AU2003266716A1 - Internal excavation method through pile, and foundation pile structure - Google Patents
Internal excavation method through pile, and foundation pile structureInfo
- Publication number
- AU2003266716A1 AU2003266716A1 AU2003266716A AU2003266716A AU2003266716A1 AU 2003266716 A1 AU2003266716 A1 AU 2003266716A1 AU 2003266716 A AU2003266716 A AU 2003266716A AU 2003266716 A AU2003266716 A AU 2003266716A AU 2003266716 A1 AU2003266716 A1 AU 2003266716A1
- Authority
- AU
- Australia
- Prior art keywords
- pile
- excavation method
- internal excavation
- foundation
- foundation pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0076—Drilling
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002-287127 | 2002-09-30 | ||
JP2002287127 | 2002-09-30 | ||
PCT/JP2003/012522 WO2004035942A1 (en) | 2002-09-30 | 2003-09-30 | Internal excavation method through pile, and foundation pile structure |
Publications (1)
Publication Number | Publication Date |
---|---|
AU2003266716A1 true AU2003266716A1 (en) | 2004-05-04 |
Family
ID=32104947
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2003266716A Abandoned AU2003266716A1 (en) | 2002-09-30 | 2003-09-30 | Internal excavation method through pile, and foundation pile structure |
Country Status (5)
Country | Link |
---|---|
JP (4) | JP4625896B2 (en) |
KR (1) | KR101071122B1 (en) |
CN (1) | CN100510276C (en) |
AU (1) | AU2003266716A1 (en) |
WO (1) | WO2004035942A1 (en) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101071122B1 (en) * | 2002-09-30 | 2011-10-07 | 미타니 세키산 가부시키가이샤 | Internal excavation method through pile and foundation pile structure |
JP5674189B2 (en) * | 2010-04-30 | 2015-02-25 | 三谷セキサン株式会社 | Pile hole drilling head |
CN101974905B (en) * | 2010-10-22 | 2013-04-24 | 上海中技桩业股份有限公司 | Pile-embedding method for hollow pile and auger drill for implementing same |
CN102383429B (en) * | 2011-01-18 | 2016-08-10 | 上海城地建设股份有限公司 | Digging pile-sinking device in the middle of a kind of heavy caliber pile tube |
CN102383428B (en) * | 2011-02-23 | 2015-12-09 | 上海城地建设股份有限公司 | Middle pick reverse drawing method prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof |
CN102373708B (en) * | 2011-02-23 | 2016-03-02 | 上海城地建设股份有限公司 | Anchor method prestressed centrifugally pile tube and square sunk pile device and pile-sinking method thereof are drawn in middle pick |
KR101416865B1 (en) * | 2011-05-12 | 2014-07-09 | 시지엔지니어링(주) | Construction method of screw file |
KR101224440B1 (en) | 2011-05-12 | 2013-01-21 | 시지엔지니어링(주) | Construction method of screw file |
CN102776885A (en) * | 2011-05-13 | 2012-11-14 | 上海城地建设发展有限公司 | Middle-stirring inverse-pulling method based pre-stressed centrifugal tubular pile sinking device, and pile sinking method |
CN102776884B (en) * | 2011-05-13 | 2016-01-20 | 上海城地建设股份有限公司 | In stir and rotate prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof |
CN102953382A (en) * | 2011-08-18 | 2013-03-06 | 上海城地建设发展有限公司 | Pile sinking device and pile sinking method for steel pipe pile by central stirring and reverse drawing |
JP5959980B2 (en) * | 2012-08-01 | 2016-08-02 | 三谷セキサン株式会社 | Method of burying ready-made piles |
CN103628480A (en) * | 2012-08-27 | 2014-03-12 | 上海中技桩业股份有限公司 | Construction method and device for guide displacement pressure precast pile |
CN105064351A (en) * | 2015-08-14 | 2015-11-18 | 云南大学 | Pile planting method |
KR101834948B1 (en) * | 2017-05-15 | 2018-04-19 | (주)나다건설 | Steel pipe micro-pile foundation system and construction method of micropile foundation using the same |
KR101834950B1 (en) * | 2017-05-15 | 2018-03-07 | (주)나다건설 | Micropile foundation structure and construction method of micropile foundation |
JP6740276B2 (en) * | 2018-04-11 | 2020-08-12 | 株式会社トーヨーアサノ | Foundation pile and method of constructing foundation using the foundation pile |
CN110835906B (en) * | 2019-11-27 | 2021-05-25 | 中国电建集团成都勘测设计研究院有限公司 | Method for determining bottom elevation of anti-impact rotary excavating pile of flood discharge outlet river bank |
CN110886292B (en) * | 2019-11-29 | 2021-10-26 | 祝波 | Full-casing composite expanded-disk pile construction method and equipment |
KR102347012B1 (en) | 2020-09-11 | 2022-01-04 | 주식회사 이지지오텍 | Under reaming auger apparatus and under reamed pile construction method using the same |
KR20220035632A (en) | 2020-09-14 | 2022-03-22 | 주식회사 이지지오텍 | Under reaming auger apparatus and under reamed pile construction method using the same |
CN113882376A (en) * | 2021-09-17 | 2022-01-04 | 湖南铁甲智能技术有限公司 | Pile sinking construction method and construction structure of prestressed pipe pile |
KR102613542B1 (en) | 2021-10-22 | 2023-12-13 | 주식회사 이지지오텍 | Under reaming auger apparatus and under reamed pile construction method using the same |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58185826A (en) * | 1982-04-23 | 1983-10-29 | Tenotsukusu:Kk | Construction of foundation pile |
GB2132668B (en) * | 1982-12-22 | 1987-01-14 | Shekisan Kogyo Co Ltd | Concrete pile installing method |
JPS6397711A (en) * | 1986-10-14 | 1988-04-28 | Nkk Corp | Soil cement composite pile |
JPH026107Y2 (en) * | 1988-04-14 | 1990-02-14 | ||
JPH02108724A (en) * | 1988-10-14 | 1990-04-20 | Takechi Koumushiyo:Kk | Enlarged-dia. hole drilling method and enlarged-dia. knot piling method |
JPH0325121A (en) * | 1989-06-22 | 1991-02-01 | Nippon Concrete Ind Co Ltd | Sinking of pile in inner drilling pile method |
JP2832481B2 (en) * | 1990-03-14 | 1998-12-09 | 三谷セキサン 株式会社 | Drilling rig for hole for concrete pile installation |
JP2846925B2 (en) * | 1990-05-22 | 1999-01-13 | 旭化成工業株式会社 | Nakabori construction method with tip enlarged diameter pile |
JPH0626036A (en) * | 1992-07-03 | 1994-02-01 | Mitani Sekisan Co Ltd | Concrete pile installation method by inner excavation |
JP3025121B2 (en) * | 1992-12-24 | 2000-03-27 | キヤノン株式会社 | Information processing method and apparatus |
JP2000144727A (en) * | 1998-11-09 | 2000-05-26 | Geotop Corp | Construction method of footing pile |
JP4671143B2 (en) * | 1999-04-13 | 2011-04-13 | 三谷セキサン株式会社 | Pile hole drilling head and pile hole drilling method |
JP5024692B2 (en) * | 1999-12-27 | 2012-09-12 | 三谷セキサン株式会社 | Construction method of foundation pile, ready-made pile, pile hole drilling rod |
JP4360745B2 (en) * | 2000-07-27 | 2009-11-11 | Jfeスチール株式会社 | Construction method of ready-made piles |
JP4599508B2 (en) * | 2000-08-23 | 2010-12-15 | 三谷セキサン株式会社 | Method of burying ready-made piles with protrusions and foundation pile structure in Nakabori method |
JP2002129557A (en) * | 2000-10-23 | 2002-05-09 | Tokyo Tokushu Kiso Kogyo:Kk | Pile burying method |
JP4471510B2 (en) * | 2001-02-01 | 2010-06-02 | 住友金属工業株式会社 | Steel pipe soil cement pile, its construction method and construction equipment |
KR101071122B1 (en) * | 2002-09-30 | 2011-10-07 | 미타니 세키산 가부시키가이샤 | Internal excavation method through pile and foundation pile structure |
-
2003
- 2003-09-30 KR KR1020057004993A patent/KR101071122B1/en active IP Right Grant
- 2003-09-30 AU AU2003266716A patent/AU2003266716A1/en not_active Abandoned
- 2003-09-30 CN CNB038231085A patent/CN100510276C/en not_active Expired - Lifetime
- 2003-09-30 JP JP2004544915A patent/JP4625896B2/en not_active Expired - Lifetime
- 2003-09-30 WO PCT/JP2003/012522 patent/WO2004035942A1/en active Application Filing
-
2009
- 2009-11-16 JP JP2009261392A patent/JP5265500B2/en not_active Expired - Lifetime
-
2010
- 2010-05-26 JP JP2010120838A patent/JP5114529B2/en not_active Expired - Lifetime
-
2012
- 2012-08-03 JP JP2012173109A patent/JP5520347B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPWO2004035942A1 (en) | 2006-02-16 |
CN1685113A (en) | 2005-10-19 |
JP4625896B2 (en) | 2011-02-02 |
KR20050059183A (en) | 2005-06-17 |
JP5520347B2 (en) | 2014-06-11 |
JP2010209678A (en) | 2010-09-24 |
JP5265500B2 (en) | 2013-08-14 |
CN100510276C (en) | 2009-07-08 |
WO2004035942A1 (en) | 2004-04-29 |
KR101071122B1 (en) | 2011-10-07 |
JP2012207532A (en) | 2012-10-25 |
JP2010031647A (en) | 2010-02-12 |
JP5114529B2 (en) | 2013-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2003266716A1 (en) | Internal excavation method through pile, and foundation pile structure | |
AU2003274056A1 (en) | Hydraulic fracturing method | |
AU2003240679A1 (en) | Hydraulic fracturing method | |
AU2003280490A1 (en) | A mobile building unit as well as a building and a method for constructing the building | |
AU2003271440A1 (en) | A fuel cell system and method of operating the same | |
AU2003276985A1 (en) | Gravel packing method using vibration and hydraulic fracturing | |
HK1060377A1 (en) | Rock penetration composite pile and its construction method | |
AU2003284170A1 (en) | Pile weatherstripping manufacturing apparatus and method | |
AU2003279167A1 (en) | Subterranean structures and methods for constructing subterranean structures | |
AP1928A (en) | Geotechnical barrier | |
AU2003257378A1 (en) | Foundation for water structures | |
AU2002311907A1 (en) | Foundation piles or similar load carrying elements | |
AU2003303498A1 (en) | Diffusion barrier and method therefor | |
AU2003289418A1 (en) | Greening block and greening block fence | |
AU2003258453A1 (en) | Method of making a flat foundation for a floor without substantial excavation and foundation made by said method | |
GB0218916D0 (en) | Kidney foundation | |
AU2003269642A1 (en) | A fuel cell system and method of operating the same | |
GB2385071B (en) | Foundations | |
AU2003219181A1 (en) | Integral foundation construction method | |
AU2003273755A1 (en) | Adjustable foundation anchor | |
AU2003209503A1 (en) | Post piling apparatus | |
AU2003252603A1 (en) | A method of making a pile or an earth anchor | |
AU2003250064A1 (en) | Geotextile | |
AU2003260785A1 (en) | Earth connection | |
AU2003211823A1 (en) | Structure of underwater tunnel, method of constructing underwater tunnel, and caisson connection device |