AU2018420472B2 - Simulation test method for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity - Google Patents

Simulation test method for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity Download PDF

Info

Publication number
AU2018420472B2
AU2018420472B2 AU2018420472A AU2018420472A AU2018420472B2 AU 2018420472 B2 AU2018420472 B2 AU 2018420472B2 AU 2018420472 A AU2018420472 A AU 2018420472A AU 2018420472 A AU2018420472 A AU 2018420472A AU 2018420472 B2 AU2018420472 B2 AU 2018420472B2
Authority
AU
Australia
Prior art keywords
coal
gas
horizontal well
well
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
AU2018420472A
Other versions
AU2018420472A1 (en
Inventor
Liwen CAO
Huazhou HUANG
Jinlong JIA
Zicheng Li
Changjiang Liu
Huihu LIU
Shiqi Liu
Shuxun SANG
Haiwen Wang
Ran Wang
Hongjie XU
Xiaozhi ZHOU
Shuyun ZHU
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
China University of Petroleum East China
Anhui University of Science and Technology
Wuhan Institute of Technology
Xuzhou Olivine Geoscience and Geotech Co Ltd
Original Assignee
China University of Mining and Technology CUMT
China University of Petroleum East China
Anhui University of Science and Technology
Wuhan Institute of Technology
Xuzhou Olivine Geoscience and Geotech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT, China University of Petroleum East China, Anhui University of Science and Technology, Wuhan Institute of Technology, Xuzhou Olivine Geoscience and Geotech Co Ltd filed Critical China University of Mining and Technology CUMT
Publication of AU2018420472A1 publication Critical patent/AU2018420472A1/en
Application granted granted Critical
Publication of AU2018420472B2 publication Critical patent/AU2018420472B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/26Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers
    • E21B10/32Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers with expansible cutting tools
    • E21B10/325Drill bits with leading portion, i.e. drill bits with a pilot cutter; Drill bits for enlarging the borehole, e.g. reamers with expansible cutting tools the cutter being shifted by a spring mechanism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/28Enlarging drilled holes, e.g. by counterboring
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C45/00Methods of hydraulic mining; Hydraulic monitors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3457Performance evaluation by simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3466Performance evaluation by tracing or monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0058Kind of property studied
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/0202Control of the test
    • G01N2203/0208Specific programs of loading, e.g. incremental loading or pre-loading
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/025Geometry of the test
    • G01N2203/0256Triaxial, i.e. the forces being applied along three normal axes of the specimen

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Computer Hardware Design (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Medicinal Chemistry (AREA)
  • Food Science & Technology (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Geophysics (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

A simulation test method for gas extraction from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity. A coal series stratum structure reconstruction and similar material simulation subsystem (1) simulates the construction of a coal reservoir. A horizontal well drilling and reaming simulation subsystem (2) constructs a U-shaped well in which a horizontal well (1.11) adjoins a vertical well (1.12), and performs a reaming process on a horizontal section thereof. A horizontal well hole-collapse cavity-construction depressurization excitation simulation subsystem (3) performs pressure-pulse excitation and stress release on the horizontal well, and hydraulically displaces a coal-liquid-gas mixture such that the mixture is conveyed towards a vertical well section. A product lifting simulation subsystem (4) further pulverizes the coal and lifts the mixture. A gas-liquid-solid separation simulation subsystem (5) separates the coal, liquid and gas. A monitoring and control subsystem detects and controls the operation and the execution processes of equipment in real time. The method enables the simulation of completion of a large-diameter horizontal well in a loose tectonically-deformed coal reservoir, horizontal well cavity-construction stress release, effective lifting of mixed fluids, and efficient separation of produced mixtures, thereby providing guidance for efficient in-situ extraction of tectonically-deformed coal seam gas.

Description

SIMULATION TEST METHOD FOR GAS EXTRACTION FROM TECTONICALLY-DEFORMED COAL SEAM IN-SITU BY DEPRESSURIZING HORIZONTAL WELL CAVITY BACKGROUND
Field The present disclosure relates to the field of coal seam gas extraction, and relates to a simulation test method for coal seam gas extraction, and in particular, to a simulation test method for gas extraction from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity.
Description of Related Art Tectonically-deformed coal refers to coal whose coal seam is subject to tectonic stress and whose primary structure and construction are significantly destroyed due to cracking, resulting in fractures, wrinkles, polished surfaces, and other structural changes. The extensive development of tectonically-deformed coal and the richness of tectonically-deformed coal seam gas resources are distinguishing features of coal and coal seam gas resources in China. Tectonically-deformed coal resources account for a very high proportion of coal resources that have been discovered in China, and a proportion of a quantity of tectonically-deformed coal seam gas resources to a total quantity of coal seam gas resources in China is larger. Tectonically-deformed coal has prominent features such as rich gas, low permeability, and looseness, and most of tectonically-deformed coal are coal and gas outburst coal seams. Due to its hazards and difficulty in extraction and utilization, the tectonically-deformed coal is mostly discharged into the atmosphere in coal production. The efficient development of tectonically-deformed coal seam gas is of great significance for energy, safety and ecology.
A method based on the theory of hydrophobic depressurization, desorption, and gas recovery is a main method for the development of surface wells for in-situ coal seam gas at present. Due to the extremely low permeability of tectonically-deformed coal reservoirs and the poor effect of a reconstruction method such as hydraulic fracturing, the theory of hydrophobic depressurization, desorption, and gas recovery is not suitable for tectonically-deformed coal reservoirs. The results of exploration and development practice also show that all coal seam gas exploration and development technologies based on the theory of hydrophobic depressurization, desorption, and gas recovery, including SVR technologies (vertical well fracturing, U-shaped well fracturing, multi-branched horizontal well fracturing, horizontal well fracturing, and the like), ECBM technologies (C0 2-ECBM,
N 2-ECBM, and the like) and their combined technologies, fail to achieve efficient development of tectonically-deformed coal seam gas. Therefore, efficient exploration and development technologies and equipment for tectonically-deformed coal seam gas have become one of important technical bottlenecks restricting the rapid and scale development of the China's coal seam gas industry.
With the in-depth study of coal seam gas extraction technologies, the development theory of mining-induced pressure relief and permeability improvement for tectonically-deformed coal seam gas in a protected layer in a coal mine area provides a new idea for in-situ extraction of tectonically-deformed coal seam gas. However, in actual extraction application, due to the characteristics of tectonically-deformed coal, there are problems such as wellbore fractures caused by overburden deformation and difficulty in connecting coal to coal seam gas production. Therefore, the research and development of a technical theory and a simulation test method that are suitable for in-situ extraction of tectonically-deformed coal seam gas is an important theoretical and practical way to break the technical bottleneck of efficient development of surface wells for tectonically-deformed coal seam gas in China and realize the exploration and development of coal seam gas in China.
SUMMARY
Technical Problem
To resolve the foregoing problem, the present disclosure provides a simulation test method for gas extraction from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity, which enables the simulation of an extraction process including completion of a large-diameter horizontal well in a loose tectonically-deformed coal reservoir, horizontal well cavity-construction stress release, effective lifting of mixed fluids, and efficient separation of produced mixtures, thereby providing guidance for efficient and continuous in-situ extraction of tectonically-deformed coal seam gas.
Technical Solution
To achieve the foregoing objective, the present disclosure adopts the following technical solution: a simulation test method for gas extraction from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity. A coal series stratum structure reconstruction and similar material simulation subsystem 1 simulates an actual tectonically-deformed coal reservoir. A horizontal well drilling and reaming simulation subsystem constructs a U-shaped well in which a horizontal well adjoins a vertical well, and performs a reaming process on a horizontal section of the horizontal well. A horizontal well hole-collapse cavity-construction depressurization excitation simulation subsystem performs pressure-pulse excitation and stress release on the horizontal well, and hydraulically displaces a coal-liquid-gas mixture such that the mixture is conveyed towards the vertical well section along a depressurizing space. A product lifting simulation subsystem further pulverizes the coal and lifts a produced mixture to a wellhead of the vertical well. A gas-liquid-solid separation simulation subsystem separates the coal, liquid and gas. A monitoring and control subsystem detects and controls the operation and the execution processes of test equipment in real time, so as to collect, display, process, and analyze test data. Specific steps are as follows:
1) according to actual geological characteristics of the tectonically-deformed coal reservoir and based on a similarity principle, configuring similar simulation materials with corresponding physical and mechanical characteristics, disposing the similar simulation materials in a triaxial stress-tight stereo support, and arranging a stress sensor, a temperature sensor, and a strain gauge;
preheating the triaxial stress-tight stereo support in a constant temperature room to reach a test design temperature; and
starting an air compressor and a gas booster pump, injecting gas into a similar material coal seam, starting an X-direction servo loading system, a Y-direction servo loading system, and a Z-direction servo loading system, increasing a three-way confining pressure to a test design pressure for the triaxial stress-tight stereo support, checking the airtightness of the device; and if the airtightness meets a requirement, performing a next step; or if the airtightness does not meet a requirement, repeating this step;
2) arranging and connecting various devices, and using an existing drilling tool and processing technology to construct the vertical well sections and kick-off sections of the vertical well and the horizontal well to the similar material coal seam;
3) replacing the drilling tool with a reciprocating drilling and reaming tool and lowering the reciprocating drilling and reaming tool to the kick-off section of the horizontal well, performing three-stage reaming and large-diameter well completion on the similar material coal seam, and forming the horizontal well section that runs through the vertical well, to achieve open-hole cavity-constructing completion;
4) removing all drilling tools from the U-shaped well, and lowering an underground injection device and a copper strip connected to a high level end of a power supply to a starting point of the horizontal section of the horizontal well, lowering gas-liquid-coal mixture lifting and production devices, namely, a pulverization disturbance device and a hydraulic jet pump to the vertical well, and connecting the wellhead of the vertical well to a coal-liquid-gas separation device;
5) starting a plunger pump, injecting high-pressure high-speed fluids into the horizontal section of the horizontal well at a specified frequency, to cut and pulverize a coal rock and form a depressurization cavity, then accelerating water into high-velocity jet flows, to further pulverize and flush coal powder, and conveying a formed gas-liquid-coal mixture to the bottom of the vertical well;
6) starting the underground pulverization disturbance device and hydraulic jet pump, further pulverizing the coal powder that flows into the bottom of the vertical well, and then lifting the coal powder to the ground to enter the coal-liquid-gas separation device;
7) separating the mixture that enters the coal-liquid-gas separation device, and allowing coal seam gas, an excitation liquid, and coal powder that are separated to respectively enter a gas collection bottle, a wastewater collection and treatment device, and a coal powder storage device; and
8) starting a return water pump and transferring the treated excitation liquid to a water tank for recycling.
The monitoring and control simulation subsystem collects corresponding related data such as a time, pressure, a temperature, stress-strain, saturation, a voltage/current, sedimentation solid mass, produced liquid mass, and a produced gas flow while controlling the foregoing respective steps, and records the data as a data file.
Further, in step 3), three-stage reaming rates are respectively 150%, 200%, and 300%, and a diameter increase after reaming is 200% to 300%.
Further, in step 5), a depressurization excitation range after the pressure-pulse excitation and the stress release are performed on the horizontal well is > 15 times a coal thickness.
Further, in step 6), coal powder concentration after pulverization is < 50%.
Further, in step 5), the high-pressure high-speed fluids are mixed with a particular proportion of an abrasive.
Advantageous Effect
In the present disclosure, based on the similarity principle, the similar simulation materials with the corresponding physical and mechanical characteristics are configured for the tectonically-deformed coal reservoir; high-pressure gas is injected into the similar material coal seam by means of a high-pressure gas cylinder to simulate geological pressure inside the coal seam; and coal seam confining pressure is simulated through three-dimensional loading to the triaxial stress-tight stereo support, to provide a basis for real and accurate simulation of in-situ extraction of the tectonically-deformed coal seam gas as much as possible.
In the present disclosure, the drilling tool in the horizontal well drilling and reaming subsystem is designed into a three-stage drilling and reaming tool; and further reaming is implemented through two-way reciprocating drilling construction after drilling in the horizontal section of the horizontal well. In this way, the diameter of the horizontal section is greatly increased, the problem of wellbore collapse induced by overburden deformation resulting from the loose tectonically-deformed coal is avoided, and continuous in-situ extraction of tectonically-deformed coal seam gas is ensured.
After the open-hole cavity-constructing completion through reaming of the horizontal well, the high-pressure high-speed fluids are injected into the horizontal well cavity at a particular pulse frequency to further cut and pulverize the medium, to simulate the pressure-pulse excitation and the stress release on the horizontal well of the tectonically-deformed coal seam gas, and hydraulically displace the coal-liquid-gas mixture such that the mixture is conveyed towards the vertical well section along the depressurizing space. In this way, subsequent lifting is ensured.
The coal powder is further pulverized and the mixture is lifted towards the wellhead of the vertical well through cooperation of the underground pulverization disturbance device and hydraulic jet pump; and efficient coal-liquid-gas separation for the produced mixture and recycling of the excitation liquid are achieved through the coal-liquid-gas separation device.
Real-time detection and control of the operation conditions and the execution processes of the test equipment are implemented through three layers of network architecture and software including on-site workstations, monitoring instruments and sensors, and a central server control system, so as to collect, display, process, and analyze the test data. The coordinated operation of subsystems in the entire extraction system achieves simulation of efficient and continuous in-situ extraction of the tectonically-deformed coal seam gas.
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an overall principle diagram of a test system used in the present disclosure.
FIG. 2 is a schematic diagram of a coal series stratum structure reconstruction and similar material simulation subsystem in a test system used in the present disclosure.
FIG. 3 is a schematic structural diagram of a drilling tool in a test system used in the present disclosure.
FIG. 3(a) is a schematic state diagram of drilling of the drilling tool.
FIG. 3(b) is a schematic state diagram of reaming of the drilling tool.
FIG. 4 is a schematic diagram of a depressurization excitation simulation subsystem, a product lifting simulation subsystem, and a gas-liquid-solid separation simulation subsystem in a test system used in the present disclosure.
DETAILED DESCRIPTION The present disclosure is further described below with reference to the accompanying drawings (a left-right direction in the following description is the same as a left-right direction in FIG. 1).
FIG. 1 to FIG. 4 show a simulation test system used in the present disclosure, which includes a coal series stratum structure reconstruction and similar material simulation subsystem 1, a horizontal well drilling and reaming simulation subsystem 2, a horizontal well hole-collapse cavity-construction depressurization excitation simulation subsystem 3, a product lifting simulation subsystem 4, a gas-liquid-solid separation simulation subsystem 5, and a monitoring and control subsystem. The coal series stratum structure reconstruction and similar material simulation subsystem 1 includes a triaxial stress-tight stereo support 1.1, a similar material surrounding rock 1.3, a similar material coal seam 1.4, a high-pressure gas cylinder 1.2, and a gas booster pump 1.9. The triaxial stress-tight stereo support 1.1 is formed by connecting sixth movable steel pates to form a sealed hexahedron, in which the similar material surrounding rock 1.3 and the similar material coal seam 1.4 are disposed. Two layers of similar material surrounding rocks 1.3 are respectively located above and below the similar material coal seam 1.4 to simulate a coal seam top plate and a coal seam bottom plate. An X-direction servo loading system 1.7, a Y-direction servo loading system 1.6, and a Z-direction servo loading system 1.5 are respectively in a hydraulic connection with a corresponding load piston 1.10 outside the triaxial stress-tight stereo support 1.1, and are configured to increase confining pressure for the similar material coal seam 1.4. An inlet of the gas booster pump 1.9 is in communication with an outlet of the high-pressure gas cylinder 1.2, an outlet pipeline of the gas booster pump 1.9 is disposed in the similar material coal seam 1.4, and a power input port is in communication with an outlet of an air compressor 1.8, and is configured to increase gas pressure in a coal seam for the similar material coal seam 1.4. A sixth valve 1.13 is disposed at an outlet of the high-pressure gas cylinder 1.2, and is configured to control gas release in the high-pressure gas cylinder 1.2. A pressure sensor (not shown), a temperature sensor (not shown), and a strain gauge (not shown) are disposed in the similar material coal seam 1.4 near a lower end, and are configured to measure pressure, a temperature, and strain in the similar material coal seam 1.4 during a test.
The horizontal well drilling and reaming simulation subsystem includes a simulation drilling rig (not shown), a drill column string (not shown), a drilling tool, and a drilling fluid circulation system. A connection between the simulation drilling rig and the drill column string is the same as that in the prior art. The simulation drilling rig is configured to power the drilling tool. The drill column string is a string consisting of a Kelly bar, a drill pipe, a drill collar, and another underground tool, and is configured to install the drilling tool. The drilling tool is a reciprocating drilling and reaming tool. The drilling tool, from a connection end with the drill column string to a drilling end, includes a third-stage reaming and retraction assembly 2.3, a primary and secondary reaming and retraction assembly 2.2, and a pilot assembly 2.1 respectively. The third-stage reaming and retraction assembly 2.3 includes a plurality of expandable and closable blades 2.5 that is circumferentially disposed. The blade 2.5 is locked and positioned by a second locking mechanism 2.6. The primary and secondary reaming and retraction assembly 2.2 includes a plurality of extendable and retractable plunger drill bits 2.4 that is circumferentially disposed. The plunger drill bit 2.4 is locked and positioned by a first locking mechanism 2.7. A connection between a drilling fluid positive circulation system and another component is the same as that in the prior art. The drilling tool is provided with a drill bit positioning sensor and a drilling speed sensor, and is configured to monitor a drill bit position and a drilling speed. During drilling construction of a horizontal well 1.11, during running towards the direction of a vertical well 1.12, the plunger drill bit 2.4 is extended to start drilling, and during returning towards the direction of the simulation drilling rig, the blade 10.5 is opened. Because the diameter after the blade 10.5 is opened is greater than the diameter when the plunger drill bit 10.4 is extended, the horizontal well is reamed, thereby achieving three-stage reaming in rock mass at drillability classes I,II, III, IV and V. Three-stage reaming rates respectively reach 150%, 200%, 300%, and a diameter increase after reaming is 200% to 300%.
The horizontal well hole-collapse cavity-construction depressurization excitation simulation subsystem includes a plunger pump 3.1, a water tank 3.3, a power supply 3.10, a measurement device 3.11, and an underground injection device 3.12. An inlet of the plunger pump 3.1 is in communication with the water tank 3.3, and an outlet of the plunger pump 3.1 is in communication with the underground injection device 3.12. The underground injection device 3.12 is disposed at one side of a horizontal section of the horizontal well 1.11 near a wellhead. A high level end of the power supply 3.10 is connected to a copper strip disposed in the horizontal well 1.11, and a low level end of the power supply 3.10 is connected to a high level end of the measurement device 3.11. A low level end of the measurement device 3.11 is electrically connected to a copper strip on an outer surface of the triaxial stress-tight stereo support 1.1. An underground pressure sensor and a saturation probe are disposed in the horizontal well 1.11 near the vertical well 1.12. A first valve 3.9 and a first pressure sensor 3.8 are disposed at a liquid inlet pipeline at the wellhead of the horizontal well 1.11, and are configured to control injection of an excitation liquid into the horizontal well 1.11 and monitor injection pressure. After the open-hole cavity-constructing completion through reaming of the horizontal well 1.11, the plunger pump 3.1 injects high-pressure high-speed fluids to a horizontal well cavity at a particular pulse frequency, which are sprayed by the underground injection device 3.12 to the horizontal section of the horizontal well 1.11 to form a depressurization cavity 6, to implement pressure-pulse excitation and stress release on the horizontal well of tectonically-deformed coal seam gas; and a gas-liquid-coal mixture is displaced through the injected high-pressure high-speed fluids such that the mixture is conveyed towards the vertical well 1.12 along a depressurizing space and then produced. A depressurization excitation range (a stress release area width/a coal thickness) after the pressure-pulse excitation and the stress release are performed on the horizontal well is > 15.
During depressurization excitation, the measurement device 3.11 monitors an underground voltage field and current field, and the underground pressure sensor and the saturation probe measure underground pressure and saturation.
The product lifting simulation subsystem includes a pulverization disturbance device 4.1 and a hydraulic jet pump 4.2. The hydraulic jet pump 4.2 is a wide-flow jet pump, is disposed in the vertical well 1.12 near the bottom of the well, and is configured to lift the gas-liquid-coal mixture to the wellhead. The pulverization disturbance device 4.1 is disposed at the bottom of the vertical well 1.12 and at a joint between the depressurization cavity 6 and the vertical well 1.12 for pulverizing coal powder at the bottom of the well, so that the coal powder can be more easily lifted by the hydraulic jet pump 4.2 to the wellhead of the vertical well 1.12. In this way, fluids with coal powder concentration < 50% are efficiently produced.
The gas-liquid-solid separation simulation subsystem includes a coal-liquid-gas separation device 5.4, a wastewater collection and treatment device 5.6, a coal powder storage device 5.8, and a gas collection bottle 5.10. An inlet of the coal-liquid-gas separation device 5.4 is in communication with a wellhead pipeline of the vertical well 1.12, and three outlets of the coal-liquid-gas separation device 5.4 are in communication with the wastewater collection and treatment device 5.6, the coal powder storage device 5.8, and the gas collection bottle 5.10 respectively. A second valve 5.2, a coal-water-gas component sensor 5.1, and a second pressure sensor 5.3 are disposed on the wellhead pipeline of the vertical well 1.12, and are configured to control discharge of the product in the vertical well, and detect components and pressure of the discharged product respectively. The subsystem can achieve gas-liquid-coal mixture pre-treating, gas separation, liquid-coal separation, coal-gas collection, excitation liquid (or water) purification and recycling, with gas separation efficiency of above 90% to %, excitation liquid separation and collection efficiency of above 80% to 90%, and a coal powder collection capability of above 98%.
The monitoring and control subsystem includes three layers of network architecture and software including on-site workstations, monitoring instruments and sensors, and a central server control system. Based on a high-precision sensor technology, through construction of the three layers of network architecture including the sensors, the on-site workstations, and the central server control system, and application of a database technology and a filtering algorithm, real-time storage and high-precision processing of mass data are implemented; an intelligent algorithm is used to implement closed loop control of physical parameters of a test platform; and configuration analysis software and an Internet of Things perception technology are applied, to form a data acquisition and monitoring system that is "accurate, visual, interactive, fast, and intelligent" to detect and control the operation conditions and the execution processes of the test system in real time, so as to collect, display, process, and analyze engineering data.
As shown in FIG. 1 and FIG. 4, the horizontal well hole-collapse cavity-construction depressurization excitation simulation subsystem further includes an abrasive tank 3.5 and a mixing chamber 3.7. An outlet of the abrasive tank 3.5 is in communication with an outlet of the plunger pump 3.1 and the mixing chamber 3.7. An outlet of the mixing chamber 3.7 is in communication with the underground injection device 3.12. The addition of a particular proportion of an abrasive to the excitation liquid improves the capability of the excitation liquid to cut a coal rock, thereby improving extraction efficiency. A stop valve 3.5 is disposed at the outlet of the abrasive tank 3.5, and is configured to control abrasive input to the mixing chamber 3.7. A branch in communication with the water tank 3.3 is disposed on an outlet pipeline of the plunger pump 3.1, and a pressure regulating valve 3.4 is disposed on the branch, and is configured to control pressure of the excitation liquid.
As shown in FIG. 1, FIG. 3(a), and FIG. 3(b), the blade 2.5 on the drilling tool is rotated and opened towards the direction of the wellhead of the horizontal well. A drilling fluid outlet 2.8 is disposed on the right of the blade 2.5, and gradually inclines towards the direction of the blade 2.5 when extending towards the outer circumference of the drilling tool from an inner cavity of the drilling tool. During drilling, drilling fluids can achieve cooling and auxiliary cutting functions like conventional drilling fluids, and can also provide sufficient support for the expansion of the blade 2.5, to reduce rigid deformation of a connecting member with the blade 2.5, and prolong a service life of the device.
As shown in FIG. 1 and FIG. 4, the simulation test system further includes a return water pump 5.11. An inlet of the return water pump 5.11 is in communication with the wastewater collection and treatment device 5.6, and an outlet of the return water pump 5.11 is in communication with the water tank 3.3. Separated excitation liquid is treated and then enters the water tank 3.3 for recycling, thereby ensuring continuity of the test and saving resources.
A filter 3.2 is connected between the plunger pump 3.1 and the water tank 3.3, and is configured to filter out impurities in water that flows from the water tank 3.3 into the plunger pump 3.1, to prevent impurities in recycling water from damaging the plunger pump 3.1.
The strain gauge is preferably a distributed optical fiber measurement instrument that can be longitudinally distributed along the similar material coal seam 1.4, so that measured strain data is more accurate.
A simulation test method for gas extraction from a tectonically-deformed coal seam in-situ by depressurizing a horizontal well cavity includes the following steps:
1) according to actual geological characteristics of a tectonically-deformed coal reservoir and based on a similarity principle, configuring similar simulation materials with corresponding physical and mechanical characteristics, disposing the similar simulation materials in a triaxial stress-tight stereo support 1.1, and arranging a stress sensor, a temperature sensor, and a strain gauge;
preheating the triaxial stress-tight stereo support 1.1 in a constant temperature room to reach a test design temperature; and
opening a sixth valve 1.13, starting an air compressor 1.8 and a gas booster pump 1.9, injecting gas into a similar material coal seam 1.4, starting an X-direction servo loading system, a Y-direction servo loading system, and a Z-direction servo loading system, increasing a confining pressure to a test design pressure for the triaxial stress-tight stereo support 1.1, checking the airtightness of the triaxial stress-tight stereo support 1.1; and if the airtightness meets a requirement, performing a next step; or if the airtightness does not meet a requirement, repeating this step;
2) arranging and connecting various devices, and using an existing drilling tool and processing technology to construct the vertical well sections and kick-off sections of the vertical well 1.12 and a horizontal well 1.11 to the similar material coal seam 1.4, where a drilling fluid circulation system provides drilling fluids for the underground during construction;
3) replacing the drilling tool with a reciprocating drilling and reaming tool and lowering the reciprocating drilling and reaming tool to the kick-off section of the horizontal well, performing three-stage reaming and large-diameter well completion on the similar material coal seam 1.4, and forming a horizontal well section that runs through the vertical well 1.12 (forming a U-shaped well in which the horizontal well adjoins the vertical well), to achieve open-hole cavity-constructing completion, where the drilling fluid circulation system provides the drilling fluids for the underground during construction;
4) removing all drilling tools from the U-shaped well, and lowering an underground injection device 3.12 and a copper strip connected to a high level end of a power supply 3.10 to a starting point of the horizontal section of the horizontal well 1.11, lowering gas-liquid-coal mixture lifting and production devices, namely, a pulverization disturbance device 4.1 and a hydraulic jet pump 4.2 to the vertical well 1.12, and connecting a wellhead of the vertical well 1.12 to a coal-liquid-gas separation device 5.4;
5) opening a first valve 3.9, starting a plunger pump 3.1, injecting high-pressure high-speed fluids into the horizontal section of the horizontal well 1.11 at a specified frequency, to cut and pulverize a coal rock and implement pressure-pulse excitation and stress release on the horizontal section of the horizontal well 1.11 to form a depressurization cavity 6, then accelerating water into high-velocity jet flows, to further pulverize and flush coal powder, and conveying a formed gas-liquid-coal mixture to the bottom of the vertical well 1.12, where during the pressure-pulse excitation and the stress release on the horizontal section of the horizontal well 1.11, a particular proportion of an abrasive may be mixed in the excitation liquid to improve the capability of the excitation liquid to cut a coal rock, thereby improving extraction efficiency;
6) opening a second valve 5.2 and a fifth valve 5.9, starting the underground pulverization disturbance device 4.1 and hydraulic jet pump 4.2, further pulverizing the coal powder that flows into the bottom of the vertical well 1.12, and then lifting the coal powder to the ground to enter the coal-liquid-gas separation device 5.4;
7) separating the mixture that enters the coal-liquid-gas separation device 5.4, and allowing coal seam gas, an excitation liquid, and coal powder that are separated to respectively enter a gas collection bottle 5.10, a wastewater collection and treatment device 5.6, and a coal powder storage device; and
8) starting a return water pump 5.11 and transferring the treated excitation liquid to a water tank 3.3 for recycling.
The monitoring and control simulation subsystem collects corresponding related data such as a time, pressure, a temperature, stress-strain, saturation, a voltage/current, sedimentation solid mass, produced liquid mass, and a produced gas flow while controlling the foregoing respective steps, and records the data as a data file.
Throughout the specification and the claims that follow, unless the context requires otherwise, the words "comprise" and "include" and variations such as "comprising" and "including" will be understood to imply the inclusion of a stated integer or group of integers, but not the exclusion of any other integer or group of integers.
The reference to any prior art in this specification is not, and should not be taken as, an acknowledgement of any form of suggestion that such prior art forms part of the common general knowledge.
It will be appreciated by those skilled in the art that the disclosure is not restricted in its use to the particular application described. Neither is the present disclosure restricted in its preferred embodiment with regard to the particular elements and/or features described or depicted herein. It will be appreciated that the disclosure is not limited to the embodiment or embodiments disclosed, but is capable of numerous rearrangements, modifications and substitutions without departing from the scope of the disclosure as set forth and defined by the following claims.

Claims (5)

CLAIMS What is claimed is:
1. A simulation test method for gas extraction from a tectonically-deformed coal seam in-situ
by depressurizing a horizontal well cavity, wherein a coal series stratum structure
reconstruction and similar material simulation subsystem simulates an actual
tectonically-deformed coal reservoir; a horizontal well drilling and reaming simulation
subsystem constructs a U-shaped well in which a horizontal well adjoins a vertical well, and
performs a reaming process on a horizontal section of the horizontal well; a horizontal well
hole-collapse cavity-construction depressurization excitation simulation subsystem performs
pressure-pulse excitation and stress release on the horizontal well, and hydraulically displaces
a coal-liquid-gas mixture such that the mixture is conveyed towards a vertical well section
along a depressurizing space; a product lifting simulation subsystem further pulverizes the
coal and lifts a produced mixture to a wellhead of the vertical well; a gas-liquid-solid
separation simulation subsystem separates the coal, liquid and gas; and a monitoring and
control subsystem detects and controls the operation and the execution processes of test
equipment in real time, so as to collect, display, process, and analyze test data, wherein
specific steps are as follows:
1) according to actual geological characteristics of the tectonically-deformed coal reservoir
and based on a similarity principle, configuring similar simulation materials with
corresponding physical and mechanical characteristics, disposing the similar simulation
materials in a triaxial stress-tight stereo support, and arranging a stress sensor, a temperature
sensor, and a strain gauge;
preheating the triaxial stress-tight stereo support in a constant temperature room to reach a test
design temperature; and
starting an air compressor and a gas booster pump, injecting gas into a similar material coal
seam, starting an X-direction servo loading system, a Y-direction servo loading system, and a
Z-direction servo loading system, increasing a three-way confining pressure to a test design
pressure for the triaxial stress-tight stereo support, checking the airtightness of the triaxial stress-tight stereo support; and if the airtightness meets a requirement, performing a next step; or if the airtightness does not meet a requirement, repeating this step;
2) arranging and connecting various devices, and using an existing drilling tool and
processing technology to construct the vertical well sections and kick-off sections of the
vertical well and the horizontal well to the similar material coal seam;
3) replacing the drilling tool with a reciprocating drilling and reaming tool and lowering the
reciprocating drilling and reaming tool to the kick-off section of the horizontal well,
performing three-stage reaming and large-diameter well completion on the similar material
coal seam, and forming a horizontal well section that runs through the vertical well, to
achieve open-hole cavity-constructing completion;
4) removing all drilling tools from the U-shaped well, and lowering an underground
injection device and a copper strip connected to a high level end of a power supply to a
starting point of the horizontal section of the horizontal well, lowering gas-liquid-coal mixture
lifting and production devices, namely, a pulverization disturbance device and a hydraulic jet
pump to the vertical well, and connecting the wellhead of the vertical well to a coal-liquid-gas
separation device;
) starting a plunger pump, injecting high-pressure high-speed fluids into the horizontal
section of the horizontal well at a specified frequency, to cut and pulverize a coal rock and
form a depressurization cavity, then accelerating water into high-velocity jet flows, to further
pulverize and flush coal powder, and conveying a formed gas-liquid-coal mixture to the
bottom of the vertical well;
6) starting the underground pulverization disturbance device and hydraulic jet pump, further
pulverizing the coal powder that flows into the bottom of the vertical well, and then lifting the
coal powder to the ground to enter the coal-liquid-gas separation device;
7) separating the mixture that enters the coal-liquid-gas separation device, and allowing coal
seam gas, an excitation liquid, and coal powder that are separated to respectively enter a gas
collection bottle, a wastewater collection and treatment device, and a coal powder storage
device; and
8) starting a return water pump and transferring the treated excitation liquid to a water tank
for recycling, wherein
the monitoring and control simulation subsystem collects corresponding related data such as a
time, pressure, a temperature, stress-strain, saturation, a voltage/current, sedimentation solid
mass, produced liquid mass, and a produced gas flow while controlling the foregoing
respective steps, and records the data as a data file.
2. The simulation test method for gas extraction from a tectonically-deformed coal seam
in-situ by depressurizing a horizontal well cavity according to claim 1, wherein in step 3),
three-stage reaming rates are respectively 150%, 200%, and 300%, and a diameter increase
after reaming is 200% to 300%.
3. The simulation test method for gas extraction from a tectonically-deformed coal seam
in-situ by depressurizing a horizontal well cavity according to claim 1 or 2, wherein in step 5),
a depressurization excitation range after the pressure-pulse excitation and the stress release
are performed on the horizontal well is > 15.
4. The simulation test method for gas extraction from a tectonically-deformed coal seam
in-situ by depressurizing a horizontal well cavity according to claim 3, wherein in step 6),
coal powder concentration after pulverization is < 50%.
5. The simulation test method for gas extraction from a tectonically-deformed coal seam
in-situ by depressurizing a horizontal well cavity according to claim 3, wherein in step 5), the
high-pressure high-speed fluids are mixed with a particular proportion of an abrasive.
AU2018420472A 2018-04-28 2018-11-12 Simulation test method for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity Active AU2018420472B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201810404471.7A CN108868740B (en) 2018-04-28 2018-04-28 Cave pressure relief mining simulation test method for tectonic coal in-situ coal bed gas horizontal well
CN201810404471.7 2018-04-28
PCT/CN2018/114946 WO2019205577A1 (en) 2018-04-28 2018-11-12 Simulation test system for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity

Publications (2)

Publication Number Publication Date
AU2018420472A1 AU2018420472A1 (en) 2020-04-23
AU2018420472B2 true AU2018420472B2 (en) 2021-04-01

Family

ID=64326829

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2018420472A Active AU2018420472B2 (en) 2018-04-28 2018-11-12 Simulation test method for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity

Country Status (4)

Country Link
US (1) US10995572B2 (en)
CN (1) CN108868740B (en)
AU (1) AU2018420472B2 (en)
WO (1) WO2019205577A1 (en)

Families Citing this family (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798630B (en) * 2018-04-28 2021-09-28 中国矿业大学 Cave pressure relief mining simulation test system for tectonic coal in-situ coal bed gas horizontal well
CN110823707A (en) * 2019-11-18 2020-02-21 中国矿业大学 Sample true triaxial sealing loading device and method for pressure-relief coal bed gas development simulation
CN110894154A (en) * 2019-12-03 2020-03-20 中国矿业大学 Surrounding rock similar material for pressure-relief coal bed gas development simulation and preparation method thereof
CN111307541B (en) * 2019-12-19 2020-09-25 磐安叶层煤矿设备有限公司 Coal bed drilling gas classification collection device
CN111155934A (en) * 2020-01-16 2020-05-15 龙元建设集团股份有限公司 Gravel layer three-shaft stirrer drill bit and construction method
CN111472729B (en) * 2020-03-27 2021-07-16 中国科学院广州能源研究所 Evaluation and test method for natural gas hydrate cave well completion
CN111830231B (en) * 2020-07-21 2023-07-21 安徽理工大学 Efficient separation, recovery treatment and cyclic utilization test method for coal-water gas mixture
CN111812295B (en) * 2020-07-21 2023-07-21 安徽理工大学 Efficient separation, recovery treatment and cyclic utilization test device for coal-water gas mixture
CN111852364B (en) * 2020-07-29 2022-03-01 中国石油化工股份有限公司 Cyclone separation and mechanical crushing type coal dust cleaning system and working method thereof
CN112285277B (en) * 2020-09-16 2023-03-31 煤炭科学技术研究院有限公司 Coal and gas outburst coal body tracing and cave shape development testing method
CN112326919A (en) * 2020-09-18 2021-02-05 安徽理工大学 Coal and gas outburst simulation test device and test method
CN112943346B (en) * 2021-01-29 2023-03-21 河南理工大学 Three-dimensional gas extraction mechanism for complex rock stratum
CN112946204B (en) * 2021-03-17 2023-03-14 重庆大学 Integrated gas pumping and injecting system for simulation coal and gas outburst experiment
CN113030430B (en) * 2021-03-17 2023-02-17 中煤科工集团重庆研究院有限公司 Method for measuring and calculating concentration of free coal bed gas in reservoir of mining stable area of coal mine
CN113110190A (en) * 2021-04-22 2021-07-13 中煤科工集团沈阳研究院有限公司 Intelligent monitoring system and monitoring method for gas extraction pump station
CN113216934B (en) * 2021-05-17 2022-05-03 吕梁学院 Coal seam gas content measuring device of directional drilling machine
CN113323663B (en) * 2021-06-03 2022-05-31 安徽理工大学 Associated resource is exploitation intelligent experimental apparatus in coordination altogether
CN113358846B (en) * 2021-06-11 2023-03-28 中煤科工集团重庆研究院有限公司 Gas-supplementing coal and gas outburst dynamic effect simulation experiment device and method
CN113417628A (en) * 2021-07-21 2021-09-21 上海市城市建设设计研究总院(集团)有限公司 Continuous detection and release method based on drilling machine shallow harmful gas detection device
CN113567244B (en) * 2021-07-23 2023-11-10 山东交通学院 Positive fault physical simulation test device and method for coal and gas outburst simulation test
CN113818841B (en) * 2021-09-22 2023-04-18 华北科技学院(中国煤矿安全技术培训中心) Triaxial loaded gas drainage simulation platform
CN114837621B (en) * 2022-03-28 2023-06-23 贵州省油气勘查开发工程研究院 Deep coal bed gas abandoned well and long stop well production method
CN114740182B (en) * 2022-06-13 2022-09-23 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Physical model test system and method for simulating stratum collapse caused by deep well pumping
CN114994287B (en) * 2022-08-04 2023-04-18 中国矿业大学(北京) Test method of three-dimensional physical model coal bed automatic mining device
CN117054250B (en) * 2023-10-11 2023-12-15 太原理工大学 Electric pulse liquid injection fracturing coal rock electric heat fluid-solid coupling test system and method
CN117665041A (en) * 2024-02-01 2024-03-08 中海石油气电集团有限责任公司 Radio frequency heating oil-rich coal in-situ pyrolysis simulation test device and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070062693A1 (en) * 2005-09-21 2007-03-22 Vetco Gray Inc. System, method, and apparatus for degassing tool for coal bed methane gas wells
CN103114827A (en) * 2013-01-23 2013-05-22 重庆大学 Multi-field coupling coal bed methane extraction simulation testing method
WO2016076537A1 (en) * 2014-11-10 2016-05-19 한국가스공사 Method for producing coal bed gas

Family Cites Families (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU773413B2 (en) * 2000-04-24 2004-05-27 Shell Internationale Research Maatschappij B.V. A method for sequestering a fluid within a hydrocarbon containing formation
US7027968B2 (en) * 2002-01-18 2006-04-11 Conocophillips Company Method for simulating subsea mudlift drilling and well control operations
CN1526511A (en) * 2003-03-07 2004-09-08 上海理工大学 Parullel mechanisms for imaginary axis machine tool, measurer, etc.
US7392848B1 (en) * 2005-05-27 2008-07-01 Bader Mansour S Methods to produce sulfate-free saline water and gypsum
CN201037402Y (en) * 2007-03-06 2008-03-19 中国矿业大学 Goaf decompression coal bed gas extracting simulation experiment device
US20130211807A1 (en) * 2010-10-27 2013-08-15 Elizabeth Land Templeton-Barrett Method and System for Fracturing a Formation
US9085950B2 (en) * 2010-12-20 2015-07-21 Joe Spacek Oil well improvement system
CN102400664B (en) * 2011-09-03 2012-12-26 中煤科工集团西安研究院 Well completion process method for increasing gas production of ground horizontally butted well of soft coal stratum
CN102518411A (en) * 2011-12-29 2012-06-27 郑州大学 Method for mining coal bed gas by hydraulic washout of butted well in manner of pressure relief
CN102536302A (en) * 2012-01-17 2012-07-04 河南省煤层气开发利用有限公司 Method for relieving pressure and eliminating outburst of ground butting well
CN103114870B (en) 2013-01-23 2015-04-29 重庆大学 Multi-field coupling coal bed methane extraction physical simulation testing system
CN105064920B (en) * 2015-08-05 2017-07-18 河南能源化工集团研究院有限公司 The hypotonic weak seam punching release extraction simulation experiment method of multi- scenarios method
CN105134162A (en) * 2015-08-28 2015-12-09 中国神华能源股份有限公司 U-shaped well system and drilling method thereof
CN105201458B (en) * 2015-11-06 2018-01-09 中国海洋石油总公司 A kind of coal bed gas horizontal well fiberglass sieve tube completion method
CN106089290B (en) * 2016-06-21 2018-03-02 太原理工大学 A kind of method for cooperateing with the old dead zone of extraction tool post formula and lower coal seam coal bed gas
CN106812523B (en) * 2017-01-22 2020-04-07 中国地质大学(北京) Physical simulation device for multi-coal-bed gas well drainage and mining and experimental method thereof
CN106644891B (en) * 2017-02-13 2019-05-21 辽宁工程技术大学 A kind of Penetration Signature test macro for simulating protective coat extracted release coal and rock
CN107387034B (en) * 2017-08-30 2020-06-09 中煤科工集团西安研究院有限公司 Extraction method of horizontal coal bed gas well completed by non-well-cementing casing
CN107762451A (en) * 2017-10-19 2018-03-06 中国石油集团渤海钻探工程有限公司 Well completion method is transformed in a kind of coal bed gas horizontal well payzone underbalance reaming

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070062693A1 (en) * 2005-09-21 2007-03-22 Vetco Gray Inc. System, method, and apparatus for degassing tool for coal bed methane gas wells
CN103114827A (en) * 2013-01-23 2013-05-22 重庆大学 Multi-field coupling coal bed methane extraction simulation testing method
WO2016076537A1 (en) * 2014-11-10 2016-05-19 한국가스공사 Method for producing coal bed gas

Also Published As

Publication number Publication date
WO2019205577A1 (en) 2019-10-31
US10995572B2 (en) 2021-05-04
CN108868740B (en) 2021-09-14
AU2018420472A1 (en) 2020-04-23
WO2019205577A8 (en) 2019-11-28
US20200263511A1 (en) 2020-08-20
CN108868740A (en) 2018-11-23

Similar Documents

Publication Publication Date Title
AU2018420472B2 (en) Simulation test method for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
US11035228B2 (en) Simulation test system for gas extraction from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
US10934817B2 (en) System for extracting gas from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
AU2018421310B2 (en) Method of extracting gas from tectonically-deformed coal seam in-situ by depressurizing horizontal well cavity
Lin et al. Cross-borehole hydraulic slotting technique for preventing and controlling coal and gas outbursts during coal roadway excavation
CN103016044B (en) Comprehensive method of drilling, permeability increasing, repairing and gas-driven displacing of drill hole underground coal mine
WO2016078165A1 (en) Simulation apparatus for natural gas hydrate formation drilling
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN108729913B (en) Controllable shock wave pre-cracking shale reservoir stratum method
CN103939077A (en) Perforation fracturing permeability-improvement method for high-stress low-porosity coal seam
Luo et al. Development of a specially designed drill bit for down-the-hole air hammer to reduce dust production in the drilling process
Zheng et al. Progress and prospects of oil and gas production engineering technology in China
CN103808633A (en) Mining-induced fractured rock mass water sand transportation testing system and monitoring method
Qun et al. Shale oil and gas exploitation in China: Technical comparison with US and development suggestions
Niu et al. Gas extraction mechanism and effect of ultra-high-pressure hydraulic slotting technology: A case study in Renlou coal mine
Ding Features and prevention countermeasures of major disasters occurred in China coal mine
CN109779634B (en) Method for determining position of fractured hard top plate of coal mine ground vertical well
Wang et al. Coal breakage impact by high-pressure water jet and induced pressure relief and permeability enhancement by hydraulic flushing cavity: mechanism and application
CN208267898U (en) A kind of anti-reflection system of &#34; three is soft &#34; low-permeable high gas layer pressure release
CN219472092U (en) Hydraulic slotting simulation test equipment for extraction drilling
CN216043858U (en) Safety monitoring system for coal bed in drill hole
Yanfang Exploration and application of deep coalbed methane test fracturing technology in Tongxu
SUN et al. Research progress and development trend of staged hydraulic fracturing technology in long-borehole underground coal mine [J]
CN117662101A (en) Underground long-distance fracturing-sand injection-logging integrated equipment and method
CN117868753A (en) Coal and coalbed methane mining system and method based on ground drilling and related equipment

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)