BE1004735A5 - Process for implementation of columns based in advance in the field. - Google Patents

Process for implementation of columns based in advance in the field. Download PDF

Info

Publication number
BE1004735A5
BE1004735A5 BE9100389A BE9100389A BE1004735A5 BE 1004735 A5 BE1004735 A5 BE 1004735A5 BE 9100389 A BE9100389 A BE 9100389A BE 9100389 A BE9100389 A BE 9100389A BE 1004735 A5 BE1004735 A5 BE 1004735A5
Authority
BE
Belgium
Prior art keywords
concrete
column
steel fibers
implementation
loaded
Prior art date
Application number
BE9100389A
Other languages
French (fr)
Original Assignee
Le Clercq Pierre
Lamotte Serge
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Le Clercq Pierre, Lamotte Serge filed Critical Le Clercq Pierre
Priority to BE9100389A priority Critical patent/BE1004735A5/en
Priority to FR9205109A priority patent/FR2675829B3/en
Application granted granted Critical
Publication of BE1004735A5 publication Critical patent/BE1004735A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Abstract

L'invention concerne un procédé de foncation consistant dans la mise en place de colonnes posées dans des puits creusés dans le sol et anrées dans des socles en béton. Conformément à l'invention, un béton chargé de fibres d'acier est mis en oeuvre autour de la partie inférieure de la colonne pour reprendre les efforts très élevés transmis par la section réduite de la colonne à la section massibe du béton de fondation.The invention relates to a driving method consisting in the installation of columns laid in wells dug in the ground and anchored in concrete bases. According to the invention, a concrete loaded with steel fibers is used around the lower part of the column to take up the very high forces transmitted by the reduced section of the column to the mass section of the foundation concrete.

Description

       

   <Desc/Clms Page number 1> 
 



  DESCRIPTION Procédé de mise en oeuvre de colonnes fondées à l'avance dans le terrain 
La présente invention a pour objet un procédé de fondation qui permet de réaliser des fondations locales profondes en béton complétées à la partie supérieure par des colonnes préfabriquées, généralement en acier, qui constitueront les colonnes des sous-sols de l'ouvrage à construire sur ces fondations. 



   Le brevet belge   n 690.   843 décrit un procédé de construction simultanée des étages et des sous-sols d'un bâtiment construit sur de telles colonnes préfondées dans des puits creusés dans le sol. 



   Dans l'état actuel de cette technique, le béton qui entoure la partie inférieure de la colonne est renforcé par des armatures de frettage. 



   La mise en place de ces armatures est une opération longue et coûteuse. 



   La présente invention supprime cette armature de frettage qui est remplacée par la mise en oeuvre d'un béton chargé de fibres en acier de petit diamètre et de faible longueur. Ces fibres en acier vont fretter le béton en augmentant considérablement la résistance du béton à la traction et donc à l'éclatement sous l'effet des charges verticales transmises par la section réduite de la colonne à la masse du béton fretté. 



   Les figures 1 et 2 montrent la disposition correspondant à l'état actuel de la technique. La figure 1 est une coupe verticale dans le terrain. La figure 2 est une coupe horizontale. 

 <Desc/Clms Page number 2> 

 



   Depuis le niveau du sol 1, un puits 2 est excavé dans le terrain, à l'aide d'une machine adéquate, généralement sous boue de bentonite 3. 



   Une colonne 4 métallique ou en béton préfabriqué comporte des dispositifs d'adhérence 5 à sa partie inférieure. 



   Une armature de frettage 6 est fixée à la partie inférieure de la colonne 4 avant son introduction dans le puits 2. 



   Pour réaliser cette opération, la colonne 4 est suspendue verticalement par une grue au-dessus du puits 2 permettant de souder la partie supérieure de l'armature de frettage 6 à la partie inférieure'de la colonne. 



   La colonne 4 comporte une tête de colonne 7 qui est boulonnée à la partie supérieure de la colonne. 



   Cette tête de colonne est descendue sur un châssis de positionnement 8 posé au-dessus du puits. 



   La colonne 4 est ensuite réglée dans les trois directions à l'aide de vérins hydrauliques ou mécaniques fixés sur le châssis 8. 



   On introduit ensuite un ou deux tubes de bétonnage 9 comportant des éléments d'environ 3 mètres de long assemblés entre eux pour constituer un tube de bétonnage généralement de plusieurs dizaines de mètres de longueur. 



   Un entonnoir 10 est fixé à la partie supérieure de ce tube de bétonnage. 



   Du béton 11 est déversé dans l'entonnoir 10 et descend dans le fond du puits en refoulant la boue de bentonite 3 qui est récupérée. 



   Au fur et à mesure de ce bétonnage, les tubes de bétonnage sont remontés de manière à pénétrer dans la masse de béton frais de 2 m à 3 m environ. 



   Le bétonnage est ainsi effectué jusqu'au niveau 12 supérieur au niveau des armatures de frettage 6. 

 <Desc/Clms Page number 3> 

 



   La partie supérieure du puits est remplie ensuite d'un matériau non cohérent 13, généralement du gravier, pour s'opposer au flambage de la colonne métallique 4 lors de sa mise en charge. 



   Les figures 3 et 4 montrent le procédé de fondation faisant l'objet de l'invention. La figure 3 est une coupe verticale dans le terrain. La figure 4 est une coupe horizontale. 



   Depuis le niveau du sol 1, un puits 2 est excavé dans le terrain, à l'aide d'une machine adéquate, généralement sous boue de bentonite 3. 



   Une colonne 4 métallique ou en béton préfabriqué comporte des dispositifs d'adhérence 5 à sa partie inférieure. 



   Du béton normal 14 est mis en oeuvre sous boue de bentonite à l'aide d'un ou deux tubes de bétonnage 9 complété par un'entonnoir 10 en refoulant la boue de bentonite 3.. 



   Ce bétonnage est effectué jusqu'à un niveau 15 situé plus bas que le niveau inférieur de la colonne 4. 



   On mélange ensuite des fibres en acier au béton de manière appropriée pour s'assurer que la répartition de ces fibres se fait bien de façon homogène dans le béton. 



   Ce béton 16 chargé de fibres en acier est ensuite déversé dans le tube 9 au travers de l'entonnoir 10 de manière à atteindre un niveau supérieur 17 correspondant au niveau 12 de la figure 1. 



   La colonne 4 avec sa tête de positionnement 7 est suspendue verticalement à la grue et introduite verticalement en position correcte dans le béton frais 16 chargé de fibres d'acier. 



   Elle pénètre aisément dans le béton frais par suite de l'absence d'armatures de frettage qui, si elles étaient fixées à la colonne, empêcheraient la pénétration de la colonne dans le béton frais. 

 <Desc/Clms Page number 4> 

 



   La tête de positionnement 7 est posée exactement à l'emplacement prévu du châssis de positionnement 8 qui a été réglé à l'avance en fonction des coordonnées précises horizontales et en altitude de la colonne 4. 



   Après durcissement du béton, le matériau de remplissage non cohérent 13 est déversé dans la partie supérieure du puits 2. 



   Dans la présente invention on peut également placer la colonne 4 avant le bétonnage. 



   On peut également réaliser le béton 14 avec adjonction de fibres au même dosage que le béton 16 ou avec un dosage inférieur. 



   A titre d'exemple, un béton normal peut avoir la compositition suivante : - ciment HK40 : 350   kg/m3   - sable 0/5 : 840   kg/m   -. gravier : 930   kg/m3   
 EMI4.1 
 - eau : 200 kq/m3 3 2. 320 kg/rn 
Un béton chargé de fibres est identique au précédent sauf qu'il comporte en plus une charge de 20 à 45 kg en poids de fibre d'acier par m3 de béton et qu'on y ajoute un fluidifiant a raison d'environ 4 kg par m3 de béton. 



   Les fibres utilisées sont de type classique dans ce genre d'application.



   <Desc / Clms Page number 1>
 



  DESCRIPTION Method for implementing columns founded in advance in the field
The subject of the present invention is a foundation process which makes it possible to produce deep local foundations in concrete supplemented at the top by prefabricated columns, generally of steel, which will constitute the columns of the basements of the structure to be built on these foundations.



   Belgian Patent No. 690,843 describes a process for the simultaneous construction of the floors and basements of a building constructed on such prefabricated columns in wells dug in the ground.



   In the current state of this technique, the concrete which surrounds the lower part of the column is reinforced by hoop reinforcements.



   The installation of these frames is a long and expensive operation.



   The present invention eliminates this hooping reinforcement which is replaced by the use of concrete loaded with steel fibers of small diameter and short length. These steel fibers will hoop the concrete, considerably increasing the tensile strength of the concrete and therefore bursting under the effect of the vertical loads transmitted by the reduced section of the column to the mass of the hooped concrete.



   Figures 1 and 2 show the arrangement corresponding to the current state of the art. Figure 1 is a vertical section through the ground. Figure 2 is a horizontal section.

 <Desc / Clms Page number 2>

 



   From ground level 1, a well 2 is excavated in the ground, using a suitable machine, generally under bentonite mud 3.



   A metal or precast concrete column 4 has adhesion devices 5 at its lower part.



   A hooping reinforcement 6 is fixed to the lower part of the column 4 before its introduction into the well 2.



   To carry out this operation, the column 4 is suspended vertically by a crane above the well 2 making it possible to weld the upper part of the hooping frame 6 to the lower part of the column.



   Column 4 has a column head 7 which is bolted to the top of the column.



   This column head is lowered onto a positioning frame 8 placed above the well.



   Column 4 is then adjusted in three directions using hydraulic or mechanical jacks fixed to the chassis 8.



   One or two concreting tubes 9 are then introduced, comprising elements approximately 3 meters long assembled together to form a concreting tube generally of several tens of meters in length.



   A funnel 10 is fixed to the upper part of this concreting tube.



   Concrete 11 is poured into the funnel 10 and descends into the bottom of the well by pumping up the bentonite mud 3 which is recovered.



   As this concreting progresses, the concreting tubes are reassembled so as to penetrate the mass of fresh concrete from 2 m to 3 m approximately.



   Concreting is thus carried out up to level 12 higher than the level of the hooping reinforcements 6.

 <Desc / Clms Page number 3>

 



   The upper part of the well is then filled with a non-coherent material 13, generally gravel, to oppose the buckling of the metal column 4 when it is loaded.



   Figures 3 and 4 show the foundation process which is the subject of the invention. Figure 3 is a vertical section through the ground. Figure 4 is a horizontal section.



   From ground level 1, a well 2 is excavated in the ground, using a suitable machine, generally under bentonite mud 3.



   A metal or precast concrete column 4 has adhesion devices 5 at its lower part.



   Normal concrete 14 is used under bentonite mud using one or two concreting tubes 9 completed by a funnel 10 by pushing back the bentonite mud 3.



   This concreting is carried out up to a level 15 located lower than the lower level of column 4.



   Steel fibers are then mixed with the concrete appropriately to ensure that the distribution of these fibers takes place evenly in the concrete.



   This concrete 16 loaded with steel fibers is then poured into the tube 9 through the funnel 10 so as to reach a higher level 17 corresponding to the level 12 of FIG. 1.



   The column 4 with its positioning head 7 is suspended vertically from the crane and introduced vertically in the correct position into the fresh concrete 16 loaded with steel fibers.



   It easily penetrates into fresh concrete due to the absence of hooping reinforcements which, if they were fixed to the column, would prevent the column from penetrating into fresh concrete.

 <Desc / Clms Page number 4>

 



   The positioning head 7 is placed exactly at the intended location of the positioning frame 8 which has been adjusted in advance as a function of the precise horizontal and altitude coordinates of column 4.



   After the concrete has hardened, the non-coherent filling material 13 is poured into the upper part of the well 2.



   In the present invention, it is also possible to place column 4 before concreting.



   Concrete 14 can also be produced with the addition of fibers at the same dosage as concrete 16 or with a lower dosage.



   For example, normal concrete can have the following composition: - HK40 cement: 350 kg / m3 - 0/5 sand: 840 kg / m -. gravel: 930 kg / m3
 EMI4.1
 - water: 200 kq / m3 3 2. 320 kg / rn
A fiber-reinforced concrete is identical to the previous one except that it additionally contains a load of 20 to 45 kg by weight of steel fiber per m3 of concrete and that a plasticizer is added at the rate of approximately 4 kg per m3 of concrete.



   The fibers used are of conventional type in this kind of application.


    

Claims (6)

REVENDICATIONS 1. Procédé de fondation consistant dans la mise en place de colonnes posées dans des puits creusés dans le sol et ancrées dans des socles en béton, souvent sous boue de bentonite, caractérisé en ce que du béton chargé de fibres d'acier est mis en oeuvre autour de la partie inférieure de la colonne pour reprendre les efforts très élevés transmis par la section réduite de la colonne à la section massive du béton. CLAIMS 1. Foundation process consisting in the installation of columns placed in wells dug in the ground and anchored in concrete bases, often under bentonite mud, characterized in that concrete loaded with steel fibers is put in works around the lower part of the column to take up the very high forces transmitted by the reduced section of the column to the massive section of the concrete. 2. Procédé suivant la revendication 1, caractérisé en ce que la colonne est mise en place après la mise en oeuvre du béton chargé de fibres en acier.  2. Method according to claim 1, characterized in that the column is put in place after the implementation of the concrete loaded with steel fibers. 3. Procédé suivant la revendication 1, caractérisé en cé que la colonne est mise en place avant le bétonnage.  3. Method according to claim 1, characterized in that the column is put in place before concreting. 4. Procédé suivant l'une quelconque des revendications 1 à 3, caractérisé en ce que le béton de fibres peut avoir des dosages en fibres différents suivant la profondeur.  4. Method according to any one of claims 1 to 3, characterized in that the fiber concrete can have different fiber dosages depending on the depth. 5. Procédé suivant l'une quelconque des revendications 1 à 3, caractérisé en ce que la mise en oeuvre du béton comprend une première phase au cours de laquelle un béton normal est versé jusqu'à un niveau situé plus bas que le niveau inférieur de la colonne puis une deuxième phase au cours de laquelle un béton chargé de fibres en acier est versé de manière à atteindre un niveau de bétonnage classique.  5. Method according to any one of claims 1 to 3, characterized in that the implementation of the concrete comprises a first phase during which a normal concrete is poured to a level located lower than the lower level of the column then a second phase during which a concrete loaded with steel fibers is poured so as to reach a standard level of concreting. 6. Procédé suivant l'une quelconque des revendications 1 à 5 caractérisé en ce que la partie inférieure de la colonne comporte des dispositifs d'adhérence.  6. Method according to any one of claims 1 to 5 characterized in that the lower part of the column comprises adhesion devices.
BE9100389A 1991-04-26 1991-04-26 Process for implementation of columns based in advance in the field. BE1004735A5 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
BE9100389A BE1004735A5 (en) 1991-04-26 1991-04-26 Process for implementation of columns based in advance in the field.
FR9205109A FR2675829B3 (en) 1991-04-26 1992-04-24 METHOD OF IMPLEMENTING COLUMNS ADVANCED IN THE FIELD.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE9100389A BE1004735A5 (en) 1991-04-26 1991-04-26 Process for implementation of columns based in advance in the field.

Publications (1)

Publication Number Publication Date
BE1004735A5 true BE1004735A5 (en) 1993-01-19

Family

ID=3885464

Family Applications (1)

Application Number Title Priority Date Filing Date
BE9100389A BE1004735A5 (en) 1991-04-26 1991-04-26 Process for implementation of columns based in advance in the field.

Country Status (2)

Country Link
BE (1) BE1004735A5 (en)
FR (1) FR2675829B3 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116290059B (en) * 2023-01-04 2023-09-08 江苏海洋大学 Prefabricated ultra-high performance concrete spiral pile cap and construction process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE690843A (en) * 1965-12-07 1967-06-07
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base
DE3827703A1 (en) * 1988-08-16 1990-02-22 Bilfinger Berger Bau Supporting elements for forming foundation bodies

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE690843A (en) * 1965-12-07 1967-06-07
DE3416679A1 (en) * 1984-05-05 1985-11-14 Gkn Keller Gmbh, 6050 Offenbach Method and apparatus for producing foundations by embedding precast members, in particular pillars, in the end base
DE3827703A1 (en) * 1988-08-16 1990-02-22 Bilfinger Berger Bau Supporting elements for forming foundation bodies

Also Published As

Publication number Publication date
FR2675829A3 (en) 1992-10-30
FR2675829B3 (en) 1993-04-09

Similar Documents

Publication Publication Date Title
US4832535A (en) Process for compaction-reinforcement-grouting or for decompaction-drainage and for construction of linear works and plane works in the soils
CN108842791B (en) Detachable load pile anchor multistage supporting structure and construction method
CN112523215B (en) Multi-equipment efficient construction method for carrier pile
US2555359A (en) Pile structure and method of making same
US3385070A (en) Shell-less cast-in-place concrete pile
US7025537B2 (en) Subterranean structures and methods for constructing subterranean structures
CN210766754U (en) Recoverable prestressed anchorage cable stock supporting construction
CN111441343A (en) Mountain photovoltaic support micropore cast-in-place pile foundation system, construction method and application
CN114215090A (en) Construction method of raft and compression pile in closed space
BE1004735A5 (en) Process for implementation of columns based in advance in the field.
US6062770A (en) Method for underpinning buildings
CN112681291A (en) Novel pile foundation and construction method thereof
CN104131562A (en) Pile-forming construction equipment for composite foundation piles
CN111424651A (en) Backfill method and structure of ultra-deep large-diameter pile hole
CN107059872B (en) Inclined cable pile pulling method and inclined cable pile pulling system
US11293407B1 (en) Circular can-shape foundation and construction method for onshore wind turbines
CN110080314B (en) Method for reducing side friction resistance of pile foundation
CN212335996U (en) Resistance to compression resistance to plucking variable diameter steel reinforcement cage club-footed pile
CN113605924A (en) Combined vertical miniature steel flower pipe pile structure and construction method
CN214784152U (en) Embankment formula steel flower tubular pile foundation joist anchor beam anchor rope high retaining wall structure
JP2884273B2 (en) Construction method for high strength cast-in-place concrete piles
CN212896321U (en) Backfill structure of ultra-deep major diameter stake hole
CN111576396B (en) Anchor rod type manual hole digging pile and construction method thereof
CN217174737U (en) Expanded-hole precast pile suspension type rock-socketed composite pile structure
EP1609914A1 (en) Method and structure for ground improvement

Legal Events

Date Code Title Description
RE20 Patent expired

Owner name: *LE CLERCQ PIERRE

Effective date: 20110426

Owner name: *LAMOTTE SERGE

Effective date: 20110426