AT408360B - METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS - Google Patents

METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS Download PDF

Info

Publication number
AT408360B
AT408360B AT177499A AT177499A AT408360B AT 408360 B AT408360 B AT 408360B AT 177499 A AT177499 A AT 177499A AT 177499 A AT177499 A AT 177499A AT 408360 B AT408360 B AT 408360B
Authority
AT
Austria
Prior art keywords
composite
ceiling
concreting
supports
concrete
Prior art date
Application number
AT177499A
Other languages
German (de)
Other versions
ATA177499A (en
Original Assignee
A Mbt Anwendungszentrum Mischb
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by A Mbt Anwendungszentrum Mischb filed Critical A Mbt Anwendungszentrum Mischb
Priority to AT177499A priority Critical patent/AT408360B/en
Priority to PCT/AT2000/000272 priority patent/WO2001029344A1/en
Priority to AU77616/00A priority patent/AU7761600A/en
Publication of ATA177499A publication Critical patent/ATA177499A/en
Application granted granted Critical
Publication of AT408360B publication Critical patent/AT408360B/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



   Die Erfindung betrifft ein Verfahren zum Betonieren einer von Verbundstutzen getragenen Ver- bunddecke, insbesondere Verbundflachdecke. 



   Verbundflachdecken und Verbundstützen stellen eine Weiterentwicklung von Stahlbetonflach- decken und herkommlichen Stahlbetonstützen dar. Verbundflachdecken stellen dabei eine bevorzugte Form einer Verbunddecke dar, bei der die Stahlträger in die Decke integnert sind. Bei her- kömmlichen Verbunddecken sind die Stahltrager hingegen   unterzugähnlich   unter der Betondecke angeordnet. 



   Verbundflachdecken werden ubhcherweise bei statischen Berechnungen im Anschlussbereich der Stahlträger an die Stützen als Gelenk gerechnet. Beim Anschluss von Verbundflachdecken an Verbundstützen wird aber bei entsprechender Knotenausbildung eine Teileinspannung der Decke in die Stützen erreicht, d. h. die Verbunddecke wird momentübertragend an die Stütze angeschlos- sen. Diese Teileinspannung ergibt für die Stütze im Vergleich zu einer konventionellen Stahlbetondecke zusätzlich zur Normalkraftbeanspruchung eine Momentbeanspruchung und reduziert dadurch die Beanspruchung für die Decke.

   Um die Momentbeanspruchung nun aber nicht zu gross werden zu lassen, und damit die Stützendurchmesser erheblich zu vergrössern, wird zwischen
Bauzustand und Endzustand ein Systemwechsel vorgesehen
Aufgabe der vorliegenden Erfindung ist für den Bauzustand des Gebäudes zunächst eine "gelenkige" Verbindung zwischen Decke und Stütze herzustellen, und anschliessend eine Teileinspannung der Decke in die Stütze für den Gebrauchszustand, also für den Endzustand des Gebäudes zu erzielen. 



   Dies wird erfindungsgemäss dadurch erreicht, dass beim Betonieren der Verbunddecke der jeweilige Anschlussbereich der Verbunddecke an die Verbundstützen zumindest teilweise ausgespart wird und dass nach Aushärtung des Betons und nach Entfernen der die Verbunddecke stützenden Verschalung die Aussparung zwischen den Verbundstützen und dem Beton der Verbunddecke mit Beton, hochfestem Mörtel, hochfestem Kunststoff oder ähnlichem ausgegossen wird. 



   Durch die Aussparung des direkten Umgebungsbereiches der Verbundstützen beim   Betomer-   vorgang wird vorerst eine gelenkige Lagerung der Decke an der Stütze erzielt. Wird nach dem Aushärten des Betons die stützende Verschalung unter der Verbunddecke entfernt, so führt dies aufgrund des Eigengewichtes der Decke zu einer Lageanderung der Decke. Konkret wird die bei der Anbringung der Verschalung vorgesehene Überhöhung der Verbunddecke ausgeglichen, sodass im Endzustand eine horizontale ebene Decke erreicht wird. Wesentlich ist, dass die Entfernung der stützenden Verschalung und die nachfolgende Lageänderung der Verbunddecke zu keiner Momentbelastung der Verbundstützen führt. Erst nach dem Einrichten unter dem Eigengewicht wird die Aussparung ausgegossen und damit eine momentübertragende Anbindung der Decke an die Stütze erzielt.

   Für alle weiteren Lastfälle ergibt sich damit ein Rahmensystem mit Teileinspannung der Decke im Stütze-Decke-Knotenbereich. Bei den Knoten handelt es sich um sogenannte semi-rigid-joints. Aufgrund der Tatsache, dass lediglich die Nutzlasten im Gebrauchszustand des Gebäudes eine Momentbeanspruchung der Stützen bewirken, ergibt sich insgesamt eine optimal querschnittsvermindernde Beanspruchungsverteilung zwischen Verbundstütze und Verbunddecke. Konkret bedeutet dies dünnere Deckenabmessungen bei gleichzeitig reduzierten Stützendurchmessern. 



   Die Momenteinleitung in der Bauphase kann bereits dadurch wirksam vermieden werden, dass die Aussparung zumindest in der oberen Halfte des Anschlussbereiches der Verbunddecke an die jeweilige Verbundstütze vorgesehen ist Da im oberen Bereich der Verbunddecke eine Zugarmierung eingelegt ist, ist die Vermeidung einer Krafteinleitung in der oberen Halfte des Anschlussbereiches von besonderer Bedeutung
Für die praktische Durchführung des erfindungsgemässen Verfahrens ist es besonders einfach, wenn die Aussparung durch Anordnung eines Platzhalters an den Verbundstützen in den Anschlussbereichen erzielt wird, wobei dieser Platzhalter vor dem Ausgiessen entfernt wird. Alternativ wäre es jedoch auch vorstellbar, durch eine dünne Trennwand einen Hohlraum im Anschlussbereich freizuhalten. 



   Bewahrt hat es sich, den Platzhalter aus geschaumtem Kunststoff, insbesondere Styropor, auszubilden, da dies die einfache Entfernung mittels eines Hochdruckwasserstrahlers erlaubt. 



   Weitere Merkmale und Einzelheiten ergeben sich aus der nachfolgenden Figurenbeschreibung Dabei zeigt. 

 <Desc/Clms Page number 2> 

 



   Fig. 1 einen einzelnen Verbundflachdecke-Verbundstütze-Knoten einer Verbundflachdecke mit Platzhaltern in Seitenansicht, wobei der Beton in der Mittelebene aufgeschnitten ist,
Fig. 2 die dazugehönge Ansicht von oben und
Fig. 3 den Knoten gemäss Fig. 1 nach Entfernen des Platzhalters. 



   Die Verbundstütze 1 ist als Hohlprofil aus Stahl ausgebildet. Dieses Hohlprofil wird vor dem Betoniervorgang der Verbundflachdecke 2 selbst ausbetoniert. In die Verbundflachdecke 2 sind Träger 5 integriert, die über Laschen 6 mit den Verbundstützen 1 verbunden sind Die Laschen 6 sind dabei mit den Verbundstützen 1 verschweisst. Die Verbundstützen 1 sind weiters mit Knaggen 7 versehen. Vom Querflansch 5a des Trägers 5 können Druckkräfte über ein Passblech 8 auf die Knagge 7 und damit auf die Verbundstütze 1 übertragen und in diese eingeleitet werden. In den Figuren ist der Einfachheit halber lediglich ein Träger 5 gezeigt.   Üblich   sind hingegen zwei gegen- überliegende Träger oder auch vier jeweils um 90  versetzte Trager. 



   Wesentlich ist, dass um die Verbundstütze 1 vor dem Betonieren Platzhalter 4 angeordnet werden. Konkret handelt es sich dabei um   Styroporelemente,   die im Anschlussbereich um die Verbundstütze 1 gelegt werden. Die Platzhalter 4 dienen dazu, ein Einbetonieren der Verbundstütze 1 im Beton 10 zu vermeiden. 



   Der Träger 5 überträgt im Bauzustand wie auch im Endzustand nach Entfernung der nicht gezeigten stützenden Verschalung die Druckkraftkomponente aus dem Deckenmoment in die Verbundstütze 1. Vorerst kann jedoch durch den Platzhalter 4 in der oberen Hälfte des Anschlussbereiches keine entsprechende Gegenkraft, die sich aus der Bewehrung 9 ergibt, in die Verbundstütze 1 eingeleitet werden. Die Verbundflachdecke 2 mit den integrierten Trägern 5 kann nach erfolgtem Betonieren durch Lösung der Schalungsunterstellung abgesenkt werden und wird sich dabei zwängungsfrei unter dem Deckeneigengewicht verformen. Die Verbundstütze 1 bleibt bei diesem Vorgang jedoch im wesentlichen momentenfrei, da der Träger 5 allein aufgrund seiner gelenkigen Anbindung an die Lasche 6 kein nennenswertes Moment auf die Verbundstütze 1 übertragen kann. 



   In nächstem Schritt werden die Platzhalter 4 aus Styropor mit einem Hochdruckwasserstrahler vollkommen entfernt. Die so freigelegte Aussparung 3 wird mit einem geeigneten Füllmaterial fugenfrei vergossen. Als Füllmaterial eignet sich Beton, hochfester Mörtel oder auch ein hochfester Kunststoff. Es muss gewährleistet sein, dass das Füllen der freigelegten Aussparung 3 vollkommen fugenfrei und kraftschlüssig erfolgt. Damit ist gewährleistet, dass nach Erhärtung des Füllmatenals von Nutzlasten herrührende Momente in die Verbundstützen 1 eingeleitet und von diesen aufgenommen werden können. 



   PATENTANSPRÜCHE: 
1. Verfahren zum Betonieren einer von Verbundstützen getragenen Verbunddecke, insbe- sondere Verbundflachdecke, dadurch gekennzeichnet, dass beim Betonieren der Verbund- decke (2) der jeweilige Anschlussbereich der Verbunddecke (2) an die Verbundstützen (1) zumindest teilweise ausgespart wird und dass nach Aushärtung des Betons und nach Ent- fernen der die Verbunddecke (2) stützenden Verschalung die Aussparung (3) zwischen den Verbundstützen (1) und dem Beton (10) der Verbunddecke (2) mit Beton, hochfestem
Mörtel, hochfestem Kunststoff oder ähnlichem ausgegossen wird.



   <Desc / Clms Page number 1>
 



   The invention relates to a method for concreting a composite ceiling supported by composite connectors, in particular a composite flat ceiling.



   Composite flat ceilings and composite columns are a further development of reinforced concrete flat ceilings and conventional reinforced concrete columns. Composite flat ceilings represent a preferred form of a composite ceiling, in which the steel beams are integrated into the ceiling. In the case of conventional composite ceilings, on the other hand, the steel girders are arranged under the concrete ceiling in a manner similar to joists.



   Composite flat ceilings are usually calculated as a joint in the case of static calculations in the connection area of the steel beams to the supports. When connecting composite flat ceilings to composite columns, with appropriate knot formation, the ceiling is partially clamped into the columns, i.e. H. the composite slab is connected to the support to transmit torque. In comparison to a conventional reinforced concrete slab, this partial clamping results in a momentary load in addition to the normal force load, thereby reducing the load on the slab.

   In order not to let the momentary load become too great, and thus to increase the column diameter considerably, there is a difference between
Construction and final state a system change is provided
The object of the present invention is first to establish an "articulated" connection between the ceiling and the support for the building condition of the building, and then to achieve a partial clamping of the ceiling in the support for the usage condition, that is to say for the final condition of the building.



   This is achieved according to the invention in that when concreting the composite floor, the respective connection area of the composite floor to the composite supports is at least partially left out and that after the concrete has hardened and after the formwork supporting the composite floor has been removed, the recess between the composite supports and the concrete of the composite floor with concrete, high-strength mortar, high-strength plastic or the like is poured out.



   By cutting out the direct surrounding area of the composite columns during the betomer process, an articulated mounting of the ceiling on the column is initially achieved. If the supporting formwork under the composite ceiling is removed after the concrete has hardened, this leads to a change in the position of the ceiling due to the weight of the ceiling. Specifically, the overlap of the composite ceiling provided for when the formwork is installed is compensated for, so that a horizontal, level ceiling is achieved in the final state. It is essential that the removal of the supporting formwork and the subsequent change in position of the composite floor does not lead to any momentary load on the composite supports. The recess is only poured out after it has been set up under its own weight and a torque-transmitting connection of the ceiling to the support is achieved.

   For all other load cases, this results in a frame system with partial restraint of the slab in the column-slab node area. The nodes are so-called semi-rigid joints. Due to the fact that only the payloads cause the columns to be momentarily stressed when in use, the overall load distribution between the composite column and the composite ceiling is optimally reduced. Specifically, this means thinner slab dimensions with reduced column diameters.



   The introduction of torque in the construction phase can already be effectively avoided by providing the recess at least in the upper half of the connection area of the composite ceiling to the respective composite support. As a tension reinforcement is inserted in the upper area of the composite ceiling, it is necessary to avoid the introduction of force in the upper half of the connection area of particular importance
For the practical implementation of the method according to the invention, it is particularly simple if the recess is achieved by arranging a placeholder on the composite supports in the connection areas, this placeholder being removed before pouring out. Alternatively, however, it would also be conceivable to keep a cavity in the connection area clear by means of a thin partition.



   It has proven useful to design the placeholder from foamed plastic, in particular styrofoam, since this allows easy removal using a high-pressure water jet.



   Further features and details result from the following description of the figures.

 <Desc / Clms Page number 2>

 



   1 is a side view of a single composite flat ceiling composite support node of a composite flat ceiling with placeholders, the concrete being cut open in the central plane,
Fig. 2 and the associated view from above
3 shows the knot according to FIG. 1 after removing the placeholder.



   The composite support 1 is designed as a hollow profile made of steel. This hollow profile is concreted out itself before the concreting process of the composite flat ceiling 2. Beams 5 are integrated into the composite flat ceiling 2 and are connected to the composite supports 1 by means of brackets 6. The brackets 6 are welded to the composite supports 1. The composite supports 1 are also provided with lugs 7. Compression forces can be transmitted from the transverse flange 5a of the carrier 5 via a fitting plate 8 to the collar 7 and thus to the composite support 1 and introduced into it. For the sake of simplicity, only one carrier 5 is shown in the figures. On the other hand, two opposite beams or four beams, each offset by 90, are common.



   It is essential that placeholders 4 are arranged around the composite support 1 before concreting. Specifically, these are polystyrene elements that are placed around the composite support 1 in the connection area. The placeholders 4 serve to prevent the composite column 1 from being concreted into the concrete 10.



   The beam 5 transmits the pressure force component from the moment of the slab into the composite column 1 in the construction state as well as in the final state after removal of the supporting formwork (not shown) results, are introduced into the composite support 1. The composite flat slab 2 with the integrated beams 5 can be lowered after concreting by loosening the formwork substructure and will deform under the weight of the slab without constraint. However, the composite support 1 remains essentially torque-free in this process, since the carrier 5 cannot transmit any significant torque to the composite support 1 solely because of its articulated connection to the bracket 6.



   In the next step, the placeholders 4 made of polystyrene are completely removed with a high-pressure water jet. The recess 3 thus exposed is cast with a suitable filling material without joints. Concrete, high-strength mortar or a high-strength plastic are suitable as filling materials. It must be ensured that the uncovered recess 3 is filled completely joint-free and non-positively. This ensures that, after the filling material has hardened, moments resulting from payloads can be introduced into the composite supports 1 and absorbed by them.



   PATENT CLAIMS:
1. A method for concreting a composite ceiling supported by composite columns, in particular a composite flat ceiling, characterized in that when concreting the composite ceiling (2) the respective connection area of the composite ceiling (2) to the composite columns (1) is at least partially left out and that after Hardening of the concrete and, after removing the formwork supporting the composite ceiling (2), the recess (3) between the composite columns (1) and the concrete (10) of the composite ceiling (2) with high-strength concrete
Mortar, high-strength plastic or the like is poured out.


    

Claims (1)

2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die Aussparung (3) zumindest in der oberen Hälfte des Anschlussbereiches der Verbunddecke (2) an die jeweilige Verbundstütze (1) vorgesehen ist.  2. The method according to claim 1, characterized in that the recess (3) at least in the upper half of the connection area of the composite ceiling (2) to the respective Composite support (1) is provided. 3 Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Aussparung (3) durch Anordnung zumindest eines Platzhalters (4) an den Verbundstützen (1) in den Anschlussbereichen erzielt wird, wobei dieser Platzhalter (4) vor dem Ausgiessen entfernt wird.  3. The method according to claim 1 or 2, characterized in that the recess (3) by arranging at least one placeholder (4) on the composite supports (1) in the Connection areas is achieved, this placeholder (4) is removed before pouring. 4. Verfahren nach Anspruch 3, dadurch gekennzeichnet, dass der Platzhalter (4) aus ge- schäumtem Kunststoff, insbesondere Styropor besteht.  4. The method according to claim 3, characterized in that the placeholder (4) consists of foamed plastic, in particular styrofoam. 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass der geschäumte Kunststoff mit- tels eines Hochdruckwasserstrahlers entfernt wird. <Desc/Clms Page number 3>  5. The method according to claim 4, characterized in that the foamed plastic is removed by means of a high pressure water jet.  <Desc / Clms Page number 3>
AT177499A 1999-10-21 1999-10-21 METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS AT408360B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
AT177499A AT408360B (en) 1999-10-21 1999-10-21 METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS
PCT/AT2000/000272 WO2001029344A1 (en) 1999-10-21 2000-10-19 Method for concreting a composite floor which is supported by composite support structures
AU77616/00A AU7761600A (en) 1999-10-21 2000-10-19 Method for concreting a composite floor which is supported by composite support structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT177499A AT408360B (en) 1999-10-21 1999-10-21 METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS

Publications (2)

Publication Number Publication Date
ATA177499A ATA177499A (en) 2001-03-15
AT408360B true AT408360B (en) 2001-11-26

Family

ID=3520715

Family Applications (1)

Application Number Title Priority Date Filing Date
AT177499A AT408360B (en) 1999-10-21 1999-10-21 METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS

Country Status (3)

Country Link
AT (1) AT408360B (en)
AU (1) AU7761600A (en)
WO (1) WO2001029344A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE921955C (en) * 1953-01-23 1955-01-07 Hubert Eishauer Process for the production of recesses in concrete structures or the like.
DE1809987A1 (en) * 1968-11-20 1970-06-18 Maret Gmbh Werner Formwork body to achieve breakthroughs for roof outlets in flat concrete roofs
DE3116102A1 (en) * 1981-04-23 1982-11-18 Stahlbau Löw GmbH & Co KG, 7129 Güglingen Structure comprising composite supports and composite beams
EP0089443A1 (en) * 1982-03-18 1983-09-28 Gustav Ickes Wall elements for repeatedly movable prefabricated buildings and device for their connection

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH430128A (en) * 1965-10-19 1967-02-15 Geilinger & Co Reinforced concrete ceiling
ATE21950T1 (en) * 1983-10-06 1986-09-15 Geilinger Ag PROCESS FOR MANUFACTURING A STRUCTURE.
FR2599070B2 (en) * 1986-05-22 1991-04-26 Culica Georges RIGID METALLIC CONNECTION BETWEEN RAISED FLOOR TILES AND PREFABRICATED REINFORCED CONCRETE POSTS FOR AUTOSTABLE STRUCTURES
DE29511898U1 (en) * 1995-07-24 1995-10-12 Kombi Tragwerk GmbH, 35619 Braunfels Prop head

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE921955C (en) * 1953-01-23 1955-01-07 Hubert Eishauer Process for the production of recesses in concrete structures or the like.
DE1809987A1 (en) * 1968-11-20 1970-06-18 Maret Gmbh Werner Formwork body to achieve breakthroughs for roof outlets in flat concrete roofs
DE3116102A1 (en) * 1981-04-23 1982-11-18 Stahlbau Löw GmbH & Co KG, 7129 Güglingen Structure comprising composite supports and composite beams
EP0089443A1 (en) * 1982-03-18 1983-09-28 Gustav Ickes Wall elements for repeatedly movable prefabricated buildings and device for their connection

Also Published As

Publication number Publication date
AU7761600A (en) 2001-04-30
ATA177499A (en) 2001-03-15
WO2001029344A1 (en) 2001-04-26

Similar Documents

Publication Publication Date Title
DE1911352C3 (en) Inflatable formwork
EP2914790B1 (en) Method for producing a tower construction from reinforced concrete
EP1907642B1 (en) Method of producing a wall-floor reinforced concrete construction
EP1405961A1 (en) Steel-concrete structure for floor slabs
EP1156175B1 (en) Method for erecting several similar constructions having a frustoconical shape
EP1248889A2 (en) Reinforced or pre-stressed concrete part which is subjected to a transverse force
DE3542651A1 (en) Shuttering element
EP1669505A1 (en) Steel-concrete composite joist with fire-resistant support for ceiling elements
DE3705961A1 (en) Balcony which can be retrofitted
AT410343B (en) METHOD FOR PRODUCING A TOWER-LIKE CONSTRUCTION
EP0138196B1 (en) Method of erection of buildings consisting of casting materials in particular of concrete and device for carrying out the method
AT408360B (en) METHOD FOR CONCRETING A CONNECTED CEILING SUPPORTED BY COMPOSITE SUPPORTS
DE2649936A1 (en) REINFORCED CONCRETE CONTAINER AND METHOD OF ERECTING IT
DE10007450A1 (en) Mounting bracket system and method for fastening a prefabricated component to a building part using the mounting bracket system
AT521261B1 (en) Method for producing a bridge girder of a prestressed concrete bridge
EP1387910B1 (en) Connector element and method for connecting a prefabricated concrete piece with a section of a building
DE3322951A1 (en) Truss bridge and method for producing it
DE2153495A1 (en) PREFABRICATED CEILING PANEL FOR ASSEMBLY CONSTRUCTION
DE19903310A1 (en) Compound support as steel support for bridge structure
DE3621611A1 (en) Arched bridge and method for the construction thereof
DE3723629C2 (en)
AT408004B (en) Prefabricated-concrete-wall shuttering-element system
DE19841442A1 (en) Carrier structure for compound floor levels in a building has swing carriers fitted to hollow steel support profiles
EP0645501A1 (en) Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul
AT152705B (en) Process for the section-wise production of reinforced concrete bodies that are primarily subject to bending.

Legal Events

Date Code Title Description
UEP Publication of translation of european patent specification
ELJ Ceased due to non-payment of the annual fee