WO2023218699A1 - 建設用装置 - Google Patents

建設用装置 Download PDF

Info

Publication number
WO2023218699A1
WO2023218699A1 PCT/JP2023/001868 JP2023001868W WO2023218699A1 WO 2023218699 A1 WO2023218699 A1 WO 2023218699A1 JP 2023001868 W JP2023001868 W JP 2023001868W WO 2023218699 A1 WO2023218699 A1 WO 2023218699A1
Authority
WO
WIPO (PCT)
Prior art keywords
belt conveyor
main body
unit
conveyor
input
Prior art date
Application number
PCT/JP2023/001868
Other languages
English (en)
French (fr)
Inventor
三宅隆誠
草野正明
黒川洋之
山口亮太
蛯原明光
Original Assignee
日本国土開発株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本国土開発株式会社 filed Critical 日本国土開発株式会社
Publication of WO2023218699A1 publication Critical patent/WO2023218699A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/71Feed mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/02Disintegrating by mills having rotary beater elements ; Hammer mills with horizontal rotor shaft
    • B02C13/04Disintegrating by mills having rotary beater elements ; Hammer mills with horizontal rotor shaft with beaters hinged to the rotor; Hammer mills
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09CRECLAMATION OF CONTAMINATED SOIL
    • B09C1/00Reclamation of contaminated soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material

Definitions

  • the present invention relates to construction equipment.
  • each unit is provided with a connecting portion for engaging (connecting) with other units.
  • the unit to be installed is lifted up with a crane, etc., and transported to the vicinity of the installation location, and while being lowered to the installation location, the connection part of the unit to be installed is connected to other units. Let's engage with.
  • the unit to be installed cannot be installed at the installation position in an appropriate state due to the relationship between the degree of freedom of the connection part and the degree of freedom of other parts.
  • the construction equipment includes a first unit that performs a first process on an object to be treated, and a second unit that performs a second process on the object to be treated.
  • the second unit has a main body part that executes the second step, and a stand part that supports the main body part, the stand part is connected to the main body part at a first connection part, The main body is engaged with the first unit at a second connecting portion, and the above-mentioned
  • a variable mechanism having a metal high-rigidity portion that varies the distance between the first connecting portion and the second connecting portion is provided.
  • the construction equipment includes a first unit that includes a processing device that performs a first step on the object to be processed, a base that supports the processing device, and a first unit that performs the first step on the object to be processed.
  • a second unit having a main body for performing a second step, and a first support for supporting the main body; It has an extending shaft member and a support member that rotatably supports the shaft member around the uniaxial direction.
  • the unit can be installed at a construction site or the like in an appropriate state. Moreover, in the second aspect, the unit can be easily installed.
  • FIG. 1 is a perspective view of a mixing system according to one embodiment.
  • FIG. It is a partial cross-sectional view of the earth and sand mixing device.
  • FIG. 3(a) is a perspective view of the discharge belt conveyor and the soil mixing device
  • FIG. 3(b) is a diagram showing the discharge belt conveyor and the soil mixing device as viewed from the +Y side.
  • FIG. 4(a) is a cross-sectional view taken along the line AA in FIG. 2
  • FIG. 4(b) is a diagram for explaining a case where the conveyor main body of the discharge belt conveyor is disposed in a shifted manner. It is a perspective view showing a V-groove bearing mechanism.
  • FIG. 3(a) is a perspective view of the discharge belt conveyor and the soil mixing device
  • FIG. 3(b) is a diagram showing the discharge belt conveyor and the soil mixing device as viewed from the +Y side.
  • FIG. 4(a) is a cross-sectional view taken along the line AA in FIG
  • FIG. 6(a) is a perspective view showing a part of the input belt conveyor 12, the soil mixing device 10, and the discharge belt conveyor 14, and FIG. 6(b) is a perspective view of the input belt conveyor, the soil mixing device 10, and the discharge belt conveyor. It is a figure showing a state where a part is seen from +Y direction.
  • FIG. 7(a) is an enlarged perspective view showing the vicinity of the front legs of the input belt conveyor, and FIG. 7(b) is a perspective view showing the vicinity of the +Y side end of the input belt conveyor.
  • FIGS. 8(a) to 8(c) are diagrams (part 1) schematically showing the procedure for installing the input belt conveyor.
  • FIGS. 9(a) to 9(c) are diagrams (part 2) schematically showing the procedure for installing the input belt conveyor.
  • FIGS. 10(a) and 10(b) are diagrams for explaining the case where the head chute is not flipped up.
  • FIGS. 11(a) to 11(f) are diagrams for explaining the effects of the link mechanism.
  • FIG. 12(a) is a diagram showing one weighing belt conveyor viewed from the +X direction
  • FIG. 12(b) is a perspective view schematically showing two weighing belt conveyors and a charging belt conveyor. be.
  • FIG. 2 is an enlarged perspective view showing the vicinity of the front leg of one weighing belt conveyor.
  • FIGS. 14(a) and 14(b) are perspective views showing the apron feeder. It is a figure which shows the state which looked at the other weighing belt conveyor from the +X direction.
  • FIG. 3 is a diagram schematically showing a reference state of two weighing belt conveyors and a charging belt conveyor as viewed from the +Z direction.
  • FIG. 18(a) is a schematic diagram showing a state in which the conveyor main body is tilted from the standard state
  • FIG. 18(b) is a schematic diagram showing a state in which the tail frame is tilted from the standard state.
  • FIGS. 19(a) and 19(b) are diagrams (part 1) for explaining a case where a displacement occurs in the positional relationship with the input belt conveyor due to an impact when installing the weighing belt conveyor.
  • FIG. 12 is a diagram (Part 2) for explaining a case where the impact when installing the weighing belt conveyor causes a shift in the positional relationship with the input belt conveyor.
  • FIG. 3 is a diagram schematically showing the degrees of freedom of each part in the mixing system in one embodiment.
  • FIG. 1 shows a perspective view of a mixing system 100 as construction equipment according to an embodiment.
  • the mixing system 100 in FIG. 1 is a system installed at a construction site or the like.
  • the mixing system 100 includes a soil mixing device (twister) 10, an input belt conveyor 12, an output belt conveyor 14, weighing belt conveyors 16 and 18 as subunits, and apron feeders 20 and 22. and a powder feeder 24.
  • a soil mixing device twister
  • Each unit included in the mixing system 100 of this embodiment is a stationary unit placed at a predetermined position at a construction site.
  • the vertical direction is the Z-axis direction
  • the left-right direction in FIG. 1 is the X-axis direction
  • the depth direction is the Y-axis direction in a plane perpendicular to the Z-axis.
  • the soil mixing device 10 is equipped with an impact applying member (impact member) that rotates at high speed within a cylindrical container, and uses the impact force of the impact member to crush and pulverize construction generated soil placed into the container. It is. That is, in this embodiment, the earth and sand mixing device 10 corresponds to the first unit, and the processing performed by the earth and sand mixing device 10 corresponds to the first step.
  • the construction generated soil input into the soil mixing device 10 may be added with additives (lime-based solidifying agents such as quicklime and slaked lime, cement-based solidifying agents such as ordinary cement and blast furnace cement, or polymeric materials) as necessary. soil conditioners, natural fibers, etc.). This allows the properties and strength of the improved soil to be adjusted. That is, in this embodiment, construction generated soil or construction generated soil mixed with an additive corresponds to the object to be treated.
  • FIG. 2 shows a partially cross-sectional view of the soil mixing device 10 as seen from the +Y side.
  • the earth and sand mixing device 10 includes a pedestal 102, a fixed drum 104, a rotating drum 106, and a rotating mechanism 108.
  • the pedestal 102 is a pedestal that holds each part of the earth and sand mixing device 10.
  • Fixed drum 104 is a cylindrical container and is fixed to pedestal 102 .
  • the object to be treated is inputted into the fixed drum 104 via the input port member 111, and the object (construction generated soil) is introduced into the rotating drum 106 provided on the lower side (-Z side) of the fixed drum 104.
  • the rotating drum 106 is a cylindrical container, and rotates (rotates) around the central axis of the cylinder (around the Z axis) by a rotating drum driving motor (not shown). Since the rotating drum 106 is supported by the pedestal 102 via a plurality of support rollers 110, it is configured to rotate smoothly in response to the rotational force of the rotating drum driving motor. Note that the rotation direction of the rotating drum 106 and the rotation direction of the impact member 112 may be the same rotation direction or may be opposite rotation directions.
  • One or more scraping rods (scrapers) 114 are provided inside the rotating drum 106.
  • the scraping rod 114 is in contact with the inner peripheral surface of the rotating drum 106 and is fixed to the fixed drum 104. Therefore, as the rotating drum 106 rotates, the scraping rod 114 moves relatively along the inner peripheral surface of the rotating drum 106. As a result, even if the object to be processed is attached to the inner peripheral surface of the rotating drum 106, the object to be processed is scraped off by the scraping rod 114 as the rotating drum 106 rotates.
  • a chute 113 is provided on the lower side (-Z side) of the rotating drum 106.
  • the chute 113 has a function as an entrance portion for guiding the processing object processed within the rotary drum 106 to the discharge belt conveyor 14.
  • the discharge belt conveyor 14 surrounds the lower opening of the chute 113 (the exit portion of the chute 113).
  • the rotation mechanism 108 includes a rotation shaft 116 arranged at the center of the fixed drum 104 and the rotation drum 106 and extending in the vertical direction (Z-axis direction), a pulley 118 provided at the upper end of the rotation shaft 116, and a rotation shaft 116 arranged at the center of the fixed drum 104 and the rotation drum 106.
  • Two impact members 112 are provided in upper and lower stages near the lower end.
  • the rotating shaft 116 is a cylindrical member, and is rotatably held by the pedestal 102 via two ball bearings 120a and 120b provided on the upper surface of the pedestal 102.
  • a spacer 122 is provided between the two ball bearings 120a, 120b, and a predetermined distance is formed between the ball bearings 120a, 120b.
  • the lower end of the rotating shaft 116 is located inside the rotating drum 106 and is a free end. That is, the rotating shaft 116 is supported in a cantilevered manner.
  • the pulley 118 is connected to a motor 155 (not shown in FIG. 2, see FIG. 1) via a belt.
  • a motor 155 rotates, the pulley 118 and rotating shaft 116 rotate.
  • Each of the two stages of impact members 112 has a plurality of (for example, four) metal chains 124, and a thick steel plate 126 is provided at the tip of each chain 124. Chains 124 are provided around rotating shaft 116 at equal intervals.
  • the impact member 112 is centrifugally rotated by the rotation of the rotating shaft 116, and the thick plate 126 moves at high speed near the inner peripheral surface of the rotating drum 106, thereby crushing or mixing the object to be processed.
  • the number of chains 124 and planks 126 of the impact member 112 can be adjusted depending on the type and properties of the raw soil, the amount of treatment, the type and amount of additives, the target quality of the improved soil, and the like.
  • the processing target conveyed by the input belt conveyor 12 is inputted into the fixed drum 104 via the input port member 111, it is moved by the impact member 112 within the rotating drum 106.
  • the materials are crushed, mixed, and discharged below the rotating drum 106.
  • the processing target discharged below the rotary drum 106 passes through the chute 113 and is thrown onto the discharge belt conveyor 14, and is transported by the discharge belt conveyor 14 in the -X direction and the +Z direction in FIG. It has become.
  • the crushing/mixing performance and the amount of deflection of the rotation shaft 116 can be maintained small, and the rotation shaft 116 can be kept small. 116 can be shortened. Thereby, the height dimension of the earth and sand mixing device 10 can be reduced.
  • the earth and sand mixing device 10 (frame 102) is installed on an iron plate 130 laid on the ground. Since the ground below the iron plate 130 is leveled horizontally, the upper surface of the iron plate 130 is horizontal. Therefore, the earth and sand mixing device 10 is also installed without tilting (with the rotating shaft 116 extending in the Z-axis direction). That is, in this embodiment, the iron plate 130 corresponds to a base.
  • FIG. 3(a) shows a perspective view of the discharge belt conveyor 14 and the soil mixing device 10
  • FIG. 3(b) shows the state of the discharge belt conveyor 14 and the soil mixing device 10 seen from the +Y side ( side view) is shown.
  • the discharge belt conveyor 14 includes a conveyor main body 142, a front leg 144, and a rotation bearing mechanism 146, as shown in FIGS. 3(a) and 3(b).
  • the conveyor main body 142 has a belt that conveys the crushed and mixed treatment target discharged from the earth and sand mixing device 10 in the ⁇ X direction and the +Z direction. That is, in this embodiment, the discharge belt conveyor 14 corresponds to the second unit, and the conveyor main body 142 corresponds to the main body. Furthermore, in this embodiment, transporting the object to be processed corresponds to the second step.
  • the front leg 144 is provided near the -X side end of the bottom surface of the conveyor main body 142 via a rotation shaft 148.
  • the front legs 144 When the front legs 144 are installed at a construction site, they are opened in the direction of arrow AR1 shown in FIG. 3(b), and are in an upright state as shown in FIG. 3(b). That is, the discharge belt conveyor 14 can stand on its own.
  • the front legs 144 when the discharge belt conveyor 14 is being transported, the front legs 144 are rotated in the direction of arrow AR2 shown in FIG. 3(b) and are in a folded state. This allows the volume of the discharge belt conveyor 14 to be reduced during transportation, making transportation easier.
  • the front leg 144 includes a substantially rectangular frame-shaped script body part 145 and a spherical bearing mechanism 147 provided on the lower side of the script body part 145.
  • the spherical bearing mechanism 147 is a connecting part that allows the posture of the script body part 145 to change with respect to the iron plate 130, and connects the spherical seat 152, the spherical bearing member 154 provided in the spherical seat 152, and the spherical bearing member 154 and the script body. It has a columnar member 156 that connects the portion 145. That is, in this embodiment, the front leg 144 corresponds to a second support part, and the script body part 145 corresponds to a leg part.
  • the spherical seat 152 is fixed to the iron plate 130 laid on the ground with bolts or the like while the position and posture of the discharge belt conveyor 14 are fixed.
  • the spherical bearing member 154 can rotate with respect to the spherical seat 152 in a rotational direction around the X-axis, a rotational direction around the Y-axis, and a rotational direction around the Z-axis. That is, the spherical bearing member 154 has three degrees of freedom ( ⁇ x, ⁇ y, ⁇ z).
  • the rotary bearing mechanism 146 includes a pair of shaft holding members 244 provided on the +Y side and the -Y side of the conveyor main body 142 (the shaft holding member 244 on the -Y side is not shown). , a columnar shaft member 245 extending in the Y-axis direction held by a pair of shaft holding members 244, and a pair of block members 246 with which the shaft member 245 engages.
  • a V-groove is formed on the upper surface of the block member 246, and the shaft member 245 engages with the V-groove.
  • the pair of block members 246 are fixed to the iron plate 130 with bolts or the like while being lined up along the Y-axis direction.
  • the shaft member 245 is restricted from moving in the X-axis direction, the Z-axis direction, and the ⁇ x, ⁇ z directions, and is allowed to move in the Y-axis direction and rotate around the Y-axis.
  • the block member 246 may be formed with a U groove instead of the V groove.
  • the rotary bearing mechanism 146 corresponds to a first support part
  • the block member 246 corresponds to a support member that rotatably supports the shaft member 245 around one axis (Y axis in the figure) direction. .
  • FIG. 21 schematically shows the degrees of freedom of each part in the mixing system 100 in this embodiment.
  • the discharge belt conveyor 14 is fixed ( ⁇ ) between the front leg 144 and the conveyor body 142, and the front leg 144 is rotated around the X axis, around the Y axis, and around the Y axis by a spherical bearing mechanism 147.
  • Posture changes ( ⁇ x, ⁇ y, ⁇ z) in the rotational direction around the Z axis are allowed.
  • the rotary bearing mechanism 146 allows the conveyor main body 142 to change its position relative to the iron plate 130 in the rotation direction around the Y-axis ( ⁇ Y) and in the Y-axis direction.
  • the conveyor body 142 can be placed in an appropriate posture (a predetermined posture with respect to the earth's axis). ) can be made.
  • the discharge belt conveyor 14 when installing the discharge belt conveyor 14 at a construction site, the discharge belt conveyor 14 is lifted up using a crane or the like with the pedestal 102 of the earth and sand mixing device 10 installed on the iron plate 130. from the position shown in Figure 3(a).
  • the pedestal 102 is provided with a beam member 163 extending in the X-axis direction, it is not provided with a beam member extending in the Y-axis direction. can be installed from above the pedestal 102. Since the front legs 144 are in a folded state at the time of delivery, after carrying the discharge belt conveyor 14 above the iron plate 130, the operator opens the front legs 144 in the direction of arrow AR1 and stands the front legs 144 on the ground.
  • the shaft member 245 of the rotary bearing mechanism 146 is engaged with the block member 246 fixed in advance on the iron plate 130 to adjust the position of the discharge belt conveyor 14 in the Y-axis direction, and the posture of the discharge belt conveyor 14 is adjusted.
  • the spherical seat 152 of the front leg 144 is fixed to the iron plate 130 in a stable state. If the pair of block members 246 are installed side by side along the Y-axis direction, simply by engaging the shaft member 245 of the rotary bearing mechanism 146 with the block member 246, the conveying direction of the discharge belt conveyor 14 can be changed to the Y-axis direction.
  • the lateral direction (width direction) of the discharge belt conveyor 14 can be made to coincide with the Y-axis direction.
  • FIG. 4(a) which is a cross-sectional view taken along the line AA in FIG. 2, it is possible to prevent the conveyor main body 142 from being misaligned with respect to the chute 113.
  • a portion of the conveyor body 142 for example, the +Y side of the conveyor body 142
  • the conveyor frame 142a provided on the -Y side and the chute 113 may come into contact (interference).
  • the portion of the rotary bearing mechanism 146 that needs to be fixed to the iron plate 130 (block member 246) can be fixed on the iron plate 130 before the discharge belt conveyor 14 is installed. Therefore, when fixing the block member 246, the conveyor body 142 etc. will not get in the way, so there is no need to put your hand into a narrow place when tightening the bolts etc. of the block member 246, and the work is easy. It is.
  • the front legs and the conveyor body were separated, and the conveyor body was installed from above with the front legs erected on the construction site in advance and measures taken to prevent them from tipping over. Since the conveyor main body 142 and the front legs 144 are integrated, it is possible to install the discharge belt conveyor 14 at a construction site without much effort.
  • the front leg 144 includes a rod-shaped member 154' whose lower surface is machined into a hemispherical shape and a block member 152' in which a V-shaped groove is formed, as shown in FIG. It may have a support mechanism (V groove bearing mechanism) 147'.
  • V groove bearing mechanism V groove bearing mechanism
  • the rod-shaped member 154' is allowed to move in the Y-axis direction and rotate in the ⁇ x, ⁇ y, and ⁇ z directions with respect to the block member 152'.
  • the discharge belt conveyor 14 can be easily installed by simply installing the bar member 154' in the V-groove of the block member 152' fixed on the iron plate 130.
  • the V groove of the block member 152' may be a U groove.
  • FIG. 6(a) shows a part of the input belt conveyor 12, the earth and sand mixing device 10, and the discharge belt conveyor 14 in a perspective view
  • FIG. 6(b) shows the input belt conveyor 12, the earth and sand mixing device 10.
  • a part of the discharge belt conveyor 14 is shown as viewed from the +Y direction.
  • the input belt conveyor 12 includes a conveyor main body 202, front legs 204, and a tail frame 206.
  • the conveyor main body 202 receives additives supplied from the powder feeder 24 (see FIG. 1), construction generated soil (hereinafter referred to as the first base material) supplied from the weighing belt conveyor 16 (see FIG. 1), It has a belt that conveys construction generated soil (hereinafter referred to as the second base material) supplied from a measuring belt conveyor 18 (see FIG. 1) to the soil mixing device 10.
  • a head chute 203 is provided at the ⁇ X side end of the conveyor body 202 as a guide for guiding each base material conveyed by the conveyor body 202 to the input port member 111 (see FIG. 2) of the earth and sand mixing device 10. There is.
  • the input belt conveyor 12 corresponds to the second unit, and the conveyance of construction generated soil carried out by the input belt conveyor 12 corresponds to the second process.
  • the conveyor main body 202 corresponds to the main body part, and the tail frame 206 corresponds to the base part.
  • the front leg 204 is provided near the ⁇ X end of the bottom surface of the conveyor body 202.
  • the front leg 204 is provided on the bottom surface of the conveyor body 202 via the Z rotation shaft 210, as shown in FIG. 6(a).
  • the Z rotation axis 210 rotates in a direction tilted from the Z axis, but for convenience of explanation, it will be described as rotating around the Z axis ( ⁇ z direction).
  • FIG. 7(a) shows an enlarged view of the vicinity of the front leg 204.
  • the front leg 204 includes a first member 212 extending in the Y-axis direction, a pair of legs 214A and 214B provided at both ends of the first member 212 in the Y-axis direction, and a leg A cylindrical member 216 is provided to connect 214A and 214B.
  • a pair of holding members 170A and 170B are provided on the pedestal 102 of the earth and sand mixing device 10, and the cylindrical member 216 engages at two places in the U groove 103 of the holding members 170A and 170B, so that the front leg 204 is connected to the pedestal 102 (earth and sand mixing device 10).
  • the front leg 204 has a degree of freedom in the rotational direction ( ⁇ y) around the Y axis with respect to the pedestal 102 because the columnar member 216 engages with the U groove 103. That is, in this embodiment, the front leg 204 corresponds to the second connection part.
  • the tail frame 206 includes a rectangular frame portion 220 and a plurality of rods (six in FIG. 6(a)) provided on the ⁇ Z side of the rectangular frame portion 220.
  • the legs 222 each have a screw-type height adjustment mechanism, and by adjusting the height using the height adjustment mechanism, the tail pedestal 206 can be installed on the ground without wobbling.
  • the spherical bearing mechanism 224 has the same configuration as the spherical bearing mechanism 147 described above.
  • the spherical bearing mechanism 224 changes the attitude of the conveyor body 202 relative to the rectangular frame 220 in the rotational direction around the X-axis ( ⁇ x), the attitude change in the rotational direction around the Y-axis ( ⁇ y), and the rotational direction around the Z-axis. Posture change ( ⁇ z) is allowed.
  • the link mechanism 225 functions as a variable mechanism that varies the distance between the spherical bearing mechanism 224 and the front leg 204 (or Z rotation axis 210), and a translation mechanism that slides the conveyor body 202 in the longitudinal direction. ing.
  • the link mechanism 225 is made of a highly rigid metal material, and as can be seen from FIG. It has a pair of link members 229 (the -Y side link member is not shown) provided at both ends of the member 228. The upper end of the link member 229 is rotatably attached to the conveyor body 202 via a rotating shaft 229a.
  • the conveyor main body 202 is allowed to move in the X-axis direction relative to the tail frame 206 by the link mechanism 225 and the spherical bearing mechanism 224. Note that the link mechanism 225 receives part of the load of the conveyor body 202.
  • the support mechanism 226A has two pillar members 236A, 236B fixed to the rectangular frame 220 and extending in the Z-axis direction. supports another belt conveyor (in this embodiment, the weighing belt conveyor 16).
  • a U-groove 234 is formed at the upper end of the column members 236A, 236B of the support mechanism 226A (see FIG. 13).
  • the support mechanism 226A supports another belt conveyor (in this embodiment, the weighing belt conveyor 16) in this U groove 234.
  • the support mechanism 226B has two pillar members 238A and 238B fixed to the rectangular frame 220 and extending in the Z-axis direction, as shown in FIG. 6(b).
  • a U-groove 240 is formed at the upper end of the pillar members 238A, 238B (see FIG. 16).
  • the support mechanism 226B supports another belt conveyor (in this embodiment, the weighing belt conveyor 18) in this U groove 240.
  • the support mechanisms 226A and 226B are provided at positions equidistant from the spherical bearing mechanism 224. That is, in this embodiment, the input belt conveyor 12 corresponds to the first unit, and the weighing belt conveyor 16 and the weighing conveyor 18 correspond to the second unit. Further, in this embodiment, the tail frame 206 corresponds to the first part, the position of the spherical bearing mechanism 224 corresponds to the first position, and the conveyor main body 202 corresponds to the second part.
  • the support mechanism 226C is similar to the support mechanisms 226A and 226B, although the installation position and orientation are different from those of the support mechanisms 226A and 226B.
  • the support mechanism 226C can support other belt conveyors in the same manner as the support mechanisms 226A and 226B. Note that in the mixing system 100 of FIG. 1, there is no other belt conveyor supported by the support mechanism 226C, but the support mechanism 226C can support another belt conveyor as needed. Further, at least one of the support mechanisms 226A, 226B, and 226C may support the belt conveyor, and all of the support mechanisms 226A, 226B, and 226C do not need to support the belt conveyor.
  • the input belt conveyor 12 which has been lifted by a crane or the like, is installed at the position shown in FIG. 6(a) from above. Then, the cylindrical member 216 of the front leg 204 of the input belt conveyor 12 is engaged with the U groove 103 (at two locations) of the holding members 170A, 170B (see FIG. 7(a)) provided on the pedestal 102 of the soil mixing device 10. Match. Further, the height adjustment mechanism of the leg portion 222 is adjusted so that the tail frame 206 does not wobble. In the input belt conveyor 12, as shown in FIG.
  • the front leg 204 has a degree of freedom in the ⁇ y direction with respect to the pedestal 102
  • the conveyor main body 202 has a degree of freedom in the ⁇ z direction with respect to the front leg 204.
  • the conveyor main body 202 has degrees of freedom in the ⁇ x, ⁇ y, and ⁇ z directions with respect to the rectangular frame portion 220.
  • the front legs 204 of the input belt conveyor 12 are shorter than in the case where they are installed directly on the ground.
  • the height of the portion where the front legs 204 are located and the height of the portion where the spherical bearing mechanism 224 is located are approximately the same. In this way, the overall height of the input belt conveyor 12 during transportation is low, making it easy to load onto a truck and transport.
  • the input belt conveyor 12 can stand on its own. As a result, when storing the input belt conveyor 12, etc., there is no need for an auxiliary device or the like to assist the input belt conveyor 12 to stand on its own.
  • the head chute 203 is rotatable around the Y-axis around a rotation shaft 250 shown in FIGS. 6(a) and 6(b).
  • FIGS. 8(a) to 9(c) schematically show the procedure for installing the input belt conveyor 12. Note that in FIGS. 8(a) to 9(c), only the pedestal 102, the holding member 170A, and the input port member 111 of the soil mixing device 10 are schematically shown. Furthermore, when installing the input belt conveyor 12, the discharge belt conveyor 14 is already installed near the earth and sand mixing device 10, but in FIGS. 8(a) to 9(c), the drawings are simplified. Therefore, illustration of the discharge belt conveyor 14 is omitted.
  • the feeding belt conveyor 12 is transported and placed near the earth and sand mixing device 10 using the crane 360.
  • the head chute 203 is in the same state as when the mixing system 100 is operating (the first posture shown in FIG. 6(a)).
  • the head chute 203 is flipped upward (to take a second attitude different from the first attitude). That is, in this embodiment, the head shoot 203 corresponds to the specific component.
  • the input belt conveyor 12 is lifted up by a crane 360. At this time, the length of each wire connecting the input belt conveyor 12 and the crane 360 is approximately the same. Thereby, the input belt conveyor 12 can be lifted substantially horizontally.
  • the input belt conveyor 12 is moved.
  • the tail frame 206 side of No. 12 is lowered. Thereby, the tail frame 206 can be grounded as shown in FIG. 9(b).
  • the front legs 204 may be engaged with the holding members 170A and 170B after the tail frame 206 is grounded first.
  • the head chute 203 is returned to its original position (the same first posture as in FIG. 8(a)), thereby completing the installation of the input belt conveyor 12.
  • the head chute 203 is raised as shown in FIGS. 8(b) to 9(b).
  • the belt conveyor 12 is conveyed in a substantially horizontally suspended state and brought closer to the soil mixing device 10, as shown in FIG. This is because there is a risk of contact (interference) with the member 111).
  • the lengths of the wires connecting the input belt conveyor 12 and the crane 360 are made different, and the entire input belt conveyor 12 is conveyed in an inclined state.
  • the entire input belt conveyor 12 is conveyed in an inclined state, it is difficult to convey it stably.
  • by making the head chute 203 flip-up as in this embodiment it becomes possible to stably transport the input belt conveyor 12.
  • the input belt conveyor 12 is provided with a link mechanism 225 to facilitate installation of the input belt conveyor 12. This point will be explained based on FIGS. 11(a) to 11(f). Note that FIGS. 11(a) to 11(f) show an example in which the tail frame 206 is first grounded, and then the front legs 204 are engaged with the holding members 170A and 170B.
  • FIGS. 11(a) to 11(c) show a state in which the tail pedestal 206 is first grounded when installing the input belt conveyor 12.
  • the position of the input belt conveyor 12 shown in Fig. 11(a) is the normal position (neutral position)
  • the position of the input belt conveyor 12 shown in Fig. 11(b) is a position behind the normal position. It is assumed that the position of the input belt conveyor 12 shown in FIG. 11(c) is in front of the normal position.
  • the conveyor body 202 of the input belt conveyor 12 moves rearward.
  • the tail pedestal 206 does not shift its position (does not drag), so the input belt conveyor 12 can be installed without imposing an unreasonable load on the tail pedestal 206 and the like.
  • FIG. 12(a) shows the weighing belt conveyor 16 viewed from the +X direction.
  • FIG. 12(b) is a perspective view schematically showing the weighing belt conveyor 16, the weighing belt conveyor 18, and the input belt conveyor 12.
  • the weighing belt conveyor 16 includes a conveyor main body 302, a front leg 304, a tail frame 306, a spherical bearing mechanism 308, and a link mechanism 309.
  • the first base material supplied from the apron feeder 20 at the -Y side end of the conveyor body 302 is conveyed in the +Y direction by the conveyor body 302, and is supplied from the head chute 303 to the input belt conveyor 12.
  • the conveyor body 302 is provided with a sensor that measures the weight of the first base material, and depending on the weight of the first base material, the feeding speed of the feeder body of the apron feeder 20 (described later) (feeding of the first base material) speed) is now controlled.
  • FIG. 13 shows an enlarged view of the front leg 304 and its vicinity.
  • the front leg 304 includes a pair of leg portions 314A, 314B, and a cylindrical member 316 serving as a shaft member provided to connect the leg portions 314A, 314B.
  • the front leg 304 (weighing belt conveyor 16) is connected to the input belt conveyor 12 by the columnar member 316 engaging with the U grooves 234 of the column members 236A, 236B of the support mechanism 226A.
  • the front leg 304 is provided on the bottom surface of the conveyor main body 302 via a Z rotation shaft 310, as shown in FIG. 12(b). Strictly speaking, the Z rotation axis 310 rotates in a direction tilted from the Z axis, but for convenience of explanation, it will be described as rotating around the Z axis ( ⁇ z direction).
  • the tail mount 306 has the same configuration as the tail mount 206 of the input belt conveyor 12 described above. However, the support mechanisms 226A to 226C provided on the tail mount 206 are not provided on the tail mount 306.
  • the spherical bearing mechanism 308 has a similar configuration to the spherical bearing mechanism 224 of the input belt conveyor 12. That is, the spherical bearing mechanism 308 changes the attitude of the conveyor body 302 relative to the tail frame 306 in the rotational direction around the X axis ( ⁇ x), the attitude change in the rotational direction around the Y axis ( ⁇ y), and the rotational direction around the Z axis.
  • the posture change ( ⁇ z) is allowed.
  • the link mechanism 309 has a similar configuration to the link mechanism 225 of the input belt conveyor 12. That is, the link mechanism 309 is made of a highly rigid metal material, and serves as a variable mechanism that varies the distance between the spherical bearing mechanism 308 and the front leg 304, and a translation mechanism that slides the conveyor body 302 in the longitudinal direction. It has a function.
  • the conveyor main body 302 is allowed to move in the Y-axis direction relative to the tail frame 306 by the link mechanism 309 and the spherical bearing mechanism 308.
  • the weighing belt conveyor 16 lifted by a crane or the like is installed at the position shown in FIG. 12(a) from above. Then, as shown in FIG. 13, the columnar member 316 of the front leg 304 of the weighing belt conveyor 16 is engaged with the U groove 234 of the column members 236A, 236B of the support mechanism 226A. By doing so, the weighing belt conveyor 16 can be installed in a state connected to the input belt conveyor 12.
  • the weighing belt conveyor 16 also has the same configuration as the input belt conveyor 12, so when installing the weighing belt conveyor 16, as explained in FIGS. 11(a) to 11(f), It is possible to prevent the tail frame 306 from being dragged and to suppress excessive loads from being applied to various parts of the weighing belt conveyor 16.
  • the front leg 304 has a degree of freedom in the ⁇ x direction with respect to the support mechanism 226A
  • the conveyor main body 302 has a degree of freedom in the ⁇ z direction with respect to the front leg 304. have.
  • the conveyor main body 302 has degrees of freedom in the ⁇ x, ⁇ y, and ⁇ z directions with respect to the tail frame 306.
  • the attitude of the conveyor body 302 around the Y axis can be determined so as to follow the attitude of the support mechanism 226A.
  • the spherical bearing mechanism 308 can absorb the inclination. That is, in this embodiment, the front leg 304 corresponds to the second connection part.
  • the weighing belt conveyor 16 since the heights of the front legs 304 and the tail frame 306 are almost the same, when the engagement between the weighing belt conveyor 16 and the input belt conveyor 12 is released, the weighing belt conveyor 16 can stand on its own. It becomes. As a result, when the weighing belt conveyor 16 is stored, etc., an auxiliary device or the like to assist the weighing belt conveyor 16 to stand on its own becomes unnecessary.
  • the head chute 303 is capable of being flipped up, as in FIG. 8(b). This makes the installation work easier because the head chute 303 does not get in the way when installing the weighing belt conveyor 16.
  • FIG. 14(a) shows a perspective view of the apron feeder as viewed from the +Y side.
  • the apron feeder 20 includes a feeder main body 502 and a support base 504 that supports the feeder main body 502.
  • the feeder main body 502 has a function of feeding the first base material onto the weighing belt conveyor 16. Note that the iron plate 420 does not have to be installed.
  • the support stand 504 when transporting the apron feeder 20, the support stand 504 can be folded as shown in FIG. 14(b). This makes it easier to transport the apron feeder 20, and also reduces the number of trucks required for transport.
  • the weighing belt conveyor 18 has a function of charging the second base material supplied from the apron feeder 22 onto the charging belt conveyor 12.
  • FIG. 15 shows the weighing belt conveyor 18 viewed from the +X direction.
  • FIG. 16 shows an enlarged view of the vicinity of the front leg 404.
  • the weighing belt conveyor 18 includes a conveyor main body 402, a front leg 404, a tail frame 406, a spherical bearing mechanism 408, and a link mechanism 409. It has a similar configuration.
  • a head chute 403 is provided as a guide for guiding the second base material conveyed by the conveyor body 402 to the input belt conveyor 12.
  • the front leg 404 has a cylindrical member 416 as a shaft member. Note that the front leg 404 is provided on the bottom surface of the conveyor main body 402 via a Z rotation shaft 410, as shown in FIG. 12(b).
  • the tail mount 406, spherical bearing mechanism 408, and link mechanism 409 have the same configuration as the tail mount 306, spherical bearing mechanism 308, and link mechanism 309 of the weighing belt conveyor 16.
  • the weighing belt conveyor 18 lifted by a crane or the like is installed at the position shown in FIG. 15 from above. Then, as shown in FIG. 16, the columnar member 416 of the front leg 404 of the weighing belt conveyor 18 is engaged with the U grooves 240 (two locations) of the column members 238A and 238B of the support mechanism 226B. By doing so, the weighing belt conveyor 18 can be installed in a state connected to the input belt conveyor 12.
  • the weighing belt conveyor 18 also has the same configuration as the input belt conveyor 12, so when installing the weighing belt conveyor 18, as explained in FIGS.
  • the tail frame 406 It is possible to prevent the tail frame 406 from being dragged and to suppress excessive loads from being applied to various parts of the weighing belt conveyor 18.
  • the order in which the weighing belt conveyors 16 and 18 are installed is arbitrary. That is, the weighing belt conveyor 16 may be installed first, or the weighing belt conveyor 18 may be installed first.
  • the front leg 404 has a degree of freedom in the ⁇ x direction with respect to the support mechanism 226B, and the conveyor main body 402 has a degree of freedom in the ⁇ z direction with respect to the front leg 404. have. Furthermore, the conveyor main body 402 has degrees of freedom in the ⁇ x, ⁇ y, and ⁇ z directions with respect to the tail frame 406. Thereby, the attitude of the conveyor body 402 around the Y axis can be determined so as to follow the attitude of the support mechanism 226B. Further, even if the upper surface of the tail frame 406 is inclined with respect to the horizontal plane, the spherical bearing mechanism 408 can absorb the inclination. That is, in this embodiment, the front leg 404 corresponds to the second connection part.
  • the weighing belt conveyor 16 and the weighing belt conveyor 18 have the same configuration, so it is necessary to provide at least one of the weighing belt conveyor 16 and the weighing belt conveyor 18 as a spare machine at the construction site. For example, when the weighing belt conveyor 16 breaks down, it can be easily replaced, so it is easy to maintain.
  • FIG. 17 is a diagram schematically showing the weighing belt conveyor 16, the weighing belt conveyor 18, and the input belt conveyor 12 as viewed from the +Z direction.
  • FIG. 17 shows a state in which the conveyance direction of the input belt conveyor 12 coincides with the X-axis direction when viewed from above, and the conveyance direction of the weighing belt conveyors 16 and 18 coincides with the Y-axis direction when viewed from above (hereinafter referred to as a standard). state).
  • the input range of the first base material from the weighing belt conveyor 16 is included in the receivable range of the first base material of the input belt conveyor 12 (range where the first base material can be received without spilling).
  • the input range of the second base material from the weighing belt conveyor 18 is included in the range in which the input belt conveyor 12 can receive the second base material.
  • FIG. 18(a) is a schematic diagram showing a case where the installation direction (longitudinal direction) of the conveyor main body 202 is inclined with respect to the X axis when viewed from above when the input belt conveyor 12 is installed.
  • the conveyor body 202 since the conveyor body 202 is tilted with respect to the spherical bearing mechanism 224, the amount of deviation between the input range and the receiving range due to the tilt of the conveyor body 202 depends on the distance from the spherical bearing mechanism 224. and change. That is, the larger the distance, the larger the amount of deviation, and the smaller the distance, the smaller the amount of deviation.
  • the amount of deviation between the input range of the weighing belt conveyor 16 and the receivable range of the input belt conveyor 12, and the amount of deviation between the input range of the weighing belt conveyor 18 and the receivable range of the input belt conveyor 12 can be reduced. It is possible to match the amount of deviation in the receivable range. Thereby, the amount of deviation of either one does not become large, and both amounts of deviation can be made as small as possible.
  • FIG. 18(b) shows that when installing the input belt conveyor 12, the tail frame 206 is tilted, and the installation direction (longitudinal direction) of the conveyor bodies 302, 402 of the weighing belt conveyors 16, 18 is aligned with the Y axis when viewed from above.
  • the amount of deviation between the input range of the weighing belt conveyor 16 and the receivable range of the input belt conveyor 12 can be reduced. It is possible to match the amount of deviation in the receivable range. Thereby, the amount of deviation of either one does not become large, and both amounts of deviation can be made as small as possible.
  • FIG. 19(a) shows a state in which the weighing belt conveyor 18 has been installed first.
  • the tail pedestal 206 rotates in a horizontal plane as shown in FIG. 19(b).
  • the conveyor body 202 of the input belt conveyor 12 rotates around the Z rotation shaft 210, resulting in a state as shown in FIG. 20.
  • the amount of deviation between the loading range of the weighing belt conveyor 16 and the receiving range of the loading belt conveyor 12 and the loading range of the weighing belt conveyor 18 can be reduced. It is possible to match the amount of deviation in the receivable range of the input belt conveyor 12. Thereby, the amount of deviation of either one does not become large, and both amounts of deviation can be made as small as possible.
  • the distances D1 and D2 do not necessarily have to match. That is, the distance between one weighing belt conveyor and the spherical bearing mechanism 224 may be determined based on the distance between the other weighing belt conveyor and the spherical bearing mechanism 224 so that the amount of deviation falls within an allowable range.
  • the apron feeder 22 is installed on an iron plate 422 laid on the ground.
  • the apron feeder 22 has the same configuration as the apron feeder 20 described above. Note that the iron plate 422 does not need to be installed.
  • each unit (earth and sand mixing device 10, input belt conveyor 12, weighing belt conveyor 16, 18, discharge belt conveyor 14) can be connected, and the ground is sloped, etc.
  • the spherical bearing mechanisms 224, 308, 408, and 147 can absorb the slope of the ground. Therefore, there is no need to mark the ground or iron plate when installing each unit.
  • the positional relationship becomes difficult to shift, so there is no need to fix it to the ground or an iron plate.
  • the front legs 204, 304, 404 of each belt conveyor 12, 16, 18 are provided in advance on the conveyor main body 202, 302, 402.
  • the front legs were placed on the ground, the conveyor body was then carried onto the front legs from above, and the conveyor body was connected to the front legs. Since such work is not necessary in this embodiment, the effort required during installation can be reduced.
  • the mixing system 100 includes the soil mixing device 10 (first unit) that crushes and pulverizes construction generated soil (first step), and the construction generated soil. It includes an input belt conveyor 12 (second unit) that transports soil (second process). Further, the input belt conveyor 12 includes a conveyor main body 202 that performs conveyance, and a tail pedestal 206 that supports the conveyor main body 202. Further, the tail frame 206 is connected to the conveyor main body 202 at a spherical bearing mechanism 224 (first connection part), and the conveyor main body 202 is engaged with the earth and sand mixing device 10 at a front leg 204 (second connection part).
  • a link mechanism 225 is provided between the tail frame 206 and the conveyor main body 202 and has a metal high-rigidity portion that makes the distance between the spherical bearing mechanism 224 and the front leg 204 variable.
  • the link mechanism 225 by providing the link mechanism 225, as explained using FIGS. 11(a) to 11(f), when installing the charging belt conveyor 12, Even if the position is slightly shifted forward or backward from the normal position (see FIG. 11(a)) (see FIGS. 11(b) and 11(c)), the input belt conveyor 12 is installed without dragging the tail frame 206. be able to. Thereby, the input belt conveyor 12 can be easily installed without imposing an unreasonable load on it.
  • the mixing system 100 of the present embodiment also includes an input belt conveyor 12 (first unit) that transports construction soil (first process), and a weighing belt that transports base material (second process).
  • Conveyor 16 (18) (second unit).
  • the weighing belt conveyor 16 (18) includes a conveyor main body 302 (402) that performs conveyance, and a tail pedestal 306 (406) that supports the conveyor main body 302 (402).
  • the tail frame 306 (406) is connected to the conveyor main body 302 (402) at the spherical bearing mechanism 308 (408), and the conveyor main body 302 (402) is engaged with the input belt conveyor 12 at the front leg 304 (404). .
  • a link mechanism 309 (409) is provided.
  • the weighing belt conveyor 16 (18) is also provided with the link mechanism 309 (409), so that the weighing belt can be moved without dragging the tail frame 306 (406), similar to the input belt conveyor 12.
  • a conveyor 16 (18) can be installed. Thereby, the weighing belt conveyor 16 (18) can be easily installed without imposing an excessive load on it.
  • each of the two weighing belt conveyors 16 and 18 is engaged with the tail frame 206 of the input belt conveyor 12 at the front legs 304 and 404, and one of the weighing belt conveyors 16 and 18 is connected to the spherical bearing mechanism 224.
  • the distance between the other of the weighing belt conveyors 16, 18 and the spherical bearing mechanism 224 is determined based on the distance.
  • the head chute 303 when installing the input belt conveyor 12, the head chute 303 is flipped up (FIG. 8(b)), and conveyance and installation are performed. Thereby, it is possible to prevent the head chute 303 from getting in the way during transportation or installation.
  • the lengths of the plurality of cables when transporting the input belt conveyor 12, the lengths of the plurality of cables can be made the same, so that the input belt conveyor 12 can be 12 can be prevented from becoming unstable.
  • the earth and sand mixing device 10 (first unit) and the discharge belt conveyor 14 (second step) that carries out the transportation (second step) of the processing target after crushing and mixing discharged from the earth and sand mixing device 10 a second unit).
  • the rotary bearing mechanism 146 that directs the conveyor main body 142 of the discharge belt conveyor 14 has a shaft member 245 extending in the Y-axis direction and a V groove (or U groove), so that the shaft member 245 cannot be rotated around the Y-axis. It has a block member 246 that supports it in a possible state. Therefore, in this embodiment, if the block member 246 is accurately positioned, positioning in the X-axis direction, Z-axis direction, ⁇ x, and ⁇ z directions can be performed simply by placing the shaft member 245 on the block member 246. can.
  • the block member 246 is fixed on the iron plate 130 on which the earth and sand mixing device 10 is installed, so that it is possible to prevent the block member 246 from shifting. Moreover, since the block member 246 can be fixed on the iron plate 130 before installing the discharge belt conveyor 14, after installing the discharge belt conveyor 14, reach under the conveyor body 142 and tighten the bolts. There is no need for such work. Thereby, it is possible to simplify the installation work.
  • the discharge belt conveyor 14 has front legs 144 that support the conveyor main body 142.
  • the front leg 144 includes a spherical bearing mechanism 147 that connects the script body part 145 and the iron plate 130 and allows the script body part 145 to tilt with respect to the iron plate 130.
  • the number of degrees of freedom regarding the rotation of the cylindrical member 216 engaged with the soil mixing device 10 of the input belt conveyor 12 is different from the number of degrees of freedom regarding the rotation of the spherical bearing mechanism 224.
  • each belt conveyor 12, 16, 18 at a construction site it is not necessary to necessarily lay an iron plate on the ground. Further, it is not necessary to perform marking for positioning each belt conveyor, and since each device is connected, there is no need for a device to fix each device on the ground. These can reduce or simplify the effort required to install the mixing system 100 at a construction site.
  • the number of degrees of freedom in the rotation of the portions of each belt conveyor 12, 16, 18 connected to other devices is greater than the number of degrees of freedom near the ground.
  • the number of rotational degrees of freedom for the located spherical bearing mechanisms 224, 308, 408 is greater. This makes it possible to stably connect each belt conveyor 12, 16, 18 to other devices while reliably absorbing the shape of the ground (slope, etc.).
  • the cylindrical members 216, 316, and 416 engage with other devices at two places (U grooves 103, 234, and 240), and the spherical bearing mechanism 224 engages with the surface on which it is installed. Contact in one place. As a result, the columnar member 216 connected to another device engages at two places, so stability during connection can be ensured.
  • the spherical bearing mechanisms 224, 308, 408 are connected to the ground side while maintaining the posture of the other devices in a predetermined state. and the cylindrical members 216, 316, 416 are engaged with the U-grooves 103, 234, 240. Thereby, the belt conveyors 12, 16, and 18 can be installed in an appropriate state according to the posture of other devices and the shape of the ground side (inclination, etc.).
  • the belt conveyors 12, 16, and 18 are not fixed with angles or the like, the time required to remove the mixing system 100 from the construction site can be shortened. As a result, even if the mixing system 100 is withdrawn from the moment it is known that a typhoon is approaching, for example, the withdrawal of the mixing system 100 can be completed before the typhoon hits.
  • the link mechanism 225 is provided between the spherical bearing mechanism 224 and the conveyor body 202 in the input belt conveyor 12, but the present invention is not limited to this.
  • a link mechanism may be provided between the conveyor body 202 and the earth and sand mixing device 10 (for example, between the front leg 204 and the conveyor body 202).
  • the same effects as in the above embodiment can be achieved. Note that the same applies not only to the input belt conveyor 12 but also to the link mechanisms of the weighing belt conveyors 16 and 18.
  • the head chute 303 when the head chute 303 becomes an obstacle during conveyance or installation on the input belt conveyor 12, the head chute 303 is flipped up (changed from the first posture to the second posture).
  • a case has been described in which the input belt conveyor 12 is conveyed and installed in a state in which the input belt 12 is in a state in which the input belt is loaded.
  • the present invention is not limited to this, and if there is a part (specific part) that gets in the way during conveyance other than the head chute 303 in the input belt conveyor 12, the posture is changed so that the specific part does not get in the way.
  • the input belt conveyor 12 may be installed in this state. The same applies to the weighing belt conveyors 16 and 18.
  • the present invention may be applied to units (soil washing equipment, conveyors, etc.) included in a soil washing plant as described in JP-A-2007-175585. Further, the present embodiment may be applied to units (such as a crusher or a conveyor) included in a plant that crushes concrete or gravel. Furthermore, the present invention may be applied to a sorting plant as described in Japanese Patent Application Laid-open No. 2006-780. Further, the present embodiment may be applied to a continuous conveyor for conveying excavated tunnel excavation soil as described in Japanese Patent Application Laid-open No. 2000-213287.
  • the present embodiment may be applied to a conveyor installed between offshore equipment and land equipment. In this case, it becomes easy to install the conveyor between the facilities, and even if the offshore facility oscillates due to changes in the tide level, waves, etc., the conveyor can follow the oscillation. Furthermore, the present embodiment can also be applied to a conveyor for discharging leftover soil from shaft excavation, as described in JP-A-2020-179973. This makes it possible to easily add more discharge conveyors when it is desired to increase the number of discharge conveyors according to the site.
  • Sediment mixing device (1st unit) 12 Input belt conveyor (second unit or first unit) 14 Discharge belt conveyor (second unit) 16,18 Weighing belt conveyor (second unit) 113 Chute (entrance) 130 Iron plate (base) 142 Conveyor body (body part) 144 Front leg (second support part) 145 Script body (leg) 147 Spherical bearing mechanism (connection part) 147' V groove bearing mechanism (support mechanism) 202 Conveyor body (main body, second part) 204 Front leg (second connection part) 206 Tail mount (pedestal, first part) 224 Spherical bearing mechanism (first connection part) 225 Link mechanism (variable mechanism) 245 Shaft member (part of the first support part) 246 Block member (support member, part of first support part) 302,402 Conveyor body (body part) 303 Head shoot (specific parts) 306, 406 Tail mount (pedestal part) 308, 408 Spherical bearing mechanism (first connection part) 304, 404 Front leg (second connection part) 309, 409

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Soil Sciences (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Food Science & Technology (AREA)
  • Agronomy & Crop Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

ユニットを適切な状態で工事現場等に設置するため、建設用装置は、処理対象物に対して第1の工程を実行する第1ユニットと、前記処理対象物に対して第2の工程を実行する第2ユニットと、を備え、前記第2ユニットは、前記第2の工程を実行する本体部と、前記本体部を支持する台部と、を有し、前記台部は第1接続部分において前記本体部と接続され、前記本体部は第2接続部分において前記第1ユニットと係合され、前記台部と前記本体部との間と、前記本体部と前記第1ユニットとの間との少なくともどちらか一方には、前記第1接続部分と前記第2接続部分との間の距離を可変にする金属製の高剛性部を有した可変機構が設けられている。

Description

建設用装置
 本発明は、建設用装置に関する。
 従来、土壌改良機として、自走式の装置やプラント型の装置が知られている(例えば、特許文献1、2等参照)。
 プラント型の装置の場合、複数のユニットを有しているため、これら複数のユニットを工事現場等まで運び、適切な位置関係となるように設置する必要がある。
特開2003-71427号公報 特開2011-156735号公報
 複数のユニットを設置した際に各ユニットが適切な位置関係になるようにするため、各ユニットには他のユニットと係合(連結)するための接続部分が設けられている。
 通常、設置対象のユニットを現場に設置する場合、設置対象のユニットをクレーン等で吊り上げた状態で設置位置の近傍まで搬送し、設置位置に下ろしつつ、設置対象のユニットの接続部分を他のユニットに係合させていく。しかしながら、このような設置方法では、接続部分の自由度や他の部分の自由度の関係から、適切な状態で設置対象のユニットを設置位置に設置できないおそれがある。
 1つの側面では、本発明は、ユニットを適切な状態で工事現場等に設置することが可能な建設用装置を提供することを目的とする。また、本発明は、ユニットを簡易に設置することが可能な建設用装置を提供することを目的とする。
 第1の態様では、建設用装置は、処理対象物に対して第1の工程を実行する第1ユニットと、前記処理対象物に対して第2の工程を実行する第2ユニットと、を備え、前記第2ユニットは、前記第2の工程を実行する本体部と、前記本体部を支持する台部と、を有し、前記台部は第1接続部分において前記本体部と接続され、前記本体部は第2接続部分において前記第1ユニットと係合され、前記台部と前記本体部との間と、前記本体部と前記第1ユニットとの間との少なくともどちらか一方には、前記第1接続部分と前記第2接続部分との間の距離を可変にする金属製の高剛性部を有した可変機構が設けられている。
 第2の態様では、建設用装置は、処理対象物に対して第1の工程を実行する処理装置と、前記処理装置を支持する土台と、を有する第1ユニットと、前記処理対象物に対して第2の工程を実行する本体部と、前記本体部を支持する第1支持部と、を有する第2ユニットと、を備え、前記第1支持部は、前記土台の水平面内の一軸方向に伸びる軸部材と、前記軸部材を前記一軸方向周りに回転可能に支持する支持部材と、を有する。
 第1の態様では、ユニットを適切な状態で工事現場等に設置することができる。また、第2の態様では、ユニットを簡易に設置することができる。
一実施形態に係る混合システムの斜視図である。 土砂混合装置の一部断面図である。 図3(a)は、排出ベルトコンベア及び土砂混合装置の斜視図であり、図3(b)は、排出ベルトコンベア及び土砂混合装置を+Y側から見た状態を示す図である。 図4(a)は、図2のA-A線断面図であり、図4(b)は、排出ベルトコンベアのコンベア本体がずれて配置された場合について説明するための図である。 V溝軸受機構を示す斜視図である。 図6(a)は、投入ベルトコンベア12、土砂混合装置10及び排出ベルトコンベア14の一部を示す斜視図であり、図6(b)は、投入ベルトコンベア、土砂混合装置及び排出ベルトコンベアの一部を+Y方向から見た状態を示す図である。 図7(a)は、投入ベルトコンベアの前脚の近傍を拡大して示す斜視図であり、図7(b)は、投入ベルトコンベアの+Y側の端部近傍を示す斜視図である。 図8(a)~図8(c)は、投入ベルトコンベアを設置する手順を模式的に示す図(その1)である。 図9(a)~図9(c)は、投入ベルトコンベアを設置する手順を模式的に示す図(その2)である。 図10(a)、図10(b)は、ヘッドシュートを跳ね上げない場合について説明するための図である。 図11(a)~図11(f)は、リンク機構の作用効果について説明するための図である。 図12(a)は、一方の計量ベルトコンベアを+X方向から見た状態を示す図であり、図12(b)は、2つの計量ベルトコンベアと投入ベルトコンベアとを模式的に示す斜視図である。 一方の計量ベルトコンベアの前脚の近傍を拡大して示す斜視図である。 図14(a)、図14(b)は、エプロンフィーダを示す斜視図である。 他方の計量ベルトコンベアを+X方向から見た状態を示す図である。 他方の計量ベルトコンベアの前脚の近傍を拡大して示す斜視図である。 2つの計量ベルトコンベアと投入ベルトコンベアの基準状態を+Z方向から見た状態を模式的に示す図である。 図18(a)は、基準状態からコンベア本体が傾いた状態を示す模式図であり、図18(b)は、基準状態からテール架台が傾いた状態を示す模式図である。 図19(a)、図19(b)は、計量ベルトコンベアを設置する際の衝撃により、投入ベルトコンベアとの位置関係にずれが生じる場合について説明するための図(その1)である。 計量ベルトコンベアを設置する際の衝撃により、投入ベルトコンベアとの位置関係にずれが生じる場合について説明するための図(その2)である。 一実施形態における混合システム内の各部の自由度を模式的に示す図である。
 以下、一実施形態に係る混合システムについて、図1~図21に基づいて詳細に説明する。
 図1には、一実施形態に係る建設用装置としての混合システム100が斜視図にて示されている。図1の混合システム100は、工事現場等に設置されるシステムである。
 図1に示すように、混合システム100は、土砂混合装置(ツイスター)10と、投入ベルトコンベア12と、排出ベルトコンベア14と、サブユニットとしての計量ベルトコンベア16、18と、エプロンフィーダ20、22と、粉体供給機24と、を備える。本実施形態の混合システム100が有する各ユニットは、工事現場の所定位置に配置される定置式のユニットである。なお、図1においては、鉛直方向をZ軸方向とし、Z軸に直交する面内において図1の左右方向をX軸方向、奥行き方向をY軸方向として示している。
(土砂混合装置10について)
 土砂混合装置10は、円筒状の容器内で高速回転する衝撃付加部材(インパクト部材)を備え、インパクト部材の衝撃力により、容器内に投入された建設発生土の破砕、細粒化を行う装置である。すなわち、本実施形態において、土砂混合装置10が第1ユニットに相当し、土砂混合装置10が行う処理が第1の工程に相当する。土砂混合装置10に投入される建設発生土には、必要に応じて、添加材(生石灰、消石灰などの石灰系固化材や、普通セメント、高炉セメントなどのセメント系固化材、あるいは高分子材料からなる土質改良材、天然繊維など)を混合することができる。これにより、改良土の性状や強度などを調整することができる。すなわち、本実施形態において、建設発生土または添加剤が混合された建設発生土が処理対象物に相当する。
 図2には、土砂混合装置10を+Y側から見た状態が一部断面して示されている。図2に示すように、土砂混合装置10は、架台102と、固定ドラム104と、回転ドラム106と、回転機構108と、を備える。
 架台102は、土砂混合装置10の各部を保持する台である。固定ドラム104は、円筒状の容器であり、架台102に固定されている。固定ドラム104内には、投入口部材111を介して処理対象が投入され、固定ドラム104の下側(-Z側)に設けられた回転ドラム106内に処理対象(建設発生土)を導く。
 回転ドラム106は、円筒状の容器であり、円筒の中心軸回り(Z軸回り)に、不図示の回転ドラム駆動用モータにより回転(自転)する。回転ドラム106は、複数の支持ローラ110を介して架台102により支持されているため、回転ドラム駆動用モータの回転力を受けてスムーズに回転するようになっている。なお、回転ドラム106の回転方向と、インパクト部材112との回転方向とは、同じ回転方向でもよく逆向きの回転方向でもよい。
 回転ドラム106の内側には、掻取棒(スクレーパ)114が1又は複数設けられている。掻取棒114は、回転ドラム106の内周面に接しており、固定ドラム104に対して固定された状態となっている。したがって、回転ドラム106が回転することにより、掻取棒114が回転ドラム106の内周面に沿って相対的に移動する。これにより、回転ドラム106の内周面に処理対象が付着した場合であっても、回転ドラム106が回転することで、処理対象が掻取棒114によって掻き取られる。
 回転ドラム106の下側(-Z側)には、シュート113が設けられている。シュート113は、回転ドラム106内で処理された処理対象を排出ベルトコンベア14に導くための入口部としての機能を有する。排出ベルトコンベア14は、シュート113の下側開口(シュート113の出口部)を包囲した状態となっている。
 回転機構108は、固定ドラム104及び回転ドラム106の中心に配置された鉛直方向(Z軸方向)に延びる回転軸116と、回転軸116の上端部に設けられたプーリ118と、回転軸116の下端部近傍において上下2段に設けられた2つのインパクト部材112と、を有する。
 回転軸116は、円柱状の部材であり、架台102の上面側に設けられた2つのボールベアリング120a、120bを介して回転自在な状態で、架台102に保持されている。2つのボールベアリング120a、120bの間には、スペーサ122が設けられており、ボールベアリング120a、120b間には所定間隔が形成されている。回転軸116の下端部は、回転ドラム106の内部に位置しており、自由端となっている。すなわち、回転軸116は、片持ち支持されている。
 プーリ118は、ベルトを介してモータ155(図2では不図示、図1参照)と接続されている。モータ155が回転すると、プーリ118及び回転軸116が回転する。
 2段のインパクト部材112それぞれは、複数本(例えば4本)の金属製のチェーン124を有しており、各チェーン124の先端には、鋼製の厚板126が設けられている。チェーン124は、回転軸116の周りに等間隔で設けられている。
 インパクト部材112は、回転軸116の回転により遠心回転し、厚板126が回転ドラム106の内周面近傍を高速移動することにより、処理対象を破砕したり混合したりする。なお、インパクト部材112のチェーン124及び厚板126の数は、原料土の種類や性状、処理量、添加材の種類、量、改良土の目標品質などに応じて調整することができる。
 本実施形態の土砂混合装置10によると、投入ベルトコンベア12によって搬送されてきた処理対象が、投入口部材111を介して固定ドラム104内に投入されると、回転ドラム106内においてインパクト部材112により破砕、混合され、回転ドラム106の下方に排出されるようになっている。回転ドラム106の下方に排出された処理対象は、シュート113内を通って排出ベルトコンベア14上に投入され、排出ベルトコンベア14によって図2の-X方向かつ+Z方向に向けて搬送されるようになっている。
 なお、本実施形態では、上述のように2つのボールベアリング120a,120bを用いた回転機構108を採用することで、破砕・混合性能や、回転軸116の撓み量を小さく維持しつつ、回転軸116の長さを短くすることが可能となっている。これにより、土砂混合装置10の高さ方向の寸法を小さくすることができる。
 図1に戻り、土砂混合装置10(架台102)は、地面上に敷設された鉄板130上に設置されている。鉄板130の下側の地面は水平に均されているため、鉄板130の上面は水平となっている。したがって、土砂混合装置10についても、傾きなく(回転軸116がZ軸方向に延びた状態で)設置されている。
 すなわち、本実施形態において、鉄板130は土台に相当する。
(排出ベルトコンベア14について)
 図3(a)には、排出ベルトコンベア14及び土砂混合装置10が斜視図にて示され、図3(b)には、排出ベルトコンベア14及び土砂混合装置10を+Y側から見た状態(側面図)が示されている。
 排出ベルトコンベア14は、図3(a)、図3(b)に示すように、コンベア本体142と、前脚144と、回転軸受機構146と、を備える。
 コンベア本体142は、土砂混合装置10から排出された、破砕、混合後の処理対象を-X方向かつ+Z方向に向けて搬送するベルトを有する。
 すなわち、本実施形態において、排出ベルトコンベア14は第2ユニットに相当し、コンベア本体142は本体部に相当する。また、本実施形態において処理対象の搬送が第2の工程に相当する。
 前脚144は、回動軸148を介して、コンベア本体142の底面の-X側端部近傍に設けられている。前脚144は、工事現場に設置されるときには、図3(b)に示す矢印AR1方向に開かれ、図3(b)のように立設状態となる。すなわち、排出ベルトコンベア14は、自立可能となっている。一方、排出ベルトコンベア14の運搬時には、前脚144は、図3(b)に示す矢印AR2方向に回動されて、畳まれた状態となる。これにより、運搬時における排出ベルトコンベア14の嵩を低くすることができるため、運搬しやすくなる。
 前脚144は、図3(a)に示すように、略矩形枠状の脚本体部145と、脚本体部145の下側に設けられた球面軸受機構147と、を備える。球面軸受機構147は、脚本体部145の鉄板130に対する姿勢変化を許容する連結部であり、球面座152と、球面座152内に設けられた球面軸受部材154と、球面軸受部材154と脚本体部145とを連結する円柱状部材156と、を有する。すなわち、本実施形態において、前脚144は第2支持部に相当し、脚本体部145は脚部に相当する。球面座152は、排出ベルトコンベア14の位置や姿勢が定まった状態で、地面上に敷設された鉄板130上にボルト等で固定される。球面軸受部材154は、球面座152に対して、X軸回りの回転方向、Y軸回りの回転方向、Z軸回りの回転方向に回転できるようになっている。すなわち、球面軸受部材154は、3自由度(θx、θy、θz)を有している。
 回転軸受機構146は、図3(a)に示すように、コンベア本体142の+Y側面及び-Y側面に設けられた一対の軸保持部材244(-Y側の軸保持部材244については不図示)と、一対の軸保持部材244に保持されたY軸方向に延びる円柱状の軸部材245と、軸部材245が係合する一対のブロック部材246と、を備える。
 ブロック部材246の上面には、V溝が形成されており、V溝に軸部材245が係合するようになっている。一対のブロック部材246は、Y軸方向に沿って並んだ状態で、鉄板130に対してボルト等で固定されている。軸部材245は、ブロック部材246に係合することにより、X軸方向、Z軸方向及びθx、θz方向の動きが規制され、Y軸方向の移動とY軸回りの回転が許容されている。なお、ブロック部材246には、V溝に代えてU溝が形成されていてもよい。すなわち、本実施形態において、回転軸受機構146は第1支持部に相当し、ブロック部材246は、軸部材245を一軸(図中のY軸)方向周りに回転可能に支持する支持部材に相当する。
 図21には、本実施形態における混合システム100内の各部の自由度が模式的に示されている。排出ベルトコンベア14は、図21に示すように、前脚144とコンベア本体142との間が固定(●)となっており、前脚144は、球面軸受機構147によって、X軸回り、Y軸回り、Z軸回りの回転方向の姿勢変化(θx、θy、θz)を許容している。また、回転軸受機構146は、コンベア本体142の、鉄板130に対するY軸回りの回転方向の姿勢変化(θY)及びY軸方向の位置変化を許容している。したがって、回転軸受機構146においてY軸方向の位置を調整し、球面軸受機構147の球面座152の固定位置を調整することで、コンベア本体142を適切な姿勢(地軸に対して予め定められた姿勢)にすることができる。
 本実施形態では、排出ベルトコンベア14を工事現場に設置する際に、鉄板130上に土砂混合装置10の架台102が設置された状態で、クレーン等を用いて吊り上げた排出ベルトコンベア14を、上方から図3(a)の位置に設置する。なお、図3(a)に示すように、架台102には、X軸方向に延びる梁部材163は設けられているものの、Y軸方向に延びる梁部材は設けられていないため、排出ベルトコンベア14を架台102の上方から設置することが可能となっている。搬入時には、前脚144は畳まれた状態となっているため、鉄板130の上方に排出ベルトコンベア14を搬入した後に、作業者は前脚144を矢印AR1方向に開き、地面上に前脚144を立てる。このとき、回転軸受機構146の軸部材245を、予め鉄板130上に固定されたブロック部材246に係合させ、排出ベルトコンベア14のY軸方向の位置を調整し、排出ベルトコンベア14の姿勢が安定した状態で、前脚144の球面座152を鉄板130に固定する。一対のブロック部材246をY軸方向に沿って並べて設置しておけば、回転軸受機構146の軸部材245を、ブロック部材246に係合させるだけで、排出ベルトコンベア14の搬送方向をY軸方向に垂直な方向に一致させることができ、排出ベルトコンベア14の短手方向(幅方向)をY軸方向に一致させることができる。
 これにより、図2のA-A線断面図である図4(a)に示すように、コンベア本体142のシュート113に対する位置ずれを防止することができる。例えば、コンベア本体142の長手方向が上方から見てX軸方向からずれてしまうと、図4(b)において破線円Bで示すように、コンベア本体142の一部(例えばコンベア本体142の+Y側及び-Y側に設けられたコンベアフレーム142a)と、シュート113とが接触(干渉)する場合がある。また、コンベア本体142の長手方向が上方から見てX軸方向からずれてしまうと、図4(b)において破線円Cで示すように、シュート113とコンベアフレーム142aとの間に隙間ができ、粉塵が外部に流出する可能性がある。したがって、本実施形態のように、コンベア本体142の長手方向をX軸方向(Y軸方向に垂直な方向)と一致させることにより、コンベア本体142とシュート113との機械的な干渉や、粉塵の発生を抑制することができる。
 また、本実施形態では、回転軸受機構146のうち、鉄板130に固定する必要のある部分(ブロック部材246)は、排出ベルトコンベア14を設置する前に鉄板130上に固定することができる。したがって、ブロック部材246の固定の際には、コンベア本体142等が邪魔になることはないため、ブロック部材246をボルト締め等する際に狭い箇所に手を入れるなどする必要が無く、作業は容易である。
 また、従前においては、前脚とコンベア本体とが分離しており、前脚を事前に工事現場に立てて転倒防止措置を施した状態で、コンベア本体を上方から設置していたが、本実施形態では、コンベア本体142と前脚144は、一体となっているため、手間をかけずに排出ベルトコンベア14を工事現場に設置することが可能である。
 なお、上記説明では、前脚144が球面軸受機構147を有する場合について説明したが、これに限られるものではない。前脚144は、球面軸受機構147に代えて、図5に示すような、下面が半球状に加工された棒状部材154’と、V字状の溝が形成されたブロック部材152’と、を有する支持機構(V溝軸受機構)147’を有していてもよい。図5のV溝軸受機構147’によれば、棒状部材154’は、ブロック部材152’に対して、Y軸方向の移動と、θx、θy、θz方向への回転が許容された状態となっている。この場合、鉄板130上に固定されたブロック部材152’のV溝に棒状部材154’を載せるように排出ベルトコンベア14を設置するだけで、排出ベルトコンベア14を簡易に設置することができる。なお、ブロック部材152’のV溝は、U溝であってもよい。
(投入ベルトコンベア12について)
 図1に戻り、投入ベルトコンベア12は、その-X端部近傍において、土砂混合装置10に連結されている。図6(a)には、投入ベルトコンベア12、土砂混合装置10及び排出ベルトコンベア14の一部が斜視図にて示され、図6(b)には、投入ベルトコンベア12、土砂混合装置10及び排出ベルトコンベア14の一部を+Y方向から見た状態が示されている。
 投入ベルトコンベア12は、コンベア本体202と、前脚204と、テール架台206と、を備える。
 コンベア本体202は、粉体供給機24(図1参照)から供給される添加材や、計量ベルトコンベア16(図1参照)から供給される建設発生土(以下、第1母材と呼ぶ)、計量ベルトコンベア18(図1参照)から供給される建設発生土(以下、第2母材と呼ぶ)を土砂混合装置10まで搬送するベルトを有する。コンベア本体202の-X側の端部には、コンベア本体202により搬送された各母材を土砂混合装置10の投入口部材111(図2参照)に導くガイドとしてのヘッドシュート203が設けられている。すなわち、本実施形態において、投入ベルトコンベア12が第2ユニットに相当し、投入ベルトコンベア12が実施する建設発生土の搬送が第2の工程に相当する。また、本実施形態において、コンベア本体202が本体部に相当し、テール架台206が台部に相当する。
 前脚204は、コンベア本体202の底面の-X端部近傍に設けられている。前脚204は、図6(a)に示すように、Z回転軸210を介してコンベア本体202の底面に設けられている。なお、Z回転軸210は、厳密にいえば、Z軸から傾いた方向の回りに回転するが、説明の便宜上、Z軸回り(θz方向)に回転するものとして説明する。
 図7(a)には、前脚204の近傍が拡大して示されている。図7(a)に示すように、前脚204は、Y軸方向に延びる第1部材212と、第1部材212のY軸方向両端部に設けられた一対の脚部214A、214Bと、脚部214A、214B間を連結する状態で設けられた円柱状部材216と、を有する。
 土砂混合装置10の架台102には、一対の保持部材170A,170Bが設けられており、保持部材170A,170Bが有するU溝103において円柱状部材216が2か所で係合することで、前脚204が架台102(土砂混合装置10)に連結される。前脚204は、円柱状部材216がU溝103に係合することで、架台102に対して、Y軸回りの回転方向(θy)の自由度を有している。すなわち、本実施形態において、前脚204が第2接続部に相当する。
 図6(a)、図6(b)に戻り、テール架台206は、矩形枠部220と、矩形枠部220の-Z側に設けられた複数本(図6(a)では6本)の脚部222と、矩形枠部220の梁部221(図7(b)参照)上に設けられた球面軸受機構224と、球面軸受機構224とコンベア本体202との間に設けられたリンク機構225と、矩形枠部220に設けられた3つの支持機構226A,226B,226Cと、を有する。すなわち、本実施形態において、球面軸受機構224が第1接続部に相当し、リンク機構225が可変機構に相当する。
 脚部222は、それぞれネジ式の高さ調整機構を有しており、高さ調整機構を用いた調整を行うことでテール架台206をガタつきなく地面上に設置することができる。
 球面軸受機構224は、前述した球面軸受機構147と同様の構成を有している。球面軸受機構224は、コンベア本体202の、矩形枠部220に対するX軸回りの回転方向の姿勢変化(θx)、Y軸回りの回転方向の姿勢変化(θy)、及びZ軸回りの回転方向の姿勢変化(θz)を許容している。
 リンク機構225は、球面軸受機構224と、前脚204(又はZ回転軸210)との間の距離を可変にする可変機構、及びコンベア本体202を長手方向にスライドさせる並進機構としての機能を有している。リンク機構225は、金属製の高剛性材料から成り、リンク機構225近傍を拡大して模式的に示す図7(b)から分かるように、球面軸受機構224に接続された棒状部材228と、棒状部材228の両端部に設けられた一対のリンク部材229(-Y側のリンク部材については不図示)とを有する。リンク部材229の上端部は、回転軸229aを介してコンベア本体202に回転可能に取り付けられている。コンベア本体202は、リンク機構225及び球面軸受機構224により、テール架台206に対するX軸方向への移動が許容された状態となっている。なお、リンク機構225は、コンベア本体202の荷重の一部を受けている。
 図6(a)、図6(b)に戻り、支持機構226Aは、矩形枠部220に固定された、Z軸方向に延びる2本の柱部材236A,236Bを有し、柱部材236A,236Bにより、他のベルトコンベア(本実施形態では計量ベルトコンベア16)を支持する。支持機構226Aの柱部材236A,236Bの上端部には、U溝234が形成されている(図13参照)。詳細については後述するが、支持機構226Aは、このU溝234において、他のベルトコンベア(本実施形態では計量ベルトコンベア16)を支持する。
 支持機構226Bは、図6(b)に示すように、矩形枠部220に固定された、Z軸方向に延びる2本の柱部材238A,238Bを有する。柱部材238A,238Bの上端部には、U溝240が形成されている(図16参照)。支持機構226Bは、このU溝240において、他のベルトコンベア(本実施形態では計量ベルトコンベア18)を支持する。詳細については後述するが、支持機構226A,226Bは、球面軸受機構224から等距離の位置に設けられている。すなわち、本実施形態において、投入ベルトコンベア12が第1ユニットに相当し、計量ベルトコンベア16と計量コンベア18とが第2ユニットに相当する。また、本実施形態において、テール架台206が第1部分に相当し、球面軸受機構224の位置が第1位置に相当し、コンベア本体202が第2部分に相当する。
 支持機構226Cは、支持機構226A,226Bと設置位置及び設置向き等が異なるものの、支持機構226A、226Bと同様となっている。支持機構226Cは支持機構226A,226Bと同様にして他のベルトコンベアを支持することができる。なお、図1の混合システム100では、支持機構226Cが支持する他のベルトコンベアは存在していないが、必要に応じて支持機構226Cに他のベルトコンベアを支持させることができる。また、支持機構226A、226B、226Cの少なくとも1つがベルトコンベアを支持していてもよいし、全ての支持機構226A、226B、226Cがベルトコンベアを支持していなくてもよい。
 本実施形態では、工事現場に土砂混合装置10と排出ベルトコンベア14が設置された状態で、クレーン等で吊り上げた状態の投入ベルトコンベア12を、上方から図6(a)の位置に設置する。そして、投入ベルトコンベア12の前脚204の円柱状部材216を土砂混合装置10の架台102に設けられた保持部材170A,170B(図7(a)参照)のU溝103(2か所)に係合させる。また、テール架台206のガタつきがなくなるように、脚部222の高さ調整機構を調整する。投入ベルトコンベア12においては、図21に示すように、前脚204が架台102に対してθy方向に自由度を有し、コンベア本体202が前脚204に対してθz方向の自由度を有している。また、コンベア本体202は、矩形枠部220に対してθx、θy、θz方向の自由度を有している。これにより、架台102の姿勢に倣うように、コンベア本体202のX軸回りの姿勢を定めることができる。また、矩形枠部220が水平面に対して傾いているような場合であっても、その傾きを球面軸受機構224で吸収することができる。
 ここで、本実施形態では、図6(a)、図6(b)に示すように、投入ベルトコンベア12の前脚204が地面に直接立設するような場合と比べて、短くなっており、運搬時には、前脚204が位置する部分の高さと、球面軸受機構224が位置する部分の高さがほぼ同一になる。このように、運搬時における投入ベルトコンベア12の高さが全体的に低いため、トラックに乗せやすく、運搬がしやすくなっている。また、本実施形態では、全体的に高さがほぼ同一であることから、投入ベルトコンベア12と土砂混合装置10の係合が解除されたときには、投入ベルトコンベア12は自立可能となっている。これにより、投入ベルトコンベア12を保管等する場合において、投入ベルトコンベア12の自立を補助する補助器具等が不要となる。
 次に、投入ベルトコンベア12の設置方法についてより詳細に説明する。
 本実施形態においては、ヘッドシュート203は、図6(a)、図6(b)に示す回動軸250を中心として、Y軸回りに回動可能となっている。
 図8(a)~図9(c)には、投入ベルトコンベア12を設置する手順が模式的に示されている。なお、図8(a)~図9(c)では、土砂混合装置10については、架台102、保持部材170A、投入口部材111のみを模式的に示している。また、投入ベルトコンベア12を設置する際には、排出ベルトコンベア14が土砂混合装置10の近傍に既に設置されているが、図8(a)~図9(c)では、図面の簡素化のため、排出ベルトコンベア14の図示を省略している。
 まず、図8(a)に示すように、クレーン360を用いて、土砂混合装置10の近傍に投入ベルトコンベア12を搬送し、配置する。このとき、ヘッドシュート203は、混合システム100が稼働しているときと同様の状態(図6(a)に示す第1の姿勢)となっている。
 次いで、図8(b)のように、ヘッドシュート203を上方に跳ね上げる(第1の姿勢とは異なる第2の姿勢とする)。すなわち、本実施形態において、ヘッドシュート203が特定部品に相当する。そして、図8(c)に示すように、投入ベルトコンベア12をクレーン360で吊り上げる。このとき、投入ベルトコンベア12とクレーン360を繋ぐ各ワイヤの長さは、略同一とする。これにより、投入ベルトコンベア12を略水平に吊り上げることができる。
 次いで、図9(a)に示すように、投入ベルトコンベア12の前脚204の円柱状部材216を架台102に設けられた保持部材170A,170B(U溝103)に係合させつつ、投入ベルトコンベア12のテール架台206側を降ろしていく。これにより、図9(b)に示すように、テール架台206を接地させることができる。なお、投入ベルトコンベア12を設置する際には、テール架台206を先に接地させた後に前脚204を保持部材170A,170Bに係合させてもよい。
 そして、図9(c)に示すようにヘッドシュート203を元の位置(図8(a)と同じ第1の姿勢)に戻すことで、投入ベルトコンベア12の設置が完了する。
 ここで、投入ベルトコンベア12を設置する際に図8(b)~図9(b)に示すようにヘッドシュート203を跳ね上げた状態にするのは、ヘッドシュート203を跳ね上げずに、投入ベルトコンベア12を略水平に吊り上げた状態で搬送して、土砂混合装置10に近づけていくと、図10(a)に示すように、ヘッドシュート203と土砂混合装置10の一部(例えば投入口部材111)とが接触(干渉)するおそれがあるからである。この接触を回避するためには、図10(b)に示すように投入ベルトコンベア12とクレーン360を繋ぐ各ワイヤの長さを異ならせて、投入ベルトコンベア12全体を傾斜させた状態で搬送することも考えられるが、投入ベルトコンベア12全体を傾斜させた状態で搬送すると安定的に搬送することが難しい。これに対し、本実施形態のようにヘッドシュート203を跳ね上げられるようにすることで、投入ベルトコンベア12を安定的に搬送することが可能となる。
 また、本実施形態では、投入ベルトコンベア12にリンク機構225を設けることで、投入ベルトコンベア12を設置しやすくしている。この点について、図11(a)~図11(f)に基づいて説明する。なお、図11(a)~図11(f)においては、先にテール架台206を接地させ、その後に前脚204を保持部材170A,170Bに係合させる例を示している。
 図11(a)~図11(c)には、投入ベルトコンベア12を設置する際に、先にテール架台206を接地させた状態が示されている。このうち、図11(a)に示す投入ベルトコンベア12の位置が正規の位置(中立位置)であり、図11(b)に示す投入ベルトコンベア12の位置が正規の位置よりも後方の位置であり、図11(c)に示す投入ベルトコンベア12の位置が正規の位置よりも前方の位置であるとする。
 図11(a)のように正規の位置に位置決めされた状態で、投入ベルトコンベア12の前脚204を保持部材170A,170Bに係合させると、図11(d)に示すようになる。この場合、リンク機構225は図11(a)の状態からほとんど変化しない。
 一方、図11(b)のように正規の位置よりも後方の位置に位置決めされた状態で、投入ベルトコンベア12の前脚204を保持部材170A,170Bに係合させようとすると、図11(e)に示すように投入ベルトコンベア12のコンベア本体202が前方に移動する。この場合、リンク機構225の作用により、テール架台206は位置ずれしない(引きずりが生じない)ため、テール架台206等に無理な負荷がかかること無く、投入ベルトコンベア12を設置することができる。
 更に、図11(c)のように正規の位置よりも前方の位置に位置決めされた状態で、投入ベルトコンベア12の前脚204を保持部材170A,170Bに係合させようとすると、図11(f)に示すように投入ベルトコンベア12のコンベア本体202が後方に移動する。この場合、リンク機構225の作用により、テール架台206は位置ずれしない(引きずりが生じない)ため、テール架台206等に無理な負荷がかかること無く、投入ベルトコンベア12を設置することができる。
 なお、投入ベルトコンベア12にリンク機構225が設けられていない場合には、図11(b)や図11(c)のように正規の位置とは異なる位置にテール架台206を接地させてしまうと、前脚204を保持部材170A,170Bに係合させるときに、図11(e)や図11(f)のようにコンベア本体202が前方や後方に移動できないため、テール架台206を引きずってしまうおそれがある。
(計量ベルトコンベア16について)
 図1に戻り、計量ベルトコンベア16は、エプロンフィーダ20から供給される第1母材を、投入ベルトコンベア12上に投入する機能を有する。図12(a)には、計量ベルトコンベア16を+X方向から見た状態が示されている。また、図12(b)は、計量ベルトコンベア16と、計量ベルトコンベア18と、投入ベルトコンベア12とを模式的に示す斜視図である。図12(a)、図12(b)に示すように、計量ベルトコンベア16は、コンベア本体302と、前脚304と、テール架台306と、球面軸受機構308と、リンク機構309と、を有する。
 コンベア本体302の+Y側の端部には、図12(a)に示すように、コンベア本体302により搬送された第1母材を投入ベルトコンベア12に導くガイドとしてのヘッドシュート303が設けられている。コンベア本体302の-Y側端部においてエプロンフィーダ20から供給された第1母材は、コンベア本体302によって+Y方向に搬送され、ヘッドシュート303から投入ベルトコンベア12に供給される。コンベア本体302には、第1母材の重量を計測するセンサが設けられており、第1母材の重量に応じて、後述するエプロンフィーダ20のフィーダ本体の投入速度(第1母材の供給速度)が制御されるようになっている。
 図13には、前脚304近傍が拡大して示されている。図13に示すように、前脚304は、一対の脚部314A,314Bと、脚部314A、314B間を連結する状態で設けられた軸部材としての円柱状部材316と、を有する。円柱状部材316が前述した支持機構226Aの柱部材236A,236BのU溝234に係合することで、前脚304(計量ベルトコンベア16)が投入ベルトコンベア12に連結される。なお、前脚304は、図12(b)に示すように、Z回転軸310を介してコンベア本体302の底面に設けられている。なお、Z回転軸310は、厳密にいえば、Z軸から傾いた方向の回りに回転するが、説明の便宜上、Z軸回り(θz方向)に回転するものとして説明する。
 図12(a)に戻り、テール架台306は、前述した投入ベルトコンベア12のテール架台206と同様の構成を有する。ただし、テール架台206に設けられている支持機構226A~226Cのような支持機構はテール架台306には設けられていない。
 球面軸受機構308は、投入ベルトコンベア12の球面軸受機構224と同様の構成を有する。すなわち、球面軸受機構308は、コンベア本体302の、テール架台306に対するX軸回りの回転方向の姿勢変化(θx)、Y軸回りの回転方向の姿勢変化(θy)、及びZ軸回りの回転方向の姿勢変化(θz)を許容している。
 リンク機構309は、投入ベルトコンベア12のリンク機構225と同様の構成を有する。すなわち、リンク機構309は、金属製の高剛性材料から成り、球面軸受機構308と、前脚304との間の距離を可変にする可変機構、及びコンベア本体302を長手方向にスライドさせる並進機構としての機能を有している。コンベア本体302は、リンク機構309及び球面軸受機構308により、テール架台306に対するY軸方向への移動が許容された状態となっている。
 本実施形態では、工事現場に投入ベルトコンベア12が設置された状態で、クレーン等で吊り上げた状態の計量ベルトコンベア16を、上方から図12(a)の位置に設置する。そして、図13に示すように、計量ベルトコンベア16の前脚304の円柱状部材316を支持機構226Aの柱部材236A、236BのU溝234に係合させる。このようにすることで、計量ベルトコンベア16を、投入ベルトコンベア12に連結した状態で設置することができる。計量ベルトコンベア16についても、投入ベルトコンベア12と同様の構成を有していることから、図11(a)~図11(f)で説明したのと同様、計量ベルトコンベア16を設置するときにテール架台306を引きずらず、計量ベルトコンベア16の各部に無理な負荷がかかるのを抑制することができる。
 ここで、計量ベルトコンベア16においては、図21に示すように、前脚304が支持機構226Aに対してθx方向に自由度を有し、コンベア本体302が前脚304に対してθz方向の自由度を有している。また、コンベア本体302は、テール架台306に対してθx、θy、θz方向の自由度を有している。これにより、支持機構226Aの姿勢に倣うように、コンベア本体302のY軸回りの姿勢を定めることができる。また、テール架台306の上面が水平面に対して傾いているような場合であっても、その傾きを球面軸受機構308で吸収することができる。すなわち、本実施形態において、前脚304が第2接続部分に相当する。
 また、本実施形態では、前脚304とテール架台306の高さがほぼ同一であることから、計量ベルトコンベア16と投入ベルトコンベア12との係合が解除されたときには、計量ベルトコンベア16は自立可能となっている。これにより、計量ベルトコンベア16を保管等する場合において、計量ベルトコンベア16の自立を補助する補助器具等が不要となる。
 なお、計量ベルトコンベア16においても、図8(b)と同様、ヘッドシュート303が跳ね上げ可能になっていることが好ましい。これにより、計量ベルトコンベア16の設置の際にヘッドシュート303が邪魔にならないため、設置作業が容易となる。
(エプロンフィーダ20について)
 図1に戻り、エプロンフィーダ20は、地面上に敷設された鉄板420上に設置される。図14(a)には、エプロンフィーダを+Y側から見た状態が斜視図にて示されている。エプロンフィーダ20は、フィーダ本体502と、フィーダ本体502を支持する支持台504とを備える。フィーダ本体502は第1母材を計量ベルトコンベア16上に投入する機能を有する。なお、鉄板420は敷設しなくてもよい。
 本実施形態においては、エプロンフィーダ20の運搬時には、図14(b)に示すように支持台504を折りたたむことができる。これにより、エプロンフィーダ20の運搬がしやすくなっており、また、運搬時に必要なトラックの台数も低減することができる。
(計量ベルトコンベア18について)
 図1に戻り、計量ベルトコンベア18は、エプロンフィーダ22から供給される第2母材を、投入ベルトコンベア12上に投入する機能を有する。図15には、計量ベルトコンベア18を+X方向から見た状態が示されている。また、図16には、前脚404近傍が拡大して示されている。図15に示すように、計量ベルトコンベア18は、コンベア本体402と、前脚404と、テール架台406と、球面軸受機構408と、リンク機構409と、を有しており、前述した計量ベルトコンベア16と同様の構成を有している。
 コンベア本体402の+Y側の端部には、図15に示すように、コンベア本体402により搬送された第2母材を投入ベルトコンベア12に導くガイドとしてのヘッドシュート403が設けられている。
 前脚404は、図15に示すように、軸部材としての円柱状部材416を有している。なお、前脚404は、図12(b)に示すように、Z回転軸410を介してコンベア本体402の底面に設けられている。
 テール架台406、球面軸受機構408、リンク機構409は、計量ベルトコンベア16のテール架台306、球面軸受機構308、リンク機構309と同様の構成を有する。
 本実施形態では、工事現場に投入ベルトコンベア12が設置された状態で、クレーン等で吊り上げた状態の計量ベルトコンベア18を、上方から図15の位置に設置する。そして、図16に示すように、計量ベルトコンベア18の前脚404の円柱状部材416を支持機構226Bの柱部材238A、238BのU溝240(2か所)に係合させる。このようにすることで、計量ベルトコンベア18を、投入ベルトコンベア12に連結した状態で設置することができる。計量ベルトコンベア18についても、投入ベルトコンベア12と同様の構成を有していることから、図11(a)~図11(f)で説明したのと同様、計量ベルトコンベア18を設置するときにテール架台406を引きずらず、計量ベルトコンベア18の各部に無理な負荷がかかるのを抑制することができる。なお、計量ベルトコンベア16、18の設置順は任意である。すなわち、計量ベルトコンベア16を先に設置してもよいし、計量ベルトコンベア18を先に設置してもよい。
 ここで、計量ベルトコンベア18においては、図21に示すように、前脚404が支持機構226Bに対してθx方向に自由度を有し、コンベア本体402が前脚404に対してθz方向の自由度を有している。また、コンベア本体402は、テール架台406に対してθx、θy、θz方向の自由度を有している。これにより、支持機構226Bの姿勢に倣うように、コンベア本体402のY軸回りの姿勢を定めることができる。また、テール架台406の上面が水平面に対して傾いているような場合であっても、その傾きを球面軸受機構408で吸収することができる。すなわち、本実施形態において、前脚404が第2接続部分に相当する。
 本実施形態においては、計量ベルトコンベア16と計量ベルトコンベア18とは、同一構成であるので、工事現場内に予備機として、計量ベルトコンベア16と計量ベルトコンベア18との少なくとも一方を備えておけば、例えば計量ベルトコンベア16が故障したときに交換が容易であるので、メンテナンス性に優れる。
 図17は、計量ベルトコンベア16、計量ベルトコンベア18、投入ベルトコンベア12を+Z方向から見た状態を模式的に示す図である。なお、図17は、投入ベルトコンベア12の搬送方向が上方から見てX軸方向と一致し、計量ベルトコンベア16、18の搬送方向が上方から見てY軸方向と一致した状態(以下、基準状態と呼ぶ)を示している。この基準状態では、計量ベルトコンベア16からの第1母材の投入範囲が、投入ベルトコンベア12の第1母材の受取可能範囲(第1母材をこぼさずに受け取れる範囲)に含まれている。また、基準状態では、計量ベルトコンベア18からの第2母材の投入範囲が、投入ベルトコンベア12の第2母材の受取可能範囲に含まれている。
 本実施形態においては、図17に示すように、計量ベルトコンベア16と、球面軸受機構224との距離をD1、計量ベルトコンベア18と、球面軸受機構224との距離をD2とした場合に、D1とD2の間には、D1=D2の関係がある。すなわち、本実施形態において距離D1が第2ユニットの一方と第1位置との距離に相当し、距離D2が第2ユニットの他方と第1位置との距離に相当する。以下、D1=D2とした理由について説明する。
 図18(a)は、投入ベルトコンベア12を設置する際に、コンベア本体202の設置方向(長手方向)が上方から見てX軸に対して傾いていた場合を示す模式図である。この場合、コンベア本体202は、球面軸受機構224を基準として傾いているため、コンベア本体202が傾くことによる投入範囲と受取可能範囲との間のずれ量は、球面軸受機構224からの距離に応じて変化する。すなわち、距離が大きいほどずれ量は大きくなり、距離が小さいほどずれ量は小さくなる。本実施形態では、距離D1とD2とを一致させることにより、計量ベルトコンベア16の投入範囲と投入ベルトコンベア12の受取可能範囲とのずれ量と、計量ベルトコンベア18の投入範囲と投入ベルトコンベア12の受取可能範囲のずれ量を一致させることができる。これにより、どちらか一方のずれ量が大きくならず、両方のずれ量を極力小さくすることができる。
 図18(b)は、投入ベルトコンベア12を設置する際に、テール架台206が傾き、計量ベルトコンベア16、18のコンベア本体302,402の設置方向(長手方向)が上方から見てY軸に対して傾いていた場合を示す模式図である。この場合にも、距離D1とD2とを一致させることにより、計量ベルトコンベア16の投入範囲と投入ベルトコンベア12の受取可能範囲とのずれ量と、計量ベルトコンベア18の投入範囲と投入ベルトコンベア12の受取可能範囲のずれ量を一致させることができる。これにより、どちらか一方のずれ量が大きくならず、両方のずれ量を極力小さくすることができる。
 更に、計量ベルトコンベア16,18を設置する際の衝撃により、投入ベルトコンベア12との位置関係にずれが生じる場合もある。図19(a)には、計量ベルトコンベア18を先に設置した状態が示されている。この状態から、計量ベルトコンベア16を設置するときに、テール架台206に+Y方向の衝撃が与えられた場合、図19(b)に示すようにテール架台206が水平面内で回転する。また、図19(b)とほぼ同時に、投入ベルトコンベア12のコンベア本体202がZ回転軸210を中心として回転し、図20に示すような状態となる。このような場合であっても、距離D1とD2とを一致させることにより、計量ベルトコンベア16の投入範囲と投入ベルトコンベア12の受取可能範囲とのずれ量と、計量ベルトコンベア18の投入範囲と投入ベルトコンベア12の受取可能範囲のずれ量を一致させることができる。これにより、どちらか一方のずれ量が大きくならず、両方のずれ量を極力小さくすることができる。
 このように、本実施形態では、距離D1とD2を一致させることで、第1、第2母材の投入範囲と受取範囲とのずれ量を極力小さくすることができるため、第1、第2母材がこぼれるのを抑制することができる。
 なお、距離D1、D2は必ずしも一致しなくてもよい。すなわち、一方の計量ベルトコンベアと球面軸受機構224との距離は、他方の計量ベルトコンベアと球面軸受機構224との間の距離に基づいて、ずれ量が許容範囲に収まるように決定すればよい。
(エプロンフィーダ22について)
 図1に戻り、エプロンフィーダ22は、地面上に敷設された鉄板422上に設置される。エプロンフィーダ22は、前述したエプロンフィーダ20と同様の構成を有している。なお、鉄板422は敷設しなくてもよい。
 本実施形態においては、前述のように、各ユニット(土砂混合装置10、投入ベルトコンベア12、計量ベルトコンベア16、18、排出ベルトコンベア14)を連結することができるとともに、地面に傾斜等があっても、球面軸受機構224,308,408、147により、地面の傾斜等を吸収することができる。このため、各ユニットを設置する際の、地面や鉄板へのマーキング(墨出し)の必要がない。また、各ベルトコンベアや土砂混合装置10を連結することで、位置関係がずれにくくなっているので、地面や鉄板への固定が不要となる。
 なお、本実施形態では、各ベルトコンベア12,16,18の前脚204,304,404がコンベア本体202,302,402に予め設けられている。従前においては、各ベルトコンベアを設置する場合には、前脚を地面上に立て、その後に、前脚上にコンベア本体を上方から搬入して、前脚にコンベア本体を接続することとしていたが、本実施形態ではこのような作業が不要となるので、設置時の手間を低減することができる。
 以上詳細に説明したように、本実施形態によると、混合システム100は、建設発生土の破砕、細粒化(第1の工程)を行う土砂混合装置10(第1のユニット)と、建設発生土の搬送(第2の工程)を行う投入ベルトコンベア12(第2のユニット)と、を備えている。また、投入ベルトコンベア12は、搬送を行うコンベア本体202と、コンベア本体202を支持するテール架台206と、を有している。また、テール架台206は球面軸受機構224(第1接続部分)においてコンベア本体202と接続され、コンベア本体202は前脚204(第2接続部分)において土砂混合装置10と係合されている。そして、テール架台206とコンベア本体202との間には、球面軸受機構224と前脚204との間の距離を可変にする金属製の高剛性部を有したリンク機構225が設けられている。このように、本実施形態では、リンク機構225を設けることにより、図11(a)~図11(f)を用いて説明したように、投入ベルトコンベア12を設置するときに投入ベルトコンベア12の位置が正規の位置(図11(a)参照)から前後に多少ずれたとしても(図11(b)、図11(c)参照)、テール架台206を引きずらずに投入ベルトコンベア12を設置することができる。これにより、投入ベルトコンベア12に無理な負荷をかけずに、簡易に設置することができる。
 また、本実施形態の混合システム100は、建設発生土の搬送(第1の工程)を行う投入ベルトコンベア12(第1のユニット)と、母材の搬送(第2の工程)を行う計量ベルトコンベア16(18)(第2のユニット)と、を備えている。また、計量ベルトコンベア16(18)は、搬送を行うコンベア本体302(402)と、コンベア本体302(402)を支持するテール架台306(406)と、を有している。また、テール架台306(406)は球面軸受機構308(408)においてコンベア本体302(402)と接続され、コンベア本体302(402)は前脚304(404)において投入ベルトコンベア12と係合されている。そして、テール架台306(406)とコンベア本体302(402)との間には、球面軸受機構308(408)と前脚304(404)との間の距離を可変にする金属製の高剛性部を有したリンク機構309(409)が設けられている。このように、本実施形態では、計量ベルトコンベア16(18)にもリンク機構309(409)が設けられているので、投入ベルトコンベア12と同様、テール架台306(406)を引きずらずに計量ベルトコンベア16(18)を設置することができる。これにより、計量ベルトコンベア16(18)に無理な負荷をかけずに、簡易に設置することができる。
 また、本実施形態では、2つの計量ベルトコンベア16、18それぞれは、前脚304,404において投入ベルトコンベア12のテール架台206に係合され、計量ベルトコンベア16、18の一方と球面軸受機構224との距離に基づいて、計量ベルトコンベア16、18の他方と球面軸受機構224との距離を決めることとしている。これにより、投入ベルトコンベア12や計量ベルトコンベア16,18が基準状態(図17)から傾いた場合でも、計量ベルトコンベア16、18それぞれの投入範囲と、投入ベルトコンベア12の受取可能範囲とのずれ量が極力小さくなるようにすることができる。
 また、本実施形態では、投入ベルトコンベア12を設置する際に、ヘッドシュート303を跳ね上げ(図8(b))、搬送及び設置を行う。これにより、ヘッドシュート303が搬送や設置の際に邪魔になるのを抑制することができる。また、図8(a)~図8(c)に示すように、投入ベルトコンベア12を搬送する際に、複数のケーブルの長さを同一にすることができるため、搬送の際に投入ベルトコンベア12が不安定になるのを抑制することができる。
 また、本実施形態では、土砂混合装置10(第1のユニット)と、土砂混合装置10から排出された、破砕、混合後の処理対象の搬送(第2の工程)を行う排出ベルトコンベア14(第2ユニット)とを備える。そして、排出ベルトコンベア14のコンベア本体142を指示する回転軸受機構146は、Y軸方向に延びる軸部材245と、V溝(又はU溝)が形成され、軸部材245をY軸回りの回転が可能な状態で支持するブロック部材246と、を有している。これにより、本実施形態では、ブロック部材246を正確に位置決めしておけば、軸部材245をブロック部材246に載せるだけで、X軸方向やZ軸方向、θx、θz方向に関する位置決めを行うことができる。
 また、本実施形態では、ブロック部材246は、土砂混合装置10が設置されている鉄板130上に固定されているので、ブロック部材246の位置ずれを防止することができる。また、ブロック部材246は、排出ベルトコンベア14を設置する前に鉄板130上に固定しておくことができるため、排出ベルトコンベア14を設置後にコンベア本体142の下側に手を伸ばしてボルト締めするなどの作業が不要である。これにより、設置作業の簡素化を図ることが可能である。
 また、本実施形態では、排出ベルトコンベア14は、コンベア本体142を支持する前脚144を有している。そして、前脚144は、脚本体部145と鉄板130とを連結し、脚本体部145の鉄板130に対する傾斜を許容する球面軸受機構147を備えている。これにより、本実施形態では、鉄板130上に排出ベルトコンベア14を置くだけで、排出ベルトコンベア14の姿勢を、鉄板を基準とした適切な状態に維持することができる。
 また、本実施形態では、投入ベルトコンベア12の土砂混合装置10に係合される円柱状部材216の回転に関する自由度の数と、球面軸受機構224の回転に関する自由度の数が異なっている。これにより、土砂混合装置10に対して投入ベルトコンベア12を連結したときに、設置面の傾斜等を吸収しつつ、投入ベルトコンベア12を安定して設置することができる。また、投入ベルトコンベア12に係合される計量ベルトコンベア16、18も同様である。したがって、投入ベルトコンベア12に対して計量ベルトコンベア16,18を連結したときに、設置面の形状(傾斜等)を吸収しつつ、計量ベルトコンベア16,18を安定して設置することができる。したがって、各ベルトコンベア12,16,18を工事現場に設置するときに、地面上に必ずしも鉄板を敷設しなくてもよくなる。また、各ベルトコンベアの位置決めのためにマーキング(墨出し)を行わなくてもよく、各装置が連結されることから、各装置を地面上に固定する器具も不要となる。これらにより、混合システム100を工事現場に設置する際の手間を軽減すなわち簡易にすることができる。
 また、本実施形態によると、各ベルトコンベア12,16,18の他の装置に連結される側の部分(円柱状部材216,316,416)の回転に関する自由度の数よりも、地面近傍に位置する球面軸受機構224、308,408の回転に関する自由度の数の方が多い。これにより、他の装置に対して各ベルトコンベア12,16,18を安定的に連結しつつ、地面の形状(傾斜等)を確実に吸収することができる。
 また、本実施形態によると、円柱状部材216、316、416は、他の装置と2か所(U溝103,234,240)で係合し、球面軸受機構224は、設置される面と1か所で当接する。これにより、他の装置に連結される円柱状部材216が2か所で係合するため、連結時の安定性を確保することができる。
 また、本実施形態では、ベルトコンベア12,16,18を他の装置に連結する際に、他の装置の姿勢を所定の状態に維持した状態で、球面軸受機構224、308,408を地面側に接地させるとともに、円柱状部材216、316,416をU溝103,234,240に係合させる。これにより、他の装置の姿勢と地面側の形状(傾斜など)に合わせて、適切な状態でベルトコンベア12,16,18を設置することができる。
 また、本実施形態では、ベルトコンベア12,16,18をアングル等で固定していないので、工事現場から混合システム100を撤収するのに要する時間を短縮することができる。これにより、例えば台風が接近しているのがわかったときから混合システム100を撤収しても、台風が襲来する前に混合システム100の撤収を完了することができる。
 なお、上記実施形態では、投入ベルトコンベア12において、リンク機構225が、球面軸受機構224とコンベア本体202との間に設けられる場合について説明したが、これに限られるものではない。例えば、コンベア本体202と土砂混合装置10との間(例えば、前脚204とコンベア本体202との間)にリンク機構が設けられてもよい。このようにしても、上記実施形態と同様の作用効果(図11(a)~図11(f))を奏することができる。なお、投入ベルトコンベア12に限らず、計量ベルトコンベア16,18のリンク機構についても同様である。
 なお、上記実施形態では、投入ベルトコンベア12においてヘッドシュート303が搬送や設置の際に邪魔になる場合に、当該ヘッドシュート303を跳ね上げた状態(第1の姿勢から第2の姿勢に変化させた状態)で投入ベルトコンベア12を搬送及び設置する場合について説明した。ただし、これに限らず、投入ベルトコンベア12において、ヘッドシュート303以外に、搬送の際に邪魔になる部品(特定部品)が存在する場合には、当該特定部品が邪魔にならないように姿勢を変化させた状態で、投入ベルトコンベア12を設置するようにしてもよい。計量ベルトコンベア16,18についても同様である。
 なお、上記実施形態では、ベルトコンベア12,16,18の下側に鉄板を敷設しない場合について説明したが、これに限らず、鉄板を敷設してもよい。
 なお、上記実施形態では、混合システム100に本発明を適用した場合について説明したが、これに限られるものではない。例えば、特開2007-175585号公報に記載されているような土壌洗浄プラントが有するユニット(土壌洗浄設備やコンベアなど)において、本実施形態を適用することとしてもよい。また、コンクリートや礫を破砕するプラントが有するユニット(破砕機やコンベアなど)において、本実施形態を適用することとしてもよい。また、特開2006-780号公報に記載されているような選別プラントにおいて、本発明を適用することとしてもよい。また、特開2000-213287号公報に記載されているようなトンネル掘削残土を搬送するための連続コンベアにおいて、本実施形態を適用することとしてもよい。また、海上設備と陸上設備との間に設置されるコンベアにおいて本実施形態を適用することとしてもよい。この場合、コンベアを設備間に設置するのが容易になるとともに、海上設備が潮位変化や波等によって揺動しても、コンベアを当該揺動に追従させることができる。更に、特開2020-179973に記載されているような立坑掘削残土の排出コンベアにおいても本実施形態を適用することができる。これにより排出コンベアを現場に合わせて増やしたい場合において、排出コンベアを簡単に追加することが可能となる。
 上述した実施形態は本発明の好適な実施の例である。但し、これに限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変形実施可能である。
  10 土砂混合装置(第1ユニット)
  12 投入ベルトコンベア(第2ユニット又は第1ユニット)
  14 排出ベルトコンベア(第2ユニット)
  16,18 計量ベルトコンベア(第2ユニット)
  113 シュート(入口部)
  130 鉄板(土台)
  142 コンベア本体(本体部)
  144 前脚(第2支持部)
  145 脚本体部(脚部)
  147 球面軸受機構(連結部)
  147’ V溝軸受機構(支持機構)
  202 コンベア本体(本体部、第2部分)
  204 前脚(第2接続部分)
  206 テール架台(台部、第1部分)
  224 球面軸受機構(第1接続部分)
  225 リンク機構(可変機構)
  245 軸部材(第1支持部の一部)
  246 ブロック部材(支持部材、第1支持部の一部)
  302,402 コンベア本体(本体部)
  303 ヘッドシュート(特定部品)
  306、406 テール架台(台部)
  308、408 球面軸受機構(第1接続部分)
  304、404 前脚(第2接続部分)
  309、409 リンク機構(可変機構)
 

Claims (13)

  1.  処理対象物に対して第1の工程を実行する第1ユニットと、
     前記処理対象物に対して第2の工程を実行する第2ユニットと、を備え、
     前記第2ユニットは、前記第2の工程を実行する本体部と、前記本体部を支持する台部と、を有し、
     前記台部は第1接続部分において前記本体部と接続され、前記本体部は第2接続部分において前記第1ユニットと係合され、
     前記台部と前記本体部との間と、前記本体部と前記第1ユニットとの間との少なくともどちらか一方には、前記第1接続部分と前記第2接続部分との間の距離を可変にする金属製の高剛性部を有した可変機構が設けられている、建設用装置。
  2.  前記可変機構は、前記本体部の荷重の一部を受ける請求項1に記載の建設用装置。
  3.  前記第1ユニットと前記第2ユニットとは、一定の位置に置かれる定置式である、請求項1に記載の建設用装置。
  4.  前記可変機構は、前記第1接続部分に設けられる球面軸受と前記本体部とを連結し、前記球面軸受と前記本体部との位置関係の変更を許容するリンク機構を有する請求項1~3のいずれか一項に記載の建設用装置。
  5.  前記第2ユニットを2つ備え、
     前記第1ユニットは、前記台部が設置される接地面上に設置される第1部分と、前記第1部分の第1位置を基準とした姿勢変化が許容された状態で前記第1部分に接続され、前記処理対象物に対して第1の工程を実行する第2部分と、を有し、
     前記2つの第2ユニットそれぞれは、前記第2接続部分において前記第1ユニットの前記第1部分に係合され、前記第2ユニットの一方と前記第1位置との距離に基づいて、前記第2ユニットの他方と前記第1位置との距離を決める、請求項1~3のいずれか一項に記載の建設用装置。
  6.  前記第1ユニットの前記第1部分が前記接地面上に設置された状態で、前記第2部分は、前記第1位置を基準として、前記接地面内の回転方向への姿勢変化が許容されている、請求項5に記載の建設用装置。
  7.  前記第2ユニットの前記本体部の前記第2接続部分の近傍には、前記第2の工程で用いられる特定部品が設けられており、前記第2の工程を実行するときの前記特定部品の前記本体部に対する第1の姿勢は、前記第2ユニットを前記第1ユニットに係合させるときの前記特定部品の前記本体部に対する第2の姿勢と異なる、請求項1~3のいずれか一項に記載の建設用装置。
  8.  処理対象物に対して第1の工程を実行する処理装置と、前記処理装置を支持する土台と、を有する第1ユニットと、
     前記処理対象物に対して第2の工程を実行する本体部と、前記本体部を支持する第1支持部と、を有する第2ユニットと、を備え、
     前記第1支持部は、前記土台の水平面内の一軸方向に伸びる軸部材と、前記軸部材を前記一軸方向周りに回転可能に支持する支持部材と、を有する建設用装置。
  9.  前記支持部材は、前記本体部の水平面内の回転を制限するため前記土台に固定されている、請求項8に記載の建設用装置。
  10.  前記支持部材には、V字状又はU字状の溝が形成されており、
     前記軸部材は、前記支持部材の前記溝によって保持された状態である、請求項8に記載の建設用装置。
  11.  前記第2ユニットは、前記本体部を支持する第2支持部を有し、
     前記第2支持部は、前記本体部から前記土台に向かって伸びる脚部と、前記脚部と前記土台とを連結し、前記脚部の前記土台に対する傾斜を許容する連結部と、を備える請求項8に記載の建設用装置。
  12.  前記連結部は、球面軸受機構、及び、V字状又はU字状の溝を有し、前記脚部を前記土台において支持する支持機構のいずれか一方である、請求項11に記載の建設用装置。
  13.  前記処理装置は、前記処理対象物を排出するための出口部を有し、
     前記本体部は、前記処理対象物を導入するための前記出口部を包囲する入口部を有する、請求項8~12のいずれか一項に記載の建設用装置。
     
PCT/JP2023/001868 2022-05-09 2023-01-23 建設用装置 WO2023218699A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-077008 2022-05-09
JP2022077008 2022-05-09

Publications (1)

Publication Number Publication Date
WO2023218699A1 true WO2023218699A1 (ja) 2023-11-16

Family

ID=88729973

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/001868 WO2023218699A1 (ja) 2022-05-09 2023-01-23 建設用装置

Country Status (1)

Country Link
WO (1) WO2023218699A1 (ja)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0530246U (ja) * 1991-09-25 1993-04-20 三菱重工業株式会社 破砕装置
JP2002250049A (ja) * 2001-02-27 2002-09-06 Hitachi Constr Mach Co Ltd 細粒化装置及びこれに用いる均し部材
JP2003129516A (ja) * 2001-10-30 2003-05-08 Kajima Corp ズリの排出方法及び排出装置
JP2004305873A (ja) * 2003-04-04 2004-11-04 Yasuo Fujii 残土選別システム
JP2006336355A (ja) * 2005-06-03 2006-12-14 Kirikawa Bussan:Kk 建設残土等の粉砕撹拌装置
JP2014173285A (ja) * 2013-03-07 2014-09-22 Penta Ocean Construction Co Ltd 混合装置及び軟弱土に対する製鋼スラグ混合方法
US20170151592A1 (en) * 2014-10-27 2017-06-01 Trumbull Holdings, LLC Portable system and method for processing waste to be placed in landfill
WO2019017083A1 (ja) * 2017-07-21 2019-01-24 株式会社小松製作所 搬送システム、制御装置、及び搬送方法
WO2021251066A1 (ja) * 2020-06-11 2021-12-16 日本国土開発株式会社 混合装置
WO2022209025A1 (ja) * 2021-03-29 2022-10-06 日本国土開発株式会社 建設用装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0530246U (ja) * 1991-09-25 1993-04-20 三菱重工業株式会社 破砕装置
JP2002250049A (ja) * 2001-02-27 2002-09-06 Hitachi Constr Mach Co Ltd 細粒化装置及びこれに用いる均し部材
JP2003129516A (ja) * 2001-10-30 2003-05-08 Kajima Corp ズリの排出方法及び排出装置
JP2004305873A (ja) * 2003-04-04 2004-11-04 Yasuo Fujii 残土選別システム
JP2006336355A (ja) * 2005-06-03 2006-12-14 Kirikawa Bussan:Kk 建設残土等の粉砕撹拌装置
JP2014173285A (ja) * 2013-03-07 2014-09-22 Penta Ocean Construction Co Ltd 混合装置及び軟弱土に対する製鋼スラグ混合方法
US20170151592A1 (en) * 2014-10-27 2017-06-01 Trumbull Holdings, LLC Portable system and method for processing waste to be placed in landfill
WO2019017083A1 (ja) * 2017-07-21 2019-01-24 株式会社小松製作所 搬送システム、制御装置、及び搬送方法
WO2021251066A1 (ja) * 2020-06-11 2021-12-16 日本国土開発株式会社 混合装置
WO2022209025A1 (ja) * 2021-03-29 2022-10-06 日本国土開発株式会社 建設用装置

Similar Documents

Publication Publication Date Title
CA2745578C (en) Mobile crusher
US9725249B2 (en) Movable processing apparatus for mineral material processing
US20120175219A1 (en) Conveyor Apparatus
CN105592928B (zh) 矿物材料加工设备以及用于操作加工设备的方法
AU2018353113B2 (en) Movable material processing apparatus comprising a foldable conveyor
US6789337B2 (en) Screening apparatus
EP2818249B1 (en) Support assembly for supporting part of a machine and processing apparatus provided with this support assembly
JP7196366B1 (ja) 建設用装置及び建設用装置の組立方法
WO2023218699A1 (ja) 建設用装置
JP2024109696A (ja) 建設装置の位置決め方法
JP2010261183A (ja) 土質改良システム
JP7202789B2 (ja) テールプーリ装置
JP2006206254A (ja) 自走式搬送装置
JP4176051B2 (ja) ズリ積込み装置およびズリ積込み設備
WO2010094950A2 (en) Mobile mineral sizer rig
JP2001207441A (ja) 自走式土質改良機械
US20230069101A1 (en) Rotary Crushing Device and Rotary Crushing Method
US20240150129A1 (en) Processing plant
JP2005087904A (ja) 土壌改良装置
JP2005207039A (ja) ズリ積込み装置
JP2003119821A (ja) 自走式土質改良機

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23803191

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2024520253

Country of ref document: JP