KR102244697B1 - Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation - Google Patents

Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation Download PDF

Info

Publication number
KR102244697B1
KR102244697B1 KR1020200058776A KR20200058776A KR102244697B1 KR 102244697 B1 KR102244697 B1 KR 102244697B1 KR 1020200058776 A KR1020200058776 A KR 1020200058776A KR 20200058776 A KR20200058776 A KR 20200058776A KR 102244697 B1 KR102244697 B1 KR 102244697B1
Authority
KR
South Korea
Prior art keywords
project
worker
extracting
crowdsourcing
platform
Prior art date
Application number
KR1020200058776A
Other languages
Korean (ko)
Inventor
박민우
김재현
Original Assignee
주식회사 크라우드웍스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 크라우드웍스 filed Critical 주식회사 크라우드웍스
Priority to KR1020200058776A priority Critical patent/KR102244697B1/en
Application granted granted Critical
Publication of KR102244697B1 publication Critical patent/KR102244697B1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a project curation method considering a tendency of a worker of a crowdsourcing-based project for artificial intelligence training data generation. The method includes: a step of requesting work execution by assigning works of a crowdsourcing-based project (hereinafter, project) to workers; a step of receiving the input of work results from the workers; a step of requesting inspection execution by assigning the work results to inspectors; a step of receiving the input of inspection results regarding the work results as inspection pass or return from the inspectors; a step of extracting a project attribute of the project; a step of classifying the project as a heavy project or a light project based on the project attribute of the project; and a step of curating the project to a heavy worker group corresponding to the heavy project or a light worker group corresponding to the light project based on the classification result.

Description

인공지능 학습 데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법{PROJECT CURATION METHOD CONSIDERING WORKER’S TENDENCY OF CROWDSOURCING BASED PROJECTS FOR ARTIFICIAL INTELLIGENCE TRAINING DATA GENERATION}Project curation method considering worker disposition of crowdsourcing-based project for generating artificial intelligence learning data {PROJECT CURATION METHOD CONSIDERING WORKER'S TENDENCY OF CROWDSOURCING BASED PROJECTS FOR ARTIFICIAL INTELLIGENCE TRAINING DATA GENERATION}

본 발명은 인공지능 학습 데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법에 관한 것이다.The present invention relates to a project curation method in consideration of worker propensity for crowdsourcing-based projects for generating artificial intelligence learning data.

최근, 기업 활동의 일부 과정에 일반 대중을 참여시키는 크라우드소싱 기반으로 많은 양의 데이터를 수집 및 가공하는 기업들이 늘고 있다. 즉, 기업은 하나의 프로젝트를 오픈하여 일반 대중, 즉 작업자가 해당 프로젝트에 참여하게 함으로써, 작업자에 의해 완료된 작업 결과를 통해 필요한 정보를 수집하게 된다.Recently, more and more companies collect and process large amounts of data on a crowdsourcing basis that engages the general public in some process of corporate activities. In other words, by opening a project and allowing the general public, that is, workers to participate in the project, necessary information is collected through the results of work completed by the workers.

하나의 프로젝트가 오픈 되면, 복수의 작업자 각각에게 복수의 작업이 배정된다. 각각의 작업자는 배정받은 복수의 작업을 수행하고, 작업 결과를 제공한다. When one project is opened, multiple tasks are assigned to each of the multiple workers. Each worker performs a plurality of tasks assigned to it, and provides the task results.

이때 작업 경험이 풍부하지 않은 작업자 또는 신규 작업자가 난이도가 높은 프로젝트에 참여하여 작업을 수행하게 된다면, 해당 작업자는 작업 수행에 어려움을 느끼고 크라우드소싱 플랫폼에 좋지 않은 인상을 갖게 된다. 이는 해당 작업자의 크라우드소싱 플랫폼의 재방문 의사를 위축시키는 결과를 초래하기도 한다. At this time, if a worker with little work experience or a new worker participates in a project with a high level of difficulty to perform the task, the worker feels difficult to perform the task and has a bad impression on the crowdsourcing platform. This may result in a decrease in the worker's intention to revisit the crowdsourcing platform.

또한, 남은 작업 건수가 많거나 마감 기한이 촉박한 프로젝트에 크라우드소싱 플랫폼에 방문 횟수가 적은 작업자가 참여한다면, 이는 작업자의 적정한 작업 속도를 기대하기 어렵고, 해당 프로젝트의 난이도가 높은 경우에는 상기 작업자에 의한 작업 병목 현상이 유발될 수도 있다. 결국, 이는 프로젝트의 지연을 초래할 수도 있다. In addition, if a worker with a small number of visits to the crowdsourcing platform participates in a project with a large number of remaining work or a short deadline, it is difficult to expect the appropriate work speed of the worker. Work bottlenecks may also be caused. Eventually, this may lead to delays in the project.

따라서, 프로젝트의 속성을 고려하여 이에 상응하는 성향을 가진 작업자에게 해당 프로젝트를 큐레이션 함으로써, 프로젝트에 적절한 작업자의 프로젝트 참여를 유도할 필요가 있다. Therefore, it is necessary to induce appropriate workers to participate in the project by curating the project to workers with a corresponding propensity in consideration of the properties of the project.

공개특허공보 제10-2014-0095956호, 2014.08.04.Unexamined Patent Publication No. 10-2014-0095956, 2014.08.04.

본 발명이 해결하고자 하는 과제는 인공지능 학습데이터 생성을 위한 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 제공하는 것이다.The problem to be solved by the present invention is to provide a project curation method in consideration of the worker tendencies of crowdsourcing-based projects for generating artificial intelligence learning data.

본 발명이 해결하고자 하는 과제들은 이상에서 언급된 과제로 제한되지 않으며, 언급되지 않은 또 다른 과제들은 아래의 기재로부터 통상의 기술자에게 명확하게 이해될 수 있을 것이다.The problems to be solved by the present invention are not limited to the problems mentioned above, and other problems that are not mentioned will be clearly understood by those skilled in the art from the following description.

상술한 과제를 해결하기 위한 본 발명의 일 면에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법은 컴퓨터에 의해 수행되는 방법으로서, 크라우드소싱 기반 프로젝트(이하,"프로젝트")의 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계, 상기 복수의 작업자로부터 복수의 작업 결과를 입력받는 단계, 상기 복수의 작업 결과를 복수의 검수자에게 배정하여 검수 수행을 요청하는 단계, 상기 복수의 검수자로부터 상기 복수의 작업 결과에 대한 복수의 검수 결과를 검수 통과 또는 반려로 입력받는 단계, 상기 프로젝트의 프로젝트 속성을 추출하는 단계, 상기 프로젝트의 프로젝트 속성에 기초하여 상기 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류하는 단계 및 상기 분류 결과에 기초하여 상기 헤비 프로젝트에 상응하는 헤비 작업자 그룹 또는 상기 라이트 프로젝트에 상응하는 라이트 작업자 그룹에 상기 프로젝트를 큐레이션 하는 단계를 포함하고, 상기 프로젝트의 프로젝트 속성을 추출하는 단계는, 상기 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 단계와, 상기 프로젝트의 남은 작업 건수를 산출하는 단계와, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계를 포함한다. The project curation method in consideration of the worker tendency of the crowdsourcing-based project according to one aspect of the present invention for solving the above-described problems is a method performed by a computer, and includes a plurality of crowdsourcing-based projects (hereinafter, "projects"). Assigning a task to a plurality of workers and requesting to perform a task, receiving a plurality of work results from the plurality of workers, assigning the plurality of work results to a plurality of inspectors and requesting to perform inspection, the plurality of Receiving a plurality of inspection results for the plurality of work results as inspection pass or rejection from an inspector of, extracting the project properties of the project, and converting the project to a heavy project or a light project based on the project properties of the project And curating the project to a heavy worker group corresponding to the heavy project or a light worker group corresponding to the light project based on the classification result, and extracting a project property of the project. The steps include calculating an average time required to perform a task per one task of the project, calculating the number of remaining tasks in the project, and an average task execution time per task as a project property of the project, and And extracting the number of remaining jobs.

본 발명의 일부 실시예에서, 상기 방법은 크라우드소싱 플랫폼(이하, "플랫폼")의 복수의 작업자를, 각 작업자의 평균 플랫폼 체류 기간 및 평균 플랫폼 재방문 기간에 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계를 더 포함할 수 있다. In some embodiments of the present invention, the method comprises a plurality of workers of a crowdsourcing platform (hereinafter, "platform"), based on the average platform stay period and the average platform revisit period of each worker, the heavy worker group or the It may further include the step of classifying the light worker group.

본 발명의 일부 실시예에서, 상기 플랫폼의 복수의 작업자를 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계는, 상기 플랫폼의 복수의 작업자를, 각 작업자에 의해서 입력된 단위 기간당 작업 수행 가능한 시간에 더 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류할 수 있다. In some embodiments of the present invention, the step of classifying the plurality of workers of the platform into the heavy worker group or the light worker group includes: Further based on time, it may be classified into the heavy worker group or the light worker group.

본 발명의 일부 실시예에서, 상기 프로젝트의 남은 작업 건수를 산출하는 단계는, 상기 프로젝트의 남은 작업 건수 및 직전 단위 기간 동안 작업 수행이 완료된 작업 건수를 산출하고, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 대비 상기 직전 단위 기간동안 작업 수행이 완료된 작업 건수를 추출할 수 있다. In some embodiments of the present invention, the step of calculating the number of remaining tasks of the project includes calculating the number of remaining tasks of the project and the number of tasks completed during the previous unit period, and the one The step of extracting the average task execution time per task and the number of remaining tasks may include, as a project property of the project, the average task execution time per task and the task that has been completed during the previous unit period compared to the remaining number of tasks. The number of cases can be extracted.

본 발명의 일부 실시예에서, 상기 방법의 상기 프로젝트의 프로젝트 속성을 추출하는 단계는, 상기 프로젝트의 반려율을 추출하는 단계를 더 포함하고, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 반려율을 추출할 수 있다. In some embodiments of the present invention, the step of extracting the project attribute of the project of the method further comprises extracting the rejection rate of the project, and the average task per task is performed as the project attribute of the project. In the step of extracting the required time and the number of remaining tasks, the average task execution time per one task, the remaining number of tasks, and the rejection rate may be extracted as project properties of the project.

본 발명의 일부 실시예에서, 상기 방법의 상기 프로젝트의 프로젝트 속성을 추출하는 단계는, 상기 프로젝트의 단위 기간당 예상 작업 수익을 추출하는 단계를 더 포함하고, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 단위 기간당 예상 작업 수익을 추출할 수 있다. In some embodiments of the present invention, the step of extracting the project property of the project of the method further comprises extracting the expected work revenue per unit period of the project, and the one work as the project property of the project In the step of extracting the average task execution time per task and the number of remaining tasks, the average task execution time per task, the remaining task count, and the estimated work revenue per unit period can be extracted as project properties of the project. have.

본 발명의 일부 실시예에서, 상기 방법의 상기 프로젝트의 프로젝트 속성을 추출하는 단계는, 상기 프로젝트의 재작업 제한 시간을 추출하는 단계를 더 포함하고, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 재작업 제한 시간을 추출할 수 있다.In some embodiments of the present invention, the step of extracting the project property of the project of the method further comprises extracting the rework limit time of the project, and the average per task as the project property of the project In the step of extracting the time required to perform a task and the number of remaining tasks, the average time required to perform a task per task, the number of remaining tasks, and the limit time for rework may be extracted as project properties of the project.

본 발명의 일부 실시예에서, 상기 방법은 상기 프로젝트의 기능요소를 추출하는 단계 및 각 작업자에 의해서 입력된 보유 작업 기기에 기초하여, 플랫폼의 복수의 작업자 중 상기 프로젝트의 기능요소에 상응하는 작업 기기를 보유한 작업자에 상기 프로젝트를 큐레이션 하는 단계를 더 포함하고, 상기 기능요소는 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 상기 작업툴은 프로젝트에서 제공되며 작업자들이 상기 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴일 수 있다. In some embodiments of the present invention, the method comprises the step of extracting the functional element of the project and the work device corresponding to the functional element of the project among a plurality of workers of the platform, based on the holding work device input by each worker. It further comprises the step of curating the project to the worker who has the project, the functional element is determined based on a work tool (Tool) for performing the project, the work tool is provided in the project, and the workers request the project It may be a tool used to perform a task to be performed.

본 발명의 일부 실시예에서, 상기 방법은 상기 큐레이션 된 프로젝트에 참여하여 소정 기간 동안 작업을 수행한 작업자에게 인센티브 포인트를 제공하는 단계를 더 포함할 수 있다. In some embodiments of the present invention, the method may further include providing incentive points to workers who participated in the curated project and performed tasks for a predetermined period of time.

상술한 과제를 해결하기 위한 본 발명의 다른 면에 따른 컴퓨터 프로그램은, 하드웨어인 컴퓨터와 결합하여 상기 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 실행하며, 컴퓨터 판독가능 기록매체에 저장될 수 있다.A computer program according to another aspect of the present invention for solving the above-described problem executes a project curation method in consideration of the worker tendency of the crowdsourcing-based project by combining with a computer as hardware, and stored in a computer-readable recording medium. I can.

본 발명의 기타 구체적인 사항들은 상세한 설명 및 도면들에 포함되어 있다.Other specific details of the present invention are included in the detailed description and drawings.

상술한 본 발명에 의하면, 오픈 되어 진행 중인 복수의 프로젝트 중, 작업을 수행하는데 오랜 시간이 소요되는 난이도가 높은 프로젝트 또는 잔여 작업 건수가 많은 프로젝트를 헤비 프로젝트로 분류하고 이에 상응하는 헤비 작업자의 해당 프로젝트의 참여를 유도할 수 있다. 따라서, 해당 프로젝트의 작업 결과의 품질을 높일 수 있으며, 프로젝트가 마감 기한까지 완료될 수 있도록 프로젝트의 지연을 방지할 수 있다. According to the present invention, among a plurality of open and ongoing projects, a project with high difficulty that takes a long time to perform a task or a project with a large number of remaining tasks is classified as a heavy project, and the corresponding project of the heavy worker. Can induce the participation of people. Therefore, it is possible to increase the quality of the work result of the project, and to prevent the delay of the project so that the project can be completed by the deadline.

반면에, 난이도가 쉬운 프로젝트 또는 잔여 작업 건수가 적은 프로젝트를 라이트 프로젝트로 분류하고 이에 상응하는 라이트 작업자의 해당 프로젝트의 참여를 유도함으로써, 라이트 작업자에게 크라우드소싱 기반 프로젝트에 대한 좋은 인상을 남기고, 궁극적으로 라이트 작업자의 프로젝트 이탈을 방지하고 상기 플랫폼의 재방문을 유도할 수 있다. On the other hand, by classifying a project with easy difficulty or a project with a small number of remaining work as a light project and encouraging the corresponding light worker to participate in the project, it leaves a good impression on the crowdsourcing-based project on the light worker, and ultimately It is possible to prevent light workers from leaving the project and induce revisiting of the platform.

즉, 크라우드소싱 플랫폼의 작업자의 성향을 고려하여, 각각의 작업자에게 적절한 프로젝트를 큐레이션 함으로써, 프로젝트의 난이도에 따라서 적절한 작업자를 참여시켜 프로젝트를 의뢰한 의뢰자가 양질의 최종 산출물을 제공받을 수 있도록 하고, 작업자에게는 크라우드소싱 플랫폼에 대한 좋은 인상을 심어 줌으로써, 작업자의 플랫폼의 지속적인 방문 및 프로젝트의 참여를 유도할 수 있다. In other words, by curating an appropriate project for each worker, taking into account the propensity of the workers of the crowdsourcing platform, appropriate workers are involved according to the difficulty of the project so that the client who requested the project can receive a quality final product. , By instilling a good impression on the crowdsourcing platform to workers, it is possible to encourage workers to visit the platform continuously and participate in the project.

본 발명의 효과들은 이상에서 언급된 효과로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 아래의 기재로부터 통상의 기술자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to the effects mentioned above, and other effects not mentioned will be clearly understood by those skilled in the art from the following description.

도 1은 본 발명의 일 실시예에 따른 크라우드소싱 서비스의 개념도이다.
도 2는 본 발명의 일 실시예에 따른 크라우드소싱 기반의 프로젝트의 진행 프로세스를 설명하기 위한 흐름도이다.
도 3은 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 개략적으로 나타낸 순서도이다..
도 4는 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 속성을 추출하는 방법을 개략적으로 나타낸 순서도이다.
도 5는 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 방법을 설명하기 위한 도면이다.
도 6은 작업자의 크라우드소싱 플랫폼에서의 체류 기간 및 재방문 기간을 산출하는 방법을 설명하기 위한 도면이다.
도 7은 크라우드소싱 플랫폼 체류 기간을 판단하는 소정의 기준 값이 설정된 경우, 작업자의 체류 기간 및 재방문 기간을 산출하는 방법을 설명하기 위한 도면이다.
도 8은 플랫폼의 복수의 작업자의 평균 플랫폼 체류 기간과 평균 플랫폼 재방문 기간을 나타내는 도면이다.
도 9는 작업자의 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간에 기초하여 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 방법을 나타내는 도면이다.
도 10은 전체 작업자를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 것을 설명하기 위한 도면이다.
도 11은 전체 작업자 중 일부를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 것을 설명하기 위한 도면이다.
도 12는 본 발명의 일 실시예에 따른 추천 배지를 이용하여 헤비 프로젝트를 헤비 작업자 그룹에게 큐레이션 하는 방법을 나타내는 예시도이다.
도 13은 본 발명의 일 실시예에 따른 헤비 프로젝트를 별도의 추천 작업으로 구분하여 헤비 작업자 그룹에게 큐레이션 하는 방법을 나타내는 예시도이다.
도 14는 바운딩 기능요소가 포함되는 프로젝트의 작업 화면에 관한 예시를 나타낸 도면이다.
도 15는 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 장치를 설명하기 위한 도면이다.
1 is a conceptual diagram of a crowdsourcing service according to an embodiment of the present invention.
2 is a flowchart illustrating a crowdsourcing-based project progress process according to an embodiment of the present invention.
FIG. 3 is a flowchart schematically illustrating a project curation method in consideration of worker propensity for a crowdsourcing-based project according to an embodiment of the present invention.
4 is a flowchart schematically illustrating a method of extracting an attribute of a crowdsourcing-based project according to an embodiment of the present invention.
FIG. 5 is a diagram for describing a method of calculating an average time required to perform a task per task of a project.
6 is a diagram for explaining a method of calculating a period of stay and a revisit period of a worker in a crowdsourcing platform.
FIG. 7 is a diagram for explaining a method of calculating a worker's stay period and revisit period when a predetermined reference value for determining the stay period of the crowdsourcing platform is set.
8 is a diagram showing an average platform stay period and an average platform revisit period of a plurality of operators of the platform.
9 is a diagram illustrating a method of classifying a worker into a heavy worker group or a light worker group based on the average platform stay period compared to the average platform revisit period of the worker.
10 is a diagram for explaining classifying all workers into a heavy worker group or a light worker group.
11 is a diagram for explaining classifying some of all workers into a heavy worker group or a light worker group.
12 is an exemplary diagram illustrating a method of curating a heavy project to a heavy worker group using a recommended badge according to an embodiment of the present invention.
13 is an exemplary view showing a method for curating a heavy worker group by dividing a heavy project into separate recommended tasks according to an embodiment of the present invention.
14 is a diagram illustrating an example of a work screen of a project including a bounding functional element.
15 is a diagram for explaining a project curation apparatus in consideration of worker propensity for a crowdsourcing-based project according to an embodiment of the present invention.

본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시예들을 참조하면 명확해질 것이다. 그러나 본 발명은 이하에서 개시되는 실시 예들에 제한되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술 분야의 통상의 기술자에게 본 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. Advantages and features of the present invention, and a method of achieving them will become apparent with reference to the embodiments described below in detail together with the accompanying drawings. However, the present invention is not limited to the embodiments disclosed below, but may be implemented in various different forms, and only these embodiments are intended to complete the disclosure of the present invention, and to those skilled in the art to which the present invention pertains. It is provided to fully inform the scope of the present invention, and the present invention is only defined by the scope of the claims.

본 명세서에서 사용된 용어는 실시예들을 설명하기 위한 것이며 본 발명을 제한하고자 하는 것은 아니다. 본 명세서에서, 단수형은 문구에서 특별히 언급하지 않는 한 복수형도 포함한다. 명세서에서 사용되는 "포함한다(comprises)" 및/또는 "포함하는(comprising)"은 언급된 구성요소 외에 하나 이상의 다른 구성요소의 존재 또는 추가를 배제하지 않는다. 명세서 전체에 걸쳐 동일한 도면 부호는 동일한 구성 요소를 지칭하며, "및/또는"은 언급된 구성요소들의 각각 및 하나 이상의 모든 조합을 포함한다. 비록 "제1", "제2" 등이 다양한 구성요소들을 서술하기 위해서 사용되나, 이들 구성요소들은 이들 용어에 의해 제한되지 않음은 물론이다. 이들 용어들은 단지 하나의 구성요소를 다른 구성요소와 구별하기 위하여 사용하는 것이다. 따라서, 이하에서 언급되는 제1 구성요소는 본 발명의 기술적 사상 내에서 제2 구성요소일 수도 있음은 물론이다.The terms used in the present specification are for describing exemplary embodiments and are not intended to limit the present invention. In this specification, the singular form also includes the plural form unless specifically stated in the phrase. As used herein, “comprises” and/or “comprising” do not exclude the presence or addition of one or more other elements other than the mentioned elements. Throughout the specification, the same reference numerals refer to the same elements, and "and/or" includes each and all combinations of one or more of the mentioned elements. Although "first", "second", and the like are used to describe various elements, it goes without saying that these elements are not limited by these terms. These terms are only used to distinguish one component from another component. Therefore, it goes without saying that the first component mentioned below may be the second component within the technical idea of the present invention.

다른 정의가 없다면, 본 명세서에서 사용되는 모든 용어(기술 및 과학적 용어를 포함)는 본 발명이 속하는 기술분야의 통상의 기술자에게 공통적으로 이해될 수 있는 의미로 사용될 수 있을 것이다. 또한, 일반적으로 사용되는 사전에 정의되어 있는 용어들은 명백하게 특별히 정의되어 있지 않는 한 이상적으로 또는 과도하게 해석되지 않는다.Unless otherwise defined, all terms (including technical and scientific terms) used in the present specification may be used with meanings that can be commonly understood by those of ordinary skill in the art to which the present invention belongs. In addition, terms defined in a commonly used dictionary are not interpreted ideally or excessively unless explicitly defined specifically.

이하, 첨부된 도면을 참조하여 본 발명의 실시예를 상세하게 설명한다. Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 일 실시예에 따른 크라우드소싱 서비스의 개념도이다.1 is a conceptual diagram of a crowdsourcing service according to an embodiment of the present invention.

도 1을 참조하면, 크라우드소싱 서비스는 의뢰자(10), 서비스 제공 업체(20) 및 대중(30)으로 구성되어 수행된다.Referring to FIG. 1, the crowdsourcing service is performed by being composed of a client 10, a service provider 20, and a public 30.

의뢰자(10)는 크라우드소싱 기반의 프로젝트(이하, 프로젝트)를 의뢰하는 기업이나 개인을 의미한다.The sponsor 10 refers to a company or individual who requests a crowdsourcing-based project (hereinafter, referred to as a project).

의뢰자(10)는 인공지능 학습데이터의 생성을 위한 소스 데이터의 수집 또는 데이터 어노테이션 등을 목적으로 프로젝트를 의뢰한다. 프로젝트를 통해서 생성된 데이터는 지도 학습, 비지도 학습, 강화 학습 등의 임의의 기계 학습의 학습데이터로 활용될 수 있다. 소스 데이터의 수집은 녹음된 음성 수집, 사진 수집 등 가공되지 않은 데이터를 수집하는 것을 의미한다. 데이터 어노테이션은 텍스트, 사진, 비디오 등의 소스 데이터에 관련 주석 데이터를 입력하는 것을 의미한다. 예들 들어, 데이터 어노테이션은 주어진 지문에서 개체를 찾는 것, 유사한 문장을 찾는 것 등이 있을 수 있으나 이에 제한되지 않는다. 한편, 전술한 프로젝트의 종류는 일 실시예에 불과하며, 의뢰자의 설계에 따라 다양한 프로젝트가 본 발명에서 취급될 수 있다.The client 10 requests a project for the purpose of collecting source data or annotating data for generating artificial intelligence learning data. The data generated through the project can be used as learning data for arbitrary machine learning such as supervised learning, unsupervised learning, and reinforcement learning. Collection of source data means collecting raw data such as recorded voice collection and photo collection. Data annotation refers to inputting relevant annotation data into source data such as text, photos, and videos. For example, the data annotation may include finding an entity in a given fingerprint or finding a similar sentence, but is not limited thereto. Meanwhile, the types of the above-described projects are only one embodiment, and various projects may be handled in the present invention according to the design of the client.

서비스 제공 업체(20)는 크라우드소싱 서비스를 제공하는 기업을 의미한다.The service provider 20 refers to a company that provides crowdsourcing services.

서비스 제공 업체(20)는 의뢰자(10)로부터 제품 또는 서비스에 대한 프로젝트를 의뢰받으면, 해당 프로젝트에 대한 작업을 일반 대중(30)에게 배정하여 대중(30)으로부터 작업 결과를 제공받는다. 이후, 작업 결과를 기반으로 추출된 최종 산출물을 의뢰자(10)에게 제공한다.When the service provider 20 receives a request for a project for a product or service from the client 10, the service provider 20 allocates a task for the project to the general public 30 and receives the work result from the public 30. Thereafter, the final product extracted based on the work result is provided to the requester 10.

이때, 서비스 제공 업체(20)는 크라우드소싱 플랫폼(이하, 플랫폼)을 통해 의뢰자(10) 및 대중(30)에게 크라우드소싱 서비스를 제공한다. 즉, 서비스 제공 업체(20)는 의뢰자(10)로부터 프로젝트를 의뢰받으면, 플랫폼에 프로젝트를 오픈한다. 이후, 대중(30)으로부터 오픈된 프로젝트에 대한 작업 결과를 제공받으면, 해당 프로젝트를 플랫폼 상에서 종료하고, 최종 산출물을 추출하여 의뢰자(10)에게 제공할 수 있다.At this time, the service provider 20 provides a crowdsourcing service to the client 10 and the public 30 through a crowdsourcing platform (hereinafter, the platform). That is, when the service provider 20 receives a request for a project from the client 10, the service provider 20 opens the project on the platform. Thereafter, when the work result for the open project is provided by the public 30, the project is terminated on the platform, and the final product may be extracted and provided to the client 10.

대중(30)은 플랫폼에 오픈된 프로젝트에 참여하는 일반 대중을 의미한다. 여기서, 대중(30)은 서비스 제공 업체(20)가 제공하는 애플리케이션 또는 웹사이트 등을 통해 플랫폼에 오픈된 프로젝트에 참여할 수 있다. The public 30 refers to the general public participating in the project open on the platform. Here, the public 30 may participate in a project opened on the platform through an application or website provided by the service provider 20.

대중(30)은 작업자(32) 및 검수자(34)로 구성된다.The public 30 is composed of a worker 32 and an inspector 34.

작업자(32)는 플랫폼에 오픈된 복수의 프로젝트 중 특정 프로젝트에 참여를 결정한다. 이후, 작업자(32)는 소스 데이터의 수집 또는 데이터 어노테이션 등의 작업을 수행하고, 이를 플랫폼에 전송한다.The worker 32 decides to participate in a specific project among a plurality of projects open on the platform. Thereafter, the operator 32 performs an operation such as collection of source data or data annotation, and transmits it to the platform.

검수자(34)는 플랫폼에 오픈 된 복수의 프로젝트 중 특정 프로젝트에 참여를 결정한다. 이후, 검수자(34)는 작업자(32)가 수행한 작업 결과에 대한 검수를 수행한다. 검수자(34)는 검수 수행 결과로서, 검수 통과 처리 또는 반려 처리를 할 수 있고, 반려 처리시 반려 사유를 입력할 수 있다. 검수 통과의 경우 재작업과 이로 인한 재검수가 필요하지 않으므로, 검수 통과는 검수 완료와 동일한 의미를 가진다.The inspector 34 decides to participate in a specific project among a plurality of projects opened on the platform. Thereafter, the inspector 34 inspects the result of the work performed by the operator 32. As a result of performing the inspection, the inspector 34 may perform inspection pass processing or rejection processing, and input a rejection reason during rejection processing. In the case of passing the inspection, rework and the resulting re-inspection are not required, so passing the inspection has the same meaning as the completion of the inspection.

도 2는 본 발명의 일 실시예에 따른 크라우드소싱 기반의 프로젝트의 진행 프로세스를 설명하기 위한 흐름도이다. 2 is a flowchart illustrating a crowdsourcing-based project progress process according to an embodiment of the present invention.

먼저, 의뢰자(10)는 서비스 제공 업체(20)로 하나 이상의 프로젝트를 의뢰한다(S11).First, the client 10 requests one or more projects to the service provider 20 (S11).

이후, 서비스 제공 업체(20)는 의뢰된 프로젝트를 플랫폼 상에 오픈한다(S12). 이때, 서비스 제공 업체(20)는 프로젝트 오픈 전에, 해당 프로젝트의 난이도 등을 고려하여 등급을 결정할 수 있다. 즉, 난이도에 따라 어떤 등급 이상의 대중(30)에게 해당 프로젝트를 노출시킬지를 결정할 수 있다. 이에 따라, 프로젝트의 작업 결과의 신뢰도를 높일 수 있게 된다.Thereafter, the service provider 20 opens the requested project on the platform (S12). At this time, the service provider 20 may determine the grade in consideration of the difficulty of the project before opening the project. That is, depending on the difficulty level, it is possible to determine which level or higher public 30 to expose the project. Accordingly, it is possible to increase the reliability of the work result of the project.

이후, 서비스 제공 업체(20)는 프로젝트의 등급에 따라 해당 등급 이상의 작업자(32)에게 작업을 할당하여 작업 요청한다(S13).Thereafter, the service provider 20 requests the work by assigning the work to the workers 32 of the corresponding level or higher according to the class of the project (S13).

이후, 작업자(32)는 할당된 작업을 수행하게 된다(S14). 이때, 작업자(32)는 어떤 이유에 의해 작업 자체가 불가능한 작업에 대해서는 작업을 수행하지 않고 작업 불가 사유를 입력할 수 있다. Thereafter, the worker 32 performs the assigned task (S14). In this case, the worker 32 may input the reason for the inability to work without performing the work for a work in which the work itself is impossible for some reason.

이후, 서비스 제공 업체(20)는 작업자(32)로부터 작업 결과를 제공받고(S15), 해당 작업 결과에 대한 검수 작업을 검수자(34)에게 할당하여 검수 요청한다(S16).Thereafter, the service provider 20 receives the work result from the worker 32 (S15), and assigns the work result to the inspector 34 to request the inspection (S16).

이후, 검수자(34)는 할당된 검수를 수행하게 된다(S17). 이때, 검수자(34)는 작업이 적합하게 수행된 것으로 판단하면 검수 통과를 결정하고, 검수 작업이 잘못된 것으로 판단하면 반려 처리한다. 반려 처리 시, 검수자(34)는 어떤 이유로 작업이 잘못된 것으로 판단했는지에 대한 반려 사유를 입력한다.Thereafter, the inspector 34 performs the assigned inspection (S17). At this time, the inspector 34 decides to pass the inspection when it is determined that the work has been properly performed, and if it is determined that the inspection work is wrong, the inspector 34 rejects it. During rejection processing, the inspector 34 inputs the rejection reason for what reason the job was judged to be wrong.

이후, 서비스 제공 업체(20)는 검수자(34)로부터 검수 결과를 제공받는다(S18). Thereafter, the service provider 20 receives the inspection result from the inspector 34 (S18).

검수 결과가 검수 통과인 경우, 서비스 제공 업체(20)는 해당 작업 결과를 유효한 데이터로 사용하여, 이를 기반으로 하여 프로젝트 종료 시 최종 산출물을 추출하게 된다.If the inspection result passes the inspection, the service provider 20 uses the work result as valid data, and based on this, extracts the final product at the end of the project.

검수 결과가 반려 처리인 경우, 서비스 제공 업체(20)는 내부적으로 검수를 다시 수행하거나, 작업자(32)에게 다시 작업을 배정하여 재작업을 수행하게 할 수도 있다. 재작업시 검수자의 재검수가 필요하다.If the result of the inspection is rejection processing, the service provider 20 may internally perform the inspection again, or assign the work to the worker 32 again to perform the rework. When reworking, re-examination by an inspector is required.

이후, 서비스 제공 업체(20)는 프로젝트 기간이 종료되거나 충분한 유효 데이터를 확보하게 되면 해당 프로젝트를 종료하고(S19), 확보된 유효 데이터를 기반으로 최종 결과물을 산출하여 의뢰자(10)에게 제공한다(S20).Thereafter, when the project period ends or sufficient valid data is secured, the service provider 20 terminates the project (S19), calculates a final result based on the secured valid data, and provides it to the client 10 ( S20).

이때, 프로젝트 종료 전, 서비스 제공 업체(20)는 작업자(32) 및 검수자(34)의 수행 결과를 평가하고, 평가에 따라 작업 비용 및 검수 비용을 산출하여 작업자(32) 및 검수자(34)에게 지급한다.At this time, before the end of the project, the service provider 20 evaluates the performance results of the worker 32 and the inspector 34, calculates the work cost and the inspection cost according to the evaluation, to the worker 32 and the inspector 34. give.

도 1 및 도 2에서는 단순히 의뢰자(10), 서비스 제공 업체(20), 작업자(32), 검수자(34)로 표현하였으나, 이들은 각 참여자에 의해서 운용되는 스마트폰, 태블릿, PDA, 랩톱, 데스크톱, 서버 등과 같은 컴퓨터 장치 또는 전기 통신 장치를 의미한다.In Figures 1 and 2, it is simply expressed as a requester 10, a service provider 20, an operator 32, and an inspector 34, but these are smartphones, tablets, PDAs, laptops, desktops operated by each participant. It means a computer device such as a server or a telecommunication device.

이하에서는 도 3 내지 도 14를 참조하여 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 설명한다. 앞서 도 1 및 도 2를 참조하여 설명한 크라우드소싱 서비스의 구성 및 크라우드소싱 기반 프로젝트의 진행 프로세스와 관련하여 중복되는 내용은 그 상세한 설명을 생략한다.Hereinafter, a project curation method in consideration of worker propensity of a crowdsourcing-based project according to an embodiment of the present invention will be described with reference to FIGS. 3 to 14. Details of overlapping content related to the crowdsourcing service configuration and the crowdsourcing-based project progress process described with reference to FIGS. 1 and 2 will be omitted.

한편, 도 3 및 도 4에 도시된 단계들은 서비스 제공 업체(20)에 의해 운영되는 플랫폼 서버(이하, 서버)에 의해 수행되는 것으로 이해될 수 있지만, 이에 제한되는 것은 아니다. Meanwhile, the steps illustrated in FIGS. 3 and 4 may be understood as being performed by a platform server (hereinafter, referred to as a server) operated by the service provider 20, but are not limited thereto.

도 3은 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 개략적으로 나타낸 순서도이다.FIG. 3 is a flowchart schematically illustrating a project curation method in consideration of worker propensity for a crowdsourcing-based project according to an embodiment of the present invention.

먼저 도 3을 참조하면, 프로젝트의 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하고(S110), 복수의 작업자로부터 복수의 작업 결과를 입력 받는다(S120). 그리고 복수의 작업 결과를 복수의 검수자에게 배정하여 검수 수행을 요청하고(S130), 이후 복수의 검수자로부터 상기 복수의 작업 결과에 대한 복수의 검수 결과를 검수 통과 또는 반려로 입력 받는다(S140).First, referring to FIG. 3, a plurality of tasks of a project are assigned to a plurality of workers to request the task to be performed (S110), and a plurality of task results are input from a plurality of workers (S120). Then, a plurality of work results are assigned to a plurality of inspectors to request inspection (S130), and then, a plurality of inspection results for the plurality of work results are input from the plurality of inspectors as passing or rejecting the inspection (S140).

S140 단계 이후, 상기 프로젝트의 프로젝트 속성을 추출한다(S150). 그리고 S150 단계에서 추출된 프로젝트 속성에 기초하여 상기 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류한다(S160). After step S140, the project properties of the project are extracted (S150). Then, the project is classified as a heavy project or a light project based on the project properties extracted in step S150 (S160).

여기서, 헤비(Heavy) 프로젝트는 헤비 작업자와 상응하는 것으로서, 헤비 작업자가 작업을 수행하기에 적합한 것으로 판단된 프로젝트를 의미한다. 반면에 라이트(Light) 프로젝트는 라이트 작업자와 상응하는 것으로서, 라이트 작업자가 작업을 수행하기에 적합한 것으로 판단된 프로젝트를 의미한다. 헤비 작업자 및 라이트 작업자에 관하여는 도 6 내지 도 11을 참조하여 자세하게 후술하기로 한다.Here, a heavy project corresponds to a heavy worker, and refers to a project that is determined to be suitable for a heavy worker to perform a task. On the other hand, a light project corresponds to a light worker, and refers to a project that is determined to be suitable for a light worker to perform a task. The heavy worker and the light worker will be described later in detail with reference to FIGS. 6 to 11.

프로젝트가 헤비 작업자에게 적합한지 또는 라이트 작업자에게 적합한지는 결국 프로젝트의 속성에 기초한다. 구체적으로, 프로젝트를 오픈한 후 프로젝트에 참여한 작업자의 작업 수행 데이터(Data) 및 검수자의 검수 수행 데이터(Data)를 바탕으로, 프로젝트의 속성을 추출하고, 이를 기초로 상기 프로젝트가 헤비 프로젝트인지 또는 라이트 프로젝트인지를 판단하는 것이다. Whether a project is suitable for heavy workers or light workers is ultimately based on the properties of the project. Specifically, after opening the project, the project properties are extracted based on the work performance data (Data) of the workers participating in the project and the inspection performance data (Data) of the inspector, and based on this, whether the project is a heavy project or light It is to determine if it is a project.

프로젝트가 헤비 프로젝트에 해당하는지 또는 라이트 프로젝트에 해당하는지를 판단하는 기준인, 프로젝트의 속성은 후술하는 바와 같이 추출될 수 있다. A project attribute, which is a criterion for determining whether a project corresponds to a heavy project or a light project, may be extracted as described later.

도 4는 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 속성을 추출하는 방법을 개략적으로 나타낸 순서도이고, 도 5는 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 방법을 설명하기 위한 도면이다.4 is a flowchart schematically illustrating a method of extracting properties of a crowdsourcing-based project according to an embodiment of the present invention, and FIG. 5 is for explaining a method of calculating an average task execution time per one task of a project. It is a drawing.

도 4를 참조하면, 본 발명의 일 실시예로, S150 단계는 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 단계(S151)와 프로젝트의 남은 작업 건수를 산출하는 단계(S152)와 프로젝트의 프로젝트 속성으로 하나의 작업당 평균 작업 수행 소요 시간 및 남은 작업 건수를 추출하는 단계(S153)를 포함한다.Referring to FIG. 4, in an embodiment of the present invention, step S150 includes a step of calculating the average task execution time per one task of a project (S151), a step of calculating the number of remaining tasks of the project (S152), and a project. And extracting the average task execution time per task and the number of remaining tasks as project properties of (S153).

먼저 도 5를 참조하여, 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 단계(S151)를 설명한다. First, referring to FIG. 5, a step (S151) of calculating an average task execution time per one task of a project will be described.

프로젝트의 하나의 작업당 평균 작업 수행 소요 시간은 해당 프로젝트에 참여한 전체 작업자의 작업 수행 소요 시간과 전체 작업 수에 기초하여 산출한다.The average time required to perform work per task of a project is calculated based on the time required to perform work and the total number of tasks of all workers participating in the project.

도 5를 참조하면, 프로젝트A에 3명의 작업자가 참여하여 작업을 수행한 경우, 작업자1은 6시간동안 15개의 작업을 수행하였고, 작업자2는 8시간 동안 16개의 작업을 수행하였다. 그리고 작업자3은 6시간 동안 20개의 작업을 수행한 것을 알 수 있다. 이때 프로젝트A의 하나의 작업당 평균 작업 수행 소요 시간은 작업자의 총 작업시간인 20시간을 총 작업수인 51개로 나눈 약 0.391시간이다. Referring to FIG. 5, when three workers participated in project A to perform tasks, worker 1 performed 15 tasks for 6 hours, and worker 2 performed 16 tasks for 8 hours. And it can be seen that worker 3 performed 20 tasks in 6 hours. At this time, the average time required to perform a task per task in Project A is about 0.391 hours, divided by the total number of work hours, which is 20 hours, by the total number of tasks, which is 51.

S151 단계에서 하나의 작업당 평균 작업 수행 소요 시간을 산출한 후, S152 단계에서 프로젝트의 남은 작업 건수를 산출한다. 프로젝트의 남은 작업 건수는 프로젝트의 속성을 추출하는 시점을 기준으로 마감일까지 남아 있는 프로젝트의 잔여 작업량 건수를 의미한다. In step S151, the average task execution time per task is calculated, and then in step S152, the number of remaining tasks for the project is calculated. The number of remaining work in the project refers to the number of remaining work in the project until the deadline from the time when the properties of the project are extracted.

한편, 프로젝트의 속성을 추출하는 시점은 다음과 같이 결정될 수 있다. On the other hand, the time point for extracting the properties of the project may be determined as follows.

프로젝트의 오픈 후 사전에 설정된 기간이 경과된 시점이거나 전체 작업 건수 대비 남은 작업 건수의 값이 사전에 설정된 값 이하인 시점(즉, 프로젝트의 완료율이 특정 값 이상인 시점)에 프로젝트의 속성을 추출할 수 있다. 그러나 이에 한정하는 것은 아니다.The properties of the project can be extracted at the point in time when a preset period has elapsed after the project is opened or when the value of the number of remaining jobs compared to the total number of jobs is less than or equal to the preset value (that is, when the completion rate of the project is more than a specific value). . However, it is not limited thereto.

S153 단계에서는, S151과 S152 단계에서 산출된 하나의 작업당 평균 작업 수행 소요 시간 및 남은 작업 건수를 프로젝트의 속성으로 추출한다. In step S153, the average task execution time per task calculated in steps S151 and S152 and the number of remaining tasks are extracted as properties of the project.

한편, 본 발명의 일 실시예로 S152 단계는 상기 프로젝트의 남은 작업 건수 및 직전 단위 기간 동안 작업 수행이 완료된 작업 건수를 산출하고, S153 단계는 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 대비 상기 직전 단위 기간동안 작업 수행이 완료된 작업 건수를 추출할 수 있다. On the other hand, according to an embodiment of the present invention, step S152 calculates the number of remaining tasks of the project and the number of tasks completed during the previous unit period, and step S153 is the average task execution per one task as a project property of the project. It is possible to extract the number of tasks completed in the previous unit period compared to the required time and the number of remaining tasks.

예를 들어, 단위 기간이 1일이고, 프로젝트의 속성을 추출하는 시점이 5월 11일 그리고 프로젝트의 마감일이 5월 15일이라고 가정하면, 5월 11을 기준으로 5월 15일까지 작업을 수행해야하는 잔여 작업 건수와 5월 10일(5월 11일 직전 단위 기간) 동안 작업 수행이 완료된 작업 건수를 산출한다. 그리고 상기 산출된 결과에 기초하여 남은 작업 건수 대비 직전 단위 기간동안 작업 수행이 완료된 작업 건수를 추출할 수 있다. For example, assuming that the unit period is 1 day, the time of extracting the properties of the project is May 11, and the deadline of the project is May 15, the task will be performed from May 11 to May 15. Calculate the number of remaining tasks to be done and the number of tasks completed during May 10 (unit period immediately before May 11). In addition, based on the calculated result, the number of tasks completed during the immediately preceding unit period compared to the remaining number of tasks may be extracted.

그리고 S153 단계에서는, 상기 프로젝트의 프로젝트 속성으로 하나의 작업당 평균 작업 수행 소요 시간과 더불어 남은 작업 건수 대비 직전 단위 기간동안 작업 수행이 완료된 작업 건수를 추출할 수 있을 것이다. In step S153, as the project property of the project, the number of tasks completed during the immediately preceding unit period compared to the number of remaining tasks as well as the average task execution time per task may be extracted.

전술한 하나의 작업당 평균 작업 수행 소요 시간 및 남은 작업 건수 외에도, 프로젝트의 속성은 다양하게 추출될 수 있다. 이에 대해서는 S170 단계를 설명한 이후 자세히 설명하도록 한다. In addition to the above-described average task execution time per task and the number of remaining tasks, properties of the project may be extracted in various ways. This will be described in detail after the step S170 is described.

다시 도 3을 참조하면, S150 단계에서 추출된 프로젝트의 속성에 기초하여, S160 단계에서는 해당 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류한다. Referring to FIG. 3 again, based on the properties of the project extracted in step S150, the project is classified as a heavy project or a light project in step S160.

S160 단계에서 프로젝트를 분류하는 방법은 다음과 같다. The method of classifying the project in step S160 is as follows.

예를 들어, 프로젝트의 속성으로 추출된 하나의 작업당 평균 작업 수행 소요 시간 및 남은 작업 건수를 사전에 설정된 각각의 기준 값과 비교하여, 그 값이 상기 각각의 기준 값의 이상일 경우 헤비 프로젝트로 분류되고, 상기 각각의 기준 값의 미만인 경우 라이트 프로젝트로 분류될 수 있다. For example, the average task execution time per task extracted as a project property and the number of remaining tasks are compared with each preset reference value, and if the value is greater than or equal to each of the above reference values, it is classified as a heavy project. If it is less than each of the reference values, it may be classified as a light project.

구체적으로, 하나의 작업당 평균 작업 수행 소요 시간이 제1 기준 값 이상이고, 남은 작업 건수가 제2 기준 값 이상이면, 상기 프로젝트를 헤비 프로젝트로 분류할 수 있다. 또는, 하나의 작업당 평균 작업 수행 소요 시간이 제3 기준 값 미만이고, 남은 작업 건수가 제4 기준 값 미만이면, 상기 프로젝트를 라이트 프로젝트로 분류할 수 있다. 즉, 하나의 작업당 평균 작업 수행 소요 시간 및 남은 작업 건수의 값이 상대적으로 높은 프로젝트를 헤비 프로젝트로 분류하고, 그 값이 낮은 프로젝트를 라이트 프로젝트로 분류하는 것이다.Specifically, the project may be classified as a heavy project when the average time required to perform a task per task is greater than or equal to the first reference value and the number of remaining tasks is greater than or equal to the second reference value. Alternatively, the project may be classified as a light project when the average time required to perform a task per task is less than the third reference value and the number of remaining tasks is less than the fourth reference value. In other words, a project with a relatively high value of the average time required to perform a task per task and the number of remaining tasks is classified as a heavy project, and a project with a low value is classified as a light project.

이때, 헤비 프로젝트의 분류를 위한 기준 값과 라이트 프로젝트의 분류를 위한 기준 값은 동일하거나 상이할 수 있다. 기준 값이 서로 상이한 경우, 헤비 프로젝트의 분류를 위한 기준 값이 라이트 프로젝트의 분류를 위한 기준 값보다 더 높은 값으로 설정될 수 있다.In this case, the reference value for classification of the heavy project and the reference value for classification of the light project may be the same or different. When the reference values are different from each other, the reference value for classification of the heavy project may be set to a higher value than the reference value for classification of the light project.

S170 단계에서는, S160 단계에서의 분류 결과에 기초하여 헤비 프로젝트에 상응하는 헤비 작업자 그룹 또는 라이트 프로젝트에 상응하는 라이트 작업자 그룹에 상기 프로젝트를 큐레이션 한다. In step S170, the project is curated to a heavy worker group corresponding to a heavy project or a light worker group corresponding to a light project based on the classification result in step S160.

여기서, 헤비 작업자는 플랫폼에서의 체류 시간이 많거나 방문 횟수가 많거나 빈번한 작업자를 의미한다. 즉, 헤비 작업자는 플랫폼에 자주 방문하고, 한 번 방문하면 상대적으로 오랜 시간 체류하면서 작업을 수행하는 성향을 갖는 작업자를 의미한다. Here, a heavy worker means a worker who has a long stay on the platform, has a large number of visits, or is frequent. In other words, a heavy worker refers to a worker who frequently visits the platform and, once visited, has a tendency to stay and perform work for a relatively long time.

반면에, 라이트 작업자는 플랫폼에서의 체류 시간이 적거나 방문 횟수가 적거나 드문 작업자를 의미한다. 즉, 라이트 작업자는 플랫폼에 가끔 방문하고, 한 번 방문하면 상대적으로 짧은 시간 체류하면서 작업을 수행하는 성향을 갖는 작업자를 의미한다. 한편 신규 작업자의 경우, 크라우드소싱 프로젝트에 익숙해지기 전까지는 라이트 작업자와 유사한 성향을 나타낼 것이므로, 라이트 작업자와 실질적으로 동일하게 취급할 수 있다.On the other hand, a light worker means a worker who has a small residence time on the platform, a small number of visits, or a rare worker. That is, a light worker refers to a worker who visits the platform occasionally, and once visits the platform, has a tendency to stay for a relatively short time and perform work. On the other hand, new workers will have similar tendencies to light workers until they become accustomed to crowdsourcing projects, so they can be treated substantially the same as light workers.

작업자를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 방법은 다음과 같다. The method of classifying workers into heavy worker groups or light worker groups is as follows.

도 6은 작업자의 크라우드소싱 플랫폼에서의 체류 기간 및 재방문 기간을 산출하는 방법을 설명하기 위한 도면이고, 도 7은 크라우드소싱 플랫폼 체류 기간을 판단하는 소정의 기준 값이 설정된 경우, 작업자의 체류 기간 및 재방문 기간을 산출하는 방법을 설명하기 위한 도면이다. 6 is a diagram for explaining a method of calculating the period of stay and revisit period of the worker in the crowdsourcing platform, and FIG. 7 is a period of stay of the worker when a predetermined reference value for determining the period of stay of the crowdsourcing platform is set And a diagram for explaining a method of calculating a revisit period.

명확하게 도시하지 않았으나, 본 발명의 일 실시예로, 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법은, 플랫폼의 복수의 작업자를, 각 작업자의 평균 플랫폼 체류 기간 및 평균 플랫폼 재방문 기간에 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계(미도시)를 더 포함할 수 있다. 일 실시예로, 상기 작업자 분류 단계는 전술한 프로젝트 분류 단계와 병행하여 동시에 수행될 수 있으나, 이에 제한되는 것은 아니다.Although not clearly shown, as an embodiment of the present invention, the project curation method in consideration of the worker tendencies of a crowdsourcing-based project includes a plurality of workers of the platform, during the average platform stay period and the average platform revisit period of each worker. On the basis of, the step of classifying into the heavy worker group or the light worker group (not shown) may be further included. In an embodiment, the worker classification step may be performed simultaneously in parallel with the above-described project classification step, but is not limited thereto.

여기서, 평균 플랫폼 체류 기간은 플랫폼에 접속한 후 상기 플랫폼을 이탈하기까지 소요된 평균 기간을 의미하며, 평균 플랫폼 재방문 기간은 플랫폼을 이탈한 후 다시 상기 플랫폼에 접속한 시간까지 소요된 평균 기간을 의미한다. Here, the average length of stay on the platform refers to the average period of time required to leave the platform after accessing the platform, and the average period of revisiting the platform refers to the average period of time taken to access the platform again after leaving the platform. it means.

이때 평균 플랫폼 체류 기간 및 평균 플랫폼 재방문 기간은 최근 단위 기간 동안의 평균 플랫폼 체류 기간 및 최근 단위 기간 동안의 평균 플랫폼 재방문 기간으로 산출될 수 있다. 그러나 이에 한정하는 것은 아니다.At this time, the average platform stay period and the average platform revisit period may be calculated as the average platform stay period during the recent unit period and the average platform revisit period during the latest unit period. However, it is not limited thereto.

작업자의 플랫폼 체류 기간 및 플랫폼 재방문 기간을 산출하는 방법은 다음과 같다.The method of calculating the period of staying on the platform and the period of revisiting the platform is as follows.

예를 들어, 도 6을 참조하면, 단위 기간이 4일이고 평균 플랫폼 체류 기간을 일수로 산출한다고 가정하면, 작업자1은 5월 6일에 4시간동안 체류한 후 플랫폼을 이탈하였다가 다시 2시간동안 상기 플랫폼에 체류하였다. 그리고 5월 9일에 다시 플랫폼에 접속하여 5시간 동안 체류하였다. For example, referring to FIG. 6, assuming that the unit period is 4 days and the average platform stay is calculated as the number of days, worker 1 stays for 4 hours on May 6 and then leaves the platform for 2 hours. Stayed on the platform for a while. And on May 9th, I reconnected to the platform and stayed for 5 hours.

이때, 작업자의 평균 플랫폼 체류 기간은 일수로 산출되기 때문에, 5월 6일에 작업자1이 방문한 횟수와 상관없이 5월 10일을 기준으로 작업자1의 단위 기간 동안 플랫폼 체류 기간은 2일이다. At this time, since the average duration of the worker's stay on the platform is calculated as the number of days, the duration of stay on the platform is 2 days for the unit period of worker 1 as of May 10, regardless of the number of visits by worker 1 on May 6th.

한편, 작업자2는 5월 6일, 5월 7일 그리고 5월 9일에 각각 상기 플랫폼에 접속하여 6시간, 4시간, 8시간을 체류하였다. 따라서 5월 10일을 기준으로 작업자2의 단위 기간 동안 플랫폼 체류 기간은 3일에 해당한다.Meanwhile, Worker 2 accessed the platform on May 6, May 7, and May 9, respectively, and stayed for 6 hours, 4 hours, and 8 hours. Therefore, as of May 10, the period of stay on the platform for Worker 2's unit period is 3 days.

그리고 5월 10일을 기준으로 작업자1의 재방문 기간은 5월 6일에 상기 플랫폼을 이탈한 후 다 시 재방문한 5월 9일까지 소요된 2일이며, 5월 10일을 기준으로 작업자2의 재방문 기간은 5월 7일 작업 후 플랫폼을 이탈한 후 다시 재방문한 5월 9일까지 소요된 기간인 1일이다.And as of May 10, Worker 1's revisit period is 2 days until May 9, when he left the platform and revisited again on May 6, and as of May 10, Worker 2 The revisit period of May 7 is 1 day, which is the period taken until May 9, after leaving the platform and revisiting after leaving the platform.

한편, 본 발명의 일 실시예로, 작업자의 체류 기간은 사전에 설정된 기준 값 이상의 시간 동안 체류한 경우에 한하여 체류 기간으로 산정될 수 있다. 이는 작업자가 특정 프로젝트에 참여하여 작업을 수행하지 않고 단순히 상기 플랫폼을 단순히 방문한 경우에는 플랫폼 체류 기간으로 판단하지 않기 위한 것이다.On the other hand, in an embodiment of the present invention, the period of stay of the worker may be calculated as the period of stay only when the worker stays for a time greater than or equal to a preset reference value. This is to avoid judging as the length of stay on the platform when a worker simply visits the platform without participating in a specific project to perform work.

예를 들어, 도 7를 참조하면, 사전에 설정된 값이 1시간이라고 가정한다면, 작업자3이 플랫폼에 30분 동안 체류한 5월 7일은 상기 플랫폼에 체류한 기간에 포함되지 않는다. 따라서 이때, 5월 10일을 기준으로 작업자3의 평균 플랫폼 체류 기간은 5월 6일과 5월 9일인 2일에 해당한다. For example, referring to FIG. 7, assuming that the preset value is 1 hour, the 7th of May, when worker 3 stays on the platform for 30 minutes, is not included in the period of stay on the platform. Therefore, at this time, as of May 10, the average duration of worker 3's stay on the platform corresponds to May 6 and May 9, which is 2 days.

그리고 5월 10일을 기준으로 작업자3의 재방문 기간은 작업자3이 30분 동안 플랫폼에 체류한 5월 7일부터 재방문하여 4시간 동안 체류한 5월 9일까지 소요된 1일에 해당한다. And as of May 10, the revisit period of Worker 3 corresponds to 1 day from May 7, when Worker 3 stays on the platform for 30 minutes, until May 9, when Worker 3 revisits and stays for 4 hours. .

이와 같이, 작업자의 체류 기간을 작업자가 프로젝트에 참여하여 실제 작업을 수행하였는지에 따라서 산출함으로써, 작업 수행 소요 시간이 상대적으로 길고 남은 작업 건수가 많은 프로젝트에 참여하도록 유도하는 헤비 작업자 그룹을 더욱 엄선하여 분류할 수 있다. In this way, by calculating the length of stay of the worker according to whether the worker participated in the project and performed the actual work, the heavy worker group that induces to participate in the project with a relatively long time required to perform the task and the number of remaining tasks is further carefully selected and classified. can do.

한편, 평균 플랫폼 체류 기간과 평균 플랫폼 재방문 기간의 산출을 위하여, 예시한 바와 달리 최근 1주일 또는 1개월의 단위 기간을 사용할 수 있으며, 이에 한정하는 것은 아니다.On the other hand, in order to calculate the average platform stay period and the average platform revisit period, a unit period of the last 1 week or 1 month may be used, but is not limited thereto.

이하, 크라우드소싱 플랫폼의 복수의 작업자를 각 작업자의 평균 플랫폼 체류 기간 및 평균 플랫폼 재방문 기간에 기초하여 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 방법에 대해서 설명한다.Hereinafter, a method of classifying a plurality of workers of the crowdsourcing platform into a heavy worker group or a light worker group based on the average platform stay period and the average platform revisit period of each worker will be described.

도 8은 플랫폼의 복수의 작업자의 평균 플랫폼 체류 기간과 평균 플랫폼 재방문 기간을 나타내는 도면이고, 도 9는 작업자의 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간에 기초하여 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 방법을 나타내는 도면이다. 8 is a diagram showing the average platform stay period and the average platform revisit period of a plurality of workers of the platform, and FIG. 9 is a heavy worker group or a light worker group based on the average platform stay period compared to the average platform revisit period of the workers. It is a diagram showing a classification method.

도 10은 전체 작업자를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 것을 설명하기 위한 도면이고, 도 11은 전체 작업자중 일부를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 것을 설명하기 위한 도면이다.FIG. 10 is a diagram for explaining classifying all workers into a heavy worker group or a light worker group, and FIG. 11 is a diagram illustrating classifying some of all workers into a heavy worker group or a light worker group.

본 발명의 일 실시예로 복수의 작업자의 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간에 기초하여 플랫폼 상의 전체 작업자를 내림차순으로 정렬하고, 사전에 설정된 기준 값 이상의 작업자를 헤비 작업자 그룹 그리고 사전에 설정된 기준 값 미만의 작업자를 라이트 작업자 그룹으로 분류할 수 있다.According to an embodiment of the present invention, all workers on the platform are sorted in descending order based on the average platform stay period compared to the average platform revisit period of a plurality of workers, and workers with a preset reference value or more are assigned to a heavy worker group and a preset criterion. Workers below the value can be classified into light worker groups.

도 8 및 도 9를 참조하면, 헤비 작업자와 라이트 작업자를 분류하는 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간의 기준 값이 1이라고 가정하면, 각각의 작업자의 평균 플랫폼 체류 기간과 평균 플랫폼 재방문 기간이 도 9와 같을 때, 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간의 값이 1 이상인 작업자1, 작업자5 그리고 작업자6이 헤비 작업자 그룹으로 분류된다. 그리고 평균 플랫폼 재방문 기간 대비 평균 플랫폼 체류 기간의 값이 1 미만인 작업자2, 작업자3 그리고 작업자4는 라이트 작업자 그룹으로 분류된다. 8 and 9, assuming that the reference value of the average platform stay period compared to the average platform revisit period for classifying heavy and light workers is 1, the average platform stay period and the average platform revisit period of each worker As shown in FIG. 9, workers 1, 5, and 6 with a value of the average platform stay period of 1 or more compared to the average revisit period of the platform are classified into the heavy worker group. In addition, workers 2, 3 and 4 whose average platform stay period is less than 1 compared to the average revisit period are classified into the light worker group.

도 10을 참조하면, 전술한 바와 같이 헤비 작업자와 라이트 작업자를 동일한 기준 값으로 분류한 경우, 전체 작업자 중 일부는 헤비 작업자 그룹 그리고 나머지 작업자는 라이트 작업자 그룹으로 분류된다.Referring to FIG. 10, when a heavy worker and a light worker are classified by the same reference value as described above, some of the entire workers are classified into a heavy worker group and the remaining workers are classified into a light worker group.

한편, 본 발명의 일 실시예로 상기 사전에 설정된 기준 값으로 헤비 작업자 그룹 선정에 사용하는 기준 값과 라이트 작업자 그룹 선정에 사용하는 기준 값이 상이할 수 있다. 즉, 헤비 작업자 그룹 선정에 제5 기준 값이 사용되고, 라이트 작업자 그룹 선정에는 제5 기준 값보다 작은 제6 기준 값이 사용될 수 있다.Meanwhile, according to an embodiment of the present invention, a reference value used for selecting a heavy worker group and a reference value used for selecting a light worker group may be different as the preset reference value. That is, the fifth reference value may be used to select a heavy worker group, and a sixth reference value smaller than the fifth reference value may be used to select the light worker group.

이 경우, 도 11을 참조하면, 전체 작업자 중 일부는 헤비 작업자 그룹 그리고 나머지 작업자 중 일부는 라이트 작업자 그룹으로 분류된다. 따라서, 헤비 작업자 그룹 또는 라이트 작업자 그룹 어디에도 속하지 않는 작업자가 존재할 수 있게 된다.In this case, referring to FIG. 11, some of all workers are classified into a heavy worker group and some of the remaining workers are classified into a light worker group. Accordingly, there may be an operator who does not belong to either the heavy operator group or the light operator group.

한편, 본 발명의 일 실시예로, 상술한 플랫폼의 복수의 작업자를 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계는, 상기 플랫폼의 복수의 작업자를, 각 작업자에 의해서 입력된 단위 기간당 작업 수행 가능한 시간에 더 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류할 수 있다. On the other hand, in an embodiment of the present invention, the step of classifying the plurality of workers of the platform into the heavy worker group or the light worker group includes: Further based on the available time to perform a task, it may be classified into the heavy worker group or the light worker group.

상기 실시예는, 각 작업자가 크라우드소싱 플랫폼에 회원 가입(또는 등록)시 입력한 프로파일 정보에 더 기초하여 복수의 작업자를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 것이다. In the above embodiment, a plurality of workers is classified into a heavy worker group or a light worker group based on profile information input when each worker joins (or registers) as a member of the crowdsourcing platform.

예를 들어, 단위 기간이 1주일이라고 가정하였을 때, 작업자가 회원 가입시 입력한 1주일 중 작업 수행 가능한 요일 및 작업 수행 가능한 요일의 작업 수행 가능한 시간에 기초하여, 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류할 수 있다. 이때, 작업자의 작업 수행 가능한 시간이 많을 수록 헤비 작업자 그룹으로 작업자의 작업 수행 가능한 시간이 적을 수록 라이트 작업자 그룹으로 분류될 수 있다. For example, assuming that the unit period is 1 week, it is classified as a heavy worker group or a light worker group based on the available days of the week that the worker can perform the work on and the time available for the work on the days of the week that can be performed. can do. In this case, the more time the worker can perform the work, the heavier the worker group, and the less time the worker can perform the work, the light worker group may be classified.

도 12는 본 발명의 일 실시예에 따른 추천 배지를 이용하여 헤비 프로젝트를 헤비 작업자 그룹에게 큐레이션 하는 방법을 나타내는 예시도이다. 12 is an exemplary diagram illustrating a method of curating a heavy project to a heavy worker group using a recommended badge according to an embodiment of the present invention.

도 13은 본 발명의 일 실시예에 따른 헤비 프로젝트를 별도의 추천 작업으로 구분하여 헤비 작업자 그룹에게 큐레이션 하는 방법을 나타내는 예시도이다. 13 is an exemplary view showing a method of dividing a heavy project into separate recommended tasks and curating a heavy worker group according to an embodiment of the present invention.

도 12를 참조하면, 크라우드소싱 플랫폼에서 헤비 프로젝트는 해당 프로젝트를 나타내는 오브젝트에 헤비 프로젝트에 상응하는 헤비 작업자 그룹의 참여를 유도하는 추천 배지와 같은 이미지 객체를 포함하여 큐레이션 될 수 있다. Referring to FIG. 12, in a crowdsourcing platform, a heavy project may be curated by including an image object such as a recommendation badge that induces participation of a heavy worker group corresponding to the heavy project in an object representing the corresponding project.

또는, 도 13을 참조하면 헤비 작업자 그룹의 크라우드소싱 플랫폼 화면에서, 헤비 프로젝트로 분류된 프로젝트를 진행 가능 작업과 구분되는 추천 작업 목록에 표시하여 헤비 작업자 그룹에게 큐레이션 할 수 있다. 한편, 라이트 작업자 그룹의 경우, 라이트 작업자 그룹의 플랫폼 화면에서는 라이트 프로젝트로 분류된 프로젝트가 추천 작업 목록에 표시되어 라이트 작업자 그룹에게 큐레이션 될 것이다. Alternatively, referring to FIG. 13, on the screen of the crowdsourcing platform of the heavy worker group, a project classified as a heavy project may be displayed in a list of recommended tasks separated from possible tasks to be curated to a heavy worker group. Meanwhile, in the case of the light worker group, projects classified as light projects will be displayed on the recommended work list on the platform screen of the light worker group and will be curated by the light worker group.

전술한 방법에 따라서, 크라우드소싱 플랫폼에 접속한 작업자에게 작업자의 성향에 따라서 작업자가 수행하기에 적합한 프로젝트를 추천하여, 작업자의 해당 프로젝트의 참여를 유도할 수 있다. 특히, 라이트 작업자는 플랫폼에 방문하는 횟수가 적으며 방문 기일을 정확히 예측할 수 없기 때문에, 라이트 작업자가 플랫폼에 접속하였을 때, 라이트 작업자에게 라이트 프로젝트를 큐레이션 함으로써, 라이트 작업자가 라이트 프로젝트에 참여하였을 때, 플랫폼에 대한 좋은 인상을 남기고, 궁극적으로 작업자의 플랫폼 재방문을 유도할 수 있을 것이다.According to the above-described method, it is possible to recommend a project suitable for the worker to perform according to the worker's disposition to the worker who has connected to the crowdsourcing platform, and induce the worker to participate in the project. In particular, since light workers visit the platform less often and cannot accurately predict the date of visit, when light workers connect to the platform, curate light projects to light workers, and when light workers participate in light projects. , You will be able to leave a good impression on the platform, and ultimately induce workers to revisit the platform.

한편, 본 발명의 일 실시예로 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법은 큐레이션 된 프로젝트에 참여하여 소정 기간 동안 작업을 수행한 작업자에게 인센티브 포인트를 제공하는 단계를 더 포함할 수 있다.On the other hand, as an embodiment of the present invention, the project curation method in consideration of worker tendencies of crowdsourcing-based projects may further include providing incentive points to workers who participated in the curated project and performed tasks for a predetermined period of time. have.

이를 통해, 하나의 작업을 수행하는데 오랜 시간이 소요되고 잔여 작업 건수가 충분한 헤비 프로젝트로의 헤비 작업자의 참여를 적극적으로 유도할 수 있다. Through this, it is possible to actively induce heavy workers' participation in heavy projects that take a long time to perform one task and the number of remaining tasks is sufficient.

또한, 라이트 작업자에게는 라이트 프로젝트로의 참여를 적극적으로 유도하여 간헐적인 방문시에도 적절한 작업 수행 경험을 쌓을 수 있도록 하고, 무엇보다 크라우드소싱 플랫폼에 대한 좋은 인상을 갖도록 함으로써, 라이트 작업자의 플랫폼 이탈을 방지할 수 있다. In addition, by actively inducing light workers to participate in the light project so that they can gain proper work experience even during intermittent visits, and above all, prevent light workers from leaving the platform by giving them a good impression of the crowdsourcing platform. can do.

다음에서는 전술한 바와 같이, 프로젝트가 헤비 프로젝트 또는 라이트 프로젝트로 분류되는데 기준이 되는, 프로젝트의 속성을 추출하는 방법에 대하여 상세히 설명한다. In the following, as described above, a method of extracting the properties of a project, which is a standard for classifying a project into a heavy project or a light project, will be described in detail.

본 발명의 일 실시예로, S150 단계는 프로젝트의 반려율을 추출하는 단계(미도시)를 더 포함하고, S153 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 외에 상기 반려율을 더 추출할 수 있다.In an embodiment of the present invention, step S150 further includes a step of extracting a rejection rate of the project (not shown), and step S153 includes the average task execution time per task as a project property of the project, and the In addition to the number of remaining jobs, the rejection rate can be further extracted.

반려율은 프로젝트의 속성을 추출하는 시점을 기준으로 프로젝트의 검수 통과된 전체 작업 건수 대비 반려 횟수로 산출되거나 검수 통과된 하나의 작업당 평균 반려횟수로 산출될 수 있다. 그러나 이에 한정하는 것은 아니다. The rejection rate can be calculated as the number of rejections relative to the total number of tasks that have passed the inspection of the project based on the time when the properties of the project are extracted, or can be calculated as the average number of rejections per task that has passed the inspection. However, it is not limited thereto.

이때, 반려 횟수는 해당 작업의 최초 반려만을 고려하여 산출되거나, 또는 재반려까지 포함하여 산출될 수 있으나 이에 한정하는 것은 아니다.In this case, the number of rejections may be calculated in consideration of only the initial rejection of the task, or may be calculated including re-rejection, but is not limited thereto.

프로젝트의 높은 반려율은 해당 프로젝트의 작업 난이도가 높다는 것을 의미한다. 따라서 반려율이 높은 프로젝트에 라이트 작업자가 참여한 경우, 오히려 높은 난이도로 인하여 반복적인 작업 결과의 반려를 발생시킬 수 있고, 이는 프로젝트의 진행을 지연시킬 수 있다. 특히, 작업 결과의 반려시 재작업이 필요한데, 라이트 작업자의 뒤늦은 재방문으로 인하여 프로젝트의 진행이 지연될 수도 있다. 또한 작업 수행에 어려움을 느낀 라이트 작업자는 크라우드소싱 플랫폼에 대한 좋지 않은 인상을 갖게 될 수 있으며, 결국 작업자의 플랫폼 이탈을 유발할 수도 있을 것이다.The high rejection rate of a project means that the project is difficult to work with. Therefore, if a light worker participates in a project with a high rejection rate, it may cause repetitive rejection of the result of repetitive work due to a higher degree of difficulty, which can delay the progress of the project. In particular, rework is required when the work result is returned, but the project may be delayed due to the belated revisit of the light worker. In addition, light workers who have difficulty in performing tasks may have a bad impression of the crowdsourcing platform, which may eventually lead to workers leaving the platform.

따라서, 반려율을 프로젝트의 속성으로 추출하고, 이를 추가적으로 고려하여 헤비 프로젝트 또는 라이트 프로젝트를 분류하여 큐레이션 함으로써, 작업자의 능력에 따라서 적절한 작업 경험을 갖도록 하여 위와 같은 문제를 방지할 수 있다.Therefore, by extracting the rejection rate as an attribute of the project, and categorizing and curating heavy projects or light projects by additionally considering them, the above problems can be prevented by having an appropriate work experience according to the capabilities of the worker.

구체적으로, 하나의 작업당 평균 작업 수행 소요 시간이 제1 기준 값 이상이고, 남은 작업 건수가 제2 기준 값 이상이고, 동시에 반려율이 제7 기준 값 이상이면, 상기 프로젝트를 헤비 프로젝트로 분류할 수 있다. 또는, 하나의 작업당 평균 작업 수행 소요 시간이 제3 기준 값 미만이고, 남은 작업 건수가 제4 기준 값 미만이고, 동시에 반려율이 제8 기준 값 미만이면, 상기 프로젝트를 라이트 프로젝트로 분류할 수 있다.Specifically, if the average task execution time per task is greater than or equal to the first standard value, the number of remaining tasks is greater than or equal to the second standard value, and the rejection rate is equal to or greater than the seventh standard value, the project is classified as a heavy project. I can. Alternatively, the project can be classified as a light project if the average time required to perform an operation per task is less than the third standard value, the number of remaining tasks is less than the fourth standard value, and the rejection rate is less than the eighth standard value. have.

이때, 제7 기준 값과 제8 기준 값은 동일하거나 상이할 수 있다. 제7 기준 값은 제8 기준 값보다 더 높은 값으로 설정될 수 있다.In this case, the seventh reference value and the eighth reference value may be the same or different. The seventh reference value may be set to a higher value than the eighth reference value.

또한, 본 발명의 다른 실시예로 S150 단계는 상기 프로젝트의 단위 기간당 예상 작업 수익을 추출하는 단계를 더 포함하고, S153 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 외에 상기 단위 기간당 예상 작업 수익을 더 추출할 수 있다.In addition, according to another embodiment of the present invention, step S150 further includes the step of extracting the expected work revenue per unit period of the project, and step S153 is the average task execution time per task as a project property of the project. And, in addition to the number of remaining jobs, the expected work revenue per unit period may be further extracted.

평균 작업 수행 소요 시간과 남은 작업 건수와 함께 단위 기간당 예상 작업 수익을 프로젝트의 속성으로 추출하고 이에 기초하여, 상기 프로젝트를 헤비 프로젝트로 분류해낼 수 있다.The project can be classified as a heavy project based on extracting the projected profit per unit period, together with the average time required to perform work and the number of remaining work, as a property of the project.

구체적으로, 단위 기간당 예상 작업 수익이 사전에 설정된 기준 값보다 높은 프로젝트를 헤비 프로젝트로 분류하고 상응하는 헤비 작업자에게 큐레이션 한다. 이로써, 높은 예상 작업 수익을 얻을 수 있는 헤비 프로젝트로의 헤비 작업자 그룹의 유입을 유도할 수 있을 것이다. 즉, 예상 작업 수익이 높은 프로젝트를 통해서, 상대적으로 많은 수의 작업을 수행하는 성향의 헤비 작업자에게 충분한 동기 및 보상을 제공할 수 있을 것이다.Specifically, projects in which the projected work income per unit period is higher than the preset reference value are classified as heavy projects and curated to corresponding heavy workers. This will lead to an influx of heavy worker groups to heavy projects that can generate high expected work returns. In other words, through a project with a high expected work income, it will be possible to provide sufficient motivation and rewards to heavy workers who tend to perform a relatively large number of tasks.

이때, 단위 기간당 예상 작업 수익은, 평균 작업 수행 소요 시간과 작업 단가에 기초하여 산출될 수 있다. 예를 들어, 단위 기간이 3시간, 평균 작업 수행 소요 시간이 5분이고 작업 단가가 100원이라면, 단위 기간인 3시간당 예상 작업 5수익은 3,600원으로 산출된다.In this case, the expected work profit per unit period may be calculated based on the average work execution time and work unit cost. For example, if the unit period is 3 hours, the average time required to perform the work is 5 minutes, and the unit cost is 100 won, the estimated 5 profit per unit period of 3 hours is calculated as 3,600 won.

또한, 본 발명의 또 다른 실시예로 S150 단계는 상기 프로젝트의 재작업 제한 시간을 추출하는 단계를 더 포함하고, S153 단계는, 상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 외에 상기 재작업 제한 시간을 더 추출할 수 있다. In addition, as another embodiment of the present invention, step S150 further includes extracting the rework limit time of the project, and step S153 includes the average task execution time per task as a project property of the project, and In addition to the remaining number of jobs, the rework limit time may be further extracted.

반려된 작업의 경우, 반려된 작업을 배정받은 작업자가 재작업 제한 시간 내에 재작업에 착수하지 않으면, 상기 배정을 취소하고 다른 작업자에게 배정된다. 이는 재작업의 지연으로 인해 발생하는 프로젝트 전체적인 병목 현상을 예방하기 위한 것이다. In the case of a rejected task, if the worker assigned the rejected task does not start rework within the rework time limit, the assignment is canceled and assigned to another worker. This is to prevent project-wide bottlenecks caused by delays in rework.

플랫폼에 체류하는 기간이 짧고 재방문하는데 오랜 기간이 소요되는 라이트 작업자가 재작업 제한 시간이 짧은 프로젝트에 참여한다면 재작업 제한 시간 내에 재작업을 수행할 것을 기대하기 어렵기 때문에, 재작업 제한 시간이 짧은 프로젝트는 헤비 프로젝트로 분류하여 헤비 작업자 그룹에 큐레이션 하는 것이 바람직하다. 이를 위해, 재작업 제한 시간이 사전에 설정된 기준 값보다 짧은 프로젝트를 헤비 프로젝트로 분류하고 상응하는 헤비 작업자에게 큐레이션 한다.If a light worker who stays on the platform for a short period of time and takes a long time to revisit, participate in a project with a short rework time limit, it is difficult to expect to perform rework within the rework time limit, so the rework time limit is limited. It is recommended that short projects be classified as heavy projects and curated by a group of heavy workers. To this end, projects whose rework time limit is shorter than the preset reference value are classified as heavy projects and curated to corresponding heavy workers.

한편, 전술한 프로젝트를 큐레이션 하는 방법은 작업자가 보유한 작업 기기에 기초할 수 있다. 이와 관련하여 다음에서 설명한다. On the other hand, the method of curating the above-described project may be based on the work equipment possessed by the worker. In this regard, it will be described below.

도 14는 바운딩 기능요소가 포함되는 프로젝트의 작업 화면에 관한 예시를 나타낸 도면이다. 14 is a diagram illustrating an example of a work screen of a project including a bounding functional element.

본 발명의 일 실시예로 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법은 프로젝트의 기능요소를 추출하는 단계(미도시) 및 각 작업자에 의해서 입력된 보유 작업 기기에 기초하여, 플랫폼의 복수의 작업자 중 상기 프로젝트의 기능요소에 상응하는 작업 기기를 보유한 작업자에 상기 프로젝트를 큐레이션 하는 단계(미도시)를 더 포함할 수 있다. According to an embodiment of the present invention, a project curation method in consideration of the worker tendencies of a crowdsourcing-based project is based on the step of extracting the functional elements of the project (not shown) and the holding work devices input by each worker, It may further include curating the project to a worker who has a work device corresponding to the functional element of the project among the workers of the project (not shown).

본 실시예는 전술한 바와 같이 작업자의 성향에 추가적으로 작업자의 작업 기기까지 고려하여 프로젝트를 큐레이션하는 것이다.This embodiment curates the project by considering the worker's work equipment in addition to the worker's propensity as described above.

이때 상기 기능요소는 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 상기 작업툴은 프로젝트에서 제공되며 작업자들이 상기 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴일 수 있다. In this case, the functional element is determined based on a work tool for executing a project, and the work tool is provided in the project and may be a tool used by workers to perform a task required by the project.

예를 들어, 프로젝트를 수행하기 위해 바운딩 작업을 위한 바운딩 박스 툴(Bounding Box Tool), 전사 작업을 위한 인풋 박스 툴(Input Box Tool) 및 분류 작업을 위한 메이크 스텝 툴(Make Step Tool)이 필요한 경우, 해당 프로젝트는 바운딩 기능요소, 전사 기능요소 및 분류 기능요소를 포함하는 것으로 분류될 수 있다.For example, if you need a Bounding Box Tool for bounding work, an Input Box Tool for transfer work, and a Make Step Tool for sorting work to perform a project. , The project can be classified as including a bounding functional element, a transcription functional element, and a classification functional element.

구체적으로, 도 14를 참조하면, 도 14에서 제시된 프로젝트에 참여한 작업자는 제시된 이미지에서 특정 객체인, 돼지를 선택하는 바운딩(Bounding) 작업을 수행하게 된다. 작업자는 상기 바운딩 작업을 수행하기 위해서 바운딩 박스 툴(Bounding Box Tool)을 사용할 수 있다. 즉, 바운딩 박스 툴에 기반하여 해당 프로젝트에 포함되는 바운딩 기능요소가 결정된다. Specifically, referring to FIG. 14, a worker who participates in the project presented in FIG. 14 performs a bounding operation for selecting a specific object, a pig, from the presented image. The operator may use a bounding box tool to perform the bounding operation. That is, the bounding functional elements included in the project are determined based on the bounding box tool.

이때, 도 14에서의 프로젝트는 바운딩 작업의 특성상 드로잉 태블릿 또는 드로잉 패드와 같은 관련 장비를 가진 작업자에게 작업 속도 또는 작업의 품질 면에서 더욱 적절할 것이다. At this time, the project in FIG. 14 will be more appropriate in terms of work speed or quality of work for a worker having related equipment such as a drawing tablet or a drawing pad due to the nature of the bounding work.

따라서, 프로젝트에 포함되는 기능요소를 추출하고, 상기 기능요소에 상응하는 작업 기기를 보유한 작업자에게 상기 프로젝트를 큐레이션 함으로써, 프로젝트의 작업 품질을 높이고 작업자의 작업 편의성을 도모할 수 있을 것이다. Accordingly, by extracting the functional elements included in the project and curating the project to a worker who has a working device corresponding to the functional element, the work quality of the project can be improved and the operator's work convenience can be promoted.

이때 작업자의 작업 기기는 작업자의 크라우드소싱 플랫폼 가입시 입력된 보유 작업 기기 정보에 기초할 수 있으나, 이에 한정하는 것은 아니다.In this case, the worker's work device may be based on the information on the work device inputted when the worker joins the crowdsourcing platform, but is not limited thereto.

한편, 상술한 설명에서, 단계 S110 내지 S170, S151 내지 S153은 본 발명의 구현예에 따라서, 추가적인 단계들로 더 분할되거나, 더 적은 단계들로 조합될 수 있다. 또한, 일부 단계는 필요에 따라 생략될 수도 있고, 단계 간의 순서가 변경될 수도 있다. 아울러, 기타 생략된 내용이라 하더라도 후술하는 도 15의 내용은 도 3 내지 도 14의 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법에도 적용될 수 있다. Meanwhile, in the above description, steps S110 to S170 and S151 to S153 may be further divided into additional steps or may be combined into fewer steps according to an embodiment of the present invention. In addition, some steps may be omitted as necessary, or the order between steps may be changed. In addition, even if other contents are omitted, the contents of FIG. 15 to be described later may be applied to the project curation method in consideration of the worker tendency of the crowdsourcing-based project of FIGS. 3 to 14.

이하, 도 15를 참조하여 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 장치에 대하여 설명하도록 한다.Hereinafter, with reference to FIG. 15, a project curation apparatus in consideration of a worker tendency of a crowdsourcing-based project according to an embodiment of the present invention will be described.

도 15는 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 장치를 설명하기 위한 도면이다.15 is a diagram for explaining a project curation apparatus in consideration of a worker tendency of a crowdsourcing-based project according to an embodiment of the present invention.

도 15를 참조하면, 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 장치(200)(이하, 장치)는 통신모듈(210), 메모리(220) 및 프로세서(230)를 포함한다.Referring to FIG. 15, a project curation device 200 (hereinafter, referred to as a device) in consideration of worker propensity for a crowdsourcing-based project includes a communication module 210, a memory 220, and a processor 230.

통신모듈(210)은 하나의 프로젝트에 대한 크라우드소싱 기반의 작업을 복수의 작업자(32)에게 송신하여 작업 수행을 요청하고, 복수의 작업자(32)로부터 작업 결과를 수신한다. 통신모듈(210)은 복수의 작업자(32)로부터 수신된 작업 결과를 복수의 검수자(34)에게 송신하여 검수를 요청하고, 복수의 검수자(34)로부터 검수 결과를 수신한다. 이때 반려된 검수 결과에 대하여는 상응하는 재작업을 작업자(32)에게 송신하여 재작업 수행을 요청하고, 상기 작업자(32)로부터 재작업 결과를 수신한다.The communication module 210 transmits a crowdsourcing-based work for one project to a plurality of workers 32 to request a task to be performed, and receives a work result from the plurality of workers 32. The communication module 210 transmits the work results received from the plurality of workers 32 to the plurality of inspectors 34 to request inspection, and receives the inspection results from the plurality of inspectors 34. At this time, for the rejected inspection result, a corresponding rework is transmitted to the worker 32 to request rework, and the rework result is received from the worker 32.

메모리(220)에는 통신모듈(210)로부터 수신한 데이터에 기초하여 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류하고 작업자를 헤비 작업자 그룹 또는 라이트 작업자 그룹으로 분류하는 프로그램이 저장된다.The memory 220 stores a program for classifying a project into a heavy project or a light project based on data received from the communication module 210 and classifying workers into a heavy worker group or a light worker group.

프로세서(230)는 메모리(220)에 저장된 프로그램을 실행시킨다. 프로세서(230)는 메모리(220)에 저장된 프로그램을 실행시킴에 따라, 도 3 내지 도 14 참조하여 설명한 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 수행할 수 있다.The processor 230 executes a program stored in the memory 220. As the processor 230 executes the program stored in the memory 220, the processor 230 may perform the project curation method in consideration of the worker tendency of the crowdsourcing-based project described with reference to FIGS. 3 to 14.

도 15를 참조하여 설명한 장치(200)는 상술한 서버의 구성요소로 제공될 수 있다.The device 200 described with reference to FIG. 15 may be provided as a component of the above-described server.

이상에서 전술한 본 발명의 일 실시예에 따른 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법은, 하드웨어인 컴퓨터와 결합되어 실행되기 위해 프로그램(또는 어플리케이션)으로 구현되어 컴퓨터 판독가능 기록 매체에 저장될 수 있다.The project curation method in consideration of the worker tendency of a crowdsourcing-based project according to an embodiment of the present invention described above is implemented as a program (or application) to be executed in combination with a computer, which is hardware, and is stored in a computer-readable recording medium. Can be saved.

상기 전술한 프로그램은, 상기 컴퓨터가 프로그램을 읽어 들여 프로그램으로 구현된 상기 방법들을 실행시키기 위하여, 상기 컴퓨터의 프로세서(CPU)가 상기 컴퓨터의 장치 인터페이스를 통해 읽힐 수 있는 C, C++, JAVA, Ruby, 기계어 등의 컴퓨터 언어로 코드화된 코드(Code)를 포함할 수 있다. 이러한 코드는 상기 방법들을 실행하는 필요한 기능들을 정의한 함수 등과 관련된 기능적인 코드(Functional Code)를 포함할 수 있고, 상기 기능들을 상기 컴퓨터의 프로세서가 소정의 절차대로 실행시키는데 필요한 실행 절차 관련 제어 코드를 포함할 수 있다. 또한, 이러한 코드는 상기 기능들을 상기 컴퓨터의 프로세서가 실행시키는데 필요한 추가 정보나 미디어가 상기 컴퓨터의 내부 또는 외부 메모리의 어느 위치(주소 번지)에서 참조되어야 하는지에 대한 메모리 참조관련 코드를 더 포함할 수 있다. 또한, 상기 컴퓨터의 프로세서가 상기 기능들을 실행시키기 위하여 원격(Remote)에 있는 어떠한 다른 컴퓨터나 서버 등과 통신이 필요한 경우, 코드는 상기 컴퓨터의 통신 모듈을 이용하여 원격에 있는 어떠한 다른 컴퓨터나 서버 등과 어떻게 통신해야 하는지, 통신 시 어떠한 정보나 미디어를 송수신해야 하는지 등에 대한 통신 관련 코드를 더 포함할 수 있다.The above-described program includes C, C++, JAVA, Ruby, which can be read by a processor (CPU) of the computer through the device interface of the computer, in order for the computer to read the program and execute the methods implemented as a program. It may include a code (Code) coded in a computer language such as machine language. Such code may include a functional code related to a function defining necessary functions for executing the methods, and a control code related to an execution procedure necessary for the processor of the computer to execute the functions according to a predetermined procedure. can do. In addition, these codes may further include additional information required for the processor of the computer to execute the functions or code related to a memory reference to which location (address address) of the internal or external memory of the computer should be referenced. have. In addition, when the processor of the computer needs to communicate with any other computer or server in a remote in order to execute the functions, the code is It may further include a communication-related code for whether to communicate, what kind of information or media to be transmitted and received during communication.

상기 저장되는 매체는, 레지스터, 캐쉬, 메모리 등과 같이 짧은 순간 동안 데이터를 저장하는 매체가 아니라 반영구적으로 데이터를 저장하며, 기기에 의해 판독(reading)이 가능한 매체를 의미한다. 구체적으로는, 상기 저장되는 매체의 예로는 ROM, RAM, CD-ROM, 자기 테이프, 플로피디스크, 광 데이터 저장장치 등이 있지만, 이에 제한되지 않는다. 즉, 상기 프로그램은 상기 컴퓨터가 접속할 수 있는 다양한 서버 상의 다양한 기록매체 또는 사용자의 상기 컴퓨터상의 다양한 기록매체에 저장될 수 있다. 또한, 상기 매체는 네트워크로 연결된 컴퓨터 시스템에 분산되어, 분산방식으로 컴퓨터가 읽을 수 있는 코드가 저장될 수 있다.The stored medium is not a medium that stores data for a short moment, such as a register, cache, memory, etc., but a medium that stores data semi-permanently and can be read by a device. Specifically, examples of the storage medium include, but are not limited to, ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage device, and the like. That is, the program may be stored in various recording media on various servers to which the computer can access, or on various recording media on the user's computer. In addition, the medium may be distributed over a computer system connected through a network, and computer-readable codes may be stored in a distributed manner.

전술한 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 예를 들어, 단일형으로 설명되어 있는 각 구성 요소는 분산되어 실시될 수도 있으며, 마찬가지로 분산된 것으로 설명되어 있는 구성 요소들도 결합된 형태로 실시될 수 있다.The above description of the present invention is for illustrative purposes only, and those of ordinary skill in the art to which the present invention pertains will be able to understand that other specific forms can be easily modified without changing the technical spirit or essential features of the present invention. will be. Therefore, it should be understood that the embodiments described above are illustrative and non-limiting in all respects. For example, each component described as a single type may be implemented in a distributed manner, and similarly, components described as being distributed may also be implemented in a combined form.

본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구범위에 의하여 나타내어지며, 특허청구범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.The scope of the present invention is indicated by the claims to be described later rather than the detailed description, and all changes or modified forms derived from the meaning and scope of the claims and their equivalent concepts should be construed as being included in the scope of the present invention. do.

10 : 의뢰자
20 : 서비스 제공 업체
30 : 대중
32 : 작업자
34 : 검수자
10: requester
20: service provider
30: public
32: worker
34: inspector

Claims (10)

컴퓨터에 의해 수행되는 방법으로서,
크라우드소싱 기반 프로젝트(이하,"프로젝트")의 복수의 작업을 복수의 작업자에게 배정하여 작업 수행을 요청하는 단계;
상기 복수의 작업자로부터 복수의 작업 결과를 입력받는 단계;
상기 복수의 작업 결과를 복수의 검수자에게 배정하여 검수 수행을 요청하는 단계;
상기 복수의 검수자로부터 상기 복수의 작업 결과에 대한 복수의 검수 결과를 검수 통과 또는 반려로 입력받는 단계;
상기 프로젝트의 프로젝트 속성을 추출하는 단계;
상기 프로젝트의 프로젝트 속성에 기초하여 상기 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류하는 단계; 및
상기 분류 결과에 기초하여 상기 헤비 프로젝트에 상응하는 헤비 작업자 그룹 또는 상기 라이트 프로젝트에 상응하는 라이트 작업자 그룹에 상기 프로젝트를 큐레이션하는 단계를 포함하고,
상기 프로젝트의 프로젝트 속성을 추출하는 단계는,
상기 프로젝트의 하나의 작업당 평균 작업 수행 소요 시간을 산출하는 단계와,
상기 프로젝트의 남은 작업 건수를 산출하는 단계와,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계를 포함하고,
상기 프로젝트를 헤비 프로젝트 또는 라이트 프로젝트로 분류하는 단계는,
상기 하나의 작업당 평균 작업 수행 소요 시간이 제1 기준 값 이상이고, 상기 남은 작업 건수가 제2 기준 값 이상이면, 상기 프로젝트를 헤비 프로젝트로 분류하는 단계와
상기 하나의 작업당 평균 작업 수행 소요 시간이 제3 기준 값 미만이고, 상기 남은 작업 건수가 제4 기준 값 미만이면, 상기 프로젝트를 라이트 프로젝트로 분류하는 단계를 포함하고,
상기 제1 기준 값은 상기 제3 기준 값 이상이고, 상기 제2 기준 값은 상기 제4 기준 값 이상이며,
크라우드소싱 플랫폼(이하, "플랫폼")의 복수의 작업자를, 각 작업자의 평균 플랫폼 체류 기간 및 평균 플랫폼 재방문 기간에 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계;를 더 포함하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
As a method performed by a computer,
Allocating a plurality of tasks of a crowdsourcing-based project (hereinafter, "project") to a plurality of workers and requesting the task to be performed;
Receiving a plurality of work results from the plurality of workers;
Assigning the plurality of work results to a plurality of inspectors and requesting to perform the inspection;
Receiving a plurality of inspection results for the plurality of work results from the plurality of inspectors as passing or rejecting the inspection;
Extracting project properties of the project;
Classifying the project as a heavy project or a light project based on the project properties of the project; And
Curating the project to a heavy worker group corresponding to the heavy project or a light worker group corresponding to the light project based on the classification result,
Extracting the project properties of the project,
Calculating an average task execution time per task of the project, and
Calculating the number of remaining tasks for the project;
Including the step of extracting the average task execution time per task and the number of remaining tasks as project properties of the project,
Classifying the project as a heavy project or a light project,
Classifying the project as a heavy project if the average task execution time per task is greater than or equal to a first reference value and the number of remaining tasks is greater than or equal to a second reference value; and
If the average task execution time per task is less than a third reference value and the number of remaining tasks is less than a fourth reference value, classifying the project as a light project,
The first reference value is greater than or equal to the third reference value, the second reference value is greater than or equal to the fourth reference value,
Classifying a plurality of workers of a crowdsourcing platform (hereinafter, "platform") into the heavy worker group or the light worker group based on the average platform stay period and the average platform revisit period of each worker; further includes doing,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
삭제delete 제1항에 있어서,
상기 플랫폼의 복수의 작업자를 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는 단계는,
상기 플랫폼의 복수의 작업자를, 각 작업자에 의해서 입력된 단위 기간당 작업 수행 가능한 시간에 더 기초하여, 상기 헤비 작업자 그룹 또는 상기 라이트 작업자 그룹으로 분류하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Classifying the plurality of workers of the platform into the heavy worker group or the light worker group,
Classifying the plurality of workers of the platform into the heavy worker group or the light worker group further based on the available time to perform work per unit period input by each worker,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 프로젝트의 남은 작업 건수를 산출하는 단계는,
상기 프로젝트의 남은 작업 건수 및 직전 단위 기간 동안 작업 수행이 완료된 작업 건수를 산출하고,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수 대비 상기 직전 단위 기간동안 작업 수행이 완료된 작업 건수를 추출하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
The step of calculating the number of remaining tasks for the project,
Calculate the number of remaining tasks in the above project and the number of tasks completed in the previous unit period,
The step of extracting the average task execution time per task and the number of remaining tasks as project properties of the project,
Extracting, as a project property of the project, the average task execution time per task and the number of tasks completed during the immediately preceding unit period compared to the number of remaining tasks,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 프로젝트의 프로젝트 속성을 추출하는 단계는,
상기 프로젝트의 반려율을 추출하는 단계를 더 포함하고,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 반려율을 추출하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Extracting the project properties of the project,
Further comprising the step of extracting the rejection rate of the project,
The step of extracting the average task execution time per task and the number of remaining tasks as project properties of the project,
Extracting the average task execution time per task, the number of remaining tasks, and the rejection rate as project properties of the project,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 프로젝트의 프로젝트 속성을 추출하는 단계는,
상기 프로젝트의 단위 기간당 예상 작업 수익을 추출하는 단계를 더 포함하고,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 단위 기간당 예상 작업 수익을 추출하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Extracting the project properties of the project,
Further comprising the step of extracting the expected work revenue per unit period of the project,
The step of extracting the average task execution time per task and the number of remaining tasks as project properties of the project,
Extracting the average task execution time per one task, the number of remaining tasks, and the expected work revenue per unit period as project properties of the project,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 프로젝트의 프로젝트 속성을 추출하는 단계는,
상기 프로젝트의 재작업 제한 시간을 추출하는 단계를 더 포함하고,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간 및 상기 남은 작업 건수를 추출하는 단계는,
상기 프로젝트의 프로젝트 속성으로 상기 하나의 작업당 평균 작업 수행 소요 시간, 상기 남은 작업 건수 및 상기 재작업 제한 시간을 추출하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Extracting the project properties of the project,
Further comprising the step of extracting the rework time limit of the project,
The step of extracting the average task execution time per task and the number of remaining tasks as project properties of the project,
Extracting the average task execution time per one task, the number of remaining tasks, and the rework limit time as project properties of the project,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 프로젝트의 기능요소를 추출하는 단계; 및
각 작업자에 의해서 입력된 보유 작업 기기에 기초하여, 플랫폼의 복수의 작업자 중 상기 프로젝트의 기능요소에 상응하는 작업 기기를 보유한 작업자에 상기 프로젝트를 큐레이션 하는 단계를 더 포함하고,
상기 기능요소는 프로젝트를 수행하기 위한 작업툴(Tool)에 기반하여 결정되고, 상기 작업툴은 프로젝트에서 제공되며 작업자들이 상기 프로젝트가 요구하는 작업을 수행하기 위하여 사용하는 툴인,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Extracting functional elements of the project; And
Curating the project to a worker who has a work device corresponding to a functional element of the project among a plurality of workers of the platform, based on the holding work device input by each worker,
The functional element is determined based on a tool for executing a project, and the work tool is provided in the project, and is a tool used by workers to perform tasks required by the project,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
제1항에 있어서,
상기 큐레이션 된 프로젝트에 참여하여 소정 기간 동안 작업을 수행한 작업자에게 인센티브 포인트를 제공하는 단계를 더 포함하는,
크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법.
The method of claim 1,
Further comprising the step of providing incentive points to workers who participated in the curated project and performed work for a predetermined period of time,
A project curation method that considers the worker tendencies of crowdsourcing-based projects.
컴퓨터와 결합하여 제1항, 제3항 내지 제9항 중 어느 하나의 항의 크라우드소싱 기반 프로젝트의 작업자 성향을 고려한 프로젝트 큐레이션 방법을 수행하기 위하여 컴퓨터 판독가능 기록매체에 저장된 컴퓨터 프로그램.A computer program stored in a computer-readable recording medium in order to perform the project curation method in consideration of the worker tendency of the crowdsourcing-based project of any one of claims 1, 3 to 9 in combination with a computer.
KR1020200058776A 2020-05-18 2020-05-18 Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation KR102244697B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020200058776A KR102244697B1 (en) 2020-05-18 2020-05-18 Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020200058776A KR102244697B1 (en) 2020-05-18 2020-05-18 Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation

Publications (1)

Publication Number Publication Date
KR102244697B1 true KR102244697B1 (en) 2021-04-26

Family

ID=75733753

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020200058776A KR102244697B1 (en) 2020-05-18 2020-05-18 Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation

Country Status (1)

Country Link
KR (1) KR102244697B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102315396B1 (en) * 2021-06-21 2021-10-20 주식회사 크라우드웍스 Project task management method that provides an online work-based optimized task operation and apparatus of the same
KR102315395B1 (en) * 2021-06-21 2021-10-20 주식회사 크라우드웍스 Project task management method that provides an online work-based optimized task operation and apparatus of the same
KR102505411B1 (en) * 2022-11-01 2023-03-06 주식회사 큐로드 Method, apparatus and computer program for task assignment and monitoring for gig workers qa platform worker
KR102506055B1 (en) * 2022-11-01 2023-03-06 주식회사 큐로드 Method, apparatus and computer program for task assignment and gathering work results for gig workers qa platform worker

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11288435A (en) * 1998-04-01 1999-10-19 Hitachi Ltd Talent assignment supporting system
JP2002006934A (en) * 2000-06-27 2002-01-11 Matsushita Electric Works Ltd Worker allocation adjustment method on production line and its system
JP2006317988A (en) * 2005-04-12 2006-11-24 Fujifilm Holdings Corp Difficulty level evaluating method for element task, operation miss influence level evaluating method for element task, characteristic evaluating method for element task, allocating method for element task, and improving method for element task
KR20140095956A (en) 2013-01-25 2014-08-04 한국전자통신연구원 Method and system for generating image-knowledge contents based on crowdsourcing
KR101887415B1 (en) * 2017-11-21 2018-08-10 주식회사 크라우드웍스 Program and method for checking data labeling product

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11288435A (en) * 1998-04-01 1999-10-19 Hitachi Ltd Talent assignment supporting system
JP2002006934A (en) * 2000-06-27 2002-01-11 Matsushita Electric Works Ltd Worker allocation adjustment method on production line and its system
JP2006317988A (en) * 2005-04-12 2006-11-24 Fujifilm Holdings Corp Difficulty level evaluating method for element task, operation miss influence level evaluating method for element task, characteristic evaluating method for element task, allocating method for element task, and improving method for element task
KR20140095956A (en) 2013-01-25 2014-08-04 한국전자통신연구원 Method and system for generating image-knowledge contents based on crowdsourcing
KR101887415B1 (en) * 2017-11-21 2018-08-10 주식회사 크라우드웍스 Program and method for checking data labeling product

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102315396B1 (en) * 2021-06-21 2021-10-20 주식회사 크라우드웍스 Project task management method that provides an online work-based optimized task operation and apparatus of the same
KR102315395B1 (en) * 2021-06-21 2021-10-20 주식회사 크라우드웍스 Project task management method that provides an online work-based optimized task operation and apparatus of the same
KR102505411B1 (en) * 2022-11-01 2023-03-06 주식회사 큐로드 Method, apparatus and computer program for task assignment and monitoring for gig workers qa platform worker
KR102506055B1 (en) * 2022-11-01 2023-03-06 주식회사 큐로드 Method, apparatus and computer program for task assignment and gathering work results for gig workers qa platform worker

Similar Documents

Publication Publication Date Title
KR102244697B1 (en) Project curation method considering worker’s tendency of crowdsourcing based projects for artificial intelligence training data generation
KR102232866B1 (en) Method for distributing functional element unit work of crowdsourcing based project for artificial intelligence training data generation
KR102164844B1 (en) Method for evaluating workers using the unit of work difficulty of crowdsourcing based projects for artificial intelligence training data generation
KR102155790B1 (en) Method and apparatus for measuring competence of worker using average return rate
KR102156582B1 (en) Method for selecting sincere worker and prioritizing inspection of crowdsourcing based projects for artificial intelligence training data generation
KR102156584B1 (en) Method for providing work rewarded advertisements using crowdsourcing based projects for artificial intelligence training data generation
KR102155889B1 (en) Method for improving quality through secondary work on work results of other workers in a crowdsourcing based projects for artificial intelligence training data generation
KR102195629B1 (en) Method for selecting workers based on capability of work in crowdsourcing based projects for artificial intelligence training data generation
KR102195630B1 (en) Method for providing rewarded training for training participants in a crowdsourcing based projects for artificial intelligence training data generation
KR102205811B1 (en) Method for setting minimum work time using work time of each functional elements of crowdsourcing based project for artificial intelligence training data generation
CN111159241A (en) Click conversion estimation method and device
KR102159578B1 (en) Method for granting inspector’s inspection authority according to the funcitional elements of crowdsourcing based projects for artificial intelligence training data generation
KR102155748B1 (en) Method for automatic apdating inspection unit price using work time versus inspection time of crowdsourcing based project for artificial intelligence training data generation
KR102183836B1 (en) Method for automatically calculating estimates based on estimated work time of crowdsourcing based projects for artificial intelligence training data generation
KR102155839B1 (en) Method and apparatus for monitoring worker based on the reason for not wokring
KR102244705B1 (en) Method for controlling worker inflow into project by reversal adjustment of work unit price between crowdsourcing based similar projects for training data generation
KR102155854B1 (en) Keyword management method and apparatus for collecting various sentences
KR102205808B1 (en) Method for determining the number of proper worker of worker pool using estimated work quantity of crowdsourcing based project for artificial intelligence training data generation
KR102195608B1 (en) Method for automatically returning using object return rate of crowdsourcing based project for artificial intelligence training data generation
KR102195606B1 (en) Method for improving reliability by selective self check of worker of crowdsourcing based project for artificial intelligence training data generation
KR102183812B1 (en) Method for paying inspection fee based on hourly wage for each inspector using the verification work results of crowdsourcing based projects for artificial intelligence training data generation
KR102155747B1 (en) Method for setting minimum re-work and re-inspection time based on the number of objects returned of crowdsourcing based project for artificial intelligence training data generation
KR102164837B1 (en) Method for cost-effectively managing inspection quality of crowdsourcing based projects for artificial intelligence training data generation
KR102156586B1 (en) Method for sequentially assigning work and inspection of crowdsourcing based project for artificial intelligence training data generation
KR102156585B1 (en) Method for controlling worker inflow into project by adjusting work unit price between crowdsourcing based projects for artificial intelligence training data generation

Legal Events

Date Code Title Description
GRNT Written decision to grant