WO2023092745A1 - Expansion joint construction structure and expansion joint construction method - Google Patents

Expansion joint construction structure and expansion joint construction method Download PDF

Info

Publication number
WO2023092745A1
WO2023092745A1 PCT/CN2021/138793 CN2021138793W WO2023092745A1 WO 2023092745 A1 WO2023092745 A1 WO 2023092745A1 CN 2021138793 W CN2021138793 W CN 2021138793W WO 2023092745 A1 WO2023092745 A1 WO 2023092745A1
Authority
WO
WIPO (PCT)
Prior art keywords
reserved
plate
expansion joint
cover plate
construction
Prior art date
Application number
PCT/CN2021/138793
Other languages
French (fr)
Chinese (zh)
Inventor
王玉玺
陈有冲
赵天刚
常小波
华鑫
李信龙
Original Assignee
中铁十局集团青岛工程有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中铁十局集团青岛工程有限公司 filed Critical 中铁十局集团青岛工程有限公司
Publication of WO2023092745A1 publication Critical patent/WO2023092745A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • E01D19/067Flat continuous joints cast in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Definitions

  • the invention relates to the field of building construction, more specifically, to a construction structure of bridge expansion joints and a construction method of bridge expansion joints.
  • Expansion joint refers to a structural joint set at an appropriate position along the construction joint direction of a building or structure in order to prevent cracks or damage to the structure due to climate temperature changes (thermal expansion, cold contraction).
  • the expansion joint is to divide the building components above the foundation such as walls, floors, bridges, etc. into two independent parts, so that the building or structure can be horizontally expanded along the long direction.
  • Bridge expansion joints are the most common expansion joints.
  • reserved steel bars are usually buried on both sides of the reserved joints, and then the reserved joints are filled with square wood or plastic foam, etc., and then the concrete base bridge is directly laid.
  • the cutting depth is relatively deep, and the cleaning process is relatively cumbersome.
  • An object of the present invention is to provide a new technical solution for expansion joint construction.
  • a construction structure of expansion joints including reserved joints, embedded steel bars are arranged on both sides of the reserved joints, and the embedded steel bars are arranged in reserved grooves, so
  • the reserved groove is covered with a dust cover, and the total length of the dust cover is consistent with the length of the reserved seam; the width of the reserved groove is larger than the reserved seam, and the reserved seam is set at at the central axis of the reserved groove.
  • the dust cover is installed in the reserved groove to protect the pre-embedded steel bars and reserved joints.
  • it will not enter the reserved groove to block the To leave seams and wrap pre-embedded steel bars, during the installation of the expansion device, only the corresponding pavement structure needs to be cut, and no special cleaning of the reserved grooves is required, so as not to cause damage to the pre-embedded steel bars, which will greatly improve the performance of the expansion joints. Construction efficiency, and can help to improve the construction quality of expansion joints.
  • the dust cover includes a side plate and a cover plate, the side plate is fixed to the side wall of the reserved groove, the cover plate covers the reserved groove and is placed on the top of the side plate .
  • the side plate can be used as a template to assist pouring to complete the reserved groove, and play a supporting role for the reserved groove, avoiding the collapse of the reserved groove caused by mechanical pressure during pouring or paving;
  • anchor rods are provided through the side plate, and one end of the anchor rods extends into the reserved groove.
  • the anchor rod can not only improve the fixing effect of the side plate, but also improve the adhesion between the concrete and the side plate after the telescopic device is installed, so as to ensure the firmness and durability of the telescopic device.
  • a support plate is provided at the bottom of the cover plate, and the support plate is supported between the embedded steel bars.
  • the support plate can support the cover plate, avoid bending and breaking of the cover plate due to top pavement or mechanical pressure, and improve the protective effect of the cover plate.
  • both sides of the cover plate are bent downward to form a limiting plate, and the top of the side plate protrudes upward to form a limiting portion, and when the cover plate is placed on the side plate, the limiting plate The part is located on the side of the limiting plate facing the reserved groove.
  • the bent limit plate can improve the strength of the cover plate and improve its pressure bearing capacity; the limit part plays a role in blocking the limit plate, preventing the cover plate from being pushed laterally and moving during the mechanical construction process. Bit corrupted.
  • one side of the support plate extends toward the limit plate to form a support portion, and the support portion is supported to the top of the limit portion.
  • the support portion can further increase the strength of the cover plate.
  • the top of the side plate extends toward one side to form a protective plate
  • the protective plate is wrapped to the top of the reserved groove
  • the bottom of the limiting plate is placed on the protective plate.
  • the supporting effect on the limiting plate is improved, and the protection effect on the reserved groove can be improved, so as to avoid damage and collapse caused by excessive pressure on the limiting plate.
  • Step 1 Set up formwork parallel to the reserved joints on both sides of the reserved joints so that the reserved steel bars are located between the formworks, and pour concrete to form reserved grooves;
  • Step 2 Cover the reserved groove with a cover plate and implement paving
  • Step 3 After the paving and maintenance are completed, cut along both sides of the cover plate to the formwork, and remove the cover plate;
  • Step 4 After placing the telescopic device and binding the reserved steel bars, formwork is poured;
  • Step 5 After the maintenance is completed, install the waterstop and complete the construction of the expansion joint.
  • the reserved groove formed by pouring will not be filled due to the later pouring and paving due to the protection of the cover plate, so that in the process of installing the telescopic device, it is only necessary to cut to the formwork and open the cover plate.
  • Gouging and planing out the reserved steel bars again avoids damage to the expansion joints and the reserved steel bars; the most cumbersome step of gouging and planing grooves is omitted, which helps to greatly improve the construction efficiency.
  • step 1 after the formwork is supported, anchor rods are inserted on the formwork so that both ends of the anchor rods are exposed to the formwork before pouring, leaving a gap between the anchor rods and the reserved steel bars gap.
  • the setting of the anchor rod can not only improve the supporting capacity of the formwork, ensure the firmness of the formwork, but also improve the firmness of the telescopic device after pouring.
  • the pavement height is flush with the upper surface of the cover plate.
  • using the construction structure or construction method of the expansion joint can avoid damage to the reserved joint and the reserved steel bar during the gouging and grooving process, which helps to improve the labor efficiency of the expansion joint. quality; and can greatly improve construction efficiency.
  • Fig. 1 is a schematic diagram of the construction structure of an expansion joint according to an embodiment of the present invention.
  • Fig. 2 is a schematic diagram of the structure at point A in Fig. 1 .
  • Fig. 3 is a schematic structural view of the side plate in Fig. 1 .
  • Fig. 4 is a schematic structural diagram of the cover plate in Fig. 1 .
  • the construction structure of the expansion joint in this embodiment includes a reserved joint 110, and embedded steel bars 130 are arranged on both sides of the reserved joint 110, and the embedded steel bars 130 are arranged on
  • the reserved slot 120 is covered with a dust cover, and the total length of the dust cover is consistent with the length of the reserved seam 110; the width of the reserved slot 120 is larger than the reserved slot 120.
  • a seam 110 is provided, and the reserved seam 110 is arranged at the central axis of the reserved groove 120 .
  • the dust cover is set in the reserved groove 120 to protect the pre-embedded steel bars 130 and the reserved joints 110.
  • the reserved groove 120 During the process of concrete pouring and paving, concrete or asphalt, etc. It will not enter the reserved groove 120 to block the reserved seam 110 and wrap the embedded steel bar 130.
  • only the corresponding pavement structure 140 needs to be cut, and no special cleaning of the reserved groove 120 is required (such as air hammer Gouging and other destructive work), so that it will not cause damage to the pre-embedded steel bar 130, and will not cause damage to the existing concrete structures, which will help greatly improve the construction efficiency of expansion joints, and can help improve the expansion joints. construction quality.
  • the dust cover includes a side plate 210 and a cover plate 220, the side plate 210 is fixed to the side wall of the reserved groove 120, and the cover plate 220 covers the A slot 120 is reserved and placed on top of the side plate 210 .
  • the side plate 210 can be used as a formwork to assist the pouring of the reserved groove 120, and play a supporting role for the reserved groove 120, avoiding the collapse of the reserved groove 120 caused by mechanical pressure during the pouring or paving process; It has the function of dust protection, and the cover plate arranged by laying can only need to be cut to the bottom of the cover plate 220 to open the cover plate 220 when the telescopic device is installed, without cutting to the bottom of the reserved groove 120, which greatly reduces the cutting cost.
  • the depth avoids damage to the reserved steel bars, which helps to further improve the construction efficiency and convenience of construction.
  • the side plate 210 in this embodiment is made of metal, which can be poured into the bridge to enhance the strength of the expansion joint; the cover plate can be made of metal or wood, and can be removed for recycling after the construction of the expansion joint is completed. Reduce construction costs.
  • anchor rods 212 are disposed through the side plate 210 , and one end of the anchor rods 212 extends into the reserved groove 120 .
  • the anchor rod 212 can not only improve the fixing effect of the side plate 210, but also improve the adhesion between the concrete and the side plate 210 after the telescopic device is installed, so as to ensure the firmness and durability of the telescopic device.
  • a support plate 221 is provided at the bottom of the cover plate 220 , and the support plate 221 is supported between the embedded steel bars 130 .
  • the support plate 221 can support the cover plate 220 , prevent the cover plate 220 from being bent and broken due to top pavement or mechanical pressure, and improve the strength and protective effect of the cover plate 220 .
  • both sides of the cover plate 220 are bent downward to form a limiting plate 223, and the top of the side plate 210 protrudes upward to form a limiting portion 211, and the cover plate 220 overlaps
  • the limiting portion 211 is located on a side of the limiting plate 223 facing the reserved groove 120 .
  • the bent limiting plate 223 can improve the strength of the cover plate 220 and improve its pressure bearing capacity; the limiting part 211 plays a blocking role on the limiting plate 223, preventing the cover plate 220 from being pushed laterally and moving during the mechanical construction process. position is damaged, maintain the stability of the position of the cover plate 220, and prevent the existence of gaps from affecting the protective effect.
  • one side of the support plate 221 extends toward the limit plate 223 to form a support portion 222, the support portion 222 is supported to the top of the limit portion 211, and the support portion 222 It is fixed with the limiting plate 223 to improve the integrity and strength of the cover plate 220 , and the support portion 222 can further improve the strength of the cover plate 220 .
  • the top of the side plate 210 extends toward one side to form a protective plate 213, the protective plate 213 wraps to the top of the reserved groove 120, and the bottom of the limiting plate 223 overlaps Put it on the protective plate 213 to improve the supporting effect on the limiting plate 223, and the setting of the protective plate 213 can improve the protective effect on the reserved groove 120, and avoid damage and collapse caused by excessive pressure on the limiting plate 223 .
  • using the construction structure or construction method of the expansion joints of this invention can avoid damage to the reserved joints and the reserved steel bars during the chiseling and grooving process, which helps to improve the expansion and contraction.
  • the quality of the seam workers and can greatly improve the construction efficiency.
  • the expansion joint construction method adopting the construction structure of the above expansion joint specifically includes the following steps:
  • Step 1 Set up formwork parallel to the reserved joints on both sides of the reserved joints, so that the reserved steel bars are located between the formworks, and pour concrete to form reserved grooves; the formwork is the above-mentioned side plate.
  • Step 2 Cover the reserved groove with a cover plate and implement paving
  • the reserved slot is covered with a cover plate, so that the limit plates on both sides of the cover plate are clamped to the outside of the top limit part of the side plate to maintain the position stability of the cover plate; and the support plate at the bottom of the cover plate supports Between the reserved steel bars, it can not only support the cover to strengthen the strength of the cover, but also play a certain role in protecting the reserved steel bars; each support plate is arranged along the direction of the bridge extension to avoid the top During mechanical construction and rolling, the force is rolled along the direction of the support plate extension to ensure the support effect of the support plate.
  • Step 3 After the pavement and maintenance are completed, cut along the two sides of the cover plate to the side plate, and remove the cover plate;
  • the height of the cover plate is consistent with the thickness of the pavement structure, so that the cover plate can be exposed to the paved road surface, and the cover plate is used as a positioning mark to avoid damage to the reserved steel bars or side plates caused by cutting position deviation.
  • the top of the cover plate is flush with the paved road surface, which is convenient for paving construction, and avoids the construction machinery from bumping the cover plate.
  • pavement can be laid directly to the top of the cover plate, and then cut to the side of the cover plate according to the marking during the grooving process, so as to open the cover plate and install the telescoping device.
  • Step 4 After placing the telescopic device and binding the reserved steel bars, formwork is poured;
  • Step 5 After the maintenance is completed, install the waterstop and complete the construction of the expansion joint.
  • the reserved groove formed by pouring will not be filled due to the later pouring and paving due to the protection of the cover plate, so that it is only necessary to cut to the side plate and open the cover plate during the installation of the telescopic device That is, there is no need to re-gouge and plan out the reserved steel bars, thereby avoiding damage to the expansion joints and the damage to the reserved steel bars; the most cumbersome steps of gouging and planing are eliminated, which helps to greatly improve the construction efficiency.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

An expansion joint construction structure, comprising a preformed joint (110) with embedded steel bars (130) being provided on two sides of the preformed joint (110), wherein the embedded steel bars (130) are arranged in a preformed groove (120); and the preformed groove (120) is covered with a dust cover, the total length of the dust cover being the same as the length of the preformed joint (110). The dust cover is arranged in the preformed groove (120) to protect the embedded steel bars (130) and the preformed joint (110), such that concrete will not enter the preformed groove (120) to block the preformed joint (110) and cover the embedded steel bars (130) during a concrete pouring and paving process. In an installation process for an expansion device, only a corresponding pavement structure (140) needs to be cut, and there is no need for special cleaning of the preformed groove (120), which will not damage the embedded steel bars (130), thereby greatly improving the construction efficiency of the expansion joint and also improving the construction quality of the expansion joint.

Description

一种伸缩缝的施工结构以及伸缩缝的施工方法Construction structure of expansion joint and construction method of expansion joint 技术领域technical field
本发明涉及建筑施工领域,更具体地,涉及一种桥梁伸缩缝的施工结构以及桥梁伸缩缝的施工方法。The invention relates to the field of building construction, more specifically, to a construction structure of bridge expansion joints and a construction method of bridge expansion joints.
背景技术Background technique
伸缩缝是指为防止建筑物构件由于气候温度变化(热胀、冷缩),使结构产生裂缝或破坏而沿建筑物或者构筑物施工缝方向的适当部位设置的一条构造缝。伸缩缝是将基础以上的建筑构件如墙体、楼板、桥梁等分成两个独立部分,使建筑物或构筑物沿长方向可做水平伸缩。Expansion joint refers to a structural joint set at an appropriate position along the construction joint direction of a building or structure in order to prevent cracks or damage to the structure due to climate temperature changes (thermal expansion, cold contraction). The expansion joint is to divide the building components above the foundation such as walls, floors, bridges, etc. into two independent parts, so that the building or structure can be horizontally expanded along the long direction.
桥梁伸缩缝是最常见的伸缩缝,现有的桥梁伸缩缝施工过程中,通常在预留缝两侧埋设预留钢筋,然后利用方木或塑料泡沫等添堵预留缝后直接铺设混凝土基层桥面和桥面的沥青铺装。当桥面养护完成后再切割伸缩缝预留槽,将预留钢筋周围的混凝土等清理干净后再进行伸缩装置的安装。该种施工过程在切割伸缩缝预留槽时需要切割至预留钢筋处,切割深度较深,清理过程较为繁琐,而且清理时由于采用破坏性的工具(如气锤凿击、切割机切割等)容易损坏预留钢筋,影响后期伸缩装置的连接和伸缩装置安装后的牢固性。Bridge expansion joints are the most common expansion joints. During the construction of existing bridge expansion joints, reserved steel bars are usually buried on both sides of the reserved joints, and then the reserved joints are filled with square wood or plastic foam, etc., and then the concrete base bridge is directly laid. Asphalt pavement for bridges and decks. After the maintenance of the bridge deck is completed, cut the reserved slots for the expansion joints, and clean up the concrete around the reserved steel bars before installing the expansion devices. In this kind of construction process, when cutting the reserved groove of the expansion joint, it needs to cut to the reserved steel bar, the cutting depth is relatively deep, and the cleaning process is relatively cumbersome. ) is easy to damage the reserved steel bars, which will affect the connection of the expansion device in the later stage and the firmness of the expansion device after installation.
因此,需要一种伸缩缝的施工结构或施工方法,能够解决上述问题。Therefore, there is a need for a construction structure or construction method of an expansion joint, which can solve the above-mentioned problems.
技术问题technical problem
本发明的一个目的是提供一种伸缩缝施工的新技术方案。An object of the present invention is to provide a new technical solution for expansion joint construction.
技术解决方案technical solution
根据本发明的第一方面,提供了一种伸缩缝的施工结构,包括预留缝,所述预留缝的两侧设置有预埋钢筋,所述预埋钢筋设置于预留槽中,所述预留槽上覆盖有防尘罩,所述防尘罩的总长度与所述预留缝的长度一致;所述预留槽的宽度大于所述预留缝,所述预留缝设置于所述预留槽的中轴线处。According to the first aspect of the present invention, there is provided a construction structure of expansion joints, including reserved joints, embedded steel bars are arranged on both sides of the reserved joints, and the embedded steel bars are arranged in reserved grooves, so The reserved groove is covered with a dust cover, and the total length of the dust cover is consistent with the length of the reserved seam; the width of the reserved groove is larger than the reserved seam, and the reserved seam is set at at the central axis of the reserved groove.
通过本方案,将防尘罩盖设至预留槽中,对预埋钢筋和预留缝起到保护的作用,在混凝土浇筑和铺装的过程中,不会进入预留槽中封堵预留缝以及包裹预埋钢筋,在安装伸缩装置过程中,仅需切割相应铺装结构,无需对预留槽进行特殊清理,从而不会对预埋钢筋造成损伤,有助于大大提高伸缩缝的施工效率,并且能够有助于提高伸缩缝的施工质量。Through this scheme, the dust cover is installed in the reserved groove to protect the pre-embedded steel bars and reserved joints. During the process of concrete pouring and paving, it will not enter the reserved groove to block the To leave seams and wrap pre-embedded steel bars, during the installation of the expansion device, only the corresponding pavement structure needs to be cut, and no special cleaning of the reserved grooves is required, so as not to cause damage to the pre-embedded steel bars, which will greatly improve the performance of the expansion joints. Construction efficiency, and can help to improve the construction quality of expansion joints.
优选地,所述防尘罩包括侧板以及盖板,所述侧板固定至所述预留槽的侧壁上,所述盖板覆盖所述预留槽并搭放至所述侧板顶部。Preferably, the dust cover includes a side plate and a cover plate, the side plate is fixed to the side wall of the reserved groove, the cover plate covers the reserved groove and is placed on the top of the side plate .
通过本方案,侧板能够作为模板辅助浇筑完成预留槽,并对预留槽起到支撑作用,避免浇筑或铺装过程中机械的压力造成预留槽坍塌;搭放设置的盖板起到防尘保护的作用,而且在伸缩装置安装时仅需要切割至盖板处打开盖板即可,有助于进一步提高施工效率和施工的便捷性。Through this scheme, the side plate can be used as a template to assist pouring to complete the reserved groove, and play a supporting role for the reserved groove, avoiding the collapse of the reserved groove caused by mechanical pressure during pouring or paving; The function of dust protection, and when the telescopic device is installed, it only needs to cut to the cover plate to open the cover plate, which helps to further improve the construction efficiency and convenience of construction.
优选地,所述侧板上贯穿设置有若干锚杆,所述锚杆的一端伸入所述预留槽中。Preferably, several anchor rods are provided through the side plate, and one end of the anchor rods extends into the reserved groove.
通过本方案,锚杆不仅能够提高侧板的固定效果,还能够在伸缩装置安装后,提高混凝土与侧板的附着力,保证伸缩装置的牢固性和耐久性。Through this solution, the anchor rod can not only improve the fixing effect of the side plate, but also improve the adhesion between the concrete and the side plate after the telescopic device is installed, so as to ensure the firmness and durability of the telescopic device.
优选地,所述盖板的底部设置有支撑板,所述支撑板支撑至所述预埋钢筋之间。Preferably, a support plate is provided at the bottom of the cover plate, and the support plate is supported between the embedded steel bars.
通过本方案,支撑板能够对盖板起到支撑作用,避免盖板因顶部铺装或机械压力造成弯曲折断,提高盖板的防护作用。Through this solution, the support plate can support the cover plate, avoid bending and breaking of the cover plate due to top pavement or mechanical pressure, and improve the protective effect of the cover plate.
优选地,所述盖板的两侧向下弯折形成限位板,所述侧板的顶部向上凸起形成限位部,所述盖板搭放至所述侧板上时所述限位部位于所述限位板朝向预留槽的一侧。Preferably, both sides of the cover plate are bent downward to form a limiting plate, and the top of the side plate protrudes upward to form a limiting portion, and when the cover plate is placed on the side plate, the limiting plate The part is located on the side of the limiting plate facing the reserved groove.
通过本方案,弯折后的限位板能够提高盖板的强度,提高其承压能力;限位部对限位板起到阻挡的作用,避免盖板在机械施工过程中被横向推动而移位损坏。Through this scheme, the bent limit plate can improve the strength of the cover plate and improve its pressure bearing capacity; the limit part plays a role in blocking the limit plate, preventing the cover plate from being pushed laterally and moving during the mechanical construction process. Bit corrupted.
优选地,所述支撑板的一侧朝向所述限位板方向延伸形成支撑部,所述支撑部支撑至所述限位部顶部。Preferably, one side of the support plate extends toward the limit plate to form a support portion, and the support portion is supported to the top of the limit portion.
通过本方案,支撑部能够进一步提高盖板的强度。Through this solution, the support portion can further increase the strength of the cover plate.
优选地,所述侧板的顶部朝向一侧延伸形成防护板,所述防护板包裹至所述预留槽的顶部,所述限位板底部搭放至所述防护板上。Preferably, the top of the side plate extends toward one side to form a protective plate, the protective plate is wrapped to the top of the reserved groove, and the bottom of the limiting plate is placed on the protective plate.
通过本方案,提高对限位板的支撑作用,而且能够提高对预留槽的防护效果,避免受限位板的压力过大而造成破损坍塌。Through this proposal, the supporting effect on the limiting plate is improved, and the protection effect on the reserved groove can be improved, so as to avoid damage and collapse caused by excessive pressure on the limiting plate.
根据本发明的第二方面,提供了一种采用上述任一项所述的伸缩缝的施工结构的伸缩缝施工方法,包括如下步骤:According to the second aspect of the present invention, there is provided an expansion joint construction method using the expansion joint construction structure described in any one of the above, comprising the following steps:
步骤一:在预留缝的两侧平行于预留缝支设模板,使预留钢筋位于模板之间,浇筑混凝土形成预留槽;Step 1: Set up formwork parallel to the reserved joints on both sides of the reserved joints so that the reserved steel bars are located between the formworks, and pour concrete to form reserved grooves;
步骤二:在预留槽上盖设盖板并实施铺装;Step 2: Cover the reserved groove with a cover plate and implement paving;
步骤三:铺装并养护完成后,沿盖板的两侧切割至模板处,取下盖板;Step 3: After the paving and maintenance are completed, cut along both sides of the cover plate to the formwork, and remove the cover plate;
步骤四:安放伸缩装置并绑扎预留钢筋后,支模浇筑;Step 4: After placing the telescopic device and binding the reserved steel bars, formwork is poured;
步骤五:养护完成后安装止水带,完成伸缩缝的施工。Step 5: After the maintenance is completed, install the waterstop and complete the construction of the expansion joint.
通过本方案,浇筑形成的预留槽由于有盖板的防护,不会因后期的浇筑以及铺装填满,从而在安装伸缩装置过程中仅需切割至模板处,打开盖板即可,无需重新凿击并刨出预留钢筋,从而避免了对伸缩缝处的损坏以及对预留钢筋的损坏;省去了最为繁琐的凿击刨槽的步骤,有助于大大提高施工效率。Through this scheme, the reserved groove formed by pouring will not be filled due to the later pouring and paving due to the protection of the cover plate, so that in the process of installing the telescopic device, it is only necessary to cut to the formwork and open the cover plate. Gouging and planing out the reserved steel bars again avoids damage to the expansion joints and the reserved steel bars; the most cumbersome step of gouging and planing grooves is omitted, which helps to greatly improve the construction efficiency.
优选地,在步骤一中,支设模板后,在模板上插设锚杆,使锚杆两端均露出所述模板后再进行浇筑,所述锚杆与所述预留钢筋之间留有间隙。Preferably, in step 1, after the formwork is supported, anchor rods are inserted on the formwork so that both ends of the anchor rods are exposed to the formwork before pouring, leaving a gap between the anchor rods and the reserved steel bars gap.
通过本方案,锚杆的设置不仅能够提高模板的支护能力,保证模板的牢固性,还能够提高伸缩装置浇筑后的牢固性。Through this solution, the setting of the anchor rod can not only improve the supporting capacity of the formwork, ensure the firmness of the formwork, but also improve the firmness of the telescopic device after pouring.
优选地,在步骤二中,铺装高度与盖板的上表面齐平。Preferably, in step 2, the pavement height is flush with the upper surface of the cover plate.
通过本方案,铺装后与盖板齐平后方便后续的切割,使盖板作为定位的标记使用,避免切割位置偏差造成预留钢筋或侧板的损坏。Through this scheme, after the pavement is flush with the cover plate, it is convenient for subsequent cutting, so that the cover plate can be used as a positioning mark to avoid damage to the reserved steel bar or side plate caused by the deviation of the cutting position.
有益效果Beneficial effect
根据本公开的一个实施例,使用本伸缩缝的施工结构或施工方法,能够避免凿击开槽过程中对预留缝处的损坏以及对预留钢筋的损坏,有助于提高伸缩缝的职工质量;而且能够大大提高施工效率。According to an embodiment of the present disclosure, using the construction structure or construction method of the expansion joint can avoid damage to the reserved joint and the reserved steel bar during the gouging and grooving process, which helps to improve the labor efficiency of the expansion joint. quality; and can greatly improve construction efficiency.
通过以下参照附图对本发明的示例性实施例的详细描述,本发明的其它特征及其优点将会变得清楚。Other features of the present invention and advantages thereof will become apparent from the following detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings.
附图说明Description of drawings
被结合在说明书中并构成说明书的一部分的附图示出了本发明的实施例,并且连同其说明一起用于解释本发明的原理。The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention.
图1是本发明实施例的伸缩缝的施工结构示意图。Fig. 1 is a schematic diagram of the construction structure of an expansion joint according to an embodiment of the present invention.
图2是图1中A处的结构示意图。Fig. 2 is a schematic diagram of the structure at point A in Fig. 1 .
图3是图1中侧板的结构示意图。Fig. 3 is a schematic structural view of the side plate in Fig. 1 .
图4是图1中盖板的结构示意图。Fig. 4 is a schematic structural diagram of the cover plate in Fig. 1 .
本发明的实施方式Embodiments of the present invention
现在将参照附图来详细描述本发明的各种示例性实施例。应注意到:除非另外具体说明,否则在这些实施例中阐述的部件和步骤的相对布置、数字表达式和数值不限制本发明的范围。Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangements of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
以下对至少一个示例性实施例的描述实际上仅仅是说明性的,决不作为对本发明及其应用或使用的任何限制。The following description of at least one exemplary embodiment is merely illustrative in nature and in no way taken as limiting the invention, its application or uses.
对于相关领域普通技术人员已知的技术、方法和设备可能不作详细讨论,但在适当情况下,所述技术、方法和设备应当被视为说明书的一部分。Techniques, methods and devices known to those of ordinary skill in the relevant art may not be discussed in detail, but where appropriate, such techniques, methods and devices should be considered part of the description.
在这里示出和讨论的所有例子中,任何具体值应被解释为仅仅是示例性的,而不是作为限制。因此,示例性实施例的其它例子可以具有不同的值。In all examples shown and discussed herein, any specific values should be construed as exemplary only, and not as limitations. Therefore, other instances of the exemplary embodiment may have different values.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步讨论。It should be noted that like numerals and letters denote like items in the following figures, therefore, once an item is defined in one figure, it does not require further discussion in subsequent figures.
实施例Example
如图1至图4所示,本实施例中的伸缩缝的施工结构,包括预留缝110,所述预留缝110的两侧设置有预埋钢筋130,所述预埋钢筋130设置于预留槽120中,所述预留槽120上覆盖有防尘罩,所述防尘罩的总长度与所述预留缝110的长度一致;所述预留槽120的宽度大于所述预留缝110,所述预留缝110设置于所述预留槽120的中轴线处。As shown in Figures 1 to 4, the construction structure of the expansion joint in this embodiment includes a reserved joint 110, and embedded steel bars 130 are arranged on both sides of the reserved joint 110, and the embedded steel bars 130 are arranged on In the reserved slot 120, the reserved slot 120 is covered with a dust cover, and the total length of the dust cover is consistent with the length of the reserved seam 110; the width of the reserved slot 120 is larger than the reserved slot 120. A seam 110 is provided, and the reserved seam 110 is arranged at the central axis of the reserved groove 120 .
通过本实施例该方案,将防尘罩盖设至预留槽120中,对预埋钢筋130和预留缝110起到保护的作用,在混凝土浇筑和铺装的过程中,混凝土或沥青等不会进入预留槽120中封堵预留缝110以及包裹预埋钢筋130,在安装伸缩装置过程中,仅需切割相应铺装结构140,无需对预留槽120进行特殊清理(如气锤凿击等破坏性工作),从而不会对预埋钢筋130造成损伤,也不会对已有的混凝土构筑物造成损伤,有助于大大提高伸缩缝的施工效率,并且能够有助于提高伸缩缝的施工质量。Through the solution of this embodiment, the dust cover is set in the reserved groove 120 to protect the pre-embedded steel bars 130 and the reserved joints 110. During the process of concrete pouring and paving, concrete or asphalt, etc. It will not enter the reserved groove 120 to block the reserved seam 110 and wrap the embedded steel bar 130. During the installation of the telescopic device, only the corresponding pavement structure 140 needs to be cut, and no special cleaning of the reserved groove 120 is required (such as air hammer Gouging and other destructive work), so that it will not cause damage to the pre-embedded steel bar 130, and will not cause damage to the existing concrete structures, which will help greatly improve the construction efficiency of expansion joints, and can help improve the expansion joints. construction quality.
在本实施例或其他实施例中,所述防尘罩包括侧板210以及盖板220,所述侧板210固定至所述预留槽120的侧壁上,所述盖板220覆盖所述预留槽120并搭放至所述侧板210顶部。侧板210能够作为模板辅助浇筑完成预留槽120,并对预留槽120起到支撑作用,避免浇筑或铺装过程中机械的压力造成预留槽120坍塌;搭放设置的盖板220起到防尘保护的作用,而且搭放布置的盖板能够在伸缩装置安装时仅需要切割至盖板220底部打开盖板220即可,无需切割至预留槽120的最底部,大大降低了切割深度,避免了对预留钢筋的损伤,有助于进一步提高施工效率和施工的便捷性。In this embodiment or other embodiments, the dust cover includes a side plate 210 and a cover plate 220, the side plate 210 is fixed to the side wall of the reserved groove 120, and the cover plate 220 covers the A slot 120 is reserved and placed on top of the side plate 210 . The side plate 210 can be used as a formwork to assist the pouring of the reserved groove 120, and play a supporting role for the reserved groove 120, avoiding the collapse of the reserved groove 120 caused by mechanical pressure during the pouring or paving process; It has the function of dust protection, and the cover plate arranged by laying can only need to be cut to the bottom of the cover plate 220 to open the cover plate 220 when the telescopic device is installed, without cutting to the bottom of the reserved groove 120, which greatly reduces the cutting cost. The depth avoids damage to the reserved steel bars, which helps to further improve the construction efficiency and convenience of construction.
该实施例中的侧板210为金属材质,能够浇筑至桥梁中以增强伸缩缝出的强度;盖板可以是金属材质也可以是木材质,能够在伸缩缝施工完毕后取下以回收利用,降低施工成本。The side plate 210 in this embodiment is made of metal, which can be poured into the bridge to enhance the strength of the expansion joint; the cover plate can be made of metal or wood, and can be removed for recycling after the construction of the expansion joint is completed. Reduce construction costs.
在本实施例或其他实施例中,所述侧板210上贯穿设置有若干锚杆212,所述锚杆212的一端伸入所述预留槽120中。锚杆212不仅能够提高侧板210的固定效果,还能够在伸缩装置安装后,提高混凝土与侧板210的附着力,保证伸缩装置的牢固性和耐久性。In this embodiment or other embodiments, several anchor rods 212 are disposed through the side plate 210 , and one end of the anchor rods 212 extends into the reserved groove 120 . The anchor rod 212 can not only improve the fixing effect of the side plate 210, but also improve the adhesion between the concrete and the side plate 210 after the telescopic device is installed, so as to ensure the firmness and durability of the telescopic device.
在本实施例或其他实施例中,所述盖板220的底部设置有支撑板221,所述支撑板221支撑至所述预埋钢筋130之间。支撑板221能够对盖板220起到支撑作用,避免盖板220因顶部铺装或机械压力造成弯曲折断,提高盖板220的强度以及防护作用。In this embodiment or other embodiments, a support plate 221 is provided at the bottom of the cover plate 220 , and the support plate 221 is supported between the embedded steel bars 130 . The support plate 221 can support the cover plate 220 , prevent the cover plate 220 from being bent and broken due to top pavement or mechanical pressure, and improve the strength and protective effect of the cover plate 220 .
在本实施例或其他实施例中,所述盖板220的两侧向下弯折形成限位板223,所述侧板210的顶部向上凸起形成限位部211,所述盖板220搭放至所述侧板210上时所述限位部211位于所述限位板223朝向预留槽120的一侧。弯折的限位板223能够提高盖板220的强度,提高其承压能力;限位部211对限位板223起到阻挡的作用,避免盖板220在机械施工过程中被横向推动而移位损坏,保持盖板220位置的稳定性,避免缝隙的存在影响防护效果。In this embodiment or other embodiments, both sides of the cover plate 220 are bent downward to form a limiting plate 223, and the top of the side plate 210 protrudes upward to form a limiting portion 211, and the cover plate 220 overlaps When placed on the side plate 210 , the limiting portion 211 is located on a side of the limiting plate 223 facing the reserved groove 120 . The bent limiting plate 223 can improve the strength of the cover plate 220 and improve its pressure bearing capacity; the limiting part 211 plays a blocking role on the limiting plate 223, preventing the cover plate 220 from being pushed laterally and moving during the mechanical construction process. position is damaged, maintain the stability of the position of the cover plate 220, and prevent the existence of gaps from affecting the protective effect.
在本实施例或其他实施例中,所述支撑板221的一侧朝向所述限位板223方向延伸形成支撑部222,所述支撑部222支撑至所述限位部211顶部,支撑部222与限位板223固定,提高盖板220的整体性和强度,支撑部222能够进一步提高盖板220的强度。In this embodiment or other embodiments, one side of the support plate 221 extends toward the limit plate 223 to form a support portion 222, the support portion 222 is supported to the top of the limit portion 211, and the support portion 222 It is fixed with the limiting plate 223 to improve the integrity and strength of the cover plate 220 , and the support portion 222 can further improve the strength of the cover plate 220 .
在本实施例或其他实施例中,所述侧板210的顶部朝向一侧延伸形成防护板213,所述防护板213包裹至所述预留槽120的顶部,所述限位板223底部搭放至所述防护板213上,提高对限位板223的支撑作用,而且防护板213的设置能够提高对预留槽120的防护效果,避免受限位板223的压力过大而造成破损坍塌。In this embodiment or other embodiments, the top of the side plate 210 extends toward one side to form a protective plate 213, the protective plate 213 wraps to the top of the reserved groove 120, and the bottom of the limiting plate 223 overlaps Put it on the protective plate 213 to improve the supporting effect on the limiting plate 223, and the setting of the protective plate 213 can improve the protective effect on the reserved groove 120, and avoid damage and collapse caused by excessive pressure on the limiting plate 223 .
根据本公开的一个实施例,使用本敲里哦伸缩缝的施工结构或施工方法,能够避免凿击开槽过程中对预留缝处的损坏以及对预留钢筋的损坏,有助于提高伸缩缝的职工质量;而且能够大大提高施工效率。According to an embodiment of the present disclosure, using the construction structure or construction method of the expansion joints of this invention can avoid damage to the reserved joints and the reserved steel bars during the chiseling and grooving process, which helps to improve the expansion and contraction. The quality of the seam workers; and can greatly improve the construction efficiency.
本实施例中采用上述伸缩缝的施工结构的伸缩缝施工方法,具体包括如下步骤:In this embodiment, the expansion joint construction method adopting the construction structure of the above expansion joint specifically includes the following steps:
步骤一:在预留缝的两侧平行于预留缝支设模板,使预留钢筋位于模板之间,浇筑混凝土形成预留槽;该模板为上述的侧板。Step 1: Set up formwork parallel to the reserved joints on both sides of the reserved joints, so that the reserved steel bars are located between the formworks, and pour concrete to form reserved grooves; the formwork is the above-mentioned side plate.
桥梁搭建完成后,铺设混凝土保护层的过程中,在预留缝的两侧支设侧板,支设侧板后使锚杆两端均露出所述侧板后再进行浇筑,所述锚杆与所述预留钢筋之间留有间隙。锚杆的设置不仅能够提高侧板的支护能力,保证侧板的牢固性,还能够提高伸缩装置浇筑后的牢固性;该预留槽的深度与侧板的高度一致,以便于后期切割开槽时无需切割混凝土层。After the bridge is built, in the process of laying the concrete protective layer, side plates are supported on both sides of the reserved joints. After the side plates are supported, both ends of the anchor bar are exposed to the side plates before pouring. The anchor bar There is a gap between the reserved steel bars. The setting of the anchor rod can not only improve the supporting capacity of the side plate and ensure the firmness of the side plate, but also improve the firmness of the telescopic device after pouring; the depth of the reserved groove is consistent with the height of the side plate, so that it can be cut and opened later. There is no need to cut concrete layers when troughing.
待混凝土保护层养护完成后,准备下一步的铺装准备。After the curing of the concrete protective layer is completed, prepare for the next step of paving.
步骤二:在预留槽上盖设盖板并实施铺装;Step 2: Cover the reserved groove with a cover plate and implement paving;
在本步骤中,预留槽上盖设盖板,使盖板两侧的限位板卡至侧板顶部限位部的外侧,保持盖板的位置稳定性;并且盖板底部的支撑板支撑至预留钢筋之间,不仅能够起到支撑盖板以加强盖板的强度,还能够对预留钢筋起到一定的保护作用;每一片支撑板均沿桥梁延伸的方向排布,以避免顶部机械施工碾压时,沿支撑板延伸的方向碾压受力,保证支撑板的支撑效果。In this step, the reserved slot is covered with a cover plate, so that the limit plates on both sides of the cover plate are clamped to the outside of the top limit part of the side plate to maintain the position stability of the cover plate; and the support plate at the bottom of the cover plate supports Between the reserved steel bars, it can not only support the cover to strengthen the strength of the cover, but also play a certain role in protecting the reserved steel bars; each support plate is arranged along the direction of the bridge extension to avoid the top During mechanical construction and rolling, the force is rolled along the direction of the support plate extension to ensure the support effect of the support plate.
步骤三:铺装并养护完成后,沿盖板的两侧切割至侧板处,取下盖板;Step 3: After the pavement and maintenance are completed, cut along the two sides of the cover plate to the side plate, and remove the cover plate;
当沥青的铺装路面养护完成后,沿盖板的两侧进行切割,保证盖板与两侧的铺装结构分离,便于取下盖板;After the asphalt pavement maintenance is completed, cut along both sides of the cover plate to ensure that the cover plate is separated from the pavement structure on both sides, and it is easy to remove the cover plate;
该实施例中盖板的高度与铺装结构的厚度一致,从而使盖板能够露出铺装路面,使盖板作为定位的标记使用,避免切割位置偏差造成预留钢筋或侧板的损坏。In this embodiment, the height of the cover plate is consistent with the thickness of the pavement structure, so that the cover plate can be exposed to the paved road surface, and the cover plate is used as a positioning mark to avoid damage to the reserved steel bars or side plates caused by cutting position deviation.
而且盖板顶部与铺装路面齐平还方便进行铺装的施工,避免施工机械磕碰盖板。Moreover, the top of the cover plate is flush with the paved road surface, which is convenient for paving construction, and avoids the construction machinery from bumping the cover plate.
在其他实施例中,铺装路面可以直接铺设至盖板顶部,然后在开槽过程中根据标记切割至盖板的侧面,以打开盖板安装伸缩装置。In other embodiments, pavement can be laid directly to the top of the cover plate, and then cut to the side of the cover plate according to the marking during the grooving process, so as to open the cover plate and install the telescoping device.
步骤四:安放伸缩装置并绑扎预留钢筋后,支模浇筑;Step 4: After placing the telescopic device and binding the reserved steel bars, formwork is poured;
根据伸缩缝的要求选取伸缩装置,安放至预留槽中,与预留钢筋绑扎固定,再支设模板浇筑混凝土,对伸缩装置进行固定。Select the expansion device according to the requirements of the expansion joint, place it in the reserved groove, bind and fix it with the reserved steel bar, and then support the formwork to pour concrete to fix the expansion device.
步骤五:养护完成后安装止水带,完成伸缩缝的施工。Step 5: After the maintenance is completed, install the waterstop and complete the construction of the expansion joint.
当混凝土养护完成后,将橡胶止水带安装至伸缩装置中,至此完成桥梁伸缩缝的施工。After the concrete curing is completed, install the rubber waterstop into the expansion device, thus completing the construction of the bridge expansion joint.
通过本实施例该方案,浇筑形成的预留槽由于有盖板的防护,不会因后期的浇筑以及铺装填满,从而在安装伸缩装置过程中仅需切割至侧板处,打开盖板即可,无需重新凿击并刨出预留钢筋,从而避免了对伸缩缝处的损坏以及对预留钢筋的损坏;省去了最为繁琐的凿击刨槽的步骤,有助于大大提高施工效率。Through the solution of this embodiment, the reserved groove formed by pouring will not be filled due to the later pouring and paving due to the protection of the cover plate, so that it is only necessary to cut to the side plate and open the cover plate during the installation of the telescopic device That is, there is no need to re-gouge and plan out the reserved steel bars, thereby avoiding damage to the expansion joints and the damage to the reserved steel bars; the most cumbersome steps of gouging and planing are eliminated, which helps to greatly improve the construction efficiency.
虽然已经通过例子对本发明的一些特定实施例进行了详细说明,但是本领域的技术人员应该理解,以上例子仅是为了进行说明,而不是为了限制本发明的范围。本领域的技术人员应该理解,可在不脱离本发明的范围和精神的情况下,对以上实施例进行修改。本发明的范围由所附权利要求来限定。Although some specific embodiments of the present invention have been described in detail through examples, those skilled in the art should understand that the above examples are for illustration only and not intended to limit the scope of the present invention. Those skilled in the art will appreciate that modifications can be made to the above embodiments without departing from the scope and spirit of the invention. The scope of the invention is defined by the appended claims.

Claims (10)

  1. 一种伸缩缝的施工结构,包括预留缝(110),所述预留缝(110)的两侧设置有预埋钢筋(130),其特征在于,所述预埋钢筋(130)设置于预留槽(120)中,所述预留槽(120)上覆盖有防尘罩,所述防尘罩的总长度与所述预留缝的长度一致;所述预留槽(120)的宽度大于所述预留缝(110),所述预留缝(110)设置于所述预留槽(120)的中轴线处。A construction structure of an expansion joint, comprising a reserved joint (110), and pre-embedded steel bars (130) are arranged on both sides of the reserved joint (110), characterized in that the pre-embedded steel bars (130) are arranged on In the reserved slot (120), the reserved slot (120) is covered with a dust cover, and the total length of the dust cover is consistent with the length of the reserved seam; the reserved slot (120) The width is larger than the reserved slit (110), and the reserved slit (110) is arranged at the central axis of the reserved groove (120).
  2. 根据权利要求1所述的伸缩缝的施工结构,其特征在于,所述防尘罩包括侧板(210)以及盖板(220),所述侧板(210)固定至所述预留槽(120)的侧壁上,所述盖板(220)覆盖所述预留槽(120)并搭放至所述侧板(210)顶部。The construction structure of the expansion joint according to claim 1, characterized in that the dust cover includes a side plate (210) and a cover plate (220), and the side plate (210) is fixed to the reserved groove ( 120), the cover plate (220) covers the reserved groove (120) and is placed on top of the side plate (210).
  3. 根据权利要求2所述的伸缩缝的施工结构,其特征在于,所述侧板(210)上贯穿设置有若干锚杆(212),所述锚杆(212)的一端伸入所述预留槽(120)中。The construction structure of the expansion joint according to claim 2, characterized in that, several anchor rods (212) are provided through the side plate (210), and one end of the anchor rod (212) extends into the reserved slot (120).
  4. 根据权利要求2所述的伸缩缝的施工结构,其特征在于,所述盖板(220)的底部设置有支撑板(221),所述支撑板(221)支撑至所述预埋钢筋(130)之间。The construction structure of the expansion joint according to claim 2, characterized in that, the bottom of the cover plate (220) is provided with a support plate (221), and the support plate (221) is supported to the embedded steel bar (130 )between.
  5. 根据权利要求4所述的伸缩缝的施工结构,其特征在于,所述盖板(220)的两侧向下弯折形成限位板(223),所述侧板(210)的顶部向上凸起形成限位部(211),所述盖板(220)搭放至所述侧板(210)上时所述限位部(211)位于所述限位板(223)朝向预留槽(120)的一侧。The construction structure of the expansion joint according to claim 4, characterized in that, both sides of the cover plate (220) are bent downward to form a limiting plate (223), and the top of the side plate (210) protrudes upward When the cover plate (220) is placed on the side plate (210), the limit portion (211) is located on the limit plate (223) facing the reserved groove ( 120) on one side.
  6. 根据权利要求5所述的伸缩缝的施工结构,其特征在于,所述支撑板(221)的一侧朝向所述限位板(223)方向延伸形成支撑部(222),所述支撑部(222)支撑至所述限位部(211)顶部。The construction structure of the expansion joint according to claim 5, characterized in that, one side of the support plate (221) extends toward the direction of the limiting plate (223) to form a support part (222), and the support part ( 222) is supported to the top of the limiting part (211).
  7. 根据权利要求4所述的伸缩缝的施工结构,其特征在于,所述侧板(210)的顶部朝向一侧延伸形成防护板(213),所述防护板(213)包裹至所述预留槽(120)的顶部,所述限位板(223)底部搭放至所述防护板(213)上。The construction structure of the expansion joint according to claim 4, characterized in that, the top of the side plate (210) extends toward one side to form a protective plate (213), and the protective plate (213) is wrapped to the reserved The top of the slot (120) and the bottom of the limiting plate (223) are placed on the protective plate (213).
  8. 一种采用权利要求1至7任一项所述的伸缩缝的施工结构的伸缩缝施工方法,其特征在于,包括如下步骤:An expansion joint construction method using the expansion joint construction structure described in any one of claims 1 to 7, characterized in that it comprises the following steps:
    步骤一:在预留缝的两侧平行于预留缝支设模板,使预留钢筋位于模板之间,浇筑混凝土形成预留槽;Step 1: Set up formwork parallel to the reserved joints on both sides of the reserved joints so that the reserved steel bars are located between the formworks, and pour concrete to form reserved grooves;
    步骤二:在预留槽上盖设盖板并实施铺装;Step 2: Cover the reserved groove with a cover plate and implement paving;
    步骤三:铺装并养护完成后,沿盖板的两侧切割至模板处,取下盖板;Step 3: After the paving and maintenance are completed, cut along both sides of the cover plate to the formwork, and remove the cover plate;
    步骤四:安放伸缩装置并绑扎预留钢筋后,支模浇筑;Step 4: After placing the telescopic device and binding the reserved steel bars, formwork is poured;
    步骤五:养护完成后安装止水带,完成伸缩缝的施工。Step 5: After the maintenance is completed, install the waterstop and complete the construction of the expansion joint.
  9. 根据权利要求8所述的伸缩缝施工方法,其特征在于,在步骤一中,支设模板后,在模板上插设锚杆,使锚杆两端均露出所述模板后再进行浇筑,所述锚杆与所述预留钢筋之间留有间隙。The construction method for expansion joints according to claim 8, characterized in that, in step 1, after the formwork is supported, anchor rods are inserted on the formwork so that both ends of the anchor rods are exposed to the formwork before pouring, so There is a gap between the anchor rod and the reserved steel bar.
  10. 根据权利要求8所述的伸缩缝的施工方法,其特征在于,在步骤二中,铺装高度与盖板的上表面齐平。The construction method of the expansion joint according to claim 8, characterized in that, in step 2, the pavement height is flush with the upper surface of the cover plate.
PCT/CN2021/138793 2021-11-26 2021-12-16 Expansion joint construction structure and expansion joint construction method WO2023092745A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202111424670.2 2021-11-26
CN202111424670.2A CN114108455A (en) 2021-11-26 2021-11-26 Construction structure and construction method for expansion joint

Publications (1)

Publication Number Publication Date
WO2023092745A1 true WO2023092745A1 (en) 2023-06-01

Family

ID=80370447

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/138793 WO2023092745A1 (en) 2021-11-26 2021-12-16 Expansion joint construction structure and expansion joint construction method

Country Status (2)

Country Link
CN (1) CN114108455A (en)
WO (1) WO2023092745A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100465A (en) * 1994-09-30 1996-04-16 Abc Trading Co Ltd Work execution method for internal corner section of expansion joint
JP2013040468A (en) * 2011-08-12 2013-02-28 Nitta Ind Corp Expansion joint for bridge
CN109853375A (en) * 2019-01-30 2019-06-07 衡水百固路桥养护工程有限公司 A kind of bridge expanssion joint of fabricated construction reserves notch and its construction method
CN210104552U (en) * 2018-12-28 2020-02-21 上海颖川佳固信息工程股份有限公司 Prefabricated type bridge expansion joint covering equipment
CN112900256A (en) * 2021-04-13 2021-06-04 湖南发通路桥集团有限公司 Construction method of bridge assembly type expansion joint device
CN213681700U (en) * 2020-08-24 2021-07-13 宁波建工工程集团有限公司 Improved bridge expansion joint width construction structure
CN113235437A (en) * 2021-05-18 2021-08-10 中国五冶集团有限公司 Construction method for reserving bridge expansion joints

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105463986B (en) * 2015-12-01 2017-01-25 中铁四局集团第三建设有限公司 Construction method of bridge expansion joint
KR101746409B1 (en) * 2016-04-26 2017-06-27 중앙크리텍 주식회사 Expansion joint using hybrid elasticity polymer composition and construction method thereof
CN110468697A (en) * 2019-07-17 2019-11-19 福州外语外贸学院 A kind of dustless construction technology of bridge expanssion joint
CN111809512A (en) * 2020-07-15 2020-10-23 中国二十冶集团有限公司 Method for temporarily plugging expansion joint of simply supported girder bridge

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100465A (en) * 1994-09-30 1996-04-16 Abc Trading Co Ltd Work execution method for internal corner section of expansion joint
JP2013040468A (en) * 2011-08-12 2013-02-28 Nitta Ind Corp Expansion joint for bridge
CN210104552U (en) * 2018-12-28 2020-02-21 上海颖川佳固信息工程股份有限公司 Prefabricated type bridge expansion joint covering equipment
CN109853375A (en) * 2019-01-30 2019-06-07 衡水百固路桥养护工程有限公司 A kind of bridge expanssion joint of fabricated construction reserves notch and its construction method
CN213681700U (en) * 2020-08-24 2021-07-13 宁波建工工程集团有限公司 Improved bridge expansion joint width construction structure
CN112900256A (en) * 2021-04-13 2021-06-04 湖南发通路桥集团有限公司 Construction method of bridge assembly type expansion joint device
CN113235437A (en) * 2021-05-18 2021-08-10 中国五冶集团有限公司 Construction method for reserving bridge expansion joints

Also Published As

Publication number Publication date
CN114108455A (en) 2022-03-01

Similar Documents

Publication Publication Date Title
CN110747899B (en) Basement waterproof construction method
KR101606391B1 (en) Non-Exposed Eengineering Method of Last Concreat for Expansion Joint
KR101036277B1 (en) Expansion joint waterproof material of structure including road and bridge, and constructing method of expansion joint part using this
US3956859A (en) Foundation of a heated building without a cellar
CN112663681A (en) Lapping method for different waterproof materials of bottom plate and side wall of large foot
CN110004974B (en) Prefabricated waterproof retaining wall plate structure and construction method thereof
RU2285764C2 (en) Reinforcing control joint assembly for concrete panels
KR100780370B1 (en) Tie bar for reinforced concrete pavemant and reinforced concrete pavemant method using the same
WO2023092745A1 (en) Expansion joint construction structure and expansion joint construction method
KR101593998B1 (en) Expansion joint maintenance facility and using the repair method
KR102358453B1 (en) A Section Reducing Member and a Fixing Frame for Concrete Structure and a Construction Method thereof
JP4787717B2 (en) Expansion joint for bridge and its construction method
KR20120082215A (en) The device of fixing for dowel bar and that of using construction method of expantion joint equipment
KR100542380B1 (en) Structure of Expansion Joint Filler for Concrete Slab, and Method for Carrying Out Thereof
US7021858B2 (en) Double joints pavement system
CN107859187A (en) The protection device and waterstop installation method of a kind of expansion joint water stop
KR101043751B1 (en) insulation deck plate for slab
CN210262567U (en) Post-pouring belt for cement concrete pavement
KR101580394B1 (en) Structure of expansion joint filler for concrete slab, and method for carrying out thereof
JP5875855B2 (en) Block type buried joint expansion and contraction device for bridge
US20050036834A1 (en) Monolithic pour joint
JPH0480410A (en) Method of widening platform
CN217027543U (en) Top plate T type socket joint formula antiseep post-cast strip structure
CN214090005U (en) Secondary pouring structure for top plate and outer wall of underground garage by water stop steel plate
CN116988593A (en) Parapet wall construction method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21965466

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE