penetrate into the two holes 11 of the pile head 6.

   By means of known concreting tools, then concrete is driven through the feed pipe 5 into the steel driving pile, first of all only at the lower part of the pile. The concrete thus fills the lower part of the., Rod 'of the pile 1 and the shoe 3 and comes out of this through the discharge sections Q1 and Q as well as through x the orifices / to penetrate! In the mass of earth which surround it.



  It thus forms the foot bead shown in the drawing of, FIG. 1 all around the shoe and the lower part of the rod, and then also rises with increased resistance in the hollow space formed around the rod 1 of the pile. By the increase in pressure which occurs, the concrete feed tube rotates about 60 in the pile shank, so that the holes Zi existing at the lower part of the shank and serving at the exit of the concrete in the mass of earth, are released.

   If then the discharge pressure increases again, the supply tube 5 turns further by a certain angle. Concrete

 <Desc / Clms Page number 8>

 then exits through the holes Z of the pile rod and rises in the hollow space which surrounds the latter until the sealing bead 9. The concrete feed tube 5 is then withdrawn slowly from the head of the pile 6 at a low concrete introduction pressure; and the steel driving pile is then also filled with concrete inside. The steel driving pile is now surrounded by concrete both on the outside and inside, so that corrosion of the steel is excluded.



    ± laws, at the same time, the concrete envelope formed around the driving pile considerably increases the bearing force of the pile as a result of the notable increase in its cross section and the intense peripheral friction thus obtained between the envelope concrete and mass of earth.



   The gradual filling of the hollow space around the rod of pile 1 by the concrete forced through the openings Z1 and Z2 or by additional openings, must not only ensure that the rod of the pile 1 is completely surrounded by concrete, but also promote the formation of beads on the concrete shell, thanks to which the load-bearing force of the steel driving pile can again be significantly increased.



   A single concrete feed tube 5. is sufficient for the driving of many piles, @ of the same dimensions, It is not a constituent part of the steel driving pile, but only serves for the distribution by progressive discharge of the concrete in the pile pile driver and: around it.



   By driving 'steel driving piles of the kind of construction here described in very dense tenacious, sticky soles such as loam, clay, and the like, to promote the uniform formation of a free space around of the rod of the pile 1 (by means of the shoe 3), one welds or one fixes in another way other small pushing shoes ;;, in the form of wedges, on the faces

 <Desc / Clms Page number 9>

 narrow of the stake shoe 3.



   In the exemplary embodiment of Figs. 8 and 9, are mounted on the outside of the walls of the pile shank, at intervals, wedge-shaped discharge tabs 12.



   Case cleats are arranged in the example shown, at the places where transverse orifices of the rod of the pile are provided. Cleats are 'angular in shape' so as to cover the transverse openings in the manner of a roof. They prevent the penetration of the mass of earth into the hollow space of the pile Mondays that the concrete driven back by: The tube 9 can exit by the cleats open on the side.



   At the upper part of the rod 1 of the pile is arranged an adjustable and removable sealing member 14 ′.



     The seal member 14 is made up of two halves and carries a collar-shaped protrusion 15 clamped to the stake shank by the connecting screws which join the two halves of the seal member. ''
The pile rod of the exemplary embodiment according to FIGS. 10 to 16 consists of four steel angles 1 connected together by intermediate pieces 24.

   The upper intermediate piece at the upper end of the pile shank is notably longer than the others, so that, at the upper intermediate piece, a sealing member, for example that described previously with regard to Figs. 8 and 9, can be mounted as an undivided sealing member in the longitudinal direction. A. The upper end of the uppermost intermediate piece 24 is welded to a reinforcing ring 6 forming the pile head.

   In the intermediate piece the lower read, which penetrates into the shoe is welded, a compression piece 17 on which, during the driving of the pile, rests a hollow driving rod 18 introduced into the rod of the pile. 'On these are applied, again at intervals, one above the

 <Desc / Clms Page number 10>

 aut-es, evacuation cleats 12 in the form of wedges, offset relative to each other. On the wedge-shaped plates of the shoe of the pile are mounted evacuation cleats'13 which prevent the penetration of the earth mass words lateral concrete exit holes.

   This hollow shoe 3 is covered above by two steel pieces in the form of angles 20 so that, during threshing, no earth from above in the shoe -dU pi eu.



   While the pile is being driven, the 'pile driver' strikes the pile driver 18 which protrudes above the pile head 6 and transmits the driving force through the compression piece 17 to the bit 2 and shoe 3. 'The pile rod consisting of four steel angle rods 1 and intermediate pieces 24, is therefore not subjected to compressive forces during driving, but is pulled down-into the ground to be built through- the shoe of the stake in the hollow space released by it in the mass of earth, and is therefore only subjected to traction.



   After the pile has been driven, concrete is driven back through the hollow driving rod 18 under high pressure, first into the hollow shoe and then, gradually withdrawing the driving rod 18 from the pile rod, into the latter and in the hollow space produced outside of it in the earth-mass.



   Instead of the intermediate ring-shaped pieces 24 mounted at intervals on the pile shank, it is also possible to choose a spiral reinforcement of round, flat or ribbon steel, running the entire length of the pile shank; it is then electrically welded or connected in another way to the profiled or round steel rods forming the rod of the pile,
It is also possible to attach to the upper end of the beating rod 18 protruding from the pile head, a tensioning device by means of which the rod of the pile consisting of light round steel bars can be stretched by traction or be tensioned.

 <Desc / Clms Page number 11>

 in advance.

   It is then also possible to use round steels or steel wires in the construction of the driving pile rod. thin, that is to say obtaining a kind of prestressed concrete in the driving pile. filled with concrete. '
The beating rod to be introduced into the pile rod can also consist of a solid profile, for example a flange holder arranged in width, shown in FIG. 17. To such a full profile driving rod, one or more concrete feed pipes 26 can be connected over its entire length through which the concrete is introduced under pressure into the mutt and into the pile rod.


    

Claims (1)

R E V E N D I C A T I O N S. R E V E N D I C A T I O N S. 1) Pieu de battage muni d'un sabot monté à son extré- mité inférieure, et ..dont la surface de la section supérieure dépasse celle de la section de la tige creuse du pieu, caractérisé en ce que le sabot creux ayant la forme d'un coin dirigé vers le bas porte à son extrémité supérieure des ouvertures de sortie et en ce que le béton est refoulé sous pression par le haut à l'intérieur du pieu, de manière qu'il sorte en. premier lieu par les ouvertures de sortie du sabot, pénètre par en dessous dans l'espace creux créé lors du battage du pieu tout autour de sa tige entre celle-ci et la masse.. 1) Driving pile provided with a shoe mounted at its lower end, and ... whose surface of the upper section exceeds that of the section of the hollow rod of the pile, characterized in that the hollow shoe having the form from a corner directed downwards carries at its upper end outlet openings and in that the concrete is forced under pressure from the top inside the pile, so that it exits. first through the outlet openings of the shoe, penetrates from below into the hollow space created during the driving of the pile all around its rod between it and the mass. de terre comprimée, et s'élève dans cet ecpace creux tout autour ' de la tige du pieu, de manière que, par suite de la pression élevée du béton, la masse de terre entourant l'espace creux soit comprimée d'avantage et que celui-ci s'élargisse de façon irrégulière cor- respondante à la résistance variable des couches de terrain traversée$ 2) Pieu de battage suivant la revendication 1 carac- térisé en ce qu'un trépan (2) est fixé dans le plan axial à l'inté- rieur du sabot en forme de coin (. 3) et dépasse le sabot en dessous. of compressed earth, and rises in this hollow space all around the shaft of the pile, so that, as a result of the high pressure of the concrete, the mass of earth surrounding the hollow space is compressed further and that this widens irregularly corresponding to the variable resistance of the layers of land crossed $ 2) A pile driver according to claim 1, characterized in that a drill bit (2) is fixed in the axial plane inside the wedge-shaped shoe (. 3) and protrudes from the shoe below. , 3) Pieu de battage suivant 1 en revendications 1 et 2 caractérisé en ce que Ion lames de coupage du trépan (2) et du sabot <Desc/Clms Page number 12> en forme de coin (3) sont décalées en hauteur. , 3) Pile according to 1 in claims 1 and 2 characterized in that ion cutting blades of the bit (2) and the shoe <Desc / Clms Page number 12> wedge-shaped (3) are offset in height. 4.) Pieu de battage suivant la revendication 1 carac- térisé en ce que, à la partie supérieure de la tige du pieu (1) est disposé à l'extérieur un organe d'étanchéité (9) qui, vers la fin de l'enfoncement du pieu dans le terrain de fondation,. obs- true vers le haut l'espace creux créé par le sabot dans la masse de terre autour de la tige du pieu. ' ' 5). Pieu- de battage suivant la revendication 1 carac- térisé en ce- que la tige creuse du pieu est munie par intervalles d'ouvertures de sortie latérales etenceque, pour le refoulement du béton dans la tige creuse du pieu, une conduite-d'accès descend à travers la tige du pieu (6) jusqu"au sabot, et en ce que,¯ en relevant progressivement la conduite d"accès, l'espace creux de. 4.) Pile pile according to claim 1 charac- terized in that, at the upper part of the rod of the pile (1) is disposed on the outside a sealing member (9) which, towards the end of the 'driving the stake into the foundation ground ,. upwards the hollow space created by the shoe in the mass of earth around the stake shank. '' 5). Pile pile according to Claim 1, characterized in that the hollow rod of the pile is provided at intervals with lateral outlet openings and that, for the discharge of the concrete into the hollow rod of the pile, an access pipe descends through the rod of the pile (6) to the shoe, and in that, ¯ gradually raising the access pipe, the hollow space of. la tige du pieu s"obstrue au dessus de la section du pieu dans laquelle le béton' est refoulé. the pile shank obstructs above the section of the pile into which the concrete is forced. 6) Pieu de battage suivant les revendications 1 et 5 caractérisé en ce. que l'espace creux à l'intérieur de la tige du pieu (1) est subdivisé par une ou plusieurs pièces intermédiaires (4) disposées entre le sabot'du pieu (3) et sa tête (6). 6) pile driver according to claims 1 and 5 characterized in that. that the hollow space inside the stem of the pile (1) is subdivided by one or more intermediate pieces (4) arranged between the shoe's shoe (3) and its head (6). 7) Pieu de battage suivant la revendication 6 carac- térisé en ce que, à hauteur des pièces intermédiaires (4) , sont prévus des orifices transversaux (Z1 et Z2) qui de'bouchent à l'ex- térieur en traversant les pièces, intermédiaires et la tige du pieu, de manière qu'en faisant tourner la conduite -d'accès (5) munie des ' orifices transversaux, les orifices de sortie (SI Z2) puissent être successivement libérés. 7) Pile pile according to claim 6 charac- terized in that, at the height of the intermediate parts (4), transverse orifices (Z1 and Z2) are provided which open out to the outside through the parts, intermediates and the rod of the pile, so that by rotating the access pipe (5) provided with the transverse openings, the outlet openings (SI Z2) can be successively released. 8) Pieu de battage, suivant la revendication 1 carac- térisé en ce que des taquetsd'évacuation (12) sont disposés extérieurement en forme de coirs et par intervalles sur les parois de la tige du pi eu. 8) Driving pile according to claim 1 charac- terized in that the discharge cleats (12) are arranged externally in the form of coir and at intervals on the walls of the rod of the pi eu. 9) Pieu de battage suivant la revendication 8 carac- térisé en ce que des taquets d'évacuation sont disposés à hauteur des ouvertures de sortie latérales, et recouvrent ces ouvertures à la manière d'un toit. <Desc/Clms Page number 13> 9) A pile driver according to claim 8 charac- terized in that the discharge cleats are arranged at the height of the lateral outlet openings, and cover these openings in the manner of a roof. <Desc / Clms Page number 13> 10) Pieu de battage suivant, la revendication 1 carac- térisé en en que, à la partie supérieure de la tige du pieu, est disposé un organe d'étanchéité (14) réglable et amovible. 10) The following piling pile, claim 1 charac- terized in that, at the upper part of the rod of the pile, is disposed a sealing member (14) adjustable and removable. 11) Pieu de battage suivant la revendication 10 carac- térisé en ce que l'organe d'étanchéité est subdivisé longitudi- nalement et en ce que ses deux moitiés sont fixées à la tige du pieu à l'endroit voulu dans'chaque cas particulier, par le serra- ge d'une saillie en deux pièces en forme de collier (15). 11) Driving pile according to claim 10 charac- terized in that the sealing member is subdivided longitudinally and in that its two halves are fixed to the rod of the pile at the desired location in each particular case , by clamping a projection in two pieces in the form of a collar (15). 12) Pieu de battage suivant la revendication 1 carac- térisé en ce que la tige du pieu est constituée de plusieurs barres d'acier profilé ou rond fixées au sabot (3) et raccordées par intervalles, et en ce que l'on introduit dans cette tige munie d'orifices de passage entre les barres profilées ou ana- logues, untige de battage aboutissant jusqu'au sabot, au moyen de laquelle la force de battage appliquée à l'extrémité supé- rieure de la tige est trasmise directement au trépan (2) et au sabot (3). 12) A pile driver according to claim 1 charac- terized in that the rod of the pile consists of several profiled or round steel bars fixed to the shoe (3) and connected at intervals, and in that it is introduced into this rod provided with orifices for passage between the profiled bars or the like, a beating rod terminating as far as the shoe, by means of which the beating force applied to the upper end of the rod is transmitted directly to the drill bit (2) and the shoe (3). 13) Pieu de battage suivant la revendication 12 carac- térisé en ce que la tige de battage s'appuie à son extrémité inférieure sur une pièce de compression (17) fixée au sabot du pieu (3). 13) Driving pile according to claim 12 charac- terized in that the driving rod is supported at its lower end on a compression piece (17) fixed to the shoe of the pile (3). Pieu de battage suivant la revendication 12, caractérisé en ce que du béton est introduit sous pression dans le pieu battu à travers une conduite d'accès qui n'y est pas ré- liée de façon rigide. Driving pile according to Claim 12, characterized in that concrete is introduced under pressure into the driven pile through an access pipe which is not rigidly connected thereto. 15) Pieu de battage suivant la revendication 12 caractérisé, en ce que la tige de battage échangeable (18) a une forme creuse et sert âpres le battage, de conduite d'amenée du béton introduit dans le pieu pour exercer la pression en dessous. 15) A pile driver according to claim 12 characterized in that the exchangeable pile rod (18) has a hollow shape and is used after the pile driving, for conveying the concrete introduced into the pile to exert the pressure below. 16) Pieu de battage suivant la revendication 12 caractérisé en ce qu'une ou plusieurs conduites d'amenée de béton sont raccordées sur toute sa longueur à une tige de battage (25) constituée d'acier profilé plein. 16) A pile driver according to claim 12 characterized in that one or more concrete feed pipes are connected over its entire length to a pile rod (25) made of solid profiled steel.
BE539486D BE539486A (en)

Publications (1)

Publication Number Publication Date
BE539486A true BE539486A (en)

Family

ID=169176

Family Applications (1)

Application Number Title Priority Date Filing Date
BE539486D BE539486A (en)

Country Status (1)

Country Link
BE (1) BE539486A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1274519B (en) * 1959-04-06 1968-08-01 Mueller Ludwig Method for making a foundation pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1274519B (en) * 1959-04-06 1968-08-01 Mueller Ludwig Method for making a foundation pile

Similar Documents

Publication Publication Date Title
CA2682816C (en) Spiral steel pile
FR2960570A1 (en) WALL FORMED IN A SOIL, COMPRISING A HOLLOW PREFABRICATED ELEMENT, AND METHOD OF MAKING SUCH A WALL
EP1087063A1 (en) Device for drilling and anchoring and method for installing ground anchors
EP1793046B1 (en) Connection element between a micropile and a driving means, and a testing device with such an element
FR2648839A1 (en) FOUNDATION PILES, METHODS, TOOLS AND MACHINES FOR CONSTRUCTING THESE PILES
BE539486A (en)
EP1793045A1 (en) Gripping device for a micro pile head and tension test apparatus including such a device
FR2606057A1 (en) REINFORCEMENT OF STRUCTURAL ELEMENTS BY INSERTING HIGH-STRENGTH PLATES
EP1882780A1 (en) Device for measuring the resistance of a micropile
EP1441076A1 (en) Injectable micropile
BE498717A (en)
KR100481149B1 (en) Concrete Filled Thin Tube Pile, CFTTP
JP2005139614A (en) Spiral support
BE546120A (en)
BE368065A (en)
EP3320147B1 (en) Method for constructing a foundation including a step of cutting-of
FR2894603A1 (en) Micropile e.g. foundation micropile, assembling stud for e.g. forming foundations on hard terrain, has anticorrosion coating and polytetrafluoroethylene film coating applied on stud, where diameter of stud is less than thirty millimeters
BE518438A (en)
BE522814A (en)
FR2502208A1 (en) Ground stabilisation and strengthening procedure - has grout injection rods acting as ground anchors forced into ground by vibrating percussion hammer
FR2534952A1 (en) METHOD FOR INSTALLING A PIEU IN THE SOIL, AND PIEU USED THEREIN
BE513698A (en)
BE379562A (en)
BE334406A (en)
BE569560A (en)