AU2014326302B2 - Pavement systems with geocell and geogrid - Google Patents

Pavement systems with geocell and geogrid Download PDF

Info

Publication number
AU2014326302B2
AU2014326302B2 AU2014326302A AU2014326302A AU2014326302B2 AU 2014326302 B2 AU2014326302 B2 AU 2014326302B2 AU 2014326302 A AU2014326302 A AU 2014326302A AU 2014326302 A AU2014326302 A AU 2014326302A AU 2014326302 B2 AU2014326302 B2 AU 2014326302B2
Authority
AU
Australia
Prior art keywords
layer
geogrid
geocell
granular
granular material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
AU2014326302A
Other versions
AU2014326302A1 (en
Inventor
Oded Erez
Izhar Halahmi
Offer Avraham Zvi Kief
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotech Technologies Ltd
Original Assignee
Geotech Tech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geotech Tech Ltd filed Critical Geotech Tech Ltd
Publication of AU2014326302A1 publication Critical patent/AU2014326302A1/en
Application granted granted Critical
Publication of AU2014326302B2 publication Critical patent/AU2014326302B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/003Foundations for pavings characterised by material or composition used, e.g. waste or recycled material
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/005Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0084Geogrids

Abstract

This disclosure relates to pavement systems and methods for paving that are suitable for locations containing a generally weak subgrade with a California Bearing Ratio of four (4) or lower. The pavement system includes a first geogrid layer placed directly on the subgrade; a first granular layer upon the first geogrid layer, the first granular layer having a thickness of from 0.5 times to 20 times the aperture distance of the geogrid layer; a first geocell layer upon the first granular layer comprising a geocell and an infill material; and a capping layer over the geocell layer. A second geocell/geogrid layer can be placed beneath the capping layer, if desired. An optional surface layer may be applied upon the capping layer if desired. The resulting pavement system provides long-term support for pavements applied over the pavement system.

Description

Date of Filing: 2014.09.30 (33) Country
US (72) Inventor(s)
Halahmi, lzhar;Erez, Oded;Kief, Offer Avraham Zvi (74) Agent / Attorney
IP Gateway Patent and Trade Mark Attorneys Pty Ltd, PO Box 1321, SPRINGWOOD, QLD, 4127, AU (56) Related Art
US 5851089 A US 2009/0142542 A1 US 2004/0067103 A1 (12) INTERNATIONAL APPLICATION PUBLISHED UNDER THE PATENT COOPERATION TREATY (PCT) (19) World Intellectual Property Organization
International Bureau (43) International Publication Date 2 April 2015 (02.04.2015)
Figure AU2014326302B2_D0001
WIPOIPCT (51) International Patent Classification:
E01C 3/00 (2006.01) (21) International Application Number:
PCT/IB2014/002807 (22) International Filing Date:
September 2014 (30.09.2014) (25) Filing Language: English (26) Publication Language: English (30) Priority Data:
61/884,231 30 September 2013 (30.09.2013) US (71) Applicant: R.F.G. TRADING LTD. [IL/IL]; RN 513456814, Weizmann 2, 6423902 Tel Aviv (IL).
(72) Inventors: HALAHMI, Izhar; 4 Itzhak Ben Zvi, Hodhasharon (IL). EREZ, Oded; 10 Berkovich Street, Tel Aviv (IL). KIEF, Offer Avraham, Zvi; 13 Ruth Street, Haifa (IL).
(81) Designated States (unless otherwise indicated, for every kind of national protection available)·. AE, AG, AL, AM, AO, AT, AU, AZ, BA, BB, BG, BH, BN, BR, BW, BY, BZ, CA, CH, CL, CN, CO, CR, CU, CZ, DE, DK, DM, (10) International Publication Number
WO 2015/044792 A3
DO, DZ, EC, EE, EG, ES, FI, GB, GD, GE, GH, GM, GT, HN, HR, HU, ID, IL, IN, IR, IS, JP, KE, KG, KN, KP, KR, KZ, LA, LC, LK, LR, LS, LU, LY, MA, MD, ME, MG,
MK, MN, MW, MX, MY, MZ, NA, NG, NI, NO, NZ, OM, PA, PE, PG, PH, PL, PT, QA, RO, RS, RU, RW, SA, SC, SD, SE, SG, SK, SL, SM, ST, SV, SY, TH, TJ, TM, TN, TR, TT, TZ, UA, UG, US, UZ, VC, VN, ZA, ZM, ZW.
(84) Designated States (unless otherwise indicated, for every kind of regional protection available)·. ARIPO (BW, GH, GM, KE, LR, LS, MW, MZ, NA, RW, SD, SL, ST, SZ, TZ, UG, ZM, ZW), Eurasian (AM, AZ, BY, KG, KZ, RU, TJ, TM), European (AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LT, LU,
LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR), OAPI (BF, BJ, CF, CG, CI, CM, GA, GN, GQ, GW, KM, ML, MR, NE, SN, TD, TG).
Published:
— with international search report (Art. 21(3)) (88) Date of publication of the international search report:
August 2015 (54) Title: PAVEMENT SYSTEMS WITH GEOCELL AND GEOGRID
WO 2015/044792 A3
Figure AU2014326302B2_D0002
Γ SO.
(57) Abstract: This disclosure relates to pavement systems and methods for paving that are suitable for locations containing a generally weak subgrade with a California Bearing Ratio of four (4) or lower. The pavement system includes a first geogrid layer placed directly on the subgrade; a first granular layer upon the first geogrid layer, the first granular layer having a thickness of from 0.5 times to 20 times the aperture distance of the geogrid layer; a first geocell layer upon the first granular layer comprising a geocell and an infill material; and a capping layer over the geocell layer. A second geocell/geogrid layer can be placed beneath the capping layer, if desired. An optional surface layer may be applied upon the capping layer if desired. The resulting pavement system provides longterm support for pavements applied over the pavement system.
2014326302 23 Feb 2018
PAVEMENT SYSTEMS WITH GEOCELL AND GEOGRID
CROSS-REFERENCE TO RELATED APPLICATIONS [0001] This application claims priority to U.S. Provisional Patent Application Serial No. 61/884,231, filed September 30, 2013, the entirety of which is incorporated by reference.
DEFINITIONS [0002] In the specification the term “comprising” shall be understood to have a broad meaning similar to the term “including” and will be understood to imply the inclusion of a stated integer or step or group of integers or steps but not the exclusion of any other integer or step or group of integers or steps. This definition also applies to variations on the term “comprising” such as “comprise” and “comprises”.
[0003] In the specification the singular forms a, an, and the include plural referents unless the context clearly dictates otherwise.
[0004] Numerical values in the specification and claims of this application should be understood to include numerical values which are the same when reduced to the same number of significant figures and numerical values which differ from the stated value by less than the experimental error of conventional measurement technique of the type described in the present application to determine the value.
[0005] All ranges disclosed in the specification herein are inclusive of the recited endpoint and independently combinable (for example, the range of “from 2 mm to 10 mm” is inclusive ofthe endpoints, 2 mm and 10 mm, and all the intermediate values).
[0006] In the specification a value modified by a term or terms, such as “about” and “substantially,” may not be limited to the precise value specified. The modifier “about” should also be considered as disclosing the range defined by the absolute values ofthe two endpoints. For example, the expression “from about 2 to about 4” also discloses the range “from 2 to 4.” [0007] When the California Bearing Ratio (CBR) is referred to in the specification herein, the value provided is measured when the layer is saturated with water.
[0008] The present application refers to pavement systems which are located in the ground. The application also refers to different layers being located “upon” or “on” or “over”
2014326302 23 Feb 2018 each other. When a second layer is described in the specification as being located relative to a first layer using these terms, the first layer is located deeper in the ground than the second layer, or put another way the second layer is closer to the surface than the first layer. There is no requirement that the first layer and the second layer directly contact each other; it is possible for another layer to be located between them. In addition, each layer has a length, a width, and a height/depth/thickness. The length and width will refer to the dimensions of the layer in the ground. In the specification the terms height, depth, and thickness will be used interchangeably to refer to the vertical dimension of the layer.
BACKGROUND [0009] In transport engineering, several layers are recognized in the construction of a pavement. These layers include the subgrade layer, the sub-base layer, the base layer, and the surface layer. The subgrade layer is the native material and acts as the foundation for the pavement. The optional sub-base layer is laid over the subgrade. The sub-base and base layers are used to carry load and dissipate it to a level acceptable for the surface layer. Depending on the desired use of the pavement, another layer can be placed over the base layer, and this layer may be known as a paver base layer. The surface layer is then placed on top of this, and is the exposed layer on the surface of the pavement. The surface layer can be, for example, asphalt (e.g. a road or parking lot), or concrete (e.g. a sidewalk), or ballast (e.g. upon which railway rails are then laid), or compacted granular material (unpaved road).
[0010] A weak subgrade is a subgrade that has a California Bearing Ratio (CBR) of 4 or lower, or more typically 3 or lower, when measured when saturated with water. Weak subgrades have low stiffness and low resistance to load. Specific weak subgrades include those where the subgrade is an expansive clay or soil susceptible to frost-heaving during cold seasons. Frost heaving is an upwards swelling of soil caused by the formation of ice below the surface. The presence of water causes a few processes to occur that can be very damaging to pavements. First, the water molecules can swell the soil particles and lower the cohesion between them. Second, swelling by water can cause expansion of the soil, increasing pressure upwards on the pavement above. Third, the water expands during freezing, and in combination with hardening due to ice formation, can damage the 2
2014326302 23 Feb 2018 pavement. These upwards stresses generated during expansion (e.g. swelling of the clay or the soil) can be significantly greater than those generated by traffic on soft subgrades. Pavements that are installed on such weak subgrade can fail prematurely.
[0011] In situations where the subgrade is weak, and the subgrade is shallow, the subgrade may be removed and replaced with stronger and more dimensionally stable granular materials. However, in other situations this may be impossible due to: (a) the soft soil of the subgrade being too deep: or (b) stronger and more dimensionally stable granular materials not being available locally, or the cost of shipment of such materials being too high. Examples of these situations can be found in peat ponds in northern Russia, expansive clay beds in Texas, and muskeg beds in Canada and Siberia.
[0012] An example of a pavement is shown in FIG. 1. The pavement here includes a weak subgrade 2, a crushed stone base 4, and a surface layer 6. Again, the weak subgrade can be due to soft soil, expansive clay, or frost-susceptible soil. Some failures include rutting (formation of a groove or rut in the pavement), cracking in the asphalt or concrete surface layer of the pavement, distortion or misalignment of railway rails laid on ballast, and pumping out of the base layer underneath the surface layer. These failure modes may be caused by irreversible deformations to the base and/or sub-base due to the lack of (1) tensile strength; (2) stiffness (modulus); (3) interfacial strength between layer and subgrade; and/or (4) bending moment (resistance to bending).
[0013] One method sometimes employed to prevent these failure modes includes the chemical modification of the subgrade. The subgrade is mixed with an inorganic binder (e.g. lime, cement or fly ash) or an organic binder (e.g. a polymer emulsion). However, this method can be subject to several undesirable characteristics such as: slow curing, poor performance when applied in wet and cold climates, leaching of inorganic binders in wet climate, high cost of polymeric binders, brittleness, poor quality due to difficulty in field mixing, poor resistance to freeze-thaw cycles, and difficulty in obtaining a homogeneous subgrade over large areas (e.g. in texture or composition).
[0014] The reference to prior art in the background above is not and should not be taken as an acknowledgment or any form of suggestion that the referenced prior art forms part of the common general knowledge in Australia or in any other country.
2014326302 23 Feb 2018
SUMMARY OF THE DISCLOSURE [0015] Applicant has recognised it would be beneficial to provide pavement systems that have improved performance when installed over a weak subgrade, or native soils, or expansive clays, or frost-susceptible soils. Applicant has recognised it would also be beneficial for such pavement systems to be constructed in an economical and easy to install method.
[0016] Disclosed in various embodiments are pavement systems and methods for installing such pavement systems over a weak subgrade having a CBR of 4 or lower, such as expansive clays, or soils susceptible to frost heaving. The pavement systems generally include a geogrid layer upon the subgrade, a first granular layer, and a geocell layer. The first granular layer has a specified thickness or height. A surface layer can be applied directly over the geocell layer, or additional geocell or geogrid reinforced layers may be placed upon the geocell layer before the surface layer is applied.
[0017] According to one aspect of the disclosure, there is provided a pavement system to be installed over a weak subgrade having a California Bearing Ratio (CBR) of 4 or lower, especially over expansive clays, or over frost-susceptible soils, comprising: a first geogrid layer placed on the subgrade and made of at least one geogrid, each geogrid being made from rib members that intersect to form geogrid apertures; a first granular layer placed upon the first geogrid layer and comprising a first granular material, the first granular layer having an average thickness of from 0.5 times to 20 times an aperture distance of the geogrid layer; a first geocell layer placed upon the first granular layer and comprising at least one geocell and that is filled with an infill material; and optionally a capping layer placed upon the first geocell layer and made from a compacted second granular material.
[0018] The pavement system may further comprise a surface layer placed upon the optional capping layer or over the first geocell layer, the surface layer comprising granular material, asphalt or concrete or ballast. In some embodiments, railway rails and ties are installed over the pavement system.
[0019] The first granular material may be sand, gravel, or crushed stone. Generally, the first granular material also enters the geogrid apertures of the first geogrid layer.
[0020] The infill material may be sand, crushed stone, gravel, recycled asphalt pavement (RAP), quarry screenings, or mixtures thereof.
2014326302 23 Feb 2018 [0021] The second granular material of the optional capping layer may be sand, gravel, or crushed stone.
[0022] The geogrid aperture distance may be from about 10 millimeters to about 500 millimeters, including from about 25 millimeters to about 100 millimeters.
[0023] The first geocell layer may have a cell height of from about 50 millimeters to about 300 millimeters. The first geocell layer may have a cell size of from about 200 millimeters to about 600 millimeters.
[0024] The at least one geogrid may be made of a polypropylene, polyethylene, polyester, polyamide, aramids, carbon fiber, textile, metal wire or mesh, glass fiber, fiberreinforced plastics, multilayer plastic laminates, or polycarbonate.
[0025] In some embodiments, the first granular material has a higher average particle size than the infill material inside the first geocell layer.
[0026] In some further embodiments, the pavement system further comprises: a optional secondary granular layer placed upon the first geocell layer; and a second geocell layer or a second geogrid layer placed upon the secondary granular layer or over the first geocell layer; wherein the capping layer is placed over the second geocell layer or the second geogrid layer. The secondary granular layer may have a thickness of about 1 mm to about 300 mm.
[0027] In other further embodiments, the pavement system further comprises a second geocell layer or a second geogrid layer placed directly upon the first geocell layer; wherein the capping layer is placed over the second geocell layer or the second geogrid layer. [0028] In other contemplated embodiments, a geotextile layer may be placed in any location between the subgrade and the capping layer. Such a layer may be particularly useful if the pavement is used in a location that has a high water table or receives heavy rains or floods, or where fines may infiltrate upwards or downwards between layers.
[0029] According to another aspect of the disclosure, there is provided a method for installing a pavement system over a weak subgrade having a California Bearing Ratio (CBR) of 4 or lower, such as expansive clays, or soils susceptible to frost heaving, comprising: applying at least one geogrid to the subgrade to form a geogrid layer, each geogrid being made from rib members that intersect to form geogrid apertures; applying a sufficient amount of a first granular material over the geogrid layer and then compacting the
2014326302 23 Feb 2018 first granular material to form a first granular layer that has an average thickness of from 0.5 times to 20 times an aperture distance of the geogrid layer; placing at least one geocell upon the first granular layer; filling the at least one geocell with an infill material to form a first geocell layer; optionally applying a second granular material over the first geocell layer and compacting the second granular material to form a capping layer upon the geocell layer, the capping layer having a thickness of zero to about 500 mm.
[0030] Optionally, a second geogrid or geocell layer can be placed directly on first geocell layer, or separated from the first geocell layer by a secondary granular layer made from a granular material.
[0031] The method may further comprise the step of applying a surface layer over the capping layer, the surface layer comprising asphalt or concrete or ballast. The method may further comprise removing soil to expose the weak subgrade.
[0032] In particular embodiments, the method also comprises: forming a secondary granular layer upon the geocell layer; and placing another geocell or geogrid upon the secondary granular layer I over the first geocell layer to form a second geocell layer or a second geogrid layer under the capping layer. The second geocell layer or second geogrid layer may be spaced apart from the first geocell layer by a distance of zero to about 500 mm.
[0033] Also disclosed is an improved pavement system, suitable for long term performance over relatively weak subgrade, said pavement system comprising in sequence from bottom to top: a subgrade having a CBR of lower than 4; a geogrid, placed directly on the subgrade, or combined within a layer of granular material; a layer of granular material on top of the geogrid, said layer thickness varying from 0.5 time to 20 times a geogrid aperture distance; a geocell, infilled with sand, crushed stone, gravel, ash, recycled asphalt pavement (RAP), quarry screenings or mixtures thereof; optionally another layer of granular material upon which is placed a second geocell or a second geogrid; a capping layer made from compacted crushed stone, gravel, or sand; and optionally, an asphalt- or concrete- or ballast-based surface layer.
[0034] These and other non-limiting aspects of the disclosure are described in more detail below.
2014326302 23 Feb 2018
BRIEF DESCRIPTION OF THE FIGURES [0035] The following is a brief description of the drawings, which are presented for the purposes of illustrating the exemplary embodiments disclosed herein and not for the purposes of limiting the same.
[0036] FIG. 1 is a cross-sectional view of a conventional pavement system that does not include a geocell layer or a geogrid layer.
[0037] FIG. 2 is a perspective view of a geocell in its expanded state.
FIG. 3 is an enlarged perspective view of a polymeric strip of the geocell of FIG.
[0038]
2.
[0039] [0040]
FIG. 4 is a plan view of a portion of a geogrid.
FIG. 5 illustrates a pavement system of the present disclosure, having a geogrid layer and a geocell layer.
[0041] FIG. 6 illustrates another pavement system, having a geogrid layer, then a first geocell layer, then a second geocell layer above the first geocell layer.
[0042] FIG. 7 illustrates another pavement system, having a first geogrid layer, then a geocell layer, then a second geogrid layer above the geocell layer.
[0043] FIG. 8 is a graph showing the calculated thickness of the base layer (Hsub-a) of a conventional unreinforced design as a function of the CBR of the subgrade to obtain a desired elastic modulus of the base layer (Ev2-t).
DETAILED DESCRIPTION [0044] A more complete understanding of the components, processes and apparatuses disclosed herein can be obtained by reference to the accompanying drawings. These figures are merely schematic representations based on convenience and the ease of demonstrating the present disclosure, and are, therefore, not intended to indicate relative size and dimensions of the devices or components thereof and/or to define or limit the scope of the exemplary embodiments.
[0045] Although specific terms are used in the following description for the sake of clarity, these terms are intended to refer only to the particular structure of the embodiments selected for illustration in the drawings, and are not intended to define or limit the scope of
2014326302 23 Feb 2018 the disclosure. In the drawings and the following description below, it is to be understood that like numeric designations refer to components of like function.
[0046] Geogrids have been employed to remedy the failure modes described above. A geogrid can be made from polymers (e.g. polyester yarn or extruded polymer) which are arranged in a network of ribs and apertures to provide uniaxial or biaxial tensile reinforcement to soil. The geogrid can include a coating that provides further chemical and mechanical benefits. Alternatively, a sheet can be punched and then drawn to form a geogrid, as is done by Tensar Corporation. Polyester or polypropylene rods or straps can also be laser heated or ultrasonically bonded together in a gridlike pattern to form a geogrid. A geogrid is generally mechanically and chemically durable, so that it can be installed in aggressive soil or in aqueous environments. A geogrid is a two-dimensional structure and lacks an effective height, and has a flat planar structure.
[0047] Geocells have also been incorporated into pavement systems to prevent failure modes. A geocell (also known as a cellular confinement system (CCS)) is an array of containment cells resembling a “honeycomb” structure that is filled with infill. CCSs are three-dimensional structures with internal force vectors acting within each cell against all the walls, whereas geogrids are only two-dimensional. However, when a geocell is used to reinforce the base or sub-base over a weak subgrade, the pavement may still fail, due to “flow” of the infill out of the bottom of the geocell and downwards towards the weak subgrade, and due to insufficient tensile strength. This causes an undesired difference in modulus and tensile strength between the base/sub-base and the subgrade, and poor tensile performance along the interface thereof.
[0048] There have been studies of combining geocells and geogrids within a common pavement system. For example, one system has placed a geogrid in the subgrade layer, then placed a geocell directly upon the geogrid-reinforced subgrade layer (i.e. in the subbase) and filled the geocell with excavated material. These layers are then compacted and topped with a layer of clean stone (0.75 inches in height). However, this system using a geogrid subgrade layer with a geocell overlayer only partially solve the identified problems relating to failure modes of pavement systems. Due to the high stiffness of the geocell layer, the geogrid-reinforced layer is subjected to low strains. Because geogrids require
2014326302 23 Feb 2018 significant deformation in order to contribute significant tensile reinforcement, the geogrid is thus unable to provide notable reinforcement to the overall system.
[0049] The present application therefore relates to improved pavement systems, suitable for long term performance over a weak subgrade that has a California Bearing Ratio (CBR) of 4 or lower, or over expansive clays, or over a soil that is susceptible to frost heaving (i.e. a frost-susceptible soil). These soils may include organic clays, peat, muskeg, montmorillonite soils, and bentonite soils. The pavement systems of the present disclosure include a geogrid-reinforced layer that is spaced from a geocell-reinforced layer by a layer of granular material. Another geogrid layer or geocell layer can be placed on top of the original geocell-reinforced layer. These systems are very suitable for use where stresses are also exerted from below the pavement (i.e. upwards).
[0050] Geocells (also known as cellular confinement systems (CCS)) are a threedimensional geosynthetic product which are useful in many geotechnical applications such as soil erosion prevention, channel lining, construction of reinforced soil retaining walls, and support of pavements. A CCS is an array of containment cells resembling a “honeycomb” structure that is filled with infill, which can be cohesionless soil, sand, gravel, ballast, or any other type of aggregate. CCSs are used in civil engineering applications to prevent erosion or provide lateral support, such as retaining walls for soil, alternatives for sandbag walls or gravity walls, and for roadway, pavement, and railway foundations. Geogrids are generally flat (i.e., two-dimensional) and used as planar reinforcement, whereas CCSs are threedimensional structures with internal force vectors acting within each cell against all the walls. CCSs also provide efficient reinforcement for relatively fine infills, such as sand, loam, and quarry waste.
[0051] FIG. 2 is a perspective view of a geocell in its expanded state. The geocell 10 comprises a plurality of polymeric strips 14. Adjacent strips are bonded together along discrete physical seams 16. The bonding may be performing by bonding, sewing or welding, but is generally done by welding. The portion of each strip between two seams 16 forms a cell wall 18 of an individual cell 20. Each cell 20 has cell walls made from two different polymeric strips. The strips 14 are bonded together so that when expanded, a honeycomb pattern is formed from the plurality of strips. For example, outside strip 22 and inside strip 24 are bonded together at seams 16 which are regularly spaced along the length 9
2014326302 23 Feb 2018 of strips 22 and 24. A pair of inside strips 24 is bonded together along seams 32. Each seam 32 is between two seams 16. As a result, when the plurality of strips 14 is stretched or expanded in a direction perpendicular to the faces of the strips, the strips bend in a sinusoidal manner to form the geocell 10. At the edge of the geocell where the ends of two polymeric strips 22, 24 meet, an end weld 26 (also considered a joint) is made a short distance from the end 28 to form a short tail 30 which stabilizes the two polymeric strips 22,
24. This geocell may also be referred to as a section, particularly when combined with other geocells over a larger area than could be practically covered by a single section.
[0052] FIG. 3 is a close-up perspective view of a polymeric strip 14 showing the length 40, height 42, and width 44, with a seam 16 illustrated for reference. The length 40, height 42, and width 44 are measured in the direction indicated. The length is measured when the geocell is in its folded or compressed state. In the compressed state, each cell 20 may be considered to have no volume, whereas the expanded state generally refers to when the geocell has been expanded to its maximum possible capacity. In embodiments, the geocell height 43 is from about 50 millimeters (mm) to about 300 mm. The geocell cell size (measured as the distance between seams in the un-folded state) can be from about 200 mm to about 600 mm.
[0053] The geocells can be made from linear low density polyethylene (PE), medium density polyethylene (MDPE) and/or high density polyethylene (HDPE). The term HDPE refers hereinafter to a polyethylene characterized by density of greater than 0.940 g/cm3. The term medium density polyethylene (MDPE) refers to a polyethylene characterized by density of greater than 0.925 g/cm3 to 0.940 g/cm3. The term linear low density polyethylene (LLDPE) refers to a polyethylene characterized by density of 0.91 to 0.925 g/cm3. The geocells can also be made from polypropylene, polyamide, polyester, polystyrene, natural fibers, woven textile, blends of polyolefins with other polymers, polycarbonate, fiberreinforced plastic, textile, or multilayer plastic laminate. The strips used to make the geocell are welded together in an offset manner, with the distance between welded seams being from about 200 mm to about 600 mm.
[0054] The usual strip wall width for a geocell is 1.27 millimeters (mm), with some variation in the range of 0.9 mm to 1.7 mm. The cell walls can be perforated and/or embossed.
2014326302 23 Feb 2018 [0055] FIG. 4 is a magnified plan view of a portion of a geogrid 60. The geogrid is made from rib members 62 that intersect each other to define geogrid apertures 64. The geogrid can be made of polypropylene, polyethylene polyester, polyamide, aramids (e.g. KEVLAR), carbon fiber, textile, metal wire or mesh, glass fiber, fiber-reinforced plastics (e.g. blends or alloys), multilayer plastic laminates, or polycarbonate. As shown here, the geogrid apertures are rectangular, but the geogrid apertures can generally be any shape, including square, triangular, circular, etc. Any geometry can be used. The rib members are less than 50% of the geogrid area, or put another way the open area of the geogrid is greater than 50%.
[0056] Each geogrid aperture has an aperture distance, which is the average length of the ribs surrounding the aperture. As illustrated here, for example, in a rectangular aperture the aperture distance is the average length of the shorter rib member 66 and the longer rib member 68. In embodiments, the aperture distance for a geogrid is from about 10 mm to about 500 mm, or from about 25 mm to about 100 mm.
[0057] A geocell and a geogrid can be distinguished by the height of their respective strip and rib member. A geocell has a height of at least 20 mm, whereas a geogrid has a height of from about 0.5 mm to 2 mm.
[0058] FIG. 5 is a cross-sectional view of an exemplary pavement system of the present disclosure. Generally, a geogrid-reinforced layer is spaced from a geocell-reinforced layer by a layer of granular material.
[0059] Initially, a geogrid layer 60 is formed on the subgrade layer 50. The geogrid layer is formed from at least one geogrid. It is noted that the subgrade may be the native subgrade, or may be chemically modified (e.g. with lime, cement, polymer, or fly ash), or may be physically modified (e.g. replaced with a more stable granular material). The modified portion of the subgrade may have a thickness that varies from about 50 mm to about 1000 mm.
[0060] Next, a first granular layer 70 is placed on the geogrid layer 60. The first granular layer comprises a first granular material, which can be sand, gravel, or crushed stone. The first granular layer has a thickness 75 of from 0.5 times to 20 times the aperture distance of the geogrid layer. It is noted that the first granular material can fall into I enter the geogrid apertures of the geogrid layer 60. If desired, the first granular layer is compacted.
2014326302 23 Feb 2018 [0061] The aperture distance of the geogrid layer is usually the same as the aperture distance of the geogrids that make up the geogrid layer, assuming that all of the geogrids are the same. In the event that different geogrids with different aperture distances are used in the geogrid layer, the aperture distance of the geogrid layer should be calculated as the average aperture distance, weighted by the surface area covered by each geogrid.
[0062] Next, a geocell layer 80 is placed on the first granular layer 70. The geocell layer is formed from at least one geocell 82, which is filled with an infill material 84. The infill material is compacted to stiffen the infill. Exemplary infill material includes sand, crushed stone, gravel, and mixtures thereof. Other finer grade granular materials can also be included in the infill material if desired. In this regard, in some embodiments, the first granular material of the first granular layer has a higher average particle size compared to the average particle size of the infill material.
[0063] The combination of the geogrid layer 60 with the first granular layer 70 is needed to develop tensile and shear forces, and for the proper performance of the geocell layer 80. The combination of the geogrid layer and the first granular layer provides: (1) a stiff and impermeable “floor” that allows the development of high stiffness in the geocell layer during compaction of the infill material; (2) a barrier against infilling of fines from the subgrade upwards into the geocell layer; (3) an interface for high shear forces; and (4) mechanical separation between the subgrade and the geocell layer, allowing the geocell layer to perform as a stiff and elastic beam while restricting its strains to the elastic range.
[0064] Optionally, a capping layer 90 is then placed above the geocell layer 80. This layer is formed from compacted materials, such as crushed stone, gravel, or sand. This layer may be considered as being made from a second granular material.
[0065] Optionally, a surface layer 100 can be placed on the capping layer 90 that is distributed above the geocell reinforced layer 80. The surface layer can include asphalt or concrete or ballast.
[0066] This design allows the geogrid layer 60 to deform, so that the geogrid layer can stiffen and reinforce the first granular layer 70 located below the geocell layer 80. This configuration significantly lowers the stresses and deformations that are passed to the subgrade 50 and the interface between the subgrade and the sub-base. The geogrid layer 60 and the first granular layer 70 also provide a stiff foundation for the geocell layer 80 by 12
2014326302 23 Feb 2018 improving the tensile strength and shear strength performance of the uppermost zone of the subgrade 50. The geogrid layer 60 increases the fatigue resistance of the subgrade and helps to reduce the downward “leakage” of infill from the geocell layer during the service lifetime of the pavement system. To be clear, the first granular layer 70 separates the geogrid layer 60 from the geocell layer 80; the geogrid and geocell do not contact each other when being assembled.
[0067] The geocell layer 80 functions as a rigid and stiff mattress that distributes stresses over a wide area of the pavement system and helps to avoid local over-stresses. These local over-stresses are a major cause for failure in pavement systems installed over weak subgrade. The infill material can be sand, gravel, or crushed stone, or mixtures thereof. [0068] A synergistic relationship is created between the geogrid layer and the geocell layer when spaced apart by the first granular layer. The geogrid layer 60 is positioned below the geocell layer 80 at a distance allowing sufficient deformation along the geogrid layer, so that it can provide tensile stiffening to the subgrade against stresses generated by expansion of the subgrade. The design of the present disclosure is capable of absorbing large mechanical stresses, elastically, with high fatigue resistance. In particular, the pavement systems of the present disclosure display improved resistance to multiple mechanical cyclic loadings, to multiple expansion-contraction events of subgrade, and to freeze-thaw cycles over a long period of time.
[0069] Without being bound by theory, it is believed that placing only one or more geogrid layers over the subgrade would not successfully strength the subgrade sufficiently due to (1) insufficient bending moment; and (2) insufficient stiffness of the geogrid layers. Similarly, using only a geocell layer over the subgrade would be unsuccessful, due to (1) insufficient tensile strength; and (2) the tendency of the infill to yield upwards/d own wards due to pressure applied by traffic or the expansion-contraction of the soil.
[0070] The disclosure also includes methods for installing the pavement systems over a weak subgrade. Generally, soil is removed to expose the weak subgrade. Next, at least one geogrid is applied to the subgrade to form the geogrid layer. A sufficient amount of a first granular material is then applied over the geogrid layer to form the first granular layer that has an average thickness of from 0.5 times to 20 times an aperture distance of the geogrid layer. At least one geocell is placed upon the first granular layer, and then is filled 13
2014326302 23 Feb 2018 with an infill material to form the geocell layer. A second granular material is applied over the geocell layer, and then compressed to form the capping layer upon the geocell layer. If desired, a surface layer is then applied over the capping layer.
[0071] FIG. 6 and FIG. 7 are cross-sectional views of two additional embodiments of pavement systems that include additional layers.
[0072] In FIG. 6, the pavement system includes a geogrid layer 60 formed on the subgrade layer 50, a first granular layer 70 placed on the geogrid layer 60, and a geocell layer 80 placed on the first granular layer 70, as described above. The first granular layer 70 has a thickness 75. A secondary granular layer 110 is then placed on the geocell layer 80. This secondary granular layer may be made from the same material as the first granular layer 70 or the infill of the geocell layer. The secondary granular layer can be considered as being formed from a third granular material (as described above, the capping layer is formed from a second granular material). The secondary granular layer has a thickness 115, which can be from about 10 mm to about 500 mm. A second geocell layer 120 is then placed upon the secondary granular layer 110. This second geocell layer is also formed from at least one geocell and filled with infill material, as described above with respect to the geocell layer 80. A capping layer 90 is then placed above the second geocell layer 120, and optionally a surface layer 100 can be placed on the capping layer 90. The capping layer and surface layer may be made as described above in FIG. 5. The second geocell layer 120 provides additional tensile strength to the system, resisting bending from the subgrade that may occur during expansion of clay or the freeze-thaw cycle.
[0073] In FIG. 7, the pavement system includes a geogrid layer 60 formed on the subgrade layer 50, a first granular layer 70 placed on the geogrid layer 60, and a geocell layer 80 placed on the first granular layer 70, as described above. The first granular layer 70 has a thickness 75. A secondary granular layer 110 is then placed on the geocell layer 80, which has a composition as described above. The secondary granular layer has a thickness 115, which can be from about 1 mm to about 300 mm. A second geogrid layer 130 is then placed upon the secondary granular layer 110. The second geogrid layer is formed from at least one geogrid. A capping layer 90 is then placed above the second geogrid layer 130, and optionally a surface layer 100 can be placed on the capping layer 90. The capping layer and surface layer may be made as described above in FIG. 5. The 14
2014326302 23 Feb 2018 material used to form the capping layer may fall into the apertures of the second geogrid layer 130. The second geogrid layer 130 also provides additional tensile strength to the system, resisting bending from the subgrade that may occur during expansion of clay or the freeze-thaw cycle.
[0074] In other contemplated embodiments, the second geogrid layer or second geocell layer can be placed directly upon the first geocell layer after the infill in the first geocell layer has been compacted. No secondary granular layer is needed. The distance between the first geocell layer and the second geogrid layer or second geocell layer can thus be adjusted from almost zero, to about 500 millimeters as needed to obtain the desired total pavement modulus and fatigue resistance.
[0075] In addition, as desired, a geotextile layer can be placed anywhere in the pavement system between the subgrade and the top layer of the system (i.e. the geotextile layer is never the uppermost layer of the system). A geotextile is a two-dimensional permeable fabric that can be woven or non-woven, and is used to avoid loss or penetration of fines up to the surface of the pavement. A geotextile can be distinguished from a geogrid because the apertures of a geogrid are large enough to allow for soil strike-through from one side of the geogrid to the other, whereas a geotextile does not allow for soil strikethrough. The geotextile layer is desirably used in areas that are subject to floods, heavy rains, or that have a high water table. The geotextile layer can be made from a fabric that has a specific weight of 50 grams per square meter (g/m2)to 3000 g/m2.
[0076] The present disclosure will further be illustrated in the following non-limiting working example, it being understood that these example is intended to be illustrative only and that the disclosure is not intended to be limited to the materials, conditions, process parameters and the like recited herein.
EXAMPLE [0077] A railway trail ran over a subgrade of expansive clay having a CBR of 3 when saturated with water. Trail maintenance was required periodically, and the train speed was limited over this subgrade. A conventional design was compared to an alternative design as described in the present disclosure.
2014326302 23 Feb 2018 [0078] FIG. 8 is a graph showing the calculated thickness of the base layer (Hsub-a) as a function of the CBR of the subgrade to obtain the desired elastic modulus of the base layer. For example, to obtain an elastic modulus of 100 kPa with a subgrade CBR of 3, the base layer will need to be 750 mm thick. This modulus is sufficient for conventional railway pavement design in Israel.
[0079] The conventional design was prepared by using sand or lime to stabilize the first 600 mm ofthe subgrade. Next, 920 mm of crushed stone was applied and compacted, and then 300 mm of gravel was applied and compacted. Ballast and railroad ties were then placed upon the pavement system.
[0080] The alternative design was designed as follows. The modulus of the combination of a geogrid-reinforced layer and a geocell-reinforced layer was measured separately in a model pavement in which the layers were installed on a subgrade with a known CBR. Pressure cells were positioned below the geogrid layer. Increasing pressure was applied on top of the geocell layer by a plate or vehicle wheel until plastic (irreversible) deformation occurred. Based on the pressure drop curve, the layer modulus was back-calculated. Based on the plastic deformation after a series of repeated loading, the degree of “immunity” to prolonged stresses was evaluated.
[0081] In the field, the alternative design was prepared by first leveling the subgrade. A first geogrid layer was applied and covered by a crushed stone layer of 200 mm thickness. A first geocell layer was then applied over the crushed stone layer. The first geocell layer was 150 mm high, and geocells had 330 mm distance between seams. The infill material was crushed stone. A secondary granular layer of 50 mm thickness was then applied over the first geocell layer, and a second geocell layer of the same construction as the first geocell layer was applied. Ballast and railroad ties were then placed upon the second geocell layer.
[0082] The difference in required materials was very apparent between the two designs. The conventional design required processing of 600 mm with sand or lime, followed by 1220 mm of granular materials. In contrast, the alternative design required only 750 mm of granular materials, providing a large cost savings.
[0083] A one-year study of the performance of the two designs was conducted in Israel. The conventional design suffered from plastic distortions that continuously increased over 16
2014326302 23 Feb 2018 time. The result was slower train speeds and maintenance being required at short intervals. The alternative design, using a geogrid and two geocell layers, showed pure elastic performance with no irreversible distortions.
[0084] It will be appreciated that variants of the above-disclosed and other features and functions, or alternatives thereof, may be combined into many other different systems or applications. Various presently unforeseen or unanticipated alternatives, modifications, variations or improvements therein may be subsequently made by those skilled in the art which are also intended to be encompassed by the following claims.
2014326302 23 Feb 2018

Claims (21)

  1. CLAIMS:
    1. A pavement system to be installed over a weak subgrade having a California Bearing Ratio (CBR) of 4 or lower, comprising:
    a first geogrid layer placed on the subgrade and made of at least one geogrid, each geogrid being made from rib members that intersect to form geogrid apertures;
    a first granular layer placed upon the first geogrid layer and comprising a first granular material, the first granular layer having an average thickness of from 0.5 times to 20 times an aperture distance of the first geogrid layer;
    a first geocell layer placed upon the first granular layer and comprising at least one geocell that is filled with an infill material; and optionally, a capping layer placed over the first geocell layer and made from a compacted second granular material.
  2. 2. The pavement system of claim 1, further comprising a surface layer placed over the first geocell layer, the surface layer comprising asphalt or concrete or ballast or granular material.
  3. 3. The pavement system of claim 1 or claim 2, wherein the first granular material is sand, gravel, or crushed stone.
  4. 4. The pavement system of any one of claims 1 to 3, wherein the first granular material also enters the geogrid apertures of the first geogrid layer.
  5. 5. The pavement system of any one of claims 1 to 4, wherein the infill material comprises sand, crushed stone, gravel, recycled asphalt pavement (RAP), quarry screenings, or mixtures thereof.
  6. 6. The pavement system of any one of claims 1 to 5, including the capping layer made from a compacted second granular material, and wherein the second granular material of the capping layer comprises sand, gravel, or crushed stone.
    2014326302 23 Feb 2018
  7. 7. The pavement system of any one of claims 1 to 6, wherein the aperture distance is from about 10 millimeters to about 500 millimeters.
  8. 8. The pavement system of any one of claims 1 to 7, wherein the first geocell layer has a cell height of from about 50 millimeters to about 300 millimeters.
  9. 9. The pavement system of any one of claims 1 to 8, wherein the first geocell layer has a cell size of from about 200 millimeters to about 600 millimeters.
  10. 10. The pavement system of any one of claims 1 to 9, wherein the at least one geogrid is made of a polypropylene, polyethylene, polyester, polyamide, aramids, carbon fiber, textile, metal wire or mesh, glass fiber, fiber-reinforced plastics, multilayer plastic laminates, or polycarbonate.
  11. 11. The pavement system of any one of claims 1 to 10, wherein the first granular material has a higher average particle size than the infill material.
  12. 12. The pavement system of claim 6, further comprising:
    a second geocell layer or a second geogrid layer placed over the first geocell layer;
    wherein the capping layer is placed over the second geocell layer or the second geogrid layer.
  13. 13. The pavement system of claim 12, further comprising a secondary granular layer having a thickness of about 1 mm to about 300 mm, the secondary granular layer being located between (i) the first geocell layer and (ii) either the second geocell layer or the second geogrid layer.
  14. 14. A method for installing a pavement system over a weak subgrade having a California Bearing Ratio (CBR) of 4 or lower, comprising:
    2014326302 23 Feb 2018 applying at least one geogrid to the subgrade to form a first geogrid layer, each geogrid being made from rib members that intersect to form geogrid apertures;
    applying a sufficient amount of a first granular material over the first geogrid layer and then compacting the first granular material to form a first granular layer that has an average thickness of from 0.5 times to 20 times an aperture distance of the geogrid layer;
    placing at least one geocell upon the first granular layer;
    filling the at least one geocell with an infill material to form a first geocell layer;
    optionally applying a second granular material over the first geocell layer and compacting the second granular material to form a capping layer upon the first geocell layer, the capping layer having a thickness of zero to about 500 mm.
  15. 15. The method of claim 14, further comprising the step of applying a surface layer over the capping layer, the surface layer comprising asphalt or concrete or ballast or granular material.
  16. 16. The method of claim 14 or claim 15, further comprising removing soil to expose the weak subgrade.
  17. 17. The method of any one of claims 14 to 16, wherein the first granular material and the second granular material are independently sand, gravel, or crushed stone.
  18. 18. The method of any one of claims 14 to 17, wherein the first granular material also enters the geogrid apertures of the geogrid layer.
  19. 19. The method of any one of claims 14 to 18, wherein the infill material comprises sand, crushed stone, gravel, or mixtures thereof.
  20. 20. The method of any one of claims 14 to 19, further comprising:
    the step of applying a second granular material over the first geocell layer and compacting the second granular material to form the capping layer, and placing another geocell or 20
    2014326302 23 Feb 2018 geogrid over the first geocell layer to form a second geocell layer or a second geogrid layer under the capping layer.
  21. 21. The method of claim 20, wherein the second geocell layer or second geogrid layer is spaced apart from the first geocell layer by a distance of zero to about 500 mm.
    WO 2015/044792
    PCT/IB2014/002807
    1/6
    Γ” s »4
    Mb, 1
    Wo 2015/044792
    2/6
    PCT/IB2014/002807
    WO 2015/044792
    PCT/IB2014/002807
    3/6
    WO 2015/044792
    PCT/IB2014/002807
    4/6
    FIG, 4
    WO 2015/044792
    PCT/IB2014/002807
    5/6
    WO 2015/044792
    PCT/IB2014/002807
AU2014326302A 2013-09-30 2014-09-30 Pavement systems with geocell and geogrid Active AU2014326302B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US201361884231P 2013-09-30 2013-09-30
US61/884,231 2013-09-30
PCT/IB2014/002807 WO2015044792A2 (en) 2013-09-30 2014-09-30 Pavement systems with geocell and geogrid

Publications (2)

Publication Number Publication Date
AU2014326302A1 AU2014326302A1 (en) 2016-05-12
AU2014326302B2 true AU2014326302B2 (en) 2018-03-22

Family

ID=52744629

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2014326302A Active AU2014326302B2 (en) 2013-09-30 2014-09-30 Pavement systems with geocell and geogrid

Country Status (21)

Country Link
US (2) US10407837B2 (en)
EP (1) EP3052703B1 (en)
JP (1) JP6351730B2 (en)
KR (2) KR20160108299A (en)
CN (2) CN105793492B (en)
AP (1) AP2016009160A0 (en)
AU (1) AU2014326302B2 (en)
CA (1) CA2925670C (en)
DK (1) DK3052703T3 (en)
EA (1) EA031977B1 (en)
ES (1) ES2689538T3 (en)
HR (1) HRP20181540T1 (en)
HU (1) HUE040617T2 (en)
IL (1) IL244821B (en)
MX (1) MX2016004124A (en)
PE (1) PE20161495A1 (en)
PL (1) PL3052703T3 (en)
PT (1) PT3052703T (en)
SI (1) SI3052703T1 (en)
TR (1) TR201819676T4 (en)
WO (1) WO2015044792A2 (en)

Families Citing this family (37)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TR201819676T4 (en) * 2013-09-30 2019-01-21 Geotech Tech Ltd COATING SYSTEM WITH GEOCELL AND GEOGRID AND INSTALLATION METHOD OF A COATING SYSTEM.
US20150142369A1 (en) * 2013-11-15 2015-05-21 Umm Al-Qura University Prediction of california bearing ratio of subbase layer using multiple linear regression model
JP6673650B2 (en) * 2015-06-26 2020-03-25 太平洋プレコン工業株式会社 Pavement method and pavement structure
CN105297574B (en) * 2015-10-13 2018-01-12 贺建辉 Handle stress absorbing layer, pavement structure and the construction method of asphalt pavement crack
WO2017078551A1 (en) * 2015-11-06 2017-05-11 CARDOZO RUBIO, Jesús Eduardo Multicomponent geocellular confinement system
CN106223150B (en) * 2016-09-09 2018-08-31 江西省地质工程(集团)公司 A kind of asphalt roads
CN106638196B (en) * 2016-12-09 2019-05-31 中国神华能源股份有限公司 A kind of stabilized expansive soil roadbed filling and preparation method thereof
US11248358B2 (en) 2017-06-27 2022-02-15 Man Zhang Geogrid and manufacturing method thereof
CN107217643A (en) * 2017-07-14 2017-09-29 河海大学 A kind of ecological revetment suitable for plateau permafrost
CN107447597A (en) * 2017-07-25 2017-12-08 中铁二院工程集团有限责任公司 A kind of non-fragment orbit railway expensive soil cutting structure and construction method
CN107747261A (en) * 2017-11-18 2018-03-02 固远晨通科技发展有限公司 A kind of new Soft Clay seasonal frozen soil region highway subgrade structure and construction method
KR101941180B1 (en) * 2018-05-15 2019-01-22 (주) 지오시스 Construction method of temporary road by in situ mixing of composite structure
CN108505528B (en) * 2018-05-25 2024-01-23 山东大学 Geogrid with auxetic effect and manufacturing method thereof
CN109293002B (en) * 2018-10-30 2022-06-10 深圳大学 Microbial preparation-based black and odorous water body in-situ remediation method and microbial preparation
CN109440541A (en) * 2018-11-07 2019-03-08 中铁二院工程集团有限责任公司 One kind passing through karez high-speed railway Reinforced subgrade construction and construction method
KR102089786B1 (en) * 2019-01-14 2020-03-18 시피케미칼 (주) A manufacturing method of geogrid coated with recycled PVC resin
CN109750572A (en) * 2019-03-13 2019-05-14 岩土科技股份有限公司 A kind of steelframe geotechnique frame is used for the construction method of dirt road base instead of block stone
CN110205890A (en) * 2019-06-20 2019-09-06 中国五冶集团有限公司 A kind of underground tunnel upper lightweight EPS road structure and its construction method
CN110438858A (en) * 2019-07-31 2019-11-12 长安大学 A kind of hard and soft is seamless Pavement Base Structure and its construction method
CN111074715A (en) * 2020-01-20 2020-04-28 湖南科技学院 Anti-crack roadbed and pavement structure and construction method thereof
CN111074717A (en) * 2020-01-20 2020-04-28 湖南科技学院 Perennial frozen soil area airport runway structure and construction method thereof
CN111074723A (en) * 2020-01-20 2020-04-28 湖南科技学院 Water-permeable anti-cracking sports field and construction method thereof
CN111441208B (en) * 2020-04-16 2020-11-06 张健 Anti-settlement highway subgrade
CN111485463A (en) * 2020-04-26 2020-08-04 中铁二十三局集团第三工程有限公司 Roadbed splicing construction method in expressway reconstruction and expansion
CN111778793B (en) * 2020-06-23 2021-12-10 盐城工学院 Cavity collapse prevention and control structure and construction method
CN112095379B (en) * 2020-08-07 2021-12-14 中电建路桥集团有限公司 Construction method of anti-settlement roadbed
CN111827037A (en) * 2020-08-17 2020-10-27 深圳市市政工程总公司 Construction method of honeycomb cell and graded broken stone composite base layer
RU2768878C1 (en) * 2020-11-02 2022-03-25 Алексей Борисович Суворов Geogrid and drainage geocomposite based thereon, as well as methods for manufacture thereof
CN112746540A (en) * 2020-12-24 2021-05-04 龙建路桥股份有限公司 Construction method for reinforcing aeolian sand to pass through roadbed in geocell
GB202101168D0 (en) * 2021-01-28 2021-03-17 Tensar Tech Limited Underpinning asphalt with multiaxial geogrids
NL1044179B1 (en) * 2021-02-26 2022-09-20 Romfix B V Road construction foundation system for a temporary road
CN113073508A (en) * 2021-04-07 2021-07-06 广州市北二环交通科技有限公司 Construction process for enhancing durability of square road of toll station
CN113323004A (en) * 2021-06-01 2021-08-31 中国长江三峡集团有限公司 Concrete panel rock-fill dam soft foundation reinforcing structure and construction method
CN114481742A (en) * 2021-12-31 2022-05-13 合肥海博工程设计集团有限公司 Construction method of municipal road asphalt concrete pavement
KR102445878B1 (en) * 2022-06-14 2022-09-21 안진하이테크(주) Color asphalt pavement system and construction method of color asphalt pavement road using natural mineral
CN114753205A (en) * 2022-06-14 2022-07-15 杭州傲翔控股有限公司 Anti-settling alternate-filling airport runway and construction method thereof
CN115045151A (en) * 2022-06-27 2022-09-13 中交(长沙)建设有限公司 On-site treatment process for refuse landfill

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5851089A (en) * 1996-10-07 1998-12-22 Tenax Spa Composite reinforced structure including an integrated multi-layer geogrid and method of constructing the same
US20040067103A1 (en) * 2001-04-06 2004-04-08 Peter Hart Reinforced permeable paving structure
US20090142542A1 (en) * 2007-09-27 2009-06-04 Prs Mediterranean Ltd. Sandwich system

Family Cites Families (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4797026A (en) * 1984-05-09 1989-01-10 The United States Of America As Represented By The Secretary Of The Army Expandable sand-grid for stabilizing an undersurface
US5320455A (en) * 1992-04-22 1994-06-14 The Tensar Corporation Geocell with facing panel
JPH08189002A (en) * 1994-12-30 1996-07-23 Railway Technical Res Inst Road-floor reinforcing structure and reinforcing construction method
ZA963715B (en) * 1995-05-12 1996-11-20 Tensar Corp Bonded composite open mesh structural textiles
US6296924B1 (en) * 1995-11-01 2001-10-02 Reynolds Consumer Products, Inc. System perforated cell confinement
US5735640A (en) * 1996-04-03 1998-04-07 Nicolon Corporation Geo textiles and geogrids in subgrade stabilization and base course reinforcement applications
JP5114234B2 (en) * 2008-02-06 2013-01-09 前田工繊株式会社 Road embankment reinforcement structure
KR101042563B1 (en) 2008-07-03 2011-06-20 유한회사 로드플랜 Paving methode by using fixed sheet
JP5067307B2 (en) * 2008-08-04 2012-11-07 株式会社大林組 Road deformation prevention structure and road deformation prevention method
CN201254728Y (en) * 2008-08-15 2009-06-10 陈维家 Pile and earthwork cellular chamber composite foundation
RU2478753C2 (en) 2008-09-29 2013-04-10 ПиАрЭс МЕДИТЕРРЭНИАН ЛТД. Geocell for versions of application related to load withstanding
US8025457B2 (en) * 2008-09-29 2011-09-27 Prs Mediterranean Ltd. Geocell for load support applications
JP5261121B2 (en) * 2008-10-03 2013-08-14 前田工繊株式会社 Reinforced structure of paved road
JP5254871B2 (en) * 2009-04-23 2013-08-07 東京インキ株式会社 Ground improvement method and structure for ground improvement
WO2011109033A1 (en) * 2010-03-05 2011-09-09 Prs Mediterranean Ltd. Geotechnical structures and processes for forming the same
EP2434059B1 (en) * 2010-09-24 2015-12-23 Terre Armee Internationale A reinforced soil structure
CN102128787A (en) * 2010-12-13 2011-07-20 湖南省交通科学研究院 Interface parameter test device for geocell or geogrid and soil composite
CN201952698U (en) * 2011-03-07 2011-08-31 冯守中 Roadbed structure reinforced by geotextile discrete material piles
KR101264601B1 (en) 2011-05-13 2013-05-27 주식회사 소모홀딩스엔테크놀러지 Construction method of sidewalk and roadway
JP2013053427A (en) * 2011-09-02 2013-03-21 Geovector Co Ltd Reinforced soil wall construction method
WO2013119259A2 (en) 2012-02-10 2013-08-15 Prs Mediterranean Ltd. Geocell for moderate and low load applications
US9982406B2 (en) * 2012-07-06 2018-05-29 Bradley Industrial Textiles, Inc. Geotextile tubes with porous internal shelves for inhibiting shear of solid fill material
CN102817299B (en) * 2012-09-05 2015-04-01 华中科技大学 Structure for repairing urban bituminous pavements and construction method thereof
CN202849895U (en) * 2012-09-05 2013-04-03 华中科技大学 Structure for repairing urban asphalt pavements
JP5939635B2 (en) * 2012-10-31 2016-06-22 公益財団法人鉄道総合技術研究所 Construction method of tide embankment by embankment reinforced earth method using honeycomb structure and planar reinforcement
JP6228397B2 (en) * 2013-07-09 2017-11-08 公益財団法人鉄道総合技術研究所 Structure laying method and structure laying structure
TR201819676T4 (en) * 2013-09-30 2019-01-21 Geotech Tech Ltd COATING SYSTEM WITH GEOCELL AND GEOGRID AND INSTALLATION METHOD OF A COATING SYSTEM.
JP5661962B1 (en) * 2014-06-02 2015-01-28 中日本ハイウェイ・メンテナンス北陸株式会社 Slope structure for road step
JP6371123B2 (en) * 2014-06-11 2018-08-08 東京インキ株式会社 Embankment structure, construction method of embankment structure and wall structure for embankment structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5851089A (en) * 1996-10-07 1998-12-22 Tenax Spa Composite reinforced structure including an integrated multi-layer geogrid and method of constructing the same
US20040067103A1 (en) * 2001-04-06 2004-04-08 Peter Hart Reinforced permeable paving structure
US20090142542A1 (en) * 2007-09-27 2009-06-04 Prs Mediterranean Ltd. Sandwich system

Also Published As

Publication number Publication date
SI3052703T1 (en) 2019-02-28
PT3052703T (en) 2018-11-06
PL3052703T3 (en) 2019-07-31
EA031977B1 (en) 2019-03-29
IL244821A0 (en) 2016-05-31
BR112016007082A2 (en) 2017-08-01
US20160230353A1 (en) 2016-08-11
KR20160108299A (en) 2016-09-19
HRP20181540T1 (en) 2018-11-30
PE20161495A1 (en) 2017-01-12
WO2015044792A2 (en) 2015-04-02
EP3052703A4 (en) 2017-05-10
CA2925670A1 (en) 2015-04-02
EP3052703A2 (en) 2016-08-10
CN105793492A (en) 2016-07-20
CN105793492B (en) 2020-12-25
US20190390413A1 (en) 2019-12-26
US10753049B2 (en) 2020-08-25
EP3052703B1 (en) 2018-09-19
EA201690682A1 (en) 2016-08-31
CN112609523A (en) 2021-04-06
TR201819676T4 (en) 2019-01-21
AP2016009160A0 (en) 2016-04-30
US10407837B2 (en) 2019-09-10
IL244821B (en) 2019-09-26
JP6351730B2 (en) 2018-07-04
JP2016532798A (en) 2016-10-20
HUE040617T2 (en) 2019-03-28
WO2015044792A3 (en) 2015-08-20
KR20210031777A (en) 2021-03-22
CA2925670C (en) 2019-06-11
MX2016004124A (en) 2016-09-16
ES2689538T3 (en) 2018-11-14
DK3052703T3 (en) 2019-01-07

Similar Documents

Publication Publication Date Title
US10753049B2 (en) Pavement systems with geocell and geogrid
AU2014326302A1 (en) Pavement systems with geocell and geogrid
Bathurst et al. Large-scale model tests of geocomposite mattresses over peat subgrades
US8790036B2 (en) Geotechnical structures and processes for forming the same
JP5815360B2 (en) Improved ground and its construction method
US20020044842A1 (en) Void-maintaining geosynthetic laminates and drainage systems
Al Qurishee Application of geosynthetics in pavement design
AU2018214448B2 (en) Track foundation
CN212316575U (en) Be used for highway to expand ground processing structure
NZ556691A (en) A water detention system incorporating a composite drainage membrane
CN202766944U (en) Enhanced subgrade drainage system of three-dimensional composite geonet
CN111236269B (en) Layered laying and combining reinforcement method for geotechnical material in airport high slope area
JPH0453205B2 (en)
OA19777A (en) Pavement systems with Geocell and Geogrid.
Bagli A tryst with geosynthetics
CN213708982U (en) A reinforced structure and road bed for ground
GB2467129A (en) Paving structure
Jain Tomorrow with Geosynthetics: A Cost Effective Building Construction Material
White et al. Subgrade Stabilization Using Geosynthetics."
BR112016007082B1 (en) PAVEMENT SYSTEM TO BE INSTALLED ON A WEAK SUBGRADE AND METHOD TO INSTALL IT
Thomas Geosynthetic solutions for geotechnical problems associated with approaches to bridges and flyovers
Crowe R. J. Bathurst
Mishra Use of Geo-Synthetics in Soil Reinforcement/Road constructions
Wilmers The use of geosynthetics as separators in civil engineering
Madhav RECENT DEVELOPMENTS IN GEO-CONSTRUCTION ENGINEERED GROUND

Legal Events

Date Code Title Description
FGA Letters patent sealed or granted (standard patent)