WO2023188359A1 - 電力需給制御装置、電力需給制御方法、及びプログラム - Google Patents

電力需給制御装置、電力需給制御方法、及びプログラム Download PDF

Info

Publication number
WO2023188359A1
WO2023188359A1 PCT/JP2022/016781 JP2022016781W WO2023188359A1 WO 2023188359 A1 WO2023188359 A1 WO 2023188359A1 JP 2022016781 W JP2022016781 W JP 2022016781W WO 2023188359 A1 WO2023188359 A1 WO 2023188359A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
electric
power
electric transportation
power supply
Prior art date
Application number
PCT/JP2022/016781
Other languages
English (en)
French (fr)
Inventor
幸雄 永渕
弘樹 長山
麻美 宮島
Original Assignee
日本電信電話株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電信電話株式会社 filed Critical 日本電信電話株式会社
Priority to PCT/JP2022/016781 priority Critical patent/WO2023188359A1/ja
Publication of WO2023188359A1 publication Critical patent/WO2023188359A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L55/00Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements

Definitions

  • the present invention relates to countermeasure technology for cyber attacks related to power supply and demand control for electric vehicles (hereinafter referred to as EVs).
  • EVs electric vehicles
  • EVs have become popular. EVs can be driven by being charged at a general home equipped with an EV charger or at a charging facility (also referred to as an EV charging stand, EV station, etc.).
  • a charging facility also referred to as an EV charging stand, EV station, etc.
  • Non-Patent Documents 1 and 2 disclose examples of techniques that utilize EVs as power supply sources.
  • the remaining EV battery level recorded in the charging control unit installed in the EV may be tampered with due to a cyber attack on the EV. If the remaining battery power of an EV has been tampered with due to a cyber attack, there is a possibility that the EV cannot be used as a power supply source.
  • the present invention has been made in view of the above points, and aims to provide a technology for reducing the impact of cyber attacks in a system that uses EVs as a power supply source.
  • a receiving unit that collects electric transportation device information that is information about electric transportation devices and collects power information that is information about electric power of a facility; a filter unit that determines a specific electric transportation device that is estimated to have suffered a cyber attack based on the electric transportation device information; Electric transportation that is dispatched from one or more electric transportation devices excluding the specific electric transportation device from the plurality of electric transportation devices for which the electric transportation device information has been collected to a facility where a power shortage is predicted based on the power information.
  • An electric power supply and demand control device is provided, comprising: a dispatch plan calculation unit that determines equipment; and a dispatch plan calculation unit that determines equipment.
  • FIG. 1 is a system configuration diagram in an embodiment of the present invention.
  • FIG. 3 is a diagram illustrating an image of connection relationships between constituent parts. It is a diagram showing an example of the hardware configuration of the device. It is a flowchart showing the operation of the power supply and demand control device 100.
  • the scope of application of the technology according to the present invention is not limited to electric vehicles, but includes all types of electric transportation equipment such as motorcycles, tractors, ships, etc.
  • the power supply and demand control device 100 collects alert information from individual EVs, VSOCs, etc. in the EV group, detects EVs whose data may have been tampered with, etc. based on the alert information, and The impact of cyber attacks is reduced by excluding them from the calculations of power supply and demand control.
  • the system configuration and operation for realizing this will be explained below.
  • FIG. 1 shows an overall configuration diagram of the system in this embodiment.
  • this system includes an electric power supply and demand control device 100 (also referred to as an electric power supply and demand control system), a security monitoring device 200 (VSOC (Vehicle Security Operation Center), etc.), and a group of EVs equipped with security sensors. 300, EV owners 400, and a group of facilities 500 that use electricity.
  • VSOC Vehicle Security Operation Center
  • the outline of each component is as follows.
  • the power supply and demand control device 100 is a device that executes power supply and demand control, such as dispatching EVs to facilities where power shortages are expected.
  • the security monitoring device 200 collects alert information from each EV in the EV group 300 equipped with a security sensor, and transmits the collected alert information to the power supply and demand control device 100.
  • the security monitoring device 200 also acquires various logs such as communication logs and charging operation logs from each EV in the EV group 300, generates alert information by analyzing the logs, and uses the generated alert information to It may also be transmitted to the supply and demand control device 100.
  • Each EV in the EV group 300 is equipped with a security sensor, and outputs alert information when a cyber attack is detected.
  • the power supply and demand control device 100 collects alert information from the security monitoring device 200, but this is just an example.
  • the power supply and demand control device 100 may collect alert information directly from EVs.
  • the EV owner 400 moves the EV in response to instructions from the power control device 100. More specifically, EV owner 400 holds a terminal such as a smart phone, and instructions from power control device 100 are transmitted to the terminal.
  • the facility group 500 that uses electricity is, for example, a facility group that receives power from a power grid managed by a local power company to which the facility group 500 belongs.
  • the facility group 500 includes corporate and factory buildings, general households, public facilities, and charging facilities (chargers (EVSE), etc.).
  • FIG. 2 is an image diagram showing the connection configuration of this system.
  • an example is shown in which the area under the jurisdiction of the power supply and demand control device 100 is region A.
  • the power supply and demand control device 100 includes an EV information receiving section 110, a data storage section 115, a power information receiving section 120, a filter section 130, an EV dispatch plan calculation section 140, and a control section 150.
  • the power supply and demand control device 100 may not include the control unit 150 and a device corresponding to the control unit 150 may be provided outside the power supply and demand control device 100. The operation of each part will be described later.
  • the EV information receiving section 110 and the power information receiving section 120 may be collectively referred to as a "receiving section.”
  • the power supply and demand control device 100 is, for example, a device realized by causing a computer to execute a program. That is, the power supply and demand control device 100 can be realized by using hardware resources such as a CPU and memory built into a computer to execute a program corresponding to the processing performed by the power supply and demand control device 100. It is.
  • the above program can be recorded on a computer-readable recording medium (such as a portable memory) and can be stored or distributed. It is also possible to provide the above program through a network such as the Internet or e-mail.
  • FIG. 3 is a diagram showing an example of the hardware configuration of the computer.
  • the computer in FIG. 3 includes a drive device 1000, an auxiliary storage device 1002, a memory device 1003, a CPU 1004, an interface device 1005, a display device 1006, an input device 1007, an output device 1008, etc., which are interconnected by a bus BS.
  • a program that realizes processing on the computer is provided, for example, on a recording medium 1001 such as a CD-ROM or a memory card.
  • a recording medium 1001 such as a CD-ROM or a memory card.
  • the program is installed from the recording medium 1001 to the auxiliary storage device 1002 via the drive device 1000.
  • the program does not necessarily need to be installed from the recording medium 1001, and may be downloaded from another computer via a network.
  • the auxiliary storage device 1002 stores installed programs as well as necessary files, data, and the like.
  • the memory device 1003 reads and stores the program from the auxiliary storage device 1002 when there is an instruction to start the program.
  • the CPU 1004 implements functions related to the power supply and demand control device 100 according to programs stored in the memory device 1003.
  • the interface device 1005 is used as an interface for connecting to a network or the like.
  • a display device 1006 displays a GUI (Graphical User Interface) and the like based on a program.
  • the input device 1007 is composed of a keyboard, a mouse, buttons, a touch panel, or the like, and is used to input various operation instructions.
  • An output device 1008 outputs the calculation result.
  • the power supply and demand control device 100 may be realized by one computer, or may be realized by multiple computers. Further, the power supply and demand control device 100 may be realized by a physical machine or a virtual machine on a cloud.
  • S101 Information collection>
  • the EV information receiving unit 110 collects EV information of each EV in the EV group 300. EV information is collected, for example, periodically (at certain time intervals). The collected EV information is stored in the data storage section 115.
  • the EV information of each EV includes, for example, the EV's "location information, remaining battery level, ID, vehicle type, usage schedule, and alert information.”
  • ID is an identifier that can uniquely identify the EV.
  • the usage schedule is information including the date and time when the EV will be used. The usage schedule may be collected from the EV user's terminal or from a charging reservation application or the like.
  • the alert information includes, for example, information indicating that a cyber attack has been detected.
  • EV information for EVs in which no cyber attack was detected does not include alert information.
  • the alert information may include information indicating which part (unit) the cyber attack was made against, and information indicating the type of cyber attack (data tampering, etc.).
  • the power information receiving unit 120 collects power information from each facility of the facility group 500 in the jurisdiction area of the power supply and demand control device 100. For example, power information is collected periodically (at certain time intervals). The collected power information is stored in the data storage section 115.
  • the power information for each facility includes, for example, the facility's identification information, the power that can be supplied at the current time, the power that can be supplied at each time from the current time to a certain time in the future (predicted value), the current power demand (power consumption and ), and the power demand (predicted value) at each time from the current time to a certain time in the future. It is assumed that the location of each facility is known.
  • the time interval between each time may be, for example, 1 minute, 10 minutes, 30 minutes, 1 hour, or other than these.
  • "Supplied power" is the maximum power that can be supplied to the facility.
  • the filter unit 130 reads the EV information of each EV from the data storage unit 115, and based on the read EV information, selects EVs that are estimated to have been attacked by a cyber attack (data tampering etc. may have occurred). EV) and notifies the EV dispatch plan calculation unit 140 of the ID of the EV.
  • An EV that is estimated to have suffered a cyber attack is, for example, an EV whose EV information includes alert information indicating that a cyber attack has been detected. Even if the EV information includes alert information indicating that a cyber attack has been detected, if the content of the alert information is determined to be unrelated to tampering with the remaining battery capacity, may not notify the EV dispatch plan calculation unit 140 of the ID of the EV.
  • the EV information receiving unit 110 may also collect information on the vulnerability of EVs to cyber attacks published by vehicle manufacturers, security companies, etc., and store the information in the data storage unit 115.
  • the filter unit 130 based on the public information that a vulnerability has been found in a specific car model, the filter unit 130 considers the EV corresponding to the specific car model to be an "EV that is presumed to have been attacked by a cyber attack," and may be specified from the EV information, and the ID of the specified EV may not be notified to the EV dispatch plan dispatching unit 140.
  • the EV dispatch plan calculation unit 140 reads out the power information of each facility from the data storage unit 115, and identifies facilities that are predicted to run out of power. For example, if "power demand>available power x ⁇ " holds true at a certain time in the future at a certain facility, it can be predicted that the facility will experience a power shortage during the time period that includes that time.
  • is a coefficient for considering safety, and satisfies 0 ⁇ 1. Note that the coefficient ⁇ may not be used.
  • "facilities predicted to experience power shortages" include facilities that are experiencing power shortages at the current time.
  • the EV dispatch plan calculation unit 140 reads the EV information of the EVs excluding the EV with the ID notified from the filter unit 130 from the data storage unit 115, and calculates the position information, remaining battery level, usage schedule, etc. included in each read EV information. Based on this, EVs to be dispatched to facilities where power shortages are expected are determined.
  • the EV dispatch plan calculation unit 140 dispatches an EV whose remaining battery level is equal to or higher than a threshold value and is not scheduled to be used during a time period when a power shortage is expected at the facility to be dispatched to a facility where a power shortage is expected. Determine as. If there are multiple EVs whose remaining battery power is above the threshold and which are not scheduled to be used during the time period when power shortages are expected at the facility, select the EV closest to the facility among the multiple EVs. select.
  • control unit 150 performs control to dispatch the EV to a facility where a power shortage is expected. Examples of control contents include (1) and (2) below.
  • control unit 150 transmits control information to the EV instructing it to move to the target facility.
  • control unit 150 If the EV is a non-self-driving vehicle, the control unit 150 notifies the EV driver or the EV owner of a movement instruction to the target facility.
  • the processor includes: Collect electric transport equipment information, which is information about electric transport equipment, and collect power information, which is information about the power of the facility. Determining a specific electric transportation device that is estimated to have suffered a cyber attack based on the electric transportation device information, Electric transportation that is dispatched from one or more electric transportation devices excluding the specific electric transportation device from the plurality of electric transportation devices for which the electric transportation device information has been collected to a facility where a power shortage is predicted based on the power information.
  • An electric power supply and demand control device comprising: determining equipment.
  • the processor includes: determining the specific electric transportation device based on alert information included in the electric transportation device information, or The power supply and demand control device according to Supplementary Note 1, wherein the specific electric transportation device is determined based on public information regarding vulnerability to cyber attacks and information on the vehicle type included in the electric transportation device information.
  • An electric power supply and demand control method executed by a computer Collect electric transport equipment information, which is information about electric transport equipment, and collect power information, which is information about the power of the facility.
  • a non-transitory storage medium comprising:
  • Power supply and demand control device 110 EV information receiving section 115 Data storage section 120 Power information receiving section 130 Filter section 140 EV dispatch plan calculation section 150 Control section 200
  • Security monitoring device 300 EV group 400 EV owner 500 Facility group 1000 Drive device 1001 Record Medium 1002 Auxiliary storage device 1003 Memory device 1004 CPU 1005 Interface device 1006 Display device 1007 Input device 1008 Output device

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

電力需給制御装置において、電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集する受信部と、前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定するフィルタ部と、前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する派遣プラン算出部とを備える。

Description

電力需給制御装置、電力需給制御方法、及びプログラム
 本発明は、電気自動車(以下、EV(Electronic Vehicle))の電力需給制御に関わるサイバー攻撃時の対策技術に関連するものである
 近年、EVが普及してきている。EVは、EV充電器を備える一般家庭、あるいは、充電施設(EV充電スタンド、EVステーション等と呼んでもよい)等において充電をすることで走行可能になる。
 EVの普及に伴い、EVがビルや家などの電力供給源に組み込まれる将来が予想される。EVを電力供給源と考えた場合、EVのバッテリ残量をセンター側で収集して、電力を必要とする家やビル、地域などに配置するサービスが考えられる。例えば非特許文献1,2には、EVを電力供給源として利用する技術の例が開示されている。
https://sei.co.jp/technology/tr/bn194/pdf/194-22.pdf、EV/PHVを活用した仮想発電所(VPP)システム、2019年1月・SEIテクニカルレビュー・第194号、 https://www.ntt.co.jp/journal/2005/files/pdf/JN20200513.pdf、NTTアノードエナジーの取り組むサービス、NTT技術ジャーナル 2020.5
 多くのEVには通信機能が備えられており、EV外の様々な装置とEVとの間で通信が可能になっている。従って、EVに対するサイバー攻撃のリスクが増大している。
 EVに対するサイバー攻撃により、例えば、EVに搭載される充電制御ユニット等に記録されているEVバッテリ残量が改ざんされる可能性がある。サイバー攻撃によりEVバッテリ残量が改ざんされていた場合、当該EVを電力供給源として使用できない可能性がある。
 本発明は上記の点に鑑みてなされたものであり、EVを電力供給源として使用するシステムにおいて、サイバー攻撃の影響を低減するための技術を提供することを目的とする。
 開示の技術によれば、電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集する受信部と、
 前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定するフィルタ部と、
 前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する派遣プラン算出部と
 を備える電力需給制御装置が提供される。
 開示の技術によれば、EVを電力供給源として使用するシステムにおいて、サイバー攻撃の影響を低減することが可能となる。
本発明の実施の形態におけるシステム構成図である。 構成部位の接続関係のイメージを示す図である。 装置のハードウェア構成例を示す図である。 電力需給制御装置100の動作を示すフローチャートである。
 以下、図面を参照して本発明の実施の形態(本実施の形態)を説明する。以下で説明する実施の形態は一例に過ぎず、本発明が適用される実施の形態は、以下の実施の形態に限られるわけではない。
 本発明に係る技術の適用範囲は、電気で動作する自動車に限られず、オートバイ、トラクター、船舶等、電動輸送機器の全般を含む。
 (システム構成)
 本実施の形態では、電力需給制御装置100が、EV群における個々のEVやVSOC等からアラート情報を収集し、アラート情報に基づいて、データ改ざん等の可能性があるEVを検出し、当該EVを電力需給制御の計算対象から除外することで、サイバー攻撃に対する影響を低減させることとしている。以下、これを実現するためのシステム構成及び動作を説明する。
 図1に、本実施の形態におけるシステムの全体構成図を示す。図1に示すように、本システムには、電力需給制御装置100(電力需給制御システムと呼んでもよい)、セキュリティ監視装置200(VSOC(Vehicle Security Operation Center)等)、セキュリティセンサを搭載したEV群300、EV所有者400、電力を利用する施設群500が存在する。各構成部分の概要は下記のとおりである。
 電力需給制御装置100は、EVを電力不足が想定される施設に派遣する等の電力需給制御を実行する装置である。
 セキュリティ監視装置200は、セキュリティセンサを搭載したEV群300における各EVからアラート情報を収集し、収集したアラート情報を電力需給制御装置100に送信する。また、セキュリティ監視装置200は、EV群300における各EVから、通信ログや充電動作のログ等の種々のログを取得し、ログを分析することでアラート情報を生成し、生成したアラート情報を電力需給制御装置100に送信してもよい。
 EV群300における各EVは、セキュリティセンサを搭載しており、サイバー攻撃を検知すると、アラート情報を出力する。図1の例では、電力需給制御装置100は、セキュリティ監視装置200からアラート情報を収集しているが、これは一例である。電力需給制御装置100は、EVから直接にアラート情報を収集してもよい。
 EV所有者400は、例えば、電力制御装置100からの指示を受けてEVの移動を行う。より詳細には、EV所有者400は、スマートホン等の端末を保持し、その端末へ電力制御装置100からの指示が送信される。
 電力を利用する施設群500は、例えば、当該施設群500が属する地域の電力事業者が管轄する電力網から電力の供給を受ける施設群である。施設群500には、企業や工場のビル、一般家庭、公共施設、充電施設(充電器(EVSE)等)が含まれる。
 図2は、本システムの接続構成を示したイメージ図である。図2の例では、電力需給制御装置100が管轄するエリアが地域Aである場合の例を示している。
 (電力需給制御装置100の構成)
 次に、電力需給制御装置100の構成について説明する。図1に示したように、電力需給制御装置100は、EV情報受信部110、データ格納部115、電力情報受信部120、フィルタ部130、EV派遣プラン算出部140、制御部150を備える。なお、電力需給制御装置100が制御部150を備えずに、制御部150に相当する装置が電力需給制御装置100の外部に備えられてもよい。各部の動作は後述する。なお、EV情報受信部110と電力情報受信部120をまとめて「受信部」と呼んでもよい。
 電力需給制御装置100は、例えば、コンピュータにプログラムを実行させることにより実現される装置である。すなわち、電力需給制御装置100は、コンピュータに内蔵されるCPUやメモリ等のハードウェア資源を用いて、電力需給制御装置100で実施される処理に対応するプログラムを実行することによって実現することが可能である。上記プログラムは、コンピュータが読み取り可能な記録媒体(可搬メモリ等)に記録して、保存したり、配布したりすることが可能である。また、上記プログラムをインターネットや電子メール等、ネットワークを通して提供することも可能である。
 図3は、上記コンピュータのハードウェア構成例を示す図である。図3のコンピュータは、それぞれバスBSで相互に接続されているドライブ装置1000、補助記憶装置1002、メモリ装置1003、CPU1004、インタフェース装置1005、表示装置1006、入力装置1007、出力装置1008等を有する。
 当該コンピュータでの処理を実現するプログラムは、例えば、CD-ROM又はメモリカード等の記録媒体1001によって提供される。プログラムを記憶した記録媒体1001がドライブ装置1000にセットされると、プログラムが記録媒体1001からドライブ装置1000を介して補助記憶装置1002にインストールされる。但し、プログラムのインストールは必ずしも記録媒体1001より行う必要はなく、ネットワークを介して他のコンピュータよりダウンロードするようにしてもよい。補助記憶装置1002は、インストールされたプログラムを格納すると共に、必要なファイルやデータ等を格納する。
 メモリ装置1003は、プログラムの起動指示があった場合に、補助記憶装置1002からプログラムを読み出して格納する。CPU1004は、メモリ装置1003に格納されたプログラムに従って、電力需給制御装置100に係る機能を実現する。インタフェース装置1005は、ネットワーク等に接続するためのインタフェースとして用いられる。表示装置1006はプログラムによるGUI(Graphical User Interface)等を表示する。入力装置1007はキーボード及びマウス、ボタン、又はタッチパネル等で構成され、様々な操作指示を入力させるために用いられる。出力装置1008は演算結果を出力する。
 なお、電力需給制御装置100は1台のコンピュータで実現してもよいし、複数台のコンピュータで実現してもよい。また、電力需給制御装置100は物理マシンで実現してもよいし、クラウド上の仮想マシンで実現してもよい。
 (電力需給制御装置100の動作例)
 次に、図4に示すフローチャートの手順に沿って、電力需給制御装置100の動作例を説明する。図4は、情報収集から、ある制御が実行されるまでの処理を示している。
 <S101:情報収集>
 S101において、EV情報受信部110は、EV群300における各EVのEV情報を収集する。EV情報の収集は例えば定期的に(ある時間間隔で)行われる。収集したEV情報はデータ格納部115に格納される。
 各EVのEV情報には、例えば、EVの「位置情報、バッテリ残量、ID、車種、利用予定、アラート情報」が含まれる。IDはEVを一意に識別可能な識別子である。利用予定は、EVを利用する日と時間を含む情報である。利用予定については、EVの利用者の端末から収集してもよいし、充電予約アプリケーション等から収集してもよい。
 アラート情報には、例えば、サイバー攻撃を検知したことを示す情報が含まれる。サイバー攻撃を検知しなかったEVのEV情報にはアラート情報は含まれない。
 アラート情報には、サイバー攻撃がどの部位(ユニット)に対してなされたかを示す情報、及び、サイバー攻撃の種類を示す情報(データ改ざんなど)が含まれていてもよい。
 電力情報受信部120は、電力需給制御装置100の管轄エリアの施設群500の各施設から電力情報を収集する。電力情報の収集は例えば定期的に(ある時間間隔で)行われる。収集した電力情報はデータ格納部115に格納される。
 各施設の電力情報には、例えば、施設の識別情報、現在時刻の供給可能電力、現在時刻から将来のある時刻までの各時刻の供給可能電力(予測値)、現在の電力需要(消費電力と呼んでもよい)、及び、現在時刻から将来のある時刻までの各時刻の電力需要(予測値)が含まれる。なお、各施設の位置については既知であるとする。
 各時刻の時間間隔は、例えば、1分であってもよいし、10分であってもよいし、30分であってもよいし、1時間であってもよいし、これら以外でもよい。「供給可能電力」は、施設に対して供給可能な最大の電力である。
 <S102:分析>
 S102において、フィルタ部130は、データ格納部115から、各EVのEV情報を読み出し、読み出したEV情報に基づいて、サイバー攻撃を受けたと推定されるEV(データ改ざん等がなされた可能性があるEV)を特定し、そのEVのIDをEV派遣プラン算出部140に通知する。
 サイバー攻撃を受けたと推定されるEVとは、例えば、EV情報の中に、サイバー攻撃が検知されたことを示すアラート情報が含まれるEVである。なお、EV情報の中に、サイバー攻撃が検知されたことを示すアラート情報が含まれるEVであっても、そのアラート情報の内容が、バッテリ残量の改ざんとは無関係であると判断できる場合には、そのEVのIDをEV派遣プラン算出部140に通知しないこととしてもよい。
 EV情報受信部110は、車両メーカーやセキュリティ会社等から公開されるEVのサイバー攻撃に対する脆弱性の情報も収集し、データ格納部115に格納してもよい。この場合、フィルタ部130は、特定の車種に脆弱性が見つかったという公開情報に基づいて、当該特定の車種に該当するEVを「サイバー攻撃を受けたと推定されるEV」と見なして、当該EVをEV情報から特定し、特定したEVのIDをEV派遣プラン派遣部140に通知しないこととしてもよい。
 <S103:派遣EV決定>
 S103において、EV派遣プラン算出部140は、データ格納部115から各施設の電力情報を読み出し、電力不足になることが予測される施設を特定する。例えば、ある施設において将来のある時刻において、「電力需要>供給可能電力×α」が成立する場合、その施設は、その時刻を含む時間帯において、電力不足になると予測できる。ここで、αは安全を見込むための係数であり、0<α<1を満たす。なお、係数αを使用しないこととしてもよい。また、「電力不足になることが予測される施設」は、現在時刻において電力不足である施設を含む。
 EV派遣プラン算出部140は、フィルタ部130から通知されたIDのEVを除くEVのEV情報をデータ格納部115から読み出し、読み出した各EV情報に含まれる位置情報、バッテリ残量、利用予定などに基づいて、電力不足が想定される施設に派遣するEVを決定する。
 例えば、EV派遣プラン算出部140は、バッテリ残量が閾値以上、かつ、該当施設において電力不足が予測される時間帯において利用する予定がないEVを、電力不足が予測される施設に派遣するEVとして決定する。バッテリ残量が閾値以上、かつ、該当施設において電力不足が予測される時間帯において利用する予定がないEVが複数台存在する場合には、複数台のEVのうち、該当施設に最も近いEVを選択する。
 <S104:制御>
 S104において、制御部150は、EVを、電力不足が予測される施設へ派遣するための制御を行う。制御内容の例として、下記の(1)、(2)がある。
 (1)EVが自動運転車である場合、制御部150は、そのEVに対して、対象施設への移動を指示する制御情報を送信する。
 (2)EVが非自動運転車である場合、制御部150は、対象施設への移動指示をEVの運転手あるいはEVの所有者に通知する。
 (実施の形態の効果)
 以上説明した技術により、EVを電力供給源とするシステムにおいて、サイバー攻撃を受けた形跡のあるEVを特定でき、そのEVを電力供給源から除外することで、サイバー攻撃の影響を軽減することが可能となる。
 (付記)
 以上の実施形態に関し、更に以下の付記項を開示する。
(付記項1)
 メモリと、
 前記メモリに接続された少なくとも1つのプロセッサと、
 を含み、
 前記プロセッサは、
 電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集し、
 前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定し、
 前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する
 を備える電力需給制御装置。
(付記項2)
 前記プロセッサは、
 前記電動輸送機器情報に含まれるアラート情報に基づいて、前記特定の電動輸送機器を決定する、又は、
 サイバー攻撃に対する脆弱性に関する公開情報と、前記電動輸送機器情報に含まれる車種の情報に基づいて、前記特定の電動輸送機器を決定する
 付記項1に記載の電力需給制御装置。
(付記項3)
 前記プロセッサは、前記電力情報に含まれる各施設における供給可能電力と電力需要とに基づいて、電力不足が予測される施設を決定する
 付記項1又は2に記載の電力需給制御装置。
(付記項4)
 コンピュータが実行する電力需給制御方法であって、
 電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集し、
 前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定し、
 前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する
 電力需給制御方法。
(付記項5)
 電力需給制御処理を実行するようにコンピュータによって実行可能なプログラムを記憶した非一時的記憶媒体であって、
 前記電力需給制御処理は、
 電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集し、
 前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定し、
 前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する
 を備える非一時的記憶媒体。
 以上、本実施の形態について説明したが、本発明はかかる特定の実施形態に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形・変更が可能である。
100 電力需給制御装置
110 EV情報受信部
115 データ格納部
120 電力情報受信部
130 フィルタ部
140 EV派遣プラン算出部
150 制御部
200 セキュリティ監視装置
300 EV群
400 EV所有者
500 施設群
1000 ドライブ装置
1001 記録媒体
1002 補助記憶装置
1003 メモリ装置
1004 CPU
1005 インタフェース装置
1006 表示装置
1007 入力装置
1008 出力装置

Claims (5)

  1.  電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集する受信部と、
     前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定するフィルタ部と、
     前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する派遣プラン算出部と
     を備える電力需給制御装置。
  2.  前記フィルタ部は、
     前記電動輸送機器情報に含まれるアラート情報に基づいて、前記特定の電動輸送機器を決定する、又は、
     サイバー攻撃に対する脆弱性に関する公開情報と、前記電動輸送機器情報に含まれる車種の情報に基づいて、前記特定の電動輸送機器を決定する
     請求項1に記載の電力需給制御装置。
  3.  前記派遣プラン算出部は、前記電力情報に含まれる各施設における供給可能電力と電力需要とに基づいて、電力不足が予測される施設を決定する
     請求項1又は2に記載の電力需給制御装置。
  4.  コンピュータが実行する電力需給制御方法であって、
     電動輸送機器に関する情報である電動輸送機器情報を収集し、施設の電力に関する情報である電力情報を収集し、
     前記電動輸送機器情報に基づいて、サイバー攻撃を受けたと推定される特定の電動輸送機器を決定し、
     前記電動輸送機器情報が収集された複数の電動輸送機器から前記特定の電動輸送機器を除いた1又は複数の電動輸送機器から、前記電力情報に基づき電力不足が予測される施設へ派遣する電動輸送機器を決定する
     電力需給制御方法。
  5.  コンピュータを、請求項1ないし3のうちいずれか1項に記載の電力需給制御装置における各部として機能させるためのプログラム。
PCT/JP2022/016781 2022-03-31 2022-03-31 電力需給制御装置、電力需給制御方法、及びプログラム WO2023188359A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/016781 WO2023188359A1 (ja) 2022-03-31 2022-03-31 電力需給制御装置、電力需給制御方法、及びプログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/016781 WO2023188359A1 (ja) 2022-03-31 2022-03-31 電力需給制御装置、電力需給制御方法、及びプログラム

Publications (1)

Publication Number Publication Date
WO2023188359A1 true WO2023188359A1 (ja) 2023-10-05

Family

ID=88200382

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/016781 WO2023188359A1 (ja) 2022-03-31 2022-03-31 電力需給制御装置、電力需給制御方法、及びプログラム

Country Status (1)

Country Link
WO (1) WO2023188359A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017103938A (ja) * 2015-12-03 2017-06-08 三菱電機株式会社 電力供給計画装置および電力供給計画方法ならびに電力供給システム
WO2019044230A1 (ja) * 2017-09-01 2019-03-07 クラリオン株式会社 車載装置、インシデント監視方法
WO2020080047A1 (ja) * 2018-10-17 2020-04-23 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 侵入地点特定装置、および、侵入地点特定方法
WO2022014155A1 (ja) * 2020-07-16 2022-01-20 株式会社スリーダム 二次電池の運搬により実現される移動充電システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017103938A (ja) * 2015-12-03 2017-06-08 三菱電機株式会社 電力供給計画装置および電力供給計画方法ならびに電力供給システム
WO2019044230A1 (ja) * 2017-09-01 2019-03-07 クラリオン株式会社 車載装置、インシデント監視方法
WO2020080047A1 (ja) * 2018-10-17 2020-04-23 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ 侵入地点特定装置、および、侵入地点特定方法
WO2022014155A1 (ja) * 2020-07-16 2022-01-20 株式会社スリーダム 二次電池の運搬により実現される移動充電システム

Similar Documents

Publication Publication Date Title
KR101907656B1 (ko) 전기차 충전기 고장관리 운영 시스템
CN111369329B (zh) 基于区块链的电动汽车电池管理系统、租赁及运维方法
US9668032B2 (en) Apparatus, system and method for a cloud based universal fleet monitoring system
US8103391B2 (en) System for detecting interrupt conditions during an electric vehicle charging process
Sarker et al. Optimal operation and services scheduling for an electric vehicle battery swapping station
US11135936B2 (en) Methods for using temperature data to protect electric vehicle battery health during use of bidirectional charger
JP2015510199A5 (ja)
RU2014137174A (ru) Распределенный интеллект электрического транспортного средства
US20210034123A1 (en) Shared Battery System and Method of Controlling Battery
JP2003259696A (ja) 発電制御方法及びそのプログラム
JP6287664B2 (ja) 充電制御監視装置及びプログラム
WO2017171123A1 (ko) 수요관리사업자의 경제성 dr 입찰을 위한 최적 분산자원 선택 및 구성 방법
CN111882251A (zh) 电池服务管理方法、电池服务管理平台以及电子设备
US20140149332A1 (en) Action suggestion device, action suggestion system, action suggestion method, and program
WO2023188359A1 (ja) 電力需給制御装置、電力需給制御方法、及びプログラム
KR101197569B1 (ko) 지능형 전원충전 시스템 및 그 제어방법
KR20110087624A (ko) 전기 자동차 충전 시스템 및 방법
CN117236486A (zh) 一种基于电力大数据的电动汽车充电站布局方法和系统
US20230092148A1 (en) Information processing apparatus, information processing method, and computer-readable medium
WO2012137304A1 (ja) 遠隔監視制御方法及びシステム
CN103885792A (zh) 对安装于终端的应用软件进行操作的方法及装置
CN113780595B (zh) 基站断电抢修的方法和数据分析服务器
KR101662949B1 (ko) 전기자동차의 축전지를 기반으로 하는 ess 운영 방법 및 시스템
CN114655076A (zh) 服务器、车辆以及车辆诊断方法
WO2023188360A1 (ja) 監視装置、監視方法及びプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22935499

Country of ref document: EP

Kind code of ref document: A1