WO2023279587A1 - Pre-bundling arrangement apparatus of bundling device, and bundling device - Google Patents

Pre-bundling arrangement apparatus of bundling device, and bundling device Download PDF

Info

Publication number
WO2023279587A1
WO2023279587A1 PCT/CN2021/127224 CN2021127224W WO2023279587A1 WO 2023279587 A1 WO2023279587 A1 WO 2023279587A1 CN 2021127224 W CN2021127224 W CN 2021127224W WO 2023279587 A1 WO2023279587 A1 WO 2023279587A1
Authority
WO
WIPO (PCT)
Prior art keywords
track
along
line body
product
length direction
Prior art date
Application number
PCT/CN2021/127224
Other languages
French (fr)
Chinese (zh)
Inventor
王刘洋
曹卉
周涛
凌霄
Original Assignee
江苏宏芯亿泰智能装备有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 江苏宏芯亿泰智能装备有限公司 filed Critical 江苏宏芯亿泰智能装备有限公司
Publication of WO2023279587A1 publication Critical patent/WO2023279587A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/50Stacking one article, or group of articles, upon another before packaging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B13/00Bundling articles
    • B65B13/02Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/36Arranging and feeding articles in groups by grippers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/40Arranging and feeding articles in groups by reciprocating or oscillatory pushers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/42Arranging and feeding articles in groups by roller-ways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B35/00Supplying, feeding, arranging or orientating articles to be packaged
    • B65B35/30Arranging and feeding articles in groups
    • B65B35/44Arranging and feeding articles in groups by endless belts or chains

Definitions

  • the present disclosure relates to the technical field of belt equipment, and in particular, to a belt finishing device and belt equipment.
  • the belting machine is used to pack the product belts.
  • the products are manually stacked and sorted, and then the products are placed on the belting machine for belting. In this way, the degree of automation is low and the work efficiency is low.
  • the purpose of the present disclosure is to provide a pre-bundle finishing device and a bundle belt equipment, the pre-bundle finishing device can solve the problem of low efficiency of manual palletizing before the bundle, and has a high degree of automation, high work efficiency and The advantage of low labor cost.
  • the present disclosure provides a pre-bundle finishing device for belting equipment.
  • the pre-bundle finishing device includes: a conveying line body, on which a product to be tied is placed; a transport mechanism, the transport mechanism A clamping assembly is provided on the top, and the clamping assembly has two clamping structures oppositely arranged along the width direction of the conveying line body, for releasably grasping the belt to be drawn in the width direction
  • the transport mechanism is used to move the clamping assembly between the conveying line body and the banding machine, so as to transport the product to be banded on the transporting line body to the banding machine; and
  • a positioning mechanism the positioning mechanism includes a blocking assembly and a pushing assembly arranged at intervals along the length direction of the conveying line body, between the blocking assembly and the pushing assembly is used to place the product to be belted
  • the pusher assembly includes a pusher structure and a first track, the pusher structure is movably arranged on the first track, and is used for pushing the
  • the conveying line body is sequentially provided with an incoming material stacking area and a positioning area along the length direction, the incoming material stacking area is used to receive the product to be belted from an upstream device, and the positioning mechanism Set in the positioning area, the conveying mechanism is used to transport the product to be belted in the incoming material stacking area to the positioning area through the clamping assembly.
  • the clamping structure includes a splint extending along the length direction and jaws arranged at the bottom end of the splint, the number of the jaws is multiple, and the multiple jaws extend along the length
  • the direction is arranged at intervals
  • the positioning area and the incoming material stacking area are provided with a plurality of transverse passages at intervals along the length direction, and the plurality of transverse passages extend along the width direction, and the transverse passages are used for For the jaws to pass through to grab the product to be tied.
  • the first rail is arranged below the conveying line body and extends along the length direction
  • the pushing structure includes a push rod extending along the height direction of the conveying line body, and the positioning area A longitudinal channel extending along the length direction and used for the top end of the push rod to pass through is provided.
  • the pusher structure further includes a plurality of pusher blocks arranged at the top of the push rod, the plurality of pusher blocks are arranged at intervals along the width direction, and two adjacent pusher blocks between the push rod and the push block adjacent to it are detachably connected through a connecting plate, and a plurality of push blocks can pass through the transverse channel of the positioning area to Driven by the push rod, the product to be tied is pushed along the length direction.
  • the positioning area is provided with a plurality of avoidance groove passages extending along the length direction, and the bottom end of the pushing block is used to insert into the avoidance groove passages after passing through the transverse passages of the positioning area And it can move along the extension direction of the avoidance groove channel.
  • a plurality of universal balls are provided on the upper surface of the positioning area, and the plurality of universal balls are used for slidingly bearing the product to be belted.
  • an anti-wear layer is provided on the upper surface of the transmission line body, and the anti-wear layer is Teflon glued on the transmission line body.
  • the pushing assembly further includes a first motor, a first transmission mechanism and a first mounting base, the pushing structure is arranged on the first mounting base, and the first mounting base passes through the first mounting base.
  • a transmission mechanism moves along the length direction
  • the first transmission mechanism includes a first lead screw connected to the first motor for driving, and the first lead screw is rotatably arranged on the first track around its own axis and extending along the length direction
  • the first mounting seat is threadedly connected with the first lead screw, and the first mounting seat abuts against the first rail to restrict the first mounting seat to follow the The first lead screw rotates.
  • the first mounting base is provided with a first drive mechanism in transmission connection with the pusher structure for driving the pusher structure to move along the height direction, and the first drive mechanism is configured It is the first air cylinder, the cylinder body of the first air cylinder is fixedly connected to the first installation seat, and the piston rod is fixedly connected to the pushing structure.
  • the stopper assembly includes a baffle and a second driving mechanism
  • the baffle extends along the height direction, and is used to stop at one end of the product to be belted along the length direction
  • the baffle is connected to the conveying line body through the second driving mechanism
  • the second driving mechanism is used to drive the baffle to move along the height direction
  • the second driving mechanism is configured as a second cylinder, the cylinder body of the second cylinder is fixedly connected to the conveying line body, and the piston rod is fixedly connected to the baffle plate.
  • the transport mechanism includes two track mechanisms arranged symmetrically and at intervals with respect to the length direction, the two clamping structures are respectively arranged on the corresponding track mechanism, and the track mechanism includes An extended second rail, a third rail extending along the width direction, and a second mount, the third rail is movably disposed on the second rail, and the second mount is movably disposed on On the third track, the clamping structure is movably arranged on the second mounting seat along the height direction.
  • the second rail is provided with a second motor and a second transmission mechanism
  • the third rail moves along the length direction through the second transmission mechanism
  • the second transmission mechanism includes The second lead screw connected by the second motor drives, the second lead screw is rotatably arranged on the second track around its own axis and extends along the length direction, the third track is connected to the second lead screw The rod is threadedly connected, and the third track abuts against the second track to limit the rotation of the third track following the second lead screw.
  • a third motor and a third transmission mechanism are provided on the third track, and the second mounting seat moves along the width direction through the third transmission mechanism, and the third transmission mechanism includes The third lead screw is driven and connected by the third motor, and the third lead screw is rotatably arranged on the third rail and extends along the width direction around its own axis, and the second mounting base and the first The three lead screws are threadedly connected, and the second mounting seat abuts against the third track to restrict the rotation of the second mounting seat following the third lead screw.
  • the second mounting base is provided with a third driving mechanism that is transmission-connected to the clamping structure, so as to drive the clamping structure to move along the height direction, and the third driving mechanism is configured It is a third air cylinder, the cylinder body of the third air cylinder is fixedly connected to the second installation seat, and the piston rod is fixedly connected to the clamping structure.
  • Another aspect of the present disclosure also provides a strapping device, the strapping device includes a strapping machine and the bundle finishing device of the strapping device as described above, the discharge end of the conveying line body is connected to the bundle The belt machine is docked, and the upper surface of the belt machine is provided with a groove for avoiding the clamping structure.
  • the end of the belt machine away from the conveying line body is docked with a receiving belt line
  • the receiving belt line includes a receiving roller and a belt line arranged in sequence along the length direction
  • the receiving roller is docked on
  • the discharge end of the conveying line body extends along the width direction
  • the conveying mechanism is used to convey the products on the belt machine to the receiving roller through the clamping assembly, and the receiving roller
  • the number is multiple, and a plurality of the receiving rollers are arranged at intervals along the length direction, wherein the receiving rollers are power rollers.
  • the clamping assembly is used to organize and align the belt products to be aligned in the width direction, and the positioning mechanism is arranged to align the belt products to be belted in the length direction, and The sorted products to be tied are transported to the banding machine by the handling mechanism for banding, which can solve the problem of low efficiency of manual palletizing before bunching.
  • the conveyor line is used to receive the products to be belted from the upstream equipment, and the products to be belted are stacked on the conveyor line. The number of stacks is set according to the customer's requirements.
  • the clamping components Grab the product to be tied and align the product to be tied in the width direction through the grasping process, then the pusher component moves, that is, the pusher structure moves along the first track to push the product to be tied toward the stop
  • the material component moves until the product to be tied is stopped by the stopper component, so that the product to be tied is aligned in the length direction, and the finishing process before the bundle is completed, and then the handling mechanism will pass the finished product to be tied through the clamping component Transfer to the belting machine for belting.
  • the pre-bundle sorting device of the strapping equipment provided by the present disclosure does not require manual participation in the palletizing and sorting process, has a high degree of automation, high work efficiency, and low labor costs.
  • FIG. 1 is a perspective view of a harness device provided in an exemplary embodiment of the present disclosure
  • FIG. 2 is a top view of a harness device provided in an exemplary embodiment of the present disclosure
  • Fig. 3 is a perspective view of a conveying line body of a bundle finishing device provided in an exemplary embodiment of the present disclosure
  • Fig. 4 is a top view of the conveying line body of the bundle finishing device provided in the exemplary embodiment of the present disclosure
  • Fig. 5 is a left side view of the conveying line body of the bundle finishing device provided in the exemplary embodiment of the present disclosure
  • Fig. 6 is a partially enlarged schematic diagram of position A in Fig. 3;
  • Fig. 7 is a perspective view of the pushing assembly of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure
  • Fig. 8 is a perspective view of a transport mechanism of a bundle finishing device provided in an exemplary embodiment of the present disclosure
  • Fig. 9 is a top view of one track mechanism of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure.
  • Fig. 10 is a front view of one of the track mechanisms of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure
  • Fig. 11 is a perspective view of a clamping structure of a bundle finishing device provided in an exemplary embodiment of the present disclosure.
  • 1-Conveying line body 110-Incoming material stacking area; 120-Positioning area; 130 Horizontal passage; 140-Longitudinal passage; Plate; 2-handling mechanism; 210-track mechanism; 211-second track; 212-third track; 213-second mounting seat; 214-third slide rail; 215-third slide block; 216-fourth slide Rail; 217-the fourth slider; 220-the second motor; 230-the third motor; 240-the third screw; 250-the third drive mechanism; 3-clamping structure; 310-splint; 320-jaw; 4-banding machine; 410-groove; 5-blocking assembly; 510-baffle; 520-second drive mechanism; 6-pushing assembly; 610-pushing structure; Block; 613-connecting plate; 620-the first track; 630-the first motor; 640-the first mounting seat; 650-the first screw; 660-the first driving mechanism; 1 slide rail; 7-universal ball; 8-undertake belt line; 810-
  • the pre-bundle finishing device for belt equipment, which is especially suitable for hard products, such as sheet-shaped hard products such as liquid crystal panels.
  • the pre-bundle finishing device includes: a conveying line body 1, on which a product to be tied is placed; a transport mechanism 2, on which a clamping assembly is arranged,
  • the clamping assembly has two clamping structures 3 oppositely arranged along the width direction of the conveying line body 1, for releasably grabbing the products to be belted in the width direction, and the handling mechanism 2 is used for connecting the conveying line body 1 and the bundle Move the clamping assembly between the belt machines 4, so as to transport the product to be belted on the conveyor line body 1 to the belt machine 4;
  • the material component 5 and the material pushing component 6 are used to place the product to be belted between the material blocking component 5 and the material pushing component 6, and the material pushing component 6 includes a material pushing structure 610 and a first track 620,
  • the clamping assembly is used to organize and align the belt products to be aligned in the width direction, and the positioning mechanism 6 is arranged to align the belt products to be aligned in the length direction, And through the transport mechanism 2, the sorted products to be tied are transported to the band machine 4 for banding, which can solve the problem of low efficiency of manual palletizing before bunching.
  • the conveyor line body 1 is used to receive the products to be belted from the upstream equipment. The products to be belted are stacked on the conveyor line body 1. The number of stacks is set according to the customer's requirements.
  • the clamping The holding assembly grasps the product to be belted and makes the product to be belted aligned in the width direction through the grasping process, and then the pusher assembly 6 moves, that is, the pusher structure 610 moves along the first track 620 for pushing the product to be belted
  • the belted product moves towards the stopper assembly 5 until the product to be belted is stopped by the stopper assembly 5, so that the belted product is aligned in the length direction and the finishing process before the bundle is completed, and then the transport mechanism 2 passes through the clamping assembly
  • the finished product to be tied is transported to the belt machine 4 for belting.
  • the pre-bundle sorting device of the strapping equipment provided by the present disclosure does not require manual participation in the palletizing and sorting process, has a high degree of automation, high work efficiency, and low labor costs.
  • the conveying line body 1 is sequentially provided with an incoming material stacking area 110 and a positioning area 120 along the length direction, and the incoming material stacking area 110 is used to receive the products to be belted from the upstream equipment.
  • the positioning mechanism is arranged in the positioning area 120 . In this way, the incoming material stacking area 110 receives the products to be belted from upstream equipment, such as liquid crystal panels, etc.
  • the transport mechanism 2 transports the products to be belted to the positioning area through the clamping assembly 120 , in the positioning area 120 , through the clamping of the clamping assembly in the width direction and the alignment of the positioning mechanism 6 in the length direction, the products to be belted can be gathered neatly. While the positioning area 120 is arranging the products to be tied, the incoming material stacking area 110 can continue to receive the products to be tied from the upstream equipment, and the handling mechanism 2 will place the finished products to be tied on the belt machine 4 and bundle them. After the tape ends, the conveying mechanism 2 controls the clamping assembly to return to the incoming material stacking area 110 to repeat the above actions.
  • the aforementioned upstream equipment can be understood as equipment upstream of the bundle finishing device when the bundle finishing device is applied to a production line, such as a liquid crystal panel production line, which is not specifically limited in the present disclosure.
  • the clamping structure 3 includes a clamping plate 310 extending in the There are multiple jaws 320 at the bottom, and multiple jaws 320 are arranged at intervals along the length direction.
  • the positioning area 120 and the incoming material stacking area 110 are evenly provided with a plurality of transverse passages 130 at intervals along the length direction.
  • a plurality of transverse passages 130 extend along the width direction, and the transverse passages 130 are used for the jaws 320 to pass through to grab the product to be belted.
  • the jaws 320 pass through the transverse channel 130 from top to bottom, and then clamp the product to be belted by the close of the two clamping plates 310, and in the process the two clamping plates 310 is used to align the product to be tied in the width direction.
  • the jaw 320 is used to support the bottom of the product to be tied to prevent it from falling.
  • Jaw 320 can be configured in any suitable manner, for example, as shown in FIG. Used to be fixedly connected to the splint 310 , the second plate extends toward the side where the product to be tied is located, and is used to support the bottom of the product to be tied.
  • the first rail 620 is disposed below the conveying line body 1 and extends along the length direction
  • the pushing structure 610 includes a push rod extending along the height direction of the conveying line body 1 611
  • the positioning area 120 is provided with a longitudinal channel 140 extending along the length direction and used for the top end of the push rod 611 to pass through.
  • setting the first track 620 below the conveying line body 1 can save the space above the conveying line body 1 , and at the same time, it is used to avoid the transport mechanism 2 to transport the products to be belted from the material stacking area 110 to the positioning area 120 .
  • Blocks 612 are arranged at intervals along the width direction, between two adjacent pushing blocks 612, between the push rod 611 and its adjacent pushing blocks 612 are detachably connected by connecting plate 613, and a plurality of pushing blocks 612 can pass through the transverse channel 130 of the positioning area 120 so as to be driven by the push rod 611 to push the product to be belted along the length direction.
  • a plurality of pushing blocks 612 can pass through the transverse channel 130 of the positioning area 120 so as to be driven by the push rod 611 to push the product to be belted along the length direction.
  • the quantity of the pushing blocks 612 can be set according to the size of the product in the width direction, which is not specifically limited in this disclosure.
  • the pusher block 612 is detachably installed through the connecting plate 613, which is convenient for adjusting the quantity of the pusher block 612, wherein the detachable connection method can be threaded connection, for example, the connection is made by fasteners such as bolts or screws.
  • the plate 613 is connected to the pushing block 612 or the pushing rod 611, but the present disclosure is not limited thereto.
  • the positioning area 120 is provided with a plurality of avoidance groove passages 150 extending along the length direction, and the pushing block 612 passes through the transverse passage 130 of the positioning area 120 and then The bottom end is used for inserting into the avoidance groove channel 150 and can move along the extending direction of the avoidance groove channel 150 .
  • the pushing block 612 can be During the pushing process, it can push the bottom layer of the product to be tied to prevent jamming caused by omission.
  • the transmission line body 1 includes a plurality of support plates 160 arranged at intervals along the length direction, and the plurality of support plates 160 all extend along the width direction, and the plurality of support plates 160
  • the plate 160 is configured such that a transverse channel 130 , a longitudinal channel 140 and an escape groove channel 150 are correspondingly formed on the conveying line body 1 .
  • the gap between any adjacent two support plates 160 forms a transverse channel 130
  • the support plate 160 of the positioning area 120 includes a first support plate 161 and a second support plate 162 arranged at intervals along the width direction, and the positioning area 120
  • the gaps between the first support plate 161 and the second support plate 162 of the plurality of support plates 160 are arranged along the length direction and jointly form the longitudinal passage 140, and the plurality of support plates 160 in the positioning area 120 are all formed with avoidance grooves.
  • the escape grooves are arranged along the length direction and jointly form the escape groove channel 150 .
  • the upper surface of the positioning area 120 A plurality of universal balls 7 are provided, and the plurality of universal balls 7 are used to slide and carry the product to be belted. In this way, the friction between the multiple universal balls 7 and the product to be tied can be reduced as much as possible, so as to prevent the product from being slipped and scratched.
  • universal ball 7 can adopt steel universal ball.
  • the upper surface of the conveying line body 1 is provided with an anti-friction layer to reduce the coefficient of friction with the product to be belted and prevent the product to be belted from being worn.
  • the wear-resistant layer can be constructed in any suitable manner, for example, it can be Teflon glued on the transmission line body 1 . Teflon has the characteristics of extremely low friction coefficient, which can effectively avoid wear and tear on the products to be belted.
  • the pusher assembly 6 further includes a first motor 630, a first transmission mechanism, and a first mount 640, and the pusher structure 610 is disposed on the first mount 640,
  • the first mounting base 640 moves along the length direction through the first transmission mechanism. In this way, the movement of the pushing structure 610 along the length direction can be realized by the first motor 630 and the first transmission mechanism.
  • the first transmission mechanism can be constructed in any suitable manner. For example, as shown in FIG. It is arranged on the first rail 620 and extends along the length direction.
  • the first mounting seat 640 is screwed to the first lead screw 650.
  • the first mounting seat 640 abuts against the first rail 620 to restrict the first mounting seat 640 to follow the first Lead screw 650 rotates. In this way, the first transmission mechanism can drive the pusher structure 610 to move along the length direction by way of screw transmission.
  • the pusher assembly further includes a first guide structure, which is used to guide the first mounting seat 640 to move along the length direction, and the first guide structure includes a matching
  • the first sliding rail 680 and the first sliding block 670 the first sliding rail 680 is disposed on the first rail 620 and extends along the length direction, and the first sliding block 670 is disposed on the first mounting base 640 .
  • the first installation base 640 is provided with a first driving mechanism 660 in transmission connection with the pusher structure 610 for driving the pusher structure 610 to move along the height direction.
  • the pushing structure 610 passes through the transverse channel 130 of the positioning area 120 from bottom to top under the drive of the first driving mechanism 660 , and then move along the longitudinal channel 140 to push the product to be belted to the blocking assembly 5, and after finishing, the pushing structure 610 is driven by the first driving mechanism 660 to pass through the transverse channel 130 from top to bottom and Move below the upper surface of the conveying line body 1 to avoid the transport mechanism 2 to transport the new product to be belted from the material stacking area 110 to the positioning area 120 again.
  • the first driving mechanism 660 can be configured in any suitable manner, for example, the first driving mechanism 660 can be configured as a first air cylinder, the cylinder body of the first air cylinder is fixedly connected to the first mount 640, and the piston rod is fixedly connected to Pushing structure 610.
  • the blocking assembly 5 includes a blocking plate 510 and a second driving mechanism 520, the blocking plate 510 extends along the height direction, and is used to stop the product to be belted in the lengthwise direction.
  • the baffle 510 is connected to the conveying line body 1 through the second driving mechanism 520, and the second driving mechanism 520 is used to drive the baffle 510 to move along the height direction.
  • the baffle plate 510 moves from bottom to top under the drive of the second drive mechanism 520, and is used to cooperate with the pusher assembly 6, so as to move in the longitudinal direction. Organize products to be tied on top.
  • the baffle plate 510 is driven by the second driving mechanism 520 to return to the bottom of the conveying line body 1, so as to avoid the conveying mechanism 2 and transport the products to be belted from the positioning area 120 to the belting machine 4 superior.
  • the second driving mechanism 520 can be configured in any suitable manner, for example, the second driving mechanism 520 can be configured as a second air cylinder, the cylinder body of the second air cylinder is fixedly connected to the transmission line body 1, and the piston rod is fixedly connected to the baffle plate 510.
  • the transport mechanism 2 can be configured in any suitable manner according to actual application requirements.
  • the track mechanism 210 includes a second track 211 extending along the length direction, a third track 212 extending along the width direction, and a second mounting base 213, the third track 212 It is movably arranged on the second rail 211 , the second mounting seat 213 is movably arranged on the third rail 212 , and the clamping structure 3 is movably arranged on the second mounting seat 213 along the height direction.
  • the second mounting seat 213 is movably arranged on the third track 212, so that the two clamping structures 3 can be moved closer or farther away from each other, thereby realizing the clamping function of the clamping assembly; the clamping structures 3 can be moved along the height direction. It is movably arranged on the second mounting seat 213, which can realize the conveyance of the belt products to be carried in the height direction; the third track 212 is movably arranged on the second track 211, and can realize the belt products to be stacked in the incoming material stacking area. 110 , the transfer between the positioning area 120 and the strapping machine 4 .
  • FIG. 8 to FIG. 10 wherein FIG. 9 and FIG. 10 respectively show a top view and a front view of the track mechanism 210 on the right side in FIG. 8 , the second track 211 is set There is a second motor 220 and a second transmission mechanism, and the third track 212 moves along the length direction through the second transmission mechanism. In this way, the movement of the third rail 212 along the length direction can be realized by the second motor 220 and the second transmission mechanism.
  • the second transmission mechanism can be constructed in any suitable manner, for example, the second transmission mechanism can include a second lead screw (not shown) that is drivingly connected with the second motor 220, and the second lead screw can rotate around its own axis Rotately arranged on the second track 220 and extending along the length direction, the third track 212 is threadedly connected with the second lead screw, and the third track 212 abuts against the second track 211 to limit the third track 212 to follow the second lead screw turn. In this way, the second transmission mechanism can realize the movement of the third track 212 along the length direction by way of screw transmission.
  • the second transmission mechanism can realize the movement of the third track 212 along the length direction by way of screw transmission.
  • the rail mechanism 210 further includes a second guide structure (not shown in the figure), which is used to guide the third rail 212 to move along the length direction, and the second guide structure includes a matching
  • the second sliding rail is arranged on the second rail 211 and extends along the length direction
  • the second sliding block is arranged on the third rail 212 .
  • a third motor 230 and a third transmission mechanism are arranged on the third track 212 , and the second mounting base 213 moves along the width direction through the third transmission mechanism. In this way, the movement of the second mounting base 213 along the width direction can be realized by the third motor 230 and the third transmission mechanism.
  • the third transmission mechanism can be constructed in any suitable manner, for example, the third transmission mechanism includes a third lead screw 240 drivingly connected with the third motor 230, and the third lead screw 240 is rotatably arranged on the third On the track 212 and extending along the width direction, the second mounting base 213 is threadedly connected with the third lead screw 240 , and the second mounting base 213 abuts against the third track 212 to limit the rotation of the second mounting base 213 following the third lead screw 240 . In this way, the third transmission mechanism can realize the movement of the second mounting base 213 in the width direction by way of screw transmission.
  • the track mechanism 210 further includes a third guiding structure, which is used to guide the second installation seat to move along the width direction, and the third guiding structure includes a matching first There are three sliding rails 214 and a third sliding block 215 , the third sliding rail 214 is disposed on the third rail 212 and extends along the width direction, and the third sliding block 215 is disposed on the second mounting seat 213 .
  • the second mounting base 213 is provided with a third drive mechanism 250 in transmission connection with the clamping structure 3 for driving the clamping structure 3 along the height direction. move.
  • the third driving mechanism 250 can be configured in any suitable manner, for example, the third driving mechanism 250 can be configured as a third air cylinder, the cylinder body of the third air cylinder is fixedly connected to the second mount 213, and the piston rod is fixedly connected to the clip Hold structure 3. In this way, the clamping structure 3 can be driven to move in the height direction by the air cylinder.
  • the track mechanism 210 further includes a fourth guiding structure, which is used to guide the clamping structure 310 to move along the height direction, and the fourth guiding structure includes a matching first Four sliding rails 216 and a fourth sliding block 217 , the fourth sliding rail 216 is disposed on the second installation seat 213 and extends along the height direction, and the fourth sliding block 217 is disposed on the clamping structure 310 .
  • the strapping device includes a strapping machine 4 and the above-mentioned strapping device before the bunch finishing device, the conveyor line
  • the discharge end of the body 1 is docked with the belt machine 4
  • the upper surface of the belt machine 4 is provided with a groove 410 for avoiding the clamping structure 3 .
  • the discharge end of the conveying line body 1 refers to the end where the positioning area 120 of the conveying line body 1 is located.
  • the strap product is transported to the strap machine 4 for strapping.
  • there are multiple grooves 410 there are multiple grooves 410, and the multiple grooves 410 are arranged at intervals along the length direction and all extend along the width direction.
  • the clamping assembly places the product to be tied on the belt machine 4, the claw 320 can be inserted into the corresponding groove 410, so that the product to be belted can be placed on the belt machine 4 smoothly, and then The clamping assembly releases the product to be laced and withdraws from the lacing frame of the lacing machine 4, at which point the lacing machine 4 can treat the lacing product as a belt.
  • the product to be banded needs to be banded multiple times, the product to be banded can be re-clamped by the clamping assembly to move its position on the banding machine 4 until the prescribed number of times of banding is completed. Since the above-mentioned bundle pre-sorting device has the advantages of high automation, high work efficiency and low labor cost, the strapping equipment also has the advantages of high automation, high work efficiency and low labor cost, and is suitable for popularization and application.
  • the end of the belt conveyor 4 facing away from the conveying line body 1 is docked with a receiving belt line 8
  • the receiving belt line includes a receiving roller 810 and a belt line 820 arranged in sequence along the length direction.
  • the receiving roller 810 is docked on the discharge end of the conveying line body 1 and extends along the width direction.
  • the conveying mechanism 2 is used to transfer the product on the belt machine 4 to the receiving roller 810 through the clamping assembly.
  • the number of receiving rollers 810 There are multiple receiving rollers 810 arranged at intervals along the length direction, wherein the receiving rollers 810 are power rollers.
  • the product on the belting machine 4 can be transported to the receiving roller 810 by the transport mechanism 2. Since the receiving roller 810 is a power roller, the product can be transported to the belt line 820, and the product can be transported to the belt line 820 by the belt.
  • the line 820 transports the product to the next process, for example, labeling and the like can be performed on the belt line 820 . Therefore, by arranging the receiving belt line 8, it is possible to avoid manually picking up the belted products from the belt machine 4, which can improve work efficiency, especially for heavy belt products, and the belt can be removed by the receiving belt line 8. The belted products are transported to the next process.
  • the belt line 820 is a belt conveyor, and the belt on it can be a green antistatic belt, which is suitable for products requiring antistatic treatment, such as liquid crystal panels.
  • the receiving roller 810 can adopt rubber-coated anti-static power rollers, which can prevent product damage through the rubber-coating process, and are also suitable for products that require anti-static treatment, such as liquid crystal panels.

Abstract

The present disclosure relates to a pre-bundling arrangement apparatus of a bundling device, and a bundling device. The pre-bundling arrangement apparatus comprises: a conveying line body, the conveying line body being used for placing a product to be bundled; a carrying mechanism, provided with a clamping assembly, the clamping assembly being provided with two clamping structures arranged opposite to each other in the width direction of the conveying line body so as to releasably grab the product in the width direction, and the carrying mechanism being used for moving the clamping assembly between the conveying line body and a bundling machine so as to carry the product on the conveying line body to the bundling machine; and a positioning mechanism, the positioning mechanism comprising a material blocking assembly and a material pushing assembly which are spaced apart in the length direction of the conveying line body, the product being placed between the material blocking assembly and the material pushing assembly, the material pushing assembly comprising a material pushing structure and a first rail, and the material pushing structure being movably arranged on the first rail for pushing the product toward the material blocking assembly. The present disclosure can solve the problem of low efficiency of manual palletizing arrangement before bundling.

Description

束带设备的束前整理装置及束带设备Bundle pre-sorting device and tie equipment 技术领域technical field
本公开涉及束带设备技术领域,具体地,涉及一种束带设备的束前整理装置及束带设备。The present disclosure relates to the technical field of belt equipment, and in particular, to a belt finishing device and belt equipment.
背景技术Background technique
束带机用于将产品束带打包,相关技术中,在将产品进行束带之前,均是由人工进行码垛整理后再将产品放置在束带机上进行束带。此种方式,自动化程度低,工作效率低。The belting machine is used to pack the product belts. In the related art, before the products are belted, the products are manually stacked and sorted, and then the products are placed on the belting machine for belting. In this way, the degree of automation is low and the work efficiency is low.
技术问题technical problem
本公开的目的是提供一种束带设备的束前整理装置及束带设备,该束前整理装置能够解决束前由人工码垛整理效率低的问题,并具有自动化程度高、工作效率高以及人力成本低的优点。The purpose of the present disclosure is to provide a pre-bundle finishing device and a bundle belt equipment, the pre-bundle finishing device can solve the problem of low efficiency of manual palletizing before the bundle, and has a high degree of automation, high work efficiency and The advantage of low labor cost.
技术解决方案technical solution
为了实现上述目的,本公开提供一种束带设备的束前整理装置,所述束前整理装置包括:输送线体,该输送线体上用于放置待束带产品;搬运机构,该搬运机构上设置有夹持组件,所述夹持组件具有沿所述输送线体的宽度方向相对设置的两个夹持结构,以用于在所述宽度方向上可释放地抓取所述待束带产品,所述搬运机构用于在所述输送线体和束带机之间移动所述夹持组件,以将所述输送线体上的所述待束带产品搬运至所述束带机上;以及定位机构,该定位机构包括沿所述输送线体的长度方向间隔设置的挡料组件和推料组件,所述挡料组件和所述推料组件之间用于放置所述待束带产品,所述推料组件包括推料结构和第一轨道,所述推料结构可移动地设置在所述第一轨道上,以用于推动所述待束带产品朝向所述挡料组件移动。In order to achieve the above purpose, the present disclosure provides a pre-bundle finishing device for belting equipment. The pre-bundle finishing device includes: a conveying line body, on which a product to be tied is placed; a transport mechanism, the transport mechanism A clamping assembly is provided on the top, and the clamping assembly has two clamping structures oppositely arranged along the width direction of the conveying line body, for releasably grasping the belt to be drawn in the width direction For products, the transport mechanism is used to move the clamping assembly between the conveying line body and the banding machine, so as to transport the product to be banded on the transporting line body to the banding machine; and A positioning mechanism, the positioning mechanism includes a blocking assembly and a pushing assembly arranged at intervals along the length direction of the conveying line body, between the blocking assembly and the pushing assembly is used to place the product to be belted, The pusher assembly includes a pusher structure and a first track, the pusher structure is movably arranged on the first track, and is used for pushing the product to be belted to move toward the stopper assembly.
可选地,所述输送线体沿所述长度方向依次设置有来料堆叠区域和定位区域,所述来料堆叠区域用于接收来自上游设备输送的所述待束带产品,所述定位机构设置在所述定位区域,所述搬运机构用于通过所述夹持组件将所述来料堆叠区域的所述待束带产品搬运至所述定位区域。Optionally, the conveying line body is sequentially provided with an incoming material stacking area and a positioning area along the length direction, the incoming material stacking area is used to receive the product to be belted from an upstream device, and the positioning mechanism Set in the positioning area, the conveying mechanism is used to transport the product to be belted in the incoming material stacking area to the positioning area through the clamping assembly.
可选地,所述夹持结构包括沿所述长度方向延伸的夹板和设置在所述夹板底端的夹爪,所述夹爪的数量为多个,且多个所述夹爪沿所述长度方向间隔地设置,所述定位区域和所述来料堆叠区域沿所述长度方向均间隔地设置有多个横向通道,多个所述横向通道均沿所述宽度方向延伸,所述横向通道用于供所述夹爪穿过以抓取所述待束带产品。Optionally, the clamping structure includes a splint extending along the length direction and jaws arranged at the bottom end of the splint, the number of the jaws is multiple, and the multiple jaws extend along the length The direction is arranged at intervals, the positioning area and the incoming material stacking area are provided with a plurality of transverse passages at intervals along the length direction, and the plurality of transverse passages extend along the width direction, and the transverse passages are used for For the jaws to pass through to grab the product to be tied.
可选地,所述第一轨道设置在所述输送线体的下方且沿所述长度方向延伸,所述推料结构包括沿所述输送线体的高度方向延伸的推杆,所述定位区域设置有沿所述长度方向延伸的且用于供所述推杆顶端穿过的纵向通道。Optionally, the first rail is arranged below the conveying line body and extends along the length direction, the pushing structure includes a push rod extending along the height direction of the conveying line body, and the positioning area A longitudinal channel extending along the length direction and used for the top end of the push rod to pass through is provided.
可选地,所述推料结构还包括设置在所述推杆顶端的多个推料块,多个所述推料块沿所述宽度方向间隔地设置,相邻两个所述推料块之间、所述推杆与与其相邻的所述推料块之间均通过连接板可拆卸地连接,且多个所述推料块均能够穿过所述定位区域的横向通道以在所述推杆的带动下沿所述长度方向推动所述待束带产品。Optionally, the pusher structure further includes a plurality of pusher blocks arranged at the top of the push rod, the plurality of pusher blocks are arranged at intervals along the width direction, and two adjacent pusher blocks between the push rod and the push block adjacent to it are detachably connected through a connecting plate, and a plurality of push blocks can pass through the transverse channel of the positioning area to Driven by the push rod, the product to be tied is pushed along the length direction.
可选地,所述定位区域设置有多个均沿所述长度方向延伸的避让槽通道,所述推料块穿过所述定位区域的横向通道后其底端用于插入所述避让槽通道且能够沿着所述避让槽通道的延伸方向移动。Optionally, the positioning area is provided with a plurality of avoidance groove passages extending along the length direction, and the bottom end of the pushing block is used to insert into the avoidance groove passages after passing through the transverse passages of the positioning area And it can move along the extension direction of the avoidance groove channel.
可选地,所述定位区域的上表面设置有多个万向球,该多个万向球用于滑动承载所述待束带产品。Optionally, a plurality of universal balls are provided on the upper surface of the positioning area, and the plurality of universal balls are used for slidingly bearing the product to be belted.
可选地,所述输送线体的上表面设置有防磨层,该防磨层为粘接在所述输送线体上的铁氟龙。Optionally, an anti-wear layer is provided on the upper surface of the transmission line body, and the anti-wear layer is Teflon glued on the transmission line body.
可选地,所述推料组件还包括第一电机、第一传动机构以及第一安装座,所述推料结构设置在所述第一安装座上,所述第一安装座通过所述第一传动机构沿所述长度方向移动,所述第一传动机构包括与所述第一电机驱动连接的第一丝杠,所述第一丝杠可绕自身轴线转动地设置在所述第一轨道上且沿所述长度方向延伸,所述第一安装座与所述第一丝杠螺纹连接,所述第一安装座抵接于所述第一轨道,以限制所述第一安装座跟随所述第一丝杠转动。Optionally, the pushing assembly further includes a first motor, a first transmission mechanism and a first mounting base, the pushing structure is arranged on the first mounting base, and the first mounting base passes through the first mounting base. A transmission mechanism moves along the length direction, the first transmission mechanism includes a first lead screw connected to the first motor for driving, and the first lead screw is rotatably arranged on the first track around its own axis and extending along the length direction, the first mounting seat is threadedly connected with the first lead screw, and the first mounting seat abuts against the first rail to restrict the first mounting seat to follow the The first lead screw rotates.
可选地,所述第一安装座上设置有与所述推料结构传动连接的第一驱动机构,以用于驱动所述推料结构沿所述高度方向移动,所述第一驱动机构构造为第一气缸,所述第一气缸的缸体固连于所述第一安装座、活塞杆固连于所述推料结构。Optionally, the first mounting base is provided with a first drive mechanism in transmission connection with the pusher structure for driving the pusher structure to move along the height direction, and the first drive mechanism is configured It is the first air cylinder, the cylinder body of the first air cylinder is fixedly connected to the first installation seat, and the piston rod is fixedly connected to the pushing structure.
可选地,所述挡料组件包括挡板和第二驱动机构,所述挡板沿所述高度方向延伸,以用于止挡在所述待束带产品在沿所述长度方向上的一端,所述挡板通过所述第二驱动机构连接于所述输送线体,所述第二驱动机构用于驱动所述挡板沿所述高度方向移动,所述第二驱动机构构造为第二气缸,所述第二气缸的缸体固连于所述输送线体、活塞杆固连于所述挡板。Optionally, the stopper assembly includes a baffle and a second driving mechanism, the baffle extends along the height direction, and is used to stop at one end of the product to be belted along the length direction , the baffle is connected to the conveying line body through the second driving mechanism, the second driving mechanism is used to drive the baffle to move along the height direction, and the second driving mechanism is configured as a second cylinder, the cylinder body of the second cylinder is fixedly connected to the conveying line body, and the piston rod is fixedly connected to the baffle plate.
可选地,所述搬运机构包括关于所述长度方向对称且间隔设置的两个轨道机构,两个所述夹持结构各自设置在对应的轨道机构上,所述轨道机构包括沿所述长度方向延伸的第二轨道、沿所述宽度方向延伸的第三轨道以及第二安装座,所述第三轨道可移动地设置在所述第二轨道上,所述第二安装座可移动地设置在所述第三轨道上,所述夹持结构沿所述高度方向可移动地设置在第二安装座上。Optionally, the transport mechanism includes two track mechanisms arranged symmetrically and at intervals with respect to the length direction, the two clamping structures are respectively arranged on the corresponding track mechanism, and the track mechanism includes An extended second rail, a third rail extending along the width direction, and a second mount, the third rail is movably disposed on the second rail, and the second mount is movably disposed on On the third track, the clamping structure is movably arranged on the second mounting seat along the height direction.
可选地,所述第二轨道上设置有第二电机和第二传动机构,所述第三轨道通过所述第二传动机构沿所述长度方向移动,所述第二传动机构包括与所述第二电机驱动连接的第二丝杠,所述第二丝杠可绕自身轴线转动地设置在所述第二轨道上且沿所述长度方向延伸,所述第三轨道与所述第二丝杠螺纹连接,所述第三轨道抵接于所述第二轨道,以限制所述第三轨道跟随所述第二丝杠转动。Optionally, the second rail is provided with a second motor and a second transmission mechanism, the third rail moves along the length direction through the second transmission mechanism, and the second transmission mechanism includes The second lead screw connected by the second motor drives, the second lead screw is rotatably arranged on the second track around its own axis and extends along the length direction, the third track is connected to the second lead screw The rod is threadedly connected, and the third track abuts against the second track to limit the rotation of the third track following the second lead screw.
可选地,所述第三轨道上设置有第三电机和第三传动机构,所述第二安装座通过所述第三传动机构沿所述宽度方向移动,所述第三传动机构包括与所述第三电机驱动连接的第三丝杠,所述第三丝杠可绕自身轴线转动地设置在所述第三轨道上且沿所述宽度方向延伸,所述第二安装座与所述第三丝杠螺纹连接,所述第二安装座抵接于所述第三轨道,以限制所述第二安装座跟随所述第三丝杠转动。Optionally, a third motor and a third transmission mechanism are provided on the third track, and the second mounting seat moves along the width direction through the third transmission mechanism, and the third transmission mechanism includes The third lead screw is driven and connected by the third motor, and the third lead screw is rotatably arranged on the third rail and extends along the width direction around its own axis, and the second mounting base and the first The three lead screws are threadedly connected, and the second mounting seat abuts against the third track to restrict the rotation of the second mounting seat following the third lead screw.
可选地,所述第二安装座上设置有与所述夹持结构传动连接的第三驱动机构,以用于驱动所述夹持结构沿所述高度方向移动,所述第三驱动机构构造为第三气缸,所述第三气缸的缸体固连于所述第二安装座、活塞杆固连于所述夹持结构。Optionally, the second mounting base is provided with a third driving mechanism that is transmission-connected to the clamping structure, so as to drive the clamping structure to move along the height direction, and the third driving mechanism is configured It is a third air cylinder, the cylinder body of the third air cylinder is fixedly connected to the second installation seat, and the piston rod is fixedly connected to the clamping structure.
本公开的另一方面还提供一种束带设备,所述束带设备包括束带机和如上所述的束带设备的束前整理装置,所述输送线体的出料端与所述束带机对接,所述束带机的上表面设置有用于避让所述夹持结构的凹槽。Another aspect of the present disclosure also provides a strapping device, the strapping device includes a strapping machine and the bundle finishing device of the strapping device as described above, the discharge end of the conveying line body is connected to the bundle The belt machine is docked, and the upper surface of the belt machine is provided with a groove for avoiding the clamping structure.
可选地,所述束带机背离所述输送线体的一端对接有承接皮带线,所述承接皮带线包括沿所述长度方向依次设置的承接滚筒和皮带线,且所述承接滚筒对接于所述输送线体的出料端且沿所述宽度方向延伸,所述搬运机构用于通过所述夹持组件将所述束带机上的产品搬运至所述承接滚筒上,所述承接滚筒的数量为多个,多个所述承接滚筒沿所述长度方向间隔地设置,其中,所述承接滚筒为动力滚筒。Optionally, the end of the belt machine away from the conveying line body is docked with a receiving belt line, and the receiving belt line includes a receiving roller and a belt line arranged in sequence along the length direction, and the receiving roller is docked on The discharge end of the conveying line body extends along the width direction, and the conveying mechanism is used to convey the products on the belt machine to the receiving roller through the clamping assembly, and the receiving roller The number is multiple, and a plurality of the receiving rollers are arranged at intervals along the length direction, wherein the receiving rollers are power rollers.
有益效果Beneficial effect
通过上述技术方案,即本公开提供的束带设备的束前整理装置,利用夹持组件在宽度方向上整理拍齐待束带产品、定位机构在长度方向上整理拍齐待束带产品,并通过搬运机构将整理好的待束带产品搬运至束带机上进行束带,能够解决束前由人工码垛整理效率低的问题。具体的工作中,输送线体用于接收上游设备输送的待束带产品,待束带产品在输送线体上堆叠,堆叠的个数按照客户的要求进行设定,堆叠完成后,夹持组件抓持待束带产品并通过该抓持过程使待束带产品在宽度方向上码齐,随后推料组件动作,即推料结构沿着第一轨道移动,用于推动待束带产品朝向挡料组件移动,直至待束带产品止挡于挡料组件,使待束带产品在长度方向上码齐,完成束前整理过程,随后由搬运机构通过夹持组件将整理好的待束带产品搬运至束带机上进行束带。综上所述,本公开提供的束带设备的束前整理装置,码垛整理过程无需人工参与,自动化程度高、工作效率高且人力成本低。Through the above technical solution, that is, the pre-beam finishing device of the belt equipment provided by the present disclosure, the clamping assembly is used to organize and align the belt products to be aligned in the width direction, and the positioning mechanism is arranged to align the belt products to be belted in the length direction, and The sorted products to be tied are transported to the banding machine by the handling mechanism for banding, which can solve the problem of low efficiency of manual palletizing before bunching. In specific work, the conveyor line is used to receive the products to be belted from the upstream equipment, and the products to be belted are stacked on the conveyor line. The number of stacks is set according to the customer's requirements. After the stacking is completed, the clamping components Grab the product to be tied and align the product to be tied in the width direction through the grasping process, then the pusher component moves, that is, the pusher structure moves along the first track to push the product to be tied toward the stop The material component moves until the product to be tied is stopped by the stopper component, so that the product to be tied is aligned in the length direction, and the finishing process before the bundle is completed, and then the handling mechanism will pass the finished product to be tied through the clamping component Transfer to the belting machine for belting. To sum up, the pre-bundle sorting device of the strapping equipment provided by the present disclosure does not require manual participation in the palletizing and sorting process, has a high degree of automation, high work efficiency, and low labor costs.
本公开的其他特征和优点将在随后的具体实施方式部分予以详细说明。Other features and advantages of the present disclosure will be described in detail in the detailed description that follows.
附图说明Description of drawings
附图是用来提供对本公开的进一步理解,并且构成说明书的一部分,与下面的具体实施方式一起用于解释本公开,但并不构成对本公开的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present disclosure, and constitute a part of the description, together with the following specific embodiments, are used to explain the present disclosure, but do not constitute a limitation to the present disclosure. In the attached picture:
图1是本公开示例性实施方式中提供的束带设备的立体图;FIG. 1 is a perspective view of a harness device provided in an exemplary embodiment of the present disclosure;
图2是本公开示例性实施方式中提供的束带设备的俯视图;FIG. 2 is a top view of a harness device provided in an exemplary embodiment of the present disclosure;
图3是本公开示例性实施方式中提供的束前整理装置的输送线体的立体图;Fig. 3 is a perspective view of a conveying line body of a bundle finishing device provided in an exemplary embodiment of the present disclosure;
图4是本公开示例性实施方式中提供的束前整理装置的输送线体的俯视图;Fig. 4 is a top view of the conveying line body of the bundle finishing device provided in the exemplary embodiment of the present disclosure;
图5是本公开示例性实施方式中提供的束前整理装置的输送线体的左视图;Fig. 5 is a left side view of the conveying line body of the bundle finishing device provided in the exemplary embodiment of the present disclosure;
图6是图3中A位置的局部放大示意图;Fig. 6 is a partially enlarged schematic diagram of position A in Fig. 3;
图7是本公开示例性实施方式中提供的束前整理装置的推料组件的立体图;Fig. 7 is a perspective view of the pushing assembly of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure;
图8是本公开示例性实施方式中提供的束前整理装置的搬运机构的立体图;Fig. 8 is a perspective view of a transport mechanism of a bundle finishing device provided in an exemplary embodiment of the present disclosure;
图9是本公开示例性实施方式中提供的束前整理装置的其中一个轨道机构的俯视图;Fig. 9 is a top view of one track mechanism of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure;
图10是本公开示例性实施方式中提供的束前整理装置的其中一个轨道机构的主视图;Fig. 10 is a front view of one of the track mechanisms of the pre-bundle finishing device provided in an exemplary embodiment of the present disclosure;
图11是本公开示例性实施方式中提供的束前整理装置的夹持结构的立体图。Fig. 11 is a perspective view of a clamping structure of a bundle finishing device provided in an exemplary embodiment of the present disclosure.
附图标记说明Explanation of reference signs
1-输送线体;110-来料堆叠区域;120-定位区域;130横向通道;140-纵向通道;150-避让槽通道;160-支撑板;161-第一支撑板;162-第二支撑板;2-搬运机构;210-轨道机构;211-第二轨道;212-第三轨道;213-第二安装座;214-第三滑轨;215-第三滑块;216-第四滑轨;217-第四滑块;220-第二电机;230-第三电机;240-第三丝杠;250-第三驱动机构;3-夹持结构;310-夹板;320-夹爪;4-束带机;410-凹槽;5-挡料组件;510-挡板;520-第二驱动机构;6-推料组件;610-推料结构;611-推杆;612-推料块;613-连接板;620-第一轨道;630-第一电机;640-第一安装座;650-第一丝杠;660-第一驱动机构;670-第一滑块;680-第一滑轨;7-万向球;8-承接皮带线;810-承接滚筒;820-皮带线。1-Conveying line body; 110-Incoming material stacking area; 120-Positioning area; 130 Horizontal passage; 140-Longitudinal passage; Plate; 2-handling mechanism; 210-track mechanism; 211-second track; 212-third track; 213-second mounting seat; 214-third slide rail; 215-third slide block; 216-fourth slide Rail; 217-the fourth slider; 220-the second motor; 230-the third motor; 240-the third screw; 250-the third drive mechanism; 3-clamping structure; 310-splint; 320-jaw; 4-banding machine; 410-groove; 5-blocking assembly; 510-baffle; 520-second drive mechanism; 6-pushing assembly; 610-pushing structure; Block; 613-connecting plate; 620-the first track; 630-the first motor; 640-the first mounting seat; 650-the first screw; 660-the first driving mechanism; 1 slide rail; 7-universal ball; 8-undertake belt line; 810-undertake roller; 820-belt line.
本发明的实施方式Embodiments of the present invention
[0008] 以下结合附图对本公开的具体实施方式进行详细说明。应当理解的是,此处所描述的具体实施方式仅用于说明和解释本公开,并不用于限制本公开。[0008] Below in conjunction with the accompanying drawings, the specific embodiments of the present disclosure will be described in detail. It should be understood that the specific embodiments described here are only used to illustrate and explain the present disclosure, and are not intended to limit the present disclosure.
在本公开中,为了便于描述,针对于束带设备定义三坐标,即XYZ坐标系,其中,Z向是指束带设备的高度方向,并以箭头所指的一侧为上,反之为下;X向是指束带设备的宽度方向,并以箭头所指的一侧为右,反之为左;Y向是指束带设备的长度方向,并以箭头所指的一侧为前,反之为后。在未作相反说明的情况下,“内、外”是指相对于部件或结构本身轮廓的内、外。此外,需要说明的是,所使用的术语如“第一、第二”等是为了区别一个要素和另一个要素,不具有顺序性和重要性。另外,在参考附图的描述中,不同附图中的同一标记表示相同的要素。In this disclosure, for the convenience of description, three coordinates are defined for the belt equipment, that is, the XYZ coordinate system, wherein the Z direction refers to the height direction of the belt equipment, and the side pointed by the arrow is up, and vice versa. ;X direction refers to the width direction of the belt equipment, and the side pointed by the arrow is right, and vice versa is left; Y direction refers to the length direction of the belt equipment, and the side pointed by the arrow is front, and vice versa for later. Unless stated to the contrary, "inner and outer" refer to inner and outer relative to the outline of the part or structure itself. In addition, it should be noted that the terms used, such as "first, second", etc., are used to distinguish one element from another, and do not have sequence or importance. In addition, in the description with reference to the drawings, the same symbols in different drawings represent the same elements.
根据本公开的第一方面,提供一种束带设备的束前整理装置,尤其适用于硬质产品,例如液晶面板等片状硬质产品。参考图1至图11所示,该束前整理装置包括:输送线体1,该输送线体1上用于放置待束带产品;搬运机构2,该搬运机构2上设置有夹持组件,夹持组件具有沿输送线体1的宽度方向相对设置的两个夹持结构3,以用于在宽度方向上可释放地抓取待束带产品,搬运机构2用于在输送线体1和束带机4之间移动夹持组件,以将输送线体1上的待束带产品搬运至束带机4上;以及定位机构,该定位机构包括沿输送线体1的长度方向间隔设置的挡料组件5和推料组件6,挡料组件5和推料组件6之间用于放置待束带产品,推料组件6包括推料结构610和第一轨道620,推料结构610可移动地设置在第一轨道620上,以用于推动待束带产品朝向挡料组件5移动。According to the first aspect of the present disclosure, there is provided a pre-bundle finishing device for belt equipment, which is especially suitable for hard products, such as sheet-shaped hard products such as liquid crystal panels. Referring to Fig. 1 to Fig. 11, the pre-bundle finishing device includes: a conveying line body 1, on which a product to be tied is placed; a transport mechanism 2, on which a clamping assembly is arranged, The clamping assembly has two clamping structures 3 oppositely arranged along the width direction of the conveying line body 1, for releasably grabbing the products to be belted in the width direction, and the handling mechanism 2 is used for connecting the conveying line body 1 and the bundle Move the clamping assembly between the belt machines 4, so as to transport the product to be belted on the conveyor line body 1 to the belt machine 4; The material component 5 and the material pushing component 6 are used to place the product to be belted between the material blocking component 5 and the material pushing component 6, and the material pushing component 6 includes a material pushing structure 610 and a first track 620, and the material pushing structure 610 is movably It is arranged on the first track 620 and is used to push the product to be belted to move toward the blocking assembly 5 .
通过上述技术方案,即本公开提供的束带设备的束前整理装置,利用夹持组件在宽度方向上整理拍齐待束带产品、定位机构6在长度方向上整理拍齐待束带产品,并通过搬运机构2将整理好的待束带产品搬运至束带机4上进行束带,能够解决束前由人工码垛整理效率低的问题。具体的工作中,输送线体1用于接收上游设备输送的待束带产品,待束带产品在输送线体1上堆叠,堆叠的个数按照客户的要求进行设定,堆叠完成后,夹持组件抓持待束带产品并通过该抓持过程使待束带产品在宽度方向上码齐,随后推料组件6动作,即推料结构610沿着第一轨道620移动,用于推动待束带产品朝向挡料组件5移动,直至待束带产品止挡于挡料组件5,使待束带产品在长度方向上码齐,完成束前整理过程,随后由搬运机构2通过夹持组件将整理好的待束带产品搬运至束带机4上进行束带。综上所述,本公开提供的束带设备的束前整理装置,码垛整理过程无需人工参与,自动化程度高、工作效率高且人力成本低。Through the above technical solution, that is, the pre-beam finishing device of the belt equipment provided by the present disclosure, the clamping assembly is used to organize and align the belt products to be aligned in the width direction, and the positioning mechanism 6 is arranged to align the belt products to be aligned in the length direction, And through the transport mechanism 2, the sorted products to be tied are transported to the band machine 4 for banding, which can solve the problem of low efficiency of manual palletizing before bunching. In the specific work, the conveyor line body 1 is used to receive the products to be belted from the upstream equipment. The products to be belted are stacked on the conveyor line body 1. The number of stacks is set according to the customer's requirements. After the stacking is completed, the clamping The holding assembly grasps the product to be belted and makes the product to be belted aligned in the width direction through the grasping process, and then the pusher assembly 6 moves, that is, the pusher structure 610 moves along the first track 620 for pushing the product to be belted The belted product moves towards the stopper assembly 5 until the product to be belted is stopped by the stopper assembly 5, so that the belted product is aligned in the length direction and the finishing process before the bundle is completed, and then the transport mechanism 2 passes through the clamping assembly The finished product to be tied is transported to the belt machine 4 for belting. To sum up, the pre-bundle sorting device of the strapping equipment provided by the present disclosure does not require manual participation in the palletizing and sorting process, has a high degree of automation, high work efficiency, and low labor costs.
为了进一步提高束前整理装置的工作效率,在一些实施方式中,参考图1和图2所示,输送线体1沿长度方向依次设置有来料堆叠区域110和定位区域120,来料堆叠区域110用于接收来自上游设备输送的待束带产品,定位机构设置在定位区域120,搬运机构2用于通过夹持组件将来料堆叠区域110的待束带产品搬运至定位区域120。这样,来料堆叠区域110接收来自上游设备输送的待束带产品,例如液晶面板等,待液晶面板堆叠到设定数量后,搬运机构2通过夹持组件将该待束带产品搬运至定位区域120,在定位区域120通过夹持组件在宽度方向上的夹持以及定位机构6在长度方向上的整理拍齐,能够将待束带产品聚拢整齐。在定位区域120整理待束带产品的同时,来料堆叠区域110可以继续接收来自上游设备输送的待束带产品,待搬运机构2将整理好的待束带产品放置到束带机4并束带结束后,搬运机构2再次控制夹持组件返回来料堆叠区域110重复上述动作。这样,可以节省来料堆叠的时间,有助于提高工作效率。其中,上述上游设备可以理解为,束前整理装置应用于生产线时,例如液晶面板生产线时,处于束前整理装置上游的设备,本公开对此不作具体限定。In order to further improve the working efficiency of the pre-bundle finishing device, in some embodiments, as shown in Fig. 1 and Fig. 2 , the conveying line body 1 is sequentially provided with an incoming material stacking area 110 and a positioning area 120 along the length direction, and the incoming material stacking area 110 is used to receive the products to be belted from the upstream equipment. The positioning mechanism is arranged in the positioning area 120 . In this way, the incoming material stacking area 110 receives the products to be belted from upstream equipment, such as liquid crystal panels, etc. After the liquid crystal panels are stacked to a set number, the transport mechanism 2 transports the products to be belted to the positioning area through the clamping assembly 120 , in the positioning area 120 , through the clamping of the clamping assembly in the width direction and the alignment of the positioning mechanism 6 in the length direction, the products to be belted can be gathered neatly. While the positioning area 120 is arranging the products to be tied, the incoming material stacking area 110 can continue to receive the products to be tied from the upstream equipment, and the handling mechanism 2 will place the finished products to be tied on the belt machine 4 and bundle them. After the tape ends, the conveying mechanism 2 controls the clamping assembly to return to the incoming material stacking area 110 to repeat the above actions. In this way, the time for stacking incoming materials can be saved, which helps to improve work efficiency. Wherein, the aforementioned upstream equipment can be understood as equipment upstream of the bundle finishing device when the bundle finishing device is applied to a production line, such as a liquid crystal panel production line, which is not specifically limited in the present disclosure.
为了便于夹持组件能够稳定的夹持待束带产品,在一些实施方式中,参考图1、图4和图11所示,夹持结构3包括沿长度方向延伸的夹板310和设置在夹板310底端的夹爪320,夹爪320的数量为多个,且多个夹爪320沿长度方向间隔地设置,定位区域120和来料堆叠区域110沿长度方向均间隔地设置有多个横向通道130,多个横向通道130均沿宽度方向延伸,横向通道130用于供夹爪320穿过以抓取待束带产品。这样,在夹持组件夹持待束带产品时,夹爪320自上而下穿过横向通道130,然后通过两个夹板310的靠拢夹持待束带产品,且在此过程中两个夹板310用于在宽度方向上拍齐待束带产品,在搬运待束带产品的过程中,夹爪320用于托住待束带产品的底部,防止其掉落。In order to facilitate the clamping assembly to stably clamp the product to be belted, in some embodiments, as shown in FIG. 1 , FIG. 4 and FIG. 11 , the clamping structure 3 includes a clamping plate 310 extending in the There are multiple jaws 320 at the bottom, and multiple jaws 320 are arranged at intervals along the length direction. The positioning area 120 and the incoming material stacking area 110 are evenly provided with a plurality of transverse passages 130 at intervals along the length direction. , a plurality of transverse passages 130 extend along the width direction, and the transverse passages 130 are used for the jaws 320 to pass through to grab the product to be belted. In this way, when the clamping assembly clamps the product to be belted, the jaws 320 pass through the transverse channel 130 from top to bottom, and then clamp the product to be belted by the close of the two clamping plates 310, and in the process the two clamping plates 310 is used to align the product to be tied in the width direction. During the process of carrying the product to be tied, the jaw 320 is used to support the bottom of the product to be tied to prevent it from falling.
夹爪320可以以任意合适的方式构造,例如,参考图11所示,夹爪320可以包括相连接的第一板和第二板,第一板和第二板形成L形板,第一板用于固连于夹板310,第二板向待束带产品所在的一侧延伸,以用于托住待束带产品的底部。Jaw 320 can be configured in any suitable manner, for example, as shown in FIG. Used to be fixedly connected to the splint 310 , the second plate extends toward the side where the product to be tied is located, and is used to support the bottom of the product to be tied.
在一些实施方式中,参考图4至图7所示,第一轨道620设置在输送线体1的下方且沿长度方向延伸,推料结构610包括沿输送线体1的高度方向延伸的推杆611,定位区域120设置有沿长度方向延伸的且用于供推杆611顶端穿过的纵向通道140。这样,在定位区域120中整理待束带产品时,推杆611的顶端可插入纵向通道140并延伸至输送线体1的上方,然后推杆611沿着纵向通道140移动,以将待束带产品推向挡料组件5所在的一侧。此外,将第一轨道620设置在输送线体1的下方,可以节省输送线体1上方的空间,同时用于避让搬运机构2将待束带产品从来料堆叠区域110搬运至定位区域120。In some embodiments, as shown in FIG. 4 to FIG. 7 , the first rail 620 is disposed below the conveying line body 1 and extends along the length direction, and the pushing structure 610 includes a push rod extending along the height direction of the conveying line body 1 611 , the positioning area 120 is provided with a longitudinal channel 140 extending along the length direction and used for the top end of the push rod 611 to pass through. In this way, when the products to be tied are arranged in the positioning area 120, the top end of the push rod 611 can be inserted into the longitudinal passage 140 and extended to the top of the conveying line body 1, and then the push rod 611 moves along the longitudinal passage 140 to place the belt to be bound. The product is pushed to the side where the material retaining assembly 5 is located. In addition, setting the first track 620 below the conveying line body 1 can save the space above the conveying line body 1 , and at the same time, it is used to avoid the transport mechanism 2 to transport the products to be belted from the material stacking area 110 to the positioning area 120 .
为了提高待束带产品在长度方向上的整理效果,在一些实施方式中,参考图5所示,推料结构610还包括设置在推杆611顶端的多个推料块612,多个推料块612沿宽度方向间隔地设置,相邻两个推料块612之间、推杆611与与其相邻的推料块612之间均通过连接板613可拆卸地连接,且多个推料块612均能够穿过定位区域120的横向通道130以在推杆611的带动下沿长度方向推动待束带产品。这样,通过设置多个沿宽度方向间隔设置的推料块612,有助于进一步提高待束带产品在长度方向上的整理效果。其中,推料块612的数量可以根据产品在宽度方向上的尺寸进行设置,本公开在此不作具体限定。此外,通过连接板613可拆卸地安装推料块612,便于对推料块612数量的调整,其中,可拆卸连接的方式可以采用螺纹连接的方式,例如通过螺栓或螺钉等紧固件将连接板613连接在推料块612或推杆611上,本公开并不仅限于此。In order to improve the tidying effect of the product to be belted in the length direction, in some embodiments, as shown in FIG. Blocks 612 are arranged at intervals along the width direction, between two adjacent pushing blocks 612, between the push rod 611 and its adjacent pushing blocks 612 are detachably connected by connecting plate 613, and a plurality of pushing blocks 612 can pass through the transverse channel 130 of the positioning area 120 so as to be driven by the push rod 611 to push the product to be belted along the length direction. In this way, by arranging a plurality of pushing blocks 612 arranged at intervals along the width direction, it is helpful to further improve the finishing effect of the products to be belted in the length direction. Wherein, the quantity of the pushing blocks 612 can be set according to the size of the product in the width direction, which is not specifically limited in this disclosure. In addition, the pusher block 612 is detachably installed through the connecting plate 613, which is convenient for adjusting the quantity of the pusher block 612, wherein the detachable connection method can be threaded connection, for example, the connection is made by fasteners such as bolts or screws. The plate 613 is connected to the pushing block 612 or the pushing rod 611, but the present disclosure is not limited thereto.
考虑到推料结构610在推料过程中,推料块612可以会遗漏待束带产品的最底一层的产品,容易造成卡阻夹塞。因此,在一些实施方式中,参考图4和图6所示,定位区域120设置有多个均沿长度方向延伸的避让槽通道150,推料块612穿过定位区域120的横向通道130后其底端用于插入避让槽通道150且能够沿着避让槽通道150的延伸方向移动。这样,推料块612在推动待束带产品时其底端插入避让槽通道150中,且避让槽通道150的延伸方向与推料块612的移动方向一致,因此,可使得推料块612在推料过程中,能够推动待束带产品的最底一层,防止遗漏造成卡阻夹塞等。Considering that during the material pushing process of the material pushing structure 610 , the material pushing block 612 may miss the product at the bottom layer of the product to be belted, which is likely to cause jamming and jamming. Therefore, in some embodiments, as shown in FIG. 4 and FIG. 6 , the positioning area 120 is provided with a plurality of avoidance groove passages 150 extending along the length direction, and the pushing block 612 passes through the transverse passage 130 of the positioning area 120 and then The bottom end is used for inserting into the avoidance groove channel 150 and can move along the extending direction of the avoidance groove channel 150 . In this way, the bottom end of the pushing block 612 is inserted into the avoidance groove channel 150 when pushing the product to be strapped, and the extending direction of the avoiding groove passage 150 is consistent with the moving direction of the pushing block 612, therefore, the pushing block 612 can be During the pushing process, it can push the bottom layer of the product to be tied to prevent jamming caused by omission.
在一些具体的实施方式中,参考图3和图4所示,输送线体1包括沿长度方向间隔设置的多个支撑板160,且多个支撑板160均沿宽度方向延伸,且多个支撑板160构造为使得输送线体1上对应的形成横向通道130、纵向通道140以及避让槽通道150。具体的,任意相邻的两个支撑板160之间的间隙形成横向通道130,定位区域120的支撑板160包括沿宽度方向间隔设置的第一支撑板161和第二支撑板162,定位区域120的多个支撑板160的第一支撑板161和第二支撑板162之间的间隙沿长度方向布置且共同形成纵向通道140,定位区域120的多个支撑板160上均形成有避让槽,多个避让槽沿长度方向布置且共同形成避让槽通道150。In some specific embodiments, as shown in FIG. 3 and FIG. 4 , the transmission line body 1 includes a plurality of support plates 160 arranged at intervals along the length direction, and the plurality of support plates 160 all extend along the width direction, and the plurality of support plates 160 The plate 160 is configured such that a transverse channel 130 , a longitudinal channel 140 and an escape groove channel 150 are correspondingly formed on the conveying line body 1 . Specifically, the gap between any adjacent two support plates 160 forms a transverse channel 130, and the support plate 160 of the positioning area 120 includes a first support plate 161 and a second support plate 162 arranged at intervals along the width direction, and the positioning area 120 The gaps between the first support plate 161 and the second support plate 162 of the plurality of support plates 160 are arranged along the length direction and jointly form the longitudinal passage 140, and the plurality of support plates 160 in the positioning area 120 are all formed with avoidance grooves. The escape grooves are arranged along the length direction and jointly form the escape groove channel 150 .
为了避免推料结构610在推料过程中,输送线体1的上表面滑擦伤待束带产品的底面,在一些实施方式中,参考图4和图6所示,定位区域120的上表面设置有多个万向球7,该多个万向球7用于滑动承载待束带产品。这样,通过多个万向球7可以尽可能的减少与待束带产品之间的摩擦,以防止滑擦伤待束带产品。其中,万向球7可以采用钢制万向球。In order to prevent the upper surface of the conveying line body 1 from slipping and scratching the bottom surface of the product to be belted during the pushing process of the pushing structure 610, in some embodiments, as shown in FIG. 4 and FIG. 6, the upper surface of the positioning area 120 A plurality of universal balls 7 are provided, and the plurality of universal balls 7 are used to slide and carry the product to be belted. In this way, the friction between the multiple universal balls 7 and the product to be tied can be reduced as much as possible, so as to prevent the product from being slipped and scratched. Wherein, universal ball 7 can adopt steel universal ball.
在一些具体的实施方式中,输送线体1的上表面设置有防磨层,以降低与待束带产品之间的摩擦系数,防止磨损待束带产品。该防磨层可以以任意合适的方式构造,例如可以为粘接在输送线体1上的铁氟龙。铁氟龙具有摩擦系数极低的特点,可以有效的避免磨损待束带产品。In some specific embodiments, the upper surface of the conveying line body 1 is provided with an anti-friction layer to reduce the coefficient of friction with the product to be belted and prevent the product to be belted from being worn. The wear-resistant layer can be constructed in any suitable manner, for example, it can be Teflon glued on the transmission line body 1 . Teflon has the characteristics of extremely low friction coefficient, which can effectively avoid wear and tear on the products to be belted.
在一些实施方式中,参考图5和图7所示,推料组件6还包括第一电机630、第一传动机构以及第一安装座640,推料结构610设置在第一安装座640上,第一安装座640通过第一传动机构沿长度方向移动。这样,通过第一电机630和第一传动机构可以实现推料结构610在沿长度方向上的移动。In some embodiments, as shown in FIG. 5 and FIG. 7 , the pusher assembly 6 further includes a first motor 630, a first transmission mechanism, and a first mount 640, and the pusher structure 610 is disposed on the first mount 640, The first mounting base 640 moves along the length direction through the first transmission mechanism. In this way, the movement of the pushing structure 610 along the length direction can be realized by the first motor 630 and the first transmission mechanism.
第一传动机构可以以任意合适的方式构造,例如,参考图5所示,第一传动机构包括与第一电机630驱动连接的第一丝杠650,第一丝杠650可绕自身轴线转动地设置在第一轨道620上且沿长度方向延伸,第一安装座640与第一丝杠650螺纹连接,第一安装座640抵接于第一轨道620,以限制第一安装座640跟随第一丝杠650转动。这样,第一传动机构可以采用丝杠传动的方式带动推料结构610沿长度方向移动。The first transmission mechanism can be constructed in any suitable manner. For example, as shown in FIG. It is arranged on the first rail 620 and extends along the length direction. The first mounting seat 640 is screwed to the first lead screw 650. The first mounting seat 640 abuts against the first rail 620 to restrict the first mounting seat 640 to follow the first Lead screw 650 rotates. In this way, the first transmission mechanism can drive the pusher structure 610 to move along the length direction by way of screw transmission.
在一些具体的实施方式中,参考图7所示,推料组件还包括第一引导结构,该第一引导结构用于引导第一安装座640沿长度方向移动,第一引导结构包括相配合的第一滑轨680和第一滑块670,第一滑轨680设置在第一轨道620上且沿长度方向延伸,第一滑块670设置在第一安装座640上。In some specific embodiments, as shown in FIG. 7 , the pusher assembly further includes a first guide structure, which is used to guide the first mounting seat 640 to move along the length direction, and the first guide structure includes a matching The first sliding rail 680 and the first sliding block 670 , the first sliding rail 680 is disposed on the first rail 620 and extends along the length direction, and the first sliding block 670 is disposed on the first mounting base 640 .
在一些实施方式中,参考图7所示,第一安装座640上设置有与推料结构610传动连接的第一驱动机构660,以用于驱动推料结构610沿高度方向移动。这样,在搬运机构2将待束带产品自来料堆叠区域110搬运至定位区域120后,推料结构610在第一驱动机构660的驱动下自下而上穿过定位区域120的横向通道130,然后沿着纵向通道140移动以将待束带产品推向挡料组件5,且在整理完成后,推料结构610在第一驱动机构660的驱动下自上而下穿过横向通道130并移动至输送线体1的上表面之下,以用于避让搬运机构2再次将新的待束带产品从来料堆叠区域110搬运至定位区域120。In some implementations, as shown in FIG. 7 , the first installation base 640 is provided with a first driving mechanism 660 in transmission connection with the pusher structure 610 for driving the pusher structure 610 to move along the height direction. In this way, after the conveying mechanism 2 transports the belt products from the incoming material stacking area 110 to the positioning area 120, the pushing structure 610 passes through the transverse channel 130 of the positioning area 120 from bottom to top under the drive of the first driving mechanism 660 , and then move along the longitudinal channel 140 to push the product to be belted to the blocking assembly 5, and after finishing, the pushing structure 610 is driven by the first driving mechanism 660 to pass through the transverse channel 130 from top to bottom and Move below the upper surface of the conveying line body 1 to avoid the transport mechanism 2 to transport the new product to be belted from the material stacking area 110 to the positioning area 120 again.
其中,第一驱动机构660可以以任意合适的方式构造,例如,第一驱动机构660可以构造为第一气缸,该第一气缸的缸体固连于第一安装座640、活塞杆固连于推料结构610。Wherein, the first driving mechanism 660 can be configured in any suitable manner, for example, the first driving mechanism 660 can be configured as a first air cylinder, the cylinder body of the first air cylinder is fixedly connected to the first mount 640, and the piston rod is fixedly connected to Pushing structure 610.
在一些实施方式中,参考图5所示,挡料组件5包括挡板510和第二驱动机构520,挡板510沿高度方向延伸,以用于止挡在待束带产品在沿长度方向上的一端,挡板510通过第二驱动机构520连接于输送线体1,第二驱动机构520用于驱动挡板510沿高度方向移动。这样,在搬运机构2将待束带产品搬运至定位区域120时,挡板510在第二驱动机构520的驱动下自下往上移动,用于与推料组件6相配合,以在长度方向上整理待束带产品。且在整理完毕后,挡板510在第二驱动机构520的驱动下重新回到输送线体1的下方,以用于避让搬运机构2将待束带产品自定位区域120搬运至束带机4上。In some embodiments, as shown in FIG. 5 , the blocking assembly 5 includes a blocking plate 510 and a second driving mechanism 520, the blocking plate 510 extends along the height direction, and is used to stop the product to be belted in the lengthwise direction. The baffle 510 is connected to the conveying line body 1 through the second driving mechanism 520, and the second driving mechanism 520 is used to drive the baffle 510 to move along the height direction. In this way, when the transport mechanism 2 transports the product to be belted to the positioning area 120, the baffle plate 510 moves from bottom to top under the drive of the second drive mechanism 520, and is used to cooperate with the pusher assembly 6, so as to move in the longitudinal direction. Organize products to be tied on top. And after sorting, the baffle plate 510 is driven by the second driving mechanism 520 to return to the bottom of the conveying line body 1, so as to avoid the conveying mechanism 2 and transport the products to be belted from the positioning area 120 to the belting machine 4 superior.
其中,第二驱动机构520可以以任意合适的方式构造,例如,第二驱动机构520可以构造为第二气缸,第二气缸的缸体固连于输送线体1、活塞杆固连于挡板510。Wherein, the second driving mechanism 520 can be configured in any suitable manner, for example, the second driving mechanism 520 can be configured as a second air cylinder, the cylinder body of the second air cylinder is fixedly connected to the transmission line body 1, and the piston rod is fixedly connected to the baffle plate 510.
搬运机构2可以根据实际应用需求以任意合适的方式构造,例如,在一些实施方式中,参考图8至图10所示,搬运机构2包括关于长度方向对称且间隔设置的两个轨道机构210,两个夹持结构3各自设置在对应的轨道机构210上,轨道机构210包括沿长度方向延伸的第二轨道211、沿宽度方向延伸的第三轨道212以及第二安装座213,第三轨道212可移动地设置在第二轨道211上,第二安装座213可移动地设置在第三轨道212上,夹持结构3沿高度方向可移动地设置在第二安装座213上。这样,第二安装座213可移动地设置在第三轨道212上,可以实现两个夹持结构3的相互靠近或远离,进而实现夹持组件的夹持功能;夹持结构3沿高度方向可移动地设置在第二安装座213上,可以实现对待束带产品在高度方向上的搬运;第三轨道212可移动地设置在第二轨道211上,可以实现待束带产品在来料堆叠区域110、定位区域120以及束带机4之间的搬运。The transport mechanism 2 can be configured in any suitable manner according to actual application requirements. For example, in some embodiments, as shown in FIG. 8 to FIG. The two clamping structures 3 are respectively arranged on the corresponding track mechanism 210, and the track mechanism 210 includes a second track 211 extending along the length direction, a third track 212 extending along the width direction, and a second mounting base 213, the third track 212 It is movably arranged on the second rail 211 , the second mounting seat 213 is movably arranged on the third rail 212 , and the clamping structure 3 is movably arranged on the second mounting seat 213 along the height direction. In this way, the second mounting seat 213 is movably arranged on the third track 212, so that the two clamping structures 3 can be moved closer or farther away from each other, thereby realizing the clamping function of the clamping assembly; the clamping structures 3 can be moved along the height direction. It is movably arranged on the second mounting seat 213, which can realize the conveyance of the belt products to be carried in the height direction; the third track 212 is movably arranged on the second track 211, and can realize the belt products to be stacked in the incoming material stacking area. 110 , the transfer between the positioning area 120 and the strapping machine 4 .
在一些具体的实施方式中,参考图8至图10所示,其中,图9和图10分别示出了图8中位于右侧的轨道机构210的俯视图和主视图,第二轨道211上设置有第二电机220和第二传动机构,第三轨道212通过第二传动机构沿长度方向移动。这样,通过第二电机220和第二传动机构可以实现第三轨道212沿长度方向的移动。In some specific implementation manners, referring to FIG. 8 to FIG. 10 , wherein FIG. 9 and FIG. 10 respectively show a top view and a front view of the track mechanism 210 on the right side in FIG. 8 , the second track 211 is set There is a second motor 220 and a second transmission mechanism, and the third track 212 moves along the length direction through the second transmission mechanism. In this way, the movement of the third rail 212 along the length direction can be realized by the second motor 220 and the second transmission mechanism.
其中,第二传动机构可以以任意合适的方式构造,例如,第二传动机构可以包括与第二电机220驱动连接的第二丝杠(图中未示出),第二丝杠可绕自身轴线转动地设置在第二轨道220上且沿长度方向延伸,第三轨道212与第二丝杠螺纹连接,第三轨道212抵接于第二轨道211,以限制第三轨道212跟随第二丝杠转动。这样,第二传动机构可以通过丝杠传动的方式实现第三轨道212沿长度方向的移动。Wherein, the second transmission mechanism can be constructed in any suitable manner, for example, the second transmission mechanism can include a second lead screw (not shown) that is drivingly connected with the second motor 220, and the second lead screw can rotate around its own axis Rotately arranged on the second track 220 and extending along the length direction, the third track 212 is threadedly connected with the second lead screw, and the third track 212 abuts against the second track 211 to limit the third track 212 to follow the second lead screw turn. In this way, the second transmission mechanism can realize the movement of the third track 212 along the length direction by way of screw transmission.
在一些具体的实施方式中,轨道机构210还包括第二引导结构(图中未示出),该第二引导结构用于引导第三轨道212沿长度方向移动,第二引导结构包括相配合的第二滑轨和第二滑块,第二滑轨设置在第二轨道211上且沿长度方向延伸,第二滑块设置在第三轨道212上。In some specific embodiments, the rail mechanism 210 further includes a second guide structure (not shown in the figure), which is used to guide the third rail 212 to move along the length direction, and the second guide structure includes a matching For the second sliding rail and the second sliding block, the second sliding rail is arranged on the second rail 211 and extends along the length direction, and the second sliding block is arranged on the third rail 212 .
在一些具体的实施方式中,参考图10所示,第三轨道212上设置有第三电机230和第三传动机构,第二安装座213通过第三传动机构沿宽度方向移动。这样,通过第三电机230和第三传动机构可以实现第二安装座213沿宽度方向的移动。In some specific implementations, as shown in FIG. 10 , a third motor 230 and a third transmission mechanism are arranged on the third track 212 , and the second mounting base 213 moves along the width direction through the third transmission mechanism. In this way, the movement of the second mounting base 213 along the width direction can be realized by the third motor 230 and the third transmission mechanism.
其中,第三传动机构可以以任意合适的方式构造,例如,第三传动机构包括与第三电机230驱动连接的第三丝杠240,第三丝杠240可绕自身轴线转动地设置在第三轨道212上且沿宽度方向延伸,第二安装座213与第三丝杠240螺纹连接,第二安装座213抵接于第三轨道212,以限制第二安装座213跟随第三丝杠240转动。这样,第三传动机构可以通过丝杠传动的方式实现第二安装座213在宽度方向上的移动。Wherein, the third transmission mechanism can be constructed in any suitable manner, for example, the third transmission mechanism includes a third lead screw 240 drivingly connected with the third motor 230, and the third lead screw 240 is rotatably arranged on the third On the track 212 and extending along the width direction, the second mounting base 213 is threadedly connected with the third lead screw 240 , and the second mounting base 213 abuts against the third track 212 to limit the rotation of the second mounting base 213 following the third lead screw 240 . In this way, the third transmission mechanism can realize the movement of the second mounting base 213 in the width direction by way of screw transmission.
在一些具体的实施方式中,参考图10所示,轨道机构210还包括第三引导结构,该第三引导结构用于引导第二安装座沿宽度方向移动,第三引导结构包括相配合的第三滑轨214和第三滑块215,第三滑轨214设置在第三轨道212上且沿宽度方向延伸,第三滑块215设置在第二安装座213上。In some specific implementation manners, as shown in FIG. 10 , the track mechanism 210 further includes a third guiding structure, which is used to guide the second installation seat to move along the width direction, and the third guiding structure includes a matching first There are three sliding rails 214 and a third sliding block 215 , the third sliding rail 214 is disposed on the third rail 212 and extends along the width direction, and the third sliding block 215 is disposed on the second mounting seat 213 .
在一些具体的实施方式中,参考图9和图11所示,第二安装座213上设置有与夹持结构3传动连接的第三驱动机构250,以用于驱动夹持结构3沿高度方向移动。其中,第三驱动机构250可以以任意合适的方式构造,例如,第三驱动机构250可以构造为第三气缸,第三气缸的缸体固连于第二安装座213、活塞杆固连于夹持结构3。这样,可以通过气缸驱动夹持结构3在高度方向上移动。In some specific implementations, as shown in FIG. 9 and FIG. 11 , the second mounting base 213 is provided with a third drive mechanism 250 in transmission connection with the clamping structure 3 for driving the clamping structure 3 along the height direction. move. Wherein, the third driving mechanism 250 can be configured in any suitable manner, for example, the third driving mechanism 250 can be configured as a third air cylinder, the cylinder body of the third air cylinder is fixedly connected to the second mount 213, and the piston rod is fixedly connected to the clip Hold structure 3. In this way, the clamping structure 3 can be driven to move in the height direction by the air cylinder.
在一些具体的实施方式中,参考图9所示,轨道机构210还包括第四引导结构,该第四引导结构用于引导夹持结构310沿高度方向移动,第四引导结构包括相配合的第四滑轨216和第四滑块217,第四滑轨216设置在第二安装座213上且沿高度方向延伸,第四滑块217设置在夹持结构310上。In some specific implementation manners, as shown in FIG. 9 , the track mechanism 210 further includes a fourth guiding structure, which is used to guide the clamping structure 310 to move along the height direction, and the fourth guiding structure includes a matching first Four sliding rails 216 and a fourth sliding block 217 , the fourth sliding rail 216 is disposed on the second installation seat 213 and extends along the height direction, and the fourth sliding block 217 is disposed on the clamping structure 310 .
根据本公开的第二方面,还提供一种束带设备,参考图1和图2所示,该束带设备包括束带机4和如上所述的束带设备的束前整理装置,输送线体1的出料端与束带机4对接,束带机4的上表面设置有用于避让夹持结构3的凹槽410。其中,输送线体1的出料端指的是输送线体1上定位区域120所在的一端,在定位区域120完成对待束带产品的整理后,搬运机构2通过夹持组件将整理好的待束带产品搬运至束带机4上进行束带。具体的,凹槽410的数量为多个,且多个凹槽410沿长度方向间隔地设置且均沿宽度方向延伸。这样,夹持组件将待束带产品放置与束带机4上时,可将卡爪320插入到对应的凹槽410中,以将待束带产品平稳的放置在束带机4上,随后夹持组件释放待束带产品并退出束带机4的束带框架,此时束带机4可对待束带产品束带。当待束带产品需要进行多次束带时,可通过夹持组件重新夹持待束带产品以挪动其在束带机4上的位置,直到完成规定的束带次数。由于上述的束前整理装置具有自动化程度高、工作效率高且人力成本低的优点,所以束带设备同样具备自动化程度高、工作效率高且人力成本低的优点,适宜推广应用。According to the second aspect of the present disclosure, there is also provided a strapping device, as shown in FIG. 1 and FIG. 2 , the strapping device includes a strapping machine 4 and the above-mentioned strapping device before the bunch finishing device, the conveyor line The discharge end of the body 1 is docked with the belt machine 4 , and the upper surface of the belt machine 4 is provided with a groove 410 for avoiding the clamping structure 3 . Wherein, the discharge end of the conveying line body 1 refers to the end where the positioning area 120 of the conveying line body 1 is located. The strap product is transported to the strap machine 4 for strapping. Specifically, there are multiple grooves 410, and the multiple grooves 410 are arranged at intervals along the length direction and all extend along the width direction. In this way, when the clamping assembly places the product to be tied on the belt machine 4, the claw 320 can be inserted into the corresponding groove 410, so that the product to be belted can be placed on the belt machine 4 smoothly, and then The clamping assembly releases the product to be laced and withdraws from the lacing frame of the lacing machine 4, at which point the lacing machine 4 can treat the lacing product as a belt. When the product to be banded needs to be banded multiple times, the product to be banded can be re-clamped by the clamping assembly to move its position on the banding machine 4 until the prescribed number of times of banding is completed. Since the above-mentioned bundle pre-sorting device has the advantages of high automation, high work efficiency and low labor cost, the strapping equipment also has the advantages of high automation, high work efficiency and low labor cost, and is suitable for popularization and application.
在一些实施方式中,参考图1和图2所示,束带机4背离输送线体1的一端对接有承接皮带线8,承接皮带线包括沿长度方向依次设置的承接滚筒810和皮带线820,且承接滚筒810对接于输送线体1的出料端且沿宽度方向延伸,搬运机构2用于通过夹持组件将束带机4上的产品搬运至承接滚筒810上,承接滚筒810的数量为多个,多个承接滚筒810沿长度方向间隔地设置,其中,承接滚筒810为动力滚筒。这样,在束带完成后,可通过搬运机构2将束带机4上的产品搬运到承接滚筒810上,由于承接滚筒810为动力滚筒,所以可将产品运输至皮带线820上,并由皮带线820将产品运输至下一道工序,例如,可在皮带线820上进行贴标签等。因此,通过设置承接皮带线8可以避免由人工从束带机4上搬取束带后的产品,可以提高工作效率,尤其对于重量较大的束带产品,且可以通过承接皮带线8将束带后的产品运至下一道工序。In some embodiments, as shown in FIG. 1 and FIG. 2 , the end of the belt conveyor 4 facing away from the conveying line body 1 is docked with a receiving belt line 8 , and the receiving belt line includes a receiving roller 810 and a belt line 820 arranged in sequence along the length direction. , and the receiving roller 810 is docked on the discharge end of the conveying line body 1 and extends along the width direction. The conveying mechanism 2 is used to transfer the product on the belt machine 4 to the receiving roller 810 through the clamping assembly. The number of receiving rollers 810 There are multiple receiving rollers 810 arranged at intervals along the length direction, wherein the receiving rollers 810 are power rollers. In this way, after the belting is completed, the product on the belting machine 4 can be transported to the receiving roller 810 by the transport mechanism 2. Since the receiving roller 810 is a power roller, the product can be transported to the belt line 820, and the product can be transported to the belt line 820 by the belt. The line 820 transports the product to the next process, for example, labeling and the like can be performed on the belt line 820 . Therefore, by arranging the receiving belt line 8, it is possible to avoid manually picking up the belted products from the belt machine 4, which can improve work efficiency, especially for heavy belt products, and the belt can be removed by the receiving belt line 8. The belted products are transported to the next process.
其中,皮带线820为皮带输送机,其上的皮带可采用绿色抗静电皮带,适用于需要抗静电处理的产品,例如液晶面板等。Among them, the belt line 820 is a belt conveyor, and the belt on it can be a green antistatic belt, which is suitable for products requiring antistatic treatment, such as liquid crystal panels.
此外,承接滚筒810可采用包胶抗静电动力滚筒,通过包胶工艺可以防止产品受损,同时适用于需要抗静电处理的产品,例如液晶面板等。In addition, the receiving roller 810 can adopt rubber-coated anti-static power rollers, which can prevent product damage through the rubber-coating process, and are also suitable for products that require anti-static treatment, such as liquid crystal panels.
以上结合附图详细描述了本公开的优选实施方式,但是,本公开并不限于上述实施方式中的具体细节,在本公开的技术构思范围内,可以对本公开的技术方案进行多种简单变型,这些简单变型均属于本公开的保护范围。The preferred embodiments of the present disclosure have been described in detail above in conjunction with the accompanying drawings. However, the present disclosure is not limited to the specific details of the above embodiments. Within the scope of the technical concept of the present disclosure, various simple modifications can be made to the technical solutions of the present disclosure. These simple modifications all belong to the protection scope of the present disclosure.
另外需要说明的是,在上述具体实施方式中所描述的各个具体技术特征,在不矛盾的情况下,可以通过任何合适的方式进行组合。为了避免不必要的重复,本公开对各种可能的组合方式不再另行说明。In addition, it should be noted that the various specific technical features described in the above specific implementation manners may be combined in any suitable manner if there is no contradiction. In order to avoid unnecessary repetition, various possible combinations are not further described in this disclosure.
此外,本公开的各种不同的实施方式之间也可以进行任意组合,只要其不违背本公开的思想,其同样应当视为本公开所公开的内容。In addition, various implementations of the present disclosure can also be combined in any way, as long as they do not violate the idea of the present disclosure, they should also be regarded as the content disclosed in the present disclosure.

Claims (17)

  1. 一种束带设备的束前整理装置,其特征在于,所述束前整理装置包括:A pre-bunch arrangement device for belt equipment, characterized in that the pre-bundle arrangement device includes:
    输送线体(1),该输送线体(1)上用于放置待束带产品;A conveying line body (1), which is used to place products to be tied on the conveying line body (1);
    搬运机构(2),该搬运机构(2)上设置有夹持组件,所述夹持组件具有沿所述输送线体(1)的宽度方向相对设置的两个夹持结构(3),以用于在所述宽度方向上可释放地抓取所述待束带产品,所述搬运机构(2)用于在所述输送线体(1)和束带机(4)之间移动所述夹持组件,以将所述输送线体(1)上的所述待束带产品搬运至所述束带机(4)上;以及A conveying mechanism (2), the conveying mechanism (2) is provided with a clamping assembly, and the clamping assembly has two clamping structures (3) arranged oppositely along the width direction of the conveying line body (1), so as to It is used to releasably grab the product to be tied in the width direction, and the handling mechanism (2) is used to move the clamp between the conveying line body (1) and the belt machine (4) holding assembly, so as to transport the product to be tied on the conveying line body (1) to the belt machine (4); and
    定位机构,该定位机构包括沿所述输送线体(1)的长度方向间隔设置的挡料组件(5)和推料组件(6),所述挡料组件(5)和所述推料组件(6)之间用于放置所述待束带产品,所述推料组件(6)包括推料结构(610)和第一轨道(620),所述推料结构(610)可移动地设置在所述第一轨道(620)上,以用于推动所述待束带产品朝向所述挡料组件(5)移动。A positioning mechanism, the positioning mechanism includes a blocking assembly (5) and a pushing assembly (6) arranged at intervals along the length direction of the conveying line body (1), and the blocking assembly (5) and the pushing assembly (6) is used to place the product to be belted, the pusher assembly (6) includes a pusher structure (610) and a first track (620), and the pusher structure (610) is movably arranged On the first track (620), it is used to push the product to be belted to move towards the stopper assembly (5).
  2. 根据权利要求1所述的束带设备的束前整理装置,其特征在于,所述输送线体(1)沿所述长度方向依次设置有来料堆叠区域(110)和定位区域(120),所述来料堆叠区域(110)用于接收来自上游设备输送的所述待束带产品,所述定位机构设置在所述定位区域(120),所述搬运机构(2)用于通过所述夹持组件将所述来料堆叠区域(110)的所述待束带产品搬运至所述定位区域(120)。The bundle finishing device of belt equipment according to claim 1, characterized in that, the conveying line body (1) is sequentially provided with an incoming material stacking area (110) and a positioning area (120) along the length direction, The incoming material stacking area (110) is used to receive the product to be belted from upstream equipment, the positioning mechanism is arranged in the positioning area (120), and the transport mechanism (2) is used to pass through the The clamping assembly transports the product to be belted in the incoming material stacking area (110) to the positioning area (120).
  3. 根据权利要求2所述的束带设备的束前整理装置,其特征在于,所述夹持结构(3)包括沿所述长度方向延伸的夹板(310)和设置在所述夹板(310)底端的夹爪(320),所述夹爪(320)的数量为多个,且多个所述夹爪(320)沿所述长度方向间隔地设置,所述定位区域(120)和所述来料堆叠区域(110)沿所述长度方向均间隔地设置有多个横向通道(130),多个所述横向通道(130)均沿所述宽度方向延伸,所述横向通道(130)用于供所述夹爪(320)穿过以抓取所述待束带产品。The bundle finishing device for belt equipment according to claim 2, characterized in that, the clamping structure (3) includes a splint (310) extending along the length direction and a splint (310) arranged at the bottom of the splint (310) The clamping jaws (320) at the end, the number of the clamping jaws (320) is multiple, and the multiple clamping jaws (320) are arranged at intervals along the length direction, the positioning area (120) and the coming The material stacking area (110) is provided with a plurality of transverse passages (130) at regular intervals along the length direction, and the plurality of transverse passages (130) all extend along the width direction, and the transverse passages (130) are used for Passed by the jaws (320) to grab the product to be tied.
  4. 根据权利要求3所述的束带设备的束前整理装置,其特征在于,所述第一轨道(620)设置在所述输送线体(1)的下方且沿所述长度方向延伸,所述推料结构(610)包括沿所述输送线体(1)的高度方向延伸的推杆(611),所述定位区域(120)设置有沿所述长度方向延伸的且用于供所述推杆(611)顶端穿过的纵向通道(140)。The bundle finishing device of belt equipment according to claim 3, characterized in that, the first track (620) is arranged below the conveying line body (1) and extends along the length direction, the The pushing structure (610) includes a pushing rod (611) extending along the height direction of the conveying line body (1), and the positioning area (120) is provided with a push rod extending along the length direction and used for the pushing rod. A longitudinal channel (140) through which the tip of the rod (611) passes.
  5. 根据权利要求4所述的束带设备的束前整理装置,其特征在于,所述推料结构(610)还包括设置在所述推杆(611)顶端的多个推料块(612),多个所述推料块(612)沿所述宽度方向间隔地设置,相邻两个所述推料块(612)之间、所述推杆(611)与与其相邻的所述推料块(612)之间均通过连接板(613)可拆卸地连接,且多个所述推料块(612)均能够穿过所述定位区域(120)的横向通道(130)以在所述推杆(611)的带动下沿所述长度方向推动所述待束带产品。The pre-bundle finishing device for strap equipment according to claim 4, characterized in that, the pushing structure (610) further comprises a plurality of pushing blocks (612) arranged at the top of the pushing rod (611), A plurality of the pusher blocks (612) are arranged at intervals along the width direction, between two adjacent pusher blocks (612), the pusher rod (611) and the pusher adjacent to it The blocks (612) are detachably connected by connecting plates (613), and a plurality of pushing blocks (612) can pass through the transverse channel (130) of the positioning area (120) to Driven by the push rod (611), the product to be tied is pushed along the length direction.
  6. 根据权利要求5所述的束带设备的束前整理装置,其特征在于,所述定位区域(120)设置有多个均沿所述长度方向延伸的避让槽通道(150),所述推料块(612)穿过所述定位区域(120)的横向通道(130)后其底端用于插入所述避让槽通道(150)且能够沿着所述避让槽通道(150)的延伸方向移动。The pre-bundle finishing device of belt equipment according to claim 5, characterized in that, the positioning area (120) is provided with a plurality of avoidance groove channels (150) all extending along the length direction, and the pusher After the block (612) passes through the transverse channel (130) of the positioning area (120), its bottom end is used to insert into the avoidance groove channel (150) and can move along the extending direction of the avoidance groove channel (150) .
  7. 根据权利要求2所述的束带设备的束前整理装置,其特征在于,所述定位区域(120)的上表面设置有多个万向球(7),该多个万向球(7)用于滑动承载所述待束带产品。The pre-beam finishing device of the belt equipment according to claim 2, characterized in that, the upper surface of the positioning area (120) is provided with a plurality of universal balls (7), and the plurality of universal balls (7) It is used to slide and carry the product to be tied.
  8. 根据权利要求1-7中任意一项所述的束带设备的束前整理装置,其特征在于,所述输送线体(1)的上表面设置有防磨层,该防磨层为粘接在所述输送线体(1)上的铁氟龙。The bundle finishing device of the belt equipment according to any one of claims 1-7, characterized in that, the upper surface of the conveying line body (1) is provided with a wear-resistant layer, and the wear-resistant layer is bonded Teflon on the delivery line body (1).
  9. 根据权利要求1所述的束带设备的束前整理装置,其特征在于,所述推料组件(6)还包括第一电机(630)、第一传动机构以及第一安装座(640),所述推料结构(610)设置在所述第一安装座(640)上,所述第一安装座(640)通过所述第一传动机构沿所述长度方向移动,所述第一传动机构包括与所述第一电机(630)驱动连接的第一丝杠(650),所述第一丝杠(650)可绕自身轴线转动地设置在所述第一轨道(620)上且沿所述长度方向延伸,所述第一安装座(640)与所述第一丝杠(650)螺纹连接,所述第一安装座(640)抵接于所述第一轨道(620),以限制所述第一安装座(640)跟随所述第一丝杠(650)转动。The pre-bundle finishing device for belt equipment according to claim 1, characterized in that, the pusher assembly (6) further comprises a first motor (630), a first transmission mechanism and a first mounting base (640), The pushing structure (610) is arranged on the first installation seat (640), and the first installation seat (640) moves along the length direction through the first transmission mechanism, and the first transmission mechanism It includes a first lead screw (650) drivingly connected with the first motor (630), the first lead screw (650) is rotatably arranged on the first track (620) around its own axis and along the The first mounting seat (640) is threadedly connected to the first lead screw (650), and the first mounting seat (640) abuts against the first track (620) to limit The first mounting seat (640) rotates following the first lead screw (650).
  10. 根据权利要求9所述的束带设备的束前整理装置,其特征在于,所述第一安装座(640)上设置有与所述推料结构(610)传动连接的第一驱动机构(660),以用于驱动所述推料结构(610)沿所述高度方向移动,所述第一驱动机构(660)构造为第一气缸,所述第一气缸的缸体固连于所述第一安装座(640)、活塞杆固连于所述推料结构(610)。The pre-bundle finishing device of belt equipment according to claim 9, characterized in that, the first mounting seat (640) is provided with a first driving mechanism (660) which is in transmission connection with the pushing structure (610) ), to drive the pushing structure (610) to move along the height direction, the first driving mechanism (660) is configured as a first air cylinder, and the cylinder body of the first air cylinder is fixedly connected to the first A mounting seat (640) and a piston rod are fixedly connected to the pushing structure (610).
  11. 根据权利要求1所述的束带设备的束前整理装置,其特征在于,所述挡料组件(5)包括挡板(510)和第二驱动机构(520),所述挡板(510)沿所述高度方向延伸,以用于止挡在所述待束带产品在沿所述长度方向上的一端,所述挡板(510)通过所述第二驱动机构(520)连接于所述输送线体(1),所述第二驱动机构(520)用于驱动所述挡板(510)沿所述高度方向移动,所述第二驱动机构(520)构造为第二气缸,所述第二气缸的缸体固连于所述输送线体(1)、活塞杆固连于所述挡板(510)。The bundle finishing device of belt equipment according to claim 1, characterized in that, the stopper assembly (5) includes a stopper (510) and a second drive mechanism (520), and the stopper (510) extending along the height direction, for stopping at one end of the product to be belted along the length direction, the baffle plate (510) is connected to the Conveying the line body (1), the second drive mechanism (520) is used to drive the baffle plate (510) to move along the height direction, the second drive mechanism (520) is configured as a second cylinder, the The cylinder body of the second cylinder is fixedly connected to the conveying line body (1), and the piston rod is fixedly connected to the baffle plate (510).
  12. 根据权利要求1所述的束带设备的束前整理装置,其特征在于,所述搬运机构(2)包括关于所述长度方向对称且间隔设置的两个轨道机构(210),两个所述夹持结构(3)各自设置在对应的轨道机构(210)上,所述轨道机构(210)包括沿所述长度方向延伸的第二轨道(211)、沿所述宽度方向延伸的第三轨道(212)以及第二安装座(213),所述第三轨道(212)可移动地设置在所述第二轨道(211)上,所述第二安装座(213)可移动地设置在所述第三轨道(212)上,所述夹持结构(3)沿所述高度方向可移动地设置在第二安装座(213)上。The bundle finishing device of belt equipment according to claim 1, characterized in that, the transport mechanism (2) comprises two rail mechanisms (210) that are symmetrically arranged with respect to the length direction and spaced apart, and the two The clamping structures (3) are each arranged on a corresponding track mechanism (210), and the track mechanism (210) includes a second track (211) extending along the length direction, a third track extending along the width direction (212) and the second mount (213), the third rail (212) is movably arranged on the second rail (211), and the second mount (213) is movably arranged on the On the third rail (212), the clamping structure (3) is movably arranged on the second mounting base (213) along the height direction.
  13. 根据权利要求12所述的束带设备的束前整理装置,其特征在于,所述第二轨道(211)上设置有第二电机(220)和第二传动机构,所述第三轨道(212)通过所述第二传动机构沿所述长度方向移动,所述第二传动机构包括与所述第二电机(220)驱动连接的第二丝杠,所述第二丝杠可绕自身轴线转动地设置在所述第二轨道(220)上且沿所述长度方向延伸,所述第三轨道(212)与所述第二丝杠螺纹连接,所述第三轨道(212)抵接于所述第二轨道(211),以限制所述第三轨道(212)跟随所述第二丝杠转动。The bundle finishing device of belt equipment according to claim 12, characterized in that, the second track (211) is provided with a second motor (220) and a second transmission mechanism, and the third track (212 ) moves along the length direction through the second transmission mechanism, the second transmission mechanism includes a second lead screw drivingly connected with the second motor (220), and the second lead screw can rotate around its own axis is arranged on the second track (220) and extends along the length direction, the third track (212) is screwed with the second lead screw, and the third track (212) abuts against the The second track (211) is connected to limit the rotation of the third track (212) following the second lead screw.
  14. 根据权利要求12所述的束带设备的束前整理装置,其特征在于,所述第三轨道(212)上设置有第三电机(230)和第三传动机构,所述第二安装座(213)通过所述第三传动机构沿所述宽度方向移动,所述第三传动机构包括与所述第三电机(230)驱动连接的第三丝杠(240),所述第三丝杠(240)可绕自身轴线转动地设置在所述第三轨道(212)上且沿所述宽度方向延伸,所述第二安装座(213)与所述第三丝杠(240)螺纹连接,所述第二安装座(213)抵接于所述第三轨道(212),以限制所述第二安装座(213)跟随所述第三丝杠(240)转动。The bundle finishing device of belt equipment according to claim 12, characterized in that, the third track (212) is provided with a third motor (230) and a third transmission mechanism, and the second mounting base ( 213) move along the width direction through the third transmission mechanism, the third transmission mechanism includes a third lead screw (240) drivingly connected with the third motor (230), the third lead screw ( 240) is rotatably arranged on the third track (212) around its own axis and extends along the width direction, and the second mounting seat (213) is screwed to the third lead screw (240), so The second mounting seat (213) abuts against the third track (212) to restrict the second mounting seat (213) from rotating following the third lead screw (240).
  15. 根据权利要求12所述的束带设备的束前整理装置,其特征在于,所述第二安装座(213)上设置有与所述夹持结构(3)传动连接的第三驱动机构(250),以用于驱动所述夹持结构(3)沿所述高度方向移动,所述第三驱动机构(250)构造为第三气缸,所述第三气缸的缸体固连于所述第二安装座(213)、活塞杆固连于所述夹持结构(3)。The pre-bundle finishing device for strap equipment according to claim 12, characterized in that, the second mounting base (213) is provided with a third drive mechanism (250) that is in transmission connection with the clamping structure (3) ), for driving the clamping structure (3) to move along the height direction, the third driving mechanism (250) is configured as a third air cylinder, and the cylinder body of the third air cylinder is fixedly connected to the first The two mounting seats (213) and the piston rod are fixedly connected to the clamping structure (3).
  16. 一种束带设备,其特征在于,所述束带设备包括束带机(4)和根据权利要求1-15中任意一项所述的束带设备的束前整理装置,所述输送线体(1)的出料端与所述束带机(4)对接,所述束带机(4)的上表面设置有用于避让所述夹持结构(3)的凹槽(410)。A strapping device, characterized in that the strapping device comprises a strapping machine (4) and a pre-bundle finishing device of the strapping device according to any one of claims 1-15, the conveying line body The discharge end of (1) is docked with the banding machine (4), and the upper surface of the banding machine (4) is provided with a groove (410) for avoiding the clamping structure (3).
  17. 根据权利要求16所述的束带设备,其特征在于,所述束带机(4)背离所述输送线体(1)的一端对接有承接皮带线(8),所述承接皮带线包括沿所述长度方向依次设置的承接滚筒(810)和皮带线(820),且所述承接滚筒(810)对接于所述输送线体(1)的出料端且沿所述宽度方向延伸,所述搬运机构(2)用于通过所述夹持组件将所述束带机(4)上的产品搬运至所述承接滚筒(810)上,所述承接滚筒(810)的数量为多个,多个所述承接滚筒(810)沿所述长度方向间隔地设置,其中,所述承接滚筒(810)为动力滚筒。The strapping device according to claim 16, characterized in that, one end of the strapping machine (4) away from the conveying line body (1) is docked with a receiving belt line (8), and the receiving belt line includes The receiving roller (810) and the belt line (820) are sequentially arranged in the longitudinal direction, and the receiving roller (810) is docked at the discharge end of the conveying line body (1) and extends along the width direction, so The conveying mechanism (2) is used to convey the product on the belt machine (4) to the receiving roller (810) through the clamping assembly, and the number of the receiving roller (810) is multiple, A plurality of the receiving rollers (810) are arranged at intervals along the length direction, wherein the receiving rollers (810) are power rollers.
PCT/CN2021/127224 2021-07-09 2021-10-29 Pre-bundling arrangement apparatus of bundling device, and bundling device WO2023279587A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202110777646.0A CN113401417A (en) 2021-07-09 2021-07-09 Pre-bundling finishing device of belt equipment and belt equipment
CN202110777646.0 2021-07-09

Publications (1)

Publication Number Publication Date
WO2023279587A1 true WO2023279587A1 (en) 2023-01-12

Family

ID=77685737

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/127224 WO2023279587A1 (en) 2021-07-09 2021-10-29 Pre-bundling arrangement apparatus of bundling device, and bundling device

Country Status (2)

Country Link
CN (1) CN113401417A (en)
WO (1) WO2023279587A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117209104A (en) * 2023-11-08 2023-12-12 成都嘉德数源环保科技有限公司 Rural sewage integrated treatment device and treatment method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113401417A (en) * 2021-07-09 2021-09-17 江苏宏芯亿泰智能装备有限公司 Pre-bundling finishing device of belt equipment and belt equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160280475A1 (en) * 2015-03-23 2016-09-29 Krones Aktiengesellschaft Method and apparatus for handling articles, piece goods, or bundles, respectively
CN107128522A (en) * 2017-06-23 2017-09-05 佛山市德力泰科技有限公司 A kind of efficient strapper of parallel-moving type
CN109094882A (en) * 2018-07-26 2018-12-28 佛山奎丰商务咨询服务有限公司 A kind of automatic band packing apparatus of packing box
CN209225463U (en) * 2018-12-21 2019-08-09 三门友谊包装有限公司 A kind of collating unit of cardboard bind hider
CN111516946A (en) * 2020-04-07 2020-08-11 浙江环力智能科技股份有限公司 Packing carton band device
CN112678234A (en) * 2020-12-09 2021-04-20 河南天悦包装有限公司 Automatic packing system of packing box
CN113401417A (en) * 2021-07-09 2021-09-17 江苏宏芯亿泰智能装备有限公司 Pre-bundling finishing device of belt equipment and belt equipment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN207644688U (en) * 2017-10-11 2018-07-24 杭州娃哈哈精密机械有限公司 A kind of magnetic shoe automatic packing production chain
CN211468909U (en) * 2020-01-14 2020-09-11 四川卡库机器人科技有限公司 Sheet material pushing mechanism and pushing and binding device
CN212243997U (en) * 2020-03-30 2020-12-29 浙江环力智能科技股份有限公司 Pre-bundling finishing device for belt bundling equipment
CN213323897U (en) * 2020-09-25 2021-06-01 联盛(厦门)彩印有限公司 Automatic packing plant of carton
CN112141391B (en) * 2020-10-19 2022-06-10 山东金号家纺集团有限公司 A baling press for towel encapsulation
CN213566716U (en) * 2020-11-02 2021-06-29 四川卡库机器人科技有限公司 Sheet material steering device
CN112849507A (en) * 2021-03-01 2021-05-28 苏州镭拓精工机械科技有限公司 Automatic PCB strapping machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160280475A1 (en) * 2015-03-23 2016-09-29 Krones Aktiengesellschaft Method and apparatus for handling articles, piece goods, or bundles, respectively
CN107128522A (en) * 2017-06-23 2017-09-05 佛山市德力泰科技有限公司 A kind of efficient strapper of parallel-moving type
CN109094882A (en) * 2018-07-26 2018-12-28 佛山奎丰商务咨询服务有限公司 A kind of automatic band packing apparatus of packing box
CN209225463U (en) * 2018-12-21 2019-08-09 三门友谊包装有限公司 A kind of collating unit of cardboard bind hider
CN111516946A (en) * 2020-04-07 2020-08-11 浙江环力智能科技股份有限公司 Packing carton band device
CN112678234A (en) * 2020-12-09 2021-04-20 河南天悦包装有限公司 Automatic packing system of packing box
CN113401417A (en) * 2021-07-09 2021-09-17 江苏宏芯亿泰智能装备有限公司 Pre-bundling finishing device of belt equipment and belt equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117209104A (en) * 2023-11-08 2023-12-12 成都嘉德数源环保科技有限公司 Rural sewage integrated treatment device and treatment method thereof
CN117209104B (en) * 2023-11-08 2024-01-02 成都嘉德数源环保科技有限公司 Rural sewage integrated treatment device and treatment method thereof

Also Published As

Publication number Publication date
CN113401417A (en) 2021-09-17

Similar Documents

Publication Publication Date Title
WO2023279587A1 (en) Pre-bundling arrangement apparatus of bundling device, and bundling device
CN207030375U (en) More specification object carrying support transmission equipments
CN113772164A (en) Packaging system and method of use
CN105197279A (en) Segmented bundling equipment for strip-shaped soft materials
CN103863612A (en) Material sorting mechanism of columnar explosives and material sorting device
US6155775A (en) Destacking feeder
US7168910B2 (en) Device for transporting a horizontal stack positioned on a support and formed in a gathering machine with upright, lined-up signatures
CN111483644A (en) Material packaging system and betel nut packaging system
CN114735277B (en) Full-automatic mining anchoring agent boxing and stacking production line and production method thereof
CN207046390U (en) Object carrying support transmission equipment
CN108313745A (en) Robot flood handgrip
CN110589140B (en) Strapping device
CN215884201U (en) Double-station packaging equipment
CN213323897U (en) Automatic packing plant of carton
CN210102760U (en) Double-assembly-line feeding device
CN211544817U (en) Bearing roller conveyor with PVC conveyer belt
US6325592B1 (en) Method and device for removing printed products from a conveying stream and for stacking the removed printed products
JP2001219909A (en) Carry-put conveyer of bundler
CN210417089U (en) West tile strapping machine
JP2003191911A (en) Binder and binding method thereof
CN219031093U (en) Automatic loading device
WO2023128269A1 (en) Packaging apparatus
CN216360241U (en) Truck battery clamping and conveying mechanism
CN217805542U (en) Automatic stacking device applied to belt binding machine
CN220199714U (en) Nylon belt packer for bundling stainless steel pipes

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21949073

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE