CN109610256A - The method for processing foundation of buried house refuse under a kind of roadbed - Google Patents

The method for processing foundation of buried house refuse under a kind of roadbed Download PDF

Info

Publication number
CN109610256A
CN109610256A CN201811483676.5A CN201811483676A CN109610256A CN 109610256 A CN109610256 A CN 109610256A CN 201811483676 A CN201811483676 A CN 201811483676A CN 109610256 A CN109610256 A CN 109610256A
Authority
CN
China
Prior art keywords
house refuse
buried
soil layer
roadbed
buried depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811483676.5A
Other languages
Chinese (zh)
Inventor
娄中波
闫正
李乐辉
吴鹏阁
孔占军
朱彬
张李明
赵吉
王晓华
贺海
练象平
甄曦
董刚
宋瀛
崔文博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Municipal Engineering Design and Research Institute
Original Assignee
Tianjin Municipal Engineering Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Municipal Engineering Design and Research Institute filed Critical Tianjin Municipal Engineering Design and Research Institute
Priority to CN201811483676.5A priority Critical patent/CN109610256A/en
Publication of CN109610256A publication Critical patent/CN109610256A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/002Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/006Sealing of existing landfills, e.g. using mining techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Abstract

The invention discloses a kind of method for processing foundation of buried house refuse under roadbed: determining the buried depth of house refuse soil layer;Determine the buried depth of various municipal pipelines under road;Determine the minimum cutting depth of buried house refuse soil layer;If the buried depth of house refuse soil layer is less than the maximum buried depth of municipal pipeline, house refuse soil layer is all removed;If the buried depth of house refuse soil layer is greater than the maximum buried depth of municipal pipeline, excavate house refuse soil layer in part, place is flattened, and prefabricated tubular pile of constructing, pile cover is performed on tubular pole top, it is laid with lime soil padding, after the compacting of lime soil padding, health reach intensity, then back-filling in layers element soil is high to roadbed top mark;It is anti-to excavate tube seat, various municipal pipelines are buried, and backfill tube seat;Roadbed grinding compacting reaches the design standard of urban road, and surface construction is carried out after acceptance(check).The present invention makes the foundation bearing capacity of road roadbed meet design requirement by squeezing into prefabricated tubular pile.

Description

The method for processing foundation of buried house refuse under a kind of roadbed
Technical field
The present invention relates to the field of foundation treatment of Artifical Fill Ground under roadbed is related to, more specifically, it relates to a kind of roads The method for processing foundation of buried house refuse under bed.
Background technique
With quickly propelling for China's Urbanization Construction, the yield of the big or middle domestic waste in China also increases year by year. A few years ago since capital investment is insufficient, the reasons such as supervision difficulty is big produce a large amount of informal garbage loading embeadings on big city periphery ?.It is counted according to pertinent literature, only the over thousands of seat of the existing informal landfill in Beijing area.The house refuse in underground is buried, Complicated component, pollution and people's health harm to environment are got worse.Main harm has: 1, polluted-water: city is raw A large amount of acid and alkaline organic pollutant can be generated during rubbish corruption living.2, it pollutes atmosphere: burying the life in underground Various chemistry occur under suitable temperature, wetness action for rubbish, microbiology turbidity generates H2S、CO2、CH4Influence urban environment, Endanger human health.
With the continuous expansion of urban construction, urban land is fewer and fewer, and originally house refuse buried regions are gradually utilized Build new urban facilities.According to the related specifications that urban road engineering designs, house refuse is unprocessed as special defects soil It must not be directly used in roadbed filling, should give and all excavate.House refuse is excavated, should be according to buried depth, dump pit periphery Building restrict situation, it is comprehensive to determine that refuse soil excavates remote fortune scheme.It is deeper for house refuse buried depth, and slope is opened The limited region in place is dug, the cost that house refuse is all removed can be very big.Firstly, the cost of excavation supporting can be very high, especially Its long and narrow structures this for urban road, support cost are higher.Secondly, changing during being excavated to foundation pit The stress condition of underground water and neighboring buildings, to surrounding buildings facility, there are biggish security risks.Third, house refuse are complete When portion excavates, the construction time of excavation supporting is longer, does not adapt to the fast-developing demand in city.
Summary of the invention
Purpose of the invention is to overcome the shortcomings in the prior art, provides a kind of ground of buried house refuse under roadbed Base processing method, this method make the foundation bearing capacity of road roadbed after cutouts house refuse, by squeezing into prefabricated tubular pile Meet design requirement;1 meter of lime soil padding is set at the top of prefabricated tubular pile, utilizes lime soil padding isolation rubbish soil layer and the external world Contact plays the infiltration for reducing moisture, inhibition and reduces the generation of various pernicious gases in rubbish soil layer and escape, and plays stake Common stress of pile and soil is coordinated in the effect of base mattress layer.Using the native back-filling in layers of element on lime soil padding, " anti-fluting " is applied after backfill The various municipal pipelines of work excavate the element soil backfilled after house refuse and provide good place for the construction of various pipeline facilities.
The purpose of the present invention is what is be achieved through the following technical solutions.
The method for processing foundation of buried house refuse under roadbed of the present invention, comprising the following steps:
(1) buried depth of house refuse soil layer is determined;
(2) buried depth for determining various municipal pipelines under road determines the maximum buried depth of municipal pipeline;
(3) according to the maximum buried depth of municipal pipeline, the minimum cutting depth of buried house refuse soil layer is determined;
(4) if the buried depth of house refuse soil layer is less than the maximum buried depth of municipal pipeline, by house refuse soil layer All remove;If the buried depth of house refuse soil layer is greater than the maximum buried depth of municipal pipeline, life is partially excavated Rubbish soil layer, place is flattened, and prefabricated tubular pile of constructing, and is performed pile cover on tubular pole top, lime soil padding is laid with, to rendzinas After bed course compacting, health reach intensity, then back-filling in layers element soil is high to roadbed top mark;
(5) counter to excavate tube seat, various municipal pipelines are buried, and backfill tube seat;
(6) roadbed grinding compacting reaches the design standard of urban road, and surface construction is carried out after acceptance(check).
Step partially excavates house refuse soil layer described in (4) specifically: the minimum clearing of house refuse soil layer with a thickness of Downward 1 meter of the maximum buried depth of municipal pipeline.
Prefabricated tubular pile described in step (4) presses triangle or rectangular arrangement, it is desirable that tubular pole enters 1.5 meters of supporting course or more.
Pile cover described in step (4) is having a size of 1.5 meters × 1.5 meters × 0.35 meter.
It is mingled with two layers of steel plastic geogrid among lime soil padding described in step (4).
Compared with prior art, the beneficial effects brought by the technical solution of the present invention are as follows:
Present invention incorporates changing to fill out cushion foundation processing method and rigid pile, including change that fill out municipal pipeline under roadbed embedded Partial house refuse soil layer is element soil, provides good foundation condition for the embedded of municipal pipeline;It squeezes into prefabricated tubular pile and applies Pile cover is done, to meet requirement of the road to foundation bearing capacity after rubbish corruption;Thicker lime soil padding, lime soil padding are set Isolation rubbish soil layer is played, prevents moisture from penetrating into, pernicious gas evolution after house refuse corruption, coordinates common stress of pile and soil etc. and make With.
The present invention meets the foundation bearing capacity of road roadbed after cutouts house refuse, by squeezing into prefabricated tubular pile Design requirement;1 meter of lime soil padding is set at the top of prefabricated tubular pile, is connect using lime soil padding isolation rubbish soil layer with extraneous Touching plays the infiltration for reducing moisture, inhibition and reduces the generation of various pernicious gases in rubbish soil layer and escape, and plays pile foundation Common stress of pile and soil is coordinated in the effect of mattress layer.Using the native back-filling in layers of element on lime soil padding, " anti-fluting " construction after backfill Various municipal pipelines excavate the element soil backfilled after house refuse and provide good place for the construction of various pipeline facilities.
Detailed description of the invention
Fig. 1 is the sectional side elevation of basement process process;
Fig. 2 is the floor plan of prefabricated tubular pile.
Specific embodiment
The invention will be further described with reference to the accompanying drawing.
The method for processing foundation of buried house refuse under roadbed of the present invention, as depicted in figs. 1 and 2, specific implementation process is such as Under:
(1) buried depth of house refuse soil layer is determined.
(2) buried depth for determining various municipal pipelines under road determines the maximum buried depth of municipal pipeline.
(3) according to the maximum buried depth of municipal pipeline, the minimum cutting depth of buried house refuse soil layer is determined.
It (4), at this time should be by life rubbish if the buried depth of house refuse soil layer is less than the maximum buried depth of municipal pipeline Rubbish soil layer is all removed, thoroughly to solve the harm of refuse soil.
If the buried depth of house refuse soil layer is greater than the maximum buried depth of municipal pipeline, and all excavates that there are costs Height can partially excavate house refuse soil layer when excavation risk is big, then carry out rigid pile basement process.Detailed process: life rubbish The minimum clearing of rubbish soil layer is with a thickness of downward 1 meter of the maximum buried depth of municipal pipeline.It, will after the completion of house refuse soil layer is removed Place leveling, and prefabricated tubular pile of constructing, prefabricated tubular pile can be determined by triangle or rectangular arrangement, spacing according to calculating, it is desirable that pipe Stake enters 1.5 meters of supporting course or more.After the completion of prefabricated tubular pile construction, 1.5 meters × 1.5 meters × 0.35 meter is performed on tubular pole top Pile cover is to coordinate pile-soil stress distribution.After the completion of pile cover construction, it is laid with 1 meter thick of lime soil padding, rendzinas pad soil on it Centre is mingled with two layers of steel plastic geogrid, to reduce differential settlement.After the compacting of lime soil padding, health reach intensity, then Back-filling in layers element soil is high to roadbed top mark.
(5) counter to excavate tube seat, various municipal pipelines are buried, and backfill tube seat.
(6) roadbed grinding compacting reaches the design standard of urban road, and surface construction is carried out after acceptance(check).
Although function and the course of work of the invention are described above in conjunction with attached drawing, the invention is not limited to Above-mentioned concrete function and the course of work, the above mentioned embodiment is only schematical, rather than restrictive, ability The those of ordinary skill in domain under the inspiration of the present invention, is not departing from present inventive concept and scope of the claimed protection situation Under, many forms can also be made, all of these belong to the protection of the present invention.

Claims (5)

1. the method for processing foundation of buried house refuse under a kind of roadbed, which comprises the following steps:
(1) buried depth of house refuse soil layer is determined;
(2) buried depth for determining various municipal pipelines under road determines the maximum buried depth of municipal pipeline;
(3) according to the maximum buried depth of municipal pipeline, the minimum cutting depth of buried house refuse soil layer is determined;
(4) if the buried depth of house refuse soil layer is less than the maximum buried depth of municipal pipeline, house refuse soil layer is whole Removing;If the buried depth of house refuse soil layer is greater than the maximum buried depth of municipal pipeline, house refuse is partially excavated Soil layer flattens place, and prefabricated tubular pile of constructing, and performs pile cover on tubular pole top, lime soil padding is laid with, to lime soil padding After compacting, health reach intensity, then back-filling in layers element soil is high to roadbed top mark;
(5) counter to excavate tube seat, various municipal pipelines are buried, and backfill tube seat;
(6) roadbed grinding compacting reaches the design standard of urban road, and surface construction is carried out after acceptance(check).
2. the method for processing foundation of buried house refuse under roadbed according to claim 1, which is characterized in that step (4) Described in partially excavate house refuse soil layer specifically: the minimum clearing of house refuse soil layer buries with a thickness of the maximum of municipal pipeline Set downward 1 meter of depth.
3. the method for processing foundation of buried house refuse under roadbed according to claim 1, which is characterized in that step (4) Described in prefabricated tubular pile press triangle or rectangular arrangement, it is desirable that tubular pole enters 1.5 meters of supporting course or more.
4. the method for processing foundation of buried house refuse under roadbed according to claim 1, which is characterized in that step (4) Described in pile cover having a size of 1.5 meters × 1.5 meters × 0.35 meter.
5. the method for processing foundation of buried house refuse under roadbed according to claim 1, which is characterized in that step (4) Described in be mingled with two layers of steel plastic geogrid among lime soil padding.
CN201811483676.5A 2018-12-04 2018-12-04 The method for processing foundation of buried house refuse under a kind of roadbed Pending CN109610256A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811483676.5A CN109610256A (en) 2018-12-04 2018-12-04 The method for processing foundation of buried house refuse under a kind of roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811483676.5A CN109610256A (en) 2018-12-04 2018-12-04 The method for processing foundation of buried house refuse under a kind of roadbed

Publications (1)

Publication Number Publication Date
CN109610256A true CN109610256A (en) 2019-04-12

Family

ID=66006045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811483676.5A Pending CN109610256A (en) 2018-12-04 2018-12-04 The method for processing foundation of buried house refuse under a kind of roadbed

Country Status (1)

Country Link
CN (1) CN109610256A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424634A (en) * 2019-11-18 2020-07-17 国网浙江省电力有限公司建设分公司 Foundation structure of soft soil stratum and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008131480A1 (en) * 2007-04-26 2008-11-06 Paul Camilleri Method of constructing building slabs and pavements and storing water
CN202227214U (en) * 2011-08-30 2012-05-23 中铁二院工程集团有限责任公司 Deep soft soil foundation embankment structure of high-speed railway
CN205000325U (en) * 2015-08-10 2016-01-27 悉地(苏州)勘察设计顾问有限公司 Urban road ground that tubular pile was handled
CN106320123A (en) * 2016-08-16 2017-01-11 桐城市永锦建筑工程有限公司 Construction method of soft soil roadbed
CN208151786U (en) * 2018-02-01 2018-11-27 江苏省交通技师学院 A kind of novel highway subgrade composite foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008131480A1 (en) * 2007-04-26 2008-11-06 Paul Camilleri Method of constructing building slabs and pavements and storing water
CN202227214U (en) * 2011-08-30 2012-05-23 中铁二院工程集团有限责任公司 Deep soft soil foundation embankment structure of high-speed railway
CN205000325U (en) * 2015-08-10 2016-01-27 悉地(苏州)勘察设计顾问有限公司 Urban road ground that tubular pile was handled
CN106320123A (en) * 2016-08-16 2017-01-11 桐城市永锦建筑工程有限公司 Construction method of soft soil roadbed
CN208151786U (en) * 2018-02-01 2018-11-27 江苏省交通技师学院 A kind of novel highway subgrade composite foundation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘予昆: "郑州市道路工程项目前期立项及可行性研究", 《工程科技Ⅱ辑》 *
武崇福: "《地基处理》", 31 January 2013 *
皮振益: "《道路工程施工便携手册》", 31 January 2006 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111424634A (en) * 2019-11-18 2020-07-17 国网浙江省电力有限公司建设分公司 Foundation structure of soft soil stratum and construction method thereof

Similar Documents

Publication Publication Date Title
CN101368383B (en) Method for treating soft soil roadbed by artificial composite crust layer
CN110306616A (en) A kind of construction method of sewage conduct
CN102896140B (en) In-situ biological treating method for municipal solid waste landfill
CN105220674A (en) Deep soft foundation reinforcing and processing method
CN101806055B (en) Vacuum pre-pressed joint rigid pile composite foundation reinforcing method
CN109797769A (en) A kind of Collapsible Loess District underground pipe gallery foundation structure and its construction method
CN105926393A (en) Method for filling embankments by using bubble mixed light soil
CN103741715A (en) Novel waterproof hydrophobic construction method for basement
CN103967015B (en) A kind of water seal for deep foundation pit excavation method and structure thereof
CN109778625A (en) A kind of express highway roadbed structure that dregs class building castoff fills
CN109610256A (en) The method for processing foundation of buried house refuse under a kind of roadbed
CN106337422B (en) A method of processing Collapsible Loess District fill foundation
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN108580503B (en) Large garbage pile slope shaping construction method
CN202850013U (en) Whole composite foundation structure for lime soil and anti-seepage membrane
CN216017668U (en) Greening system for soil ecological restoration area
CN101691765B (en) Double-ash well pole stress relief coordination and rectification method for complex foundation
CN216865196U (en) Sealing covering structure of municipal solid waste landfill
CN108442356A (en) The construction technology of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN211142675U (en) Roadbed structure of expressway filled with muck type construction waste
CN209816896U (en) Collapsible loess area utility tunnel foundation structure
CN209810895U (en) Horizontal drainage guide system of refuse landfill
CN207878494U (en) The structure of underground utilities foundation pit and soft soil foundation synchronization process
Gordon et al. The stockley park project
CN107795145B (en) Cave collapse filling and soil organic reconstruction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190412

WD01 Invention patent application deemed withdrawn after publication