AR088698A1 - Seccion de pie de torre de una instalacion de energia eolica, disposicion de pie de torre, torre de una instalacion de energia eolica y procedimiento para montar dicha torre - Google Patents
Seccion de pie de torre de una instalacion de energia eolica, disposicion de pie de torre, torre de una instalacion de energia eolica y procedimiento para montar dicha torreInfo
- Publication number
- AR088698A1 AR088698A1 ARP120104199A ARP120104199A AR088698A1 AR 088698 A1 AR088698 A1 AR 088698A1 AR P120104199 A ARP120104199 A AR P120104199A AR P120104199 A ARP120104199 A AR P120104199A AR 088698 A1 AR088698 A1 AR 088698A1
- Authority
- AR
- Argentina
- Prior art keywords
- tower
- flange
- foundation
- fixing bolts
- fixing
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Sustainable Development (AREA)
- Mechanical Engineering (AREA)
- Combustion & Propulsion (AREA)
- Chemical & Material Sciences (AREA)
- Sustainable Energy (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Motor Or Generator Frames (AREA)
- Iron Core Of Rotating Electric Machines (AREA)
- Motor Or Generator Cooling System (AREA)
Abstract
Se refiere a una sección de pie de torre (1) para ser dispuesta y fijada sobre una fundación (18) y para montar una torre de una instalación de energía eólica (100) sobre la misma, y que abarca una brida anular inferior exterior (6) para ser colocada sobre la fundación (18) y para su fijación sobre la fundación (18), un brida anular superior interior (8) para colocar y fijar un segmento de torre (32) con correspondiente brida inferior de la torre (30) sobre la misma, una brida de apoyo inferior interior (10) para su colocación sobre la fundación (18) y elementos de apoyo interiores (22), en especial piezas de apoyo (22) para apoyar la brida anular superior (8) contra la brida de apoyo inferior (10). Se describe un método para montar dicha torre. Reivindicación 5: Disposición de pie de torre (2) que comprende: una sección de pie de torre (1),en especial de acuerdo con una de las reivindicaciones precedentes; una jaula de fundación (4), con pernos de fijación interiores y exteriores (24, 26) para anclar con en cada caso un lado en una fundación (18) para fijar con en cada caso otro lado en la sección de pie de torre (1), en donde los pernos de fijación interiores (24) son un poco más largos en la altura de la sección de pie de torre (1) que los pernos de fijación exteriores (26). Reivindicación 6: Disposición de pie de torre (2) de acuerdo con la reivindicación 5, en donde los pernos de fijación exteriores (26) se hacen pasar por perforaciones de la brida anular inferior exterior (6) para la fijación con la sección de torre (1); y los pernos de fijación interiores (24) se hacen pasar por perforaciones de la brida de apoyo interior inferior (10) y por perforaciones de la brida anular interior superior (8), y están preparados para la fijación con un segmento de torre (32) a ser montado mediante una brida inferior de la torre (8), a efectos de ser conducidos a través de perforaciones de la brida inferior de la torre (30). Reivindicación 8: Disposición de pie de torre (2) de acuerdo con la reivindicación 7, caracterizada porque los pernos de unión para el tensado están provistos en cada caso de dos medios de tensado, en especial tuercas de tensado, a efectos de tensar entre sí la brida anular superior interior (8) y la correspondiente brida inferior de la torre (30) del segmento de torre colocado (32). Reivindicación 9: Disposición de pie de torre de acuerdo con la reivindicación 7 u 8, en donde los pernos de fijación interiores (24) y los pernos de unión llegan en cada caso a través de la brida anular superior interior (8) y de la brida inferior de la torre (30) del segmento de torre colocado (32) y en este caso en especial se alternan. Reivindicación 10: Torre de una instalación de energía eólica (100), que abarca: una fundación (18) con una jaula de fundación (4) con pernos de fijación exteriores e interiores (24, 26) y con una sección de pie de torre (1) de acuerdo con una de las reivindicaciones 1 a 4; y un segmento inferior de la torre (32), en especial un segmento de torre de acero (32), con una brida inferior de la torre (30), en donde el segmento inferior de la torre (32) está dispuesto con su brida de torre (30) sobre la sección de pie de torre (1) y algunos de los pernos de fijación (24), en especial los pernos de fijación interiores (24) se extienden desde la fundación (18) a través de la brida de apoyo inferior interior (10) y a través de la brida anular superior interior (8) de la sección de pie de torre (1), y son guiados a través de la brida inferior de la torre, para de esta manera fijar la brida inferior de la torre sobre la brida de torre, en especial mediante atornillado y ajuste de tuercas de fijación (36) sobre los pernos de fijación (24) que sobresalen hacia arriba a traes de la brida inferior de la torre (30). Reivindicación 12: Procedimiento para montar una torre de una instalación de energía eólica (100), en especial una torre de acero, que abarca los pasos siguientes: posicionado de una jaula de fundación (4) unida a una sección de pie de torre (1), en una excavación preparada para la colada de una fundación (18); colada de hormigón en las excavación de fundación para el hormigonado parcial de la jaula de fundación (4), endurecimiento del hormigón colado (18); y colocación y fijación de un segmento inferior de la torre (32). Reivindicación 13: Procedimiento de acuerdo con la reivindicación 8, caracterizado porque se emplea una sección de torre (1) de acuerdo con una de las reivindicaciones 1 a 4 y/o una disposición de pie de torre de acuerdo con una de las reivindicaciones 5 a 9, y porque durante el posicionado de la jaula de fundación (4) la misma está unida mediante los pernos de fijación (24, 26) con la sección de pie de torre (1), en donde los pernos de fijación interiores (24) son guiados a través de perforaciones de la brida anular interior superior (8) y allí son fijados mediante tuercas de fijación (36), en especial mediante tuercas correspondientes; durante la colada del hormigón la sección de pie de torre (1) es mantenida mediante una grúa o por un marco portante montado en la excavación de la fundación, con lo que además se sostiene la jaula de fundación (4) fijada a la sección de torre (1); después del endurecimiento se nivela la sección de pie de torre; y/o la colocación y fijación de un segmento inferior de la torre (32) tiene lugar de manera tal que de los pernos de fijación interiores (24) los medios de fijación (36) son removidos, el segmento inferior de la torre (30) se coloca sobre la brida anular superior interior (8) con una brida inferior de la torre (30), en donde los pernos de fijación interiores (24) son conducidos a través de perforaciones de la brida inferior de la torre (30), y los medios de fijación (36), en especial las tuercas de fijación (36), son atornillados sobre los pernos de fijación (24) que sobresalen a través de la brida de torre (30), a efectos de fijar firmemente la brida de torre (30) sobre la brida de torre interior superior (30) de la sección de torre.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102011085947A DE102011085947A1 (de) | 2011-11-08 | 2011-11-08 | Turmfußsektion einer Windenergieanlage |
Publications (1)
Publication Number | Publication Date |
---|---|
AR088698A1 true AR088698A1 (es) | 2014-06-25 |
Family
ID=47178663
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP120104199A AR088698A1 (es) | 2011-11-08 | 2012-11-08 | Seccion de pie de torre de una instalacion de energia eolica, disposicion de pie de torre, torre de una instalacion de energia eolica y procedimiento para montar dicha torre |
Country Status (25)
Country | Link |
---|---|
US (1) | US9322396B2 (es) |
EP (1) | EP2776637B1 (es) |
JP (1) | JP5917707B2 (es) |
KR (1) | KR101780537B1 (es) |
CN (1) | CN103930623B (es) |
AR (1) | AR088698A1 (es) |
AU (1) | AU2012334092B2 (es) |
BR (1) | BR112014011033A2 (es) |
CA (1) | CA2853246C (es) |
CL (1) | CL2014001118A1 (es) |
CY (1) | CY1117337T1 (es) |
DE (1) | DE102011085947A1 (es) |
DK (1) | DK2776637T3 (es) |
ES (1) | ES2568064T3 (es) |
HR (1) | HRP20160364T1 (es) |
HU (1) | HUE027929T2 (es) |
ME (1) | ME02358B (es) |
MX (1) | MX343658B (es) |
PL (1) | PL2776637T3 (es) |
RS (1) | RS54617B1 (es) |
RU (1) | RU2611086C2 (es) |
SI (1) | SI2776637T1 (es) |
TW (1) | TWI534328B (es) |
WO (1) | WO2013068403A1 (es) |
ZA (1) | ZA201402872B (es) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013156632A1 (es) * | 2012-02-28 | 2013-10-24 | Ms Enertech, S.L. | Conexión entre una torre de un aerogenerador y su cimentación |
WO2014055534A1 (en) * | 2012-10-01 | 2014-04-10 | Valmont Industries, Inc. | Base angle attachment assemblies |
CN103266621B (zh) * | 2013-05-21 | 2015-04-22 | 孟庆波 | 一种风力发电机钢绞线预应力基础结构及其施工方法 |
DE102013105512A1 (de) * | 2013-05-29 | 2014-12-04 | Max Bögl Wind AG | Betonfundament und Verfahren zur Herstellung eines Betonfundaments für einen Windkraftturm sowie Positioniervorrichtung zur Positionierung von Hüllrohren in einem Betonfundament |
DE102013211750A1 (de) * | 2013-06-21 | 2014-12-24 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Fundament |
DE102013225128A1 (de) | 2013-12-06 | 2015-06-11 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Turm |
DE102013226536A1 (de) * | 2013-12-18 | 2015-06-18 | Wobben Properties Gmbh | Anordnung mit einem Betonfundament und einem Turm und Verfahren zum Errichten eines Turms |
JP6145056B2 (ja) * | 2014-02-28 | 2017-06-07 | 三菱重工業株式会社 | 風力発電装置用タワー及び風力発電装置 |
US9255408B2 (en) | 2014-03-17 | 2016-02-09 | Hitachi Metals Techno, Ltd. | Column structure and base member |
WO2015140892A1 (ja) | 2014-03-17 | 2015-09-24 | 日立機材株式会社 | 柱構造及びベース部材 |
JP5795433B1 (ja) * | 2014-03-17 | 2015-10-14 | 日立機材株式会社 | 柱構造 |
JPWO2015140890A1 (ja) | 2014-03-17 | 2017-04-06 | 日立機材株式会社 | 柱構造及びベース部材 |
DK3132095T3 (en) * | 2014-04-16 | 2018-01-22 | Vestas Wind Sys As | A FOUNDATION FOR A WINDMILL |
CN106415005B (zh) * | 2014-04-30 | 2020-10-30 | 温德凯尔印度私人有限公司 | 风轮机叶片的拆卸和重新安装方法与系统 |
KR20160033012A (ko) * | 2014-09-17 | 2016-03-25 | 한국전력공사 | 압축용 마이크로파일 및 분할 프리캐스트 기초부를 이용한 송전철탑 기초체 |
DE102015004828A1 (de) * | 2015-04-14 | 2016-10-20 | Liebherr-Werk Biberach Gmbh | Fundamentverankerung für Arbeitsmaschine |
DE102015216444A1 (de) | 2015-08-27 | 2017-03-02 | Wobben Properties Gmbh | Windenergieanlage |
US11072903B2 (en) | 2015-08-31 | 2021-07-27 | Siemens Gamesa Renewable Energy, Inc. | Equipment tower having a concrete plinth |
EP3178996B1 (en) * | 2015-12-09 | 2018-02-14 | innogy SE | Pile for an offshore monopile foundation |
PL3312416T3 (pl) * | 2016-10-24 | 2022-08-16 | Nordex Energy Spain, S.A. | Wieża turbiny wiatrowej na fundamentach |
US10815969B2 (en) * | 2016-11-10 | 2020-10-27 | General Electric Company | Methods and apparatus for refurbishing wind turbine foundations |
CN107938696A (zh) * | 2017-12-22 | 2018-04-20 | 中国地质大学(武汉) | 一种用于岩石地区的预应力扩底锚索风机基础 |
CN108223294B (zh) * | 2018-01-31 | 2024-06-11 | 运达能源科技集团股份有限公司 | 混凝土塔筒高空用预应力穿筋及锚栓调平装置的使用方法 |
KR102160628B1 (ko) | 2018-11-19 | 2020-09-29 | 한국건설기술연구원 | 부분적 리파워링을 위해 기초부를 보강한 풍력발전 구조물 및 그 시공방법 |
DK3660220T3 (da) * | 2018-11-30 | 2022-10-24 | Nordex Energy Spain Sau | Ankerbur til et fundament til en vindmølle, fremgangsmåde for montering deraf og fundament til en vindmølle |
DE102018131443A1 (de) * | 2018-12-07 | 2020-06-10 | Wobben Properties Gmbh | Fundamentanordnung, Adapterelement, Spannvorrichtung und Turm einer Windenergieanlage sowie Verfahren zum Vorspannen eines Turms einer Windenergieanlage |
US11319724B2 (en) * | 2019-08-01 | 2022-05-03 | Tindall Corporation | System and method for coupling a post to a foundation |
CN110671278B (zh) * | 2019-10-28 | 2023-09-05 | 同济大学建筑设计研究院(集团)有限公司 | 一种反向平衡法兰节点及其应用方法 |
US11905924B2 (en) * | 2022-03-03 | 2024-02-20 | Barr Engineering Co. | Spreader box |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US900517A (en) * | 1908-03-17 | 1908-10-06 | John Glover | Column-step. |
JPS5578722A (en) | 1978-12-11 | 1980-06-13 | Mitsubishi Heavy Ind Ltd | Groundwork construction of steel smoke stuck |
US4469956A (en) * | 1983-01-24 | 1984-09-04 | U.S. Windpower, Inc. | Windmill support structure |
JP2000272692A (ja) * | 1999-03-24 | 2000-10-03 | Fuji Kako Kk | 繊維強化プラスチック製塔槽 |
JP3648146B2 (ja) * | 2000-10-16 | 2005-05-18 | 株式会社ピーエス三菱 | 風力発電タワー |
DE10226996B4 (de) * | 2001-10-09 | 2014-07-03 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
DE10230273B3 (de) * | 2002-07-05 | 2004-02-12 | Institut für Fertigteiltechnik und Fertigbau Weimar e.V. | Turm einer Windkraftanlage mit einem unteren Teil aus Spannbeton und einem aufgesetzten Stahlrohr |
DE102004017006B4 (de) * | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017008B4 (de) * | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
JP2007023626A (ja) * | 2005-07-19 | 2007-02-01 | Nippon Sharyo Seizo Kaisha Ltd | 制震免震構造 |
DE102005044989B3 (de) * | 2005-09-21 | 2006-12-14 | Nordex Energy Gmbh | Verfahren zur Gründung eines Fundamentkörpers für eine Windenenergieanlage |
US8051627B2 (en) * | 2006-04-30 | 2011-11-08 | General Electric Company | Tower adapter, method of producing a tower foundation and tower foundation |
DE102007031065B4 (de) * | 2007-06-28 | 2011-05-05 | Nordex Energy Gmbh | Windenergieanlagenturm |
US20100024311A1 (en) * | 2008-07-30 | 2010-02-04 | Dustin Jon Wambeke | Wind turbine assembly with tower mount |
US20100132299A1 (en) * | 2008-12-02 | 2010-06-03 | General Electric Company | Wind turbine with improved tower and method of assembling same |
ES2388807T3 (es) * | 2008-12-16 | 2012-10-18 | Vestas Wind Systems A/S | Cimentación para permitir el anclaje de una torre de turbina eólica a la misma por medio de pernos pasantes reemplazables |
RU89543U1 (ru) | 2009-06-11 | 2009-12-10 | Открытое акционерное общество "Федеральная сетевая компания Единой энергетической системы" | Анкерный металлический оголовок железобетонного фундамента |
AU2009284717A1 (en) * | 2009-12-25 | 2011-07-21 | Mitsubishi Heavy Industries, Ltd. | Monopole tower and wind turbine generator having monopole tower |
US20110138704A1 (en) * | 2010-06-30 | 2011-06-16 | General Electric Company | Tower with tensioning cables |
US8307593B2 (en) * | 2010-08-18 | 2012-11-13 | General Electric Company | Tower with adapter section |
FI125153B (fi) * | 2010-09-16 | 2015-06-15 | Peikko Group Oy | Menetelmä ja sovitelma tornimaisen rakenteen kiinnittämiseksi perustukseen |
WO2012159061A1 (en) * | 2011-05-18 | 2012-11-22 | Toorman Norman L | Foundation for a wind turbine utilizing a slurry of low viscosity grout |
US8443557B2 (en) * | 2011-09-16 | 2013-05-21 | General Electric Company | Tower base section of a wind turbine, a wind turbine and a system for mounting a tower |
-
2011
- 2011-11-08 DE DE102011085947A patent/DE102011085947A1/de not_active Withdrawn
-
2012
- 2012-11-07 ME MEP-2016-51A patent/ME02358B/me unknown
- 2012-11-07 TW TW101141393A patent/TWI534328B/zh not_active IP Right Cessation
- 2012-11-07 CN CN201280054941.2A patent/CN103930623B/zh not_active Expired - Fee Related
- 2012-11-07 SI SI201230503A patent/SI2776637T1/sl unknown
- 2012-11-07 MX MX2014005463A patent/MX343658B/es active IP Right Grant
- 2012-11-07 HU HUE12786940A patent/HUE027929T2/en unknown
- 2012-11-07 US US14/356,545 patent/US9322396B2/en active Active
- 2012-11-07 RS RS20160161A patent/RS54617B1/en unknown
- 2012-11-07 CA CA2853246A patent/CA2853246C/en not_active Expired - Fee Related
- 2012-11-07 EP EP12786940.2A patent/EP2776637B1/de active Active
- 2012-11-07 DK DK12786940.2T patent/DK2776637T3/en active
- 2012-11-07 RU RU2014122983A patent/RU2611086C2/ru not_active IP Right Cessation
- 2012-11-07 PL PL12786940T patent/PL2776637T3/pl unknown
- 2012-11-07 KR KR1020147015321A patent/KR101780537B1/ko active IP Right Grant
- 2012-11-07 WO PCT/EP2012/072035 patent/WO2013068403A1/de active Application Filing
- 2012-11-07 AU AU2012334092A patent/AU2012334092B2/en not_active Ceased
- 2012-11-07 ES ES12786940.2T patent/ES2568064T3/es active Active
- 2012-11-07 JP JP2014540436A patent/JP5917707B2/ja active Active
- 2012-11-07 BR BR112014011033A patent/BR112014011033A2/pt active Search and Examination
- 2012-11-08 AR ARP120104199A patent/AR088698A1/es active IP Right Grant
-
2014
- 2014-04-22 ZA ZA2014/02872A patent/ZA201402872B/en unknown
- 2014-04-29 CL CL2014001118A patent/CL2014001118A1/es unknown
-
2016
- 2016-03-30 CY CY20161100259T patent/CY1117337T1/el unknown
- 2016-04-08 HR HRP20160364TT patent/HRP20160364T1/hr unknown
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR088698A1 (es) | Seccion de pie de torre de una instalacion de energia eolica, disposicion de pie de torre, torre de una instalacion de energia eolica y procedimiento para montar dicha torre | |
AU2011244287A1 (en) | Wind power plant foundation and wind power plant | |
DK2715115T3 (en) | PROCEDURE FOR THE CONSTRUCTION OF A WINDOW POWER PLANT | |
US20110131899A1 (en) | Apparatus and method for producing a concrete foundation | |
US20120023860A1 (en) | Adapter Configuration for a Wind Tower Lattice Structure | |
US11365714B2 (en) | Methods for mounting or dismounting a wind turbine component of a multirotor wind turbine | |
CN103114604B (zh) | 预应力混凝土圆筒型风力发电机组基础 | |
CA2995146C (en) | Wind turbine foundation with concrete foundation pedestal | |
MX2009013516A (es) | Metodo para montar en secciones una torre anular para un generador de energia eolica o heliostatica o chimenea. | |
AR109719A1 (es) | Base para turbinas eólicas | |
ES2405034A2 (es) | Procedimiento y unidad para la fijación de una torre de un aerogenerador a una cimentación y aerogenerador que incorpora dicha unidad | |
RU2014125424A (ru) | Устройство и способ для анкерного крепления ветроэнергетической установки | |
KR20160060431A (ko) | 풍력발전기용 기초구조물 및 그 시공방법 | |
NZ624309B2 (en) | Foundation for a wind turbine | |
RU82234U1 (ru) | Грибовидный фундамент под оттяжки опор линии электропередачи | |
RU2021103341A (ru) | Фундамент для ветроэнергетической установки | |
RU2014125416A (ru) | Импульсная система усиления гидравлического давления | |
RU2021103367A (ru) | Фундамент для ветроэнергетической установки | |
AR127067A1 (es) | Dispositivo de plataforma flotante para torre eólica y método de montaje |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG | Grant, registration |