CN201952698U - Roadbed structure reinforced by geotextile discrete material piles - Google Patents
Roadbed structure reinforced by geotextile discrete material piles Download PDFInfo
- Publication number
- CN201952698U CN201952698U CN2011200565263U CN201120056526U CN201952698U CN 201952698 U CN201952698 U CN 201952698U CN 2011200565263 U CN2011200565263 U CN 2011200565263U CN 201120056526 U CN201120056526 U CN 201120056526U CN 201952698 U CN201952698 U CN 201952698U
- Authority
- CN
- China
- Prior art keywords
- layer
- geotextile
- granular pile
- coarse sand
- roadbed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004746 geotextile Substances 0.000 title claims abstract description 70
- 239000000463 material Substances 0.000 title abstract description 12
- 239000004576 sand Substances 0.000 claims abstract description 39
- 239000002689 soil Substances 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 abstract description 4
- 241000581613 Alchemilla arvensis Species 0.000 abstract 3
- 238000012545 processing Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000004062 sedimentation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- -1 makes stake Substances 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200565263U CN201952698U (en) | 2011-03-07 | 2011-03-07 | Roadbed structure reinforced by geotextile discrete material piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200565263U CN201952698U (en) | 2011-03-07 | 2011-03-07 | Roadbed structure reinforced by geotextile discrete material piles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201952698U true CN201952698U (en) | 2011-08-31 |
Family
ID=44496818
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200565263U Expired - Fee Related CN201952698U (en) | 2011-03-07 | 2011-03-07 | Roadbed structure reinforced by geotextile discrete material piles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201952698U (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444112A (en) * | 2011-09-21 | 2012-05-09 | 陕西长嘉实业发展有限公司 | Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method |
CN102605699A (en) * | 2012-03-23 | 2012-07-25 | 河海大学 | Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment |
CN102926304A (en) * | 2012-11-28 | 2013-02-13 | 中铁第四勘察设计院集团有限公司 | Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation |
CN103628379A (en) * | 2013-12-03 | 2014-03-12 | 山东大学 | Method for reinforcing interface of high-intensity geogrid and soil through single graded crushed stone material |
RU2534840C1 (en) * | 2013-12-23 | 2014-12-10 | Общество с ограниченной ответственностью "Центральный склад N 1" | Ground module |
CN105350513A (en) * | 2015-12-04 | 2016-02-24 | 中铁第四勘察设计院集团有限公司 | Novel construction method for end-bearing type composite consolidated foundation |
CN105507228A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel construction method of suspended composite consolidated foundation |
CN105507230A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel lateral resistance type composite construction method for consolidating foundations |
CN105507227A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel construction method of large-diameter composite structure pile consolidated foundation |
CN105793492A (en) * | 2013-09-30 | 2016-07-20 | 吉欧泰克科技有限公司 | Pavement systems with geocell and geogrid |
CN107700300A (en) * | 2017-10-17 | 2018-02-16 | 蒋昌霞 | A kind of safety protective road foundation |
CN108457135A (en) * | 2018-03-14 | 2018-08-28 | 广东工业大学 | A kind of Vibrant buffer layer |
CN111074716A (en) * | 2020-01-20 | 2020-04-28 | 湖南科技学院 | Soft soil foundation airport runway structure and construction method thereof |
CN111304993A (en) * | 2020-03-17 | 2020-06-19 | 长沙理工大学 | Road surface adds muscle structure |
CN113323004A (en) * | 2021-06-01 | 2021-08-31 | 中国长江三峡集团有限公司 | Concrete panel rock-fill dam soft foundation reinforcing structure and construction method |
-
2011
- 2011-03-07 CN CN2011200565263U patent/CN201952698U/en not_active Expired - Fee Related
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102444112B (en) * | 2011-09-21 | 2014-02-26 | 陕西长嘉实业发展有限公司 | Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method |
CN102444112A (en) * | 2011-09-21 | 2012-05-09 | 陕西长嘉实业发展有限公司 | Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method |
CN102605699A (en) * | 2012-03-23 | 2012-07-25 | 河海大学 | Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment |
CN102926304A (en) * | 2012-11-28 | 2013-02-13 | 中铁第四勘察设计院集团有限公司 | Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation |
CN105793492A (en) * | 2013-09-30 | 2016-07-20 | 吉欧泰克科技有限公司 | Pavement systems with geocell and geogrid |
CN112609523A (en) * | 2013-09-30 | 2021-04-06 | 吉欧泰克科技有限公司 | Pavement system laid on weak roadbed and laying method thereof |
US10753049B2 (en) | 2013-09-30 | 2020-08-25 | Geotech Technologies Ltd. | Pavement systems with geocell and geogrid |
US10407837B2 (en) | 2013-09-30 | 2019-09-10 | Geotech Technologies Ltd. | Pavement systems with geocell and geogrid |
CN103628379A (en) * | 2013-12-03 | 2014-03-12 | 山东大学 | Method for reinforcing interface of high-intensity geogrid and soil through single graded crushed stone material |
CN103628379B (en) * | 2013-12-03 | 2015-07-29 | 山东大学 | Utilize the high-strength geo-grid-Soil Interface intensifying method of single graded broken stone material |
RU2534840C1 (en) * | 2013-12-23 | 2014-12-10 | Общество с ограниченной ответственностью "Центральный склад N 1" | Ground module |
CN105507227A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel construction method of large-diameter composite structure pile consolidated foundation |
CN105507230A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel lateral resistance type composite construction method for consolidating foundations |
CN105507228A (en) * | 2015-12-04 | 2016-04-20 | 中铁第四勘察设计院集团有限公司 | Novel construction method of suspended composite consolidated foundation |
CN105350513A (en) * | 2015-12-04 | 2016-02-24 | 中铁第四勘察设计院集团有限公司 | Novel construction method for end-bearing type composite consolidated foundation |
CN107700300A (en) * | 2017-10-17 | 2018-02-16 | 蒋昌霞 | A kind of safety protective road foundation |
CN108457135A (en) * | 2018-03-14 | 2018-08-28 | 广东工业大学 | A kind of Vibrant buffer layer |
CN111074716A (en) * | 2020-01-20 | 2020-04-28 | 湖南科技学院 | Soft soil foundation airport runway structure and construction method thereof |
CN111074716B (en) * | 2020-01-20 | 2024-05-17 | 湖南科技学院 | Soft soil foundation airport runway structure and construction method thereof |
CN111304993A (en) * | 2020-03-17 | 2020-06-19 | 长沙理工大学 | Road surface adds muscle structure |
CN113323004A (en) * | 2021-06-01 | 2021-08-31 | 中国长江三峡集团有限公司 | Concrete panel rock-fill dam soft foundation reinforcing structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201952698U (en) | Roadbed structure reinforced by geotextile discrete material piles | |
CN103758113B (en) | A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop | |
CN206157746U (en) | Gravelly soil slope retaining structure | |
CN106988178A (en) | A kind of subgrade in soft soil zone widened structure and its construction method | |
CN101608421A (en) | The method of reinforcing soft soil roadbed by geotextile granular material pile | |
CN205152982U (en) | Barricade and structure of filling suitable for height is filled | |
CN202227214U (en) | Deep soft soil foundation embankment structure of high-speed railway | |
CN101654899A (en) | Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway | |
CN202969393U (en) | Ribbing load reduction structure of road high hill culvert | |
CN101598028A (en) | Lining structure for super large section water-rich loess tunnel of high-speed railroad | |
CN201530968U (en) | High-speed railway liquefying soil foundation-roadbed seismic strengthening structure | |
CN101424079A (en) | Construction method of geotechnical grid reinforcement bed course and sandstone pile bidirectional reinforced composite foundation | |
CN204570720U (en) | A kind of widening of subgrade culvert foundation | |
CN205223767U (en) | Loose sand bed slope ground embankment structure | |
CN203684204U (en) | Plastic flow soft foundation reinforced structure | |
CN207646754U (en) | A kind of pile body penetration type bankets body reinforcement bearing structure | |
CN104695419A (en) | Soft soil roadbed construction method | |
CN206157745U (en) | Gravelly soil is height embankment reinforced structure of filling for side slope based on anchor rope | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN206385525U (en) | A kind of timber structure for preventing the high backfill earthwork from sinking | |
CN107700528A (en) | A kind of pile body penetration type bankets body reinforcement bearing structure and construction method | |
CN202492856U (en) | Reinforced concrete pile type buttress retaining wall | |
CN112281911A (en) | Novel ecological block retaining wall and construction method thereof | |
CN103590390A (en) | Plastic flow soft foundation reinforced structure and reinforcing method thereof | |
CN207228101U (en) | A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: WUHAN GUANGYI TRANSPORTATION SCIENCE AND TECHNOLOG Free format text: FORMER OWNER: FENG SHOUZHONG Effective date: 20140417 Free format text: FORMER OWNER: YAN SHUWANG DUAN HAIPENG LI JIE Effective date: 20140417 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 200437 HONGKOU, SHANGHAI TO: 430074 WUHAN, HUBEI PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140417 Address after: 430074 A, block 2502 and 10, building 03, Pioneer Street, East Lake New Technology Development Zone, Wuhan, Hubei, Optics Valley Patentee after: Wuhan Guangyi Traffic Technology Co., Ltd. Address before: 200437 Shanghai city Hongkou District Yiminhe Road 99 Lane 1 Building Room 403 Patentee before: Feng Shouzhong Patentee before: Yan Shuwang Patentee before: Duan Haipeng Patentee before: Li Jie |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110831 Termination date: 20190307 |