AU2003252603A1 - A method of making a pile or an earth anchor - Google Patents
A method of making a pile or an earth anchorInfo
- Publication number
- AU2003252603A1 AU2003252603A1 AU2003252603A AU2003252603A AU2003252603A1 AU 2003252603 A1 AU2003252603 A1 AU 2003252603A1 AU 2003252603 A AU2003252603 A AU 2003252603A AU 2003252603 A AU2003252603 A AU 2003252603A AU 2003252603 A1 AU2003252603 A1 AU 2003252603A1
- Authority
- AU
- Australia
- Prior art keywords
- pile
- making
- earth anchor
- anchor
- earth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
- E02D5/808—Ground anchors anchored by using exclusively a bonding material
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE0202501-3 | 2002-08-23 | ||
SE0202501A SE0202501L (en) | 2002-08-23 | 2002-08-23 | Ways to make a pole and / or a tie rod |
PCT/SE2003/001262 WO2004018781A1 (en) | 2002-08-23 | 2003-08-12 | A method of making a pile or an earth anchor |
Publications (1)
Publication Number | Publication Date |
---|---|
AU2003252603A1 true AU2003252603A1 (en) | 2004-03-11 |
Family
ID=20288783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2003252603A Abandoned AU2003252603A1 (en) | 2002-08-23 | 2003-08-12 | A method of making a pile or an earth anchor |
Country Status (3)
Country | Link |
---|---|
AU (1) | AU2003252603A1 (en) |
SE (1) | SE0202501L (en) |
WO (1) | WO2004018781A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1794374A1 (en) * | 2004-08-30 | 2007-06-13 | Foot Foundation A/S | Methods for providing piled foundations for constructions, piled foundations and a balloon for providing an enlarged footing |
EP2213802B1 (en) * | 2009-02-02 | 2012-10-10 | BAUER Maschinen GmbH | Supply device for supplying concrete and glass into the drill ribbon of a drilling device when creating a concrete borehole and method for setting a concrete borehole |
CN114108664B (en) * | 2021-11-25 | 2024-08-13 | 重庆大学 | Landslide treatment method for vertical small-diameter hole guiding high-pressure jet grouting treatment |
CN116289947A (en) * | 2023-03-09 | 2023-06-23 | 中冶建筑研究总院有限公司 | Construction method of novel rotary spraying expanded anchor rod or anchor cable |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE436781B (en) * | 1981-11-16 | 1985-01-21 | Atlas Copco Ab | SVELLKROPP |
SU1032103A1 (en) * | 1982-02-18 | 1983-07-30 | Харьковский Институт Механизации И Электрификации Сельского Хозяйства | Pile |
SE451268B (en) * | 1982-12-21 | 1987-09-21 | Atlas Copco Ab | SWELL BODY FOR MARK LOCATION CONSTRUCTIONS |
EP0134379A1 (en) * | 1983-07-20 | 1985-03-20 | BAUTEK S.r.l. | Anchor element for tie bars in civil works |
NO167051C (en) * | 1989-02-02 | 1991-09-25 | L Oe Hoksrud | PROCEDURE FOR THE ESTABLISHMENT OF CONCRETE CONSTRUCTIONS IN LOANS, FROM THE TERRACE LEVEL, AND EQUIPMENT FOR EXERCISING THE PROCEDURE |
WO1991006713A1 (en) * | 1989-10-24 | 1991-05-16 | Groutco (Aust.) Pty. Ltd. | Inflatable ground anchor |
US5100262A (en) * | 1990-02-23 | 1992-03-31 | Michael Richard D | Expanding base deep foundation system |
JPH06200524A (en) * | 1993-01-06 | 1994-07-19 | Okabe Co Ltd | Lock anchor |
JPH06248645A (en) * | 1993-02-26 | 1994-09-06 | Maeda Corp | Construction of ground anchor in hole expanded by high-pressure jet |
SE501607C2 (en) * | 1993-03-28 | 1995-03-27 | Soilex Ab | Procedure for casting piles |
SE515997C2 (en) * | 2000-10-10 | 2001-11-05 | Soilex Ab | In situ formation of pile in ground, by inserting expansion body into feed pipe in ground, lifting pipe and filling body with concrete |
-
2002
- 2002-08-23 SE SE0202501A patent/SE0202501L/en not_active Application Discontinuation
-
2003
- 2003-08-12 WO PCT/SE2003/001262 patent/WO2004018781A1/en not_active Application Discontinuation
- 2003-08-12 AU AU2003252603A patent/AU2003252603A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
SE0202501L (en) | 2004-02-24 |
WO2004018781A1 (en) | 2004-03-04 |
SE0202501D0 (en) | 2002-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2387226B (en) | A method of seismic surveying | |
EG24385A (en) | Method of constructing a pile foundation | |
AU2003291437A1 (en) | Method of making a compound magnet | |
AU3818500A (en) | Method of creating a wellbore in an underground formation | |
AU2003213784A1 (en) | Method for installing a pile anchor | |
GB2435514B (en) | A method and system for seismic surveying of an earth formation | |
AU2002241207A1 (en) | Improved concrete pile made of such a concrete and method for drilling a hole adapted for receiving the improved concrete pile in a weak ground | |
AU7438601A (en) | Seismic method of performing the time picking step | |
AU2003279167A1 (en) | Subterranean structures and methods for constructing subterranean structures | |
GB0409233D0 (en) | Method of drilling a borehole into an earth formation | |
GB0307895D0 (en) | Method for determining parameters of earth formations surrounding a wellbore | |
AU2003252603A1 (en) | A method of making a pile or an earth anchor | |
AU2003258453A1 (en) | Method of making a flat foundation for a floor without substantial excavation and foundation made by said method | |
AU2002351613A1 (en) | Multi-level undercut excavation method using superimposed posts | |
AU2002246305A1 (en) | A method of implementing fixed-width data types | |
AU7025900A (en) | Drilling tool and method of installing a foundation pile | |
AU2002255160A1 (en) | Method for representing a volume of earth using a modelling environment | |
AU6698400A (en) | A method of determining parameters of formations through which a borehole passes | |
ZA200510247B (en) | A method of constructing a pile | |
AU2002258036A1 (en) | A method of making salt | |
AU2002342775A1 (en) | Tool and method for measuring properties of an earth formation surrounding a borehole | |
AU2003260785A1 (en) | Earth connection | |
AU2003219181A1 (en) | Integral foundation construction method | |
GB2373263B (en) | Method of forming foundations for a building | |
AUPR526501A0 (en) | An improved method of repairing wharf piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK6 | Application lapsed section 142(2)(f)/reg. 8.3(3) - pct applic. not entering national phase |