WO2023149301A1 - 鉛蓄電池システム及び鉛蓄電池の寿命推定方法 - Google Patents

鉛蓄電池システム及び鉛蓄電池の寿命推定方法 Download PDF

Info

Publication number
WO2023149301A1
WO2023149301A1 PCT/JP2023/002257 JP2023002257W WO2023149301A1 WO 2023149301 A1 WO2023149301 A1 WO 2023149301A1 JP 2023002257 W JP2023002257 W JP 2023002257W WO 2023149301 A1 WO2023149301 A1 WO 2023149301A1
Authority
WO
WIPO (PCT)
Prior art keywords
lead
acid battery
capacity
dod
discharge
Prior art date
Application number
PCT/JP2023/002257
Other languages
English (en)
French (fr)
Inventor
秀人 中村
雄大 谷村
礼華 沓間
敏幸 佐藤
英明 吉田
Original Assignee
古河電気工業株式会社
古河電池株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 古河電気工業株式会社, 古河電池株式会社 filed Critical 古河電気工業株式会社
Priority to CN202380014466.4A priority Critical patent/CN118235052A/zh
Publication of WO2023149301A1 publication Critical patent/WO2023149301A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/378Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC] specially adapted for the type of battery or accumulator
    • G01R31/379Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC] specially adapted for the type of battery or accumulator for lead-acid batteries
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3828Arrangements for monitoring battery or accumulator variables, e.g. SoC using current integration
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/392Determining battery ageing or deterioration, e.g. state of health
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a lead-acid battery system and a lead-acid battery life estimation method for estimating the remaining life of a lead-acid battery.
  • Examples of such storage batteries include lead storage batteries and lithium ion secondary batteries. These electric power storage batteries are installed in residences, offices, factories, electric power companies, and the like. It is expected to be used in units of several years to ten years after the start of operation. When long-term use is expected in this way, it is necessary to perform maintenance on a regular basis after the start of operation. This is because it is known that in the case of various storage batteries as described above, deterioration progresses with use and the available battery capacity decreases. These storage batteries are used repeatedly, unlike primary batteries, which are not immediately replaced when they have lost their capacity after a single discharge. Therefore, an appropriate understanding of the state of the installed storage battery is required.
  • the capacity turnover value is a value obtained by dividing the total discharge capacity by the rated capacity of the storage battery, and is used as a life index of the storage battery. Cyclic charge-discharge lead-acid batteries require the number of discharges (cycle life) from the beginning to the end of their life under certain conditions, making it possible to calculate the capacity turnover value from the beginning to the end of their life.
  • FIG. 16 shows an example of the relationship between the DOD representing the depth of discharge and the life of the storage battery. When a lead-acid battery with a rated capacity of 1000 Ah indicated by arrow A can be discharged for 4500 cycles at a DOD of 70%.
  • Patent Document 1 As a conventional lead-acid battery life prediction method, for example, the method disclosed in Patent Document 1 is known.
  • a method for predicting the life of a lead-acid battery disclosed in Patent Document 1 integrates the amount of charge electricity from the charging current value of the lead-acid battery, and predicts the life of the lead-acid battery from the integrated value.
  • the lead-acid battery life prediction method disclosed in Patent Document 1 the relationship between the charged battery voltage and battery temperature, and the charging current is measured in advance using a standard lead-acid battery. The battery temperature is detected and the charging current value is determined based on the detected value and the above relationship.
  • deterioration factors of lead-acid batteries include deterioration of the positive electrode foil, as well as softening and sulfation of the active material. (ratio of accumulated discharge capacity to capacity).
  • the life of a lead-acid battery varies with the magnitude of DOD as shown in FIG. For this reason, it is desirable to consider the magnitude of DOD in order to calculate the capacity turnover value during operation in order to estimate the life of the lead-acid battery in consideration of the progress of deterioration due to softening and sulfation of the active material. .
  • the present invention provides a lead-acid battery system and lead-acid battery life estimation that can accurately estimate the remaining life of a lead-acid battery by calculating a capacity turnover value during operation in consideration of the size of the DOD.
  • the purpose is to provide a method.
  • a lead-acid battery system is a lead-acid battery system in which the remaining life of the lead-acid battery is estimated by comparing a capacity turnover value from the beginning to the end of the life and a capacity turnover value during operation. and a capacity turnover value calculation unit that calculates the capacity turnover value during operation, and the capacity turnover value calculation unit calculates the cumulative discharge capacity after the lead-acid battery starts discharging.
  • the gist is to calculate the capacity turnover value during operation using a correction coefficient based on the DOD calculated based on the DOD representing the depth of discharge calculated by dividing by the rated capacity of the lead-acid battery.
  • a method for estimating the life of a lead-acid battery estimates the remaining life of a lead-acid battery by comparing a capacity turnover value from the beginning to the life and a capacity turnover value during operation.
  • a method for estimating the life of a lead-acid battery comprising a capacity turnover value calculation step of calculating a capacity turnover value during operation, wherein the lead-acid battery starts discharging in the capacity turnover value calculation step
  • the capacity turnover value during operation is calculated based on the DOD that is calculated based on the DOD that represents the depth of discharge calculated by dividing the accumulated discharge capacity after the discharge by the rated capacity of the lead-acid battery.
  • the gist is to calculate
  • the capacity turnover value calculation unit represents the depth of discharge calculated by dividing the cumulative discharge capacity after the lead-acid battery starts discharging by the rated capacity of the lead-acid battery. Since the capacity turnover value during operation is calculated using the correction coefficient by DOD calculated based on DOD, the capacity turnover value during operation can be calculated considering the change due to DOD, In addition to corrosion of the positive electrode foil, it is possible to take into consideration the progress of deterioration due to softening and sulfation of the active material, and it is possible to provide a lead-acid battery system capable of accurately estimating the remaining life of the lead-acid battery.
  • the capacity turnover value calculation unit is calculated by dividing the above-mentioned DOD and the discharge current value when the lead-acid battery is discharged by the rated capacity of the lead-acid battery. Using the average C rate obtained by averaging the C rate representing the magnitude of the discharge current over time, the aforementioned DOD correction coefficient is calculated. Since the DOD changes depending on the C rate that indicates the magnitude of the discharge current (see FIG. 17), the DOD and the average C rate are used to calculate the DOD correction coefficient, so that the capacity turnover value during operation is It is possible to provide a lead-acid battery system capable of obtaining a more accurate value and more accurately estimating the remaining life of the lead-acid battery.
  • the lead-acid battery is a bipolar lead-acid battery. Accordingly, it is possible to provide a lead-acid battery system capable of accurately estimating the remaining life of a bipolar lead-acid battery.
  • the discharge calculated by dividing the accumulated discharge capacity after the start of discharge of the lead-acid battery by the rated capacity of the lead-acid battery. Since the capacity turnover value during operation is calculated using the DOD correction coefficient calculated based on the DOD representing the depth, the capacity turnover value during operation is calculated considering the size of the DOD.
  • the lead-acid battery life estimation method in the capacity turnover value calculation step, the above-mentioned DOD and the discharge current value when the lead-acid battery is discharged are divided by the rated capacity of the lead-acid battery. Using the average C rate obtained by averaging the calculated C rate representing the magnitude of the discharge current over time, the above-described DOD correction coefficient is calculated. Since the DOD varies depending on the C rate, which represents the magnitude of the discharge current, the DOD and the average C rate are used to calculate the DOD correction factor, which allows the capacity turnover value during operation to be a more accurate value. As a result, it is possible to provide a lead-acid battery life estimation method capable of estimating the remaining life of a lead-acid battery with higher accuracy.
  • the lead-acid battery is a bipolar lead-acid battery.
  • the lead-acid battery life estimation method capable of accurately estimating the remaining life of a bipolar lead-acid battery.
  • FIG. 1 is a block diagram showing the overall configuration of a lead-acid battery system according to first and second embodiments of the present invention
  • FIG. 2 is a block diagram showing the internal configuration of a BMU that constitutes the lead-acid battery system shown in FIG. 1 according to the first and second embodiments of the present invention
  • FIG. 3 is a block diagram showing internal configurations of a recording unit and a state determination unit that constitute the BMU shown in FIG. 2 in the lead-acid battery system according to the first embodiment of the present invention
  • FIG. 4 is a block diagram showing the internal configuration of a capacity turnover value calculation section that constitutes the state determination section shown in FIG. 3
  • 4 is a flow chart showing the flow of processing in a state determination unit shown in FIG. 3;
  • FIG. 3 is a block diagram showing the overall configuration of a lead-acid battery system according to first and second embodiments of the present invention
  • FIG. 3 is a block diagram showing the internal configuration of a BMU that constitutes the lead-acid battery system shown in
  • FIG. 6 is a flow chart showing the process flow of step S8 (capacity turnover value calculation step) in the flow chart shown in FIG. 5.
  • FIG. FIG. 7 is a flow chart showing the flow of processing in step S75 (correction coefficient calculation step by DOD) in the flow chart shown in FIG. 6;
  • FIG. Regarding charge/discharge of a lead-acid battery when the lead-acid battery is charged at night and discharged at peak power before noon, as an example of peak cut/peak shift, the start time of processing by the state determination unit and the end time of discharge start determination FIG.
  • FIG. 10 is a diagram for explaining the end timing of discharge end determination; 4 is a graph showing an example of a relationship between a DOD representing depth of discharge and a correction coefficient K dod (c) based on the DOD; 3 is a block diagram showing internal configurations of a recording unit and a state determination unit that constitute the BMU shown in FIG. 2 in the lead-acid battery system according to the second embodiment of the present invention; FIG. FIG. 11 is a block diagram showing the internal configuration of a capacity turnover value calculator that constitutes the state determination unit shown in FIG. 10; 11 is a flow chart showing the flow of processing in a state determination unit shown in FIG. 10; FIG.
  • FIG. 13 is a flow chart showing the flow of processing in step S17 (capacity turnover value calculation step) in the flow chart shown in FIG. 12.
  • FIG. FIG. 14 is a flow chart showing the flow of processing in step S165 (correction coefficient calculation step by DOD) in the flow chart shown in FIG. 13;
  • FIG. 4 is a graph for explaining an example of cycle characteristics of a general lead-acid battery; 4 is a graph showing an example of the relationship between the DOD representing the depth of discharge and the life of the storage battery. 4 is a graph showing an example of the relationship between a C rate representing the magnitude of discharge current and DOD representing depth of discharge;
  • FIG. 1 shows the overall configuration of a lead-acid battery system according to a first embodiment of the present invention and a second embodiment described later.
  • the lead-acid battery system S shown in FIG. It is a system that transmits the electric power stored in the power supply to the loads such as homes, offices, factories, etc. as needed.
  • This lead-acid battery system S includes a lead-acid battery B, a BMU 1 , an EMS 2 and a PCS 3 .
  • the BMU 1 is a battery management unit, and is a device that manages the voltage of each cell that constitutes the lead-acid battery B, the temperature of the entire lead-acid battery B, and the like. Therefore, the BMU 1 can grasp the state of the lead-acid battery B via a sensor that acquires various information provided in the lead-acid battery B. FIG. The BMU 1 also estimates the remaining life of the lead-acid battery B by comparing the capacity turnover value from the beginning to the end of the life with the capacity turnover value during operation. Therefore, the BMU 1 has a life estimation program necessary for the estimation. Note that the functions of the BMU 1 are not limited to the functions described here, and may have other functions such as managing voltage balance in each cell, for example.
  • the BMU 1 is a computer system with arithmetic processing functions, and by executing various dedicated computer programs pre-stored in hardware, each function can be realized on software. Also, the BMU 1 may be installed near the lead-acid battery B, and may be configured so as to be managed on the cloud or remotely (remotely). A detailed configuration of the BMU 1 will be described later.
  • EMS2 is a so-called Energy Management System, a system that grasps, manages, and optimizes the usage of electric energy.
  • PCS3 is a power conditioner (Power Conditioning System), which converts direct current generated by system current etc. into alternating current, and has the role of adjusting the output to the load and stable output suitable for storage in lead-acid battery B. Fulfill.
  • Power Conditioning System Power Conditioning System
  • Lead-acid battery B is a secondary battery that uses lead as an electrode.
  • As the lead-acid battery B it is preferable to apply a bipolar lead-acid battery, but it may have any structure, and the number of installations, the installation method, etc. are not limited and can be set arbitrarily. Further, in the lead-acid battery B, information (sensor information) acquired from various sensors described later is transmitted to the BMU1. A transmitting/receiving device and the like are provided.
  • the lead-acid battery B is provided with various sensors for acquiring the relevant driving history information (display of these various sensors is omitted in FIG. 1).
  • the various sensors are sensors that acquire information indicating the operation history and state of the lead-acid battery B, such as current, voltage, or temperature. These sensors may be provided for each unit, or may be provided for each individual lead-acid battery B.
  • FIG. 1 A diagram of an exemplary lead-acid battery B.
  • direct current from power plants such as thermal power plants or system current such as renewable energy is converted into alternating current in the PCS 3 and sent to the load.
  • storage in the lead-acid battery B is performed.
  • the BMU 1 grasps the charging rate, the degree of deterioration, etc., and issues an operation command to the EMS 2 according to the state of the lead-acid battery B.
  • This operation command is further transmitted to the PCS 3 to appropriately issue a charge/discharge command for the lead-acid battery B, and output to the load described above.
  • the four components of the lead-acid battery system S are BMU1, EMS2, PCS3, and lead-acid battery B, but the components of the lead-acid battery system S are not limited to these. do not have. Moreover, it is also possible to provide the BMU1 with the functions of the EMS2 and the PCS3.
  • FIG. 2 is a block diagram showing the internal configuration of a BMU that constitutes the lead-acid battery system shown in FIG. 1 according to the first embodiment of the present invention and a second embodiment described later.
  • the BMU 1 includes a measurement section 11 , a recording section 12 , a state determination section 13 , a setting section 14 and a communication section 15 .
  • the measurement unit 11 receives information about measured values such as current, voltage, and temperature measured via the various sensors provided in the lead-acid battery B described above. Further, the measurement unit 11 may be set so that the above information is continuously input, or may be input between two arbitrarily set times in advance. Alternatively, it may be set to be entered periodically.
  • the recording unit 12 stores information about measured values from various sensors received by the measuring unit 11, information exchanged with the EMS 2, information necessary for calculating the capacity turnover value during operation and from the beginning to the end of life (for example, lead storage battery B's rated capacity, etc.), the results of processing by the state determination unit 13 (remaining life of the lead-acid battery B, the capacity turnover value during operation calculated by the state determination unit 13), etc. are recorded.
  • the state determination unit 13 determines the state of the lead-acid battery B, specifically, the remaining life of the lead-acid battery B by comparing the capacity turnover value from the beginning to the end of the life with the capacity turnover value during operation. to estimate.
  • the capacity turnover value is a value obtained by dividing the total discharge capacity by the rated capacity of the storage battery, as described above, and is used as a life index of the storage battery.
  • the capacity turnover value from the beginning to the end of life is obtained by dividing the total discharge capacity from the beginning to the end of life by the rated capacity of the storage battery. For example, in the case shown in FIG.
  • the capacity turnover value during operation is calculated by the method described later.
  • the processing by the state determination unit 13 is executed at any time, for example, during normal operation.
  • the processing by the state determination unit 13 is performed by charging and discharging the lead-acid battery B during the nighttime and discharging the lead-acid battery B during the peak power peak before noon.
  • the start timing a of the processing by the state determination unit is set to the middle of charging of the lead-acid battery B.
  • the end time b of the discharge start determination by the state determination unit 13 is when the lead-acid battery B starts discharging
  • the end time c of the discharge end determination is when the lead-acid battery B finishes discharging.
  • the setting unit 14 determines the state of the lead-acid battery B in the state determination unit 13. More specifically, the setting unit 14 is used when estimating the remaining life of the lead-acid battery B. For example, the current value used for discharge start determination and discharge end determination. , and transmits the set information to the recording unit 12 . An input unit and a display unit not shown in FIG. 2 are used for setting the threshold.
  • the communication unit 15 transmits the result of the processing of the state determination unit 13 recorded in the recording unit 12 to the EMS 2 .
  • the BMU 1 is a computer system having an arithmetic processing function. It has a configuration that is connected through Further, the input/output interface is connected to an input unit and a display unit used by a person who manages the lead-acid battery system S, and is also connected to each unit shown in FIG. 2 described above.
  • the CPU reads and executes a boot program for starting the BMU 1 from the ROM based on the input signal from the input section, and reads various operating systems stored in the recording section 12 .
  • the CPU may also control the lead-acid battery B or the like based on input signals from other external devices (not shown in FIG. 2) via the input section or input/output interface. Further, the CPU reads out the programs and data stored in the RAM, the recording unit 12, etc., and loads them into the RAM. It is a processing device that realizes a series of processes such as calculation and processing of necessary data.
  • the input unit is composed of an input device, such as a touch panel, through which a person who manages the lead-acid battery system S inputs various operations. sent.
  • the display unit is, for example, a liquid crystal display. This display unit receives an output signal from the CPU via the bus and displays the processing result of the CPU.
  • the BMU 1 itself is operated by remote control, for example, the input section and the display section do not have to be provided inside the BMU 1 .
  • the BMU 1 may have functions other than those described above.
  • FIG. 3 is a block diagram showing internal configurations of the recording unit 12 and the state determination unit 13 that constitute the BMU 1 shown in FIG. 2 in the lead-acid battery system S according to the first embodiment of the present invention.
  • the recording unit 12 is composed of, for example, a semiconductor or a magnetic disk.
  • the recording unit 12 stores information about measured values from various sensors received by the measuring unit 11, for example, current values and voltage values when the lead-acid battery B is charged and discharged, or information on the temperature of the lead-acid battery B, and EMS2.
  • the state determination unit 13 includes a current/temperature acquisition unit 131, a discharge start determination unit 132, a C rate calculation unit 133, a current value temperature correction unit 134, a discharge current integration unit 135, a discharge end determination unit 136, and a capacity turnover value calculation.
  • a unit 137 and a life estimation unit 138 are provided.
  • the current/temperature acquisition unit 131 acquires the current value and temperature information of the lead-acid battery B input to the recording unit 12 via the measurement unit 11 from the start to the end of the processing by the state determination unit 13. Acquired from the recording unit 12 .
  • the start timing a of the processing by the state determination unit 13 is set to the middle of charging of the lead-acid battery B.
  • the processing by the state determination unit 13 ends after the termination time c of the discharge termination determination.
  • the discharge start determination unit 132 determines whether or not the lead-acid battery B has started discharging from the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 131 . Specifically, when the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 131 is smaller than a threshold value, it is determined that discharge has started. Specifically, the threshold value is 0 amperes. When the current value of the lead-acid battery B is negative, it is determined that the discharge has started. is determined. The threshold for determining the start of discharge is set by the setting unit 14 and recorded in the recording unit 12 , and the discharge start determination unit 132 acquires information on the threshold from the recording unit 12 .
  • the C-rate calculating unit 133 calculates the C-rate from the current value of the lead-acid battery B acquired by the current/temperature acquiring unit 131. calculate.
  • the C rate represents the magnitude of the discharge current, and is calculated by dividing the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 131 by the rated current of the lead-acid battery B.
  • Information on the rated current of the lead-acid battery B is recorded in the recording unit 12 , and the C rate calculation unit 133 acquires the information on the rated current from the recording unit 12 .
  • the temperature correction coefficient is calculated by the following formula (1).
  • the storage battery coefficient is a correction value for each storage battery and is normally set to 1. Further, the discharge current accumulator 135 integrates the current value corrected by the temperature corrector 134 after the lead-acid battery B starts discharging, and the integrated discharge capacity value after the lead-acid battery B starts discharging. Calculate Further, the discharge end determination unit 136 determines whether or not the discharge of the lead-acid battery B is completed based on the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 131 . Specifically, when the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 131 is equal to or greater than the threshold, it is determined that the battery is in the charged state and the discharge is completed. determined to be in The threshold is the same as the threshold used in discharge start determination section 132 .
  • FIG. 4 is a block diagram showing the internal configuration of the capacity turnover value calculator 137 that constitutes the state determination unit 13 shown in FIG.
  • the capacity turnover value calculation unit 137 includes a previous capacity turnover value acquisition unit 137a, an integrated discharge capacity acquisition unit 137b, a rated capacity acquisition unit 137c, a DOD calculation unit 137d, a DOD correction coefficient calculation unit 137e, and a capacity turnover value calculation unit 137c. It has an over value calculator 137f.
  • the previous capacity turnover value acquisition unit 137a determines whether the state determination unit 13 starts processing (in the example shown in FIG. 8, A capacity turnover value (hereinafter referred to as the previous CT value) before the start time a of processing by the state determination unit 13 is acquired from the recording unit 12 .
  • the previous CT value is the CT value during operation calculated by the capacity turnover value calculation unit 137 during the previous processing by the state determination unit 13, and has already been entered in the
  • the accumulated discharge capacity acquisition unit 137b acquires information on the accumulated discharge capacity value calculated by the discharge current accumulation unit 135 after the lead-acid battery B starts discharging.
  • the rated capacity acquisition unit 137 c acquires information on the rated capacity (Ah) of the lead-acid battery B from the recording unit 12 .
  • the DOD calculation unit 137d calculates the DOD from the accumulated discharge capacity after the start of discharge of the lead-acid battery B obtained by the accumulated discharge capacity obtaining unit 137b and the rated capacity of the lead-acid battery B obtained by the rated capacity obtaining unit 137c.
  • DOD accumulated discharge capacity/rated capacity ⁇ 100%.
  • DOD represents the depth of discharge calculated by dividing the accumulated discharge capacity after the lead-acid battery B starts discharging by the rated capacity of the lead-acid battery B. As shown in FIG.
  • the DOD-based correction coefficient calculator 137e calculates a DOD-based correction coefficient Kdod(c) based on the DOD calculated by the DOD calculator 137d.
  • This DOD correction coefficient Kdod(c) is obtained by using the DOD calculated by the DOD calculation unit 137d and the average C rate calculated by the C rate calculation unit 133 by averaging the C rate over the discharge time, and the following ( 2) Calculated by the formula.
  • FIG. 9 shows an example of the relationship between the DOD representing the depth of discharge and the DOD correction coefficient Kdod(c).
  • the DOD correction coefficient Kdod(c) varies depending on the magnitude of the DOD and the C rate. .
  • 0.1CA, 0.2CA and 0.3CA indicate C rates.
  • the capacity turnover value calculation unit 137f calculates the CT value during operation by combining the previous CT value acquired by the previous capacity turnover value acquisition unit 137a and the lead storage battery B acquired by the accumulated discharge capacity acquisition unit 137b. Using the integrated discharge capacity after the start of discharge, the rated capacity (Ah) acquired by the rated capacity acquisition unit 137c, and the DOD correction coefficient Kdod (c) calculated by the DOD correction coefficient calculation unit 137e, It is calculated by the following formula (3).
  • the life estimation unit 138 of the state determination unit 13 compares the CT value from the beginning to the end of life obtained from the recording unit 12 with the CT value during operation calculated by the capacity turnover value calculation unit 137, Estimate the remaining lifetime of B. That is, the life estimator 138 estimates the remaining life of the lead-acid battery B from the CT value obtained by subtracting the CT value during operation from the CT value from the beginning to the end of the life. Then, the life estimation unit 138 records the estimation result by the life estimation unit 138 including the CT value during operation in the recording unit 12 .
  • the capacity turnover value calculation unit 137 calculates the cumulative discharge capacity after the lead-acid battery B starts discharging with the rated capacity of the lead-acid battery B.
  • a capacity turnover value during operation is calculated using a correction coefficient Kdod(c) based on the DOD calculated based on the DOD representing the depth of discharge calculated by division.
  • Kdod(c) a correction coefficient based on the DOD calculated based on the DOD representing the depth of discharge calculated by division.
  • the capacity turnover value calculation unit 137 calculates the above-mentioned DOD and the discharge current value when the lead-acid battery B is discharged with the rated capacity of the lead-acid battery B.
  • a correction coefficient Kdod(c) based on DOD is calculated using an average C rate obtained by averaging the C rate, which represents the magnitude of the discharge current calculated by division, over the discharge time. As shown in FIG. 17, the DOD varies depending on the C rate, which indicates the magnitude of the discharge current. becomes a more accurate value, and the remaining life of the lead-acid battery B can be estimated more accurately.
  • the lead-acid battery system S when the lead-acid battery B is a bipolar lead-acid battery, the lead-acid battery system S is capable of accurately estimating the remaining life of the bipolar lead-acid battery. can be done.
  • the method for estimating the life of a lead-acid battery according to the first embodiment will be described with reference to a flowchart showing the flow of processing in the state determination unit shown in FIG. capacity turnover value calculation step) and a flowchart showing the flow of processing in step S75 (correction coefficient calculation step by DOD) in the flow chart shown in FIG. to explain.
  • the state determination unit 13 for example, starts its processing from the start time a in FIG. 8, and as shown in FIG. From the start to the end of the processing by 13, information on the current value and temperature of the lead-acid battery B input to the recording unit 12 via the measuring unit 11 is acquired from the recording unit 12 (current value/temperature acquisition step).
  • step S2 the discharge start determination unit 132 of the state determination unit 13 determines whether or not the lead-acid battery B has started discharging from the current value of the lead-acid battery B acquired in step S1 (discharge start determination step). Specifically, when the current value of the lead-acid battery B obtained in step S1 is smaller than a threshold value, it is determined that discharge has started, and when it is equal to or greater than the threshold value, it is determined that the battery is in a charged state. Specifically, the threshold value is 0 amperes. When the current value of the lead-acid battery B is negative, it is determined that the discharge has started. is determined.
  • the threshold for determining the start of discharge is set by the setting unit 14 and recorded in the recording unit 12 , and the discharge start determination unit 132 acquires information on the threshold from the recording unit 12 .
  • the determination result in step S2 is YES (when it is determined that discharge has started)
  • the process proceeds to step S3, and when the determination result is NO, the process returns to step S1.
  • step S3 the C rate calculator 133 of the state determination unit 13 calculates the C rate from the current value of the lead-acid battery B acquired in step S1 (C rate calculation step).
  • the C rate represents the magnitude of the discharge current, and is calculated by dividing the current value of the lead-acid battery B obtained in step S1 by the rated current of the lead-acid battery B.
  • Information on the rated current of the lead-acid battery B is recorded in the recording unit 12 , and the C rate calculation unit 133 acquires the information on the rated current from the recording unit 12 .
  • step S4 the current value temperature correction unit 134 of the state determination unit 13 adjusts the current value of the lead-acid battery B acquired in step S1 to the temperature because the life of the lead-acid battery B changes depending on the temperature of the lead-acid battery B.
  • step S5 the discharge current integration unit 135 of the state determination unit 13 integrates the current value corrected in step S4 after the lead-acid battery B starts discharging. is calculated (accumulated discharge capacity calculation step).
  • step S6 the current/temperature acquisition unit 131 of the state determination unit 13 acquires again from the recording unit 12 the information on the current value and temperature of the lead-acid battery B input to the recording unit 12 via the measurement unit 11. (current value/temperature acquisition step).
  • step S7 the discharge end determination unit 136 of the state determination unit 13 determines whether or not the discharge of the lead-acid battery B is completed based on the current value of the lead-acid battery B acquired in step S6 (discharge end determination step). Specifically, when the current value of the lead-acid battery B obtained in step S6 is equal to or greater than a threshold value, it is determined that the battery is in a charged state and the discharge is completed.
  • the threshold is similar to the threshold used in step S2.
  • step S7 When the determination result in step S7 is YES (when it is determined that the discharge is finished), the process proceeds to step S8, and when the determination result is NO, the process returns to step S3.
  • the capacity turnover value calculation unit 137 of the state determination unit 13 calculates a capacity turnover value during operation (hereinafter referred to as a CT value during operation) (capacity turnover value calculation step).
  • step S71 the previous capacity turnover value acquisition unit 137a of the capacity turnover value calculation unit 137 is set before the state determination unit 13 starts processing (in the example shown in FIG.
  • the capacity turnover value (hereinafter referred to as the previous CT value) before the start time a) is obtained from the recording unit 12 (previous capacity turnover value obtaining step).
  • the previous CT value is the CT value during operation calculated by the capacity turnover value calculation unit 137 during the previous processing by the state determination unit 13, and has already been entered in the
  • step S72 the accumulated discharge capacity acquisition unit 137b of the capacity turnover value calculation unit 137 acquires information on the accumulated discharge capacity value after the lead-acid battery B starts discharging calculated in step S5 ( cumulative discharge capacity value acquisition step).
  • step S ⁇ b>73 the rated capacity acquiring section 137 c of the capacity turnover value calculating section 137 acquires information on the rated capacity (Ah) of the lead-acid battery B from the recording section 12 .
  • step S74 the DOD calculation unit 137d of the capacity turnover value calculation unit 137 calculates the accumulated discharge capacity after the start of discharge of the lead-acid battery B obtained in step S72 and the lead-acid battery B obtained in step S73.
  • DOD represents the depth of discharge calculated by dividing the accumulated discharge capacity after the lead-acid battery B starts discharging by the rated capacity of the lead-acid battery B. As shown in FIG.
  • step S75 the DOD correction coefficient calculation unit 137e of the capacity turnover value calculation unit 137 calculates the DOD correction coefficient Kdod(c) based on the DOD calculated in step S74 (the DOD correction coefficient calculation step).
  • the DOD-based correction coefficient calculator 137e acquires the DOD calculated in step S74 from the DOD calculator 137d (DOD acquisition step).
  • step S752 the DOD-based correction coefficient calculator 137e calculates an average C rate by averaging the C rates calculated in step S3 over the discharge time (average C rate calculation step).
  • step S753 the DOD correction coefficient calculation unit 137e uses the DOD obtained in step S751 and the average C rate calculated in step S752 to calculate the DOD correction coefficient Kdod( c) is calculated.
  • step S76 the capacity turnover value calculation unit 137f obtains the CT value during operation from the previous CT value obtained in step S71 and the CT value obtained in step S72. Using the accumulated discharge capacity after the lead-acid battery B started discharging, the rated capacity (Ah) acquired in step S73, and the correction coefficient Kdod (c) based on the DOD calculated in step S75, the above ( 3) Calculate by the formula. Thus, the processing in step S8 ends.
  • step S9 the life estimation unit 138 of the state determination unit 13 compares the CT value from the beginning to the end of the life obtained from the recording unit 12 with the CT value during operation calculated in step S7. Estimate remaining life. That is, the life estimator 138 estimates the remaining life of the lead-acid battery B from the CT value obtained by subtracting the CT value during operation from the CT value from the beginning to the end of the life. Then, the life estimation unit 138 records the estimation result by the life estimation unit 138 including the CT value during operation in the recording unit 12 . Thereby, the processing in the state determination unit 13 ends.
  • the capacity turnover value calculation step (step S8), the accumulated discharge capacity after the start of discharge of the lead-acid battery B is calculated as the lead-acid battery.
  • a capacity turnover value during operation is calculated using a correction coefficient Kdod(c) based on the DOD calculated based on the DOD representing the depth of discharge calculated by dividing by the rated capacity of B.
  • the DOD and the discharge current value when the lead-acid battery B is discharged are set to the lead-acid battery rating.
  • a correction coefficient Kdod(c) based on DOD is calculated using an average C rate obtained by averaging the C rate, which represents the magnitude of the discharge current calculated by dividing by the capacity, over the discharge time. Since the DOD changes depending on the C rate that represents the magnitude of the discharge current, the DOD and the average C rate are used to calculate the correction coefficient Kdod(c) based on the DOD, so that the capacity turnover value during operation can be improved. It is possible to provide a method for estimating the life of a lead-acid battery that can estimate the remaining life of the lead-acid battery B with high precision.
  • the lead-acid battery life estimation method can accurately estimate the remaining life of the bipolar lead-acid battery. can be provided.
  • FIG. 3 is a block diagram showing internal configurations of a recording unit 12 and a state determination unit 13 that constitute a BMU 1 shown in FIG. 2 in the lead-acid battery system S according to the second embodiment of the present invention shown in FIG. 1;
  • the lead-acid battery system S according to the second embodiment has the same basic configuration as the lead-acid battery system S according to the first embodiment, but the configuration of the state determination unit 13 is different.
  • the state determination unit 13 in the lead-acid battery system S according to the second embodiment determines the state of the lead-acid battery B in the same manner as the state determination unit 13 in the lead-acid battery system S according to the first embodiment.
  • the remaining life of the storage battery B is estimated by comparing the capacity turnover value from the beginning to the life and the capacity turnover value during operation.
  • the state determination unit 13 in the lead-acid battery system S according to the second embodiment differs in that the life of the lead-acid battery B changes depending on the temperature of the lead-acid battery B.
  • the temperature correction is not performed when integrating the current value during discharge as in the first embodiment, but when calculating the capacity turnover value during operation, the temperature correction coefficient Kt is used to calculate the capacity turnover. It differs in that the over value is calculated.
  • the state determination unit 13 in the lead-acid battery system S includes a current/temperature acquisition unit 231, a discharge start determination unit 232, a C rate calculation unit 233, a discharge current integration unit 234, a discharge An end determination unit 235 , a capacity turnover value calculation unit 236 and a life estimation unit 237 are provided.
  • the current/temperature acquisition unit 231 acquires the current value and temperature information of the lead-acid battery B input to the recording unit 12 via the measurement unit 11 from the start to the end of the processing by the state determination unit 13. Acquired from the recording unit 12 .
  • the discharge start determination unit 232 determines whether or not the lead-acid battery B has started discharging from the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 231 . Specifically, when the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 231 is smaller than a threshold value, it is determined that discharge has started. Specifically, the threshold value is 0 amperes. When the current value of the lead-acid battery B is negative, it is determined that the discharge has started. is determined. The threshold for determining the start of discharge is set by the setting unit 14 and recorded in the recording unit 12 , and the discharge start determination unit 232 acquires information on the threshold from the recording unit 12 .
  • the C-rate calculating unit 233 calculates the C-rate from the current value of the lead-acid battery B acquired by the current/temperature acquiring unit 231. calculate.
  • the C rate represents the magnitude of the discharge current, and is calculated by dividing the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 231 by the rated current of the lead-acid battery B.
  • Information on the rated current of the lead-acid battery B is recorded in the recording unit 12 , and the C rate calculation unit 233 acquires the information on the rated current from the recording unit 12 .
  • the discharge current integration unit 234 integrates the current value acquired by the current/temperature acquisition unit 231 after the lead-acid battery B starts discharging, and the integrated discharge after the lead-acid battery B starts discharging. Calculate the capacitance value.
  • the discharge end determination unit 235 determines whether or not the discharge of the lead-acid battery B is completed based on the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 231 . Specifically, when the current value of the lead-acid battery B acquired by the current/temperature acquisition unit 231 is equal to or greater than the threshold, it is determined that the battery is in the charged state and the discharge is completed. determined to be in The threshold is the same as the threshold used by the discharge start determination unit 232 .
  • FIG. 11 is a block diagram showing the internal configuration of the capacity turnover value calculator 236 that constitutes the state determination unit 13 shown in FIG.
  • the capacity turnover value calculation unit 236 includes a previous capacity turnover value acquisition unit 236a, an integrated discharge capacity acquisition unit 236b, a rated capacity acquisition unit 236c, a DOD calculation unit 236d, a DOD correction coefficient calculation unit 236e, and a temperature correction coefficient acquisition unit. It has a section 236f and a capacity turnover value calculation section 236g.
  • the previous capacity turnover value acquisition unit 236a determines whether the state determination unit 13 starts processing (in the example shown in FIG. 8, A capacity turnover value (hereinafter referred to as the previous CT value) before the start time a of processing by the state determination unit 13 is acquired from the recording unit 12 .
  • the previous CT value is the CT value during operation calculated by the capacity turnover value calculation unit 236 during the previous processing by the state determination unit 13, and is the CT value during operation calculated by the capacity turnover value calculation unit 236 to the recording unit 12. has already been entered in the
  • the accumulated discharge capacity acquisition unit 236b acquires information on the accumulated discharge capacity value after the lead-acid battery B starts discharging, which is calculated by the discharge current accumulation unit 234.
  • the rated capacity acquisition unit 236 c acquires information on the rated capacity (Ah) of the lead-acid battery B from the recording unit 12 .
  • the DOD calculation unit 236d calculates the DOD from the accumulated discharge capacity after the start of discharge of the lead-acid battery B obtained by the accumulated discharge capacity obtaining unit 236b and the rated capacity of the lead-acid battery B obtained by the rated capacity obtaining unit 236c.
  • DOD accumulated discharge capacity/rated capacity ⁇ 100%.
  • DOD represents the depth of discharge calculated by dividing the accumulated discharge capacity after the lead-acid battery B starts discharging by the rated capacity of the lead-acid battery B. As shown in FIG.
  • the DOD-based correction coefficient calculator 236e calculates a DOD-based correction coefficient Kdod(c) based on the DOD calculated by the DOD calculator 236d.
  • This DOD correction coefficient Kdod(c) is obtained by using the DOD calculated by the DOD calculation unit 236d and the average C rate obtained by averaging the C rate calculated by the C rate calculation unit 233 over the discharge time. 2) Calculated by the formula.
  • the temperature correction coefficient acquisition unit 236f obtains the lead-acid battery B obtained by the current/temperature acquisition unit 231 from the recording unit 12 that records the temperature coefficient conversion table representing the relationship between the temperature of the lead-acid battery B and the temperature correction coefficient. obtains a temperature correction coefficient Kt corresponding to the temperature of .
  • the capacity turnover value calculation unit 236g calculates the CT value during operation by combining the previous CT value acquired by the previous capacity turnover value acquisition unit 236a and the lead storage battery B acquired by the accumulated discharge capacity acquisition unit 236b.
  • the cumulative discharge capacity after the start of discharge, the rated capacity (Ah) obtained by the rated capacity obtaining unit 236c, the DOD correction coefficient Kdod (c) calculated by the DOD correction coefficient calculation unit 236e, and the temperature correction coefficient It is calculated by the following equation (4) using the temperature correction coefficient Kt acquired by the acquisition unit 236f.
  • the life estimation unit 237 of the state determination unit 13 compares the CT value from the beginning to the end of the life obtained from the recording unit 12 with the CT value during operation calculated by the capacity turnover value calculation unit 236, Estimate the remaining lifetime of B. That is, the life estimator 237 estimates the remaining life of the lead-acid battery B from the CT value obtained by subtracting the CT value during operation from the CT value from the beginning to the end of the life. Then, the life estimation unit 237 records the estimation result by the life estimation unit 237 including the CT value during operation in the recording unit 12 .
  • the capacity turnover value calculation unit 236 calculates the cumulative discharge capacity after the lead-acid battery B starts discharging with the rated capacity of the lead-acid battery B.
  • a capacity turnover value during operation is calculated using a correction coefficient Kdod(c) based on the DOD calculated based on the DOD representing the depth of discharge calculated by division.
  • Kdod(c) a correction coefficient based on the DOD calculated based on the DOD representing the depth of discharge calculated by division.
  • the capacity turnover value calculation unit 236 calculates the above-mentioned DOD and the discharge current value when the lead-acid battery B is discharged with the rated capacity of the lead-acid battery B.
  • a correction coefficient Kdod(c) based on DOD is calculated using an average C rate obtained by averaging the C rate, which represents the magnitude of the discharge current calculated by division, over the discharge time. As shown in FIG. 17, the DOD varies depending on the C rate, which indicates the magnitude of the discharge current. becomes a more accurate value, and the remaining life of the lead-acid battery B can be estimated more accurately.
  • the lead-acid battery system S can accurately estimate the remaining life of the bipolar lead-acid battery. can be done.
  • step S17 capacity turnover value calculation step
  • step S165 correction coefficient calculation step by DOD
  • the state determination unit 13 for example, starts its processing from the start time a in FIG. 8, and as shown in FIG. From the start to the end of the processing by 13, information on the current value and temperature of the lead-acid battery B input to the recording unit 12 via the measuring unit 11 is acquired from the recording unit 12 (current value/temperature acquisition step).
  • step S12 the discharge start determination unit 232 of the state determination unit 13 determines whether or not the lead-acid battery B has started discharging from the current value of the lead-acid battery B acquired in step S11 (discharge start determination step). Specifically, when the current value of the lead-acid battery B obtained in step S11 is smaller than the threshold value, it is determined that discharge has started, and when it is equal to or greater than the threshold value, it is determined that the battery is in a charged state. Specifically, the threshold value is 0 amperes. When the current value of the lead-acid battery B is negative, it is determined that the discharge has started. is determined.
  • the threshold for determining the start of discharge is set by the setting unit 14 and recorded in the recording unit 12 , and the discharge start determination unit 132 acquires information on the threshold from the recording unit 12 . Then, when the determination result in step S12 is YES (when it is determined that discharge has started), the process proceeds to step S13, and when the determination result is NO, the process returns to step S11.
  • step S13 the C rate calculation unit 233 of the state determination unit 13 calculates the C rate from the current value of the lead-acid battery B acquired in step S11 (C rate calculation step).
  • the C rate represents the magnitude of the discharge current, and is calculated by dividing the current value of the lead-acid battery B obtained in step S11 by the rated current of the lead-acid battery B.
  • Information on the rated current of the lead-acid battery B is recorded in the recording unit 12 , and the C rate calculation unit 133 acquires the information on the rated current from the recording unit 12 .
  • step S14 the discharge current integration unit 234 of the state determination unit 13 integrates the current value acquired in step S11 after the lead-acid battery B started discharging. Calculate the cumulative discharge capacity value after (integrated discharge capacity calculation step).
  • step S15 the current/temperature acquisition unit 231 of the state determination unit 13 of the state determination unit 13 obtains the information on the current value and temperature of the lead-acid battery B input to the recording unit 12 via the measurement unit 11 again. Acquired from the recording unit 12 (current value/temperature acquisition step).
  • step S16 the discharge end determination unit 235 of the state determination unit 13 determines whether or not the discharge of the lead-acid battery B is completed based on the current value of the lead-acid battery B obtained in step S15 (discharge end determination step). Specifically, when the current value of the lead-acid battery B obtained in step S15 is equal to or greater than the threshold value, it is determined that the battery is in the charged state, and the discharge is terminated.
  • the threshold is similar to the threshold used in step S12.
  • step S16 determines whether the discharge is finished. If the determination result in step S16 is YES (when it is determined that the discharge is finished), the process proceeds to step S17, and when the determination result is NO, the process returns to step S13.
  • the capacity turnover value calculation unit 236 of the state determination unit 13 calculates a capacity turnover value during operation (hereinafter referred to as CT value during operation) (capacity turnover value calculation step).
  • step S161 the previous capacity turnover value acquisition unit 236a of the capacity turnover value calculation unit 236 is set before the state determination unit 13 starts processing (in the example shown in FIG.
  • the capacity turnover value (hereinafter referred to as the previous CT value) before the start time a) is obtained from the recording unit 12 (previous capacity turnover value obtaining step).
  • the previous CT value is the CT value during operation calculated by the capacity turnover value calculation unit 236 during the previous processing by the state determination unit 13, and is the CT value during operation calculated by the capacity turnover value calculation unit 236 to the recording unit 12. has already been entered in the
  • step S162 the accumulated discharge capacity acquisition unit 236b of the capacity turnover value calculation unit 236 acquires information on the accumulated discharge capacity value after the lead-acid battery B starts discharging calculated in step S5 ( cumulative discharge capacity value acquisition step).
  • step S ⁇ b>163 the rated capacity acquisition unit 236 c of the capacity turnover value calculation unit 236 acquires information on the rated capacity of the lead-acid battery B from the recording unit 12 .
  • step S164 the DOD calculation unit 236d of the capacity turnover value calculation unit 236 calculates the accumulated discharge capacity after the start of discharge of the lead-acid battery B obtained in step S162 and the lead-acid battery B obtained in step S163.
  • DOD represents the depth of discharge calculated by dividing the accumulated discharge capacity after the lead-acid battery B starts discharging by the rated capacity of the lead-acid battery B. As shown in FIG.
  • step S165 the DOD-based correction coefficient calculator 236e of the capacity turnover value calculator 236 calculates a DOD-based correction coefficient Kdod(c) based on the DOD calculated by the DOD calculator 236d. correction coefficient calculation step).
  • step S1651 the DOD-based correction coefficient calculator 236e acquires the DOD calculated in step S164 from the DOD calculator 236d (DOD acquisition step).
  • step S1652 the DOD-based correction coefficient calculation unit 236e calculates an average C rate by averaging the C rates calculated in step S13 over the discharge time (average C rate calculation step).
  • step S1653 the DOD correction coefficient calculation unit 236e uses the DOD obtained in step S1651 and the average C rate calculated in step S1652 to calculate the DOD correction coefficient Kdod ( c) is calculated.
  • step S166 the temperature correction coefficient acquisition unit 236f stores the temperature coefficient conversion table representing the relationship between the temperature of the lead-acid battery B and the temperature correction coefficient. , the temperature correction coefficient Kt corresponding to the temperature of the lead-acid battery B obtained in step S11 is obtained.
  • step S167 the capacity turnover value calculation unit 236g combines the CT value during operation with the previous CT value obtained in step S161 and the CT value obtained in step S162 after lead-acid battery B starts discharging. (4 ) is calculated by the formula. Thus, the processing in step S17 ends.
  • step S18 the life estimation unit 237 of the state determination unit 13 compares the CT value from the beginning to the end of the life obtained from the recording unit 12 with the CT value during operation calculated in step S16. Estimate remaining life. That is, the life estimator 138 estimates the remaining life of the lead-acid battery B from the CT value obtained by subtracting the CT value during operation from the CT value from the beginning to the end of the life. Then, the life estimation unit 237 records the estimation result by the life estimation unit 237 including the CT value during operation in the recording unit 12 . Thereby, the processing in the state determination unit 13 ends.
  • the accumulated discharge capacity after the lead-acid battery B starts discharging is calculated as the lead-acid battery
  • a capacity turnover value during operation is calculated using a correction coefficient Kdod(c) based on the DOD calculated based on the DOD representing the depth of discharge calculated by dividing by the rated capacity of B.
  • the DOD and the discharge current value when the lead-acid battery B is discharged are set to the lead-acid battery rating.
  • a correction coefficient Kdod(c) based on DOD is calculated using an average C rate obtained by averaging the C rate, which represents the magnitude of the discharge current calculated by dividing by the capacity, over the discharge time. Since the DOD changes depending on the C rate that represents the magnitude of the discharge current, the DOD and the average C rate are used to calculate the correction coefficient Kdod(c) based on the DOD, so that the capacity turnover value during operation can be improved. It is possible to provide a method for estimating the life of a lead-acid battery that can estimate the remaining life of the lead-acid battery B with high precision.
  • the lead-acid battery life estimation method can accurately estimate the remaining life of the bipolar lead-acid battery. can be provided.
  • the present invention is not limited to this and can be modified and improved in various ways.
  • the current value and temperature correction unit 134 determines the lead-acid battery acquired by the current/temperature acquisition unit 131 (step S1).
  • the current value of B is corrected according to its temperature, this temperature correction is not necessarily performed.
  • the temperature correction coefficient acquisition unit 236f acquires from the recording unit 12 the current/temperature acquisition unit 231 (step S11).
  • a temperature correction coefficient Kt corresponding to the temperature of the lead-acid battery B that is in operation is obtained, and the capacity turnover value calculation unit 236g (step S167) uses the temperature correction coefficient Kt to calculate the CT value during operation.
  • the correction by the temperature correction coefficient Kt may not necessarily be performed.
  • the correction coefficient Kdod(c) based on the DOD is set to ( 2) is calculated by the formula, but if the correction coefficient Kdod(c) by the DOD is calculated using the DOD and the average C rate, the formula (2) does not necessarily have to be used.
  • a lead-acid battery system and a lead-acid battery life estimation method according to the present invention can accurately estimate the remaining life of a lead-acid battery by calculating a capacity turnover value during operation in consideration of the size of the DOD. Therefore, it can be extremely beneficially used in various industries.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することで、鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システム及び鉛蓄電池の寿命推定方法を提供する。鉛蓄電池システム(S)は、鉛蓄電池(B)の残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する。鉛蓄電池システム(S)は、運用途中のキャパシーンオーバー値を算出するキャパシティーターンオーバー値算出部(137)を備える。キャパシティーターンオーバー値算出部(137)は、鉛蓄電池(B)が放電を開始してからの積算放電容量を鉛蓄電池(B)の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数Kdod(c)を用いて、運用途中のキャパシティーターンオーバー値を算出する。

Description

鉛蓄電池システム及び鉛蓄電池の寿命推定方法
 本発明は、鉛蓄電池の残り寿命を推定する鉛蓄電池システム及び鉛蓄電池の寿命推定方法に関する。
 近年、太陽光や風力等の自然エネルギーを利用した発電設備が増えている。このような発電設備においては、発電量を制御することができないことから、蓄電池を利用して電力負荷の平準化を図るようにしている。すなわち、発電量が消費量よりも多いときには差分を蓄電池に充電する一方、発電量が消費量よりも小さいときには差分を蓄電池から放電するようにしている。
 このような蓄電池としては、例えば、鉛蓄電池やリチウムイオン二次電池等を挙げることができる。これら電力貯蔵用の蓄電池は、住宅やオフィス、或いは、工場、電力会社等の敷地に設置される。そして運用開始から数年ないし10年単位での使用が想定されている。
 このように長期間の使用が想定される場合、運用開始後、定期的に保守・管理(メンテナンス)を行う必要がある。なぜならば上述したような各種蓄電池の場合、使用とともに劣化が進行し、利用可能な電池容量が減少することが知られているからである。これらの蓄電池は、一次電池のように一度の放電によりその容量が無くなってしまったからといって直ちに交換されるものではなく、繰り返し使用されるものである。そのため、設置された蓄電池の状態の適切な把握が求められる。
 ここで、一般的な鉛蓄電池のサイクル特性の例について説明すると、図15に示すように、劣化による鉛蓄電池の容量低下が発生するのは例えば寿命4500サイクルに対して3900サイクル近辺からであり、鉛蓄電池の寿命近くにならないと特性変化が現れない可能性がある。
 この鉛蓄電池の容量低下の主な要因は、正極格子と活物質の密着性の低下である。エネルギー密度の観点から、近年注目されている双極(バイポーラ)型鉛蓄電池では、寿命近くになって更に急激な容量低下が発生する可能性がある。
 このように鉛蓄電池の寿命近くにならないと特性変化(容量低下)が現れない可能性に鑑みて、放電回数に関連した指標であるキャパシティーターンオーバー値(CT値)から鉛蓄電池の寿命を推定することが従来より行われている。
 ここで、キャパシティーターンオーバー値について説明すると、キャパシティーターンオーバー値は、総放電容量を蓄電池の定格容量で除した値であり、蓄電池の寿命指標に使用されるものである。サイクル充放電用鉛蓄電池では、一定条件のもと当初から寿命までの放電回数(サイクル寿命)が求められており、当初から寿命までのキャパシティーターンオーバー値の算出が可能となっている。図16には、放電深度を表すDODと蓄電池の寿命との関係の一例が示されており、矢印Aで示すところの定格容量1000Ahの鉛蓄電池がDOD70%で4500サイクル分の放電可能である場合、当初から寿命までのキャパシティーターンオーバー値は、総放電容量(1000Ah×70%×4500サイクル)/定格容量(1000Ah)=3150(回)となる。
 従って、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較することで、鉛蓄電池の残りの寿命を推定することができる。
 一方、従来の鉛蓄電池の寿命予測方法として、例えば、特許文献1に示すものが知られている。
 特許文献1に示す鉛蓄電池の寿命予測方法は、鉛蓄電池の充電電流値から充電電気量を積算し、積算値から鉛蓄電池の寿命を予測するものである。そして、特許文献1に示す鉛蓄電池の寿命予測方法では、予め標準鉛蓄電池を用いて充電電池電圧及び電池温度と充電電流との関係を測定しておき、対象となる鉛蓄電池の充電電池電圧及び電池温度を検出して検出値と前述の関係とに基づいて充電電流値を決定するようにしている。
特開平2-288074号公報
 しかしながら、この従来の特許文献1に示す鉛蓄電池の寿命予測方法にあっては、鉛蓄電池の寿命予測において、鉛蓄電池の充電電流値から充電電気量を積算し、積算値から鉛蓄電池の寿命を予測するものであって、前述した当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較することで、鉛蓄電池の残りの寿命を推定するものではない。このため、鉛蓄電池の残りの寿命を正確に推定することが困難である。
 一方、鉛蓄電池の劣化要因としては、正極箔の劣化の他に、活物質の軟化及びサルフェーションがあり、これら活物質の軟化及びサルフェーションによる鉛蓄電池の劣化モードは放電深度を表すDOD(蓄電池の定格容量に対する積算放電容量の比)によって変化する。鉛蓄電池の寿命は、図16に示したようにDODの大きさによって変化する。
 このため、活物質の軟化及びサルフェーションによる劣化進行を考慮して鉛蓄電池の寿命を推定するために運用途中のキャパシティーターンオーバー値を算出するためには、DODの大きさを考慮することが望ましい。
 従って、本発明は、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することで、鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システム及び鉛蓄電池の寿命推定方法を提供することを目的とする。
 本発明の一態様に係る鉛蓄電池システムは、鉛蓄電池の残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する鉛蓄電池システムであって、前記運用途中のキャパシティーターンオーバー値を算出するキャパシティーターンオーバー値算出部を備え、該キャパシティーターンオーバー値算出部は、前記鉛蓄電池が放電を開始してからの積算放電容量を前記鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、前記運用途中のキャパシティーターンオーバー値を算出することを要旨とする。
 また、本発明の別の態様に係る鉛蓄電池の寿命推定方法は、鉛蓄電池の残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する鉛蓄電池の寿命推定方法であって、前記運用途中のキャパシティーターンオーバー値を算出するキャパシティーターンオーバー値算出ステップを含み、該キャパシティーターンオーバー値算出ステップでは、前記鉛蓄電池が放電を開始してからの積算放電容量を前記鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、前記運用途中のキャパシティーターンオーバー値を算出することを要旨とする。
 本発明に係る鉛蓄電池システムによれば、キャパシティーターンオーバー値算出部は、鉛蓄電池が放電を開始してからの積算放電容量を鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、運用途中のキャパシティーターンオーバー値を算出するので、DODによる変化を考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システムを提供することができる。
 また、本発明に係る鉛蓄電池システムによれば、キャパシティーターンオーバー値算出部は、前述のDODと、鉛蓄電池が放電する際の放電電流値を鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを時間で平均した平均Cレートとを用いて、前述のDODによる補正係数を算出する。DODは放電電流の大きさを表すCレートによって変化するため(図17参照)、DODと、平均Cレートとを用いてDODによる補正係数を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池の残り寿命をより精度よく推定することができる鉛蓄電池システムを提供することができる。
 また、本発明に係る鉛蓄電池システムによれば、鉛蓄電池が、バイポーラ型鉛蓄電池である。これにより、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システムを提供することができる。
 本発明に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップでは、鉛蓄電池が放電を開始してからの積算放電容量を鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、運用途中のキャパシティーターンオーバー値を算出するので、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、本発明に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップでは、前述のDODと、鉛蓄電池が放電する際の放電電流値を鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを時間で平均した平均Cレートとを用いて、前述のDODによる補正係数を算出する。DODは放電電流の大きさを表すCレートによって変化するため、DODと、平均Cレートとを用いてDODによる補正係数を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池の残り寿命をより精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、本発明に係る鉛蓄電池の寿命推定方法によれば、鉛蓄電池が、バイポーラ型鉛蓄電池である。これにより、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
本発明の第1及び第2実施形態に係る鉛蓄電池システムの全体の構成を示すブロック図である。 本発明の第1及び第2実施形態に係る図1に示す鉛蓄電池システムを構成するBMUの内部構成を示すブロック図である。 本発明の第1実施形態に係る鉛蓄電池システムにおいて、図2に示すBMUを構成する記録部及び状態判定部の内部構成を示すブロック図である。 図3に示す状態判定部を構成するキャパシティーターンオーバー値算出部の内部構成を示すブロック図である。 図3に示す状態判定部における処理の流れを示すフローチャートである。 図5に示すフローチャートにおけるステップS8(キャパシティーターンオーバー値算出ステップ)の処理の流れを示すフローチャートである。 図6に示すフローチャートにおけるステップS75(DODによる補正係数算出ステップ)の処理の流れを示すフローチャートである。 鉛蓄電池の充放電について、夜間に鉛蓄電池を充電し、昼前の電力ピーク時に放電するピークカット/ピークシフトを例にした場合の、状態判定部による処理の開始時期と、放電開始判定の終了時期と、放電終了判定の終了時期とを説明するための図である。 放電深度を表すDODとDODによる補正係数Kdod(c)との関係の一例を示すグラフである。 本発明の第2実施形態に係る鉛蓄電池システムにおいて、図2に示すBMUを構成する記録部及び状態判定部の内部構成を示すブロック図である。 図10に示す状態判定部を構成するキャパシティーターンオーバー値算出部の内部構成を示すブロック図である。 図10に示す状態判定部における処理の流れを示すフローチャートである。 図12に示すフローチャートにおけるステップS17(キャパシティーターンオーバー値算出ステップ)の処理の流れを示すフローチャートである。 図13に示すフローチャートにおけるステップS165(DODによる補正係数算出ステップ)の処理の流れを示すフローチャートである。 一般的な鉛蓄電池のサイクル特性の例を説明するためのグラフである。 放電深度を表すDODと蓄電池の寿命との関係の一例を示すグラフである。 放電電流の大きさを表すCレートと放電深度を表すDODとの関係の一例を示すグラフである。
 以下、本発明の実施の形態について図面を参照して詳細に説明する。なお、以下に説明する実施の形態は、本発明の一例を示したものである。また、本実施の形態には種々の変更又は改良を加えることが可能であり、その様な変更又は改良を加えた形態も本発明に含まれ得る。この実施形態やその変形は、発明の範囲や要旨に含まれると共に、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
(第1実施形態)
 図1には、本発明の第1実施形態及び後述する第2実施形態に係る鉛蓄電池システムの全体構成が示されている。
 図1に示す鉛蓄電池システムSは、例えば火力発電所等の各種発電所、或いは、風力発電等の再生可能エネルギーによって作られて送電された系統電流を鉛蓄電池Bに蓄電するとともに、鉛蓄電池Bに蓄電された電力を必要に応じて家庭やオフィス、工場等の負荷に対して送電するシステムである。この鉛蓄電池システムSは、鉛蓄電池Bの他、BMU1と、EMS2と、PCS3と、を備えている。
 BMU1は、電池管理ユニット(Buttery Management Unit)であり、鉛蓄電池Bを構成する各セルの電圧や鉛蓄電池B全体の温度等を管理する装置である。そのため、BMU1は、鉛蓄電池Bに設けられる各種情報を取得するセンサを介して、鉛蓄電池Bの状態を把握することができるようにされている。
 また、BMU1は、鉛蓄電池Bの残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する。このため、BMU1は、当該推定に必要な寿命推定プログラムを備えている。
 なお、BMU1の機能については、ここで説明した機能に限定されるわけではなく、例えば、各セルにおける電圧のバランスを管理するといった、その他の機能を備えていても良い。
 BMU1は、演算処理機能を有するコンピュータシステムであり、ハードウェアに予め記憶された各種専用のコンピュータプログラムを実行することにより、各機能をソフトウェア上で実現できるようになっている。また、BMU1は鉛蓄電池Bの近傍に設置されていても良く、また、クラウド上での管理、或いは、リモート(遠隔)で管理されるように構成されていても良い。BMU1の詳しい構成については後述する。
 EMS2は、いわゆるエネルギー管理システム(Energy Management System)であり、電力エネルギーの使用状況を把握、管理し、最適化するシステムである。また、PCS3はパワーコンディショナー(Power Conditioning System)であり、系統電流等で作られる直流電流を交流電流に変換し、負荷への出力や鉛蓄電池Bへの蓄電に適した安定した出力に整える役割を果たす。
 鉛蓄電池Bは、電極に鉛を用いた二次電池である。鉛蓄電池Bとしては、バイポーラ型鉛蓄電池を適用すると好ましいが、どのような構造のものであってもよく、設置数、設置方法等についても限定はなく、任意に設定可能である。また、鉛蓄電池Bでは、BMU1に対して後述する各種センサから取得した情報(センサ情報)を送信するが、取得されたセンサ情報をBMU1に送信し、例えば、PCS3からの指令を受信するための送受信装置等が設けられている。
 鉛蓄電池Bには当該運転履歴情報を取得するための各種センサが設けられている(図1ではこれら各種センサの表示を省略している)。各種センサは、電流、電圧、或いは、温度といった鉛蓄電池Bの運転履歴や状態を示す情報を取得するセンサである。これらのセンサは、ユニットごとに設けられていても、或いは、個々の鉛蓄電池Bごとに設けられていても良い。
 第1実施形態及び後述する第2実施形態に係る鉛蓄電池システムSにおいては、火力等の発電所、或いは、再生可能エネルギーといった系統電流からの直流電流をPCS3において交流電流に変換等し、負荷への出力、鉛蓄電池Bへの蓄電が行われる。
 BMU1では、鉛蓄電池Bの残り寿命を推定するほか、充電率や劣化度合い等を把握し、鉛蓄電池Bの状態に合わせてEMS2に対して運転指令を出す。この運転指令は、さらにPCS3へと送信されて、適宜鉛蓄電池Bに対する充放電の指令を出し、上述した負荷への出力等を行う。
 なお、図1に示すように、鉛蓄電池システムSの構成要素としてBMU1、EMS2、PCS3及び鉛蓄電池Bの4つを挙げているが、鉛蓄電池システムSの構成要素はこれらに限定されるものではない。また、BMU1にEMS2やPCS3の機能を付与することも可能であり、この場合には鉛蓄電池システムSはBMU1と鉛蓄電池Bとから構成される。
 次に、BMU1についてさらに詳しく説明する。図2は、本発明の第1実施形態及び後述する第2実施形態に係る図1に示す鉛蓄電池システムを構成するBMUの内部構成を示すブロック図である。
 BMU1は、計測部11と、記録部12と、状態判定部13と、設定部14と、通信部15と、を備えている。
 計測部11は、鉛蓄電池Bに設けられている上述した各種センサを介して測定された電流、電圧、温度等の測定値に関する情報を受信する。また、計測部11は、上記情報が連続的に入力されるように設定されていても良く、或いは、予め任意に設定された2つの時間の間に入力されても良い。または、定期的に入力されるように設定されていても良い。
 記録部12は、計測部11が受信した各種センサからの測定値に関する情報、EMS2とやりとりした情報、運用途中及び当初から寿命までのキャパシティーターンオーバー値の算出に必要な情報(例えば、鉛蓄電池Bの定格容量等)、状態判定部13の処理による結果(鉛蓄電池Bの残り寿命、状態判定部13で算出された運用途中のキャパシティーターンオーバー値)等を記録している。
 状態判定部13は、鉛蓄電池Bの状態を判定、具体的には、鉛蓄電池Bの残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する。ここで、キャパシティーターンオーバー値は、前述したように、総放電容量を蓄電池の定格容量で除した値であり、蓄電池の寿命指標に使用されるものである。当初から寿命までのキャパシティーターンオーバー値は、当初から寿命までの総放電容量を蓄電池の定格容量で除して求められるものであり、例えば、図16に示す場合、矢印Aで示すところの定格容量1000Ahの鉛蓄電池がDOD70%で4500サイクル分の放電可能である場合、当初から寿命までのキャパシティーターンオーバー値(以下、当初から寿命までのCT値という)は、総放電容量(1000Ah×70%×4500サイクル)/定格容量(1000Ah)=3150(回)となる。また、運用途中のキャパシティーターンオーバー値は、後述する方法によって算出する。
 状態判定部13による処理は、例えば通常運転時に随時実行される。状態判定部13による処理は、例えば、図8に示すように、鉛蓄電池Bの充放電について、夜間に鉛蓄電池Bを充電し、昼前の電力ピーク時に放電するピークカット/ピークシフトを例にした場合には、状態判定部による処理の開始時期aは鉛蓄電池Bの充電途中とされる。なお、図8において、状態判定部13による放電開始判定の終了時期bは鉛蓄電池Bの放電開始時、放電終了判定の終了時期cは鉛蓄電池Bの放電終了時とされる。
 設定部14は、状態判定部13において鉛蓄電池Bの状態を判定、具体的には鉛蓄電池Bの残り寿命を推定する際に用いられる、例えば、放電開始判定及び放電終了判定に用いられる電流値の閾値等を設定し、設定された情報を記録部12に送信する。閾値の設定に当たっては、図2に図示されない入力部や表示部が利用される。
 通信部15は、記録部12に記録された状態判定部13の処理による結果等をEMS2に送信する。
 BMU1は、前述したように、演算処理機能を有するコンピュータシステムであり、CPU(Central Processing Unit)と、ROM(Read Only Memory)と、RAM(Random Access Memory)と、入出力インターフェイスとがバスを介して接続される構成を備えている。さらに当該入出力インターフェイスには、鉛蓄電池システムSを管理する者が使用する入力部や表示部が接続されるとともに、上述した図2に示す各部が接続されている。
 CPUは、入力部からの入力信号に基づいてROMからBMU1を起動するためのブートプログラムを読み出して実行し、記録部12に格納されている各種オペレーティングシステムを読み出す。またCPUは、入力部や入出力インターフェイスを介して、図2において図示していないその他の外部機器からの入力信号に基づいて鉛蓄電池B等の制御を行うこととされていても良い。
 さらにCPUは、RAMや記録部12等に記憶されたプログラム及びデータを読み出してRAMにロードするとともに、RAMから読み出されたプログラムのコマンドに基づいて、鉛蓄電池Bの残り寿命を推定するために必要なデータの計算、加工等、一連の処理を実現する処理装置である。
 入力部は、鉛蓄電池システムSを管理する者が各種の操作を入力する、例えばタッチパネル等の入力デバイスにより構成されており、管理者の操作に基づいて入力信号が作成されバスを介してCPUに送信される。
 表示部は、例えば液晶ディスプレイである。この表示部は、CPUからバスを介して出力信号を受信し、CPUの処理結果を表示する。
 なお、BMU1自体が遠隔操作によって操作される場合には、例えば、入力部や表示部はBMU1の内部に設けられていなくても足りる。また、BMU1は以上説明した各部以外の機能を備えていても良い。
 次に記録部12及び状態判定部13の内部構成をさらに詳細に説明すると以下の通りである。図3は、本発明の第1実施形態に係る鉛蓄電池システムSにおいて、図2に示すBMU1を構成する記録部12及び状態判定部13の内部構成を示すブロック図である。
 記録部12は、例えば、半導体や磁気ディスクで構成されている。記録部12は、計測部11が受信した各種センサからの測定値に関する情報、例えば、鉛蓄電池Bが充放電を行った際の電流値や電圧値、或いは、鉛蓄電池Bの温度の情報、EMS2とやりとりした情報、運用途中及び当初から寿命までのキャパシティーターンオーバー値の算出に必要な情報(例えば、鉛蓄電池Bの定格容量等)、状態判定部13の処理による結果(鉛蓄電池Bの残り寿命、状態判定部13で算出された運用途中のキャパシティーターンオーバー値)等を記録する。
 状態判定部13は、電流・温度取得部131、放電開始判定部132、Cレート算出部133、電流値温度補正部134、放電電流積算部135、放電終了判定部136、キャパシティーターンオーバー値算出部137、及び寿命推定部138を備えている。
 電流・温度取得部131は、状態判定部13による処理が開始してから終了にいたるまでの間、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する。例えば、図8に示す例においては、状態判定部13による処理の開始時期aは鉛蓄電池Bの充電途中とされる。また、図8に示す例において状態判定部13による処理の終了は、放電電終了判定の終了時期cの後である。
 また、放電開始判定部132は、電流・温度取得部131で取得している鉛蓄電池Bの電流値から鉛蓄電池Bが放電を開始したか否かを判定する。具体的には、電流・温度取得部131で取得している鉛蓄電池Bの電流値が、閾値よりも小さい場合に放電開始と判定し、閾値以上の場合には充電状態にあると判定する。閾値は具体的には0アンペアであり、鉛蓄電池Bの電流値がマイナス電流である場合には放電開始と判定され、鉛蓄電池Bの電流値が0かプラス電流の場合には充電状態にあると判定される。放電開始の判定を行う際の閾値は、設定部14において設定され記録部12に記録されたものであり、放電開始判定部132は、その閾値の情報を記録部12から取得する。
 また、Cレート算出部133は、放電開始判定部132において鉛蓄電池Bが放電を開始したと判定された後、電流・温度取得部131で取得している鉛蓄電池Bの電流値からCレートを算出する。
 Cレートは、放電電流の大きさを表すものであり、電流・温度取得部131で取得している鉛蓄電池Bの電流値を、鉛蓄電池Bの定格電流で除算して算出する。鉛蓄電池Bの定格電流の情報は、記録部12に記録されており、Cレート算出部133は、その定格電流の情報を記録部12から取得する。
 また、電流値温度補正部134は、鉛蓄電池Bの寿命が鉛蓄電池Bの温度によって変化することから、電流・温度取得部131で取得している鉛蓄電池Bの電流値をその温度に応じて補正する。
 具体的に説明すると、25℃を基準温度とし、アレニウスの式に則り温度が10°上昇した場合に25℃と比較して劣化が2倍加速する(放電電流が2倍となったと同等)と仮定する。
 そして、温度補正後の電流値=電流値×温度補正係数の式に基づいて、電流・温度取得部131で取得している鉛蓄電池Bの電流値を補正する。ここで、温度補正係数は、次の(1)式により算出される。
Figure JPOXMLDOC01-appb-M000001
 蓄電池係数は蓄電池毎の補正値であり、通常は1に設定される。
 また、放電電流積算部135は、鉛蓄電池Bが放電を開始してからの電流値温度補正部134で補正した電流値を積算し、鉛蓄電池Bが放電を開始してからの積算放電容量値を算出する。
 また、放電終了判定部136は、電流・温度取得部131で取得している鉛蓄電池Bの電流値から鉛蓄電池Bの放電が終了したか否かを判定する。具体的には、電流・温度取得部131で取得している鉛蓄電池Bの電流値が、閾値以上の場合には充電状態になったとして放電終了と判定し、閾値より小さい場合には放電状態にあると判定する。閾値は放電開始判定部132で使用される閾値と同様である。
 次に、キャパシティーターンオーバー値算出部137は、放電終了判定部136において、鉛蓄電池Bの放電が終了したと判定される場合に、運用途中のキャパシティーターンオーバー値(以下、運用途中のCT値という)を算出する。
 キャパシティーターンオーバー値算出部137の内部構成を更に詳細に説明すると、以下の通りである。図4は、図3に示す状態判定部13を構成するキャパシティーターンオーバー値算出部137の内部構成を示すブロック図である。
 キャパシティーターンオーバー値算出部137は、前回キャパシティーターンオーバー値取得部137a、積算放電容量取得部137b、定格容量取得部137c、DOD算出部137d、DODによる補正係数算出部137e、及びキャパシティーターンオーバー値演算部137fを備えている。
 前回キャパシティーターンオーバー値取得部137aは、放電終了判定部136において、鉛蓄電池Bの放電が終了したと判定される場合に、状態判定部13による処理を開始する前(図8に示す例では状態判定部13による処理の開始時期aより前)のキャパシティーターンオーバー値(以下、前回のCT値という)を記録部12から取得する。前回のCT値は、キャパシティーターンオーバー値算出部137によって前回の状態判定部13による処理のときに算出された運用途中のCT値であって、キャパシティーターンオーバー値算出部137から記録部12に既に入力されたものである。
 また、積算放電容量取得部137bは、放電電流積算部135で算出された鉛蓄電池Bが放電を開始してからの積算放電容量値の情報を取得する。
 また、定格容量取得部137cは、記録部12から鉛蓄電池Bの定格容量(Ah)の情報を取得する。
 また、DOD算出部137dは、積算放電容量取得部137bで取得した鉛蓄電池Bが放電を開始してからの積算放電容量と定格容量取得部137cで取得した鉛蓄電池Bの定格容量とからDODを、DOD=積算放電容量/定格容量×100%の式に基づいて算出する。DODは、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すものである。
 また、DODによる補正係数算出部137eは、DOD算出部137dで算出されたDODに基づいてDODによる補正係数Kdod(c)を算出する。
 このDODによる補正係数Kdod(c)は、DOD算出部137dで算出されたDODと、Cレート算出部133で算出されたCレートを放電時間で平均した平均Cレートとを用いて、次の(2)式によって算出される。
Figure JPOXMLDOC01-appb-M000002
 ここで、(2)式において、cは平均Cレート、dはDOD、αは0.0267、βは70、γは22.790、εは70である。
 図9には、放電深度を表すDODとDODによる補正係数Kdod(c)との関係の一例が示されており、DODによる補正係数Kdod(c)は、DOD及びCレートの大きさによって変化する。図9において、0.1CA、0.2CA、0.3CAはCレートを示す。
 更に、キャパシティーターンオーバー値演算部137fは、運用途中のCT値を、前回キャパシティーターンオーバー値取得部137aで取得した前回のCT値と、積算放電容量取得部137bで取得した鉛蓄電池Bが放電を開始してからの積算放電容量と、定格容量取得部137cで取得した定格容量(Ah)と、DODによる補正係数算出部137eで算出したDODによる補正係数Kdod(c)とを用いて、次の(3)式により算出する。
Figure JPOXMLDOC01-appb-M000003
 そして、状態判定部13の寿命推定部138は、記録部12から取得した当初から寿命までのCT値とキャパシティーターンオーバー値算出部137で算出した運用途中のCT値とを比較し、鉛蓄電池Bの残りの寿命を推定する。つまり、寿命推定部138は、当初から寿命までのCT値から運用途中のCT値を差し引いたCT値から鉛蓄電池Bの残りの寿命を推定する。
 そして、寿命推定部138は、運用途中のCT値を含めた寿命推定部138による推定結果を記録部12に記録する。
 このように、第1実施形態に係る鉛蓄電池システムSによれば、キャパシティーターンオーバー値算出部137は、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数Kdod(c)を用いて、運用途中のキャパシティーターンオーバー値を算出する。これにより、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池Bの残り寿命を精度よく推定することができる。
 また、第1実施形態に係る鉛蓄電池システムSによれば、キャパシティーターンオーバー値算出部137は、前述のDODと、鉛蓄電池Bが放電する際の放電電流値を鉛蓄電池Bの定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、DODによる補正係数Kdod(c)を算出する。DODは、図17に示すように、放電電流の大きさを表すCレートによって変化するため、DODと、平均Cレートとを用いてDODによる補正係数Kdod(c)を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池Bの残り寿命をより精度よく推定することができる。
 また、第1実施形態に係る鉛蓄電池システムSにおいて、鉛蓄電池Bを、バイポーラ型鉛蓄電池とした場合、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システムSを提供することができる。
 次に、第1実施形態に係る鉛蓄電池の寿命推定方法を、図5に示された状態判定部における処理の流れを示すフローチャート、図6に示された、図5に示すフローチャートにおけるステップS8(キャパシティーターンオーバー値算出ステップ)の処理の流れを示すフローチャート、及び図7に示された、図6に示すフローチャートにおけるステップS75(DODによる補正係数算出ステップ)の処理の流れを示すフローチャートを参照して説明する。
 状態判定部13は、例えば、図8における開始時期aからその処理を開始し、図5に示すように、先ず、ステップS1において、状態判定部13の電流・温度取得部131が、状態判定部13による処理が開始してから終了にいたるまでの間、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する(電流値・温度取得ステップ)。
 次いで、ステップS2において、状態判定部13の放電開始判定部132が、ステップS1で取得している鉛蓄電池Bの電流値から鉛蓄電池Bが放電を開始したか否かを判定する(放電開始判定ステップ)。具体的には、ステップS1で取得している鉛蓄電池Bの電流値が、閾値よりも小さい場合に放電開始と判定し、閾値以上の場合には充電状態にあると判定する。閾値は具体的には0アンペアであり、鉛蓄電池Bの電流値がマイナス電流である場合には放電開始と判定され、鉛蓄電池Bの電流値が0かプラス電流の場合には充電状態にあると判定される。放電開始の判定を行う際の閾値は、設定部14において設定され記録部12に記録されたものであり、放電開始判定部132は、その閾値の情報を記録部12から取得する。
 そして、ステップS2における判定結果がYESの場合(放電開始と判定された場合)、ステップS3に移行し、判定結果がNOの場合、ステップS1に戻る。
 ステップS3では、状態判定部13のCレート算出部133は、ステップS1で取得している鉛蓄電池Bの電流値からCレートを算出する(Cレート算出ステップ)。
 Cレートは、前述したように、放電電流の大きさを表すものであり、ステップS1で取得している鉛蓄電池Bの電流値を、鉛蓄電池Bの定格電流で除算して算出する。鉛蓄電池Bの定格電流の情報は、記録部12に記録されており、Cレート算出部133は、その定格電流の情報を記録部12から取得する。
 次いで、ステップS4において、状態判定部13の電流値温度補正部134が、鉛蓄電池Bの寿命が鉛蓄電池Bの温度によって変化することから、ステップS1で取得した鉛蓄電池Bの電流値をその温度に応じて補正する(電流値温度補正ステップ)。
 次いで、ステップS5において、状態判定部13の放電電流積算部135が、鉛蓄電池Bが放電を開始してからのステップS4で補正した電流値を積算し、鉛蓄電池Bが放電を開始してからの積算放電容量値を算出する(積算放電容量算出ステップ)。
 次いで、ステップS6において、状態判定部13の電流・温度取得部131が、再度、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する(電流値・温度取得ステップ)。
 次いで、ステップS7において、状態判定部13の放電終了判定部136が、ステップS6で取得した鉛蓄電池Bの電流値から鉛蓄電池Bの放電が終了したか否かを判定する(放電終了判定ステップ)。具体的には、ステップS6で取得した鉛蓄電池Bの電流値が、閾値以上の場合には充電状態になったとして放電終了と判定し、閾値より小さい場合には放電状態にあると判定する。閾値はステップS2で使用される閾値と同様である。
 そして、ステップS7における判定結果がYESの場合(放電終了と判定された場合)、ステップS8に移行し、判定結果がNOの場合、ステップS3に戻る。
 ステップS8では、状態判定部13のキャパシティーターンオーバー値算出部137は、運用途中のキャパシティーターンオーバー値(以下、運用途中のCT値という)を算出する(キャパシティーターンオーバー値算出ステップ)。
 このステップS8の処理の詳細な流れを図6を参照して説明する。
 先ず、ステップS71において、キャパシティーターンオーバー値算出部137の前回キャパシティーターンオーバー値取得部137aが、状態判定部13による処理を開始する前(図8に示す例では状態判定部13による処理の開始時期aより前)のキャパシティーターンオーバー値(以下、前回のCT値という)を記録部12から取得する(前回キャパシティーターンオーバー値取得ステップ)。前回のCT値は、キャパシティーターンオーバー値算出部137によって前回の状態判定部13による処理のときに算出された運用途中のCT値であって、キャパシティーターンオーバー値算出部137から記録部12に既に入力されたものである。
 次いで、ステップS72において、キャパシティーターンオーバー値算出部137の積算放電容量取得部137bが、ステップS5で算出された鉛蓄電池Bが放電を開始してからの積算放電容量値の情報を取得する(積算放電容量値取得ステップ)。
 次いで、ステップS73において、キャパシティーターンオーバー値算出部137の定格容量取得部137cが記録部12から鉛蓄電池Bの定格容量(Ah)の情報を取得する。
 次いで、ステップS74において、キャパシティーターンオーバー値算出部137のDOD算出部137dが、ステップS72で取得した鉛蓄電池Bが放電を開始してからの積算放電容量とステップS73で取得した鉛蓄電池Bの定格容量とからDODを、DOD=積算放電容量/定格容量×100%の式に基づいて算出する(DOD算出ステップ)。DODは、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すものである。
 次いで、ステップS75において、キャパシティーターンオーバー値算出部137のDODによる補正係数算出部137eは、ステップS74で算出されたDODに基づいてDODによる補正係数Kdod(c)を算出する(DODによる補正係数算出ステップ)。
 このステップS75の処理の詳細な流れを図7を参照して説明する。
 先ず、ステップS751において、DODによる補正係数算出部137eは、ステップS74で算出されたDODをDOD算出部137dから取得する(DOD取得ステップ)。
 次いで、ステップS752において、DODによる補正係数算出部137eは、ステップS3で算出されたCレートを放電時間で平均した平均Cレートを算出する(平均Cレート算出ステップ)。
 次いで、ステップS753において、DODによる補正係数算出部137eは、ステップS751で取得したDODと、ステップS752で算出した平均Cレートとを用いで、前述の(2)式により、DODによる補正係数Kdod(c)を算出する。
 DODによる補正係数Kdod(c)の算出が終了したら、ステップS76において、キャパシティーターンオーバー値演算部137fは、運用途中のCT値を、ステップS71で取得した前回のCT値と、ステップS72で取得した鉛蓄電池Bが放電を開始してからの積算放電容量と、ステップS73で取得した定格容量(Ah)と、ステップS75で算出したDODによる補正係数Kdod(c)とを用いて、前述の(3)式により算出する。
 これにより、ステップS8における処理は終了する。
 そして、ステップS9において、状態判定部13の寿命推定部138が、記録部12から取得した当初から寿命までのCT値とステップS7で算出した運用途中のCT値とを比較し、鉛蓄電池Bの残りの寿命を推定する。つまり、寿命推定部138は、当初から寿命までのCT値から運用途中のCT値を差し引いたCT値から鉛蓄電池Bの残りの寿命を推定する。
 そして、寿命推定部138は、運用途中のCT値を含めた寿命推定部138による推定結果を記録部12に記録する。
 これにより、状態判定部13における処理は終了する。
 このように、第1実施形態に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップ(ステップS8)では、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数Kdod(c)を用いて、運用途中のキャパシティーターンオーバー値を算出する。これにより、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池Bの残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、第1実施形態に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップ(ステップS8)では、DODと、鉛蓄電池Bが放電する際の放電電流値を鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、DODによる補正係数Kdod(c)を算出する。DODは放電電流の大きさを表すCレートによって変化するため、DODと、平均Cレートとを用いてDODによる補正係数Kdod(c)を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池Bの残り寿命をより精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、第1実施形態に係る鉛蓄電池の寿命推定方法において、鉛蓄電池Bを、バイポーラ型鉛蓄電池とした場合、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
(第2実施形態)
 次に、本発明の第2実施形態に係る鉛蓄電池システム及び鉛蓄電池の寿命推定方法について、図10乃至図14を参照して説明する。図1に示した本発明の第2実施形態に係る鉛蓄電池システムSにおいて、図2に示すBMU1を構成する記録部12及び状態判定部13の内部構成を示すブロック図である。
 第2実施形態に係る鉛蓄電池システムSは、第1実施形態に係る鉛蓄電池システムSと基本構成は同様であるが、状態判定部13の構成が相違している。
 第2実施形態に係る鉛蓄電池システムSにおける状態判定部13は、第1実施形態に係る鉛蓄電池システムSにおける状態判定部13と同様に、鉛蓄電池Bの状態を判定、具体的には、鉛蓄電池Bの残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する。但し、第2実施形態に係る鉛蓄電池システムSにおける状態判定部13は、第1実施形態に係る鉛蓄電池システムSにおける状態判定部13と異なり、鉛蓄電池Bの寿命が鉛蓄電池Bの温度によって変化することに鑑みて、温度補正を第1実施形態のように放電の際の電流値積算時にするのではなく、運用途中のキャパシティーターンオーバー値の算出時に温度補正係数Ktを用いてキャパシティーターンオーバー値を算出するようにしている点で異なる。
 第2実施形態に係る鉛蓄電池システムSにおける状態判定部13は、図10に示すように、電流・温度取得部231、放電開始判定部232、Cレート算出部233、放電電流積算部234、放電終了判定部235、キャパシティーターンオーバー値算出部236、及び寿命推定部237を備えている。
 電流・温度取得部231は、状態判定部13による処理が開始してから終了にいたるまでの間、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する。
 また、放電開始判定部232は、電流・温度取得部231で取得している鉛蓄電池Bの電流値から鉛蓄電池Bが放電を開始したか否かを判定する。具体的には、電流・温度取得部231で取得している鉛蓄電池Bの電流値が、閾値よりも小さい場合に放電開始と判定し、閾値以上の場合には充電状態にあると判定する。閾値は具体的には0アンペアであり、鉛蓄電池Bの電流値がマイナス電流である場合には放電開始と判定され、鉛蓄電池Bの電流値が0かプラス電流の場合には充電状態にあると判定される。放電開始の判定を行う際の閾値は、設定部14において設定され記録部12に記録されたものであり、放電開始判定部232は、その閾値の情報を記録部12から取得する。
 また、Cレート算出部233は、放電開始判定部232において鉛蓄電池Bが放電を開始したと判定された後、電流・温度取得部231で取得している鉛蓄電池Bの電流値からCレートを算出する。
 Cレートは、放電電流の大きさを表すものであり、電流・温度取得部231で取得している鉛蓄電池Bの電流値を、鉛蓄電池Bの定格電流で除算して算出する。鉛蓄電池Bの定格電流の情報は、記録部12に記録されており、Cレート算出部233は、その定格電流の情報を記録部12から取得する。
 また、放電電流積算部234は、鉛蓄電池Bが放電を開始してからの電流・温度取得部231で取得している電流値を積算し、鉛蓄電池Bが放電を開始してからの積算放電容量値を算出する。
 また、放電終了判定部235は、電流・温度取得部231で取得している鉛蓄電池Bの電流値から鉛蓄電池Bの放電が終了したか否かを判定する。具体的には、電流・温度取得部231で取得している鉛蓄電池Bの電流値が、閾値以上の場合には充電状態になったとして放電終了と判定し、閾値より小さい場合には放電状態にあると判定する。閾値は放電開始判定部232で使用される閾値と同様である。
 次に、キャパシティーターンオーバー値算出部236は、放電終了判定部235において、鉛蓄電池Bの放電が終了したと判定される場合に、運用途中のキャパシティーターンオーバー値(以下、運用途中のCT値という)を算出する。
 キャパシティーターンオーバー値算出部236の内部構成を更に詳細に説明すると、以下の通りである。図11は、図10に示す状態判定部13を構成するキャパシティーターンオーバー値算出部236の内部構成を示すブロック図である。
 キャパシティーターンオーバー値算出部236は、前回キャパシティーターンオーバー値取得部236a、積算放電容量取得部236b、定格容量取得部236c、DOD算出部236d、DODによる補正係数算出部236e、温度補正係数取得部236f、及びキャパシティーターンオーバー値演算部236gを備えている。
 前回キャパシティーターンオーバー値取得部236aは、放電終了判定部235において、鉛蓄電池Bの放電が終了したと判定される場合に、状態判定部13による処理を開始する前(図8に示す例では状態判定部13による処理の開始時期aより前)のキャパシティーターンオーバー値(以下、前回のCT値という)を記録部12から取得する。前回のCT値は、キャパシティーターンオーバー値算出部236によって前回の状態判定部13による処理のときに算出された運用途中のCT値であって、キャパシティーターンオーバー値算出部236から記録部12に既に入力されたものである。
 また、積算放電容量取得部236bは、放電電流積算部234で算出された鉛蓄電池Bが放電を開始してからの積算放電容量値の情報を取得する。
 また、定格容量取得部236cは、記録部12から鉛蓄電池Bの定格容量(Ah)の情報を取得する。
 また、DOD算出部236dは、積算放電容量取得部236bで取得した鉛蓄電池Bが放電を開始してからの積算放電容量と定格容量取得部236cで取得した鉛蓄電池Bの定格容量とからDODを、DOD=積算放電容量/定格容量×100%の式に基づいて算出する。DODは、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すものである。
 また、DODによる補正係数算出部236eは、DOD算出部236dで算出されたDODに基づいてDODによる補正係数Kdod(c)を算出する。
 このDODによる補正係数Kdod(c)は、DOD算出部236dで算出されたDODと、Cレート算出部233で算出されたCレートを放電時間で平均した平均Cレートとを用いて、前述の(2)式によって算出される。
 また、温度補正係数取得部236fは、鉛蓄電池Bの温度と温度補正係数との関係を表す温度係数換算表を記録した記録部12から、電流・温度取得部231で取得している鉛蓄電池Bの温度に対応する温度補正係数Ktを取得する。
 更に、キャパシティーターンオーバー値演算部236gは、運用途中のCT値を、前回キャパシティーターンオーバー値取得部236aで取得した前回のCT値と、積算放電容量取得部236bで取得した鉛蓄電池Bが放電を開始してからの積算放電容量と、定格容量取得部236cで取得した定格容量(Ah)と、DODによる補正係数算出部236eで算出したDODによる補正係数Kdod(c)と、温度補正係数取得部236fで取得した温度補正係数Ktとを用いて、次の(4)式により算出する。
Figure JPOXMLDOC01-appb-M000004
 そして、状態判定部13の寿命推定部237は、記録部12から取得した当初から寿命までのCT値とキャパシティーターンオーバー値算出部236で算出した運用途中のCT値とを比較し、鉛蓄電池Bの残りの寿命を推定する。つまり、寿命推定部237は、当初から寿命までのCT値から運用途中のCT値を差し引いたCT値から鉛蓄電池Bの残りの寿命を推定する。
 そして、寿命推定部237は、運用途中のCT値を含めた寿命推定部237による推定結果を記録部12に記録する。
 このように、第2実施形態に係る鉛蓄電池システムSによれば、キャパシティーターンオーバー値算出部236は、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数Kdod(c)を用いて、運用途中のキャパシティーターンオーバー値を算出する。これにより、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池Bの残り寿命を精度よく推定することができる。
 また、第2実施形態に係る鉛蓄電池システムSによれば、キャパシティーターンオーバー値算出部236は、前述のDODと、鉛蓄電池Bが放電する際の放電電流値を鉛蓄電池Bの定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、DODによる補正係数Kdod(c)を算出する。DODは、図17に示すように、放電電流の大きさを表すCレートによって変化するため、DODと、平均Cレートとを用いてDODによる補正係数Kdod(c)を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池Bの残り寿命をより精度よく推定することができる。
 また、第2実施形態に係る鉛蓄電池システムSにおいて、鉛蓄電池Bを、バイポーラ型鉛蓄電池とした場合、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池システムSを提供することができる。
 次に、第2実施形態に係る鉛蓄電池の寿命推定方法を、図12に示された状態判定部における処理の流れを示すフローチャート、図13に示された、図12に示すフローチャートにおけるステップS17(キャパシティーターンオーバー値算出ステップ)の処理の流れを示すフローチャート、及び図14に示された、図13に示すフローチャートにおけるステップS165(DODによる補正係数算出ステップ)の処理の流れを示すフローチャートを参照して説明する。
 状態判定部13は、例えば、図8における開始時期aからその処理を開始し、図12に示すように、先ず、ステップS11において、状態判定部13の電流・温度取得部231が、状態判定部13による処理が開始してから終了にいたるまでの間、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する(電流値・温度取得ステップ)。
 次いで、ステップS12において、状態判定部13の放電開始判定部232が、ステップS11で取得している鉛蓄電池Bの電流値から鉛蓄電池Bが放電を開始したか否かを判定する(放電開始判定ステップ)。具体的には、ステップS11で取得した鉛蓄電池Bの電流値が、閾値よりも小さい場合に放電開始と判定し、閾値以上の場合には充電状態にあると判定する。閾値は具体的には0アンペアであり、鉛蓄電池Bの電流値がマイナス電流である場合には放電開始と判定され、鉛蓄電池Bの電流値が0かプラス電流の場合には充電状態にあると判定される。放電開始の判定を行う際の閾値は、設定部14において設定され記録部12に記録されたものであり、放電開始判定部132は、その閾値の情報を記録部12から取得する。
 そして、ステップS12における判定結果がYESの場合(放電開始と判定された場合)、ステップS13に移行し、判定結果がNOの場合、ステップS11に戻る。
 ステップS13では、状態判定部13のCレート算出部233が、ステップS11で取得している鉛蓄電池Bの電流値からCレートを算出する(Cレート算出ステップ)。
 Cレートは、前述したように、放電電流の大きさを表すものであり、ステップS11で取得している鉛蓄電池Bの電流値を、鉛蓄電池Bの定格電流で除算して算出する。鉛蓄電池Bの定格電流の情報は、記録部12に記録されており、Cレート算出部133は、その定格電流の情報を記録部12から取得する。
 次いで、ステップS14において、状態判定部13の放電電流積算部234が、鉛蓄電池Bが放電を開始してからのステップS11で取得している電流値を積算し、鉛蓄電池Bが放電を開始してからの積算放電容量値を算出する(積算放電容量算出ステップ)。
 次いで、ステップS15において、状態判定部13の状態判定部13の電流・温度取得部231が、再度、計測部11を介して記録部12に入力された鉛蓄電池Bの電流値及び温度の情報を記録部12から取得する(電流値・温度取得ステップ)。
 次いで、ステップS16において、状態判定部13の放電終了判定部235が、ステップS15で取得した鉛蓄電池Bの電流値から鉛蓄電池Bの放電が終了したか否かを判定する(放電終了判定ステップ)。具体的には、ステップS15で取得した鉛蓄電池Bの電流値が、閾値以上の場合には充電状態になったとして放電終了と判定し、閾値より小さい場合には放電状態にあると判定する。閾値はステップS12で使用される閾値と同様である。
 そして、ステップS16における判定結果がYESの場合(放電終了と判定された場合)、ステップS17に移行し、判定結果がNOの場合、ステップS13に戻る。
 ステップS17では、状態判定部13のキャパシティーターンオーバー値算出部236が、運用途中のキャパシティーターンオーバー値(以下、運用途中のCT値という)を算出する(キャパシティーターンオーバー値算出ステップ)。
 このステップS17の処理の詳細な流れを図13を参照して説明する。
 先ず、ステップS161において、キャパシティーターンオーバー値算出部236の前回キャパシティーターンオーバー値取得部236aが、状態判定部13による処理を開始する前(図8に示す例では状態判定部13による処理の開始時期aより前)のキャパシティーターンオーバー値(以下、前回のCT値という)を記録部12から取得する(前回キャパシティーターンオーバー値取得ステップ)。前回のCT値は、キャパシティーターンオーバー値算出部236によって前回の状態判定部13による処理のときに算出された運用途中のCT値であって、キャパシティーターンオーバー値算出部236から記録部12に既に入力されたものである。
 次いで、ステップS162において、キャパシティーターンオーバー値算出部236の積算放電容量取得部236bが、ステップS5で算出された鉛蓄電池Bが放電を開始してからの積算放電容量値の情報を取得する(積算放電容量値取得ステップ)。
 次いで、ステップS163において、キャパシティーターンオーバー値算出部236の定格容量取得部236cが、記録部12から鉛蓄電池Bの定格容量の情報を取得する。
 次いで、ステップS164において、キャパシティーターンオーバー値算出部236のDOD算出部236dが、ステップS162で取得した鉛蓄電池Bが放電を開始してからの積算放電容量とステップS163で取得した鉛蓄電池Bの定格容量とからDODを、DOD=積算放電容量/定格容量×100%の式に基づいて算出する(DOD算出ステップ)。DODは、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すものである。
 次いで、ステップS165において、キャパシティーターンオーバー値算出部236のDODによる補正係数算出部236eは、DOD算出部236dで算出されたDODに基づいてDODによる補正係数Kdod(c)を算出する(DODによる補正係数算出ステップ)。
 このステップS165の処理の詳細な流れを図14を参照して説明する。
 先ず、ステップS1651において、DODによる補正係数算出部236eは、ステップS164で算出されたDODをDOD算出部236dから取得する(DOD取得ステップ)。
 次いで、ステップS1652において、DODによる補正係数算出部236eは、ステップS13で算出されたCレートを放電時間で平均した平均Cレートを算出する(平均Cレート算出ステップ)。
 次いで、ステップS1653において、DODによる補正係数算出部236eが、ステップS1651で取得したDODと、ステップS1652で算出した平均Cレートとを用いで、前述の(2)式により、DODによる補正係数Kdod(c)を算出する。
 DODによる補正係数Kdod(c)の算出が終了したら、ステップS166において、温度補正係数取得部236fが、鉛蓄電池Bの温度と温度補正係数との関係を表す温度係数換算表を記録した記録部12から、ステップS11で取得している鉛蓄電池Bの温度に対応する温度補正係数Ktを取得する。
 次いで、ステップS167において、キャパシティーターンオーバー値演算部236gが、運用途中のCT値を、ステップS161で取得した前回のCT値と、ステップS162で取得した鉛蓄電池Bが放電を開始してからの積算放電容量と、ステップS163で取得した定格容量(Ah)と、ステップS165で算出したDODによる補正係数Kdod(c)と、ステップS166で取得した温度補正係数Ktとを用いて、前述の(4)式により算出する。
 これにより、ステップS17における処理は終了する。
 そして、ステップS18において、状態判定部13の寿命推定部237が、記録部12から取得した当初から寿命までのCT値とステップS16で算出した運用途中のCT値とを比較し、鉛蓄電池Bの残りの寿命を推定する。つまり、寿命推定部138は、当初から寿命までのCT値から運用途中のCT値を差し引いたCT値から鉛蓄電池Bの残りの寿命を推定する。
 そして、寿命推定部237は、運用途中のCT値を含めた寿命推定部237による推定結果を記録部12に記録する。
 これにより、状態判定部13における処理は終了する。
 このように、第2実施形態に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップ(ステップS17)では、鉛蓄電池Bが放電を開始してからの積算放電容量を鉛蓄電池Bの定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数Kdod(c)を用いて、運用途中のキャパシティーターンオーバー値を算出する。これにより、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することができ、正極箔腐食に加え、活物質の軟化やサルフェーションによる劣化進行を考慮するが可能となり、鉛蓄電池Bの残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、第2実施形態に係る鉛蓄電池の寿命推定方法によれば、キャパシティーターンオーバー値算出ステップ(ステップS17)では、DODと、鉛蓄電池Bが放電する際の放電電流値を鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、DODによる補正係数Kdod(c)を算出する。DODは放電電流の大きさを表すCレートによって変化するため、DODと、平均Cレートとを用いてDODによる補正係数Kdod(c)を算出することで、運用途中のキャパシティーターンオーバー値がより精度が高い値となり、鉛蓄電池Bの残り寿命をより精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 また、第2実施形態に係る鉛蓄電池の寿命推定方法において、鉛蓄電池Bを、バイポーラ型鉛蓄電池とした場合、バイポーラ型鉛蓄電池の残り寿命を精度よく推定することができる鉛蓄電池の寿命推定方法を提供することができる。
 以上、本発明の実施形態について説明してきたが、本発明はこれに限定されずに種々の変更、改良を行うことができる。
 例えば、第1実施形態に係る鉛蓄電池システムS及び鉛蓄電池の寿命推定方法では、電流値温度補正部134(ステップS4)において、電流・温度取得部131(ステップS1)で取得している鉛蓄電池Bの電流値をその温度に応じて補正するようにしているが、この温度補正は必ずしも行わなくても良い。
 また、第2実施形態に係る鉛蓄電池システムS及び鉛蓄電池の寿命推定方法では、温度補正係数取得部236f(ステップS166)において、記録部12から、電流・温度取得部231(ステップS11)で取得している鉛蓄電池Bの温度に対応する温度補正係数Ktを取得し、キャパシティーターンオーバー値演算部236g(ステップS167)では、当該温度補正係数Ktを用いて、運用途中のCT値を算出しているが、温度補正係数Ktによる補正は必ずしも行わなくても良い。
 また、第1実施形態に係る鉛蓄電池システムS及び鉛蓄電池の寿命推定方法、及び第2実施形態に係る鉛蓄電池システムS及び鉛蓄電池の寿命推定方法において、DODによる補正係数Kdod(c)を(2)式により算出しているが、DODと平均Cレートとを用いて、DODによる補正係数Kdod(c)を算出するのであれば、必ずしも(2)式に基づかなくても良い。
 本発明に係る鉛蓄電池システム及び鉛蓄電池の寿命推定方法は、DODの大きさを考慮して運用途中のキャパシティーターンオーバー値を算出することで、鉛蓄電池の残り寿命を精度よく推定することができるので、各種産業において極めて有益に利用することができる。
 1 BMU
 2 EMS
 3 PCS
 11 計測部
 12 記録部
 13 状態判定部
 14 設定部
 15 通信部
 131 電流・温度取得部
 132 放電開始判定部
 133 Cレート算出部
 134 電流値温度補正部
 135 放電電流積算部
 136 放電終了判定部
 137 キャパシティーターンオーバー値算出部
 137a 前回キャパシティーターンオーバー値取得部
 137b 積算放電容量取得部
 137c 定格容量取得部
 137d DOD算出部
 137e DODによる補正係数算出部
 137f キャパシティーターンオーバー値演算部
 138 寿命推定部
 231 電流・温度取得部
 232 放電開始判定部
 233 Cレート算出部
 234 放電電流積算部
 235 放電終了判定部
 236 キャパシティーターンオーバー値算出部
 236a 前回キャパシティーターンオーバー値取得部
 236b 積算放電容量取得部
 236c 定格容量取得部
 236d DOD算出部
 236e DODによる補正係数算出部
 236f 温度補正係数取得部
 236g キャパシティーターンオーバー値演算部
 237 寿命推定部
 B 鉛蓄電池
 S 鉛蓄電池システム

Claims (6)

  1.  鉛蓄電池の残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する鉛蓄電池システムであって、
     前記運用途中のキャパシティーターンオーバー値を算出するキャパシティーターンオーバー値算出部を備え、
     該キャパシティーターンオーバー値算出部は、前記鉛蓄電池が放電を開始してからの積算放電容量を前記鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、前記運用途中のキャパシティーターンオーバー値を算出することを特徴とする鉛蓄電池システム。
  2.  前記キャパシティーターンオーバー値算出部は、前記DODと、前記鉛蓄電池が放電する際の放電電流値を前記鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、前記DODによる補正係数を算出することを特徴とする請求項1に記載の鉛蓄電池システム。
  3.  前記鉛蓄電池が、バイポーラ型鉛蓄電池であることを特徴とする請求項1又は2に記載の鉛蓄電池システム。
  4.  鉛蓄電池の残り寿命を、当初から寿命までのキャパシティーターンオーバー値と運用途中のキャパシティーターンオーバー値とを比較して推定する鉛蓄電池の寿命推定方法であって、
     前記運用途中のキャパシティーターンオーバー値を算出するキャパシティーターンオーバー値算出ステップを含み、
     該キャパシティーターンオーバー値算出ステップでは、前記鉛蓄電池が放電を開始してからの積算放電容量を前記鉛蓄電池の定格容量で除算して算出される放電深度を表すDODに基づいて算出されるDODによる補正係数を用いて、前記運用途中のキャパシティーターンオーバー値を算出することを特徴とする鉛蓄電池の寿命推定方法。
  5.  前記キャパシティーターンオーバー値算出ステップでは、前記DODと、前記鉛蓄電池が放電する際の放電電流値を前記鉛蓄電池の定格容量で除算して算出される放電電流の大きさを表すCレートを放電時間で平均した平均Cレートとを用いて、前記DODによる補正係数を算出することを特徴とする請求項4に記載の鉛蓄電池の寿命推定方法。
  6.  前記鉛蓄電池が、バイポーラ型鉛蓄電池であることを特徴とする請求項4又は5に記載の鉛蓄電池の寿命推定方法。
PCT/JP2023/002257 2022-02-03 2023-01-25 鉛蓄電池システム及び鉛蓄電池の寿命推定方法 WO2023149301A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202380014466.4A CN118235052A (zh) 2022-02-03 2023-01-25 铅蓄电池系统及铅蓄电池的寿命推断方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022015639 2022-02-03
JP2022-015639 2022-02-03

Publications (1)

Publication Number Publication Date
WO2023149301A1 true WO2023149301A1 (ja) 2023-08-10

Family

ID=87552211

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/002257 WO2023149301A1 (ja) 2022-02-03 2023-01-25 鉛蓄電池システム及び鉛蓄電池の寿命推定方法

Country Status (2)

Country Link
CN (1) CN118235052A (ja)
WO (1) WO2023149301A1 (ja)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001091605A (ja) * 1999-09-27 2001-04-06 Yuasa Corp 鉛蓄電池の残存容量、残存寿命及び寿命の判定装置とその判定方法
JP2003161768A (ja) * 2001-11-28 2003-06-06 Ntt Power & Building Facilities Inc 蓄電池の劣化予測方法
JP2008074257A (ja) * 2006-09-21 2008-04-03 Mazda Motor Corp バッテリ劣化判定装置
WO2010001605A1 (ja) * 2008-07-02 2010-01-07 パナソニック株式会社 鉛蓄電池の寿命推定方法および電源システム
WO2011051997A1 (ja) * 2009-10-26 2011-05-05 新神戸電機株式会社 鉛蓄電池の運用方法及び該運用方法により運用される鉛蓄電池を備えた蓄電装置
CN103529399A (zh) * 2013-10-28 2014-01-22 湖南大学 一种基于铅酸电池改进型pngv模型的模拟方法
JP2017219405A (ja) * 2016-06-07 2017-12-14 日立化成株式会社 車両およびその電池状態検知システム
JP2018152959A (ja) * 2017-03-10 2018-09-27 オムロン株式会社 蓄電池システム、パワーコンディショナおよび蓄電池の寿命保証方法
JP6430054B1 (ja) * 2018-05-21 2018-11-28 古河電池株式会社 蓄電池の容量把握方法および容量監視装置
WO2020066290A1 (ja) * 2018-09-27 2020-04-02 古河電池株式会社 鉛蓄電池
CN112290637A (zh) * 2020-11-06 2021-01-29 国网辽宁省电力有限公司电力科学研究院 延长电池储能寿命的双电池运行策略生成方法

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001091605A (ja) * 1999-09-27 2001-04-06 Yuasa Corp 鉛蓄電池の残存容量、残存寿命及び寿命の判定装置とその判定方法
JP2003161768A (ja) * 2001-11-28 2003-06-06 Ntt Power & Building Facilities Inc 蓄電池の劣化予測方法
JP2008074257A (ja) * 2006-09-21 2008-04-03 Mazda Motor Corp バッテリ劣化判定装置
WO2010001605A1 (ja) * 2008-07-02 2010-01-07 パナソニック株式会社 鉛蓄電池の寿命推定方法および電源システム
WO2011051997A1 (ja) * 2009-10-26 2011-05-05 新神戸電機株式会社 鉛蓄電池の運用方法及び該運用方法により運用される鉛蓄電池を備えた蓄電装置
CN103529399A (zh) * 2013-10-28 2014-01-22 湖南大学 一种基于铅酸电池改进型pngv模型的模拟方法
JP2017219405A (ja) * 2016-06-07 2017-12-14 日立化成株式会社 車両およびその電池状態検知システム
JP2018152959A (ja) * 2017-03-10 2018-09-27 オムロン株式会社 蓄電池システム、パワーコンディショナおよび蓄電池の寿命保証方法
JP6430054B1 (ja) * 2018-05-21 2018-11-28 古河電池株式会社 蓄電池の容量把握方法および容量監視装置
WO2020066290A1 (ja) * 2018-09-27 2020-04-02 古河電池株式会社 鉛蓄電池
CN112290637A (zh) * 2020-11-06 2021-01-29 国网辽宁省电力有限公司电力科学研究院 延长电池储能寿命的双电池运行策略生成方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
NAKAJIMA HIDEHITO, HONMA, TOKUNORI, MIDORIKAWA, KIYOSHI, AKASAKA, YUICHI, SHIBATA, SATOSHI, YOSHIDA, HIDEAKI, HASHIMOTO, KENSUKE, : "Development of UltraBattery", vol. 131, 1 February 2013 (2013-02-01), pages 21 - 27, XP093082556, ISSN: 1348-1789 *
NAKAMURA HIDETO, SUMIO KACHI; DAISUKE WATANABE; HIRONOSHI KUBOYAMA; YASUHIRO ARIMA; YU MIURA: "Development of battery condition monitoring device (BMU)", FURUKAWA ELECTRIC TIMES, vol. 131, 1 February 2013 (2013-02-01), pages 16 - 20, XP093083344 *

Also Published As

Publication number Publication date
CN118235052A (zh) 2024-06-21

Similar Documents

Publication Publication Date Title
CN102073016B (zh) 电池实际容量、剩余容量、备电时间及健康状况检测方法
JP5619744B2 (ja) 蓄電デバイスの状態検知方法及びその装置
CN112035777B (zh) 电池充电剩余时间计算方法、装置及车辆
CN110618386B (zh) 电池电量比例检测方法、设备和计算机可读存储介质
AU2016203834A1 (en) State estimation device and state estimation method
JP5644965B2 (ja) 蓄電池システム
CN112448434B (zh) 一种充电控制方法及充电控制装置
CN109216803A (zh) 一种UMDs电池管理系统
CN114552039A (zh) 一种电池常带电自保养的控制方法及常带电自保养的电池
CN115754736A (zh) 一种储能系统充放电末端的soc校准方法及装置
CN111007411A (zh) 一种储能电池系统的电量状态修正方法
JP2014153131A (ja) 充電状態算出装置、充電状態算出方法および電力供給システム
JP6494431B2 (ja) 蓄電デバイスの劣化診断装置
KR101646730B1 (ko) 나트륨계 배터리의 충전상태 추정 시스템 및 그 방법
WO2023149301A1 (ja) 鉛蓄電池システム及び鉛蓄電池の寿命推定方法
JP2018045844A (ja) 蓄電装置診断システムおよび蓄電装置診断方法
US20180226812A1 (en) Charge/discharge management device
JP2013029445A (ja) バッテリ管理装置及び電力供給システム
JP2018205313A (ja) 電池の劣化推定装置及び電池の劣化推定方法
US11486931B2 (en) Battery capacity estimation device, battery capacity estimation method, and computer program product
WO2023149304A1 (ja) 鉛蓄電池システム及び鉛蓄電池の寿命推定方法
CN109585955B (zh) 数据中心储能用后备时间保障方法及系统
WO2023149302A1 (ja) 鉛蓄電池システム及び鉛蓄電池の寿命推定方法
WO2023149303A1 (ja) 鉛蓄電池システム及び鉛蓄電池の寿命推定方法
CN116054349B (zh) 一种光伏蓄能电池组电压控制保护系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23749617

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023578499

Country of ref document: JP