BE379562A - - Google Patents

Info

Publication number
BE379562A
BE379562A BE379562DA BE379562A BE 379562 A BE379562 A BE 379562A BE 379562D A BE379562D A BE 379562DA BE 379562 A BE379562 A BE 379562A
Authority
BE
Belgium
Prior art keywords
pipes
concrete
wall
sheep
ground
Prior art date
Application number
Other languages
French (fr)
Publication of BE379562A publication Critical patent/BE379562A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



  Fondations en béton. 



   La   présenta   invention est relative à un   citerne   de fondations avantageusement applicable à des murs de fondations, murs de quais , murs de soutainements, piles de ponts   etc...   



   Dans tous ces systèmes où il s'agit de réaliser des murs souterrains , on a dû jusqu'à présent recourir pour la réali- sation de ceux-ci ,à des travaux de   terrassement   importants nécessitant non seulement une main d'oeuvre considérable mais encore un temps généralement long 
Dans le but de   remédier   a cet inconvément,   l'invention   prévoit de réaliser un mar de fondation ou analogue constitué par la juxtaposition de pieux en béton disposés dans le sol et soudés intimement entre eux . 



   Le procédé pour l'exécution d'un tel   mur     consiste;   sui- vant l'invention à réaliser simultanément par compression de béton frais dans le sol plusieurs pieux juxtaposés 
Suivant l'invention on enfonce dans le sol une série de tuyaux disposés suivant l'axe du mur ou analogue à réaliser , on refoule ensuite la terre   perpendiculairement   à   l'axe   du mur au cours de l'enfoncement du tuyau , on releve ensuite par étapes plusieurs des tuyaux enfoncés et on dame au béton frais 

 <Desc/Clms Page number 2> 

 dans chacun des tuyaux en dessous de la. partie relevée      aprèschaque étape de levage . 



   La   compression,   latérale de la terre au cours de l'enfoncement des tuyaux ast suivant l'invention   obtenue   par un mouton   perforateur   taillé en biseau et guidé par rapport aux tuyaux de façon à ce que le biseau soit orienté suivant l'axe du mur à réaliser . 



   Dans le but d'éviter la rotation des tuyaux l'un par rapport à   l'autre ,   l'invention prévoit de les guider l'un par rapport à l'autre pendant l'enfoncement . Ce guidage est réalisé par des nervures rigidement réunies à chacun des tuyaux par exemple par   soudure ,   rivetage etc.. 



   Dans le cas où les fondations sont armées grâce à des armatures longitudinales , l'invention prévoit en outre de disposer des étriers horizontaux autour de celles-ci . La mise en place de ces étriers s'effectue en relevant le mouton dameur après chaque couche de damage et en disposant un étrier horizontal autour des arma- tures longitudinales , la descente du mouton damerur ayant pour effetde mettre ces étriers   automatiquement   à l'en- droit choisi . 



   Les dessins annexés indiquent à titre d'exemple non limitatif divers modes d'exécution de l'invention   .Celle-   ci s'étend aux diverses particularités   originales   Que comportent les dispositions représentées . 



   La   fig.l   est une vue schématique montrant la forma- tion du mur en cours d'exécution. 



   La fig.2 est une coupe suivant le plan A-A de la fig. 1. 



   La   fig.3   est une vue agrandie d'une portion de la 

 <Desc/Clms Page number 3> 

 fig.2 . 



   La fig.4 est une vue de la partie   inférieure   du tuyau inférieur muni du mouton perforateur 
La fig.5 est -une vue du. pilon dameur. 



   La fig.6 est relative à l'application de   l'invention   à la formation de piles de ponts .Le système de   fondation   suivant l'invention consiste à enfoncer en terre une série de tuyaux en acier tels que 2 maintenus l'un par rapport à l'autre par dos guides tels que 2a réalisés par des glissières en acier soudées à l'arc ou rivetées sur ces tuyaux .Un seul tuyau est enfoncé à la fois ayant sa base munie d'un mouton perforateur 3.Ce mouton perforateur est taillé en biseau de manière à ne pas comprimer le sol dans la direction correspondant à   l'axe   du mur à former. 



   Afin d'empêcher la rotation du mouton   perfora Leur   au cours da l'enfoncement , celui-ci est guidé par des nervures telles que 2b disposées   intérieurement   dans le tuyau inférieur 2k et   s'engageant   -dais des rainures appropriées telles que 2d réalisées par le mouton perforateur . 



     Etant   donné que las tuyaux ne peuvent tourner l'un par rapport à l'autre par suite des glissières de guidage 2a , il est aisé de se rendre compte qua de cette façon le biseau pourra facilement être   maintenu,   suivant l'axe du mur à former. 



   Ainsi que visible à la fig.3, les tuyaux sont normale- ment pourvus d'une glissière 2a pourvue de   rainures     telles   que 2d dans lesquelles s'engagent des   nervures   telles que   2f   appartenant à une applique 2m fixée sur ces tuyaux 
Les tuyaux destinés à constituer les angles du. mur peuvent être pourvus da quatre appliques   telles   que 2m dis- posées à angle droit .Le tuyau inférieur recevant le mouton 

 <Desc/Clms Page number 4> 

 perforateur peut être guidé par rapport au tuyau immédia- tement supérieur dans lequel il est engagé ,de façon analogue au guidage du mouton perforateur dans ce tuyau inférieur. 



   Le mouton perforateur enfoncé par coups successif donnés par exemple par un marteau à vapeur , s'enfonce dans le sol entrainant avec lui le tuyau qui lui sert de guide . Ce tuyau est muni à sa partie   inférieure   d'un. bourrelet rentrait 2f sur lequel s'appuie le mouton per- forateur . Dès que le tuyau est enfoncé per exemple à 2 ou 3 mètres de profondeur , on y joint un second et ainsi de suite suivant la profondeur de 1'  enfoncement   à réaliser. Quand une série de tuyaux voisins est battue à la profondeur voulue , on soulève l'un des tuyaux d'une hauteur déterminée par exemple un mètre et on y coule du béton que l'on pilonne fortement au moyen du pilon dame= 4 représenté à la fig.5.

   Ce pilon dameur est pourvu de trous tels que 4a servant au passage d'armatures   longitu-     dinales   telles que 5 (voir fig.l). 



   Lorsque le béton coulé dans le premier tuyau est pilonné , on soulève le second tuyau et on   répète   la même opération de damage . 



   Le béton damé rencontrant   d'une   part le tuyau voisin et d'autre part le béten du tuyau précédemment soulevé , il s'ensuit que le béton est   comprimé   dans les parois latérales que   forme   le terrain déjà comprimé par le mouton perforateur .

   Le béton étant empêphé d'entrer indéfiniment dans le sol et arrêté par le tuyau joignant, est comprimé contre le béton placé par le précédent tube d'où se réalise ainsi une soudure intime des deux bétons 
En continuant, progressivement le relevage des tuyaux 

 <Desc/Clms Page number 5> 

 et le damage du béton , on arrive à réaliser un mur formant un véritable monolithe 
Dans le cas où il est fait usage d'étrfers de renfor- cement tels que 6 , disposés horizontalement , ces étriers sont mis en place de la   .façon   suivante :

   après pilonnage d'une couche de béton correspondant à la distance entre deux de ces étriers , on relève la pilon dameur et l'on dispose en dessous de celui-ci et autour- des armatures longitudinales, un étrier qui descendra jusqu'à la couche de béton damé lors de la descente du pilon   dameur  De cette façon ces étriers sont automatiquement mis en place 
Le système de fondation suivant l'invention supprime les coffrages et les fouilles et permet de réaliser des   fondations   tout à fait étanches sans être sujettes à n'importe quel   genre   de glissement , 
Il est également possible suivant l'invention du venir raccorder à un mur déjà existant , d'autres murs latéraux par exemple dans le cas où il s'agit de réaliser des contre- forts . 



   Il est également possible de réaliser des caissons sans fond souterrains pour la construction des piles de ponts (voir fig.6) . Lorsque les murs réalisés par enfoncement de tuyaux sont arrivés à la même hauteur et affluant à l'endroit du fond de la rivière , on les recouvre   d'un   hourdis en béton armé ou d'une voûte sur laquelle la construction peut être   érigée .   L'intérieur des caissons peut même être rempli de sable damé sur lequel on peut construire . 



   REVENDICATIONS. 

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 



  Concrete foundations.



   The present invention relates to a foundation tank advantageously applicable to foundation walls, quay walls, retaining walls, bridge piers, etc.



   In all these systems where it is a question of making underground walls, it has until now been necessary to have recourse for the realization of these, to important earthworks requiring not only a considerable manpower but also a generally long time
In order to remedy this drawback, the invention provides for making a foundation or the like formed by the juxtaposition of concrete piles arranged in the ground and welded intimately together.



   The method for the execution of such a wall consists; according to the invention to be produced simultaneously by compressing fresh concrete in the ground, several juxtaposed piles
According to the invention, a series of pipes arranged along the axis of the wall or the like to be produced is driven into the ground, the earth is then driven back perpendicular to the axis of the wall during the sinking of the pipe, then raised by steps several of the pipes in place and we start with fresh concrete

 <Desc / Clms Page number 2>

 in each of the pipes below the. part raised after each lifting step.



   The lateral compression of the earth during the sinking of the pipes ast according to the invention obtained by a perforating hammer beveled and guided with respect to the pipes so that the bevel is oriented along the axis of the wall to achieve .



   In order to prevent the pipes from rotating with respect to each other, the invention provides for guiding them with respect to each other during the sinking. This guidance is produced by ribs rigidly joined to each of the pipes, for example by welding, riveting, etc.



   In the case where the foundations are reinforced by means of longitudinal reinforcements, the invention further provides for placing horizontal brackets around them. These stirrups are put in place by raising the tamper ram after each layer of tamping and by placing a horizontal stirrup around the longitudinal reinforcements, the descent of the ram ram having the effect of placing these stirrups automatically in the middle. chosen right.



   The appended drawings indicate by way of non-limiting example various embodiments of the invention. This extends to the various original features which include the arrangements shown.



   Fig. 1 is a schematic view showing the wall formation in progress.



   Fig.2 is a section on the plane A-A of fig. 1.



   Fig. 3 is an enlarged view of a portion of the

 <Desc / Clms Page number 3>

 fig. 2.



   Fig. 4 is a view of the lower part of the lower pipe fitted with the perforating hammer
Fig. 5 is a view of. tamper pestle.



   FIG. 6 relates to the application of the invention to the formation of bridge piers. The foundation system according to the invention consists in driving into the earth a series of steel pipes such as 2 held in relation to each other. to the other by back guides such as 2a made by steel slides welded to the arc or riveted on these pipes. A single pipe is driven in at a time having its base provided with a perforating sheep 3. This perforating sheep is beveled so as not to compress the soil in the direction corresponding to the axis of the wall to be formed.



   In order to prevent the rotation of the ram perforated Them during the sinking, it is guided by ribs such as 2b arranged internally in the lower pipe 2k and engaging -dais suitable grooves such as 2d made by the perforator sheep.



     Since the pipes cannot turn with respect to each other as a result of the guide rails 2a, it is easy to realize that in this way the bevel can easily be maintained, along the axis of the wall at form.



   As shown in fig. 3, the pipes are normally provided with a slide 2a provided with grooves such as 2d in which are engaged ribs such as 2f belonging to a bracket 2m fixed to these pipes.
The pipes intended to constitute the angles of the. wall can be fitted with four brackets such as 2m arranged at right angles. The lower pipe receiving the sheep

 <Desc / Clms Page number 4>

 perforator can be guided with respect to the immediately upper pipe in which it is engaged, in a manner analogous to the guiding of the perforator ram in this lower pipe.



   The hammer drill, driven in by successive blows given, for example, by a steam hammer, sinks into the ground, bringing with it the pipe which serves as a guide. This pipe is provided at its lower part with a. bead retracted 2f on which the perforator leans. As soon as the pipe is inserted per example at 2 or 3 meters deep, a second is added to it and so on depending on the depth of the depression to be made. When a series of neighboring pipes is beaten to the desired depth, one of the pipes is lifted by a determined height, for example one meter, and concrete is poured into it, which is strongly pounded by means of the pestle = 4 shown at fig. 5.

   This tamper ram is provided with holes such as 4a for the passage of longitudinal reinforcements such as 5 (see fig.l).



   When the concrete poured in the first pipe is pounded, the second pipe is lifted and the same tamping operation is repeated.



   The rammed concrete meeting on the one hand the neighboring pipe and on the other hand the concrete of the previously lifted pipe, it follows that the concrete is compressed in the side walls formed by the ground already compressed by the perforating ram.

   The concrete being prevented from entering the ground indefinitely and stopped by the joining pipe, is compressed against the concrete placed by the previous tube from which is thus carried out an intimate welding of the two concretes.
Continuing, gradually lifting the pipes

 <Desc / Clms Page number 5>

 and the tamping of the concrete, we manage to make a wall forming a real monolith
In the case where use is made of reinforcing irons such as 6, arranged horizontally, these brackets are put in place in the following way:

   after pounding a layer of concrete corresponding to the distance between two of these stirrups, the tamper pestle is raised and a stirrup is placed below it and around the longitudinal reinforcements, which will descend to the layer of rammed concrete during the descent of the tamper ram In this way these brackets are automatically put in place
The foundation system according to the invention eliminates formwork and excavations and makes it possible to make completely watertight foundations without being subject to any kind of sliding,
It is also possible according to the invention to come and connect to an already existing wall, other side walls for example in the case where it is a question of making buttresses.



   It is also possible to make bottomless underground caissons for the construction of bridge piers (see fig. 6). When the walls made by driving pipes have reached the same height and flowing towards the bottom of the river, they are covered with a reinforced concrete slab or with a vault on which the construction can be erected. The interior of the caissons can even be filled with tamped sand on which to build.



   CLAIMS.

** ATTENTION ** end of DESC field can contain start of CLMS **.


    

Claims (1)

1. Un mur de fondations ou analogues constitué par la juxtaposition de pieux en béton disposés dans le sol et soudés <Desc/Clms Page number 6> entre eux . 1. A foundation wall or the like formed by the juxtaposition of concrete piles placed in the ground and welded <Desc / Clms Page number 6> between them . 2. Procédé pour l'exécution de murs de fondations ou analogues consistant à réaliser simultanément par compression de 'béton frais dans le sol plusieurs pieux juxtaposés . 2. Method for the execution of foundation walls or the like consisting in simultaneously producing by compressing fresh concrete in the ground several juxtaposed piles. 3. Procédé pour l'exécution de murs de fondations ou analogues consistant à enfoncer dans le sol et suivant l'axe du mur à former une série de tuyaux voisins , à refouler la terre perpendiculairement à l'axe du mur pen- dant l'enfoncement , à relever ensuite par étapes plu- sieurs des tuyaux enfoncés et à damer du béton frais dans chacun des tuyaux et en dessous de la partie relevée après chaque étape de levage . 3. Method for the execution of foundation walls or the like consisting of driving into the ground and along the axis of the wall forming a series of neighboring pipes, pushing back the earth perpendicular to the axis of the wall during the period. sinking, then lifting in stages several of the sinking pipes and tamping fresh concrete in each of the pipes and below the raised part after each lifting step. 4. Procédé suivant la revendication 3 consistant à guider les tuya,ux entre eux pendant l'enfoncement . 4. The method of claim 3 consisting in guiding the pipes, ux between them during the depression. 5. Dispositif pour la réalisation du procédé sui- vant les revendications 3 et 4 caractérisé en ce que le mouton perforateur utilisé est taillé en biseau et est guidé par rapport aux tuyaux de façon à ce que le biseau soit orienté suivant l'axe du mur à, réaliser . 5. Device for carrying out the method according to claims 3 and 4, characterized in that the perforating hammer used is bevelled and is guided with respect to the pipes so that the bevel is oriented along the axis of the wall. to achieve . 6. Dispositif pour la réalisation du procédé sui- vant la revendication 4 caractérisé en ce que les tubes sont munis dé nervures de guidage réunies rigidement par exemple par soudure . 6. Device for carrying out the method according to claim 4, characterized in that the tubes are provided with guide ribs joined together rigidly, for example by welding. 7. Procédé pour la mise en place d'étriers dans un système de fonçage utilisant un pilon dameur coulissant autour d'armatures longitudinales , consistant à relever le mouton après chaque couche de damage et disposer un étrier horizontal autour des armatures longitudinales et <Desc/Clms Page number 7> en dessous du mouton relevé , la descente du mouton dameur ayant pour effet de mettre cet étrier automatiquement à l'endroit choisi . 7. Method for the installation of stirrups in a jacking system using a tamper ram sliding around longitudinal reinforcements, consisting in raising the sheep after each layer of tamping and placing a horizontal stirrup around the longitudinal reinforcements and <Desc / Clms Page number 7> below the raised sheep, the descent of the tamping sheep having the effect of placing this stirrup automatically in the chosen location. 8. Fondation en béton réalisée et mise;) en oeuvre au substance de la façon décrite ou comme représenté à titre d'exemple par les dessins annexés . 8. Concrete foundation made and implemented;) Substantially implemented as described or as shown by way of example by the accompanying drawings.
BE379562D BE379562A (en)

Publications (1)

Publication Number Publication Date
BE379562A true BE379562A (en)

Family

ID=49452

Family Applications (1)

Application Number Title Priority Date Filing Date
BE379562D BE379562A (en)

Country Status (1)

Country Link
BE (1) BE379562A (en)

Similar Documents

Publication Publication Date Title
EP0240493B1 (en) Method for compaction-trussing-injection or decompaction-draining and construction of linear works or planar works in grounds
EP0102340B1 (en) Method of making reinforced concrete constructions such as subways, road tunnels and the like; prefabricated concrete elements for making such constructions
CH642416A5 (en) METHOD OF CONSTRUCTING UNDERGROUND WORKS WITH VERTICAL WALLS, DEVICE FOR EXECUTING THE METHOD AND UNDERGROUND WORK.
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
JP6319935B2 (en) Tubing pile driving method
RU2319809C1 (en) Method to reinforce existent building and building structure foundation
BE379562A (en)
US6641333B2 (en) Method of forming enlarged pile heads
JPS61134425A (en) Method of forming foundation pile
JP4911242B2 (en) Reinforcement structure of existing gravity quay
JP6403300B1 (en) How to embed sheet pile
JP5238092B2 (en) Wall construction method and hollow pile used therefor
FR2888259A1 (en) INSTALLATION AND METHOD FOR CUTTING UNDERWATER STRUCTURES ENCLOSED IN THE BOTTOM OF THE SEA
JP2000240075A (en) Penetration type retaining wall
CH172996A (en) Process for the execution of concrete sheet piles molded in the ground and device for its implementation.
BE392784A (en)
BE1004735A5 (en) Process for implementation of columns based in advance in the field.
FR2532684A1 (en) Method for producing an underground construction.
FR2827319A1 (en) Construction procedure for cast concrete wall below ground level uses vertical tube as trench shutter, destroyed when wall section has set
JP4670625B2 (en) Reinforcement method of existing gravity quay
FI127280B (en) Method of establishing a column and foundation of a column
US806755A (en) Pile for piers or pier-casings.
KR20210082737A (en) Construction Method of Soil Retaining Wall
FI126683B (en) Method for establishing a train path pillar and foundation of a train track pillar
BE493440A (en)