CN201952698U - Roadbed structure reinforced by geotextile discrete material piles - Google Patents

Roadbed structure reinforced by geotextile discrete material piles Download PDF

Info

Publication number
CN201952698U
CN201952698U CN2011200565263U CN201120056526U CN201952698U CN 201952698 U CN201952698 U CN 201952698U CN 2011200565263 U CN2011200565263 U CN 2011200565263U CN 201120056526 U CN201120056526 U CN 201120056526U CN 201952698 U CN201952698 U CN 201952698U
Authority
CN
China
Prior art keywords
layer
geotextile
granular pile
coarse sand
roadbed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200565263U
Other languages
Chinese (zh)
Inventor
冯守中
陈修和
张胜
闫澍旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN GUANGYI TRAFFIC TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200565263U priority Critical patent/CN201952698U/en
Application granted granted Critical
Publication of CN201952698U publication Critical patent/CN201952698U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to the field of civil engineering construction, and particularly relates to a roadbed structure reinforced by geotextile discrete material piles. The roadbed structure is characterized by comprising a geotextile discrete material pile layer, a middle coarse sand or break stone mattress layer, a first geogrid or geocell layer and a roadbed fill stratum, the geotextile discrete material pile layer consists of geotextile discrete material piles which are inserted into a soft soil roadbed, the geotextile discrete material piles are distributed on the soft soil roadbed at intervals ranging from 60cm to 250cm, the top of the geotextile discrete material pile layer is located on the ground, the middle coarse sand or break stone mattress layer is arranged at the top of the geotextile discrete material pile layer, the first geogrid or geocell layer is horizontally laid at the top of the middle coarse sand or break stone mattress layer, and the roadbed fill stratum is built on the first geogrid or geocell layer. The roadbed structure is applicable to soft soil roadbed.

Description

The road structure that utilizes the geotextile granular pile to reinforce
Technical field
The utility model belongs to the civil engineering construction field, is specifically related to a kind of road structure.
Background technology
Highway construction such as highway, railway is by weak soil location (soft foundation) time, because of the deficiency of subgrade rating must be carried out the treatment of soft foundation design, to guarantee the stability and the sedimentation and deformation requirement of roadbed.
Summary of the invention
The purpose of this utility model is to provide a kind of road structure that utilizes the geotextile granular pile to reinforce, and this road structure is applicable to soft foundation.
To achieve these goals, technical solution adopted in the utility model is: the road structure that utilizes the geotextile granular pile to reinforce is characterized in that it comprises geotextile granular pile layer, medium coarse sand or rubble mattress layer, first geo-grid or geotechnical grid layer, roadbed fill stratum; Geotextile granular pile layer is made up of the geotextile granular pile, and the geotextile granular pile inserts in the soft foundation, and every interval 60~250cm is laid with a geotextile granular pile soft soil roadbed, and the top of geotextile granular pile layer rest on the ground; The top of geotextile granular pile layer is laid with medium coarse sand or rubble mattress layer, and the top, horizontal of medium coarse sand or rubble mattress layer is equipped with one deck first geo-grid or geotechnical grid layer, has filled the roadbed fill stratum on first geo-grid or the geotechnical grid layer.
Be provided with the geotextile layer between the top of described geotextile granular pile layer and medium coarse sand or the rubble mattress layer.
The stake of described geotextile granular pile is long to be 0.5~25m.
The thickness of described coarse sand or rubble mattress layer is 20~100cm.
Be provided with 1~4 second geo-grid or geotechnical grid layer in described medium coarse sand or the rubble mattress layer.
The beneficial effects of the utility model are: adopt the geotextile granular pile of geotextile granular pile layer to insert in the soft foundation, on geotextile granular pile layer, establish medium coarse sand or rubble mattress layer (perhaps again, between the top of geotextile granular pile layer and medium coarse sand or rubble mattress layer, be provided with the geotextile layer), guarantee the stability and the sedimentation and deformation requirement of roadbed.Road structure of the present utility model is applicable to the soft soil roadbed processing of highway construction various types of properties.
The stress that embankment load is formed by geo-grid and coarse sand or rubble mattress layer is regulated the basis load stress is forwarded on stake and the inter-pile soil, makes stake, soil bear load jointly, and this can effectively improve the effect of soft soil roadbed processing.
Description of drawings
Fig. 1 is the sectional schematic diagram of the road structure that utilizes the reinforcing of geotextile granular pile of the utility model embodiment 1;
Fig. 2 is the sectional schematic diagram of the road structure that utilizes the reinforcing of geotextile granular pile of the utility model embodiment 2;
Among the figure: 1-soft foundation, 2-geotextile granular pile, 3-medium coarse sand or rubble mattress layer, 4-first geo-grid or geotechnical grid layer, 5-roadbed fill stratum, 6-second geo-grid or geotechnical grid layer, 7-geotextile layer.
The specific embodiment
In order to understand the utility model better, further illustrate content of the present utility model below in conjunction with example, but the utility model not only is confined to the following examples.
Embodiment 1:
As shown in Figure 1, the road structure that utilizes the geotextile granular pile to reinforce, it comprises geotextile granular pile layer, medium coarse sand or rubble mattress layer 3, first geo-grid or geotechnical grid layer 4, roadbed fill stratum 5; Geotextile granular pile layer is made up of a plurality of geotextile granular piles 2, (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X in the geotextile granular pile 2 insertion soft foundations 1, denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile), every interval 60~250cm is laid with a geotextile granular pile 2 on soft soil roadbed 1, and the top of geotextile granular pile layer rest on the ground; The top of geotextile granular pile layer is laid with medium coarse sand or rubble mattress layer 3, and the top, horizontal of medium coarse sand or rubble mattress layer 3 is equipped with on one deck first geo-grid or geotechnical grid layer 4, the first geo-grid or the geotechnical grid layer 4 and has filled roadbed fill stratum 5.
The stake of described geotextile granular pile is long to be 0.5~25m.
The thickness of described coarse sand or rubble mattress layer 3 is 20~100cm.
Be provided with 1~4 second geo-grid or geotechnical grid layer 6 (in the present embodiment for being provided with 1 second geogrids layer) in described medium coarse sand or the rubble mattress layer.
Embodiment 2:
As shown in Figure 2, substantially the same manner as Example 1, difference is: be provided with geotextile layer 7 between the top of described geotextile granular pile layer and medium coarse sand or the rubble mattress layer 3.
The job practices of above-mentioned road structure, it comprises the steps:
1) every interval 60~250cm lays a geotextile granular pile 2 (all geotextile granular piles are formed geotextile granular pile layer) on soft soil roadbed 1; The plane mode of laying out pile is quadrangle or triangle, the diameter of geotextile granular pile can be designed to 30~200cm according to actual conditions, the spacing of geotextile granular pile is 0.5~3.0m, the stake of geotextile granular pile is long to be 0.5~25m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) adopt one of following two kinds of methods:
1. level is laid layer of geotextile layer 7 on the ground of geotextile granular pile top bit, lays medium coarse sand or rubble mattress layer 3 then on geotextile layer 7; Geotextile layer 7 is to cover one deck geotextiles on one deck geo-grid or one deck geo-grid; The material of medium coarse sand or rubble mattress layer 3 is medium coarse sand or rubble; The thickness of medium coarse sand or rubble mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of coarse sand or rubble mattress layer;
2. or directly on geotextile granular pile top bit, directly lay medium coarse sand or rubble mattress layer 3;
The material of medium coarse sand or rubble mattress layer 3 is medium coarse sand or rubble; The thickness of medium coarse sand or rubble mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of medium coarse sand or rubble mattress layer;
3) material in medium coarse sand or rubble mattress layer top, horizontal laying one deck first geogrids layer 4, the first geogrids layer 4 is geo-grid or geotechnical grid, then filling roadbed the banketing of first geogrids layer, 4 higher slices, forms roadbed fill stratum 5.
In described medium coarse sand or the rubble mattress layer, lay second geogrids layer 6 apart from level by 20~50cm interlamellar spacing; The material of second geogrids layer 6 is a geo-grid.Can establish 1~4 second geogrids layer 6 in medium coarse sand or the rubble mattress layer.
The distance of described interlamellar spacing is meant: the distance between the bottom surface of basecoat first geogrids layer and medium coarse sand or rubble mattress layer (or geotextile layer 7), second adjacent geogrids layer 6 and the distance between second geogrids layer 6, the distance between last layer second geogrids layer 6 and first geogrids layer 4.
The maximum particle diameter of rubble should not surpass 10cm.

Claims (5)

1. the road structure that utilizes the geotextile granular pile to reinforce is characterized in that it comprises geotextile granular pile layer, medium coarse sand or rubble mattress layer (3), first geo-grid or geotechnical grid layer (4), roadbed fill stratum (5); Geotextile granular pile layer is made up of geotextile granular pile (2), geotextile granular pile (2) inserts in the soft foundation (1), go up every interval 60~250cm in soft soil roadbed (1) and be laid with a geotextile granular pile (2), the top of geotextile granular pile layer rest on the ground; The top of geotextile granular pile layer is laid with medium coarse sand or rubble mattress layer (3), the top, horizontal of medium coarse sand or rubble mattress layer (3) is equipped with one deck first geo-grid or geotechnical grid layer (4), has filled roadbed fill stratum (5) on first geo-grid or the geotechnical grid layer (4).
2. the road structure that utilizes the geotextile granular pile to reinforce according to claim 1 is characterized in that: be provided with geotextile layer (7) between the top of described geotextile granular pile layer and medium coarse sand or the rubble mattress layer (3).
3. the road structure that utilizes the geotextile granular pile to reinforce according to claim 1 is characterized in that: the long 0.5~25m of being of stake of described geotextile granular pile.
4. the road structure that utilizes the geotextile granular pile to reinforce according to claim 1, it is characterized in that: the thickness of described coarse sand or rubble mattress layer (3) is 20~100cm.
5. the road structure that utilizes the geotextile granular pile to reinforce according to claim 1 is characterized in that: be provided with 1~4 second geo-grid or geotechnical grid layer (6) in described medium coarse sand or the rubble mattress layer.
CN2011200565263U 2011-03-07 2011-03-07 Roadbed structure reinforced by geotextile discrete material piles Expired - Fee Related CN201952698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200565263U CN201952698U (en) 2011-03-07 2011-03-07 Roadbed structure reinforced by geotextile discrete material piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200565263U CN201952698U (en) 2011-03-07 2011-03-07 Roadbed structure reinforced by geotextile discrete material piles

Publications (1)

Publication Number Publication Date
CN201952698U true CN201952698U (en) 2011-08-31

Family

ID=44496818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200565263U Expired - Fee Related CN201952698U (en) 2011-03-07 2011-03-07 Roadbed structure reinforced by geotextile discrete material piles

Country Status (1)

Country Link
CN (1) CN201952698U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444112A (en) * 2011-09-21 2012-05-09 陕西长嘉实业发展有限公司 Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method
CN102605699A (en) * 2012-03-23 2012-07-25 河海大学 Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment
CN102926304A (en) * 2012-11-28 2013-02-13 中铁第四勘察设计院集团有限公司 Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation
CN103628379A (en) * 2013-12-03 2014-03-12 山东大学 Method for reinforcing interface of high-intensity geogrid and soil through single graded crushed stone material
RU2534840C1 (en) * 2013-12-23 2014-12-10 Общество с ограниченной ответственностью "Центральный склад N 1" Ground module
CN105350513A (en) * 2015-12-04 2016-02-24 中铁第四勘察设计院集团有限公司 Novel construction method for end-bearing type composite consolidated foundation
CN105507228A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel construction method of suspended composite consolidated foundation
CN105507230A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel lateral resistance type composite construction method for consolidating foundations
CN105507227A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel construction method of large-diameter composite structure pile consolidated foundation
CN105793492A (en) * 2013-09-30 2016-07-20 吉欧泰克科技有限公司 Pavement systems with geocell and geogrid
CN107700300A (en) * 2017-10-17 2018-02-16 蒋昌霞 A kind of safety protective road foundation
CN108457135A (en) * 2018-03-14 2018-08-28 广东工业大学 A kind of Vibrant buffer layer
CN111074716A (en) * 2020-01-20 2020-04-28 湖南科技学院 Soft soil foundation airport runway structure and construction method thereof
CN111304993A (en) * 2020-03-17 2020-06-19 长沙理工大学 Road surface adds muscle structure
CN113323004A (en) * 2021-06-01 2021-08-31 中国长江三峡集团有限公司 Concrete panel rock-fill dam soft foundation reinforcing structure and construction method

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444112B (en) * 2011-09-21 2014-02-26 陕西长嘉实业发展有限公司 Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method
CN102444112A (en) * 2011-09-21 2012-05-09 陕西长嘉实业发展有限公司 Gravel pier shell structure used for salinized soft soil foundation and pier shell construction method
CN102605699A (en) * 2012-03-23 2012-07-25 河海大学 Technology for settlement control of hollow rigid plate after construction of deep soft soil foundation of high-level embankment
CN102926304A (en) * 2012-11-28 2013-02-13 中铁第四勘察设计院集团有限公司 Reinforcement method and reinforcement structure for treating railway soft soil roadbed settlement overweight before operation
CN105793492A (en) * 2013-09-30 2016-07-20 吉欧泰克科技有限公司 Pavement systems with geocell and geogrid
CN112609523A (en) * 2013-09-30 2021-04-06 吉欧泰克科技有限公司 Pavement system laid on weak roadbed and laying method thereof
US10753049B2 (en) 2013-09-30 2020-08-25 Geotech Technologies Ltd. Pavement systems with geocell and geogrid
US10407837B2 (en) 2013-09-30 2019-09-10 Geotech Technologies Ltd. Pavement systems with geocell and geogrid
CN103628379A (en) * 2013-12-03 2014-03-12 山东大学 Method for reinforcing interface of high-intensity geogrid and soil through single graded crushed stone material
CN103628379B (en) * 2013-12-03 2015-07-29 山东大学 Utilize the high-strength geo-grid-Soil Interface intensifying method of single graded broken stone material
RU2534840C1 (en) * 2013-12-23 2014-12-10 Общество с ограниченной ответственностью "Центральный склад N 1" Ground module
CN105507227A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel construction method of large-diameter composite structure pile consolidated foundation
CN105507230A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel lateral resistance type composite construction method for consolidating foundations
CN105507228A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel construction method of suspended composite consolidated foundation
CN105350513A (en) * 2015-12-04 2016-02-24 中铁第四勘察设计院集团有限公司 Novel construction method for end-bearing type composite consolidated foundation
CN107700300A (en) * 2017-10-17 2018-02-16 蒋昌霞 A kind of safety protective road foundation
CN108457135A (en) * 2018-03-14 2018-08-28 广东工业大学 A kind of Vibrant buffer layer
CN111074716A (en) * 2020-01-20 2020-04-28 湖南科技学院 Soft soil foundation airport runway structure and construction method thereof
CN111074716B (en) * 2020-01-20 2024-05-17 湖南科技学院 Soft soil foundation airport runway structure and construction method thereof
CN111304993A (en) * 2020-03-17 2020-06-19 长沙理工大学 Road surface adds muscle structure
CN113323004A (en) * 2021-06-01 2021-08-31 中国长江三峡集团有限公司 Concrete panel rock-fill dam soft foundation reinforcing structure and construction method

Similar Documents

Publication Publication Date Title
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN206157746U (en) Gravelly soil slope retaining structure
CN106988178A (en) A kind of subgrade in soft soil zone widened structure and its construction method
CN101608421A (en) The method of reinforcing soft soil roadbed by geotextile granular material pile
CN205152982U (en) Barricade and structure of filling suitable for height is filled
CN202227214U (en) Deep soft soil foundation embankment structure of high-speed railway
CN101654899A (en) Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN201530968U (en) High-speed railway liquefying soil foundation-roadbed seismic strengthening structure
CN101424079A (en) Construction method of geotechnical grid reinforcement bed course and sandstone pile bidirectional reinforced composite foundation
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN205223767U (en) Loose sand bed slope ground embankment structure
CN203684204U (en) Plastic flow soft foundation reinforced structure
CN207646754U (en) A kind of pile body penetration type bankets body reinforcement bearing structure
CN104695419A (en) Soft soil roadbed construction method
CN206157745U (en) Gravelly soil is height embankment reinforced structure of filling for side slope based on anchor rope
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN206385525U (en) A kind of timber structure for preventing the high backfill earthwork from sinking
CN107700528A (en) A kind of pile body penetration type bankets body reinforcement bearing structure and construction method
CN202492856U (en) Reinforced concrete pile type buttress retaining wall
CN112281911A (en) Novel ecological block retaining wall and construction method thereof
CN103590390A (en) Plastic flow soft foundation reinforced structure and reinforcing method thereof
CN207228101U (en) A kind of sand compaction pile for being used in the soft soil foundation of deep water off-lying sea reinforce vertical type shore protection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN GUANGYI TRANSPORTATION SCIENCE AND TECHNOLOG

Free format text: FORMER OWNER: FENG SHOUZHONG

Effective date: 20140417

Free format text: FORMER OWNER: YAN SHUWANG DUAN HAIPENG LI JIE

Effective date: 20140417

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200437 HONGKOU, SHANGHAI TO: 430074 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20140417

Address after: 430074 A, block 2502 and 10, building 03, Pioneer Street, East Lake New Technology Development Zone, Wuhan, Hubei, Optics Valley

Patentee after: Wuhan Guangyi Traffic Technology Co., Ltd.

Address before: 200437 Shanghai city Hongkou District Yiminhe Road 99 Lane 1 Building Room 403

Patentee before: Feng Shouzhong

Patentee before: Yan Shuwang

Patentee before: Duan Haipeng

Patentee before: Li Jie

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20190307