BE502297A - - Google Patents

Info

Publication number
BE502297A
BE502297A BE502297DA BE502297A BE 502297 A BE502297 A BE 502297A BE 502297D A BE502297D A BE 502297DA BE 502297 A BE502297 A BE 502297A
Authority
BE
Belgium
Prior art keywords
emi
concrete
slabs
column
load
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Publication of BE502297A publication Critical patent/BE502297A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor

Description

       

  PROCEDE POUR L'ERECTION DE BATIMENTS.

  
La présente invention se rapporte à un procédé pour l'érection

  
 <EMI ID=1.1> 

  
coffrage et on le réemploie pour d'autres constructions étages., ou analogues.  On connaît aussi déjà l'emploi de pièces terminées en béton pour la construc-

  
 <EMI ID=2.1> 

  
plus ou moins secondaires de la maisons par exemple des poutres porteuses pour les hourdis., des linteaux de portes et fenêtres qui sont introduites

  
 <EMI ID=3.1> 

  
Il est connu, aussi d'assembler des pièces de béton terminées à la manière des éléments d'une armature en acier.!) où les fers d'armature coopèrent directement les uns avec les autres et sont- accouplés directement au moyen de boulons., de pièces tubulaires et analogues. Le principe de cet=

  
 <EMI ID=4.1> 

  
du venta laisse d'ailleurs à désirer.

  
Suivant 1* invention, les pièces terminées en béton sont employées de telle façon que non seulement ils représentent les éléments porteurs de

  
 <EMI ID=5.1> 

  
en béton sont assemblées les unes aux autres de façon rigide aux noeuds, suivant le mode de construction du béton armé. La construction porteuse de tout- l'édifice comprend un squellette comportant des colonnes, qui sont superposées les unes aux autres , en outre 16 allant' de colonne à colonne à hauteur des noeuds des poutres porteuses qui seront désignées ci-après comme poutres de ceintures. Les colonnes et les poutres de ceintures en

  
 <EMI ID=6.1> 

  
coulée sur places de manière particulière. L'assemblage en beton armé aux

  
 <EMI ID=7.1> 

  
santo Les fers d'armature pénètrent librement dans un espace creux contenu à l'intérieur des colonnes, qui constituera le noeud ultérieur Cet espace creux dans la colonne reçoit un passage d'accès par une ouverture de remplissage et est garni de béton coulé sur le chantier. Les poutres de ceintures sont placées alors dans des évidements des têtes de colonnes

  
et arrivent avec leurs fers d'armature dans l'espace creux des noeuds

  
 <EMI ID=8.1> 

  
mêmes, et en fait il s'étend aussi bien dans la colonne inférieure que dans la colonne supérieure de sorte qu'une liaison intime des pièces de construc-

  
 <EMI ID=9.1> 

  
plissage 

  
Les poutres de ceintures sont établies à hauteur des noeuds

  
 <EMI ID=10.1> 

  
fermeture en une pièce embrassant les colonnes (couronne de maintien)  Ces poutres de ceintures reprennent la charge des hourdis comme des poutres porteuses de hourdis ou analogues. 

  
Le maintien ensemble des poutres de ceintures est donc réalisé aux noeuds d'articulation par les fers d'armature supérieurs dépassant la coulée se faisant au moins jusqu'au niveau supérieur des poutres de ceintures. 

  
 <EMI ID=11.1> 

  
bétons des avantages importants. 0 D'abord on utilise le bon marché de la construction en masse d'éléments de construction types faits en ateliers fixes, au lieu du travail de chantier. Dans la construction en béton armé terminée on économise le bois de coffrage et de soutènement. En outre on peut améliorer la qualité des matériaux de construction.-On obtient ainsi des dimensions plus favorables avec des poids plus bas des pièces terminées., ce qui se traduit par des économies en frais de transporta en ciment et en

  
 <EMI ID=12.1> 

  
vant l'invention donne un mode de construction rigide en utilisant des pièces de béton terminées, qui permet d'élever en pièces terminées en béton

  
 <EMI ID=13.1> 

  
Le squelette de béton fait de colonnes et d'une couronne de fermeture con-

  
 <EMI ID=14.1> 

  
truction à plusieurs étages, être soumis aux fortes poussées de parois qui se présentent habituellement... ce qui n'était pas possible avec le mode de

  
 <EMI ID=15.1> 

  
intérieur des colonnes.!) de sorte que l'étage qui vient justement d'être terminé peut servir d'ossature pour la_prochaine étape de construction.

  
 <EMI ID=16.1> 

  
 <EMI ID=17.1> 

  
trouvent en dessous L9érection du bâtiment avec l'aide de pièces terminées en béton suivant l'invention se fait de telle manière que l'on construit

  
 <EMI ID=18.1> 

  
étant alors coulés. Après cela le prochain étage est construit., de sorte que l'étage qui se trouve en dessous sert pour ainsi dire de fondation à la construction ultérieure. Les murs extérieurs et les cloisons intérieures consistent avantageusement en une combinaison de deux plaques dressées verticalement avec des espaces d'air et chaque fois un verrou de fermeture qui subdivise les divers espaces. Suivant l'invention, il est facile, lors de la construe-tion de la maison, de tenir compte des constructions en saillie, des balcons et analogues,9 pour orner la façade de la maisono Pour cela les éléments porteurs du hourdis en béton sont amenés en saillie de manière sim-

  
 <EMI ID=19.1> 

  
ment en pièces terminées en béton. On utilise pour cela des joues porteuses en béton sur lesquelles reposent les marches en'béton. Les joues porteuses en béton sont elles-mêmes maintenues par ce qu&#65533;on appelle les cadres de cage d&#65533;escalier en béton, ou analogues. 

  
Le procédé et la conformation des pièces terminées en béton suivant Pinvention sont représentées en plusieurs exemples sur le dessin.

  
- La figure 1 montre une vue d'ensemble schématique du squelet- <EMI ID=20.1>  une colonne porteuse principale et d'une colonne de paroi en élévation et en coupe-  <EMI ID=21.1>  avec encorbellement pour un balcon; ,  <EMI ID=22.1>  construction d'un escalier, et
- les figures 7 et 8 montrent en coupe longitudinale et en coupe transversale la conformation suivant l'invention de l'ancrage aux noeuds des colonnes et des poutres de ceintures. 

  
La colonne principale 1 en pièce de béton terminée présente une armature 2 qui dépasse.9 à l'extérieur au moins à 1-'extrémité terminale en

  
 <EMI ID=23.1> 

  
qui donnent lieu pour des colonnes superposées à un espace creux de noeud formé par leur ensemble et en fait les fers d'armature saillants 3 pénètrent dans l'espace creux 5 qui possède à la partie supérieure une ouverture de

  
 <EMI ID=24.1> 

  
dans les espaces creux des noeuds 4 et 5 (voir figure 7). 

  
La colonne principale 1 peut, pour le reste, en dehors des espaces creux 4 et 5 être de conformation massive. Mais on peut aussi la faire com-

  
 <EMI ID=25.1> 

  
éléments de conformation correspondante des plaques murales Suivant le but d'emploi des colonnes, par exemple comme colonnes de coin et analogues, la surface extérieure peut être réalisée lisse ou être pourvue d'une couche de carrelage 12. Les colonnes de paroi pour le cloisonnement intérieur se pré-

  
 <EMI ID=26.1> 

  
montés à des intervalles convenables.

  
La poutre de ceintures 7 qui vont de colonne à colonne à hauteur des noeuds, peuvent également être formées de simples poutres rectangulaires en béton avec des armatures dépassant aux deux bouts et reposent sur des

  
 <EMI ID=27.1> 

  
bellement correspondante 159 l'armature étant prolongée alors jusqu'à la partie en surplomb. La partie en surplomb 15 elle-même s'amincit en fonction des sollicitations. 

  
 <EMI ID=28.1> 

  
une joue porteuse pour recevoir des marches d'escaliers en pièces terminées  <EMI ID=29.1> 

  
tion de la fondation^, dont dépassent les fers de raccordement aux colonnes,,

  
on place d'abord les colonnes, et en fait elles sont plantées sur ces ferso

  
Ensuite on monte une autre colonne et dans les évidements 8 et 9 des têtes

  
et des pieds de colonnes,, on engage les poutres de ceinture. Par les deux

  
 <EMI ID=30.1> 

  
mature se trouvent simplement 1-'un à côté de 1-'autre dans 1? espace creux

  
de noeud. Ils'sont précédemment coudés convenablement*, comme cela se voit

  
 <EMI ID=31.1> 

  
pose dessus, et la ou les poutres de ceinture qui sont agencés d'un ou des

  
deux côtés sont réunis par coulée à la manière du béton armé, par le remplis-

  
 <EMI ID=32.1> 

  
prévoir simplement des ouvertures de passageo Dès que les noeuds d'un étage

  
 <EMI ID=33.1> 

  
à procéder à la suite de la construction et mettre en place les pièces de

  
garnissage des parois. 

  
En même temps que le montage des parois extérieures se poursuit

  
le montage des colonnes de parois avec les plaques correspondantes Dans les

  
 <EMI ID=34.1> 

  
re est rempli de béton coulée 

  
Pour les travaux de coulée on emploie avantageusement du ciment

  
 <EMI ID=35.1> 

  
tres de ceintures sont tellement durcies qu'on peut commencer le montage

  
des hourdis. Les éléments porteurs de hourdis sont placés. En soie on peut

  
employer un mode quelconque de construction des hourdis La construction

  
progresse d&#65533;étage en étage Le mode de construction du toit aussi peut être

  
 <EMI ID=36.1> 

  
liers et des marches. 

REVENDICATIONS. 

  
 <EMI ID=37.1>  ..-.étages avec emploi de pièces terminées en béton comme colonnes poutres et analogues., caractérisé en ce que les colonnes représentant les éléments de

  
 <EMI ID=38.1> 

  
ceintures) sont assemblés au noeud avec les pièces terminées en bétons suivant le mode de construction du béton armé.!) les colonnes et les poutres de

  
centures étant chaque fois munies de fers d'armatures dépassant qui pénètrent

  
librement dans un espace creux formant le noeuds qui se trouve à 1-*intérieur

  
des colonnes lequel espace est rempli de béton sur place par une ouverture

  
d'introduction qui se trouve à la partie supérieure de l'espace creuxo 

  
 <EMI ID=39.1> 



  PROCESS FOR THE ERECTION OF BUILDINGS.

  
The present invention relates to a method for erection

  
 <EMI ID = 1.1>

  
formwork and it is reused for other constructions floors., or the like. The use of finished concrete parts for the construction is also already known.

  
 <EMI ID = 2.1>

  
more or less secondary to the house, for example load-bearing beams for the slabs., door and window lintels which are introduced

  
 <EMI ID = 3.1>

  
It is also known to assemble finished concrete pieces in the manner of the elements of a steel reinforcement.!) Where the reinforcing bars cooperate directly with each other and are coupled directly by means of bolts. , tubular parts and the like. The principle of this =

  
 <EMI ID = 4.1>

  
Venta leaves much to be desired.

  
According to the invention, the finished concrete parts are used in such a way that they not only represent the supporting elements.

  
 <EMI ID = 5.1>

  
concrete are rigidly assembled to each other at the nodes, following the construction method of reinforced concrete. The supporting construction of the whole building comprises a skeleton comprising columns, which are superimposed on each other, in addition 16 going from column to column at the height of the nodes of the supporting beams which will be referred to hereinafter as belt beams. . The columns and beams of the belts in

  
 <EMI ID = 6.1>

  
casting in places in a particular way. The reinforced concrete assembly

  
 <EMI ID = 7.1>

  
santo The reinforcing bars penetrate freely into a hollow space contained inside the columns, which will constitute the subsequent node This hollow space in the column receives an access passage through a filling opening and is lined with concrete poured on the construction site. The belt beams are then placed in the recesses of the column heads

  
and arrive with their reinforcing bars in the hollow space of the nodes

  
 <EMI ID = 8.1>

  
same, and in fact it extends as well in the lower column as in the upper column so that an intimate connection of the parts of construction

  
 <EMI ID = 9.1>

  
pleating

  
The belt beams are set at the height of the nodes

  
 <EMI ID = 10.1>

  
closure in one piece embracing the columns (retaining crown) These belt beams take up the load of the slabs as load-bearing beams of slabs or the like.

  
The holding together of the belt beams is therefore achieved at the articulation nodes by the upper reinforcing bars projecting beyond the casting being done at least up to the upper level of the belt beams.

  
 <EMI ID = 11.1>

  
concrete important advantages. 0 First the cheapness of mass construction of typical construction elements made in fixed workshops is used instead of site work. In the finished reinforced concrete construction, shuttering and retaining timber are saved. In addition, the quality of the construction materials can be improved. -More favorable dimensions are thus obtained with lower weights of the finished parts. This results in savings in transport costs, cement and

  
 <EMI ID = 12.1>

  
Before the invention gives a rigid construction method using finished concrete pieces, which allows to raise in finished concrete pieces

  
 <EMI ID = 13.1>

  
The concrete skeleton made of columns and a closing crown con-

  
 <EMI ID = 14.1>

  
construction on several floors, be subjected to the strong thrusts of the walls which usually occur ... which was not possible with the

  
 <EMI ID = 15.1>

  
inside the columns.!) so that the just finished storey can be used as a framework for the next stage of construction.

  
 <EMI ID = 16.1>

  
 <EMI ID = 17.1>

  
are located below The erection of the building with the help of finished concrete parts according to the invention is done in such a way that

  
 <EMI ID = 18.1>

  
being then sunk. After that the next floor is built, so that the floor below serves as a foundation for the further construction. The exterior walls and interior partitions advantageously consist of a combination of two plates erected vertically with air spaces and each time a closing bolt which subdivides the various spaces. According to the invention, it is easy, during the construe-tion of the house, to take into account the protruding constructions, balconies and the like, 9 to adorn the facade of the houseo For this the supporting elements of the concrete slab are projecting in a simple way

  
 <EMI ID = 19.1>

  
ment in finished concrete parts. Concrete load-bearing cheeks are used for this on which the concrete steps rest. The concrete load-bearing cheeks are themselves held in place by so-called concrete stairwell frames, or the like.

  
The process and the shaping of the finished concrete parts according to the invention are shown in several examples in the drawing.

  
- Figure 1 shows a schematic overview of the skeleton- <EMI ID = 20.1> a main bearing column and a wall column in elevation and in section - <EMI ID = 21.1> with corbel for a balcony; , <EMI ID = 22.1> construction of a staircase, and
- Figures 7 and 8 show in longitudinal section and in cross section the conformation according to the invention of the anchoring at the nodes of the columns and the belt beams.

  
The main column 1 in a finished piece of concrete has a reinforcement 2 which protrudes. 9 on the outside at least at 1-'terminal end in

  
 <EMI ID = 23.1>

  
which give rise for columns superimposed to a hollow space of node formed by their whole and in fact the projecting reinforcing bars 3 penetrate into the hollow space 5 which has at the top an opening of

  
 <EMI ID = 24.1>

  
in the hollow spaces of nodes 4 and 5 (see figure 7).

  
The main column 1 can, for the rest, outside the hollow spaces 4 and 5, be of massive conformation. But we can also make it like

  
 <EMI ID = 25.1>

  
corresponding shaped elements of the wall plates Depending on the purpose of use of the columns, for example as corner columns and the like, the outer surface can be made smooth or be provided with a layer of tiling 12. The wall columns for partitioning interior is pre-

  
 <EMI ID = 26.1>

  
mounted at suitable intervals.

  
The beam of belts 7 which go from column to column at the height of the nodes, can also be formed of simple rectangular concrete beams with reinforcements projecting at both ends and rest on

  
 <EMI ID = 27.1>

  
beautifully corresponding 159 the reinforcement being then extended to the overhanging part. The overhanging part 15 itself thins as a function of the stresses.

  
 <EMI ID = 28.1>

  
a load-bearing cheek to receive the steps of stairs in finished pieces <EMI ID = 29.1>

  
tion of the foundation ^, from which the connecting bars to the columns protrude ,,

  
we first place the columns, and in fact they are planted on these irons

  
Then we mount another column and in the recesses 8 and 9 of the heads

  
and the feet of columns, we engage the girders of the belt. By both

  
 <EMI ID = 30.1>

  
mature are just 1-'one next to 1-'other in 1? hollow space

  
knot. They are previously properly bent *, as can be seen

  
 <EMI ID = 31.1>

  
placed on it, and the belt beam (s) which are arranged with one or more

  
two sides are joined by casting in the manner of reinforced concrete, by the filling

  
 <EMI ID = 32.1>

  
simply provide passage openings o As soon as the nodes of a floor

  
 <EMI ID = 33.1>

  
to proceed with the rest of the construction and put in place the

  
lining the walls.

  
At the same time as the assembly of the outer walls continues

  
the assembly of the wall columns with the corresponding plates In the

  
 <EMI ID = 34.1>

  
re is filled with poured concrete

  
Cement is advantageously used for casting work

  
 <EMI ID = 35.1>

  
many belts are so hard that we can start assembling

  
slabs. The supporting elements of slabs are placed. In silk we can

  
use any method of construction of the slabs Construction

  
progresses from floor to floor The roof construction method can also be

  
 <EMI ID = 36.1>

  
binders and steps.

CLAIMS.

  
 <EMI ID = 37.1> ..-. Floors with the use of finished concrete parts as columns, beams and the like., Characterized in that the columns representing the elements of

  
 <EMI ID = 38.1>

  
belts) are assembled at the knot with the finished concrete parts according to the reinforced concrete construction method.!) the columns and beams of

  
centures being each time provided with reinforcing irons protruding which penetrate

  
freely in a hollow space forming the knot which is 1- * inside

  
columns which space is filled with concrete in place through an opening

  
introduction which is located at the top of the hollow space

  
 <EMI ID = 39.1>


    

Claims (1)

<EMI ID=40.1> <EMI ID = 40.1> et forment à chaque étage, après coulée des noeuds une couronne de fermeture (chaînage) unitaire maintenant la construction., et reprennent la charge and form on each floor, after casting of the nodes a unitary closing ring (chaining) maintaining the construction., and take up the load des hourdis comme des éléments porteurs des hourdis,, etc... <EMI ID=41.1> slabs as supporting elements for slabs, etc ... <EMI ID = 41.1> que les poutres de ceintures, ainsi que les colonnes placées en dessous et au dessus pénètrent dans des évidements et en ce que les fers d'armature that the belt beams, as well as the columns placed below and above penetrate into recesses and that the reinforcing bars <EMI ID=42.1> <EMI ID = 42.1> que le noyau de la colonne présente une section transversale carrée avec un panier d'armatures correspondant et en ce que 1-'espace creux pour le noeud est de conformation cylindrique^ 1-'espace creux pouvant s'étendre de part en part aussi dans le sens de la longueur. that the core of the column has a square cross section with a corresponding reinforcement basket and in that the hollow space for the node is of cylindrical conformation ^ 1-the hollow space which can extend right through also into the length direction. <EMI ID=43.1> <EMI ID = 43.1> que les faces de la colonne sont profilées, par exemple présentent une ou plusieurs rainures longitudinales et en ce que les pièces de béton attenantes présentent une conformation superficielle correspondant aux rainures.. that the faces of the column are profiled, for example have one or more longitudinal grooves and in that the adjoining concrete pieces have a surface conformation corresponding to the grooves. <EMI ID=44.1> <EMI ID = 44.1> ractérisé en ce que les murs extérieurs et les cloisons intérieures portantes sont constituées-par la combinaison de deux plaques dressées verti- ractérisé in that the external walls and the internal load-bearing partitions are constituted by the combination of two upright plates vertically <EMI ID=45.1> <EMI ID = 45.1> subdivise les divers espaces creuxo subdivides the various hollow spaces <EMI ID=46.1> <EMI ID = 46.1> que balcons, pièces avancées et analogues sont conformés avec dès éléments porteurs de hourdis en béton en encorbellements. that balconies, overhanging rooms and the like are formed with supporting elements of concrete slabs in corbel. 10 Escalier ou analogue pour bâtiments suivant les revendications 10 Staircase or the like for buildings according to the claims <EMI ID=47.1> <EMI ID = 47.1> sur lesquelles reposent les marches d'escalier en béton, les supports de palier et les cadres de cage d'escalier servant comme éléments porteurs d&#65533;appui on which the concrete stair treads, landing brackets and stairwell frames serve as load-bearing supporting elements rest
BE502297D 1950-04-03 BE502297A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1034957X 1950-04-03

Publications (1)

Publication Number Publication Date
BE502297A true BE502297A (en)

Family

ID=7715862

Family Applications (1)

Application Number Title Priority Date Filing Date
BE502297D BE502297A (en) 1950-04-03

Country Status (3)

Country Link
BE (1) BE502297A (en)
FR (1) FR1034957A (en)
NL (1) NL160247C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660331A (en) * 1983-04-08 1987-04-28 Dahlen Gustav L Concrete-filled structural tube with cantilevers, particularly for balcony floors

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1340016A (en) * 1962-11-29 1963-10-11 Construction process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4660331A (en) * 1983-04-08 1987-04-28 Dahlen Gustav L Concrete-filled structural tube with cantilevers, particularly for balcony floors

Also Published As

Publication number Publication date
FR1034957A (en) 1953-08-10
NL160247C (en)

Similar Documents

Publication Publication Date Title
MX2008010390A (en) Unitized post tension block system for masonry structures.
KR102628752B1 (en) building system
WO2006122372A1 (en) Modular building frame
US10837167B2 (en) Construction of the prefabricated column and beam type
AU2016268484A1 (en) Construction of the prefabricated column and beam type
FR2950638A1 (en) Constructive system for building, has wall elements equipped with two concrete strips spaced and connected together by vertical spacers, where parts of strips blades external to spacers form walls of slide boxes of framework of building
KR100694493B1 (en) Downward construction method capable of using bracket support type temporary structure as working table
WO1985003966A1 (en) Structural elements and method for making the same
US1259698A (en) Reinforced concrete.
FR2488930A1 (en) Building construction using reinforced ring beams - has self wedging prefabricated elements forming lost shutters for floor and walls on each level
BE502297A (en)
JP7411749B2 (en) How to construct a concrete building
US20230203800A1 (en) A building system
JP2009024449A (en) Building internal staircase and method of constructing the same
JP6767552B1 (en) Wood fence straight pin construction method
BE1010092A6 (en) Method of manufacturing and assembly of an element construction concrete.
FR2564875A1 (en) Novel rapid method for constructing buildings, using pumped materials, by means of permanent multi-dimensional, self-shuttering reinforcements and of a scaffolding assembly having various uses
KR102376382B1 (en) Base structure for connection of column and beam
US2139907A (en) Building construction
FR2885624A1 (en) Base unit`s e.g. ground floor, lateral wall constructing method for prefabricated building, involves pouring and hardening cement material in molds delimited by panels, where material is penetrated into perforations and is solidified
FR2753468A1 (en) Prefabricated hurricane resistant house or building
BE511396A (en)
US947492A (en) Concrete construction.
RU2343251C1 (en) Wall
FR2529599A1 (en) Method for constructing buildings having several stories, especially dwelling houses joined together in so-called &#34;terraces&#34; and houses thus obtained.