WO2024088294A1 - 一种晶片调度方法和一种电子设备 - Google Patents
一种晶片调度方法和一种电子设备 Download PDFInfo
- Publication number
- WO2024088294A1 WO2024088294A1 PCT/CN2023/126409 CN2023126409W WO2024088294A1 WO 2024088294 A1 WO2024088294 A1 WO 2024088294A1 CN 2023126409 W CN2023126409 W CN 2023126409W WO 2024088294 A1 WO2024088294 A1 WO 2024088294A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- processed
- wafer
- scheduling
- time point
- test piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Definitions
- the present invention relates to the field of semiconductor technology, and in particular to a wafer scheduling method and an electronic device.
- the production capacity of semiconductor cluster tools is one of the important factors affecting the overall production capacity of semiconductor chip processing.
- the process complexity and control accuracy of semiconductor cluster tools for processing chips are also constantly improving to obtain a higher production yield.
- test (Dummy) wafer In addition to the normal scheduling of the process wafers to be processed in the semiconductor assembly equipment, there is also a wafer for restoring the chamber, called a test (Dummy) wafer.
- the processing chamber is restored and cleaned by sending the wafer of the recovery chamber into the processing chamber for processing.
- the use of the test piece is usually affected by the setting of the chamber of the semiconductor assembly equipment and the setting of the wafer to be processed.
- a test piece can be inserted before the processing of the wafer to be processed, after the processing is completed, or at a fixed interval to restore the processing chamber.
- a test piece can also be inserted after the processing chamber accumulates several wafers to be processed to restore the processing chamber.
- the insertion order of the test piece for different wafer settings is also different, and the existing insertion order may also be changed during the processing process. It is difficult to predict the insertion time in advance and deliver the test piece to the processing chamber that needs to be restored in a timely and accurate manner, resulting in the processing chamber being idle waiting for the test piece, reducing the utilization rate of the semiconductor assembly equipment, and thus reducing the production capacity of semiconductor chips.
- embodiments of the present invention are proposed to provide a wafer scheduling method and a corresponding electronic device that overcome the above problems or at least partially solve the above problems.
- an embodiment of the present invention discloses a wafer scheduling method, wherein the wafer includes a test wafer and a wafer to be processed, and the method includes:
- simulation scheduling sequence runs to the test wafer scheduling time point, a target wafer to be processed is determined, and the simulation scheduling sequence is used to schedule the wafer to be processed;
- a test wafer process path is set at the target wafer to be processed scheduling time point to generate an executable scheduling sequence.
- the method further comprises:
- test piece usage rule includes the test piece scheduling time point and the test piece process path.
- the simulation scheduling sequence includes a transmission path corresponding to the wafer to be processed, and the transmission path sequentially passes through a wafer loading and unloading module, a first manipulator, a calibration module, an atmospheric environment vacuum lock chamber, a vacuum environment vacuum lock chamber, and a second manipulator; when the simulation scheduling sequence runs to the test piece scheduling time point, determining the target wafer to be processed includes:
- the wafers to be processed on the transmission path are sorted according to the transmission order of the transmission path to generate a sequence of wafers to be processed;
- the wafer to be processed at the end of the sequence of wafers to be processed is determined as the target wafer to be processed.
- rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed includes:
- the data from the target wafer to be processed scheduling time point to the test wafer scheduling time point corresponding to the target wafer to be processed in the simulation scheduling sequence is deleted.
- rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed includes:
- the current path point is one of the first manipulator, the calibration module, the second manipulator, the atmospheric environment vacuum lock chamber, and the vacuum environment vacuum lock chamber;
- the data from the target wafer to be processed scheduling time point to the test wafer scheduling time point corresponding to the target wafer to be processed in the simulation scheduling sequence is deleted.
- test wafer process path corresponds to a test wafer priority
- test wafer process path is set at the target wafer to be processed scheduling time point to generate an executable scheduling sequence, including:
- the process duration is added to obtain the target test wafer process completion time point;
- the priority of the test piece is cleared to generate an executable scheduling sequence.
- the method further includes:
- next test piece scheduling time point exists, determining the next test piece scheduling time point as the test piece scheduling time point, and executing the step of determining the target wafer to be processed when the simulation scheduling sequence runs to the test piece scheduling time point until the next test piece scheduling time point does not exist;
- the method further comprises:
- the executable scheduling sequence is sent to a preset semiconductor process equipment, and the preset semiconductor process equipment is used to schedule the test piece for production based on the executable scheduling sequence.
- the method further comprises:
- the simulation scheduling sequence is generated based on the operating status of the preset semiconductor process equipment.
- the embodiment of the present invention further discloses an electronic device, which is connected to a semiconductor process device.
- the electronic device is used to execute the wafer scheduling method as described above.
- the embodiment of the present invention determines the target wafer to be processed when the simulation scheduling sequence runs to the test wafer scheduling time point, and the simulation scheduling sequence is used to schedule the wafer to be processed; rolls back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed; and schedules the target wafer to be processed.
- the process path of the test piece is set at a time point to generate an executable scheduling sequence. When the test piece needs to be scheduled, the wafer to be processed at this time is determined, and the target wafer to be processed scheduling time point is rolled back.
- the process path of the test piece is set at the target wafer to be processed scheduling time point, so that the test piece is scheduled first at this time, so that when the test piece is needed to enter the processing chamber, the test piece in the process path can be used quickly, saving idle waiting time, thereby improving production efficiency.
- the scheduling of the test piece is performed on the basis of the normal scheduling time of the wafer to be processed, so that even in the case of complex scheduling of the wafer to be processed, it can be accurately scheduled, and it can adapt to changes in different processing technology requirements more quickly, further improving the production capacity of semiconductor chips.
- FIG1 is a flow chart of the steps of a wafer scheduling method according to an embodiment of the present invention.
- FIG2 is a flowchart of another wafer scheduling method according to an embodiment of the present invention.
- FIG3 is a schematic diagram of a wafer transmission path according to an embodiment of the present invention.
- FIG4 is a schematic diagram of an application system of a wafer scheduling method according to an embodiment of the present invention.
- FIG5 is a flowchart of an exemplary wafer scheduling method according to an embodiment of the present invention.
- FIG. 6 is a structural block diagram of an electronic device according to an embodiment of the present invention.
- the wafers scheduled in the embodiment of the present invention include a test wafer and a wafer to be processed.
- the test wafer is a dummy wafer; the wafer to be processed is a wafer to be processed, such as a silicon wafer.
- the wafer scheduling method may specifically include the following steps:
- Step 101 when the simulation scheduling sequence runs to the test wafer scheduling time point, the target wafer to be processed is determined, and the simulation scheduling sequence is used to schedule the wafer to be processed.
- test wafer and the wafer to be processed are both in the same semiconductor assembly equipment and can be dispatched using the same mechanical parts.
- the difference between the test wafer and the wafer to be processed is that the storage boxes of the two are located at different loading and unloading positions.
- a simulation scheduling sequence can be determined according to the process flow.
- the simulation scheduling sequence can be used to schedule the wafer to be processed in the semiconductor assembly equipment during the processing.
- the above-mentioned simulation scheduling sequence will run in chronological order to determine the actions that need to be performed at each time point in the processing process.
- the time point that the simulation scheduling sequence is currently running to matches the test piece scheduling time point it is determined that the simulation scheduling sequence runs to the test piece scheduling time point.
- the wafer to be processed that is closest to the processing chamber is determined from the multiple wafers to be processed that are currently being scheduled as the target wafer to be processed, that is, the wafer to be processed that is in the process path but has not been processed, and is closest to the end of the process path.
- the test piece scheduling time point is the time point when the processing chamber needs to schedule the test piece to enter in order to clean and calibrate the processing chamber; it uses the same timeline as the simulation scheduling sequence.
- Step 102 rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed.
- the actions that have been executed by the target wafer to be processed can be determined in the simulation scheduling sequence, and the time point at which the target wafer to be processed starts to be scheduled can be calculated according to the time of executing these actions, which is the target wafer to be processed scheduling time point corresponding to the target wafer to be processed.
- the simulation scheduling sequence is rolled back from the current time point to the target wafer to be processed scheduling time point, and is re-run from the target wafer to be processed scheduling time point.
- Step 103 setting a test wafer process path at the target wafer to be processed scheduling time point, and generating an executable scheduling sequence.
- the test piece process path is set at the wafer scheduling time point, that is, the action performed by the simulation scheduling sequence at the target wafer to be processed scheduling time point is to schedule the test piece according to the test piece process path.
- the updated simulation scheduling sequence is determined as the executable scheduling sequence.
- the executable scheduling sequence is the actual operation control sequence that can meet the scheduling requirements of the test piece.
- the embodiment of the present invention determines the target wafer to be processed when the simulation scheduling sequence runs to the test piece scheduling time point, and the simulation scheduling sequence is used to schedule the wafer to be processed; rolls back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed; sets the test piece process path at the target wafer to be processed scheduling time point to generate an executable scheduling sequence.
- the wafer to be processed at this time is determined, rolled back to the target wafer to be processed scheduling time point, and the test piece process path is set at the target wafer to be processed scheduling time point, so that the test piece is first scheduled at this time, so that when the test piece needs to be scheduled to enter the processing chamber, the test piece in the process path can be quickly scheduled for use, saving idle waiting time, thereby improving production efficiency.
- the scheduling of the test piece is performed on the basis of the normal scheduling time of the wafer to be processed, so that even in the case of complex scheduling of the wafer to be processed, it can be accurately scheduled, and can adapt to changes in different processing technology requirements more quickly, further improving the production capacity of semiconductor chips.
- the wafers to be scheduled include test wafers and wafers to be processed; the scheduling method may specifically include the following steps:
- Step 201 recording the operating status of a preset semiconductor process equipment.
- the semiconductor process equipment that needs to schedule the use of test pieces during the processing process can be used as the semiconductor process equipment for action simulation, that is, the preset semiconductor process equipment.
- the operation status of the semiconductor process equipment can be recorded. That is, all process actions and states of the semiconductor process equipment without considering the potential test piece requirements are recorded.
- Step 202 Generate a simulation scheduling sequence based on the operating status of the preset semiconductor process equipment.
- the recorded operating status of the preset semiconductor process equipment is used as configuration data to generate a simulation scheduling sequence, and the simulation scheduling sequence is started to simulate the actions of the preset semiconductor process equipment. Based on the time sequence, the actions of the simulation scheduling sequence are executed to take out the wafers to be processed from the specified wafer box for scheduling.
- Step 203 when running the simulation scheduling sequence, obtain the test piece usage rules, the test piece usage rules including the test piece scheduling time point and the test piece process path.
- the simulation scheduling sequence is run, and the corresponding actions are executed to schedule the wafers to be processed, and the actions of the semiconductor assembly equipment are simulated.
- the test piece usage rules can be obtained at the same time as the simulation scheduling sequence starts.
- the test piece usage rules are used to determine the time when the test piece needs to be scheduled, and the path for scheduling the test piece. Therefore, the test piece usage rules include the test piece scheduling time point and the test piece process path. Among them, the test piece process path is the path that the test piece passes through when scheduling the test piece.
- the test piece usage rule is information determined jointly according to the process requirements of the wafer to be processed and the setting of the processing chamber of the preset semiconductor process equipment.
- the determination of the test piece scheduling time point of the test piece usage rule are that the test piece is required before the job (process) starts, the number of wafers to be processed is processed at intervals, and the job is completed;
- the setting requirements of the processing chamber of the preset semiconductor process equipment are that the test piece is required after the processing chamber is idle for a period of time and the fixed number of wafers to be processed are continuously executed. Therefore, based on this condition, there is a unique test piece scheduling time point and test piece process path.
- the test piece scheduling time point and the time when the simulation scheduling sequence runs are on the same time axis.
- the time point can be expressed in a relative time manner. For example, the time when the simulation scheduling sequence starts running is "0", and the subsequent test piece scheduling time point can be expressed as 10 seconds; that is, the test piece scheduling time point is the 10th second after the simulation scheduling sequence runs.
- the accuracy of the corresponding time point can be determined according to production requirements, and the accuracy of the time is not limited here.
- the usage rules for the test piece can be obtained from the specified storage space address. It can be a local storage space address or a third-party storage space address, which is not specifically limited in the embodiment of the present invention.
- Step 204 When the simulation scheduling sequence runs to the test wafer scheduling time point, the target wafer to be processed is determined.
- the simulation scheduling sequence runs in chronological order to perform the corresponding actions.
- the time point of the simulation scheduling sequence runs matches the test piece scheduling time point, it is determined that the simulation scheduling sequence runs to the test piece scheduling time point.
- the simulation scheduling sequence runs to the 10th second it is determined that the simulation scheduling sequence runs to the test piece scheduling time point.
- the wafers to be processed that are in the process path but have not been processed at the test piece scheduling time point are determined. From the wafers to be processed that are in the process path but have not been processed, the wafer to be processed closest to the end of the process path is determined as the target wafer to be processed. If there is no wafer to be processed that is in the process path but has not been processed at the test piece scheduling time point, it can be determined that the target wafer to be processed is empty.
- the simulation scheduling sequence includes a transmission path corresponding to the wafer to be processed, and the transmission path sequentially passes through the wafer loading and unloading module, the first manipulator, the calibration module, the atmospheric environment vacuum lock chamber, the vacuum environment vacuum lock chamber, and the second manipulator;
- the process path corresponding to processing a wafer to be processed into a semiconductor chip is a wafer loading and unloading module (LoadPort), a first manipulator (ATM), an alignment module (Aligner), an atmospheric vacuum lock chamber (one of the slots of LoadLock), a vacuum vacuum lock chamber (another slot of LoadLock), a second manipulator (VTM), a processing chamber (PM1, PM2, PM3, PM4), a second manipulator, a vacuum vacuum lock chamber, an atmospheric vacuum lock chamber, a first manipulator, and a wafer loading and unloading module.
- the transmission path is the path that the wafer to be processed passes through when it is in the process path but not processed, that is, it passes through the wafer loading and unloading module, the first manipulator, the alignment module, the atmospheric vacuum lock chamber, the vacuum vacuum lock chamber, and the second manipulator in sequence.
- the first manipulator can be a single-arm manipulator
- the second manipulator can be a double-arm manipulator.
- the target wafer to be processed is determined, including:
- Sub-step S2041 when the simulation scheduling sequence runs to the test wafer scheduling time point, determining whether there is a wafer to be processed in the transmission path;
- the first manipulator If there is no wafer to be processed at the wafer loading and unloading module, the first manipulator, the calibration module, the atmospheric environment vacuum lock chamber, the vacuum environment vacuum lock chamber, and the second manipulator position, it is determined that there is no wafer to be processed on the transmission path.
- Sub-step S2042 when there is no wafer to be processed in the transmission path, determining that the target wafer to be processed is empty;
- Sub-step S2043 when there are wafers to be processed in the transmission path, sorting the wafers to be processed in the transmission path according to the transmission order of the transmission path to generate a sequence of wafers to be processed;
- the wafers to be processed currently in the transmission path are sorted in the order of the wafer loading and unloading module, the first manipulator, the calibration module, the atmospheric environment vacuum lock chamber, the vacuum environment vacuum lock chamber, and the second manipulator, and the obtained sequence is the sequence of wafers to be processed.
- Sub-step S2044 determining the last wafer to be processed in the sequence of wafers to be processed as the target wafer to be processed.
- Step 205 rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed.
- the corresponding time of all actions performed by the target wafer to be processed from the wafer to the position point is calculated, and based on the time, the scheduling time point of the target wafer to be processed is determined in the simulation scheduling sequence.
- the determination of the scheduling time point of the target wafer to be processed can be determined according to the type of the target wafer to be processed.
- simulation scheduling sequence is rolled back to the target wafer to be processed scheduling time point, so that the next action of the simulation scheduling sequence can be adjusted at the target wafer to be processed scheduling time point.
- rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed includes:
- Sub-step S2051 determining the test wafer scheduling time point as the target wafer to be processed scheduling time point corresponding to the target wafer to be processed.
- test piece scheduling time point is determined to be the target wafer to be processed scheduling time point.
- Sub-step S2052 deleting the data from the target wafer to be processed scheduling time point to the test wafer scheduling time point corresponding to the target wafer to be processed in the simulation scheduling sequence.
- the data from the scheduling time point of the target wafer to be processed to the scheduling time point of the test wafer in the simulation scheduling sequence is deleted.
- all actions and parameters executed in the simulation scheduling sequence during the period from the target wafer to be processed scheduling time point to the test wafer scheduling time point can be deleted, and the current time point can be rolled back to the target wafer to be processed scheduling time point.
- rolling back the simulation scheduling sequence to the target wafer to be processed scheduling time point corresponding to the target wafer to be processed includes:
- Sub-step S2053 determining a current path point corresponding to the target wafer to be processed, where the current path point is one of the first manipulator, the calibration module, the second manipulator, the atmospheric environment vacuum lock chamber, and the vacuum environment vacuum lock chamber;
- a current path point of the target wafer to be processed on the transmission path at the current moment is determined, wherein the current path point is one of the first manipulator, the calibration module, the atmospheric environment vacuum lock chamber, the vacuum environment vacuum lock chamber, and the second manipulator.
- Sub-step S2054 calculating the running time from the wafer loading and unloading module to the current path point;
- the first manipulator, the calibration module, the atmospheric environment vacuum lock chamber, the vacuum environment vacuum lock chamber, and the second manipulator have corresponding action durations.
- the action duration corresponding to each current path point is determined according to the duration of the semiconductor process equipment in the action during actual processing. According to the action duration corresponding to the current path point of the target wafer to be processed, the running time of the target wafer to be processed from the wafer loading and unloading module to the current path point is calculated.
- the action time of the first manipulator is 1 second
- the action time of the calibration module is 2 seconds
- the action time of the atmospheric vacuum lock chamber is 1 second
- the action time of the vacuum vacuum lock chamber is 1 second
- the action time of the vacuum vacuum lock chamber is 1 second
- the action time of the second manipulator is 1 second.
- the current path point of the target wafer to be processed is the atmospheric vacuum lock chamber, that is, the running time of the target wafer to be processed from the wafer loading and unloading module to the atmospheric vacuum lock chamber is 4 seconds (the sum of the action time of the first manipulator, the action time of the calibration module and the action time of the atmospheric vacuum lock chamber).
- Sub-step S2055 subtracting the running time from the test wafer scheduling time point to obtain the target wafer to be processed scheduling time point corresponding to the target wafer to be processed.
- the time point obtained by subtracting the running time from the test chip scheduling time point is the target wafer to be processed corresponding to the target wafer to be processed scheduling time point.
- the simulation scheduling sequence starts scheduling the target wafer to be processed at the target wafer to be processed scheduling time point.
- Sub-step S2056 deleting the data from the target wafer to be processed scheduling time point to the test wafer scheduling time point corresponding to the target wafer to be processed in the simulation scheduling sequence.
- the data from the target wafer to be processed scheduling time point to the test wafer scheduling time point in the simulation scheduling sequence is deleted. All the actions and parameters executed in the simulation scheduling sequence during the period from the target wafer to be processed scheduling time point to the test wafer scheduling time point can be deleted, and the data can be rolled back to the target wafer to be processed scheduling time point at the current time.
- Step 206 setting a test wafer process path at the target wafer to be processed scheduling time point, and generating an executable scheduling sequence.
- the process path of the test piece is set at the scheduling time point of the target wafer to be processed, and the priority of scheduling the test piece is raised to the highest level, so that when the simulation scheduling sequence runs to the scheduling time point of the target wafer to be processed, the test piece is scheduled first. After the scheduling requirements of all test pieces are met, the updated simulation scheduling sequence is determined as the executable scheduling sequence.
- the process path of the test piece can be determined according to the actual path of the test piece from its loading and unloading position to the target processing chamber and then back to its loading and unloading position.
- test wafer process path corresponds to the test wafer priority
- test wafer process path is set at the target wafer to be processed scheduling time point
- an executable scheduling sequence is generated, including:
- Sub-step S2061 determining a target test piece process path based on the test piece priority
- test piece process path with the highest priority is the test piece process path currently required. Therefore, based on the test piece priority, the test piece process path with the highest priority can be determined from the test piece process paths as the target test piece process path.
- Sub-step S2062 adding the target test wafer process path to the target wafer to be processed scheduling time point;
- Add the target test piece process path to the target wafer to be processed scheduling time point that is, the next step after the target wafer to be processed scheduling time point is to execute the target test piece process path scheduling test piece.
- the process duration required to complete the entire process path of the target test piece is calculated.
- the target test piece process path is a test piece loading and unloading module (DummyPort), a first manipulator (ATM), a calibration module (Aligner), an atmospheric environment vacuum lock chamber (one of the slots of LoadLock), a vacuum environment vacuum lock chamber (another slot of LoadLock), a second manipulator (VTM), (, a processing chamber (PM1, PM2, PM3, PM4), a second manipulator, a vacuum environment vacuum lock chamber, an atmospheric environment vacuum lock chamber, a first manipulator, and a test piece loading and unloading module.
- the corresponding action durations are 1 second, 1 second, 2 seconds, 1 second, 1 second, 2 seconds, 3 seconds, 2 seconds, 1 second, 1 second, 1 second, and 1 second.
- the process duration is 17 seconds (the sum of the action durations corresponding to all path points of the target test piece process path).
- Sub-step S2064 adding the process duration to the target wafer to be processed scheduling time point to obtain the target test wafer process completion time point;
- the process duration is added on this basis, and the obtained time point is determined as the target test piece process completion time point.
- the target test piece process completion time point is used to represent the time point when the current test piece is completed.
- Sub-step S2065 at the target test piece process completion time point, clear the test piece priority and generate an executable scheduling sequence.
- the test piece priority is cleared so that the simulation scheduling sequence does not continue to schedule the test piece at the time point when the target test piece process is completed, and waits for the next test piece process with a higher priority to be scheduled again; thereby updating the simulation scheduling sequence to generate an executable scheduling sequence.
- test wafer scheduling time points there may be a situation where multiple different processing chambers need to schedule the use of test wafers, that is, there may be a situation where there are multiple test wafer scheduling time points.
- the target wafer to be processed scheduling time point After the step of setting the process path of the test piece, determine whether there is a next test piece scheduling time point in the simulation scheduling sequence according to the time sequence;
- next test piece scheduling time point is the last time point at which the semiconductor process equipment needs to schedule a test piece.
- next test piece scheduling time point determines the next test piece scheduling time point as the test piece scheduling time point, and perform the step of determining the target wafer to be processed when the simulation scheduling sequence runs to the test piece scheduling time point until there is no next test piece scheduling time point;
- the currently updated simulation scheduling sequence cannot be used as an executable scheduling sequence for controlling the processing of the preset semiconductor process equipment. It is necessary to continue to update the action of scheduling the test piece in the simulation scheduling sequence.
- the next test piece scheduling time point can be determined as the test piece scheduling time point, and the simulation scheduling sequence is continued to be executed at the test piece scheduling time point to run to the test piece scheduling time point, and the steps of determining the target wafer to be processed are determined, and the new target wafer to be processed and the corresponding target wafer to be processed scheduling time point are determined, so as to insert the action of scheduling the test piece at the new target wafer to be processed scheduling time point, and further update the simulation scheduling sequence; until there is no next test piece scheduling time point.
- the updated simulation scheduling sequence can accurately control the preset semiconductor process equipment to produce semiconductor chips.
- the step of generating an executable scheduling sequence is executed, and the simulation scheduling sequence updated at this time is determined as the executable scheduling sequence.
- Step 207 sending the executable scheduling sequence to a preset semiconductor process equipment, where the preset semiconductor process equipment is used to schedule the test piece for production based on the executable scheduling sequence.
- the executable scheduling sequence can be sent to a preset semiconductor process equipment.
- the preset semiconductor process equipment receives the executable scheduling sequence, controls the corresponding modules to run based on the actions in the executable scheduling sequence, and produces semiconductor chips.
- the test piece scheduling method of the embodiment of the present invention has good versatility and can support various types of wafers. And when the simulation scheduling sequence is run to schedule the wafer to be processed, the test piece scheduling is adjusted in parallel, so that the logic of scheduling the wafer to be processed and scheduling the test piece are decoupled, and the two are independent of each other, which can adapt to the changes of different process requirements more quickly.
- the priority of the test piece is adjusted to achieve the earliest test piece output, and re-scheduling, so that when the processing chamber needs a test piece, the test piece in the process path is closest to the processing chamber, saving the idle waiting time of the processing chamber, thereby improving the production capacity of semiconductor chips.
- the application system may specifically include the following five modules:
- Optimization scheduling module It adopts optimization scheduling algorithms such as finite state machine and extended finite state machine. According to the real-time status of the simulated system, it can optimize and calculate the optimal scheduling strategy (simulation scheduling sequence) without considering the potential test piece requirements.
- Simulation module The simulation of each equipment unit of the semiconductor combination equipment can be used to simulate the process control execution process of actual semiconductor process equipment.
- Dummy demand logic judgment module According to the system status of the simulation and the logic of the test piece usage rules, it is judged whether each processing chamber needs the test piece usage rules in this simulation state, and the required test piece usage rule information is output;
- State rollback module determines the rollback time point, triggers the simulation module to perform state rollback, and modifies the process path and priority of the corresponding test piece in the simulation module;
- Scheduling sequence output module According to the scheduling action sequence recorded by the simulation system, organize and output the scheduling sequence list (executable sequence).
- the wafer scheduling method flow may refer to FIG. 5 .
- Step 1 Use a computer program to simulate the machine, record all process actions and states of the machine, and initialize or update the simulation program according to the actual state of the semiconductor assembly equipment;
- Step 2 Remove the wafers to be processed in LoadPort (wafer loading and unloading position) and DummyPort (test wafer loading and unloading position) in order of priority;
- Step 3 Using the optimization scheduling algorithm, the scheduling sequence (simulation scheduling sequence) is solved without considering the potential dummy demand (i.e., the test wafer is scheduled as the wafer to be processed);
- Step 4 Run the simulation program and execute the next action in the simulation program in chronological order; if the next action is that the Dummy piece (test piece) that has completed the process returns to the DummyPort (test piece loading and unloading position), clear the process path and priority of the Dummy piece.
- Step 5 Determine whether all (test slice) scheduling tasks are completed. If yes, execute step 6; otherwise, execute step 7.
- Step 6 Arrange and output all process actions recorded by the simulation program as the machine executable scheduling sequence, and the program ends and the executable scheduling sequence is output;
- Step 7 According to the usage logic rules of the Dummy sheet (test sheet usage rules), loop to determine whether each PM (processing chamber) currently needs a Dummy sheet. If all PMs do not need it, execute step 4, otherwise execute step 8.
- Step 8 Record the PM that needs the dummy piece as PM_dummy (target processing chamber). If there are multiple PMs that need the dummy piece, select a PM record according to the priority.
- Step 9 Determine whether there are wafers that have left the LoadPort (wafer loading and unloading position to be processed) and have not been processed (i.e., wafers to be processed on the transport path). If so, execute step 10; otherwise, execute step eleven;
- Step 10 Find the last wafer to be processed in the steps of LoadPort (wafer loading and unloading position to be processed) -> ATM (first manipulator) -> Aligner (calibration module) -> ATM (second manipulator) -> LoadLock atmospheric environment (atmospheric environment vacuum lock chamber) -> LoadLock vacuum environment (vacuum environment vacuum lock chamber);
- T2 The time point when this chip leaves LoadPort is obtained as T2 (the scheduling time point of the target chip to be processed); roll back the status of all devices, chips and Dummy chips in the simulation system to the T2 time point, and delete all action and status records from T2 to the current time in the simulation program.
- Step 11 Find the first Dummy slice according to the priority of the Dummy slice; initialize the process path of this Dummy slice, and set the target pm to PM_dummy; regard this Dummy slice as a wafer to be processed, and set the priority to the highest; go to step 2.
- FIG. 6 a block diagram of an electronic device according to an embodiment of the present invention is shown; an electronic device 601 is connected to a semiconductor process device,
- the electronic device 601 is used to execute the above wafer scheduling method.
- the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
- An embodiment of the present invention also provides a computer-readable storage medium, on which a computer program is stored.
- a computer program is stored.
- the various processes of the above-mentioned test piece scheduling method embodiment are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.
- the embodiments of the embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the embodiments of the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the embodiments of the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
- computer-usable storage media including but not limited to disk storage, CD-ROM, optical storage, etc.
- These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing terminal device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing terminal device generate a device for implementing the functions specified in one process or multiple processes in the flowchart and/or one box or multiple boxes in the block diagram.
- These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing terminal device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a manufactured product including an instruction device that implements the functions specified in one or more processes in the flowchart and/or one or more boxes in the block diagram.
- These computer program instructions can also be loaded onto a computer or other programmable data processing terminal device so that a series of operating steps are executed on the computer or other programmable terminal device to produce computer-implemented processing, so that the instructions executed on the computer or other programmable terminal device provide steps for implementing the functions specified in one or more processes in the flowchart and/or one or more boxes in the block diagram.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Computer Hardware Design (AREA)
- Development Economics (AREA)
- Testing Or Measuring Of Semiconductors Or The Like (AREA)
Abstract
Description
Claims (10)
- 一种晶片调度方法,其特征在于,所述晶片包括测试片和待加工晶片,所述方法包括:当仿真调度序列运行至测试片调度时间点时,确定目标待加工晶片,所述仿真调度序列用于调度所述待加工晶片;将所述仿真调度序列回滚至所述目标待加工晶片对应的目标待加工晶片调度时间点;在所述目标待加工晶片调度时间点上设定测试片工艺路径,生成可执行调度序列。
- 根据权利要求1所述的方法,其特征在于,所述方法还包括:在运行所述仿真调度序列时,获取测试片使用规则,所述测试片使用规则包括所述测试片调度时间点和所述测试片工艺路径。
- 根据权利要求1所述的方法,其特征在于,所述仿真调度序列包括所述待加工晶片对应的传输路径,所述传输路径依次经过晶片装卸模块、第一机械手、校准模块、大气环境真空锁腔、真空环境真空锁腔、第二机械手;所述当仿真调度序列运行至所述测试片调度时间点时,确定目标待加工晶片,包括:当所述仿真调度序列运行至所述测试片调度时间点时,确定是否存在处于所述传输路径的待加工晶片;当不存在处于所述传输路径的待加工晶片时,确定所述目标待加工晶片为空;当存在处于所述传输路径的待加工晶片时,按照所述传输路径的传输顺序对所述处于所述传输路径的待加工晶片进行排序,生成待加工晶片序列;确定所述待加工晶片序列中末端的待加工晶片为所述目标待加工晶片。
- 根据权利要求3所述的方法,其特征在于,所述目标待加工晶片为空时,所述将所述仿真调度序列回滚至所述目标待加工晶片对应的目标待加工晶片调度时间点,包括:确定所述测试片调度时间点为所述目标待加工晶片对应的目标待加工晶片调度时间点;将所述仿真调度序列中所述目标待加工晶片对应的目标待加工晶片调度时间点至所述测试片调度时间点内的数据删除。
- 根据权利要求3所述的方法,其特征在于,当所述目标待加工晶片为所述待加工晶片序列中末端的待加工晶片时,所述将所述仿真调度序列回滚至所述目标待加工晶片对应的目标待加工晶片调度时间点,包括:确定所述目标待加工晶片对应的当前路径点,所述当前路径点为所述第一机械手、所述校准模块、所述第二机械手、所述大气环境真空锁腔、所述真空环境真空锁腔中的一个;计算由所述晶片装卸模块运行至所述当前路径点的运行时长;将所述测试片调度时间点减去所述运行时长,得到所述目标待加工晶片对应的目标待加工晶片调度时间点;将所述仿真调度序列中所述目标待加工晶片对应的目标待加工晶片调度时间点至所述测试片调度时间点内的数据删除。
- 根据权利要求1所述的方法,其特征在于,所述测试片工艺路径对应有测试片优先级,所述在所述目标待加工晶片调度时间点上设定所述测试片工艺路径,生成可执行调度序列,包括:基于所述测试片优先级,确定目标测试片工艺路径;将所述目标测试片工艺路径添加至所述目标待加工晶片调度时间点上;计算所述目标测试片工艺路径的工艺时长;在所述目标待加工晶片调度时间点上,增加所述工艺时长,得到目标测试片工艺完成时间点;在所述目标测试片工艺完成时间点上,对所述测试片优先级清零,生成可执行调度序列。
- 根据权利要求6所述的方法,其特征在于,所述测试片调度时间点为多个,在所述目标待加工晶片调度时间点上设定测试片工艺路径的步骤之后,所述方法还包括:按照时间顺序,判断所述仿真调度序列是否存在下一个测试片调度时间点;当存在所述下一个测试片调度时间点时,确定所述下一个测试片调度时间点为所述测试片调度时间点,执行所述当仿真调度序列运行至测试片调度时间点时,确定目标待加工晶片的步骤,直至不存在所述下一个测试片调度时间点;当不存在所述下一个测试片调度时间点时,执行所述生成可执行调度序列的步骤。
- 根据权利要求1所述的方法,其特征在于,所述方法还包括:发送所述可执行调度序列至预设半导体工艺设备,所述预设半导体工艺设备用于基于所述可执行调度序列调度所述测试片进行生产。
- 根据权利要求1所述的方法,其特征在于,所述方法还包括:记录预设半导体工艺设备的运行状态;基于所述预设半导体工艺设备的运行状态,生成所述仿真调度序列。
- 一种电子设备,其特征在于,所述电子设备与半导体工艺设备连接,所述电子设备用于执行权利要求1-9任一项所述的晶片调度方法。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211318051.X | 2022-10-26 | ||
| CN202211318051.XA CN115794506B (zh) | 2022-10-26 | 2022-10-26 | 一种晶片调度方法和一种电子设备 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2024088294A1 true WO2024088294A1 (zh) | 2024-05-02 |
| WO2024088294A9 WO2024088294A9 (zh) | 2025-01-09 |
Family
ID=85433841
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2023/126409 Ceased WO2024088294A1 (zh) | 2022-10-26 | 2023-10-25 | 一种晶片调度方法和一种电子设备 |
Country Status (3)
| Country | Link |
|---|---|
| CN (1) | CN115794506B (zh) |
| TW (1) | TWI879172B (zh) |
| WO (1) | WO2024088294A1 (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20210374625A1 (en) * | 2018-07-19 | 2021-12-02 | Beijing Naura Microelectronics Equipment Co., Ltd. | Method and apparatus for material dispatching, and vertical furnace apparatus |
| CN118943050A (zh) * | 2024-07-23 | 2024-11-12 | 北京北方华创微电子装备有限公司 | 用于半导体工艺设备的晶片调度序列确定方法及电子设备 |
| CN119846910A (zh) * | 2025-01-20 | 2025-04-18 | 三河建华高科有限责任公司 | 一种用于匀胶显影设备的调度方法 |
| WO2025237230A1 (zh) * | 2024-05-17 | 2025-11-20 | 北京北方华创微电子装备有限公司 | 一种调度方法及相关装置 |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115794506B (zh) * | 2022-10-26 | 2023-10-13 | 北京北方华创微电子装备有限公司 | 一种晶片调度方法和一种电子设备 |
| CN116442034A (zh) * | 2023-04-23 | 2023-07-18 | 上海华力集成电路制造有限公司 | 减小不同批次晶圆化学机械研磨厚度差异的方法和系统 |
| CN119400735B (zh) * | 2024-10-31 | 2026-04-21 | 北京北方华创微电子装备有限公司 | 调度方法、调度设备及半导体工艺设备 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5928389A (en) * | 1996-10-21 | 1999-07-27 | Applied Materials, Inc. | Method and apparatus for priority based scheduling of wafer processing within a multiple chamber semiconductor wafer processing tool |
| US6122566A (en) * | 1998-03-03 | 2000-09-19 | Applied Materials Inc. | Method and apparatus for sequencing wafers in a multiple chamber, semiconductor wafer processing system |
| CN101459098A (zh) * | 2007-12-14 | 2009-06-17 | 北京北方微电子基地设备工艺研究中心有限责任公司 | 一种晶片优化调度的方法和装置 |
| CN105185731A (zh) * | 2015-08-17 | 2015-12-23 | 北京七星华创电子股份有限公司 | 一种半导体热处理设备的晶片调度控制方法及系统 |
| CN115794506A (zh) * | 2022-10-26 | 2023-03-14 | 北京北方华创微电子装备有限公司 | 一种晶片调度方法和一种电子设备 |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20080275582A1 (en) * | 2004-11-19 | 2008-11-06 | Nettles Steven C | Scheduling AMHS pickup and delivery ahead of schedule |
| US7610111B2 (en) * | 2007-02-13 | 2009-10-27 | Tech Semiconductor Singapore Pte Ltd | Method and system for wafer lot order |
| JP2009158736A (ja) * | 2007-12-27 | 2009-07-16 | Nikon Corp | クラスタツールのスケジューリング管理方法 |
| CN101740441B (zh) * | 2008-11-04 | 2012-04-11 | 北京北方微电子基地设备工艺研究中心有限责任公司 | 一种机械手调度方法、装置及等离子体处理设备 |
| US20110288808A1 (en) * | 2010-05-20 | 2011-11-24 | International Business Machines Corporation | Optimal test flow scheduling within automated test equipment for minimized mean time to detect failure |
| CN107871194B (zh) * | 2016-09-28 | 2020-10-16 | 北京北方华创微电子装备有限公司 | 一种生产线设备的调度方法和装置 |
| CN117522018A (zh) * | 2018-07-19 | 2024-02-06 | 北京北方华创微电子装备有限公司 | 一种物料优化调度的方法和设备 |
| CN111339720B (zh) * | 2020-02-28 | 2023-08-29 | 深圳市赤狐软件技术有限公司 | 基于大数据采集的芯片信息生成方法、装置及计算机设备 |
| CN111539556A (zh) * | 2020-04-02 | 2020-08-14 | 北京北方华创微电子装备有限公司 | 晶片调度方法及装置 |
| CN114169805A (zh) * | 2022-01-10 | 2022-03-11 | 北京烁科精微电子装备有限公司 | 一种晶圆调度方法、装置、存储介质及电子设备 |
| CN114883222B (zh) * | 2022-05-07 | 2025-11-11 | 北京北方华创微电子装备有限公司 | 晶圆的调度方法、装置及半导体工艺设备 |
| CN114818395B (zh) * | 2022-06-29 | 2022-09-06 | 埃克斯工业(广东)有限公司 | 一种基于ropn模型的生产调度仿真方法及其装置 |
-
2022
- 2022-10-26 CN CN202211318051.XA patent/CN115794506B/zh active Active
-
2023
- 2023-10-25 WO PCT/CN2023/126409 patent/WO2024088294A1/zh not_active Ceased
- 2023-10-25 TW TW112140811A patent/TWI879172B/zh active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5928389A (en) * | 1996-10-21 | 1999-07-27 | Applied Materials, Inc. | Method and apparatus for priority based scheduling of wafer processing within a multiple chamber semiconductor wafer processing tool |
| US6122566A (en) * | 1998-03-03 | 2000-09-19 | Applied Materials Inc. | Method and apparatus for sequencing wafers in a multiple chamber, semiconductor wafer processing system |
| CN101459098A (zh) * | 2007-12-14 | 2009-06-17 | 北京北方微电子基地设备工艺研究中心有限责任公司 | 一种晶片优化调度的方法和装置 |
| CN105185731A (zh) * | 2015-08-17 | 2015-12-23 | 北京七星华创电子股份有限公司 | 一种半导体热处理设备的晶片调度控制方法及系统 |
| CN115794506A (zh) * | 2022-10-26 | 2023-03-14 | 北京北方华创微电子装备有限公司 | 一种晶片调度方法和一种电子设备 |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20210374625A1 (en) * | 2018-07-19 | 2021-12-02 | Beijing Naura Microelectronics Equipment Co., Ltd. | Method and apparatus for material dispatching, and vertical furnace apparatus |
| US12476123B2 (en) * | 2018-07-19 | 2025-11-18 | Beijing Naura Microelectronics Equipment Co., Ltd. | Method and apparatus for material dispatching, and vertical furnace apparatus |
| WO2025237230A1 (zh) * | 2024-05-17 | 2025-11-20 | 北京北方华创微电子装备有限公司 | 一种调度方法及相关装置 |
| CN118943050A (zh) * | 2024-07-23 | 2024-11-12 | 北京北方华创微电子装备有限公司 | 用于半导体工艺设备的晶片调度序列确定方法及电子设备 |
| CN119846910A (zh) * | 2025-01-20 | 2025-04-18 | 三河建华高科有限责任公司 | 一种用于匀胶显影设备的调度方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115794506A (zh) | 2023-03-14 |
| TW202418081A (zh) | 2024-05-01 |
| CN115794506B (zh) | 2023-10-13 |
| WO2024088294A9 (zh) | 2025-01-09 |
| TWI879172B (zh) | 2025-04-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2024088294A1 (zh) | 一种晶片调度方法和一种电子设备 | |
| TWI575561B (zh) | 用於控制多批工件處理的方法、儲存媒體及系統 | |
| US8655472B2 (en) | Scheduler, substrate processing apparatus, and method of transferring substrates in substrate processing apparatus | |
| EP4488777A1 (en) | Wafer transfer supervision control method and system, computer device and storage medium | |
| US20240210926A1 (en) | Material scheduling method and device of semiconductor processing equipment | |
| TWI489236B (zh) | Processing instructions, processing instructions, computer programs and processing devices | |
| CN113867295A (zh) | 一种基于数字孪生的制造车间agv动态调度方法、系统、设备及存储介质 | |
| CN113871330B (zh) | 一种物料调度方法和一种半导体工艺设备 | |
| US20090317924A1 (en) | Method for optimizing the routing of wafers/lots based on yield | |
| CN114373699B (zh) | 一种物料传输方法和一种半导体工艺设备 | |
| CN116053175B (zh) | 一种晶圆调度方法、装置及半导体设备 | |
| TW202427256A (zh) | 製程任務啟動方法、製程任務排程方法、電子設備、存儲介質和半導體製程設備 | |
| US20250362668A1 (en) | Rapid-response intelligent scheduling method and system for semiconductor packaging and testing workshop | |
| US10698392B2 (en) | Using graphics processing unit for substrate routing and throughput modeling | |
| TW523800B (en) | Method and apparatus for determining scheduling for wafer processing in cluster tools with integrated metrology and defect control | |
| CN118919446A (zh) | 物料调度方法及半导体工艺设备 | |
| CN113436991B (zh) | 用于批处理半导体设备的晶圆调度方法及系统 | |
| WO2025152839A1 (zh) | 物料路径建立方法、物料调度方法及半导体工艺设备 | |
| CN119133037A (zh) | 一种多腔体蚀刻设备的生产排程方法及相关设备 | |
| CN119987295A (zh) | 调度方法、装置、半导体工艺设备及计算机可读存储介质 | |
| CN119250328A (zh) | 一种晶圆调度系统下的动态节点保留的a*路径优化方法 | |
| US20080201003A1 (en) | Method and system for reticle scheduling | |
| CN120613289A (zh) | 晶圆调度方法及半导体工艺设备 | |
| CN117808425B (zh) | 基于酸洗工艺失效约束条件的机台派工方法以及系统 | |
| US12451381B2 (en) | Scheduling multiple production steps under Q-time constraints in semiconductor manufacturing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23881871 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 11202502649S Country of ref document: SG |
|
| WWP | Wipo information: published in national office |
Ref document number: 11202502649S Country of ref document: SG |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 23881871 Country of ref document: EP Kind code of ref document: A1 |