CN202227214U - Deep soft soil foundation embankment structure of high-speed railway - Google Patents

Deep soft soil foundation embankment structure of high-speed railway Download PDF

Info

Publication number
CN202227214U
CN202227214U CN2011203204873U CN201120320487U CN202227214U CN 202227214 U CN202227214 U CN 202227214U CN 2011203204873 U CN2011203204873 U CN 2011203204873U CN 201120320487 U CN201120320487 U CN 201120320487U CN 202227214 U CN202227214 U CN 202227214U
Authority
CN
China
Prior art keywords
soft soil
speed railway
embankment
soil foundation
deep soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011203204873U
Other languages
Chinese (zh)
Inventor
姚裕春
李安洪
庞应刚
曾永红
周成
李楚根
叶世斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN2011203204873U priority Critical patent/CN202227214U/en
Application granted granted Critical
Publication of CN202227214U publication Critical patent/CN202227214U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a deep soft soil foundation embankment structure of a high-speed railway, which can effectively solve the strength and the deformation problems of the high-speed railway constructed on the deep soft soil foundation embankment, and includes prestressed pipe piles (4) penetrating from a soft soil layer (1) to a certain depth of a rock bearing hard layer (2) and longitudinally and transversely arranged at an interval along the foundation, a reinforced cushion layer (6) laid above the prestressed pipe piles (4), a concrete cushion layer (7) laid above the reinforced cushion layer (6), cantilever arm or support arm retaining walls (5) arranged on the two transverse sides of the foundation and on the concrete cushion layer (7), a soil embankment (3) filled and constructed between the deep soft soil foundation and the retaining walls (5), and sand and cobble inverse filter layers (8) arranged between the inner sides of the retaining walls (5) and the soil embankment (3).

Description

High-speed railway deep soft soil foundation embankment structure
Technical field
The utility model relates to embankment structures such as railway, highway, the piece of smooth land, particularly high-speed railway deep soft soil foundation embankment structure.
Background technology
Deep soft soil foundation extensively distributes in China's Coastal Areas; Coastal area land resources is very rare and precious simultaneously, and the demand ten minutes that coastal Deep Thick Soft Ground Area is built high-speed railway is huge, therefore; A kind of embankment structure of building high-speed railway in the coastal area of active demand; Intensity and deformation requirements that high-speed railway is higher had both been guaranteed, and had saved the area again and invest also have the characteristics of the simple and compliance with environmental protection requirements of construction technology.
The utility model content
The utility model technical problem to be solved provides a kind of high-speed railway deep soft soil foundation embankment structure, can effectively solve and build high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation.
It is following that the utility model solves the technical scheme that its technical problem adopted:
The high-speed railway deep soft soil foundation embankment of the utility model structure is characterized in that it comprises: pass the pile for prestressed pipe that soft layer to ground is held power hard formation certain depth, along roadbed vertically, be horizontally arranged at interval; Reinforcement cushion is layed in the pile for prestressed pipe top; Concrete cushion is layed in the reinforcement cushion top; Cantilevered or hold up arm-type barricade places on roadbed both lateral sides and the concrete cushion; The soil property embankment fills on the deep soft soil foundation and between the barricade; The sandy gravel loaded filter is arranged between barricade inboard and the soil property embankment.
The beneficial effect of the utility model is; Have that globality is strong, the characteristics of good stability; Solved effectively and built high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation, adopt embankment put the slope fill can save the area with the ground stabilization measure, can reduce the investment more than 10%; Environmental protection is good, and construction technology is simple.
Description of drawings
This manual comprises following three width of cloth accompanying drawings:
Fig. 1 is the utility model high-speed railway deep soft soil foundation embankment structure cross-sectional configuration sketch map;
Fig. 2 is the utility model high-speed railway deep soft soil foundation embankment structure reinforcement cushion structural representation;
Fig. 3 is the utility model high-speed railway deep soft soil foundation embankment structure reinforcement cushion top concrete cushion structural representation.
Member shown in the figure, position and pairing mark: soft layer 1, ground are held power hard formation 2, soil property embankment 3; Pile for prestressed pipe 4, pile cover 401; Barricade 5; Reinforcement cushion 6, first floor hardcore bed 601, second layer hardcore bed 602, the 3rd layer of hardcore bed 603, first floor GSZ 611, second layer GSZ 612; Concrete cushion 7; Sandy gravel loaded filter 8.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
With reference to Fig. 1, the high-speed railway deep soft soil foundation embankment of the utility model structure, it comprises: pass the pile for prestressed pipe 4 that soft layer 1 to ground is held power hard formation 2 certain depths, along roadbed vertically, be horizontally arranged at interval, guarantee the intensity and the distortion of embankment structure; Reinforcement cushion 6 is layed in pile for prestressed pipe 4 tops, makes pile for prestressed pipe 4 stressed even; Concrete cushion 7 is layed in reinforcement cushion 6 tops, to increase cantilevered or to hold up arm-type barricade 5 underlying strengths; Cantilevered or hold up arm-type barricade 5 places on roadbed both lateral sides and the concrete cushion 7, carries out embankment and receives the slope and reduce railway land and ground stabilization measure; Soil property embankment 3 fills on the deep soft soil foundation and between the barricade 5; Sandy gravel loaded filter 8 is arranged between barricade 5 inboards and the soil property embankment 3, to discharge the infiltration of going in the embankment.Have that globality is strong, the characteristics of good stability; Solved effectively and built high-speed railway embankment intensity and problem on deformation on the deep soft soil foundation, adopt embankment put the slope fill can save the area with the ground stabilization measure, can reduce the investment more than 10%; Environmental protection is good, and construction technology is simple.
With reference to Fig. 1, be arranged at cantilevered or hold up the pile for prestressed pipe 4 under the arm-type barricade 5, its spacing is according to cantilevered or hold up 5 inspections of arm-type barricade to calculate to require to confirm, stretches into down ground for sleeping in and holds power hard formation 2 degree of depth and need guarantee the top cantilevered or hold up stablizing of arm-type barricade 5.
With reference to Fig. 3 and Fig. 4, the top of said pile for prestressed pipe 4 is consolidated with pile cover 401, and the cross section of pile cover 401 is general rounded or square, and its diameter or the length of side are generally 1.0~1.2m, highly are 0.4~0.6m.The setting of pile cover 401 can strengthen pile for prestressed pipe 4 and effectively hold the power area, and reinforcement cushion 6 places pile for prestressed pipe pile cover top, makes pile for prestressed pipe stressed evenly, reduces soil property embankment 3 differential settlements.
With reference to Fig. 2; Said reinforcement cushion 6 is usually by first floor hardcore bed 601, first floor GSZ 611, second layer hardcore bed 602, second layer GSZ 612, the 3rd layer of hardcore bed 603 of laying successively from bottom to up, and the thickness of first floor hardcore bed 601, second layer hardcore bed 602 and the 3rd layer of hardcore bed 603 is generally 0.2m.
With reference to Fig. 3, said concrete cushion 7 is laid on the reinforcement cushion 6, and its thickness is generally 0.1~0.2m.With reference to Fig. 1, concrete cushion 7 outsides are extended cantilevered or are held up the outer width of arm-type barricade 5 toe of wall plates to be not less than 0.5m, and the width of reinforcement cushion 6 is then consistent with the width of concrete cushion 7.With reference to Fig. 1, said cantilevered or hold up the toe of wall buried depth of arm-type barricade 5 to be not less than 1.0m, the thickness of said sandy gravel loaded filter 8 is generally 0.3m.Said cantilevered or hold up arm-type barricade 5 along the every interval 15~20m of embankment bearing of trend one place, shrinkage joint to be set, shrinkage joint adopt the filling of pitch plank.
Some principles of the above the utility model high-speed railway deep soft soil foundation embankment structure that just explains through diagrams; Be not be to the utility model be confined to shown in described concrete structure and the scope of application in; So every the modify and equivalent that might be utilized all belongs to the claim that the utility model is applied for.

Claims (8)

1. high-speed railway deep soft soil foundation embankment structure is characterized in that it comprises: pass the pile for prestressed pipe (4) that soft layer (1) to ground is held power hard formation (2) certain depth, along roadbed vertically, be horizontally arranged at interval; Reinforcement cushion (6) is layed in pile for prestressed pipe (4) top; Concrete cushion (7) is layed in reinforcement cushion (6) top; Cantilevered or hold up arm-type barricade (5) places on roadbed both lateral sides and the concrete cushion (7); Soil property embankment (3) fills on the deep soft soil foundation and between the barricade (5); Sandy gravel loaded filter (8) is arranged between barricade (5) inboard and the soil property embankment (3).
2. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1; It is characterized in that: the top of said pile for prestressed pipe (4) is consolidated with pile cover (401); The cross section of pile cover (401) is rounded or square, and its diameter or the length of side are 1.0~1.2m, highly is 0.4~0.6m.
3. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1; It is characterized in that: said reinforcement cushion (6) is by first floor hardcore bed (601), first floor GSZ (611), second layer hardcore bed (602), second layer GSZ (612), the 3rd layer of hardcore bed (603) laid successively from bottom to up, and the thickness of first floor hardcore bed (601), second layer hardcore bed (602) and the 3rd layer of hardcore bed (603) is 0.2m.
4. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1, it is characterized in that: said concrete cushion (7) thickness is 0.1~0.2m, its outside is extended cantilevered or is held up the outer width of arm-type barricade (5) toe of wall plate to be not less than 0.5m.
5. high-speed railway deep soft soil foundation embankment structure as claimed in claim 4, it is characterized in that: the width of said reinforcement cushion (6) is consistent with the width of concrete cushion (7).
6. high-speed railway deep soft soil foundation embankment structure as claimed in claim 1, it is characterized in that: the thickness of said sandy gravel loaded filter (8) is 0.3m.
7. high-speed railway deep soft soil foundation embankment as claimed in claim 1 structure is characterized in that: said cantilevered or hold up arm-type barricade (5) along the every interval 15~20m of embankment bearing of trend one place, shrinkage joint to be set, the filling of pitch plank is adopted at the shrinkage joint.
8. high-speed railway deep soft soil foundation embankment as claimed in claim 7 structure is characterized in that: said cantilevered or hold up the toe of wall buried depth of arm-type barricade (5) to be not less than 1.0m.
CN2011203204873U 2011-08-30 2011-08-30 Deep soft soil foundation embankment structure of high-speed railway Expired - Lifetime CN202227214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203204873U CN202227214U (en) 2011-08-30 2011-08-30 Deep soft soil foundation embankment structure of high-speed railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203204873U CN202227214U (en) 2011-08-30 2011-08-30 Deep soft soil foundation embankment structure of high-speed railway

Publications (1)

Publication Number Publication Date
CN202227214U true CN202227214U (en) 2012-05-23

Family

ID=46077807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203204873U Expired - Lifetime CN202227214U (en) 2011-08-30 2011-08-30 Deep soft soil foundation embankment structure of high-speed railway

Country Status (1)

Country Link
CN (1) CN202227214U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733354A (en) * 2012-07-19 2012-10-17 陈洪凯 Pile-wall combined anti-sliding support managing structure
CN105970755A (en) * 2016-05-27 2016-09-28 宁波市交通规划设计研究院有限公司 Construction method for prevention and treatment for sidewise slippage of soft soil roadbed
CN106283950A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN107268573A (en) * 2017-07-18 2017-10-20 深圳市工勘岩土集团有限公司 The composite construction of soft soil foundation
CN109610256A (en) * 2018-12-04 2019-04-12 天津市市政工程设计研究院 The method for processing foundation of buried house refuse under a kind of roadbed
CN109653049A (en) * 2018-12-18 2019-04-19 中铁十五局集团第工程有限公司 The construction method in approach fill section in a kind of soft ground treatment
CN109972470A (en) * 2019-04-10 2019-07-05 四川省交通勘察设计研究院有限公司 A kind of assembled subgrade construction system and technique suitable for deep soft foundation
CN110374136A (en) * 2019-08-12 2019-10-25 广东电网有限责任公司 Soil-baffling structure suitable for the electrical building building on soft geological
CN111235992A (en) * 2020-03-17 2020-06-05 中铁二院工程集团有限责任公司 Slope soft soil foundation cantilever retaining wall reinforcing structure and construction method
CN111424567A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Highway soft soil foundation culvert construction method
CN115369889A (en) * 2022-09-09 2022-11-22 中冶成都勘察研究总院有限公司 Assembled reinforced concrete foundation pit supporting structure based on wet joint and construction method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733354A (en) * 2012-07-19 2012-10-17 陈洪凯 Pile-wall combined anti-sliding support managing structure
CN102733354B (en) * 2012-07-19 2014-07-02 陈洪凯 Pile-wall combined anti-sliding support managing structure
CN105970755A (en) * 2016-05-27 2016-09-28 宁波市交通规划设计研究院有限公司 Construction method for prevention and treatment for sidewise slippage of soft soil roadbed
CN106283950A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN107268573A (en) * 2017-07-18 2017-10-20 深圳市工勘岩土集团有限公司 The composite construction of soft soil foundation
CN109610256A (en) * 2018-12-04 2019-04-12 天津市市政工程设计研究院 The method for processing foundation of buried house refuse under a kind of roadbed
CN109653049A (en) * 2018-12-18 2019-04-19 中铁十五局集团第工程有限公司 The construction method in approach fill section in a kind of soft ground treatment
CN109653049B (en) * 2018-12-18 2021-12-03 中铁十五局集团第一工程有限公司 Construction method for processing bridge head filling road section on soft foundation
CN109972470A (en) * 2019-04-10 2019-07-05 四川省交通勘察设计研究院有限公司 A kind of assembled subgrade construction system and technique suitable for deep soft foundation
CN110374136A (en) * 2019-08-12 2019-10-25 广东电网有限责任公司 Soil-baffling structure suitable for the electrical building building on soft geological
CN111235992A (en) * 2020-03-17 2020-06-05 中铁二院工程集团有限责任公司 Slope soft soil foundation cantilever retaining wall reinforcing structure and construction method
CN111424567A (en) * 2020-03-26 2020-07-17 中电建十一局工程有限公司 Highway soft soil foundation culvert construction method
CN111424567B (en) * 2020-03-26 2021-08-24 中电建十一局工程有限公司 Highway soft soil foundation culvert construction method
CN115369889A (en) * 2022-09-09 2022-11-22 中冶成都勘察研究总院有限公司 Assembled reinforced concrete foundation pit supporting structure based on wet joint and construction method
CN115369889B (en) * 2022-09-09 2023-11-28 中冶成都勘察研究总院有限公司 Assembled reinforced concrete foundation pit supporting structure based on wet connection and construction method

Similar Documents

Publication Publication Date Title
CN202227214U (en) Deep soft soil foundation embankment structure of high-speed railway
CN106988178A (en) A kind of subgrade in soft soil zone widened structure and its construction method
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN202595591U (en) Micro steel pipe pile network structure for tunnel cavern roadbed in karst region
CN102425082A (en) Subgrade strengthening structure for highly karstified station turnout zone on high-speed railway
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN203346750U (en) Long-short pile raft structure roadbed of deep spongy soil region
CN107119520A (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Treatment Methods
CN202247575U (en) Structure for strengthening roadbed in high-speed railway station turnout area with highly developed karst
CN205116204U (en) Roadbed structure of crowded native bored concrete pile stake board of two -way spiral
CN202809501U (en) Reinforced load reducing structure of motorway high filling culvert in mountainous area
CN202323922U (en) Tilted stratum soft foundation reinforcing structure of high-speed railway
CN203270559U (en) Roadbed structure of screw pile network structure composite foundation
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN102797265A (en) Protective structure for bedding slope bridge piers and abutments
CN110205982B (en) Channel structure for improving flood control standard of existing river levee and construction method thereof
CN202492856U (en) Reinforced concrete pile type buttress retaining wall
CN210238180U (en) Soft roadbed processing device with unit type gravel pile composite foundation combined with overload prepressing
CN201538934U (en) Collapsible loess tunnel foundation basic structure of high-speed railway
CN203007761U (en) Grouting reinforcement structure for steel floral tube of existing railway roadbed under operation condition
CN215976642U (en) Soft foundation treatment structure for high-water-level deep garbage soil of coastal railway
CN206800092U (en) The soft base combined type of coastal tidal, which is changed, fills out structure and Roadbed by offshore soft clay
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN203498863U (en) Three-dimensional continuous-frame-type reinforced concrete structural retaining wall
CN106283949B (en) Medium-and low-speed maglev traffic engineering single line embankment location independence pier stud type support rail girder construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120523

CX01 Expiry of patent term