CN101608421A CNA2009100633200A CN200910063320A CN101608421A CN 101608421 A CN101608421 A CN 101608421A CN A2009100633200 A CNA2009100633200 A CN A2009100633200A CN 200910063320 A CN200910063320 A CN 200910063320A CN 101608421 A CN101608421 A CN 101608421A
Authority
CN
China
Prior art keywords
layer
geotextile
pile
geogrids
mattress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100633200A
Other languages
Chinese (zh)
Inventor
冯守中
陈修和
张胜
闫澍旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2009100633200A priority Critical patent/CN101608421A/en
Publication of CN101608421A publication Critical patent/CN101608421A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention belongs to the civil engineering construction field, be specifically related to a kind of reinforcing soft soil roadbed method.The method that worker's fabric granular pile is reinforcing soft soil roadbed is characterized in that it comprises the steps: 1) every interval 30~150cm lays a geotextile granular pile (1) soft soil roadbed; 2) level is laid layer of geotextile layer (2) on the ground of geotextile granular pile top bit, goes up at geotextile layer (2) then and lays mattress layer (3); Or directly on geotextile granular pile top bit, directly lay mattress layer (3); 3) the mattress layer top, horizontal is laid one deck second geogrids layer (5), and the material of second geogrids layer (5) is a geo-grid, then filling roadbed the banketing of second geogrids layer (5) higher slice (6).This method can effectively improve the effect of soft soil roadbed processing.

Description

The method of reinforcing soft soil roadbed by geotextile granular material pile
Technical field
The invention belongs to the civil engineering construction field, be specifically related to a kind of reinforcing soft soil roadbed method.
Background technology
Highway construction such as highway, railway is by the weak soil location time, because of the deficiency of subgrade rating must be carried out the treatment of soft foundation design, to guarantee the stability and the sedimentation and deformation requirement of roadbed.Utilizing the reinforcing road bed weak soil of geotextile granular pile is a kind of new technology of subgrade strengthening design, and its reinforcement mechanism is the composite foundation treatment technology that integrates displacement, compacted, fixed and pile foundation load.
Summary of the invention
The object of the present invention is to provide a kind of method of reinforcing soft soil roadbed by geotextile granular material pile, this method can effectively improve the effect of soft soil roadbed processing.
To achieve these goals, technical scheme of the present invention is: the method for reinforcing soft soil roadbed by geotextile granular material pile is characterized in that it comprises the steps:
1) every interval 30~150cm lays a geotextile granular pile 1 (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) soft soil roadbed; The plane mode of laying out pile is quadrangle or triangle, the diameter of geotextile granular pile can be designed to 30~200cm according to actual conditions, the spacing of geotextile granular pile is 0.5~3.0m, the stake of geotextile granular pile is long to be 0.5~25m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) adopt one of following two kinds of methods:
1. level is laid layer of geotextile layer 2 on the ground of geotextile granular pile top bit, lays mattress layer 3 then on geotextile layer 2; Geotextile layer 2 is to cover one deck geotextiles on one deck geo-grid or one deck geo-grid; The material of mattress layer 3 is medium coarse sand or rubble; The thickness of mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of mattress layer;
2. or directly on geotextile granular pile top bit, directly lay mattress layer 3;
The material of mattress layer 3 is medium coarse sand or rubble; The thickness of mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of mattress layer;
3) material of laying one deck second geogrids layer 5, the second geogrids layer 5 in the mattress layer top, horizontal is a geo-grid, bankets 6 in that second geogrids layer, 5 higher slices are filling roadbed then.
In the described mattress layer, lay first geogrids layer 4 apart from level by 20~50cm interlamellar spacing; The material of first geogrids layer 4 is a geo-grid.Can establish 1~4 first geogrids layer in the mattress layer.
The distance of described interlamellar spacing is meant: the distance between the bottom surface of basecoat first geogrids layer and mattress layer (or geotextile layer 2), first adjacent geogrids layer and the distance between first geogrids layer, the distance between last layer first geogrids layer and second geogrids layer 5.
The maximum particle diameter of rubble should not surpass 10cm.
The invention has the beneficial effects as follows: method of the present invention is applicable to the soft soil roadbed processing of highway construction various types of properties, it is that several grounds of the displacement of collection part, compacted, discharging consolidation, pile foundation load are handled mechanism and are compound in one that this method is handled roadbed weak soil, the stress that the while embankment load is formed by geo-grid and mattress layer is regulated the basis load stress is forwarded on stake and the inter-pile soil, make stake, soil bear load jointly, this can effectively improve the effect of soft soil roadbed processing.The compliance that this method is handled the roadbed weak soil is strong.
Description of drawings
Fig. 1 is the sectional schematic diagram of reinforcing soft soil roadbed by geotextile granular material pile of the present invention;
Among the figure: 1-geotextile granular pile, 2-geotextile layer, the 3-mattress layer, 4-first geogrids layer, 5-second geogrids layer, the 6-roadbed bankets, the 7-soft foundation.
The specific embodiment
In order to understand the present invention better, further illustrate content of the present invention below in conjunction with example, but the present invention not only is confined to the following examples.
Embodiment 1:
The method of reinforcing soft soil roadbed by geotextile granular material pile, it comprises the steps:
1) every interval 30cm lays a geotextile granular pile (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) soft soil roadbed; The plane mode of laying out pile is a quadrangle, the diameter of geotextile granular pile can be designed to 30cm according to actual conditions, the spacing of geotextile granular pile is 1.0m, the stake of geotextile granular pile is long to be 3.5m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) level is laid layer of geotextile layer (the geotextile layer is one deck geo-grid) on the ground of geotextile granular pile top bit, and the material of geotextile layer is a geo-grid; On the geotextile layer, lay mattress layer then;
The material of mattress layer is a medium coarse sand; The thickness of mattress layer is 20cm, the compacting compactness 0.85 of mattress layer;
3) the mattress layer top, horizontal is laid one deck geogrids layer (being one deck geo-grid), and the material of geogrids layer is a geo-grid, fills closely knit roadbed at the geogrids layer higher slice then and bankets.
Embodiment 2:
The method of reinforcing soft soil roadbed by geotextile granular material pile, it comprises the steps:
1) every interval 100cm lays a geotextile granular pile 1 (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) on soft soil roadbed 7; The plane mode of laying out pile is a quadrangle, the diameter of geotextile granular pile can be designed to 60cm according to actual conditions, the spacing of geotextile granular pile is 1.5m, the stake of geotextile granular pile is long to be 15m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) directly on geotextile granular pile top bit, directly lay mattress layer 3;
The material of mattress layer 3 is a medium coarse sand; The thickness of mattress layer is 60cm, the compacting compactness 0.9 of mattress layer; Level is laid 2 first geogrids layer 4 (each first geogrids layer is one deck geo-grid), the first geo-grid interlamellar spacing 20cm in the mattress layer; The material of first geogrids layer 4 is a geo-grid;
3) the mattress layer top, horizontal is laid one deck second geogrids layer 5 (second geogrids layer is one deck geo-grid), and the material of second geogrids layer 5 is a geo-grid, and the closely knit roadbed that fills at second geogrids layer, 5 higher slices bankets 6 then.
Embodiment 3:
The method of reinforcing soft soil roadbed by geotextile granular material pile, it comprises the steps:
1) every interval 100cm lays a geotextile granular pile 1 (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) on soft soil roadbed 7; The plane mode of laying out pile is a quadrangle, the diameter of geotextile granular pile can be designed to 100cm according to actual conditions, the spacing of geotextile granular pile is 2.0m, the stake of geotextile granular pile is long to be 15m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) level is laid layer of geotextile layer 2 on the ground of geotextile granular pile top bit, and geotextile layer 2 is to cover one deck geotextiles on one deck geo-grid; On geotextile layer 2, lay mattress layer 3 then;
The material of mattress layer 3 is a medium coarse sand; The thickness of mattress layer is 60cm, the compacting compactness 0.9 of mattress layer; Level is laid 2 first geogrids layer 4 (each first geogrids layer is one deck geo-grid), the first geo-grid interlamellar spacing 20cm in the mattress layer; The material of first geogrids layer 4 is a geo-grid;
3) the mattress layer top, horizontal is laid one deck second geogrids layer 5 (second geogrids layer is one deck geo-grid), and the material of second geogrids layer 5 is a geo-grid, and the closely knit roadbed that fills at second geogrids layer, 5 higher slices bankets 6 then.
Embodiment 4:
As shown in Figure 1, the method for reinforcing soft soil roadbed by geotextile granular material pile, it comprises the steps:
1) every interval 150cm lays a geotextile granular pile 1 (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) on soft soil roadbed 7; The plane mode of laying out pile is a triangle, the diameter of geotextile granular pile can be designed to 80cm according to actual conditions, the spacing of geotextile granular pile is 1.8m, the stake of geotextile granular pile is long to be 25m, design parameters such as pile spacing, length can be handled the degree of depth according to geological conditions, ground, and condition such as subgrade deformation requirement calculates or experiment is determined;
2) level is laid layer of geotextile layer 2 on the ground of geotextile granular pile top bit, and geotextile layer 2 is to cover one deck geotextiles on one deck geo-grid; On geotextile layer 2, lay mattress layer 3 then;
The material of mattress layer 3 is a rubble; The thickness of mattress layer is 100cm, the compacting compactness 0.95 of mattress layer; Level is laid 1 layer of first geogrids layer 4 (every layer first geogrids layer is one deck geo-grid) in the mattress layer, and first geogrids layer is positioned at the middle part of mattress layer; The material of first geogrids layer 4 is a geo-grid;
3) the mattress layer top, horizontal is laid one deck second geogrids layer 5 (second geogrids layer is one deck geo-grid), and the material of second geogrids layer 5 is a geo-grid, fills closely knit roadbed at second geogrids layer, 5 higher slices then and bankets 6.
Embodiment 5:
Substantially the same manner as Example 4, difference is: level is laid 4 first geogrids layer 4 in the mattress layer, lays first geogrids layer by the 20cm interlamellar spacing apart from level.

Claims (2)

1. the method for reinforcing soft soil roadbed by geotextile granular material pile is characterized in that it comprises the steps:
1) every interval 30~150cm lays a geotextile granular pile (1) soft soil roadbed; The plane mode of laying out pile is quadrangle or triangle, and the diameter of geotextile granular pile is 30~200cm, and the spacing of geotextile granular pile is 0.5~3.0m, and the stake of geotextile granular pile is long to be 0.5~25m;
2) adopt one of following two kinds of methods:
1. level is laid layer of geotextile layer (2) on the ground of geotextile granular pile top bit, goes up at geotextile layer (2) then and lays mattress layer (3); Geotextile layer (2) is to cover one deck geotextiles on one deck geo-grid or one deck geo-grid; The material of mattress layer (3) is medium coarse sand or rubble; The thickness of mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of mattress layer;
2. directly on geotextile granular pile top bit, directly lay mattress layer (3);
The material of mattress layer (3) is medium coarse sand or rubble; The thickness of mattress layer is 20~100cm, the compacting compactness 0.85~0.95 of mattress layer;
3) lay one deck second geogrids layer (5) in the mattress layer top, horizontal, the material of second geogrids layer (5) is a geo-grid, then filling roadbed the banketing of second geogrids layer (5) higher slice (6).
2. the method for reinforcing soft soil roadbed by geotextile granular material pile according to claim 1 is characterized in that: in the described mattress layer, lay first geogrids layer (4) by 20~50cm interlamellar spacing apart from level; The material of first geogrids layer (4) is a geo-grid.
CNA2009100633200A 2009-07-27 2009-07-27 The method of reinforcing soft soil roadbed by geotextile granular material pile Pending CN101608421A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100633200A CN101608421A (en) 2009-07-27 2009-07-27 The method of reinforcing soft soil roadbed by geotextile granular material pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100633200A CN101608421A (en) 2009-07-27 2009-07-27 The method of reinforcing soft soil roadbed by geotextile granular material pile

Publications (1)

Publication Number Publication Date
CN101608421A true CN101608421A (en) 2009-12-23

Family

ID=41482320

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100633200A Pending CN101608421A (en) 2009-07-27 2009-07-27 The method of reinforcing soft soil roadbed by geotextile granular material pile

Country Status (1)

Country Link
CN (1) CN101608421A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953309A (en) * 2012-11-09 2013-03-06 中铁六局集团天津铁路建设有限公司 Method for constructing high-speed railway subgrade
CN105507102A (en) * 2015-12-15 2016-04-20 上海交通大学 Construction method for utilizing waste plastic woven bags for reinforcing roadbed
CN104947560B (en) * 2014-03-28 2017-04-19 中国二十冶集团有限公司 Pile-net composite roadbed pile top differential settlement control method
CN106592363A (en) * 2016-11-29 2017-04-26 昆山顶牛市政建设有限公司 Construction method for municipal soft soil roadbed
CN106609490A (en) * 2016-12-13 2017-05-03 重庆交通大学 Pile-reinforcement material composite foundation structure and construction methods thereof
CN107700300A (en) * 2017-10-17 2018-02-16 蒋昌霞 A kind of safety protective road foundation
CN108018752A (en) * 2017-12-02 2018-05-11 江苏惠淳建设有限公司 A kind of soft soil roadbed reinforcing construction process
CN112458814A (en) * 2020-12-11 2021-03-09 孙萌 Road design roadbed reinforced structure
CN114908760A (en) * 2022-05-31 2022-08-16 山东建筑大学 Three-dimensional reinforcement structure and method for near top surface of deep foundation pit of alluvial field road

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953309A (en) * 2012-11-09 2013-03-06 中铁六局集团天津铁路建设有限公司 Method for constructing high-speed railway subgrade
CN104947560B (en) * 2014-03-28 2017-04-19 中国二十冶集团有限公司 Pile-net composite roadbed pile top differential settlement control method
CN105507102A (en) * 2015-12-15 2016-04-20 上海交通大学 Construction method for utilizing waste plastic woven bags for reinforcing roadbed
CN106592363A (en) * 2016-11-29 2017-04-26 昆山顶牛市政建设有限公司 Construction method for municipal soft soil roadbed
CN106592363B (en) * 2016-11-29 2019-04-26 滨州交通工程公司 A kind of construction method that municipal administration is soft soil roadbed
CN106609490A (en) * 2016-12-13 2017-05-03 重庆交通大学 Pile-reinforcement material composite foundation structure and construction methods thereof
CN106609490B (en) * 2016-12-13 2019-04-05 重庆交通大学 A kind of stake-reinforcement material composite foundation structure and its construction method
CN107700300A (en) * 2017-10-17 2018-02-16 蒋昌霞 A kind of safety protective road foundation
CN108018752A (en) * 2017-12-02 2018-05-11 江苏惠淳建设有限公司 A kind of soft soil roadbed reinforcing construction process
CN112458814A (en) * 2020-12-11 2021-03-09 孙萌 Road design roadbed reinforced structure
CN112458814B (en) * 2020-12-11 2022-04-19 孙萌 Road design roadbed reinforced structure
CN114908760A (en) * 2022-05-31 2022-08-16 山东建筑大学 Three-dimensional reinforcement structure and method for near top surface of deep foundation pit of alluvial field road

Similar Documents

Publication Publication Date Title
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN101608421A (en) The method of reinforcing soft soil roadbed by geotextile granular material pile
Arulrajah et al. Ground improvement techniques for railway embankments
CN101343852B (en) Method for filling highroad roadbed by waste steel slags
CN104358188B (en) Filling construction method for collapsible loess subgrade
CN104480963B (en) The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade
CN204418003U (en) A kind of bridge platform post processing combined system
CN101463599A (en) Bidirectional reinforcing and water drainage reinforcing means for highway soft soil foundation
CN104631254A (en) Construction method of geogrid reinforced clay edge-covered tailing subgrade
CN105297571B (en) A kind of mud stone filled-up ground structure and its construction method
CN103835203B (en) The construction method of jacking light road bank structure after a kind of deep soft foundation
CN101654899A (en) Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway
CN104452507A (en) Construction method for filling roadbed by using wind deposited sand
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN102561132A (en) Plate supporting type embankment technology for post-construction settlement controlling of deep soft soil foundation on high-grade highway
Arulrajah et al. Geosynthetic applications in high-speed railways: a case study
CN106894432A (en) A kind of pile variation rigidity reinforcement cushion composite foundation and its construction method
Nimbalkar et al. Field assessment of ballasted railroads using geosynthetics and shock mats
CN201530968U (en) High-speed railway liquefying soil foundation-roadbed seismic strengthening structure
CN104863031B (en) A kind of karst area ductility anti-collapse road structure and construction method thereof
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN104358196A (en) Construction method for embankment settlement treatment structure of road open to traffic
CN104695419A (en) Soft soil roadbed construction method
CN102644264B (en) Method for reinforcing soft soil foundation by adopting soft foundation light tamping mode
CN106192652A (en) A kind of high steep embankment ruggedized construction preventing differential settlement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20091223