WO2023176283A1 - 通信装置、通信装置の制御方法およびプログラム - Google Patents

通信装置、通信装置の制御方法およびプログラム Download PDF

Info

Publication number
WO2023176283A1
WO2023176283A1 PCT/JP2023/005413 JP2023005413W WO2023176283A1 WO 2023176283 A1 WO2023176283 A1 WO 2023176283A1 JP 2023005413 W JP2023005413 W JP 2023005413W WO 2023176283 A1 WO2023176283 A1 WO 2023176283A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
communication
antenna
receiving device
power receiving
Prior art date
Application number
PCT/JP2023/005413
Other languages
English (en)
French (fr)
Inventor
光央 小森谷
Original Assignee
キヤノン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by キヤノン株式会社 filed Critical キヤノン株式会社
Publication of WO2023176283A1 publication Critical patent/WO2023176283A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J50/00Circuit arrangements or systems for wireless supply or distribution of electric power
    • H02J50/80Circuit arrangements or systems for wireless supply or distribution of electric power involving the exchange of data, concerning supply or distribution of electric power, between transmitting devices and receiving devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries

Definitions

  • the present disclosure relates to a communication device, a method of controlling the communication device, and a program.
  • Patent Document 1 discloses a method of controlling a plurality of communication units during wireless power transmission in a wireless power transmission system capable of communication using a plurality of communication units.
  • the power transmitting device recognizes the identification information of the power receiving device through communication using the first communication method, and starts communication using the second communication method using a predetermined process as a trigger.
  • the power transmitting device receives a signal called ADV_IND including identification information of the power receiving device, the power transmitting device transmits a connection request message. Accordingly, it is possible to establish a communication connection using the second communication method with the target of power transmission.
  • the present disclosure aims to suppress the occurrence of unnecessary processing related to communication.
  • a communication device is a communication device that performs wireless power transmission, and includes a communication device that communicates with an external device that performs wireless power transmission via a first antenna and a second antenna, and a communication device that communicates with an external device that performs wireless power transmission.
  • FIG. 2 is a block diagram illustrating an example of the internal configuration of a power transmission device according to an embodiment.
  • FIG. 2 is a block diagram illustrating an example of the internal configuration of a power receiving device according to an embodiment.
  • FIG. 2 is a block diagram illustrating an example of a functional configuration of a power transmission device according to an embodiment.
  • 1 is a diagram illustrating a configuration example of a wireless power transmission system according to an embodiment.
  • 2 is a flowchart illustrating an example of a basic processing procedure executed by a power transmission device.
  • 12 is a flowchart illustrating an example of a processing procedure on the power transmission device side to avoid unnecessary in-band communication.
  • 12 is a flowchart illustrating an example of a processing procedure on the power transmission device side to avoid unnecessary in-band communication.
  • 12 is a flowchart illustrating an example of a processing procedure on the power transmission device side to avoid unnecessary in-band communication.
  • 2 is a flowchart illustrating an example of a basic processing procedure executed by a power receiving device.
  • 12 is a flowchart illustrating an example of a processing procedure on the power receiving device side to avoid unnecessary in-band communication.
  • 12 is a flowchart illustrating an example of a processing procedure on the power receiving device side to avoid unnecessary in-band communication.
  • 12 is a flowchart illustrating an example of a processing procedure on the power receiving device side to avoid unnecessary in-band communication.
  • 12 is a flowchart illustrating an example of a processing procedure on the power receiving device side to avoid unnecessary in-band communication.
  • FIG. 12 is a flowchart illustrating an example of a processing procedure on the power receiving device side to avoid unnecessary in-band communication.
  • FIG. 2 is a sequence diagram showing operations in a power receiving device and a power transmitting device in the embodiment.
  • FIG. 2 is a sequence diagram showing operations in a power receiving device and a power transmitting device in the embodiment.
  • FIG. 7 is a diagram for explaining a method in which a power transmitting device requests a power receiving device to notify a BD_ADDR.
  • FIG. 3 is a diagram for explaining a calibration process of a foreign object detection method based on a power loss method.
  • FIG. 4 is a diagram illustrating a configuration example of a wireless power transmission system 400 according to the present embodiment.
  • the wireless power transmission system 400 according to the present embodiment is configured to include a power transmitting device (first power transmitting device 401 or second power transmitting device 402) and a power receiving device (first power receiving device 411 or second power receiving device 412).
  • the power receiving device is an electronic device that receives power from the power transmitting device and charges a built-in battery.
  • the power transmitting device is an electronic device that wirelessly transmits power to a power receiving device placed on the power transmitting device. Note that the power receiving device and the power transmitting device have a function of executing applications other than wireless charging.
  • the power receiving device is placed on the power transmitting device refers to a state in which the power receiving device is included in the power transmission range of the power transmitting device.
  • the power transmittable range of the power transmitting device is the range in which power can be transmitted to the power receiving device using the power transmitting coil.
  • the power receiving device and the power transmitting device do not need to be in contact with each other when the power receiving device is placed on the power transmitting device.
  • a state in which the first power receiving device 411 is included in the range where power can be transmitted without contact with the first power transmitting device 401 is also considered to be a state in which "the first power receiving device 411 is placed on the first power transmitting device 401.” shall be taken as a thing.
  • the power receiving device may not be placed on the power transmitting device, but may be placed on the side of the power transmitting device, for example. Furthermore, in the following description, an object that is included in the power transmittable range of the power transmitting device and that is different from the power transmitting device and the power receiving device is referred to as a foreign object.
  • the power receiving device and the power transmitting device may have a function of executing applications other than wireless charging.
  • An example of the power receiving device is an information processing terminal such as a smartphone
  • an example of the power transmitting device is an accessory device for charging the information processing terminal.
  • an information terminal device has a display unit (display) that is supplied with power received from a power receiving coil (antenna) and that displays information to the user. Further, the power received from the power receiving coil is stored in a power storage unit (battery), and power is supplied from the battery to the display unit.
  • the power receiving device may include a communication unit that communicates with another device different from the power transmitting device.
  • the communication unit may be compatible with communication standards such as NFC communication and the fifth generation mobile communication system (5G). Further, in this case, the communication unit may communicate by supplying power from the battery to the communication unit.
  • the power receiving device may be a tablet terminal, a storage device such as a hard disk device and a memory device, or an information processing device such as a personal computer (PC). Further, the power receiving device may be, for example, an imaging device (such as a camera or a video camera). Further, the power receiving device may be an image input device such as a scanner, or may be an image output device such as a printer, a copier, or a projector. Further, the power receiving device may be a robot, a medical device, or the like.
  • the power transmission device may be a device for charging the device described above.
  • the power transmission device may be a smartphone.
  • the power receiving device may be another smartphone or may be a wireless earphone.
  • the power receiving device in this embodiment may be a vehicle such as an automobile.
  • a car serving as a power receiving device may receive power from a charger (power transmitting device) via a power transmitting antenna installed in a parking lot.
  • the vehicle serving as the power receiving device may receive power from a charger (power transmitting device) via a power transmitting coil (antenna) embedded in the road.
  • the received power is supplied to the battery.
  • the battery power may be supplied to a driving part (motor, electric part) that drives the wheels, or may be used to drive a sensor used for driving assistance or a communication part that communicates with an external device. good.
  • the power receiving device may include, in addition to wheels, a battery, a motor or sensor that is driven using the received power, and a communication unit that communicates with a device other than the power transmitting device.
  • the power receiving device may include a housing section that accommodates a person.
  • the sensor includes a sensor used to measure the distance between vehicles and the distance to other obstacles.
  • the communication unit may be compatible with, for example, a global positioning system (Global Positioning Satellite, GPS). Further, the communication unit may be compatible with a communication standard such as a fifth generation mobile communication system (5G).
  • the vehicle may be a bicycle or a motorcycle.
  • the power receiving device is not limited to a vehicle, and may be a moving object, an aircraft, etc. that has a motive unit that is driven using electric power stored in a battery.
  • the power receiving device in this embodiment may be a power tool, a home appliance, or the like.
  • these devices that are power receiving devices may include a motor driven by received power stored in the battery. Further, these devices may have a notification means for notifying the remaining battery level and the like. Further, these devices may have a communication unit that communicates with another device different from the power transmission device.
  • the communication unit may be compatible with communication standards such as NFC and the fifth generation mobile communication system (5G).
  • the power transmission device in this embodiment may be an in-vehicle charger that transmits power to a mobile information terminal device such as a smartphone or a tablet that supports wireless power transmission in a vehicle.
  • a mobile information terminal device such as a smartphone or a tablet that supports wireless power transmission in a vehicle.
  • Such an on-vehicle charger may be installed anywhere in the vehicle.
  • an in-vehicle charger may be installed in the console of a car, an instrument panel (instrument panel, dashboard), a position between passenger seats, a ceiling, or a door. However, it is best not to install it in a place where it will interfere with driving.
  • the power transmission device has been described as an example of an on-vehicle charger, such a charger is not limited to being placed in a vehicle, and may be installed in a transport aircraft such as a train, an airplane, or a ship.
  • the charger in this case may also be installed at a position between passenger seats, on the ceiling, or on the door.
  • a vehicle such as an automobile equipped with an on-vehicle charger may be a power transmission device.
  • the power transmitting device includes wheels and a battery, and uses the power of the battery to supply power to the power receiving device through a power transmitting circuit unit or a power transmitting coil (antenna).
  • the power transmitting device and power receiving device in FIG. 4 also use BLE (Bluetooth (registered trademark) Low Energy) as out-of-band communication. It has a communication function. Note that instead of BLE, the device may have a communication function compatible with other wireless communication methods such as NFC (Near Field Communication) and Wi-Fi (registered trademark) as out-of-band communication. Further, around the wireless power transmission system 400 according to the present embodiment, other devices (the first communication device 421 and the second communication device 421 and the second communication device 422) exists.
  • BLE Bluetooth (registered trademark) Low Energy
  • NFC Near Field Communication
  • Wi-Fi registered trademark
  • the BLE communication unit (a unit configured by an antenna, a communication circuit, etc.) may be simply referred to as "BLE.”
  • the first power transmitting device 401 and the second power transmitting device 402 function as a BLE central
  • the first power receiving device 411 and the second power receiving device 412 function as BLE peripherals.
  • the first communication device 421 functions as a central device
  • the second communication device 422 functions as a peripheral device.
  • central indicates a BLE control station
  • peripheral indicates a BLE terminal station.
  • the BLE central communicates with the BLE peripherals and does not communicate with other centrals.
  • the BLE peripheral communicates with the BLE central, but does not communicate with other peripherals. That is, in BLE, communication between centrals or between peripherals is not performed.
  • the central can be connected to a plurality of peripherals and can send and receive data between the plurality of peripherals.
  • a peripheral can only be connected to one central, and does not communicate with multiple centrals in parallel.
  • the first power receiving device 411 is located within the power transmitting and receiving range when viewed from the first power transmitting device 401, while the second power receiving device 412 is not located within the power transmitting and receiving range.
  • the first power transmitting device 401 performs wireless power transmission only to the first power receiving device 411 and does not perform power transmission to the second power receiving device 412.
  • the first power transmission device 401 in order for the first power transmission device 401 to perform out-of-band communication using BLE and transmit power to the first power reception device 411, it must be connected to at least the BLE (peripheral) of the first power reception device 411. .
  • the BLE central can be connected to multiple peripherals at the same time. Therefore, the BLE (central) of the first power transmission device 401 may be connected not only to the first power reception device 411 but also to the second power reception device 412 and the second communication device 422 that function as peripherals.
  • the BLE (central) of the second power transmitting device 402 is connected to the BLE (peripheral) of the second power receiving device 412, even if it is connected to the first power receiving device 411 or the second communication device 422. good.
  • the BLE (peripheral) of the first power receiving device 411 can be connected to only one central. Therefore, in order to perform control communication for power transmission between the first power transmitting device 401 and the first power receiving device 411 using BLE, the BLE (peripheral) of the first power receiving device 411 must be connected to the first power transmitting device 401. It is necessary to be connected only to the BLE (central) of When the BLE (peripheral) of the first power receiving device 411 is connected to other BLE (central) such as the second power transmitting device 402 and the first communication device 421, the BLE (peripheral) of the first power receiving device 411 performs control communication with the BLE (central) of the first power transmitting device 401.
  • the BLE (peripheral) of the second power receiving device 412 is connected to the second power transmitting device 402. It must be connected only to BLE (central). Therefore, the BLE (peripheral) of the second power receiving device 412 should not be connected to other BLE (central) such as the first power transmitting device 401 and the first communication device 421.
  • control communication should be performed between the power transmitting device and the power receiving device (for example, the first power transmitting device 401 and the first power receiving device 411) that transmit and receive power.
  • the power transmitting device and the power receiving device may establish a connection for out-of-band communication with a device that is not the target of power transmission and reception.
  • establishing a connection for out-of-band communication with a device that is not the target of power transmission and reception will be referred to as a cross connection.
  • a state in which the first power receiving device 411 and the second power transmitting device 402 or the first communication device 421 are connected by BLE is a cross connection.
  • the first power transmitting device 401 uses BLE (out-of-band communication) for control communication, it is necessary to ensure that the first power receiving device 411 within the power transmission and reception range is connected by BLE. It is. If this confirmation is not available, the first power transmitting device 401 establishes a connection using BLE with the second power receiving device 412 and the second communication device 422 and performs control communication while transmitting power to the first power receiving device 411. there is a possibility. Therefore, the first power transmitting device 401 cannot perform appropriate communication with the first power receiving device 411. Similarly, when the first power receiving device 411 uses BLE (out-of-band communication), it is necessary to ensure that the first power transmitting device 401 within the power transmitting/receiving range is connected by BLE.
  • BLE out-of-band communication
  • the first power receiving device 411 receives the power transmitted by the first power transmitting device 401, establishes a connection with the second power transmitting device 402 and the first communication device 421 by BLE, and performs control. There is a possibility of communication. Therefore, the first power receiving device 411 is no longer able to perform appropriate control communication with the first power transmitting device 401.
  • control communication using BLE includes, for example, communication for exchanging information between the power transmitting device and the power receiving device necessary for foreign object detection based on the power loss method described later, and communication for device authentication in the power transmitting device. Including etc.
  • the power transmitting device and the power receiving device are configured to be able to establish a connection using BLE with a partner device for wireless power transmission.
  • a Bluetooth Device Address is used that indicates the manufacturer of the power transmitting device or the power receiving device and the individual identification information of the BLE communication function.
  • the Bluetooth Device Address is a Public Address defined in the BLE standard.
  • the Bluetooth Device Address will be referred to as "BD_ADDR”.
  • the power receiving device or the power transmitting device may change this BD_ADDR periodically or irregularly. In this embodiment, even if the power receiving device changes BD_ADDR, the power transmitting device and the power receiving device are able to establish a connection using BLE with a partner device for wireless power transmission.
  • BLE is one example, and any wireless communication method that can be used for out-of-band communication in wireless power transmission can be used. Further, in the following, it is assumed that the wireless power transfer to be performed is based on the WPC standard, and the WPC standard here includes functions defined in version 1.2.3. Note that in this embodiment, the power transmission device and the power reception device will be described as being compliant with the WPC standard, but the present invention is not limited to this, and other wireless power transmission standards may be used. Below, an example of the configuration of the power transmitting device and the power receiving device and an example of the flow of processing to be executed will be described.
  • FIG. 1 is a block diagram showing an example of the internal configuration of the first power transmission device 401 according to the present embodiment.
  • FIG. 2 is a block diagram showing an example of the internal configuration of the first power receiving device 411 according to the present embodiment. Note that it is assumed that the second power transmitting device 402 and the second power receiving device 412 have the same configuration as the first power transmitting device 401 and the first power receiving device 402, respectively.
  • the first power transmission device 401 includes, for example, a control section 101, a power supply section 102, a power transmission circuit section 103, a first communication section 104, a power transmission antenna 105, a second communication section 106, and a memory 107.
  • the control unit 101 controls the entire first power transmission device 401. Further, the control unit 101 performs control related to power transmission control including communication for device authentication in the first power transmission device 401. Furthermore, the control unit 101 may perform control for executing applications other than wireless power transmission.
  • the control unit 101 is configured to include one or more processors such as a CPU (Central Processing Unit) or an MPU (Micro Processor Unit). Note that the control unit 101 may be configured with hardware such as an application specific integrated circuit (ASIC). Further, the control unit 101 may be configured to include an array circuit such as an FPGA (Field Programmable Gate Array) compiled to execute predetermined processing.
  • the control unit 101 causes the memory 107 to store information that should be stored during execution of various processes. Further, the control unit 101 measures time using a timer (not shown).
  • the power supply unit 102 is a power supply that supplies power when at least the control unit 101 and the power transmission circuit unit 103 operate.
  • the power supply unit 102 may be, for example, a wired power receiving circuit, a battery, or the like that receives power from a commercial power source.
  • the battery stores power supplied from a commercial power source.
  • the power transmission circuit unit 103 converts DC or AC power input from the power supply unit 102 into AC frequency power in a frequency band used for wireless power transmission. Then, by outputting the AC frequency power to the power transmission antenna 105, electromagnetic waves for causing the first power receiving device 411 to receive power are generated.
  • the power transmission circuit unit 103 converts the DC voltage supplied by the power supply unit 102 into an AC voltage using a half-bridge or full-bridge switching circuit using FETs (Field Effect Transistors).
  • FETs Field Effect Transistors
  • power transmission circuit section 103 includes a gate driver that controls ON/OFF of the FET.
  • the power transmission circuit unit 103 controls the intensity of the electromagnetic waves to be output by adjusting the voltage (power transmission voltage) or the current (power transmission current) output to the power transmission antenna 105, or both.
  • the power transmission circuit unit 103 performs output control of AC power based on instructions from the control unit 101 so that power transmission from the power transmission antenna 105 is started or stopped. Further, it is assumed that the power transmission circuit unit 103 has the ability to supply enough power to output 15 watts (W) of power to the charging unit 206 of the first power receiving device 411 that complies with the WPC (Wireless Power Consortium) standard.
  • W Wired Power Consortium
  • the first communication unit 104 performs communication for power transmission control based on the WPC standard with the first communication unit 203 of the first power receiving device 411.
  • the first communication unit 104 modulates electromagnetic waves output from the power transmission antenna 105, transmits information to the first power receiving device 411, and performs communication.
  • the first power transmission device 401 performs modulation using frequency shift keying (FSK).
  • the first communication unit 104 demodulates the electromagnetic wave transmitted from the power transmission antenna 105 modulated by the first power reception device 411, and acquires the information transmitted by the first power reception device 411.
  • the first power receiving device 411 performs modulation by load modulation or amplitude modulation as described later.
  • the communication performed by the first communication unit 104 is performed by superimposing a signal on the electromagnetic wave transmitted from the power transmission antenna 105. Further, the first communication unit 104 may communicate with the first power receiving device 411 using a communication standard different from the WPC standard using an antenna different from the power transmission antenna 105, or may selectively use a plurality of communication methods. The first power receiving device 411 may also be used to communicate with the first power receiving device 411 .
  • the above-mentioned communication via the first communication unit 104 is performed by in-band communication.
  • the first power transmitting device 401 transmits a maximum of 15 watts of power to the charging unit 206 of the first power receiving device 411, which also uses in-band communication. It shall be possible to supply enough power to output .
  • the second communication unit 106 performs control communication for wireless power transfer based on the WPC standard with the second communication unit 204 of the first power receiving device 411.
  • the second communication unit 106 performs out-of-band communication using a frequency different from the frequency of the power transmission circuit unit 103 and an antenna (not shown) different from the power transmission antenna 105.
  • the second communication unit 106 is compatible with BLE, but instead, a communication unit compatible with other wireless communication methods such as NFC or WiFi may be used.
  • the second communication unit 106 may be shared with the first communication unit 104. In this case, a communication unit that also serves as the first communication unit 104 and the second communication unit 106 performs communication via the power transmission antenna 105 and communication via an antenna (not shown) that performs out-of-band communication.
  • the first power transmitting device 401 uses out-of-band communication for control communication with the first power receiving device 411, the first power receiving device It is assumed that a large amount of power can be supplied to the device 411.
  • the first power transmitting device 401 supplies power so that the maximum power output to the charging unit 206 of the first power receiving device 411 is 100 watts. shall be able to do so.
  • in-band communication small changes in voltage and current are superimposed on the transmitted power for communication, and as the transmitted power increases, noise generated from the power transmitting circuit section 103 and the power receiving circuit section 202 increases. Therefore, when using in-band communication, transmitted power is limited so that minute changes in voltage and current for communication can be detected.
  • out-of-band communication such restrictions are eliminated, so it is possible to increase the amount of power to be transmitted.
  • the memory 107 also stores the states of the first power transmitting device 401 and the first power receiving device 411 (transmitted power value, received power value, etc.). For example, the state of the first power transmitting device 401 is acquired by the control unit 101, the state of the first power receiving device 411 is acquired by the control unit 201 of the first power receiving device 411, and the state of the first power transmitting device 401 is acquired by the control unit 201 of the first power receiving device 411. Received via.
  • the memory 107 stores each element and the overall state of the first power transmission device 401 and the wireless power transmission system.
  • control section 101 the power supply section 102, the power transmission circuit section 103, the first communication section 104, the memory 107, and the second communication section 106 are each described as separate blocks. On the other hand, two or more of these blocks may be combined into one chip or the like. Furthermore, one block may be divided into multiple blocks.
  • the control unit 201 controls the entire first power receiving device 411 by executing a control program stored in the memory 208, for example. That is, the control unit 201 controls each functional unit shown in FIG. Furthermore, the control unit 201 may perform control for executing applications other than wireless power transmission.
  • An example of the control unit 201 is configured to include one or more processors such as a CPU or an MPU. Note that the entire first power receiving device 411 may be controlled in cooperation with an OS (Operating System) that the control unit 201 is running.
  • OS Operating System
  • control unit 201 may be configured with hardware such as an ASIC. Further, the control unit 201 may be configured to include an array circuit such as an FPGA compiled to execute predetermined processing. The control unit 201 causes the memory 208 to store information that should be stored during execution of various processes. Further, the control unit 201 can measure time using a timer (not shown).
  • the first communication unit 203 performs control communication for wireless power transmission based on the WPC standard with the first communication unit 104 of the first power transmission device 401.
  • the first communication unit 203 demodulates the electromagnetic waves input from the power receiving antenna 205 and acquires information transmitted from the first power transmitting device 401.
  • the first communication unit 203 performs load modulation or amplitude modulation on the input electromagnetic wave to superimpose a signal related to information to be transmitted to the first power transmission device 401 on the electromagnetic wave, thereby communicating with the first power transmission device 401. communicate between.
  • This control communication is performed by in-band communication in which electromagnetic waves received by the power receiving antenna 205 are load-modulated or amplitude-modulated.
  • the first power receiving device 411 uses only in-band communication for communication with the first power transmitting device 401, the first power receiving device 411 receives power wirelessly from the first power transmitting device 401, and supplies the charging unit 206 with the maximum power. Assume that it can output 15 watts of power.
  • the second communication unit 204 performs control communication for wireless power transmission based on the WPC standard with the second communication unit 106 of the first power transmission device 401.
  • the second communication unit 204 performs out-of-band communication using a frequency different from the frequency of electromagnetic waves received by the power receiving circuit unit 202 and using an antenna (not shown) different from the power receiving antenna 205.
  • the second communication unit 204 is compatible with BLE, but instead, a communication unit compatible with other wireless communication methods such as NFC or Wi-Fi may be used. .
  • the second communication unit 204 may be shared with the first communication unit 203.
  • a communication unit that also serves as the first communication unit 203 and the second communication unit 204 performs communication via the power receiving antenna 205 and an antenna that performs out-of-band communication (not shown). Further, the second communication unit 204 may receive power supply from the battery 207 or may receive power supply directly from the power receiving circuit unit 202. Note that in this embodiment, when using out-of-band communication for communication with the first power transmitting device 401, the first power receiving device 411 receives power wirelessly from the first power transmitting device 401, and connects the charging unit to the first power receiving device 411. 206 is capable of outputting a maximum of 100 watts of power.
  • the charging unit 206 charges the battery 207 using the DC voltage and DC current supplied from the power receiving circuit unit 202.
  • the memory 208 also stores the states of the first power transmitting device 401 and the first power receiving device 411.
  • the state of the first power receiving device 411 is acquired by the control unit 201
  • the state of the first power transmitting device 401 is acquired by the control unit 101 of the first power transmitting device 401
  • the state of the first power receiving device 411 is acquired by the control unit 101 of the first power transmitting device 401. Received via.
  • a power transmitting device or a power receiving device is compatible with control communication using out-of-band communication is expressed as being compatible with version A of the WPC standard.
  • Version A of the WPC standard is a successor standard to WPCv1.2.3, and it is assumed that at least a control communication function using out-of-band communication has been added.
  • FIG. 3 is a block diagram showing an example of the functional configuration of the control unit 101 of the first power transmission device 401. Note that it is assumed that the second power transmission device 402 also has a similar functional configuration.
  • the control unit 101 includes a communication control unit 301, a power transmission control unit 302, a measurement unit 303, a setting unit 304, and a foreign object detection unit 305.
  • the setting unit 304 sets a threshold value used for detecting a foreign object based on the average transmitted power or the Q value measured by the measuring unit 303, for example, by calculation processing. Further, the setting unit 304 may have a function of setting a threshold value that is a reference for determining the presence or absence of a foreign object, which is necessary when performing foreign object detection processing using other methods.
  • the foreign object detection unit 305 performs foreign object detection processing based on the threshold set by the setting unit 304 and the transmitted power and Q value measured by the measurement unit 303. Further, the foreign object detection unit 305 may have a function for performing foreign object detection processing using other methods. For example, in a power transmission device equipped with an NFC communication function, the foreign object detection unit 305 may perform foreign object detection processing using an opposing device detection function according to the NFC standard. Further, the foreign object detection unit 305 has a function other than detecting foreign objects, and detects that the state on the first power transmission device 401 has changed. For example, the first power transmitting device 401 can also detect an increase or decrease in the number of power receiving devices on the first power transmitting device 401.
  • the functions of the communication control unit 301, the power transmission control unit 302, the measurement unit 303, the setting unit 304, and the foreign object detection unit 305 are realized as a program that operates in the control unit 101.
  • Each processing unit is configured as an independent program, and can operate in parallel while synchronizing the programs through event processing and the like. However, two or more of these processing units may be incorporated into one program.
  • This system performs wireless power transmission using an electromagnetic induction method for wireless charging based on the WPC standard. That is, the first power receiving device 411 and the first power transmitting device 401 transmit wireless power for wireless charging based on the WPC standard between the power receiving antenna 205 of the first power receiving device 411 and the power transmitting antenna 105 of the first power transmitting device 401. Perform transmission.
  • the wireless power transmission method applied to this system is not limited to the method specified by the WPC standard, but may also include other methods using electromagnetic induction, magnetic resonance, electric resonance, microwave, laser, etc. There may be. Further, in this embodiment, it is assumed that wireless power transmission is used for wireless charging, but wireless power transmission may be performed for purposes other than wireless charging.
  • the processing between the first power receiving device 411 and the first power transmitting device 401 will be described below, but the same processing will be performed for the second power receiving device 412 and the second power transmitting device 402 based on the WPC standard. .
  • the amount of power guaranteed when the first power receiving device 411 receives power from the first power transmitting device 401 is defined by a value called Guaranteed Power (hereinafter referred to as "GP").
  • GP Guaranteed Power
  • the GP can reduce the load on the first power receiving device 411 (e.g. , charging circuit, battery, etc.).
  • the WPC standard stipulates a method for power transmission equipment to detect the presence of a foreign object on top of the power transmission equipment, so that power transmission can be stopped in the event that a foreign object is present, thereby preventing the foreign object from rising in temperature or being destroyed. .
  • a power loss method is defined in which a foreign object is detected based on the difference between the power transmitted by a power transmitting device and the power received by a power receiving device.
  • the WPC standard defines a Q-value measurement method as a foreign object detection method, which detects foreign objects based on a change in the quality factor (Q value) of a power transmitting antenna (power transmitting coil) in a power transmitting device.
  • the foreign object detected by the first power transmission device 401 in this embodiment is not limited to an object existing on the first power transmission device 401.
  • the first power transmitting device 401 may detect a foreign object located near the first power transmitting device 401, for example, it may detect a foreign object located within a range where the first power transmitting device 401 can transmit power.
  • FIG. 12 The horizontal axis in FIG. 12 represents the power transmitted by the first power transmitting device 401, and the vertical axis represents the power received by the first power receiving device 411.
  • the foreign object is an object other than the first power receiving device 411 that may affect power transmission from the first power transmitting device 401 to the first power receiving device 411, and is, for example, an object such as a piece of conductive metal.
  • the first power transmitting device 401 transmits power to the first power receiving device 411 at the first transmitted power value Pt1.
  • the first power receiving device 411 receives power at the first received power value Pr1 (this state is referred to as a Light Load state (light load state)).
  • the first power transmission device 401 stores the first transmitted power value Pt1.
  • the first transmitted power value Pt1 or the first received power value Pr1 is a predetermined minimum transmitted power or received power.
  • the first power receiving device 411 controls the load (charging circuit, battery, etc.) so that the received power is the minimum power.
  • the first power receiving device 411 may disconnect the load from the power receiving antenna 205 so that the received power is not supplied to the load.
  • the first power receiving device 411 reports the first received power value Pr1 to the first power transmitting device 401.
  • a calibration point 1200 is created that indicates the correspondence between the first transmitted power value Pt1 and the first received power value Pr1.
  • the first power transmitting device 401 changes the transmitted power value to the second transmitted power value Pt2, and transmits power to the first power receiving device 411.
  • the first power receiving device 411 receives power at the second received power value Pr2 (this state is referred to as a Connected Load state (load connected state)).
  • the first power transmission device 401 stores the second transmitted power value Pt2.
  • the second transmitted power value Pt2 or the second received power value Pr2 is a predetermined maximum transmitted power or received power.
  • the power receiving device controls the load so that the received power is the maximum power. For example, the power receiving device connects the power receiving antenna 205 to the load so that the received power is supplied to the load.
  • the first power receiving device 411 reports the second received power value Pr2 to the first power transmitting device 401.
  • a calibration point 1201 is created that indicates the correspondence between the second transmitted power value Pt2 and the second received power value Pr2.
  • the first power transmitting device 401 and the first power transmitting device 411 1 power receiving device 411 can be determined. Further, by interpolating from multiple combinations, it is possible to estimate the power loss between the first power transmitting device 401 and the first power receiving device 411 according to all the loads. In this way, the calibration process performed by the first power transmitting device 401 and the first power receiving device 411 in order for the first power transmitting device 401 to obtain a combination of the transmitted power value and the received power value will be described below using the "power loss method.” This is called “calibration processing (CAL processing)".
  • CAL processing calibration processing
  • This power value P loss _FO can be considered to be a power loss due to power consumed by a foreign object when the foreign object is present near the first power transmitting device 401 and the first power receiving device 411. Therefore, if the power value P loss _FO that would have been consumed by the foreign object exceeds a predetermined threshold, it can be determined that the foreign object is present.
  • the first power transmitting device 401 determines the difference between the first power transmitting device 401 and the first power receiving device 411 in the state where the foreign object is present, based on the received power value Pr3' received from the first power receiving device 411 in the state where the foreign object is present.
  • Find the power loss Pt3-Pr3' ( P loss3 ').
  • P loss _FO the power value of the power value consumed by foreign objects
  • P loss 3'-P loss3 P loss _FO
  • the first power receiving device 411 and the first power transmitting device 401 in this embodiment perform communication for controlling power transmission and reception based on the WPC standard.
  • the WPC standard specifies multiple phases, including a Power Transfer phase in which power is transferred, and one or more phases before the actual power transfer, and communication necessary for power transmission and reception control in each phase is defined. It will be done.
  • the phase before power transmission includes a Selection phase, a Ping phase, an Identification and Configuration phase, a Negotiation phase, and a Calibration phase. Note that hereinafter, the Identification and Configuration phase will be referred to as the I&C phase. The basic processing of each phase will be explained below.
  • the first power transmission device 401 intermittently transmits Analog Ping to indicate that an object is placed on the first power transmission device 401 (for example, a power receiving device, a conductor piece, etc. is placed on a charging stand (not shown)). detected).
  • the first power transmission device 401 detects at least one of the voltage value and current value of the power transmission antenna 105 when transmitting Analog Ping, and detects when the voltage value is below a certain threshold value or when the current value is above a certain threshold value. It is determined that an object exists and transitions to the Ping phase.
  • the first power transmission device 401 transmits Digital Ping, which has higher power than Analog Ping.
  • the power of Digital Ping is sufficient to start the control unit 201 of the first power receiving device 411 placed on the first power transmitting device 401.
  • the first power receiving device 411 notifies the first power transmitting device 401 of the magnitude of the received power voltage.
  • the first power transmitting device 401 recognizes that the object detected in the Selection phase is the first power receiving device 411 by receiving the response from the first power receiving device 411 that has received the Digital Ping. .
  • the first power transmitting device 401 receives the notification of the power reception voltage value, it transitions to the I&C phase.
  • the first power transmitting device 401 measures the Q value (Q-Factor) of the power transmitting antenna (power transmitting coil) 105 before transmitting the Digital Ping. This measurement result is used when performing foreign object detection processing using the Q value measurement method.
  • the first power transmitting device 401 identifies the first power receiving device 411 and acquires device configuration information (capability information) from the first power receiving device 411.
  • the first power receiving device 411 transmits an ID Packet and a Configuration Packet.
  • the ID Packet includes identifier information of the first power receiving device 411
  • the Configuration Packet includes device configuration information (capability information) of the power receiving device.
  • the first power transmission device 401 that has received the ID Packet and Configuration Packet responds with an acknowledgement (ACK). Then, the I&C phase ends, and the process moves to the next Negotiation phase.
  • ACK acknowledgement
  • the first power receiving device 411 notifies the first power transmitting device 401 of a predetermined received power value (received power value in a light load state/received power value in a maximum load state), and the first power transmitting device 401 efficiently transmits power. Make adjustments to The received power value notified to the first power transmission device 401 is used for foreign object detection processing using the power loss method.
  • control is performed to start and continue power transmission, and to stop power transmission due to an error or full charge.
  • the first power transmitting device 401 and the first power receiving device 411 use the power transmitting antenna 105 and the power receiving antenna 205, which are used when performing wireless power transmission based on the WPC standard, to control power transmission and reception. Communication is carried out by superimposing signals on electromagnetic waves transmitted from Note that the range in which communication based on the WPC standard is possible between the first power transmitting device 401 and the first power receiving device 411 is almost the same as the power transmittable range of the first power transmitting device 401.
  • FIG. 5 is a flowchart illustrating an example of a basic processing procedure executed by the first power transmission device 401 in this embodiment. Note that this process is started when the power transmission circuit unit 103 is powered on and activated by receiving power supply from the power supply unit 102 or the like. Further, this processing is realized by the control unit 101 executing a program stored in the memory 107. However, the present process is not limited to these, and may be executed in response to the power transmission function being activated by the user's operation, such as pressing a predetermined button. Further, at least a part of the processing shown in FIG. 5 may be realized by hardware.
  • a dedicated circuit is used that is automatically generated on the FPGA from a program for implementing the processing steps using a predetermined compiler.
  • hardware for executing predetermined processing steps may be implemented by a gate array circuit.
  • the first power transmission device 401 starts a process compliant with the WPC standard.
  • a partner device is specified by a Selection phase, a Ping phase, and an I&C phase.
  • negotiation regarding the transmitted power is executed, and then, after passing through the Calibration phase for power transmission, processing of the Power Transfer phase in which actual power transmission is performed is executed.
  • the control unit 101 of the first power transmission device 401 first executes the processes of the Selection phase and the Ping phase. Specifically, the first power transmission device 401 first transmits Analog Ping via the power transmission antenna (power transmission coil) 105 in the Selection phase.
  • Analog Ping is minute electric power for detecting an object that exists near the power transmission antenna (power transmission coil) 105.
  • the first power transmission device 401 detects the voltage value or current value of the power transmission antenna (power transmission coil) 105 when transmitting Analog Ping, and if the voltage is below a certain threshold or the current exceeds a certain threshold, an object is detected. It is determined that there is one nearby, and the process shifts to the Ping phase.
  • the first power receiving device 411 is placed on the first power transmitting device 401 by the user.
  • the first power transmission device 401 transmits power as a Digital Ping, which is larger than the Analog Ping.
  • Digital Ping generates enough power to activate the control unit 201, first communication unit 203, and second communication unit 204 of the first power receiving device 411 that is located near the power transmission antenna (power transmission coil) 105.
  • the control unit 201 and the first communication unit 203 of the first power receiving device 411 are activated by a Digital Ping received via the power receiving antenna (power receiving coil) 205
  • the magnitude of the received power voltage is determined by in-band communication by the first communication unit 203. is notified to the first power transmission device 401.
  • the first power transmission device 401 receives the notification of the power reception voltage value via the first communication unit 104, it ends the Ping phase processing and shifts to the I&C phase.
  • the control unit 101 receives the Identification Packet transmitted by the first power receiving device 411 via the first communication unit 104.
  • the control unit 101 provides information as to whether or not the first power receiving device 411, which is the transmission source of the packet, is compatible with version A of the WPC standard, and information on whether or not the first power receiving device 411, which is the transmission source of the packet, is compatible with version A of the WPC standard, and the The individual identification information of the first power receiving device 411 is acquired. Further, the control unit 101 further receives a Configuration Packet transmitted by the first power receiving device 411 via the first communication unit 104.
  • control unit 101 transmits an acknowledgment (ACK) by in-band communication via the first communication unit 104 as a response to receiving the Configuration Packet in S502.
  • ACK acknowledgment
  • the control unit 101 determines whether there is an inquiry about the capability information from the first power receiving device 411 within a predetermined time.
  • This inquiry about the capability information is performed by transmitting General Request, which is data defined by the WPC standard, from the first power receiving device 411 to the first power transmitting device 401.
  • General Request which is data defined by the WPC standard
  • the process advances to S512.
  • the control unit 101 determines whether the own device is in a state where BLE can be used. As a result of this determination, if the own device is not in a state in which BLE can be used, the process advances to S541. Then, in S541, the control unit 101 sets the BLE compatibility information of the Power Transmitter Capability Packet to information indicating “not compatible” and transmits it to the first power receiving device 411 via the first communication unit 104. Then, the process advances to S542.
  • the Power Transmitter Capability Packet transmitted at this time includes information regarding the capability of the power transmission device, such as the maximum value of GP, and in this embodiment, further includes BLE compatibility information.
  • the Power Transmitter Capability Packet will be referred to as a "TX Capability Packet.”
  • the determination in S512 is based on whether the own device has a BLE communication function, whether it is operating as a BLE peripheral, whether BLE is being used with another device, etc. , determines whether communication using BLE is executable at the present time. For example, if the own device is a BLE central, it is determined that BLE is available because it can connect to multiple peripherals. Furthermore, even when the own device is not communicating with another device using BLE, it is determined that the device is in a state where BLE can be used. On the other hand, if the own device is communicating with another device as a peripheral using BLE, it is determined that BLE is not available.
  • the determination in S512 may be performed through communication with a control unit of a product (for example, a printer) connected to the first power transmission device 401.
  • the control unit 101 of the first power transmission device 401 and the control unit of the product are connected by GPIO (General Purpose Input/Output) or serial communication, and the control unit 101 of the first power transmission device 401 communicates with the control unit of the product using BLE.
  • the product control unit indicates that BLE is being used as a response regarding the BLE usage status
  • the control unit 101 determines that BLE is not usable at that time. Further, if the response indicates that BLE is not in use, the control unit 101 determines that BLE is in a usable state.
  • the process advances to S513. Then, in S513, the control unit 101 sets the BLE compatibility information of the TX Capability Packet to information indicating that "BLE is usable". Then, the TX Capability Packet is transmitted to the first power receiving device 411 via the first communication unit 104 .
  • the control unit 101 determines whether a signal inquiring about the individual identification information of BLE of the first power transmission device 401 is received from the first power reception device 411 via the first communication unit 104 within a predetermined time. judge.
  • This signal is, for example, a General Request of the WPC standard, and hereinafter, the General Request that inquires about the individual identification information of BLE will be referred to as "General Request (ID)."
  • the General Request ID
  • the process advances to S542 because communication using BLE cannot be performed with the first power receiving device 411.
  • the control unit 101 transmits a response including the BD_ADDR regarding the BLE of the own device to the first power receiving device 411 via the first communication unit 104.
  • This response is a Power Transmitter Identification Packet (hereinafter referred to as a "TX ID Packet") defined by the WPC standard.
  • the TX ID Packet includes the version of the WPC standard that the power transmission device supports, and the identification number of the manufacturer of the functional block related to in-band communication of the power transmission device.
  • the power transmission device compatible with version A can include BLE BD_ADDR in this TX ID Packet.
  • the first power receiving device 411 can associate and recognize the identification information of the first power transmitting device 401 according to the WPC standard and the individual identification information (BD_ADDR) in BLE.
  • BD_ADDR is, as described above, a Public Address specified by the BLE standard that indicates, for example, the manufacturer of the first power transmission device 401 and individual identification information of the BLE communication function (second communication unit 106).
  • the control unit 101 sends a signal from the first power receiving device 411 via the first communication unit 104 to the first power receiving device 411 requesting the first power receiving device 411 to inquire about BLE individual identification information within a predetermined time. is received.
  • This signal is, for example, a General Request of the WPC standard.
  • a General Request requesting to inquire about BLE identification information will be referred to as a "General Request (OOB ID Req)."
  • OOB ID Req General Request requesting to inquire about BLE identification information
  • the control unit 101 receives an OOB ID Packet from the first power receiving device 411 compatible with version A via the first communication unit 104 within a predetermined time as a response to the OOB ID Request Packet transmitted in S517. Determine whether or not.
  • This OOB ID Packet can include individual identification information used in out-of-band communication, and here includes BLE's BD_ADDR. This allows the first power transmitting device 401 to associate and recognize the identification information of the first power receiving device 411 according to the WPC standard and the individual identification information (BD_ADDR) in BLE.
  • the process advances to S542. Note that before that, the BD_ADDR of the first power receiving device 411 was acquired and held in the memory 107, and if it is determined in S518 that the OOB ID Packet was not received from the first power receiving device 411, that information is discarded. You may also do so.
  • the control unit 101 retains the BD_ADDR of the first power receiving device 411 included in the OOB ID Packet in the memory 107.
  • the BD_ADDR held at this time is, for example, a Public Address defined in the BLE standard that indicates the manufacturer of the first power receiving device 411 and individual identification information of the BLE communication function (second communication unit 204).
  • the first power transmitting device 401 which is compliant with version A of the WPC standard, monitors whether or not it has received this OOB ID Packet, thereby determining whether the first power receiving device 411 is able to use BLE at that time. It is possible to determine whether This can prevent the power transmitting device from misunderstanding that a power receiving device that is not compliant with version A of the WPC standard can perform communication using BLE. Note that it may be indicated whether communication is possible through out-of-band communication not limited to BLE. Furthermore, an area similar to the BLE compatibility information may be provided that indicates whether or not each communication method that can be used for out-of-band communication other than BLE is executable. For example, NFC compatibility information indicating whether or not the device has an NFC communication function may be provided.
  • the control unit 101 activates the BLE communication function of the own device as a scanner in order to attempt communication using BLE with the first power receiving device 411.
  • Scanner is one of the states defined in the BLE standard, and receives ADVERTISE_INDICATION broadcasted to discover the source BLE device (or service).
  • this ADVERTISE_INDICATION will be referred to as ADV_IND.
  • ADV_IND is a signal that is broadcast by a device in an advertiser state defined in the BLE standard, and is used to broadcast the BD_ADDR of the device and corresponding service information.
  • the control unit 101 determines whether or not ADV_IND has been received via the second communication unit 106. As a result of this determination, if ADV_IND is not received, the process advances to S551. Then, in S551, the control unit 101 determines whether a timeout has occurred. As a result of this determination, if a timeout has occurred, the process advances to S542. On the other hand, as a result of the determination in S551, if the timeout has not occurred, the process returns to S521 and waits for ADV_IND.
  • the control unit 101 determines whether the received ADV_IND corresponds to the BD_ADDR held in the memory 107 in S519. As a result of this determination, if the ADV_IND does not correspond to the BD_ADDR held in the memory 107, the process advances to S551.
  • the control unit 101 transmits a BLE connection request message to the BD_ADDR via the second communication unit 106. That is, when the control unit 101 receives ADV_IND from the first power receiving device 411 before timeout, the control unit 101 transmits a connection request message using BLE to the first power receiving device 411 via the second communication unit 106.
  • This connection request message is CONNECT_REQ (hereinafter referred to as "CONNECT") defined in the BLE standard.
  • CONNECT CONNECT
  • the first power transmission device 401 receives ADV_IND, it does not transmit CONNECT if it is not the ADV_IND corresponding to the BD_ADDR held in the memory 107 (NO in S522). That is, at the stage of attempting communication using BLE for power transmission, the first power transmission device 401 limits the target to which CONNECT is transmitted so that a BLE connection for a use other than such a use is not established. .
  • control unit 101 sets the allowable value of GP to 100 watts (W) since out-of-band communication can be used.
  • the control unit 101 negotiates GP with the first power receiving device 411. If out-of-band communication is possible, GP negotiation is performed via the second communication unit 106; if out-of-band communication is not possible, GP negotiation is performed by in-band communication via the first communication unit 106. 104. Furthermore, in the Negotiation phase, the control unit 101 also performs foreign object detection processing using the Q-value measurement method as necessary. Then, when the necessary processing in the Negotiation phase is completed, the process moves to the Calibration phase.
  • control unit 101 executes necessary processing in the Calibration phase. Specifically, CAL processing necessary for foreign object detection processing using the power loss method is executed. Then, when the CAL process ends, the process moves to the Power Transfer phase.
  • the control unit 101 transmits power from the power transmission circuit unit 103 to the first power receiving device 411 via the power transmission antenna 105.
  • control data requesting an increase or decrease in transmitted power is transmitted from the first power receiving device 411 to the first power transmitting device 401, but this communication is a control communication. Therefore, in situations where BLE (out-of-band communication) can be used, communication is performed using BLE.
  • the control unit 101 receives an End Power Transfer (EPT) requesting to stop power transfer due to the end of charging or the like from the first power receiving device 411, and ends the power transfer process.
  • EPT End Power Transfer
  • EPT is defined in the WPC standard, and will be referred to as "EPT" hereinafter. Since EPT transmission and reception is also control communication, it is performed using BLE (out-of-band communication) in situations where BLE (out-of-band communication) can be used.
  • S513, S515, and S517 which are signal transmission processes necessary to start out-of-band communication, will be explained using FIGS. 6A to 6C.
  • FIG. 5 it is assumed that a TX Capability Packet, a TX ID Packet, and an OOB ID Req Packet are transmitted in S513, S515, and S517, respectively, on the assumption that BLE communication has not been established.
  • FIGS. 6A to 6C processing using in-band communication that triggers the start of out-of-band communication (BLE) is prevented from being executed.
  • FIG. 6A is a flowchart illustrating an example of a detailed processing procedure when a General Req (Capability) is received from the first power receiving device 411 in this embodiment. Note that the process shown in FIG. 6A is a process performed in place of S513 in FIG. 5, for example, but the process in FIG. 6A is similarly performed when General Req (Capability) is received in other phases.
  • the control unit 101 determines whether out-of-band communication (communication using BLE) has already been established with the first power receiving device 411. As a result of this determination, if out-of-band communication has not been established with the first power receiving device 411, the operation is normal and the process advances to S621a. Then, in S621a, the control unit 101 sets the BLE compatibility information of the TX Capability Packet to information indicating that "BLE is usable". Then, the TX Capability Packet is transmitted to the first power receiving device 411 via the first communication unit 104, and the process advances to S514 in FIG.
  • out-of-band communication communication using BLE
  • the next step S603a is the same as S543 in FIG.
  • the control unit 101 transmits LL_TERMINATE_IND (hereinafter referred to as “TERMINATE”) indicating that the BLE connection is to be disconnected to the first power receiving device 411 via the second communication unit 106.
  • S605a to S608a are similar to S532 to S535 in FIG. 5, respectively. In this case, these processes are performed by in-band communication.
  • FIG. 6B is a flowchart illustrating an example of a detailed processing procedure when a General Req (ID) is received from the first power receiving device 411 in this embodiment. Note that the process shown in FIG. 6B is performed in place of S515 in FIG. 5, for example, but the process in FIG. 6B is similarly performed when a General Req (ID) is received in any other phase.
  • S601b includes the same processing as S601a. As a result of this determination, if out-of-band communication has not been established with the first power receiving device 411, the operation is normal and the process advances to S621b. Then, in S621b, the control unit 101 transmits the TX ID Packet to the first power receiving device 411 via the first communication unit 104. Then, the process advances to S516 in FIG.
  • S602b to S608b are respectively similar to S602a to S608a in FIG. 6A.
  • FIG. 6C is a flowchart illustrating an example of a detailed processing procedure when a General Req (OOB ID Req) is received from the first power receiving device 411 in this embodiment. Note that the process shown in FIG. 6C is a process performed in place of S517 in FIG. 5, for example, but the process in FIG. 6C is similarly performed when General Req (OOB ID Req) is received in other phases. .
  • S601c includes the same processing as S601a. As a result of this determination, if out-of-band communication with the first power receiving device 411 has not been established, the operation is normal and the process advances to S621c. Then, in S621c, the control unit 101 transmits the OOB ID Req Packet to the first power receiving device 411 via the first communication unit 104. Then, the process advances to S518 in FIG.
  • S602c to S608c are respectively similar to S602a to S608a in FIG. 6A.
  • the processes in FIGS. 6A to 6C are executed not only in the I&C phase but also in subsequent phases (Negotiation phase, Calibration phase, Power Transfer phase).
  • the Power Transfer phase there may be a case where a General Request (ID) is received from the first power receiving device 411 even though communication with the first power receiving device 411 is established using BLE. Therefore, since BLE communication has already been established with the first power receiving device 411, the power transfer phase is also determined to be an abnormal operation according to the process of FIG. 6B.
  • the first power transmission device 401 then suspends power transmission control using out-of-band communication and decides to use power transmission control using in-band communication.
  • the first power transmitting device 401 has already established out-of-band communication with the first power receiving device 411 before executing the process using in-band communication that triggers the start of out-of-band communication. Determine whether or not there is. Based on the determination result, if out-of-band communication has already been established with the first power receiving device 411, it is determined that the operation is not normal, and it is determined not to use out-of-band communication. This can prevent processing related to starting out-of-band communication from being executed after out-of-band communication has been established. Therefore, unnecessary power consumption and processing time can be prevented from occurring.
  • FIG. 7 is a flowchart illustrating an example of a basic processing procedure executed by the first power receiving device 411 in this embodiment.
  • this process is started in response to activation of the control unit 201 and the first communication unit 203 by electric power (Digital Ping) received via the power receiving antenna 205.
  • the main power is activated in response to the power receiving function being activated by the user's operation such as pressing a predetermined button, or in response to the first power receiving device 411 being brought into the vicinity of the first power transmitting device 401. Processing may begin. Further, although this process is realized by the control unit 201 executing a program stored in the memory 208, dedicated hardware for executing the process described below may be used.
  • a dedicated circuit is used that is automatically generated on the FPGA using a predetermined compiler from a program for implementing the processing steps.
  • hardware for executing predetermined processing steps may be implemented by a gate array circuit.
  • the first power receiving device 411 is first placed near the first power transmitting device 401 and is detected by the first power transmitting device 401, and the first power transmitting device 401 transmits a Digital Ping. Then, the control unit 201 and the first communication unit 203 of the first power receiving device 411 are activated by the Digital Ping received via the power receiving antenna 205. First, in S701, the control unit 201 measures the magnitude of the power reception voltage of Digital Ping, and notifies the first power transmission device 401 of the magnitude of the power reception voltage by in-band communication via the first communication unit 203. After that, the first power receiving device 411 shifts to the I&C phase.
  • the control unit 201 Upon transition to the I&C phase, in S702, the control unit 201 transmits an Identification Packet to the first power transmission device 401 via in-band communication via the first communication unit 203.
  • the Identification Packet is configured to include information indicating whether or not version A of the WPC standard is supported, and at least individual identification information used in a version of the WPC standard earlier than version A. Note that the individual identification information used in the WPC standard is identification information when performing control communication by in-band communication.
  • the control unit 201 transmits the Configuration Packet to the first power transmission device 401 by in-band communication via the first communication unit 203. Then, in S704, the control unit 201 determines whether ACK has been received from the first power transmission device 401 within a predetermined time. As a result of this determination, if ACK has not been received, the process advances to S734, and the process moves to the Power Transfer phase.
  • a power transmission device that only supports versions earlier than version 1.2 of the WPC standard does not support the Negotiation phase and the Calibration phase. Therefore, when such a power transmission device receives a Configuration Packet, it shifts to the Power Transfer phase without transmitting an ACK. Therefore, if the first power receiving device 411 does not receive an ACK from the first power transmitting device 401, the first power receiving device 411 shifts to the Power Transfer phase. Thereby, even if the first power transmitting device 401 is a power transmitting device of a version earlier than version 1.2 of the WPC standard, the first power receiving device 411 can receive power. That is, with such a configuration, the first power receiving device 411 can ensure backward compatibility. Note that if ACK is not received, the maximum value of power that the power receiving circuit unit 202 can supply to the load (charging unit 206 and battery 207) is limited to 5 watts.
  • the control unit 201 transmits a General Req (Capability) to the first power transmission device 401 to inquire about the capability information of the first power transmission device 401 via the first communication unit 203 . Then, in S711, the control unit 201 determines whether the response (TX Capability Packet) has been received via the first communication unit 203 within a predetermined time. As a result of this determination, if the TX Capability Packet is not received within the predetermined time, the process advances to S742. Then, in S742, the control unit 201 determines not to use out-of-band communication. Thereafter, the process moves to the Negotiation phase, and in S743, since out-of-band communication cannot be used, the control unit 201 sets the maximum value of the requested GP to 15 watts, and proceeds to S732.
  • TX Capability Packet the response
  • the control unit 201 determines whether the own device is currently in a state where it can use BLE for control communication.
  • the own device has a BLE communication function, whether or not the own device operates as a BLE peripheral, and whether or not the own device has a BLE communication function. This is done based on whether the device is in use with other devices, etc.
  • the device itself is a BLE central, it can be connected to a plurality of peripherals, so it is determined that BLE can be used for control communication. Furthermore, even when the own device is not communicating with another device using BLE, it is determined that BLE can be used for control communication. On the other hand, if the own device is communicating with another device using BLE as a peripheral, it is determined that BLE cannot be used for control communication.
  • the determination in S712 may be performed by communication with a control unit of a product (for example, a smartphone, a camera, etc.) connected to the first power receiving device 411.
  • a control unit of a product for example, a smartphone, a camera, etc.
  • the control unit 201 of the first power receiving device 411 and the control unit of the product are connected by GPIO or serial communication, and the control unit 201 of the first power receiving device 411 inquires about the usage status of BLE to the control unit of the product. Good too.
  • the control unit 201 determines that BLE cannot be used for control communication at that time. Further, if the response indicates that BLE is not in use, it is determined that BLE can be used for control communication.
  • the control unit 201 checks the bit indicating BLE compatibility information in the TX Capability Packet received from the first power transmission device 401, and determines whether the first power transmission device 401 is capable of executing control communication using BLE. Determine whether or not. As a result of this determination, if the first power transmitting device 401 is not capable of executing control communication using BLE, control communication using BLE cannot be performed with the first power transmitting device 401, and the process advances to S742.
  • the process advances to S714.
  • the control unit 201 transmits a General Req (ID) via the first communication unit 203 in order to acquire the individual identification information of the first power transmission device 401 in BLE.
  • the control unit 201 determines whether a TX ID Packet has been received from the first power transmission device 401 via the first communication unit 203 within a predetermined time as a response to the General Request (ID). do.
  • the TX ID Packet is not received from the first power transmitting device 401 within the predetermined time, control communication using BLE cannot be performed with the first power transmitting device 401, so the process advances to S742.
  • the process advances to S716. Then, in S716, the control unit 201 acquires the BD_ADDR of the first power transmission device 401 stored in the packet, and stores it in the memory 208. At this point, the first power receiving device 411 can associate and recognize the identification information of the first power transmitting device 401 in the WPC standard and the BD_ADDR in BLE.
  • the control unit 201 transmits a General Req (OOB ID Req) to the first power transmission device 401 via the first communication unit 203, requesting an inquiry about BLE individual identification information. Then, in S718, the control unit 201 determines whether an OOB ID Req Packet requesting BLE individual identification information has been received from the first power transmission device 401 via the first communication unit 203 within a predetermined time. As a result of this determination, if the OOB ID Req Packet is not received from the first power transmitting device 401 within the predetermined time, control communication using BLE cannot be performed with the first power transmitting device 401, so the process advances to S742. .
  • OOB ID Req General Req
  • this OOB ID Packet includes the individual identification information (BD_ADDR) of the first power receiving device 411 used in out-of-band communication.
  • the first power transmitting device 401 side can associate and recognize the identification information of the first power receiving device 411 according to the WPC standard and the individual identification information (BD_ADDR) in BLE.
  • the control unit 201 activates the BLE communication function of the own device as an advertiser in order to attempt communication using BLE with the first power transmission device 401. Then, in S721, the control unit 201 broadcasts ADV_IND via the second communication unit 204.
  • Advertiser is one of the states defined in the BLE standard, and has the role of announcing its own device's BD_ADDR and corresponding service information using ADV_IND so that the above-mentioned Scanner can discover BLE devices (or services). has.
  • ADV_IND includes a UUID (Universally Unique IDentifier) indicating a service (profile) supported by the second communication unit 204.
  • ADV_IND includes a UUID indicating a wireless charging service (hereinafter referred to as "wireless charging service”) using out-of-band communication according to the WPC standard.
  • ADV_IND also includes information such as the device type (for example, camera, smartphone), manufacturer name, model name, serial number, etc. of the product to which the power receiving device (first power receiving device 411) is connected.
  • the control unit 201 determines whether CONNECT has been received via the second communication unit 204 from the Scanner that has received ADV_IND. As a result of this determination, if CONNECT is not received, the process advances to S752. Then, in S752, the control unit 201 determines whether a timeout has occurred. As a result of this determination, if a timeout has occurred, control communication using BLE cannot be performed with the first power transmission device 401, so the process advances to S742. On the other hand, as a result of the determination in S752, if the timeout has not occurred, the process returns to S721 and ADV_IND is transmitted again.
  • the control unit 201 determines whether the identification information of the transmission source of the CONNECT is held in the memory 208 as the individual identification information (BD_ADDR) of the first power transmission device 401 (S723). That is, it is determined whether the transmission source of CONNECT is the first power transmission device 401 or not. As a result of this determination, if the transmission source of CONNECT is not the first power transmitting device 401, the process advances to S751. Then, in S751, the control unit 201 transmits TERMINATE indicating that the BLE connection connected by CONNECT is to be terminated to the source of CONNECT via the second communication unit 204, and the process proceeds to S752.
  • BD_ADDR individual identification information
  • the control unit 201 determines to use out-of-band communication, and establishes an out-of-band communication connection between the first power receiving device 411 and the first power transmitting device 401. Note that in communication by BLE between the first power receiving device 411 and the first power transmitting device 401 after CONNECT, BD_ADDR is not used as each identifier, but Connection Handle is used.
  • the control unit 201 sets the maximum value of the requested GP to 100 watts (W).
  • the control unit 201 negotiates GP with the first power transmission device 401. This negotiation is performed based on the maximum allowable GP value in the first power transmitting device 401 and the GP value requested by the first power receiving device 411. Note that, as described above, the maximum value of GP requested by the first power receiving device 411 is determined by the process of S724 or S743 depending on whether out-of-band communication can be used. Furthermore, when out-of-band communication is possible, GP negotiation is performed via the second communication unit 204, and when out-of-band communication is not possible, GP negotiation is performed through in-band communication through the first communication unit 204. This is done via the communication unit 203. Then, when the necessary processing in the Negotiation phase is completed, the process moves to the Calibration phase.
  • the control unit 201 executes necessary processing in the Calibration phase. Specifically, the first power transmission device 401 measures the received power value used in CAL processing for foreign object detection processing using the power loss method, and transmits the information. When the necessary processing in the Calibration phase is completed, the process moves to the Power Transfer phase.
  • the control unit 201 When moving to the Power Transfer phase, the control unit 201 receives power from the first power transmission device 401 via the power receiving antenna 205 in S734. In the Power Transfer phase, control data requesting an increase or decrease in the transmitted power is transmitted from the first power receiving device 411 to the first power transmitting device 401, but since this communication is a control communication, BLE (out-of-band communication) is used. This is done using BLE in possible situations.
  • BLE out-of-band communication
  • the control unit 201 transmits an EPT requesting the first power transmission device 401 to stop power transmission for battery charging, for example in response to the completion of charging. Then, the control unit 201 transmits TERMINATE to disconnect the BLE connection as necessary, and ends this process.
  • EPT transmission and reception is also control communication, it is performed using BLE (out-of-band communication) in situations where BLE (out-of-band communication) can be used.
  • the TERMINATE may be transmitted from the first power transmitting device 401 side.
  • each packet is transmitted in S710, S714, S717, S719, and S721 on the premise that the first power receiving device 411 has not established communication using BLE as a peripheral. Therefore, if communication using BLE with the first power transmission device 401 has already been established, it is not necessary to transmit these packets. Furthermore, when communication with the first power transmitting device 401 via BLE has already been established, receiving packets such as TX Capability Packet, TX ID Packet, OOB ID Req Packet, etc.
  • in-band communication is performed instead of out-of-band communication.
  • processing using in-band communication that triggers the start of out-of-band communication (BLE) is prevented from being executed.
  • FIG. 8A is a flowchart illustrating an example of a detailed processing procedure when a response (ACK) indicating that a Configuration Packet and an Identification Packet have been received from the first power transmission device 401 is received in this embodiment. Note that the process shown in FIG. 8A is a process performed in place of S710 in FIG. 7, for example, but the process in FIG. 8A is similarly performed when ACK is received in other phases.
  • ACK response
  • the control unit 201 determines whether out-of-band communication (communication using BLE) has already been established with the first power transmission device 401. As a result of this determination, if out-of-band communication has not been established with the first power transmission device 401, the process advances to S821a. Then, in S821a, the control unit 201 transmits General Req (Capability) to the first power transmission device 401 via the first communication unit 203. Then, the process advances to S711 in FIG.
  • out-of-band communication communication using BLE
  • the next step S803a is similar to S743 in FIG. 7.
  • the control unit 201 transmits TERMINATE to the first power transmission device 401 via the second communication unit 204, indicating that the BLE connection is to be disconnected.
  • S805a to S808a are the same as S732 to S735 in FIG. 7, respectively. In this case, these processes are performed by in-band communication.
  • FIG. 8B is a flowchart illustrating an example of a detailed processing procedure when a TX Capability Packet is received from the first power transmission device 401 in this embodiment. Note that the process shown in FIG. 8B is performed in place of, for example, S714 in FIG. 7, but the process in FIG. 8B is similarly performed when a TX Capability Packet is received in any other phase.
  • S801b includes the same processing as S801a. As a result of this determination, if out-of-band communication has not been established with the first power transmission device 401, the process advances to S821b. Then, in S821b, the control unit 201 transmits a General Req (ID) via the first communication unit 203 in order to acquire identification information of the first power transmission device 401 in BLE.
  • ID General Req
  • S802b to S808b are respectively similar to S802a to S808a in FIG. 8A.
  • FIG. 8C is a flowchart illustrating an example of a detailed processing procedure when a TX ID Packet is received from the first power transmission device 401 in this embodiment. Note that the process shown in FIG. 8C is performed in place of, for example, S717 in FIG. 7, but the process in FIG. 8C is similarly performed when a TX ID Packet is received in any other phase.
  • S801c includes the same processing as S801a. As a result of this determination, if out-of-band communication has not been established with the first power transmission device 401, the process advances to S821c. Then, in S821c, the control unit 201 transmits a General Req (OOB ID Req) to the first power transmission device 401 via the first communication unit 203, requesting an inquiry about BLE individual identification information.
  • OOB ID Req General Req
  • S802c to S808c are respectively similar to S802a to S808a in FIG. 8A.
  • FIG. 8D is a flowchart illustrating an example of a detailed processing procedure when an OOB ID Req Packet is received from the first power transmission device 401 in this embodiment. Note that the process shown in FIG. 8D is performed in place of, for example, S719 in FIG. 7, but the process in FIG. 8D is similarly performed when an OOB ID Req Packet is received in any other phase.
  • S801d includes the same processing as S801a. As a result of this determination, if out-of-band communication has not been established with the first power transmission device 401, the process advances to S821d. Then, in S821d, the control unit 201 transmits the OOB ID Packet to the first power transmission device 401 via the first communication unit 203.
  • S802d to S808d are similar to S802a to S808a in FIG. 8A, respectively.
  • FIG. 8E is a flowchart illustrating another example of the detailed processing procedure when an OOB ID Req Packet is received from the first power transmission device 401 in this embodiment.
  • FIG. 8E is a process performed in place of S721 in FIG. 7, for example, but the process in FIG. 8E is similarly performed when an OOB ID Req Packet is received in any other phase.
  • S801e includes the same processing as S801a. As a result of this determination, if out-of-band communication has not been established with the first power transmission device 401, the process advances to S821e. Then, in S821e, the control unit 201 broadcasts ADV_IND via the second communication unit 204.
  • S802e to S808e are respectively similar to S802a to S808a in FIG. 8A.
  • the processes in FIGS. 8A to 8E are executed not only in the I&C phase but also in subsequent phases (Negotiation phase, Calibration phase, Power Transfer phase).
  • the Power Transfer phase there may be a case where an OOB ID Req Packet is received from the first power transmitting device 401 even though communication by BLE is established with the first power transmitting device 401. Therefore, since BLE communication has already been established with the first power transmission device 401, the power transfer phase is also determined to be an abnormal operation according to the process of FIG. 8D or FIG. 8E.
  • the first power transmission device 401 then suspends power transmission control using out-of-band communication and decides to use power transmission control using in-band communication.
  • the first power receiving device 411 has already established out-of-band communication with the first power transmitting device 401 before executing the process using in-band communication that triggers the start of out-of-band communication. Determine whether or not there is. Based on the determination result, if out-of-band communication has already been established with the first power transmission device 401, it is determined that the operation is not normal, and it is determined not to use out-of-band communication. This can prevent processing related to starting out-of-band communication from being executed after out-of-band communication has been established. Therefore, unnecessary power consumption and processing time can be prevented from occurring.
  • FIGS. 9 and 10 are sequence diagrams showing the operations of the first power receiving device 411 and the first power transmitting device 401 shown in FIG. 4 in this embodiment. Note that in FIGS. 9 and 10, broken line arrows indicate exchanges performed by in-band communication between the first power receiving device 411 and the first power transmitting device 401. Solid arrows indicate exchanges performed through out-of-band communication between the first power receiving device 411 and the first power transmitting device 401.
  • the first power transmission device 401 which operates as a central in BLE communication, transmits Analog Ping in the Selection phase (S901).
  • the first power transmission device 401 detects the voltage value or current value of the power transmission coil when power is transmitted by Analog Ping, and determines that an object exists nearby if the voltage is below a certain threshold or the current value exceeds a certain threshold. Then, it moves to the Ping phase. Then, in the Ping phase, the first power transmission device 401 transmits a Digital Ping, which has higher power than an Analog Ping (S902).
  • the first power receiving device 411 which operates as a peripheral in BLE communication, is activated by the received Digital Ping, and measures the magnitude of the received voltage of the Digital Ping. Then, the first power receiving device 411 notifies the first power transmitting device 401 of the magnitude of the received power voltage through in-band communication. After that, the first power receiving device 411 shifts to the I&C phase.
  • the first power receiving device 411 transmits a signal inquiring about capability information to the first power transmitting device 401 (S911).
  • This signal is the above-mentioned General Request (Capability).
  • the first power transmitting device 401 receives the General Request (Capability), it transmits a response including information about the capability information of its own device to the first power receiving device 411 (S912).
  • This response is a TX Capability Packet as described above.
  • the first power receiving device 411 transmits a signal inquiring about BD_ADDR to the first power transmitting device 401 (S913).
  • This signal is the above-mentioned General Request (ID).
  • the first power transmitting device 401 receives the General Req (ID)
  • it transmits a response including BD_ADDR regarding the BLE of its own device to the first power receiving device 411 (S914).
  • This response is a TX ID Packet as described above.
  • the first power receiving device 411 retains BD_ADDR of the first power transmitting device 401 in the memory 208.
  • the first power receiving device 411 transmits a signal requesting the first power transmitting device 401 to inquire about the individual identification information of BLE in order to notify the first power transmitting device 401 of the BD_ADDR of the first power receiving device 411.
  • This signal is the above-mentioned General Req (OOB ID Req).
  • the first power transmitting device 401 that has received the General Req (OOB ID Req) transmits a signal inquiring about the BD_ADDR of the first power receiving device 411 to the first power receiving device 411 as a response (S916).
  • This signal is the OOB ID Req mentioned above.
  • the first power receiving device 411 that has received the OOB ID Req transmits a response including the BD_ADDR for BLE of the own device to the first power transmitting device 401 as a response (S917).
  • This signal is the OOB ID Packet mentioned above.
  • ADV_IND is transmitted using BLE (S918), and charging control using BLE is started with the first power transmission device 401 (S919).
  • S912, S914, and S916 signal transmission related to the process of starting out-of-band communication (BLE) in the first power transmission device 401 follow the procedures of FIGS. 6A to 6C, respectively. That is, before transmitting each signal, it is determined whether communication by BLE with the first power receiving device 411 is currently established.
  • the example in FIG. 9 is an example in which BLE communication is not established at the time of each of the above-described processes.
  • the first power receiving device 411 in FIG. 9 is compatible with version A of the WPC standard, but does not have a function to perform the processing shown in FIGS. 8A to 8E.
  • the first power receiving device 411 uses something as a trigger to start charging control using BLE, and then transmits General Req (OOB ID Req) (S941).
  • OOB ID Req General Req
  • the first power transmitting device 401 of the present embodiment determines whether communication by BLE with the first power receiving device 411 has been established according to the procedure shown in FIG. 6C before transmitting the OOB ID Req Packet. .
  • FIG. 9 the example of FIG.
  • the first power transmitting device 401 since communication using BLE has already been established with the first power receiving device 411, the first power transmitting device 401 does not transmit the OOB ID Req Packet. Furthermore, since abnormal processing was performed in the first power receiving device 411, communication using BLE is terminated (S942). This is achieved by the first power transmission device 401 transmitting TERMINATE, which is a BLE packet. Then, communication with the first power receiving device 411 is switched to in-band communication, and charging control is performed (S951).
  • the processes of S1011, S1013, S1015, S1017, and S1018 (signal transmission) related to the process of starting out-of-band communication (BLE) in the first power receiving device 411 follow the procedures of FIGS. 8A to 8E, respectively. That is, before transmitting each signal, it is determined whether communication with the first power transmitting device 401 by BLE is established at the present time.
  • the example in FIG. 10 is an example in which BLE communication is not established at the time of each of the above-described processes.
  • the first power transmission device 401 in FIG. 10 is compatible with version A of the WPC standard, but does not have a function to perform the processing shown in FIGS. 6A to 6C.
  • the first power transmission device 401 uses some trigger as a trigger to start charging control using BLE, and then transmits an OOB ID Req Packet (S1041).
  • the first power receiving device 411 of the present embodiment determines whether communication by BLE with the first power transmitting device 401 has been established according to the procedure shown in FIG. 8D before transmitting the OOB ID Packet.
  • FIG. 10 the example of FIG.
  • the first power receiving device 411 since communication by BLE with the first power transmitting device 401 has already been established, the first power receiving device 411 does not transmit the OOB ID Packet. Furthermore, since abnormal processing was performed in the first power transmission device 401, communication using BLE is terminated (S1042). This is achieved by the first power receiving device 401 transmitting TERMINATE, which is a BLE packet. Then, communication with the first power transmission device 401 is switched to in-band communication, and charging control is performed (S1051).
  • the communication partner before executing the process using in-band communication that triggers the start of out-of-band communication, the communication partner has already It is determined whether out-of-band communication has been established with the out-of-band communication. If out-of-band communication has already been established, it is determined that the operation is not normal and it is determined not to use out-of-band communication. This can prevent processing related to starting out-of-band communication (BLE) from being executed after out-of-band communication is established. Therefore, unnecessary power consumption and processing time can be prevented from occurring.
  • BLE starting out-of-band communication
  • the first power receiving device 411 requests the first power transmitting device 401 to transmit BD_ADDR by transmitting the General Request (ID), but the present invention is not limited to this.
  • a Reserved Packet or a Proprietary Packet packet with an undefined packet type among the Specific Requests of version 1.2.3 of the WPC standard may be used.
  • a Reserved Packet or a Proprietary Packet with an undefined packet type may be used among the General Requests of version 1.2.3 of the WPC standard.
  • packets other than Specific Request and General Request may be used for this request.
  • a Reserved Packet or a Proprietary Packet with an undefined packet type other than Specific Request or General Request is used for this request.
  • the communication using BLE after establishing communication using BLE with a communication partner, if a signal regarding the start of out-of-band communication is received from the communication partner using in-band communication, the communication using BLE is terminated and the communication is switched to in-band communication.
  • an example of restarting charging control was shown.
  • the present invention is not limited to this, and for example, the process of returning to the Selection phase may be executed after the communication using BLE ends. Alternatively, for example, the communication using BLE may not end, the process may return to the Negotiation phase, and the process of restarting charging control using BLE may be executed.
  • the power receiving device spontaneously sends the notification of BD_ADDR by spontaneously transmitting the General Req (OOB ID Req).
  • the power transmitting device may spontaneously request the power receiving device to notify the power receiving device of BD_ADDR.
  • a method for making the request for example, as shown in FIG. 11, there is a method in which the first power transmitting device 401 transmits a request packet to the first power receiving device 411 by in-band communication.
  • a request packet is transmitted from the first power transmitting device 401 to the first power receiving device 411.
  • This request packet is a packet indicating that the first power transmitting device 401 requests the first power receiving device 411 to perform an operation.
  • the packet includes identification information that identifies the operation that the first power transmitting device 401 requests the first power receiving device 411 to perform in S1102.
  • the operations in S1101 and S1102 may be performed in one packet. That is, the first power transmitting device 401 transmits a packet indicating that the first power transmitting device 401 requests the first power receiving device 411 to perform an operation and includes identification information that identifies the requested operation to the first power receiving device 411. It may also be transmitted to device 411.
  • the first power receiving device 411 that has received the request packet and the requested operation identification packet notifies the first power transmitting device 401 of its own BD_ADDR through in-band communication (S1103).
  • the present disclosure provides a system or device with a program that implements one or more functions of the embodiments described above via a network or a storage medium, and one or more processors in a computer of the system or device reads and executes the program. This can also be achieved by processing. It can also be realized by a circuit (for example, ASIC) that realizes one or more functions.
  • a circuit for example, ASIC

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

通信装置は、無線電力伝送を行う外部装置と第2のアンテナを介する通信が確立されている場合には、外部装置と第2のアンテナを介する通信の確立を行うための第1のアンテナを介する通信を行わないように制御する。

Description

通信装置、通信装置の制御方法およびプログラム
 本開示は、通信装置、通信装置の制御方法およびプログラムに関する。
 近年、無線電力伝送システムの技術開発が広く行われている。特許文献1には、複数の通信部を用いた通信が可能な無線電力伝送システムにおいて、無線電力伝送の際に複数の通信部を制御する方法が開示されている。特許文献1に記載の方法では、送電装置は、受電装置の識別情報を第1の通信方式による通信で認識し、所定の処理をトリガとして第2の通信方式による通信を開始する。そして送電装置は、受電装置の識別情報を含むADV_INDという信号を受信した場合に、接続要求メッセージを送信するようにする。これにより、電力伝送の対象との間で第2の通信方式による通信による接続を確立することができるとしている。
特開2019-187070号公報
 しかしながら、第2の通信方式による通信の開始のトリガとなる第1の通信方式による通信を用いた処理が、第2の通信方式による通信が確立した後に実行されると、不要にもかかわらず、第2の通信方式による通信の開始に関する処理が実行されてしまう。これにより不要な処理が発生する虞がある。
 本開示は前述の問題点に鑑み、通信に係る不要な処理の発生を抑制することを目的としている。
 本開示に係る通信装置は、無線電力伝送を行う通信装置であって、第1のアンテナと第2のアンテナとを介して、無線電力伝送を行う外部装置と通信を行う通信手段と、前記外部装置と前記第2のアンテナを介する通信を行うための前記第1のアンテナを介する通信を行うように前記通信手段を制御する制御手段と、を有し、前記制御手段は、前記第2のアンテナを介する通信の確立に基づいて、前記外部装置と前記第2のアンテナを介する通信の確立を行うための前記第1のアンテナを介する通信を行わないように制御することを特徴とする。
 本開示によれば、通信に係る不要な処理の発生を抑制することができる。
実施形態に係る送電装置の内部構成例を示すブロック図である。 実施形態に係る受電装置の内部構成例を示すブロック図である。 実施形態に係る送電装置の機能構成例を示すブロック図である。 実施形態に係る無線電力伝送システムの構成例を示す図である。 送電装置が実行する基本的な処理手順の一例を示すフローチャートである。 不要なインバンド通信を回避するための送電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための送電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための送電装置側の処理手順の例を示すフローチャートである。 受電装置が実行する基本的な処理手順の一例を示すフローチャートである。 不要なインバンド通信を回避するための受電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための受電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための受電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための受電装置側の処理手順の例を示すフローチャートである。 不要なインバンド通信を回避するための受電装置側の処理手順の例を示すフローチャートである。 実施形態における、受電装置と送電装置とにおける動作を表したシーケンス図である。 実施形態における、受電装置と送電装置とにおける動作を表したシーケンス図である。 送電装置が受電装置に対してBD_ADDRの通知を要求する方法を説明するための図である。 パワーロス法に基づく異物検出方法のCalibration処理を説明するための図である。
 (第1の実施形態)
 以下、添付図面を参照して実施形態を詳しく説明する。実施形態には複数の特徴が記載されているが、これらの複数の特徴の全てが本開示に必須のものとは限らず、また、複数の特徴は任意に組み合わせられてもよい。さらに、添付図面においては、同一若しくは同様の構成に同一の参照番号を付す。
 [無線電力伝送システムの構成]
 図4は、本実施形態に係る無線電力伝送システム400の構成例を示す図である。本実施形態に係る無線電力伝送システム400は、送電装置(第1送電装置401または第2送電装置402)及び受電装置(第1受電装置411または第2受電装置412)を含んで構成される。受電装置は、送電装置から受電して内蔵バッテリに充電を行う電子機器である。また、送電装置は、送電装置上に載置された受電装置に対して無線で送電する電子機器である。なお、受電装置と送電装置は無線充電以外のアプリケーションを実行する機能を有する。
 以下の説明において「受電装置が送電装置上に載置される」ことは受電装置が送電装置の送電可能範囲に含まれる状態」を表すものとする。送電装置の送電可能範囲とは、送電コイルを使用して受電装置に送電可能な範囲である。また、受電装置が送電装置上に載置される状態は、受電装置と送電装置とが接触していなくてもよい。例えば、第1受電装置411が第1送電装置401と非接触で送電可能範囲に含まれている状態も、「第1受電装置411が第1送電装置401上に載置された」状態とみなすものとする。また、受電装置が送電装の上に置かれるのではなく、例えば送電装置の側面に配置される構成でもよい。また、以下の説明においては、送電装置の送電可能範囲に含まれる、送電装置及び受電装置とは異なる物体を、異物と記載する。
 なお、受電装置と送電装置は無線充電以外のアプリケーションを実行する機能を有しうる。受電装置の一例はスマートフォン等の情報処理端末であり、送電装置の一例はその情報処理端末を充電するためのアクセサリ機器である。例えば、情報端末機器は、受電コイル(アンテナ)から受けた電力が供給される、情報をユーザに表示する表示部(ディスプレイ)を有している。また、受電コイルから受けた電力は蓄電部(バッテリ)に蓄積され、そのバッテリから表示部に電力が供給される。この場合、受電装置は、送電装置とは異なる他の装置と通信する通信部を有していてもよい。通信部は、NFC通信や、第5世代移動通信システム(5G)などの通信規格に対応していてもよい。またこの場合、バッテリから通信部に電力が供給されることにより、通信部が通信を行ってもよい。また、受電装置は、タブレット端末、あるいは、ハードディスク装置及びメモリ装置などの記憶装置であってもよいし、パーソナルコンピュータ(PC)などの情報処理装置であってもよい。また、受電装置は、例えば、撮像装置(カメラやビデオカメラ等)であってもよい。また、受電装置は、スキャナ等の画像入力装置であってもよいし、プリンタ、コピー機、プロジェクタ等の画像出力装置であってもよい。また、受電装置は、ロボット、医療機器等であってもよい。送電装置は、上述した機器を充電するための装置でありうる。
 また、送電装置がスマートフォンであってもよい。この場合、受電装置は別のスマートフォンでもよいし、無線イヤホンであってもよい。
 また、本実施形態における受電装置が自動車などの車両であってもよい。例えば、受電装置である自動車は、駐車場に設置された送電アンテナを介して充電器(送電装置)から電力を受けとるものであってもよい。また、受電装置である自動車は、道路に埋め込まれた送電コイル(アンテナ)を介して充電器(送電装置)から電力を受けとるものでもよい。このような自動車は、受電した電力はバッテリに供給される。バッテリの電力は、車輪を駆動する発動部(モータ、電動部)に供給されてもよいし、運転補助に用いられるセンサの駆動や外部装置との通信を行う通信部の駆動に用いられてもよい。つまり、この場合、受電装置は、車輪の他、バッテリや、受電した電力を用いて駆動するモータやセンサ、さらには送電装置以外の装置と通信を行う通信部を有していていもよい。さらに、受電装置は、人を収容する収容部を有していてもよい。例えば、センサとしては、車間距離や他の障害物との距離を測るために使用されるセンサなどがある。通信部は、例えば、全地球測位システム(Global Positioning System、Global Positioning Satellite、GPS)に対応していてもよい。また、通信部は、第5世代移動通信システム(5G)などの通信規格に対応していてもよい。また、車両としては、自転車や自動二輪車であってもよい。また、受電装置は、車両に限定されず、バッテリに蓄積された電力を使用して駆動する発動部を有する移動体及び飛行体等であってもよい。
 また、本実施形態における受電装置は、電動工具、家電製品などでもよい。受電装置であるこれらの機器は、バッテリの他、バッテリに蓄積された受電電力によって駆動するモータを有していてもよい。また、これらの機器は、バッテリの残量などを通知する通知手段を有していてもよい。また、これらの機器は、送電装置とは異なる他の装置と通信する通信部を有していてもよい。通信部は、NFCや、第5世代移動通信システム(5G)などの通信規格に対応していてもよい。
 また、本実施形態における送電装置は、自動車の車両内で、無線電力伝送に対応するスマートフォンやタブレットなどの携帯情報端末機器に対して送電を行う車載用充電器であってもよい。このような車載用充電器は、自動車内のどこに設けられていてもよい。例えば、車載用充電器は、自動車のコンソールに設置されてもよいし、インストルメントパネル(インパネ、ダッシュボード)や、乗客の座席間の位置や天井、ドアに設置されてもよい。ただし、運転に支障をきたすような場所に設置されないほうがよい。また、送電装置が車載用充電器の例で説明したが、このような充電器が、車両に配置されるものに限らず、電車や航空機、船舶等の輸送機に設置されてもよい。この場合の充電器も、乗客の座席間の位置や天井、ドアに設置されてもよい。
 また、車載用充電器を備えた自動車等の車両が、送電装置であってもよい。この場合、送電装置は、車輪と、バッテリとを有し、バッテリの電力を用いて、送電回路部や送電コイル(アンテナ)により受電装置に電力を供給する。
 また、図4の送電装置及び受電装置は、それぞれ一般的なインバンド(In-Band)通信の他に、アウトオブバンド(Out-of-Band)通信としてBLE(Bluetooth(登録商標) Low Energy)による通信機能を有する。なお、BLEに代えて、アウトオブバンド通信としてNFC(Near Field Communication)やWi―Fi(登録商標)等の他の無線通信方式に対応する通信機能を有するようにしてもよい。また、本実施形態に係る無線電力伝送システム400の周囲には、一例として、BLEによる通信機能を有するが、無線電力伝送の機能を有しない他の装置(第1通信装置421及び第2通信装置422)が存在するものとする。
 次に、図4に示す例におけるBLEによる通信について説明する。なお、以下では、BLEの通信部(アンテナや通信回路等によって構成されるユニット)を単に「BLE」と呼ぶ場合がある。図4に示すように、第1送電装置401と第2送電装置402は、BLEのセントラルとして機能し、第1受電装置411と第2受電装置412は、BLEのペリフェラルとして機能する。また、第1通信装置421はセントラルとして機能し、第2通信装置422はペリフェラルとして機能するものとする。なお、「セントラル」は、BLEの制御局であることを示し、「ペリフェラル」は、BLEの端末局であることを示している。
 BLEのセントラルは、BLEのペリフェラルとの間で通信を行い、他のセントラルとの通信を行わない。また、BLEのペリフェラルは、BLEのセントラルとの間では通信を行うが、他のペリフェラルとの間では通信を行わない。すなわち、BLEでは、セントラル同士又はペリフェラル同士の通信は行われない。また、セントラルは複数のペリフェラルと接続状態となることができ、複数のペリフェラルとの間でデータを送受信することができる。一方、ペリフェラルは、1台のセントラルとしか接続状態になることができず、複数のセントラルと並行して通信することはない。
 図4において、第1送電装置401から見て、第1受電装置411は送受電範囲内に位置している一方で、第2受電装置412は送受電範囲内に位置していないものとする。この場合、第1送電装置401は第1受電装置411のみに対して無線電力伝送を行い、第2受電装置412に対して電力伝送は行わない。
 また、第1送電装置401がBLEを用いたアウトオブバンド通信を行って第1受電装置411に送電するためには、少なくとも第1受電装置411のBLE(ペリフェラル)と接続状態とならなければならない。上述のように、BLEのセントラルは、同時に複数のペリフェラルと接続状態になりうる。そのため、第1送電装置401のBLE(セントラル)は、第1受電装置411のみならず、ペリフェラルとして機能する第2受電装置412や第2通信装置422と接続状態であってもよい。同様に、第2送電装置402のBLE(セントラル)は、第2受電装置412のBLE(ペリフェラル)と接続状態であれば、第1受電装置411や第2通信装置422と接続状態であってもよい。
 一方、第1受電装置411のBLE(ペリフェラル)は、1つのセントラルとのみ接続可能である。このため、第1送電装置401と第1受電装置411との間の電力伝送のための制御通信をBLEで行うためには、第1受電装置411のBLE(ペリフェラル)が、第1送電装置401のBLE(セントラル)とのみ接続状態である必要がある。第1受電装置411のBLE(ペリフェラル)は、第2送電装置402や第1通信装置421などの他のBLE(セントラル)と接続状態となると、第1送電装置401のBLE(セントラル)と制御通信を行うことができなくなるからである。同様に、第2送電装置402と第2受電装置412との間の電力伝送のための制御通信をBLEで行うためには、第2受電装置412のBLE(ペリフェラル)は第2送電装置402のBLE(セントラル)とのみ接続状態でなければならない。したがって、第2受電装置412のBLE(ペリフェラル)は、第1送電装置401や第1通信装置421等の他のBLE(セントラル)と接続状態であるべきでない。
 このように、送受電が実行される送電装置と受電装置(例えば第1送電装置401と第1受電装置411)との間で制御通信が行われるべきである。しかしながら、アウトオブバンド通信の通信範囲がインバンド通信の通信範囲より広い場合、送電装置及び受電装置は送受電対象でない機器とアウトオブバンド通信のための接続を確立してしまう場合がある。以下、このような送受電対象でない機器とアウトオブバンド通信のための接続を確立することをクロスコネクションと呼ぶ。例えば、図4において、第1受電装置411と、第2送電装置402又は第1通信装置421がBLE接続される状態がクロスコネクションである。
 図4において、第1送電装置401は、制御通信としてBLE(アウトオブバンド通信)を使用する時は、送受電範囲内にある第1受電装置411とBLEによる接続がなされているという確証が必要である。この確証がない場合は、第1送電装置401は、第1受電装置411を送電対象としながら、第2受電装置412や第2通信装置422とBLEによる接続を確立して制御通信を行ってしまう可能性がある。したがって、第1送電装置401が、第1受電装置411に対して適切な通信を行うことができなくなる。同様に、第1受電装置411も、BLE(アウトオブバンド通信)を使用する時は、送受電範囲内にある第1送電装置401とBLEによる接続がなされているという確証が必要である。
 この確証がない場合は、第1受電装置411は、第1送電装置401が送電する電力を受電するとしながら、第2送電装置402や第1通信装置421とのBLEによる接続を確立して制御通信を行う可能性がある。したがって、第1受電装置411は、第1送電装置401との間で適切な制御通信を行うことができなくなる。
 以上のように、図4の無線電力伝送システム400では、送電装置及び受電装置の両方が、バッテリを充電する電力の送受電やその電力の交渉に先立って、送受電範囲内にある相手装置とBLEによる制御通信が可能であるという確証を得ることが重要となる。なお、BLEによる制御通信には、例えば後述するパワーロス法に基づく異物検出を行う上で必要な送電装置と受電装置間の情報のやり取りを行うための通信や、送電装置における機器認証のための通信等を含む。
 このため、本実施形態では、送電装置と受電装置は、無線電力伝送の相手装置との間でBLEによる接続を確立することができるようにする。なお、これを実現するために、送電装置あるいは受電装置の製造元や、BLEの通信機能の個体識別情報を示すBluetooth Device Addressを使用する。なお、Bluetooth Device Addressは、BLE規格で規定されたPublic Addressである。以下、Bluetooth Device Addressを「BD_ADDR」と呼ぶ。受電装置あるいは送電装置は、プライバシー保護の観点から、このBD_ADDRを定期的、あるいは不定期に変更することが考えられる。本実施形態では、受電装置がBD_ADDRを変更する場合であっても、送電装置と受電装置は、無線電力伝送の相手装置との間でBLEによる接続を確立することができるようにする。
 なお、BLEは一例であり、無線電力伝送におけるアウトオブバンド通信に利用可能な任意の無線通信方式が利用可能である。また、以下では、実行される無線電力伝送はWPC規格に準拠しているものとし、ここでのWPC規格は、バージョン1.2.3に規定された機能を含む。なお、本実施形態では、送電装置と受電装置とがWPC規格に準拠しているものとして説明するが、これに限られず、他の無線電力伝送規格であってもよい。以下では、送電装置及び受電装置の構成例と、実行される処理の流れの例について説明する。
 [送電装置および受電装置の構成]
 続いて、本実施形態における送電装置及び受電装置の構成について説明する。なお、以下で説明する構成は一例に過ぎず、説明される構成の一部(場合によっては全部が)他の同様の機能を果たす他の構成と置き換えられ又は省略されてもよく、さらなる構成が説明される構成に追加されてもよい。さらに、以下の説明で示される1つのブロックが複数のブロックに分割されてもよいし、複数のブロックが1つのブロックに統合されてもよい。また、以下に示す各機能ブロックは、ソフトウェアプログラムとして機能が実施されるものとするが、本機能ブロックに含まれる一部または全部がハードウェア化されていてもよい。
 図1は、本実施形態に係る第1送電装置401の内部構成例を示すブロック図である。また、図2は、本実施形態による第1受電装置411の内部構成例を示すブロック図である。なお、第2送電装置402および第2受電装置412も、それぞれ第1送電装置401および第1受電装置402と同様の構成を有しているものとする。第1送電装置401は、例えば、制御部101、電源部102、送電回路部103、第1通信部104、送電アンテナ105、第2通信部106、及びメモリ107を有する。
 制御部101は、第1送電装置401全体を制御する。また、制御部101は、第1送電装置401における機器認証のための通信を含む送電制御に関する制御を行う。さらに、制御部101は、無線電力伝送以外のアプリケーションを実行するための制御を行ってもよい。制御部101は、例えばCPU(Central Processing Unit)又はMPU(Micro Processor Unit)等の1つ以上のプロセッサーを含んで構成される。なお、制御部101は、特定用途向け集積回路(ASIC:Application Specific Integrated Circuit)等のハードウェアで構成されてもよい。また、制御部101は、所定の処理を実行するようにコンパイルされたFPGA(Field Programmable Gate Array)等のアレイ回路を含んで構成されてもよい。制御部101は、各種処理を実行中に記憶しておくべき情報をメモリ107に記憶させる。また、制御部101は、タイマ(不図示)を用いて時間を計測する。
 電源部102は、少なくとも制御部101及び送電回路部103が動作する際の電力を供給する電源である。電源部102は、例えば、商用電源から電力の供給を受ける有線受電回路やバッテリ等でありうる。バッテリには、商用電源から供給される電力が蓄電される。
 送電回路部103は、電源部102から入力される直流又は交流電力を、無線電力伝送に用いる周波数帯の交流周波数電力に変換する。そして、その交流周波数電力を送電アンテナ105へ出力することによって、第1受電装置411に受電させるための電磁波を発生させる。例えば、送電回路部103は、電源部102が供給する直流電圧を、FET(Field Effect Transistor)を使用したハーフブリッジ又はフルブリッジ構成のスイッチング回路で交流電圧に変換する。この場合、送電回路部103は、FETのON/OFFを制御するゲートドライバを含む。
 また、送電回路部103は、送電アンテナ105に出力する電圧(送電電圧)又は電流(送電電流)、又はその両方を調節することにより、出力させる電磁波の強度を制御する。送電電圧又は送電電流を大きくすると電磁波の強度が強くなり、送電電圧又は送電電流を小さくすると電磁波の強度が弱くなる。また、送電回路部103は、制御部101の指示に基づいて、送電アンテナ105からの送電が開始又は停止されるように、交流電力の出力制御を行う。また、送電回路部103はWPC(Wireless Power Consortium)規格に対応した第1受電装置411の充電部206に15ワット(W)の電力を出力するだけの電力を供給する能力があるものとする。
 第1通信部104は、第1受電装置411の第1通信部203との間で、WPC規格に基づく送電制御のための通信を行う。第1通信部104は、送電アンテナ105から出力される電磁波を変調し、第1受電装置411へ情報を伝送して、通信を行う。このとき、第1送電装置401は周波数偏移変調(FSK)による変調を行う。また、第1通信部104は、第1受電装置411が変調した送電アンテナ105から送電される電磁波を復調して、第1受電装置411が送信した情報を取得する。このとき第1受電装置411は、後述するように負荷変調あるいは振幅変調による変調を行う。すなわち、第1通信部104で行う通信は、送電アンテナ105から送電される電磁波に信号が重畳されて行われる。また、第1通信部104は、送電アンテナ105とは異なるアンテナを用いたWPC規格とは異なる規格による通信で第1受電装置411と通信を行ってもよいし、複数の通信を選択的に用いて第1受電装置411と通信を行ってもよい。
 本実施形態では、第1通信部104を介した上述の通信はインバンド通信により行われる。また、本実施形態では、第1送電装置401は、制御通信にインバンド通信のみを使用する場合は、同様にインバンド通信を使用する第1受電装置411の充電部206に最大15ワットの電力を出力するだけの電力を供給できるものとする。
 第2通信部106は、第1受電装置411の第2通信部204との間で、WPC規格に基づいた無線電力伝送の制御通信を行う。第2通信部106は、送電回路部103の周波数と異なる周波数を使用し、送電アンテナ105と異なる不図示のアンテナを使用して、アウトオブバンド通信を行う。本実施形態では、第2通信部106がBLEに対応しているものとするが、これに代えて、NFCやWiFi等の他の無線通信方式に対応する通信部が用いられてもよい。なお、第2通信部106は、第1通信部104と共用であってもよい。この場合、第1通信部104と第2通信部106を兼ねる通信部が、送電アンテナ105を介する通信と、不図示のアウトオブバンド通信を行うアンテナを介する通信を行う。
 本実施形態では、第1送電装置401は、第1受電装置411との間での制御通信にアウトオブバンド通信を使用する場合は、インバンド通信を使用する場合と比較して、第1受電装置411に大きい電力を供給することができるものとする。例えば、第1送電装置401は、アウトオブバンド通信によって制御通信を行う場合には、第1受電装置411の充電部206に出力される電力が最大100ワットとなるように、電力を供給することができるものとする。インバンド通信では、通信のために、送電電力に微小な電圧および電流の変化が重畳され、送電電力が大きくなると、送電回路部103や受電回路部202から発生するノイズが大きくなる。このため、インバンド通信を用いる場合は、通信のための微小な電圧および電流の変化を検出できるように、送電電力が制限される。一方、アウトオブバンド通信が用いられる場合は、このような制約がなくなるため、送電する電力を大きくすることができる。
 メモリ107は、制御プログラムを記憶するほかに、第1送電装置401及び第1受電装置411の状態(送電電力値、受電電力値等)なども記憶する。例えば、第1送電装置401の状態は制御部101により取得され、第1受電装置411の状態は第1受電装置411の制御部201により取得され、第1通信部104あるいは第2通信部106を介して受信される。メモリ107は、第1送電装置401や無線電力伝送システムの各要素および全体の状態を記憶する。
 なお、図1の例では、制御部101、電源部102、送電回路部103、第1通信部104、メモリ107、および第2通信部106が、それぞれ別個のブロックとして記載されている。一方で、これらのうちの2つ以上のブロックが1つのチップ等によってまとめられてもよい。また、1つのブロックが複数のブロックに分割されてもよい。
 次に、本実施形態に係る第1受電装置411の内部構成例について、図2を参照しながら説明する。第1受電装置411は、例えば、制御部201、受電回路部202、第1通信部203、第2通信部204、受電アンテナ205、充電部206、バッテリ207、及びメモリ208を有する。
 制御部201は、例えばメモリ208に記憶されている制御プログラムを実行することにより第1受電装置411全体を制御する。すなわち、制御部201は、図2で示す各機能部を制御する。さらに、制御部201は、無線電力伝送以外のアプリケーションを実行するための制御を行ってもよい。制御部201の一例は、CPU又はMPU等の1つ以上のプロセッサーを含んで構成される。なお、制御部201が実行しているOS(Operating System)との協働により第1受電装置411全体を制御するようにしてもよい。
 また、制御部201は、ASIC等のハードウェアで構成されてもよい。また、制御部201は、所定の処理を実行するようにコンパイルされたFPGA等のアレイ回路を含んで構成されてもよい。制御部201は、各種処理を実行中に記憶しておくべき情報をメモリ208に記憶させる。また、制御部201は、タイマ(不図示)を用いて時間を計測しうる。
 受電回路部202は、受電アンテナ205を介して、第1送電装置401の送電アンテナ105から放射された電磁波に基づく電磁誘導により生じた交流電力(交流電圧及び交流電流)を取得する。そして、受電回路部202は、交流電力を直流又は所定周波数の交流電力に変換して、バッテリ207を充電するための処理を行う充電部206に電力を出力する。すなわち、受電回路部202は、受電装置における負荷に対して電力を供給するために必要な、整流部と電圧制御部を含む。上述のGPは、受電回路部202から出力されることが保証される電力量である。受電回路部202は、充電部206がバッテリ207を充電するための電力を供給し、充電部206に15ワットの電力を出力するだけの電力を供給する能力があるものとする。
 第1通信部203は、第1送電装置401の第1通信部104との間で、WPC規格に基づいた無線電力伝送のための制御通信を行う。第1通信部203は、受電アンテナ205から入力された電磁波を復調して第1送電装置401から送信された情報を取得する。
 そして、第1通信部203は、その入力された電磁波を負荷変調あるいは振幅変調することによって第1送電装置401へ送信すべき情報に関する信号を電磁波に重畳することにより、第1送電装置401との間で通信を行う。この制御通信は、受電アンテナ205で受電する電磁波を負荷変調あるいは振幅変調するインバンド通信によって行われる。本実施形態では、第1受電装置411は、第1送電装置401との間の通信にインバンド通信のみを使用する場合、第1送電装置401から無線で電力を受電し、充電部206に最大で15ワットの電力を出力できるものとする。
 第2通信部204は、第1送電装置401の第2通信部106との間で、WPC規格に基づいた無線電力伝送の制御通信を行う。第2通信部204は、受電回路部202が受電する電磁波の周波数と異なる周波数を使用し、受電アンテナ205とは異なる不図示のアンテナを使用してアウトオブバンド通信を行う。本実施形態では、第2通信部204がBLEに対応しているものとするが、これに代えて、NFCやWi-Fi等の他の無線通信方式に対応する通信部が用いられてもよい。なお、第2通信部204は、第1通信部203と共用であってもよい。この場合、第1通信部203と第2通信部204を兼ねる通信部が、受電アンテナ205を介する通信と、不図示のアウトオブバンド通信を行うアンテナを介する通信を行う。また、第2通信部204は、バッテリ207から電力供給を受けてもよいし、受電回路部202から直接電力供給を受けてもよい。なお、本実施形態では、第1受電装置411は、第1送電装置401との間の通信にアウトオブバンド通信を使用する場合は、第1送電装置401から無線で電力を受電し、充電部206に最大で100ワットの電力を出力できるものとする。
 充電部206は、受電回路部202から供給される直流電圧と直流電流を利用して、バッテリ207を充電する。
 メモリ208は、制御プログラムを記憶するほかに、第1送電装置401及び第1受電装置411の状態なども記憶する。例えば、第1受電装置411の状態は制御部201により取得され、第1送電装置401の状態は第1送電装置401の制御部101により取得され、第1通信部203あるいは第2通信部204を介して受信される。
 なお、図2の例では、制御部201、受電回路部202、第1通信部203、第2通信部204、充電部206、及びメモリ208が、それぞれ別個のブロックとして記載されている。一方で、これらのうちの2つ以上のブロックが1つのチップ等によってまとめられてもよい。また、1つのブロックが複数のブロックに分割されてもよい。
 また、以下の説明では、送電装置または受電装置がアウトオブバンド通信による制御通信に対応していることを、WPC規格のバージョンAに対応していると表す。WPC規格のバージョンAは、WPCv1.2.3の後継の規格であり、少なくともアウトオブバンド通信による制御通信機能が追加されているものとする。
 次に、図3を参照して、第1送電装置401の制御部101の機能について説明する。図3は、第1送電装置401の制御部101の機能構成例を示すブロック図である。なお、第2送電装置402も同様の機能構成を有しているものとする。制御部101は、通信制御部301、送電制御部302、測定部303、設定部304、および異物検出部305を有する。
 通信制御部301は、第1通信部104あるいは第2通信部106を介したWPC規格に基づいた第1受電装置411との制御通信を行う。送電制御部302は、送電回路部103を制御し、第1受電装置411への送電を制御する。測定部303は、送電回路部103を介して第1受電装置411に対して送電する電力を計測し、単位時間ごとに平均送電電力を測定する。また、測定部303は、送電アンテナ105の品質係数(Q値)を測定する。
 設定部304は、測定部303により測定された平均送電電力あるいはQ値に基づいて、異物を検出するために用いる閾値を、例えば算出処理により設定する。また、設定部304は、その他の手法を用いた異物検出処理を行う上で必要となる、異物の有無を判定するための基準となる閾値を設定する機能を有してもよい。
 異物検出部305は、設定部304により設定された閾値と、測定部303により測定された送電電力やQ値に基づいて、異物検出処理を行う。また、異物検出部305は、その他の手法を用いて異物検出処理を行うための機能を有してもよい。例えばNFC通信機能を備える送電装置においては、異物検出部305は、NFC規格による対向機検出機能を用いて異物検出処理を行ってもよい。また、異物検出部305は、異物を検出する以外の機能として、第1送電装置401上の状態が変化したことを検出する。例えば、第1送電装置401は、第1送電装置401上の受電装置の数の増減も、検出することが可能である。
 通信制御部301、送電制御部302、測定部303、設定部304、および異物検出部305は、制御部101において動作するプログラムとしてその機能が実現される。各処理部は、それぞれが独立したプログラムとして構成され、イベント処理等によりプログラム間の同期をとりながら並行して動作しうる。ただし、これらの処理部のうち2つ以上が1つのプログラムに組み込まれていてもよい。
 本システムでは、WPC規格に基づいて、無線充電のための電磁誘導方式を用いた無線電力伝送を行う。すなわち、第1受電装置411と第1送電装置401は、第1受電装置411の受電アンテナ205と第1送電装置401の送電アンテナ105との間で、WPC規格に基づく無線充電のための無線電力伝送を行う。なお、本システムに適用される無線電力伝送方式は、WPC規格で規定された方式に限られず、他の電磁誘導方式、磁界共鳴方式、電界共鳴方式、マイクロ波方式、レーザー等を利用した方式であってもよい。また、本実施形態では、無線電力伝送が無線充電に用いられるものとするが、無線充電以外の用途で無線電力伝送が行われてもよい。以下、第1受電装置411と第1送電装置401との間の処理について説明するが、第2受電装置412および第2送電装置402についても、WPC規格に基づいて同様の処理を行うものとする。
 WPC規格では、第1受電装置411が第1送電装置401から受電する際に保証される電力の大きさが、Guaranteed Power(以下、「GP」と呼ぶ)と呼ばれる値によって規定される。GPは、例えば第1受電装置411と第1送電装置401の位置関係が変動して受電アンテナ205と送電アンテナ105との間の送電効率が低下しても、第1受電装置411の負荷(例えば、充電用の回路、バッテリー等)への出力が保証される電力値を示す。例えばGPが5ワットの場合、受電アンテナ205と送電アンテナ105の位置関係が変動して送電効率が低下したとしても、第1送電装置401は、第1受電装置411内の負荷へ5ワットを出力することができるように制御して送電を行う。
 また、送電装置から受電装置へ送電を行う際に、送電装置の近傍に受電装置ではない物体として異物が存在する場合、送電のための電磁波が異物に影響して異物の温度を上昇させたり異物を破壊したりしてしまう虞がある。そこでWPC規格では、異物が存在する場合に送電を停止することで異物の温度上昇や破壊を防げるように、送電装置が送電装置の上に異物が存在することを検出する手法が規定されている。具体的には、送電装置における送電電力と受電装置における受電電力の差分により異物を検出するパワーロス法が規定されている。また、WPC規格では、異物検出方法として、送電装置における送電アンテナ(送電コイル)の品質係数(Q値)の変化により異物を検出するQ値計測法が規定されている。なお、本実施形態における第1送電装置401が検出する異物は第1送電装置401の上に存在する物体に限定されない。第1送電装置401は、第1送電装置401の近傍に位置する異物を検出すればよく、例えば第1送電装置401が送電可能な範囲に位置する異物を検出することとしてもよい。
 [パワーロス法に基づく異物検出方法]
 次に、WPC規格で規定されているパワーロス法に基づく異物検出方法について、図12を用いて説明する。図12の横軸は第1送電装置401の送電電力を表し、縦軸は第1受電装置411の受電電力を表す。ここで異物とは、第1送電装置401から第1受電装置411への送電に影響しうる、第1受電装置411以外の物体であり、例えば導電性を有する金属片等の物体である。
 まず、第1送電装置401は第一送電電力値Pt1で第1受電装置411に対して送電を行う。第1受電装置411は、第一受電電力値Pr1で受電する(この状態をLight Loadの状態(軽負荷状態)という)。そして、第1送電装置401は第一送電電力値Pt1を記憶する。ここで、第一送電電力値Pt1、又は第一受電電力値Pr1は、予め定められた最小の送電電力又は受電電力である。このとき、第1受電装置411は受電する電力が最小の電力となるように、負荷(充電回路やバッテリなど)を制御する。例えば、第1受電装置411は、受電した電力が負荷に供給されないように、受電アンテナ205から負荷を切断してもよい。
 続いて、第1受電装置411は、第一受電電力値Pr1を第1送電装置401に報告する。第1受電装置411から第一受電電力値Pr1の情報を受信した第1送電装置401は、第1送電装置401と第1受電装置411との間の電力損失Pt1-Pr1(=Ploss1)を算出する。そして、第一送電電力値Pt1と第一受電電力値Pr1との対応を示すキャリブレーションポイント1200を作成する。
 続いて、第1送電装置401は、送電電力値を第二送電電力値Pt2に変更し、第1受電装置411に対して送電を行う。第1受電装置411は、第二受電電力値Pr2で受電する(この状態をConnected Loadの状態(負荷接続状態)という)。そして、第1送電装置401は第二送電電力値Pt2を記憶する。ここで、第二送電電力値Pt2、又は第二受電電力値Pr2は、予め定められた最大の送電電力又は受電電力である。このとき、受電装置は受電する電力が最大の電力となるように、負荷を制御する。例えば、受電装置は、受電した電力が負荷に供給されるように、受電アンテナ205と負荷を接続する。
 続いて、第1受電装置411は第二受電電力値Pr2を第1送電装置401に報告する。第1受電装置411から第二受電電力値Pr2の情報を受信した第1送電装置401は、第1送電装置401と第1受電装置411との間の電力損失Pt2-Pr2(=Ploss2)を算出する。そして、第二送電電力値Pt2と第二受電電力値Pr2との対応を示すキャリブレーションポイント1201を作成する。
 そして、第1送電装置401は、キャリブレーションポイント1200とキャリブレーションポイント1201との間を直線補間する直線1202を作成する。直線1202は第1送電装置401と第1受電装置411の近傍に異物が存在しない状態における送電電力と受電電力の関係を示している。第1送電装置401は直線1202に基づいて、異物がない状態において所定の送電電力で送電した場合に第1受電装置411が受電する電力値を予想することができる。例えば、第1送電装置401が第三送電電力値Pt3で送電した場合は、直線1202上のPt3に対応する点1203から、第1受電装置411が受電する第三受電電力値はPr3になると推測することができる。
 以上のように、負荷を変えながら測定した第1送電装置401の送電電力値と第1受電装置411の受電電力値との複数の組み合わせに基づいて、負荷に応じた第1送電装置401と第1受電装置411との間の電力損失を求めることができる。また、複数の組み合わせからの補間により、すべての負荷に応じた第1送電装置401と第1受電装置411との間の電力損失を推定することができる。このように、第1送電装置401が送電電力値と受電電力値との組み合わせを取得するために第1送電装置401と第1受電装置411とが行うキャリブレーション処理を、以下では「パワーロス法のキャリブレーション処理(CAL処理)」と呼ぶ。
 CAL処理後、実際に第1送電装置401が第三送電電力値Pt3で第1受電装置411に送電した場合に、第1送電装置401が第1受電装置411から受電電力値Pr3’を受信したとする。第1送電装置401は異物が存在しない状態における第三受電電力値Pr3から実際に第1受電装置411から受信した受電電力値Pr3’を引いた値Pr3-Pr3’(=Ploss_FO)を算出する。この電力値Ploss_FOは、第1送電装置401と第1受電装置411の近傍に異物が存在する場合に、その異物で消費される電力による電力損失と考えることができる。よって、異物で消費されたであろう電力値Ploss_FOがあらかじめ決められた閾値を超えた場合に、異物が存在すると判定することができる。
 あるいは、第1送電装置401は、事前に、異物が存在しない状態における第三受電電力値Pr3から、第1送電装置401と第1受電装置411との間の電力損失Pt3-Pr3(=Ploss3)を求めておく。そして第1送電装置401は、異物が存在する状態において第1受電装置411から受信した受電電力値Pr3’から、異物が存在する状態での第1送電装置401と第1受電装置411との間の電力損失Pt3-Pr3’(=Ploss3’)を求める。そして、Ploss3’-Ploss3(=Ploss_FO)を用いて、異物で消費されたであろう電力値Ploss_FOを推定してもよい。
 以上のように、異物で消費されたで電力値Ploss_FOの求め方としては、Pr3-Pr3’(=Ploss_FO)として求めてもよいし、Ploss3’-Ploss3(=Ploss_FO)として求めてもよい。本実施形態においては、基本的にPloss3’-Ploss3(=Ploss_FO)として求める方法について説明するが、Pr3-Pr3’(=Ploss_FO)として求める方法も適用可能である。
 [電力伝送が実行されるまでの各フェーズの説明]
 パワーロス法による異物検出は、後述するCalibrationフェーズにより得られたデータを基に、電力伝送(送電)中(後述のPower Transferフェーズ)に実施される。また、Q値計測法による異物検出は、電力伝送前(後述のDigital Ping送信前、NegotiationフェーズまたはRenegotiationフェーズ)に実施される。
 本実施形態における第1受電装置411と第1送電装置401は、WPC規格に基づく送受電制御のための通信を行う。WPC規格では、電力伝送が実行されるPower Transferフェーズと、実際の電力伝送前の1以上のフェーズとを含んだ、複数のフェーズが規定され、各フェーズにおいて必要な送受電制御のための通信が行われる。電力伝送前のフェーズは、Selectionフェーズ、Pingフェーズ、Identification and Configurationフェーズ、Negotiationフェーズ、Calibrationフェーズを含む。なお、以下では、Identification and ConfigurationフェーズをI&Cフェーズと呼ぶ。以下、各フェーズの基本的な処理について説明する。
 Selectionフェーズでは、第1送電装置401が、Analog Pingを間欠的に送信し、物体が第1送電装置401に載置されたこと(例えば不図示の充電台に受電装置や導体片等が載置されたこと)を検出する。第1送電装置401は、Analog Pingを送信した時の送電アンテナ105の電圧値と電流値の少なくとも何れか一方を検出し、電圧値がある閾値を下回る場合又は電流値がある閾値を超える場合に物体が存在すると判断し、Pingフェーズに遷移する。
 Pingフェーズでは、第1送電装置401が、Analog Pingより電力が大きいDigital Pingを送信する。Digital Pingの電力の大きさは、第1送電装置401の上に載置された第1受電装置411の制御部201が起動するのに十分な電力である。第1受電装置411は、受電電圧の大きさを第1送電装置401へ通知する。このように、第1送電装置401は、そのDigital Pingを受信した第1受電装置411からの応答を受信することにより、Selectionフェーズにおいて検出された物体が第1受電装置411であることを認識する。第1送電装置401は、受電電圧値の通知を受けると、I&Cフェーズに遷移する。また、第1送電装置401はDigital Pingを送信する前に、送電アンテナ(送電コイル)105のQ値(Q-Factor)を測定する。この測定結果は、Q値計測法を用いた異物検出処理を実行する際に使用される。
 I&Cフェーズでは、第1送電装置401は、第1受電装置411を識別し、第1受電装置411から機器構成情報(能力情報)を取得する。第1受電装置411は、ID Packet及びConfiguration Packetを送信する。ID Packetには第1受電装置411の識別子情報が含まれ、Configuration Packetには、受電装置の機器構成情報(能力情報)が含まれる。ID Packet及びConfiguration Packetを受信した第1送電装置401は、アクノリッジ(ACK、肯定応答)で応答する。そして、I&Cフェーズが終了し、次のNegotiationフェーズに移行する。
 Negotiationフェーズでは、第1受電装置411が要求するGPの値や第1送電装置401の送電能力等に基づいてGPの値が決定される。また、第1送電装置401は、第1受電装置411からの要求に従って、Q値計測法を用いた異物検出処理を実行する。また、WPC規格では、一旦後述のPower Transferフェーズに移行した後、第1受電装置411の要求によって再度Negotiationフェーズと同様の処理を行う方法が規定されている。以下、Power Transferフェーズから移行してこれらの処理を行うフェーズのことをRenegotiationフェーズと呼ぶ。
 Calibrationフェーズでは、WPC規格に基づいてキャリブレーション処理を実施する。また、第1受電装置411が所定の受電電力値(軽負荷状態における受電電力値/最大負荷状態における受電電力値)を第1送電装置401へ通知し、第1送電装置401が、効率よく送電するための調整を行う。第1送電装置401へ通知された受電電力値は、パワーロス法による異物検出処理のために使用される。
 Power Transferフェーズでは、送電の開始、継続、及びエラーや満充電による送電停止等のための制御が行われる。第1送電装置401と第1受電装置411は、これらの送受電制御のために、WPC規格に基づいて無線電力伝送を行う際に使用する送電アンテナ105及び受電アンテナ205を用いて、これらのアンテナから送信される電磁波に信号を重畳して通信を行う。なお、第1送電装置401と第1受電装置411との間で、WPC規格に基づく通信が可能な範囲は、第1送電装置401の送電可能範囲とほぼ同様である。
 (処理の流れ)
 続いて、アウトオブバンド通信としてBLEを使用する場合の、各装置において実行される処理の流れの例について説明するとともに、システム全体の処理の流れの例について説明する。特に、アウトオブバンド通信の開始時の一連の処理の実行条件について以下に説明する。また前述した通り、第1送電装置401はBLEのセントラルとして機能し、第1受電装置411はBLEのペリフェラルとして機能するものとする。
 [送電装置の動作]
 図5は、本実施形態における第1送電装置401が実行する基本的な処理手順の一例を示すフローチャートである。なお、本処理は、送電回路部103が電源部102から電源供給を受ける等によって電源が投入されて起動したことに応じて開始される。また、本処理は、制御部101が、メモリ107に記憶されたプログラムを実行することによって実現される。ただし、これらに限られず、例えばユーザによる所定のボタンの押下等の操作によって電力伝送機能が起動されたことに応じて、本処理が実行されてもよい。また、図5に示される処理の少なくとも一部がハードウェアによって実現されてもよい。少なくとも一部の処理がハードウェアによって実現される場合、例えば、その処理ステップを実現するためのプログラムから、所定のコンパイラを用いてFPGA上に自動的に生成された専用回路が用いられる。また、FPGAと同様に、ゲートアレイ回路によって、所定の処理ステップを実行するためのハードウェアが実現されてもよい。
 第1送電装置401は、本処理が開始されると、WPC規格に準拠した処理を開始する。WPC規格では、Selectionフェーズ、Pingフェーズ、I&Cフェーズによって相手装置が特定される。そして、Negotiationフェーズにおいて、送電電力に関する交渉が実行され、その後、電力伝送のためのCalibrationフェーズを経て、実際の電力伝送を行うPower Transferフェーズの処理が実行される。
 図5のS501において、第1送電装置401の制御部101は、まず、Selectionフェーズ及びPingフェーズの処理を実行する。具体的には、第1送電装置401は、まず、Selectionフェーズにおいて、送電アンテナ(送電コイル)105を介してAnalog Pingを送電する。ここで、Analog Pingは、送電アンテナ(送電コイル)105の近傍に存在する物体を検出するための微小な電力である。第1送電装置401は、Analog Pingを送電した時の送電アンテナ(送電コイル)105の電圧値又は電流値を検出し、電圧がある閾値を下回る場合又は電流値がある閾値を超える場合に物体が近傍に存在すると判断し、Pingフェーズに移行する。ここでは、ユーザにより第1送電装置401上に第1受電装置411が載置されたものとする。
 そして、Pingフェーズにおいて、第1送電装置401は、Analog Pingより大きいDigital Pingを送電する。ここで、Digital Pingは、送電アンテナ(送電コイル)105の近傍に存在する第1受電装置411の制御部201、第1通信部203、及び第2通信部204が起動するのに十分な電力を有する。第1受電装置411の制御部201及び第1通信部203は、受電アンテナ(受電コイル)205を介して受電したDigital Pingにより起動すると、第1通信部203によるインバンド通信で受電電圧の大きさを第1送電装置401へ通知する。第1送電装置401は、第1通信部104を介して受電電圧値の通知を受けると、Pingフェーズの処理を終了し、I&Cフェーズに移行する。
 次に、S502において制御部101は、第1通信部104を介して第1受電装置411によって送信されたIdentification Packetを受信する。このとき、制御部101は、パケットの送信元である第1受電装置411がWPC規格のバージョンAに対応しているか否かの情報と、少なくともバージョンAより前のバージョンのWPC規格で使用する第1受電装置411の個体識別情報を取得する。また、制御部101は、第1通信部104を介してさらに第1受電装置411によって送信されたConfiguration Packetを受信する。
 次に、S503において、制御部101は、S502でConfiguration Packetを受信したことの応答として、第1通信部104を介してインバンド通信によりアクノリッジ(ACK)を送信する。
 続いてS511において、制御部101は、所定時間内に第1受電装置411からの能力情報の問い合わせがあったか否かを判定する。この能力情報の問い合わせは、WPC規格で規定されているデータであるGeneral Requestが第1受電装置411から第1送電装置401へ送信されることによって行われる。以下、このような能力情報を問い合わせるGeneral Requestを、「General Req(Capability)」と呼ぶ。
 S511の判定の結果、General Req(Capability)を受信しなかった場合は、S542に進む。そして、S542において、制御部101は、アウトオブバンド通信を使用しないことを決定する。そして、Negotiationフェーズに移行し、S543において、制御部101は、アウトオブバンド通信の使用が不可能であることから、GPの許容値を15ワットに設定し、S532に進む。
 一方、S511の判定の結果、General Req(Capability)を受信した場合は、S512に進む。そして、S512において、制御部101は、自装置がBLEを使用可能な状態にあるか否かを判定する。この判定の結果、自装置がBLEを使用可能な状態でない場合は、S541に進む。そして、S541において、制御部101は、Power Transmitter Capability PacketのBLE対応情報を「対応していない」ことを表す情報に設定し、第1通信部104を介して第1受電装置411へ送信する。そして、S542に進む。このとき送信するPower Transmitter Capability Packetは、GPの最大値など、送電装置の能力に関する情報を含み、本実施形態では、さらにBLE対応情報も含むものとする。以下、Power Transmitter Capability Packetのことを「TX Capability Packet」と呼ぶ。
 また、S512の判定では、自装置がBLE通信機能を有しているか否か、BLEのペリフェラルとして動作しているか否か、BLEを他の装置との間で使用中であるか等に基づいて、現時点でBLEによる通信が実行可能であるか否かを判定する。例えば、自装置がBLEのセントラルである場合は、複数のペリフェラルと接続可能であるため、BLEが使用可能な状態にあると判定する。また、自装置が他の装置とBLEによる通信を行っていない場合も、BLEを使用可能な状態にあると判定する。一方、自装置がペリフェラルとして他の装置とBLEによる通信を行っている場合は、BLEを使用可能な状態でないと判定する。
 また、S512の判定は、第1送電装置401と接続されている製品(例えばプリンタなど)の制御部との通信により行ってもよい。例えば、第1送電装置401の制御部101と、製品の制御部とをGPIO(General Purpose Input/Output)やシリアル通信で接続し、第1送電装置401の制御部101が製品の制御部へBLEの使用状況を問い合わせてもよい。製品の制御部からBLEの使用状況についての応答としてBLEを使用中であることを示す場合は、制御部101はその時点でBLEを使用可能な状態でないと判定する。また、その応答がBLEを使用中でないことを示す場合は、制御部101はBLEを使用可能な状態にあると判定する。
 S512の判定の結果、自装置がBLEを使用可能な状態にある場合は、S513に進む。そして、S513において、制御部101は、TX Capability PacketのBLE対応情報を「BLEは使用可能」であることを表す情報に設定する。そして、第1通信部104を介して第1受電装置411へTX Capability Packetを送信する。
 続いてS514において、制御部101は、所定時間内に第1受電装置411から、第1通信部104を介して第1送電装置401のBLEの個体識別情報を問い合わせる信号を受信したか否かを判定する。この信号は、例えば、WPC規格のGeneral Requestであり、以下、BLEの個体識別情報を問い合わせるGeneral Requestを「General Req(ID)」と呼ぶ。この判定の結果、第1受電装置411からGeneral Req(ID)を受信しなかった場合は、第1受電装置411との間でBLEによる通信を行うことができないため、S542に進む。
 一方、S514の判定の結果、第1受電装置411からGeneral Req(ID)を受信した場合は、S515に進む。そして、S515において、制御部101は、第1通信部104を介して自装置のBLEについてのBD_ADDRを含んだ応答を第1受電装置411へ送信する。この応答は、WPC規格で規定されているPower Transmitter Identification Packet(以下、「TX ID Packet」と呼ぶ。)である。TX ID Packetには、送電装置が対応しているWPC規格のバージョンや、送電装置のインバンド通信に係る機能ブロックの製造者等による識別番号が含まれる。さらに、バージョンAに対応した送電装置は、このTX ID Packetに、BLEのBD_ADDRを含めることができる。これにより、第1受電装置411は、第1送電装置401のWPC規格における識別情報と、BLEにおける個体識別情報(BD_ADDR)とを関連付けて認識することができるようになる。ここでBD_ADDRは、前述したように、例えば、第1送電装置401の製造元や、BLEの通信機能(第2通信部106)の個体識別情報を示す、BLE規格で規定されたPublic Addressである。
 次に、S516において、制御部101は、所定時間内に第1受電装置411から、第1通信部104を介して第1受電装置411に対してBLEの個体識別情報を問い合わせることを要求する信号を受信したか否かを判定する。この信号は、例えば、WPC規格のGeneral Requestである。以下、BLEの識別情報を問い合わせることを要求するGeneral Requestを「General Req(OOB ID Req)」と呼ぶ。この判定の結果、第1受電装置411からGeneral Req(OOB ID Req)を受信しなかった場合は、第1受電装置411との間でBLEによる通信を行うことができないため、S542に進む。
 一方、S516の判定の結果、General Req(OOB ID Req)を受信した場合は、S517に進む。そして、S517において、制御部101は、第1通信部104を介して第1受電装置411に対して、BLEの個体識別情報を問い合わせるOOB ID Req Packetを送信する。
 次にS518において、制御部101はS517で送信したOOB ID Req Packetの応答として、所定時間内に第1通信部104を介してバージョンAに対応した第1受電装置411からOOB ID Packetを受信したか否かを判定する。このOOB ID Packetには、アウトオブバンド通信で使用する個体識別情報を含めることができ、ここではBLEのBD_ADDRを含める。これにより、第1送電装置401が、第1受電装置411のWPC規格における識別情報と、BLEにおける個体識別情報(BD_ADDR)とを関連付けて認識することができるようになる。この判定の結果、第1受電装置411からOOB ID Packetを受信しなかった場合は、第1受電装置411との間でBLEによる通信を行うことができないため、S542に進む。なお、それ以前において、第1受電装置411のBD_ADDRを取得してメモリ107に保持しており、S518で第1受電装置411からOOB ID Packetを受信しなかったと判定した場合は、その情報を破棄するようにしてもよい。
 一方、S518の判定の結果、第1受電装置411からOOB ID Packetを受信した場合は、第1受電装置411との間でBLEによる通信を行うことが可能であることから、S519に進む。そして、S519において、制御部101は、OOB ID Packetに含まれる第1受電装置411のBD_ADDRをメモリ107に保持する。この時保持するBD_ADDRは、例えば、第1受電装置411の製造元や、BLEの通信機能(第2通信部204)の個体識別情報を示す、BLE規格で規定されたPublic Addressである。
 WPC規格のバージョンAに準拠している第1送電装置401は、このOOB ID Packetを受信したか否かを監視することにより、第1受電装置411がその時点でBLEを使用可能であるか否かを判定することができる。これにより、WPC規格のバージョンAに準拠していない受電装置がBLEでの通信を実行可能であるように送電装置が誤解することを防ぐことができる。なお、BLEに限定しないアウトオブバンド通信による通信を実行可能な状態にあるかが示されてもよい。また、BLE以外のアウトオブバンド通信に利用可能な通信方式のそれぞれについて、実行可能か否かを示す、BLE対応情報と同様の領域が設けられてもよい。例えば、NFC通信機能を有するか否かを示すNFC対応情報等が設けられてもよい。
 次に、S520において、制御部101は、第1受電装置411とのBLEによる通信を試行するために、自装置のBLE通信機能をScannerとして起動する。なお、Scannerは、BLE規格で定義されている状態の1つであり、ブロードキャスト送信されるADVERTISE_INDICATIONを受信して、その送信元のBLEデバイス(またはサービス)を発見する。以下、このADVERTISE_INDICATIONをADV_INDと呼ぶ。ADV_INDは、BLE規格で定義されているAdvertiserの状態のデバイスによってブロードキャスト送信され、そのデバイスのBD_ADDRや対応しているサービス情報を報知するための信号である。
 S521において、制御部101は、第2通信部106を介してADV_INDを受信したか否かを判定する。この判定の結果、ADV_INDを受信しなかった場合は、S551に進む。そして、S551において、制御部101は、タイムアウトしたか否かを判定する。この判定の結果、タイムアウトした場合にはS542に進む。一方、S551の判定の結果、タイムアウトしていない場合はS521に戻り、ADV_INDを待ち受ける。
 S521の判定の結果、ADV_INDを受信した場合は、S522に進む。そして、S522において、制御部101は、受信したADV_INDがS519でメモリ107に保持されたBD_ADDRに対応するADV_INDであるか否かを判定する。この判定の結果、メモリ107に保持されたBD_ADDRに対応するADV_INDでなかった場合は、S551に進む。
 一方、S522の判定の結果、メモリ107に保持されたBD_ADDRに対応するADV_INDである場合は、S523に進む。そして、S523において、制御部101は、第2通信部106を介してBLEによる接続要求メッセージをそのBD_ADDRに宛てて送信する。すなわち、制御部101は、タイムアウト前に第1受電装置411からのADV_INDを受信した場合に、第2通信部106を介してBLEによる接続要求メッセージを第1受電装置411へ送信する。この接続要求メッセージは、BLE規格で規定されたCONNECT_REQ(以下、「CONNECT」と呼ぶ。)である。そして、第1送電装置401は、Negotiationフェーズへと移行する。ここでは、BLEによる通信が可能な状態であるため、Negotiationフェーズにおける交渉はBLEによる通信(アウトオブバンド通信)を用いて実行される。
 なお、第1送電装置401は、ADV_INDを受信した場合であっても、それがメモリ107に保持されたBD_ADDRに対応するADV_INDでない場合(S522でNO)にはCONNECTを送信しないようにしている。すなわち、電力伝送のためのBLEによる通信を試行する段階においては、第1送電装置401はそのような用途とは異なる用途でのBLEの接続が確立されないように、CONNECTを送信する対象を限定する。
 その後、Negotiationフェーズに移行すると、S531において、制御部101は、アウトオブバンド通信の使用が可能であることから、GPの許容値を100ワット(W)に設定する。
 次に、S532において、制御部101は、第1受電装置411とGPを交渉する。アウトオブバンド通信が可能である場合は、GPの交渉は第2通信部106を介して行われ、アウトオブバンド通信が不可能である場合は、インバンド通信によりGPの交渉は第1通信部104を介して行われる。また、Negotiationフェーズでは、制御部101は、必要に応じてQ値計測法を用いた異物検出処理なども行う。そして、Negotiationフェーズで必要な処理が終了すると、Calibrationフェーズに移行する。
 Calibrationフェーズに移行すると、S533において、制御部101は、Calibrationフェーズで必要な処理を実行する。具体的には、パワーロス法による異物検出処理のために必要なCAL処理などが実行される。そして、CAL処理が終了すると、Power Transferフェーズに移行する。
 Power Transferフェーズに移行すると、S534において、制御部101は、送電回路部103から送電アンテナ105を介して、第1受電装置411へ電力を伝送する。ここで、Power Transferフェーズでは、第1受電装置411から第1送電装置401へ送電電力の増減を要求する制御データが送信されるが、この通信は制御通信である。このため、BLE(アウトオブバンド通信)を利用可能な状況ではBLEによって行われる。
 その後、S535において、制御部101は、第1受電装置411から充電終了などによって電力伝送の停止を要求するEnd Power Transfer(EPT)を受信し、電力伝送処理を終了する。End Power Transfer(EPT)はWPC規格で規定されており、以下、「EPT」と呼ぶ。EPTの送受信も制御通信であるため、BLE(アウトオブバンド通信)を利用可能な状況ではBLEによって行われる。
 次に、アウトオブバンド通信の開始に必要な信号の送信処理であるS513、S515、およびS517について、図6A~図6Cを用いて詳細を説明する。図5の説明では、BLEによる通信を確立していないことを前提に、S513、S515およびS517でそれぞれ、TX Capability Packet、TX ID Packet、OOB ID Req Packetを送信するとした。一方で、第1受電装置411とBLEによる通信が既に確立しているにもかかわらず、これらのパケットが要求されることは、正常な動作ではないといえる。そこで本実施形態では、このような場合には、アウトオブバンド通信の代わりにインバンド通信を実行するようにする。具体的には、以下の図6A~図6Cの手順を採用することにより、アウトオブバンド通信(BLE)の開始のトリガとなるインバンド通信を用いた処理が実行されてしまうことを防止する。
 図6Aは、本実施形態において、第1受電装置411からGeneral Req(Capability)を受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図6Aに示す処理は、例えば、図5のS513の代わりに行われる処理であるが、その他のフェーズでGeneral Req(Capability)を受信した場合も同様に図6Aの処理が行われる。
 まず、S601aにおいて、制御部101は、すでに第1受電装置411とアウトオブバンド通信(BLEによる通信)を確立している否かを判定する。この判定の結果、第1受電装置411とアウトオブバンド通信を確立していない場合は、正常な動作であるため、S621aに進む。そして、S621aにおいて、制御部101は、TX Capability PacketのBLE対応情報を「BLEは使用可能」であることを表す情報に設定する。そして、第1通信部104を介して第1受電装置411へTX Capability Packetを送信し、図5のS514に進む。
 一方、S601aの判定の結果、すでに第1受電装置411とアウトオブバンド通信を確立している場合は、S602aに進む。そして、S602aにおいて、制御部101は図5のS542と同様の処理を行う。つまり、制御部101は、アウトオブバンド通信を使用しないことを決定する。これにより、アウトオブバンド通信が確立した後に、不要にもかかわらず、アウトオブバンド通信(BLE)の開始のトリガとなるインバンド通信を用いた処理が実行されてしまうことを防止することができる。よって、不要な消費電力、処理時間が発生することを防止できる。
 次のS603aは、図5のS543と同様である。そして、S604aにおいて、制御部101は、第2通信部106を介してBLEによる接続を切断することを示すLL_TERMINATE_IND(以下、「TERMINATE」と呼ぶ)を第1受電装置411に送信する。S605a~S608aは、それぞれ図5のS532~S535と同様である。この場合、これらの処理はインバンド通信により行われる。
 図6Bは、本実施形態において、第1受電装置411からGeneral Req(ID)を受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図6Bに示す処理は、例えば、図5のS515の代わりに行われる処理であるが、その他のフェーズでGeneral Req(ID)を受信した場合も同様に図6Bの処理が行われる。
 まず、S601bはS601aと同様の処理をある。この判定の結果、第1受電装置411とアウトオブバンド通信を確立していない場合は、正常な動作であるため、S621bに進む。そして、S621bにおいて、制御部101は、第1通信部104を介してTX ID Packetを第1受電装置411へ送信する。そして、図5のS516に進む。
 一方、S601bの判定の結果、すでに第1受電装置411とアウトオブバンド通信を確立している場合は、正常な動作ではないため、S602bに進む。S602b~S608bはそれぞれ、図6AのS602a~S608aと同様である。
 図6Cは、本実施形態において、第1受電装置411からGeneral Req(OOB ID Req)を受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図6Cに示す処理は、例えば、図5のS517の代わりに行われる処理であるが、その他のフェーズでGeneral Req(OOB ID Req)を受信した場合も同様に図6Cの処理が行われる。
 まず、S601cはS601aと同様の処理をある。この判定の結果、第1受電装置411とアウトオブバンド通信を確立していない場合は、正常な動作であるため、S621cに進む。そして、S621cにおいて、制御部101は、第1通信部104を介してOOB ID Req Packetを第1受電装置411へ送信する。そして、図5のS518に進む。
 一方、S601cの判定の結果、すでに第1受電装置411とアウトオブバンド通信を確立している場合は、正常な動作ではないため、S602cに進む。S602c~S608cはそれぞれ、図6AのS602a~S608aと同様である。
 前述したように、図6A~図6Cの処理は、I&Cフェーズに限らず、その後のフェーズ(Negotiationフェーズ、Calibrationフェーズ、Power Transferフェーズ)においても同様に実行される。例えば、Power Transferフェーズにおいて、第1受電装置411とBLEによる通信を確立している状態にもかかわらず、第1受電装置411からGeneral Req(ID)を受信する場合などがありうる。そこで、すでに第1受電装置411とBLE通信を確立しているため、Power Transferフェーズでも図6Bの処理に従って異常な動作と判断する。そして、第1送電装置401は、アウトオブバンド通信による送電制御を中断し、インバンド通信により送電制御を使用することにする。
 以上のように、第1送電装置401は、アウトオブバンド通信の開始のトリガとなるインバンド通信を用いた処理を実行する前に、すでに第1受電装置411とアウトオブバンド通信を確立している否かを判定する。そして、その判定結果から、すでに第1受電装置411とアウトオブバンド通信を確立している場合は、正常でない動作と判断し、アウトオブバンド通信を使用しないことを決定するようにした。これにより、アウトオブバンド通信が確立した後にアウトオブバンド通信の開始に関する処理が実行されてしまうことを防止することができる。よって、不要な消費電力、処理時間が発生することを防止できる。
 [受電装置の動作]
 図7は、本実施形態における第1受電装置411が実行する基本的な処理手順の一例を示すフローチャートである。以下の説明では、受電アンテナ205を介して受信した電力(Digital Ping)によって制御部201及び第1通信部203が起動したことに応じて本処理が開始されるものとする。一方で、例えばユーザによる所定のボタンの押下等の操作によって受電機能が起動されたことに応じて、又は第1受電装置411が第1送電装置401の近傍に持ち込まれたことに応じて、本処理を開始してもよい。また、本処理は、制御部201が、メモリ208に記憶されたプログラムを実行することによって実現されるが、後述の処理を実行するための専用のハードウェアが用いられてもよい。
 例えば、少なくとも一部の処理がハードウェアによって実現される場合、その処理ステップを実現するためのプログラムから、所定のコンパイラを用いてFPGA上に自動的に生成された専用回路が用いられる。また、FPGAと同様に、ゲートアレイ回路によって、所定の処理ステップを実行するためのハードウェアが実現されてもよい。
 図7において、第1受電装置411は、まず、第1送電装置401の近傍に置かれることによって第1送電装置401に検出され、第1送電装置401によりDigital Pingが送信される。そして、第1受電装置411の制御部201および第1通信部203は、受電アンテナ205を介して受電したDigital Pingにより起動する。まず、S701において、制御部201は、Digital Pingの受電電圧の大きさを測定し、第1通信部203を介してインバンド通信によりその受電電圧の大きさを第1送電装置401へ通知する。その後、第1受電装置411は、I&Cフェーズへ移行する。
 I&Cフェーズに移行すると、S702において、制御部201は、第1通信部203を介してインバンド通信によりIdentification Packetを第1送電装置401へ送信する。このとき、Identification Packetには、WPC規格のバージョンAに対応しているか否かを示す情報と、少なくともバージョンAより前のバージョンのWPC規格で使用される個体識別情報とを含むようにする。なお、WPC規格で使用される個体識別情報は、インバンド通信で制御通信を行う場合の識別情報である。
 続いてS703において、制御部201は、第1通信部203を介してインバンド通信によりConfiguration Packetを第1送電装置401へ送信する。そして、S704において、制御部201は、所定時間内に第1送電装置401からACKを受信したか否かを判定する。この判定の結果、ACKを受信しなかった場合は、S734に進み、Power Transferフェーズへ移行する。
 WPC規格のバージョン1.2より前のバージョンのみに対応している送電装置は、Negotiationフェーズ及びCalibrationフェーズに対応していない。このため、このような送電装置では、Configuration Packetを受信すると、ACKを送信せずにPower Transferフェーズに移行する。このため、第1受電装置411は、第1送電装置401からACKを受信しなかった場合は、Power Transferフェーズに移行するようにする。これにより、第1送電装置401がWPC規格のバージョン1.2より前のバージョンの送電装置である場合であっても、第1受電装置411は受電を行うことができる。すなわち、このような構成により、第1受電装置411は、後方互換性を確保することができる。なお、ACKを受信しなかった場合、受電回路部202が負荷(充電部206及びバッテリ207)へ供給できる電力の最大値は5ワットに制限される。
 一方、S704の判定の結果、ACKを受信した場合は、S710に進む。そして、S710において、制御部201は、第1通信部203を介して、第1送電装置401の能力情報の問い合わせを行うGeneral Req(Capability)を第1送電装置401に送信する。そして、S711において、制御部201は、所定時間内に第1通信部203を介してその応答(TX Capability Packet)を受信したか否かを判定する。この判定の結果、所定時間内にTX Capability Packetを受信しなかった場合は、S742に進む。そして、S742において、制御部201は、アウトオブバンド通信を使用しないことを決定する。その後、Negotiationフェーズに移行し、S743において、制御部201は、アウトオブバンド通信の使用が不可能であることから、要求するGPの最大値を15ワットに設定し、S732に進む。
 一方、S711の判定の結果、所定時間内にTX Capability Packetを受信した場合は、S712に進む。そして、S712において、制御部201は、現時点において自装置がBLEを制御通信に使用可能な状態であるか否かを判定する。ここで、BLEを制御通信に使用可能であるか否かの判定は、例えば、自装置がBLE通信機能を有しているか否か、自装置がBLEのペリフェラルとして動作しているか否か、BLEを他の装置との間で使用中であるか等に基づいて行われる。例えば、自装置がBLEのセントラルである場合は、複数のペリフェラルと接続可能であるため、BLEを制御通信に使用可能である状態と判定する。また、自装置が他の装置とBLEによる通信を行っていない場合も、BLEを制御通信に使用可能である状態と判定する。一方、自装置がペリフェラルとして他の装置とBLEによる通信を行っている場合は、BLEを制御通信に使用可能でない状態と判定する。
 また、S712の判定は、第1受電装置411と接続されている製品(例えばスマートフォンやカメラなど)の制御部との通信により行ってもよい。例えば、第1受電装置411の制御部201と、製品の制御部とをGPIOやシリアル通信で接続し、第1受電装置411の制御部201が、製品の制御部へBLEの使用状況を問い合わせてもよい。製品の制御部からBLEの使用状況についての応答としてBLEを使用中であることを示す場合は、制御部201はその時点で制御通信にBLEを使用できない状態と判定する。また、その応答がBLEを使用中でないことを示す場合は、制御通信にBLEを使用可能である状態と判定する。
 S712の判定の結果、現時点において自装置がBLEを制御通信に使用可能な状態でない場合、第1送電装置401との間でBLEによる制御通信を行うことができないため、S742に進む。
 一方、S712の判定の結果、現時点において自装置がBLEを制御通信に使用可能な状態である場合は、S713に進む。そして、S713において、制御部201は、第1送電装置401から受信したTX Capability Packet内のBLE対応情報を示すbitを確認し、第1送電装置401がBLEでの制御通信を実行可能であるか否かを判定する。この判定の結果、第1送電装置401がBLEでの制御通信を実行可能でない場合は、第1送電装置401との間でBLEによる制御通信を行うことができないため、S742へ進む。
 一方、S713の判定の結果、第1送電装置401がBLEでの制御通信を実行可能である場合は、S714に進む。そして、S714において、制御部201は、第1送電装置401のBLEにおける個体識別情報を取得するために、第1通信部203を介してGeneral Req(ID)を送信する。続いてS715において、制御部201は、General Req(ID)への応答として、所定時間内に第1通信部203を介して第1送電装置401からのTX ID Packetを受信したか否かを判定する。この判定の結果、所定時間内に第1送電装置401からTX ID Packetを受信しなかった場合は、第1送電装置401との間でBLEによる制御通信を行うことができないため、S742へ進む。
 一方、S715の判定の結果、所定時間内に第1送電装置401からTX ID Packetを受信した場合は、S716に進む。そして、S716において、制御部201は、そのパケット内に格納されている第1送電装置401のBD_ADDRを取得し、メモリ208に保持する。この時点で、第1受電装置411は、第1送電装置401のWPC規格における識別情報とBLEにおけるBD_ADDRとを対応付けて認識することができる。
 次に、S717において、制御部201は、第1通信部203を介してBLEの個体識別情報の問い合わせを要求するGeneral Req(OOB ID Req)を第1送電装置401に送信する。そして、S718において、制御部201は、所定時間内に第1通信部203を介して第1送電装置401からBLEの個体識別情報を要求するOOB ID Req Packetを受信したか否かを判定する。この判定の結果、所定時間内に第1送電装置401からOOB ID Req Packetを受信しなかった場合は、第1送電装置401との間でBLEによる制御通信を行うことができないため、S742へ進む。
 一方、S718の判定の結果、所定時間内に第1送電装置401からOOB ID Req Packetを受信した場合は、S719に進む。そして、S719において、制御部201は、第1送電装置401に対し、第1通信部203を介してOOB ID Packetを送信する。前述したように、このOOB ID Packetには、アウトオブバンド通信で使用する第1受電装置411の個体識別情報(BD_ADDR)が含まれる。これにより、第1送電装置401側は、第1受電装置411のWPC規格における識別情報と、BLEにおける個体識別情報(BD_ADDR)とを関連付けて認識することができるようになる。
 続いてS720において、制御部201は、第1送電装置401との間でBLEによる通信を試行するために、自装置のBLE通信機能をAdvertiserとして起動する。そして、S721において、制御部201は、第2通信部204を介してADV_INDをブロードキャスト送信する。なお、Advertiserは、BLE規格で定義されている状態の1つであり、上述のScannerがBLEデバイス(又はサービス)を発見できるように、自装置のBD_ADDRや対応するサービス情報をADV_INDによって報知する役割を有する。ここで、ADV_INDには、第2通信部204が対応しているサービス(プロファイル)を示すUUID(Universally Unique IDentifier)を含むようにする。なお、本実施形態では、WPC規格によるアウトオブバンド通信を用いた無線充電サービス(以下では「無線充電サービス」と呼ぶ。)を示すUUIDが、ADV_INDに含まれる。また、ADV_INDは、受電装置(第1受電装置411)が接続される製品の機器種別(例えば、カメラ、スマートフォン)、メーカー名、モデル名、シリアル番号等の情報も含む。
 次に、S722において、制御部201は、ADV_INDを受信したScannerから第2通信部204を介してCONNECTを受信したか否かを判定する。この判定の結果、CONNECTを受信しなかった場合は、S752に進む。そして、S752において、制御部201は、タイムアウトしたか否かを判定する。この判定の結果、タイムアウトした場合は、第1送電装置401との間でBLEによる制御通信を行うことができないため、S742に進む。一方、S752の判定の結果、タイムアウトしていない場合はS721に戻り、ADV_INDを再び送信する。
 一方、S722の判定の結果、CONNECTを受信した場合は、S723に進む。そして、S723において、制御部201は、そのCONNECTの送信元の識別情報が、第1送電装置401の個体識別情報(BD_ADDR)としてメモリ208に保持されているか否かを判定する(S723)。すなわち、CONNECTの送信元が第1送電装置401であるか否かを判定する。この判定の結果、CONNECTの送信元が第1送電装置401でない場合は、S751に進む。そして、S751において、制御部201は、CONNECTで接続したBLE接続を切断することを示すTERMINATEを、第2通信部204を介してCONNECTの送信元へ送信し、S752に進む。
 一方、S723の判定の結果、受信したCONNECTが第1送電装置401からのものである場合は、S724に進む。そして、S724において、制御部201は、アウトオブバンド通信を使用することを決定し、第1受電装置411と第1送電装置401とでアウトオブバンド通信の接続を確立する。なお、CONNECTした後の第1受電装置411と第1送電装置401とのBLEによる通信においては、それぞれの識別子としてBD_ADDRを使用せず、Connection Handleを用いる。
 その後、Negotiationフェーズに移行し、S731において、制御部201は、要求するGPの最大値を100ワット(W)に設定する。
 次に、S732において、制御部201は、第1送電装置401との間でGPの交渉を行う。この交渉は、第1送電装置401において許容できるGPの最大値と、第1受電装置411が要求するGPの値とに基づいて行われる。なお、第1受電装置411が要求するGPの最大値は、上述のように、S724又はS743の処理によって、アウトオブバンド通信を利用可能か否かに応じて決定される。また、アウトオブバンド通信が可能である場合は、GPの交渉は第2通信部204を介して行われ、アウトオブバンド通信が不可能である場合は、インバンド通信によりGPの交渉は第1通信部203を介して行われる。そして、Negotiationフェーズで必要な処理が終了すると、Calibrationフェーズに移行する。
 Calibrationフェーズに移行すると、S733において、制御部201は、Calibrationフェーズで必要な処理を実行する。具体的には、第1送電装置401でパワーロス法による異物検出処理のためのCAL処理で用いる受電電力値の測定およびその情報の送信処理などを実行する。Calibrationフェーズで必要な処理が終了すると、Power Transferフェーズに移行する。
 Power Transferフェーズに移行すると、S734において、制御部201は、受電アンテナ205を介して第1送電装置401から電力を受電する。Power Transferフェーズでは、第1受電装置411から第1送電装置401へ送電電力の増減を要求する制御データが送信されるが、この通信は制御通信であるため、BLE(アウトオブバンド通信)を利用可能な状況ではBLEによって行われる。
 その後、S735において、制御部201は、例えば充電が終了したことに応じて、第1送電装置401に対してバッテリ充電のための電力伝送の停止を要求するEPTを送信する。そして、制御部201は、必要に応じてBLEの接続を切断するためのTERMINATEを送信し、本処理を終了する。前述したように、EPTの送受信も制御通信であるため、BLE(アウトオブバンド通信)を利用可能な状況ではBLEによって行われる。また、EPTを送信した後のTERMINATEの送信は第1送電装置401側から行ってもよい。
 次に、アウトオブバンド通信の開始に必要な処理であるS710、S714、S717、S719、およびS721について、図8A~図8Eを用いて詳細を説明する。図7の説明では、第1受電装置411がペリフェラルとしてBLEによる通信を確立していないことを前提に、S710、S714、S717、S719、およびS721でそれぞれのパケットを送信するとした。したがって、第1送電装置401とBLEによる通信が既に確立している場合は、これらのパケットの送信は不要である。また、第1送電装置401とBLEによる通信が既に確立している場合に、TX Capability Packet、TX ID Packet、OOB ID Req Packetなどのパケットを受信することは、正常な動作でないといえる。そこで本実施形態では、このような場合には、アウトオブバンド通信の代わりにインバンド通信を実行するようにする。具体的には、以下の図8A~図8Eの手順を採用することにより、アウトオブバンド通信(BLE)の開始のトリガとなるインバンド通信を用いた処理が実行されてしまうことを防止する。
 図8Aは、本実施形態において、第1送電装置401からConfiguration PacketおよびIdentification Packetを受信した旨の応答(ACK)を受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図8Aに示す処理は、例えば、図7のS710の代わりに行われる処理であるが、その他のフェーズでACKを受信した場合も同様に図8Aの処理が行われる。
 まず、S801aにおいて、制御部201は、すでに第1送電装置401とアウトオブバンド通信(BLEによる通信)を確立している否かを判定する。この判定の結果、第1送電装置401とアウトオブバンド通信を確立していない場合は、S821aに進む。そして、S821aにおいて、制御部201は、第1通信部203を介して、General Req(Capability)を第1送電装置401に送信する。そして、図7のS711に進む。
 一方、S801aの判定の結果、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、S802aに進む。そして、S802aにおいて、制御部201は、図7のS742と同様の処理を行う。つまり、制御部201は、アウトオブバンド通信を使用しないことを決定する。これにより、アウトオブバンド通信を確立した後に、不要にもかかわらず、アウトオブバンド通信(BLE)の開始のトリガとなるインバンド通信を用いた処理が実行されてしまうことを防止することができる。よって、不要な消費電力、処理時間が発生することを防止できる。
 次のS803aは、図7のS743と同様である。そして、S804aにおいて、制御部201は、第2通信部204を介してBLEによる接続を切断することを示すTERMINATEを第1送電装置401に送信する。S805a~S808aは、それぞれ図7のS732~S735と同様である。この場合、これらの処理はインバンド通信により行われる。
 図8Bは、本実施形態において、第1送電装置401からTX Capability Packetを受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図8Bに示す処理は、例えば、図7のS714の代わりに行われる処理であるが、その他のフェーズでTX Capability Packetを受信した場合も同様に図8Bの処理が行われる。
 まず、S801bはS801aと同様の処理をある。この判定の結果、第1送電装置401とアウトオブバンド通信を確立していない場合は、S821bに進む。そして、S821bにおいて、制御部201は、第1送電装置401のBLEにおける識別情報を取得するために、第1通信部203を介してGeneral Req(ID)を送信する。
 一方、S801bの判定の結果、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、S802bに進む。S802b~S808bはそれぞれ、図8AのS802a~S808aと同様である。
 図8Cは、本実施形態において、第1送電装置401からTX ID Packetを受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図8Cに示す処理は、例えば、図7のS717の代わりに行われる処理であるが、その他のフェーズでTX ID Packetを受信した場合も同様に図8Cの処理が行われる。
 まず、S801cはS801aと同様の処理をある。この判定の結果、第1送電装置401とアウトオブバンド通信を確立していない場合は、S821cに進む。そして、S821cにおいて、制御部201は、第1通信部203を介してBLEの個体識別情報の問い合わせを要求するGeneral Req(OOB ID Req)を第1送電装置401に送信する。
 一方、S801cの判定の結果、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、S802cに進む。S802c~S808cはそれぞれ、図8AのS802a~S808aと同様である。
 図8Dは、本実施形態において、第1送電装置401からOOB ID Req Packetを受信した場合の詳細な処理手順の一例を示すフローチャートである。なお、図8Dに示す処理は、例えば、図7のS719の代わりに行われる処理であるが、その他のフェーズでOOB ID Req Packetを受信した場合も同様に図8Dの処理が行われる。
 まず、S801dはS801aと同様の処理をある。この判定の結果、第1送電装置401とアウトオブバンド通信を確立していない場合は、S821dに進む。そして、S821dにおいて、制御部201は、第1送電装置401に対し、第1通信部203を介してOOB ID Packetを送信する。
 一方、S801dの判定の結果、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、S802dに進む。S802d~S808dはそれぞれ、図8AのS802a~S808aと同様である。
 図8Eは、本実施形態において、第1送電装置401からOOB ID Req Packetを受信した場合の詳細な処理手順の他の一例を示すフローチャートである。
 なお、図8Eに示す処理は、例えば、図7のS721の代わりに行われる処理であるが、その他のフェーズでOOB ID Req Packetを受信した場合も同様に図8Eの処理が行われる。
 まず、S801eはS801aと同様の処理をある。この判定の結果、第1送電装置401とアウトオブバンド通信を確立していない場合は、S821eに進む。そして、S821eにおいて、制御部201は、第2通信部204を介してADV_INDをブロードキャスト送信する。
 一方、S801eの判定の結果、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、S802eに進む。S802e~S808eはそれぞれ、図8AのS802a~S808aと同様である。
 前述したように、図8A~図8Eの処理は、I&Cフェーズに限らず、その後のフェーズ(Negotiationフェーズ、Calibrationフェーズ、Power Transferフェーズ)においても同様に実行される。例えば、Power Transferフェーズにおいて、第1送電装置401とBLEによる通信を確立している状態にもかかわらず、第1送電装置401からOOB ID Req Packetを受信する場合などがありうる。そこで、すでに第1送電装置401とBLE通信を確立しているため、Power Transferフェーズでも図8Dまたは図8Eの処理に従って異常な動作と判断する。そして、第1送電装置401は、アウトオブバンド通信による送電制御を中断し、インバンド通信により送電制御を使用することにする。
 以上のように、第1受電装置411は、アウトオブバンド通信の開始のトリガとなるインバンド通信を用いた処理を実行する前に、すでに第1送電装置401とアウトオブバンド通信を確立している否かを判定する。そして、その判定結果から、すでに第1送電装置401とアウトオブバンド通信を確立している場合は、正常でない動作と判断し、アウトオブバンド通信を使用しないことを決定するようにした。これにより、アウトオブバンド通信が確立した後にアウトオブバンド通信の開始に関する処理が実行されてしまうことを防止することができる。よって、不要な消費電力、処理時間が発生することを防止できる。
 [電力伝送システムの処理の流れ]
 続いて、電力伝送システムで実行される処理の流れの例について、図9および図10を用いて説明する。図9および図10は、本実施形態における、図4に示した第1受電装置411と、第1送電装置401とにおける動作を表したシーケンス図である。なお、図9および図10において、破線の矢印は、第1受電装置411と第1送電装置401との間で、インバンド通信で行われるやり取りを示す。実線の矢印は、第1受電装置411と第1送電装置401との間で、アウトオブバンド通信で行われるやり取りを示す。
 まず、図9を参照しながら、本実施形態に係る第1送電装置401と、WPC規格のバージョンAに対応する第1受電装置411との処理の流れを説明する。
 まず、BLE通信におけるセントラルとして動作する第1送電装置401は、Selectionフェーズにおいて、Analog Pingを送電する(S901)。第1送電装置401は、Analog Pingを送電した時の送電コイルの電圧値または電流値を検出し、電圧がある閾値を下回る場合または電流値がある閾値を超える場合に物体が近傍に存在すると判断し、Pingフェーズに移行する。そして、Pingフェーズにおいて、第1送電装置401は、Analog Pingより電力が大きいDigital Pingを送電する(S902)。BLE通信におけるペリフェラルとして動作する第1受電装置411は、受電したDigital Pingにより起動し、そのDitigal Pingの受電電圧の大きさを測定する。そして、第1受電装置411は、その受電電圧の大きさをインバンド通信により第1送電装置401へ通知する。その後、第1受電装置411は、I&Cフェーズへ移行する。
 I&Cフェーズにおいて、第1受電装置411は、第1送電装置401に対して能力情報を問い合わせる信号を送信する(S911)。この信号は、上述したGeneral Request(Capability)である。第1送電装置401は、General Request(Capability)を受信すると、自装置の能力情報についての情報を含んだ応答を第1受電装置411へ送信する(S912)。この応答は、上述したようにTX Capability Packetである。
 次に第1受電装置411は、第1送電装置401に対してBD_ADDRを問い合わせる信号を送信する(S913)。この信号は、上述したGeneral Request(ID)である。第1送電装置401は、General Req(ID)を受信すると、自装置のBLEについてのBD_ADDRを含んだ応答を第1受電装置411へ送信する(S914)。この応答は、上述したようにTX ID Packetである。第1受電装置411は、第1送電装置401のBD_ADDRをメモリ208に保持する。
 次に第1受電装置411は、第1受電装置411のBD_ADDRを第1送電装置401に通知するため、第1送電装置401に対し、BLEの個体識別情報を問い合わせることを要求する信号を送信する(S915)。この信号は上述したGeneral Req(OOB ID Req)である。General Req(OOB ID Req)を受信した第1送電装置401は、その応答として第1受電装置411に対し、第1受電装置411のBD_ADDRを問い合わせる信号を送信する(S916)。この信号は、上述したOOB ID Reqである。OOB ID Reqを受信した第1受電装置411は、その応答として自装置のBLEについてのBD_ADDRを含んだ応答を第1送電装置401へ送信する(S917)。この信号は上述したOOB ID Packetである。そしてBLEでADV_INDを送信し(S918)、第1送電装置401との間でBLEによる充電制御を開始する(S919)。
 ここで第1送電装置401におけるアウトオブバンド通信(BLE)の開始に関する処理に関わるS912、S914およびS916の処理(信号の送信)は、それぞれ図6A~図6Cの手順に従う。つまり、それぞれの信号を送信する前に現時点で第1受電装置411とBLEによる通信が確立しているか否かを判定する。図9の例は、上述の各処理の時点において、BLEによる通信を確立していない例である。
 また、図9の第1受電装置411は、WPC規格のバージョンAに対応しているが、図8A~図8Eに示したような処理を行う機能を有していないものとする。そして、図9の例において、第1受電装置411が何かをトリガとして、BLEによる充電制御を開始した後に、General Req(OOB ID Req)を送信したものとする(S941)。本実施形態の第1送電装置401は、この応答として、OOB ID Req Packetを送信する前に、図6Cに示す手順に従って第1受電装置411とBLEによる通信が確立しているか否かを判定する。図9の例では、すでに第1受電装置411とBLEによる通信が確立しているため、第1送電装置401はOOB ID Req Packetを送信しないようにする。また、第1受電装置411において異常な処理が行われたため、BLEによる通信を終了する(S942)。これは第1送電装置401がBLEのパケットであるTERMINATEを送信することで実現する。そして、第1受電装置411との通信をインバンド通信に切り替え、充電制御を行うようにする(S951)。
 次に、図10を参照しながら、本実施形態に係る第1受電装置411と、WPC規格のバージョンAに対応する第1送電装置401との処理の流れを説明する。なお、図10のS1001からS1031までの処理は、それぞれ図9のS901からS931までの処理と同様であるので、説明は省略する。
 ここで第1受電装置411におけるアウトオブバンド通信(BLE)の開始に関する処理に関わるS1011、S1013、S1015、S1017およびS1018の処理(信号の送信)は、それぞれ図8A~図8Eの手順に従う。つまり、それぞれの信号を送信する前に現時点で第1送電装置401とBLEによる通信が確立しているか否かを判定する。図10の例は、上述の各処理の時点において、BLEによる通信を確立していない例である。
 また、図10の第1送電装置401は、WPC規格のバージョンAに対応しているが、図6A~図6Cに示したような処理を行う機能を有していないものとする。そして、図10の例において、第1送電装置401が何かをトリガとして、BLEによる充電制御を開始した後に、OOB ID Req Packetを送信したものとする(S1041)。本実施形態の第1受電装置411は、この応答として、OOB ID Packetを送信する前に、図8Dに示す手順に従って第1送電装置401とBLEによる通信が確立しているか否かを判定する。図10の例では、すでに第1送電装置401とBLEによる通信が確立しているため、第1受電装置411はOOB ID Packetを送信しないようにする。また、第1送電装置401において異常な処理が行われたため、BLEによる通信を終了する(S1042)。これは、第1受電装置401がBLEのパケットであるTERMINATEを送信することで実現する。そして、第1送電装置401との通信をインバンド通信に切り替え、充電制御を行うようにする(S1051)。
 以上のように本実施形態に係る第1送電装置401および第1受電装置411によれば、アウトオブバンド通信の開始のトリガとなるインバンド通信を用いた処理を実行する前に、すでに通信相手とアウトオブバンド通信を確立している否かを判定する。そして、すでにアウトオブバンド通信を確立している場合は、正常でない動作と判断し、アウトオブバンド通信を使用しないことを決定するようにした。これにより、アウトオブバンド通信が確立した後にアウトオブバンド通信(BLE)の開始に関する処理が実行されてしまうことを防止することができる。よって不要な消費電力、処理時間が発生することを防止できる。
 なお、本実施形態では、第1受電装置411がGeneral Req(ID)を送信することによって、第1送電装置401のBD_ADDRの送信を要求したが、これに限られない。この要求に、例えば、WPC規格のバージョン1.2.3のSpecific Requestのうち、Packet typeが未定義のReserved PacketやProprietary Packetパケットが用いられてもよい。また、この要求に、WPC規格のバージョン1.2.3のGeneral Requestのうち、Packet typeが未定義のReserved PacketやProprietary Packetが用いられてもよい。また、WPC規格のバージョン1.2.3のパケットのうち、Specific RequestやGeneral Request以外のパケットが、この要求に用いられてもよい。例えば、Specific RequestやGeneral Request以外のPacket typeが未定義のReserved PacketやProprietary Packetがこの要求のために用いられる。
 (その他の実施形態)
 上述した実施形態では、電力伝送の対象との間でBLEによる接続を確立し、一方で電力伝送の対象ではない他の装置との間でBLEによる接続を確立しないようにする方法について説明した。以下、実施形態に適用可能な構成について説明する。
 上述した実施形態では、通信相手とBLEによる通信を確立した後に、アウトオブバンド通信の開始に関する信号を通信相手からインバンド通信にて受信した場合、BLEによる通信を終了してインバンド通信に切り替え、充電制御を再開する例を示した。これに限らず、例えばBLEによる通信を終了した後に、Selectionフェーズに戻る処理を実行してもよい。また、例えば、BLEによる通信は終了せず、Negotiationフェーズに戻り、BLEにて充電制御を再開する処理を実行してもよい。
 また、上述した実施形態では、受電装置が自発的にGeneral Req(OOB ID Req)を送信することにより、受電装置から自発的にBD_ADDRの通知を実行した。一方で、送電装置が自発的に受電装置に対してBD_ADDRの通知を要求してもよい。要求する方法としては、例えば図11に示すように、第1送電装置401が第1受電装置411に対してインバンド通信で要求パケットを送信する方法がある。
 この方法では、S1101において、第1送電装置401から第1受電装置411に対して要求パケットを送信する。この要求パケットは、第1送電装置401が第1受電装置411に対して動作を要求することを示すパケットである。そして、S1102において、第1送電装置401が第1受電装置411に対して要求する動作を識別する識別情報を含むパケットである。なお、S1101とS1102の動作を、1つのパケットで実施してもよい。すなわち、第1送電装置401が第1受電装置411に対して動作を要求することを示すパケットであり、かつ要求する動作を識別する識別情報を含むパケットを、第1送電装置401が第1受電装置411に送信してもよい。この要求パケット、要求動作識別パケットを受信した第1受電装置411は、自らのBD_ADDRをインバンド通信で第1送電装置401に通知する(S1103)。
 本開示は、上述の実施形態の1以上の機能を実現するプログラムを、ネットワーク又は記憶媒体を介してシステム又は装置に供給し、そのシステム又は装置のコンピュータにおける1つ以上のプロセッサーがプログラムを読出し実行する処理でも実現可能である。また、1以上の機能を実現する回路(例えば、ASIC)によっても実現可能である。
 本発明は上記実施の形態に制限されるものではなく、本発明の精神及び範囲から離脱することなく、様々な変更及び変形が可能である。従って、本発明の範囲を公にするために以下の請求項を添付する。
 本願は、2022年3月15日提出の日本国特許出願特願2022-040169を基礎として優先権を主張するものであり、その記載内容の全てをここに援用する。

Claims (23)

  1.  無線電力伝送を行う通信装置であって、
     第1のアンテナと第2のアンテナとを介して、無線電力伝送を行う外部装置と通信を行う通信手段と、
     前記外部装置と前記第2のアンテナを介する通信を行うための前記第1のアンテナを介する通信を行うように前記通信手段を制御する制御手段と、
     を有し、
     前記制御手段は、前記第2のアンテナを介する通信の確立に基づいて、前記外部装置と前記第2のアンテナを介する通信の確立を行うための前記第1のアンテナを介する通信を行わないように制御する通信装置。
  2.  前記外部装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記外部装置から前記第2のアンテナを介する通信を確立するための情報の要求を受信した場合に、前記制御手段は、前記受信した要求を受け入れないように制御する請求項1に記載の通信装置。
  3.  前記外部装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記外部装置から前記第2のアンテナを介する通信を確立するための情報を受信した場合に、前記制御手段は、前記第2のアンテナを介する通信を確立するための他の情報の要求を送信しないようにする請求項1または2に記載の通信装置。
  4.  前記通信装置は無線で電力を送電する送電装置であり、前記外部装置は前記送電装置から無線で電力を受電する受電装置である請求項1または2に記載の通信装置。
  5.  前記受電装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記受電装置から前記第2のアンテナを介する通信に係る識別情報または能力情報の要求を受信した場合に、前記制御手段は、当該識別情報または能力情報を前記受電装置に送信しないようにする請求項4に記載の通信装置。
  6.  前記受電装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記受電装置から前記第2のアンテナを介する通信に係る識別情報の問い合わせの要求を受信した場合に、前記制御手段は、前記受電装置に前記第2のアンテナを介する通信に係る識別情報の要求を送信しないようにする請求項4または5に記載の通信装置。
  7.  車輪と、バッテリと、を有し、
     前記バッテリの電力を用いて、前記受電装置に無線で送電する請求項4~6の何れか1項に記載の通信装置。
  8.  車両内に設置される請求項4~7の何れか1項に記載の通信装置。
  9.  前記通信装置は無線で電力を受電する受電装置であり、前記外部装置は前記受電装置に無線で電力を送電する送電装置である請求項1~3の何れか1項に記載の通信装置。
  10.  前記送電装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記送電装置から前記第2のアンテナを介する通信に係る能力情報を受信した場合に、前記制御手段は、前記送電装置の識別情報を前記送電装置に要求しないようにする請求項9に記載の通信装置。
  11.  前記送電装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記送電装置から前記第2のアンテナを介する通信に係る識別情報を受信した場合に、前記制御手段は、前記受電装置の識別情報の問い合わせを前記送電装置に要求しないようにする請求項9または10に記載の通信装置。
  12.  前記送電装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記送電装置から前記第2のアンテナを介する通信に係る識別情報の要求を受信した場合に、前記制御手段は、前記受電装置の識別情報を前記送電装置に送信しないようにする請求項9~11の何れか1項に記載の通信装置。
  13.  前記送電装置と前記第2のアンテナを介する通信が確立している場合に、前記制御手段は、前記受電装置の存在を周囲に報知するためのパケットをブロードキャスト送信しないようにする請求項9~12の何れか1項に記載の通信装置。
  14.  前記送電装置から受電した電力を蓄積するバッテリと、
     前記バッテリの電力を用いて車輪を駆動させるためのモータと、を有する請求項9~13の何れか1項に記載の通信装置。
  15.  前記送電装置から受電した電力を蓄積するバッテリと、
     前記バッテリの電力が供給される表示部と、を有する請求項9~13の何れか1項に記載の通信装置。
  16.  前記送電装置から受電した電力を蓄積するバッテリと、
     前記バッテリの残量を通知する通知手段と、を有する請求項9~13の何れか1項に記載の通信装置。
  17.  前記外部装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記外部装置から前記第2のアンテナを介する通信を確立するための情報の要求を受信した場合に、前記制御手段は、前記第2のアンテナを介する通信を切断する請求項1~16の何れか1項に記載の通信装置。
  18.  前記外部装置と前記第2のアンテナを介する通信が確立している状態で、前記第1のアンテナを介する通信により前記外部装置から前記第2のアンテナを介する通信を確立するための情報を受信した場合に、前記制御手段は、前記第2のアンテナを介する通信を切断する請求項1~16の何れか1項に記載の通信装置。
  19.  前記制御手段は、前記第2のアンテナを介する通信を切断した後に、前記外部装置と前記第1のアンテナを介する通信を確立するための制御を行う請求項17または18に記載の通信装置。
  20.  前記第2のアンテナを介する通信は、BLE(Bluetooth(登録商標) Low Energy)による通信である請求項1~19の何れか1項に記載の通信装置。
  21.  前記通信手段は、前記第1のアンテナを介して通信する第1の通信手段と、前記第2のアンテナを介して通信する第2の通信手段とを有する請求項1~20の何れか1項に記載の通信装置。
  22.  無線電力伝送を行う通信装置であって、
     第1のアンテナと第2のアンテナとを介して、無線電力伝送を行う外部装置と通信を行う通信工程と、
     前記外部装置と前記第2のアンテナを介する通信を行うための前記第1のアンテナを介する通信を行うように前記通信工程を制御する制御工程と、
     を有し、
     前記制御工程においては、前記第2のアンテナを介する通信の確立に基づいて、前記外部装置と前記第2のアンテナを介する通信の確立を行うための前記第1のアンテナを介する通信を行わないように制御する通信装置の制御方法。
  23.  請求項1~21の何れか1項に記載の通信装置の各手段としてコンピュータを機能させるためのプログラム。
PCT/JP2023/005413 2022-03-15 2023-02-16 通信装置、通信装置の制御方法およびプログラム WO2023176283A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-040169 2022-03-15
JP2022040169A JP2023135122A (ja) 2022-03-15 2022-03-15 通信装置、通信装置の制御方法およびプログラム

Publications (1)

Publication Number Publication Date
WO2023176283A1 true WO2023176283A1 (ja) 2023-09-21

Family

ID=88022940

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/005413 WO2023176283A1 (ja) 2022-03-15 2023-02-16 通信装置、通信装置の制御方法およびプログラム

Country Status (2)

Country Link
JP (1) JP2023135122A (ja)
WO (1) WO2023176283A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013172501A (ja) * 2012-02-20 2013-09-02 Sumitomo Electric Ind Ltd 非接触電力伝送システムおよび非接触電力伝送方法
JP2017184488A (ja) * 2016-03-30 2017-10-05 キヤノン株式会社 送電装置、送電装置の制御方法及びプログラム
JP2019187070A (ja) * 2018-04-09 2019-10-24 キヤノン株式会社 受電装置、送電装置、制御方法、及びプログラム
JP2021122175A (ja) * 2013-04-19 2021-08-26 キヤノン株式会社 受電装置およびその制御方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013172501A (ja) * 2012-02-20 2013-09-02 Sumitomo Electric Ind Ltd 非接触電力伝送システムおよび非接触電力伝送方法
JP2021122175A (ja) * 2013-04-19 2021-08-26 キヤノン株式会社 受電装置およびその制御方法
JP2017184488A (ja) * 2016-03-30 2017-10-05 キヤノン株式会社 送電装置、送電装置の制御方法及びプログラム
JP2019187070A (ja) * 2018-04-09 2019-10-24 キヤノン株式会社 受電装置、送電装置、制御方法、及びプログラム

Also Published As

Publication number Publication date
JP2023135122A (ja) 2023-09-28

Similar Documents

Publication Publication Date Title
JP6516519B2 (ja) 送電装置、送電装置が行う制御方法、及びプログラム
JP2020188634A (ja) 送電装置、送電装置の制御方法、及びプログラム
WO2021039115A1 (ja) 送電装置、送電装置の制御方法及びプログラム
WO2021261053A1 (ja) 送電装置、送電装置の制御方法、およびプログラム
WO2023176283A1 (ja) 通信装置、通信装置の制御方法およびプログラム
WO2023085048A1 (ja) 送電装置、受電装置、制御方法及びプログラム
WO2023008091A1 (ja) 送電装置、受電装置、制御方法、およびプログラム
WO2022264800A1 (ja) 受電装置、送電装置、制御方法、及びプログラム
WO2023002835A1 (ja) 受電装置、受電装置の制御方法およびプログラム
WO2023048095A1 (ja) 送電装置、受電装置、制御方法及びプログラム
WO2023048238A1 (ja) 送電装置、受電装置、制御方法及びプログラム
JP7538630B2 (ja) 送電装置、送電装置の制御方法、およびプログラム
WO2023189199A1 (ja) 送電装置、受電装置、制御方法及びプログラム
WO2023276711A1 (ja) 電子機器、電子機器の制御方法およびプログラム
WO2023112622A1 (ja) 受電装置、受電装置の制御方法およびプログラム
WO2023106030A1 (ja) 受電装置、送電装置、無線電力伝送方法、および、プログラム
JP2024005357A (ja) 送電装置、受電装置、制御方法、およびプログラム
WO2023276580A1 (ja) 送電装置、受電装置、無線電力伝送の方法、及び、プログラム
WO2023042679A1 (ja) 送電装置および受電装置
WO2023090126A1 (ja) 受電装置、無線電力伝送システムおよび受電装置の制御方法
JP2023112407A (ja) 送電装置、送電装置の制御方法およびプログラム
JP2023144646A (ja) 送電装置、受電装置、無線電力伝送の制御方法、およびプログラム
JP2023181742A (ja) 送電装置、送電装置の制御方法、およびプログラム
JP2023103805A (ja) 送電装置、受電装置および無線電力伝送システム
JP2023076336A (ja) 受電装置、送電装置、制御方法、およびプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23770243

Country of ref document: EP

Kind code of ref document: A1