CN202227214U - Deep soft soil foundation embankment structure of high-speed railway - Google Patents
Deep soft soil foundation embankment structure of high-speed railway Download PDFInfo
- Publication number
- CN202227214U CN202227214U CN2011203204873U CN201120320487U CN202227214U CN 202227214 U CN202227214 U CN 202227214U CN 2011203204873 U CN2011203204873 U CN 2011203204873U CN 201120320487 U CN201120320487 U CN 201120320487U CN 202227214 U CN202227214 U CN 202227214U
- Authority
- CN
- China
- Prior art keywords
- soft soil
- speed railway
- embankment
- soil foundation
- deep soft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model relates to a deep soft soil foundation embankment structure of a high-speed railway, which can effectively solve the strength and the deformation problems of the high-speed railway constructed on the deep soft soil foundation embankment, and includes prestressed pipe piles (4) penetrating from a soft soil layer (1) to a certain depth of a rock bearing hard layer (2) and longitudinally and transversely arranged at an interval along the foundation, a reinforced cushion layer (6) laid above the prestressed pipe piles (4), a concrete cushion layer (7) laid above the reinforced cushion layer (6), cantilever arm or support arm retaining walls (5) arranged on the two transverse sides of the foundation and on the concrete cushion layer (7), a soil embankment (3) filled and constructed between the deep soft soil foundation and the retaining walls (5), and sand and cobble inverse filter layers (8) arranged between the inner sides of the retaining walls (5) and the soil embankment (3).
Description
Technical field
The utility model relates to embankment structures such as railway, highway, the piece of smooth land, particularly high-speed railway deep soft soil foundation embankment structure.
Background technology
Deep soft soil foundation extensively distributes in China's Coastal Areas; Coastal area land resources is very rare and precious simultaneously, and the demand ten minutes that coastal Deep Thick Soft Ground Area is built high-speed railway is huge, therefore; A kind of embankment structure of building high-speed railway in the coastal area of active demand; Intensity and deformation requirements that high-speed railway is higher had both been guaranteed, and had saved the area again and invest also have the characteristics of the simple and compliance with environmental protection requirements of construction technology.
The utility model content
The utility model technical problem to be solved provides a kind of high-speed railway deep soft soil foundation embankment structure, can effectively solve and build high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation.
It is following that the utility model solves the technical scheme that its technical problem adopted:
The high-speed railway deep soft soil foundation embankment of the utility model structure is characterized in that it comprises: pass the pile for prestressed pipe that soft layer to ground is held power hard formation certain depth, along roadbed vertically, be horizontally arranged at interval; Reinforcement cushion is layed in the pile for prestressed pipe top; Concrete cushion is layed in the reinforcement cushion top; Cantilevered or hold up arm-type barricade places on roadbed both lateral sides and the concrete cushion; The soil property embankment fills on the deep soft soil foundation and between the barricade; The sandy gravel loaded filter is arranged between barricade inboard and the soil property embankment.
The beneficial effect of the utility model is; Have that globality is strong, the characteristics of good stability; Solved effectively and built high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation, adopt embankment put the slope fill can save the area with the ground stabilization measure, can reduce the investment more than 10%; Environmental protection is good, and construction technology is simple.
Description of drawings
This manual comprises following three width of cloth accompanying drawings:
Fig. 1 is the utility model high-speed railway deep soft soil foundation embankment structure cross-sectional configuration sketch map;
Fig. 2 is the utility model high-speed railway deep soft soil foundation embankment structure reinforcement cushion structural representation;
Fig. 3 is the utility model high-speed railway deep soft soil foundation embankment structure reinforcement cushion top concrete cushion structural representation.
Member shown in the figure, position and pairing mark: soft layer 1, ground are held power hard formation 2, soil property embankment 3; Pile for prestressed pipe 4, pile cover 401; Barricade 5; Reinforcement cushion 6, first floor hardcore bed 601, second layer hardcore bed 602, the 3rd layer of hardcore bed 603, first floor GSZ 611, second layer GSZ 612; Concrete cushion 7; Sandy gravel loaded filter 8.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
With reference to Fig. 1, the high-speed railway deep soft soil foundation embankment of the utility model structure, it comprises: pass the pile for prestressed pipe 4 that soft layer 1 to ground is held power hard formation 2 certain depths, along roadbed vertically, be horizontally arranged at interval, guarantee the intensity and the distortion of embankment structure; Reinforcement cushion 6 is layed in pile for prestressed pipe 4 tops, makes pile for prestressed pipe 4 stressed even; Concrete cushion 7 is layed in reinforcement cushion 6 tops, to increase cantilevered or to hold up arm-type barricade 5 underlying strengths; Cantilevered or hold up arm-type barricade 5 places on roadbed both lateral sides and the concrete cushion 7, carries out embankment and receives the slope and reduce railway land and ground stabilization measure; Soil property embankment 3 fills on the deep soft soil foundation and between the barricade 5; Sandy gravel loaded filter 8 is arranged between barricade 5 inboards and the soil property embankment 3, to discharge the infiltration of going in the embankment.Have that globality is strong, the characteristics of good stability; Solved effectively and built high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation, adopt embankment put the slope fill can save the area with the ground stabilization measure, can reduce the investment more than 10%; Environmental protection is good, and construction technology is simple.
With reference to Fig. 1, be arranged at cantilevered or hold up the pile for prestressed pipe 4 under the arm-type barricade 5, its spacing is according to cantilevered or hold up 5 inspections of arm-type barricade to calculate to require to confirm, stretches into down ground for sleeping in and holds power hard formation 2 degree of depth and need guarantee the top cantilevered or hold up stablizing of arm-type barricade 5.
With reference to Fig. 3 and Fig. 4, the top of said pile for prestressed pipe 4 is consolidated with pile cover 401, and the cross section of pile cover 401 is general rounded or square, and its diameter or the length of side are generally 1.0~1.2m, highly are 0.4~0.6m.The setting of pile cover 401 can strengthen pile for prestressed pipe 4 and effectively hold the power area, and reinforcement cushion 6 places pile for prestressed pipe pile cover top, makes pile for prestressed pipe stressed evenly, reduces soil property embankment 3 differential settlements.
With reference to Fig. 2; Said reinforcement cushion 6 is usually by first floor hardcore bed 601, first floor GSZ 611, second layer hardcore bed 602, second layer GSZ 612, the 3rd layer of hardcore bed 603 of laying successively from bottom to up, and the thickness of first floor hardcore bed 601, second layer hardcore bed 602 and the 3rd layer of hardcore bed 603 is generally 0.2m.
With reference to Fig. 3, said concrete cushion 7 is laid on the reinforcement cushion 6, and its thickness is generally 0.1~0.2m.With reference to Fig. 1, concrete cushion 7 outsides are extended cantilevered or are held up the outer width of arm-type barricade 5 toe of wall plates to be not less than 0.5m, and the width of reinforcement cushion 6 is then consistent with the width of concrete cushion 7.With reference to Fig. 1, said cantilevered or hold up the toe of wall buried depth of arm-type barricade 5 to be not less than 1.0m, the thickness of said sandy gravel loaded filter 8 is generally 0.3m.Said cantilevered or hold up arm-type barricade 5 along the every interval 15~20m of embankment bearing of trend one place, shrinkage joint to be set, shrinkage joint adopt the filling of pitch plank.
Some principles of the above the utility model high-speed railway deep soft soil foundation embankment structure that just explains through diagrams; Be not be to the utility model be confined to shown in described concrete structure and the scope of application in; So every the modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.
Claims (8)
1. high-speed railway deep soft soil foundation embankment structure is characterized in that it comprises: pass the pile for prestressed pipe (4) that soft layer (1) to ground is held power hard formation (2) certain depth, along roadbed vertically, be horizontally arranged at interval; Reinforcement cushion (6) is layed in pile for prestressed pipe (4) top; Concrete cushion (7) is layed in reinforcement cushion (6) top; Cantilevered or hold up arm-type barricade (5) places on roadbed both lateral sides and the concrete cushion (7); Soil property embankment (3) fills on the deep soft soil foundation and between the barricade (5); Sandy gravel loaded filter (8) is arranged between barricade (5) inboard and the soil property embankment (3).
2. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1; It is characterized in that: the top of said pile for prestressed pipe (4) is consolidated with pile cover (401); The cross section of pile cover (401) is rounded or square, and its diameter or the length of side are 1.0~1.2m, highly is 0.4~0.6m.
3. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1; It is characterized in that: said reinforcement cushion (6) is by first floor hardcore bed (601), first floor GSZ (611), second layer hardcore bed (602), second layer GSZ (612), the 3rd layer of hardcore bed (603) laid successively from bottom to up, and the thickness of first floor hardcore bed (601), second layer hardcore bed (602) and the 3rd layer of hardcore bed (603) is 0.2m.
4. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1, it is characterized in that: said concrete cushion (7) thickness is 0.1~0.2m, its outside is extended cantilevered or is held up the outer width of arm-type barricade (5) toe of wall plate to be not less than 0.5m.
5. high-speed railway deep soft soil foundation embankment structure as claimed in claim 4, it is characterized in that: the width of said reinforcement cushion (6) is consistent with the width of concrete cushion (7).
6. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1, it is characterized in that: the thickness of said sandy gravel loaded filter (8) is 0.3m.
7. high-speed railway deep soft soil foundation embankment as claimed in claim 1 structure is characterized in that: said cantilevered or hold up arm-type barricade (5) along the every interval 15~20m of embankment bearing of trend one place, shrinkage joint to be set, the filling of pitch plank is adopted at the shrinkage joint.
8. high-speed railway deep soft soil foundation embankment as claimed in claim 7 structure is characterized in that: said cantilevered or hold up the toe of wall buried depth of arm-type barricade (5) to be not less than 1.0m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203204873U CN202227214U (en) | 2011-08-30 | 2011-08-30 | Deep soft soil foundation embankment structure of high-speed railway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203204873U CN202227214U (en) | 2011-08-30 | 2011-08-30 | Deep soft soil foundation embankment structure of high-speed railway |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202227214U true CN202227214U (en) | 2012-05-23 |
Family
ID=46077807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203204873U Expired - Lifetime CN202227214U (en) | 2011-08-30 | 2011-08-30 | Deep soft soil foundation embankment structure of high-speed railway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202227214U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733354A (en) * | 2012-07-19 | 2012-10-17 | 陈洪凯 | Pile-wall combined anti-sliding support managing structure |
CN105970755A (en) * | 2016-05-27 | 2016-09-28 | 宁波市交通规划设计研究院有限公司 | Construction method for prevention and treatment for sidewise slippage of soft soil roadbed |
CN106283950A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure |
CN107268573A (en) * | 2017-07-18 | 2017-10-20 | 深圳市工勘岩土集团有限公司 | The composite construction of soft soil foundation |
CN109610256A (en) * | 2018-12-04 | 2019-04-12 | 天津市市政工程设计研究院 | The method for processing foundation of buried house refuse under a kind of roadbed |
CN109653049A (en) * | 2018-12-18 | 2019-04-19 | 中铁十五局集团第工程有限公司 | The construction method in approach fill section in a kind of soft ground treatment |
CN109972470A (en) * | 2019-04-10 | 2019-07-05 | 四川省交通勘察设计研究院有限公司 | A kind of assembled subgrade construction system and technique suitable for deep soft foundation |
CN110374136A (en) * | 2019-08-12 | 2019-10-25 | 广东电网有限责任公司 | Soil-baffling structure suitable for the electrical building building on soft geological |
CN111235992A (en) * | 2020-03-17 | 2020-06-05 | 中铁二院工程集团有限责任公司 | Slope soft soil foundation cantilever retaining wall reinforcing structure and construction method |
CN111424567A (en) * | 2020-03-26 | 2020-07-17 | 中电建十一局工程有限公司 | Highway soft soil foundation culvert construction method |
CN115369889A (en) * | 2022-09-09 | 2022-11-22 | 中冶成都勘察研究总院有限公司 | Assembled reinforced concrete foundation pit supporting structure based on wet joint and construction method |
-
2011
- 2011-08-30 CN CN2011203204873U patent/CN202227214U/en not_active Expired - Lifetime
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733354A (en) * | 2012-07-19 | 2012-10-17 | 陈洪凯 | Pile-wall combined anti-sliding support managing structure |
CN102733354B (en) * | 2012-07-19 | 2014-07-02 | 陈洪凯 | Pile-wall combined anti-sliding support managing structure |
CN105970755A (en) * | 2016-05-27 | 2016-09-28 | 宁波市交通规划设计研究院有限公司 | Construction method for prevention and treatment for sidewise slippage of soft soil roadbed |
CN106283950A (en) * | 2016-09-15 | 2017-01-04 | 中铁第四勘察设计院集团有限公司 | Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure |
CN107268573A (en) * | 2017-07-18 | 2017-10-20 | 深圳市工勘岩土集团有限公司 | The composite construction of soft soil foundation |
CN109610256A (en) * | 2018-12-04 | 2019-04-12 | 天津市市政工程设计研究院 | The method for processing foundation of buried house refuse under a kind of roadbed |
CN109653049A (en) * | 2018-12-18 | 2019-04-19 | 中铁十五局集团第工程有限公司 | The construction method in approach fill section in a kind of soft ground treatment |
CN109653049B (en) * | 2018-12-18 | 2021-12-03 | 中铁十五局集团第一工程有限公司 | Construction method for processing bridge head filling road section on soft foundation |
CN109972470A (en) * | 2019-04-10 | 2019-07-05 | 四川省交通勘察设计研究院有限公司 | A kind of assembled subgrade construction system and technique suitable for deep soft foundation |
CN110374136A (en) * | 2019-08-12 | 2019-10-25 | 广东电网有限责任公司 | Soil-baffling structure suitable for the electrical building building on soft geological |
CN111235992A (en) * | 2020-03-17 | 2020-06-05 | 中铁二院工程集团有限责任公司 | Slope soft soil foundation cantilever retaining wall reinforcing structure and construction method |
CN111424567A (en) * | 2020-03-26 | 2020-07-17 | 中电建十一局工程有限公司 | Highway soft soil foundation culvert construction method |
CN111424567B (en) * | 2020-03-26 | 2021-08-24 | 中电建十一局工程有限公司 | Highway soft soil foundation culvert construction method |
CN115369889A (en) * | 2022-09-09 | 2022-11-22 | 中冶成都勘察研究总院有限公司 | Assembled reinforced concrete foundation pit supporting structure based on wet joint and construction method |
CN115369889B (en) * | 2022-09-09 | 2023-11-28 | 中冶成都勘察研究总院有限公司 | Assembled reinforced concrete foundation pit supporting structure based on wet connection and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202227214U (en) | Deep soft soil foundation embankment structure of high-speed railway | |
CN106988178A (en) | A kind of subgrade in soft soil zone widened structure and its construction method | |
CN103758113B (en) | A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop | |
CN202595591U (en) | Micro steel pipe pile network structure for tunnel cavern roadbed in karst region | |
CN102425082A (en) | Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway | |
CN202969393U (en) | Ribbing load reduction structure of road high hill culvert | |
CN203346750U (en) | Long-short pile raft structure roadbed of deep spongy soil region | |
CN107119520A (en) | The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods | |
CN202247575U (en) | Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst | |
CN205116204U (en) | Roadbed structure of crowded native bored concrete pile stake board of two -way spiral | |
CN202809501U (en) | Reinforced load reducing structure of motorway high filling culvert in mountainous area | |
CN202323922U (en) | Tilted stratum soft foundation reinforcing structure of high-speed railway | |
CN203270559U (en) | Roadbed structure of screw pile network structure composite foundation | |
CN202830673U (en) | Existing embankment heightening structure for limited using land area | |
CN102797265A (en) | Protective structure for bedding slope bridge piers and abutments | |
CN110205982B (en) | Channel structure for improving flood control standard of existing river levee and construction method thereof | |
CN202492856U (en) | Reinforced concrete pile type buttress retaining wall | |
CN210238180U (en) | Soft roadbed processing device with unit type gravel pile composite foundation combined with overload prepressing | |
CN201538934U (en) | Collapsible loess tunnel foundation basic structure of high-speed railway | |
CN203007761U (en) | Grouting reinforcement structure for steel floral tube of existing railway roadbed under operation condition | |
CN215976642U (en) | Soft foundation treatment structure for high-water-level deep garbage soil of coastal railway | |
CN206800092U (en) | The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay | |
CN110172988A (en) | A kind of piling formula composite concrete placement ground and its construction method | |
CN203498863U (en) | Three-dimensional continuous-frame-type reinforced concrete structural retaining wall | |
CN106283949B (en) | Medium-and low-speed maglev traffic engineering single line embankment location independence pier stud type support rail girder construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20120523 |
|
CX01 | Expiry of patent term |