JPH08100465A - Work execution method for internal corner section of expansion joint - Google Patents

Work execution method for internal corner section of expansion joint

Info

Publication number
JPH08100465A
JPH08100465A JP23742394A JP23742394A JPH08100465A JP H08100465 A JPH08100465 A JP H08100465A JP 23742394 A JP23742394 A JP 23742394A JP 23742394 A JP23742394 A JP 23742394A JP H08100465 A JPH08100465 A JP H08100465A
Authority
JP
Japan
Prior art keywords
wall
vertical
cover material
horizontal
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP23742394A
Other languages
Japanese (ja)
Other versions
JP2747229B2 (en
Inventor
Nobuyuki Kobayashi
信幸 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ABC Trading Co Ltd
Original Assignee
ABC Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABC Trading Co Ltd filed Critical ABC Trading Co Ltd
Priority to JP23742394A priority Critical patent/JP2747229B2/en
Publication of JPH08100465A publication Critical patent/JPH08100465A/en
Application granted granted Critical
Publication of JP2747229B2 publication Critical patent/JP2747229B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Abstract

PURPOSE: To provide an execution method for the internal corner section of an expansion joint capable of absorbing the fluctuation of a building and preventing the infiltration of rain water even at the time of executing the skeleton gap between adjacent buildings formed with the internal angle sections. CONSTITUTION: A cover material 24 is variably supported and a joint 8 is executed to close the vertical skeleton gap formed between a stretched wall 9 protruded from the outer wall face 5 of a building 6 and a stretched wall 10 protruded from the tower room 3 of a building 4, and a horizontal cover material 19 fixed to the outer wall face 5 at one end section is slidably fitted to the top end section of a parapet 2. A joint 20 is executed to seal the gap between the stretched wall 9 and the horizontal cover material 19 and to close the horizontal skeleton gap with the horizontal cover material 19.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、隣接する建物の躯体間
隙を被閉し、かつ建物の変動を吸収すべくエキスパンシ
ョンジョイントを施工する場合の施工方法に関し、少な
くとも一方の躯体部分に入隅部が形成された隣接する建
物の躯体間隙を被閉すべく施工する場合のエキスパンシ
ョンジョイントの入隅部用施工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for constructing an expansion joint so as to close a gap between skeletons of adjacent buildings and to absorb fluctuations of the building. The present invention relates to a construction method for an entering corner portion of an expansion joint when the construction is performed so as to close a frame gap of an adjacent building in which a ridge is formed.

【0002】[0002]

【従来の技術】エキスパンションジョイント(以下、単
に「ジョイント」という)は、隣接する建物の躯体間隙
を被閉して雨水の侵入を防止すると共に、建物の変動を
吸収すべく施工されるものであり、その施工方法は様々
なものが既に知られている。従来、一方の躯体部分に入
隅部が形成された隣接する躯体間隙をジョイントにより
被閉する場合、以下のような施工方法が採られていた。
すなわち、図10に示すような屋上101にパラペット
102を周設すると共に塔屋103を立設した建物10
4と、屋上101より外壁面105の方が高くなってい
る建物106とが間隙Vを隔てて隣接している場合にお
いて、
2. Description of the Related Art An expansion joint (hereinafter simply referred to as "joint") is constructed so as to close a skeleton gap between adjacent buildings to prevent rainwater from entering and to absorb fluctuations in the buildings. The various construction methods are already known. Conventionally, when a joint is used to close an adjacent skeleton gap in which a corner portion is formed in one skeleton portion, the following construction method has been adopted.
That is, a building 10 in which a parapet 102 is provided around a roof 101 as shown in FIG.
4 and the building 106 whose outer wall surface 105 is higher than the roof 101 are adjacent to each other with a gap V,

【0003】建物106の外壁面105に切欠部107
を形成し、ジョイント108の横カバー材109の一端
部分を切欠部107に把持させた状態で、横カバー材1
09で横方向の躯体間隙を被閉し、同時に塔屋103の
外側面のうち、横カバー材109が当接する部分を切り
欠いて横カバー材109の端部を挿入させると共に、コ
ーキング処理110をして横カバー材109を塔屋10
3に固着していた。こうして横カバー材109で横方向
の躯体間隙を被閉すると共に横カバー材109の上部に
コーナーカバー材111を縦方向の躯体間隙を被閉すべ
く配設し、その下端を横カバー材109の上面に当接さ
せてコーキング材で塞ぐ等してジョイント112を施工
し、縦方向の躯体間隙を被閉するようにしていた。
A cutout 107 is formed on the outer wall surface 105 of the building 106.
Is formed, and one end portion of the horizontal cover material 109 of the joint 108 is held in the notch 107, the horizontal cover material 1
At 09, the lateral skeleton gap is closed, and at the same time, a portion of the outer surface of the tower 103 where the horizontal cover material 109 abuts is cut out to insert the end portion of the horizontal cover material 109, and the caulking process 110 is performed. Side cover material 109 to Toya 10
It was stuck to 3. In this way, the horizontal cover material 109 closes the horizontal frame gap, and the corner cover material 111 is arranged above the horizontal cover material 109 so as to close the vertical frame gap, and the lower end thereof is the upper surface of the horizontal cover material 109. The joint 112 was constructed by abutting against the above and closing it with a caulking material, etc. to close the longitudinal body gap.

【0004】また、図11は、同一高さの建物113及
び建物114であって、それぞれ屋上115、116に
パラペット117、118を周設し、塔屋119、12
0を立設したものを示している。この場合は横カバー材
121をパラペット117、118に跨がせて、同時に
この横カバー材121が当接する塔屋119、120の
外側面に切欠部を形成して横カバー材121の一端部を
挿入し、そしてコーキング処理122をして横カバー材
121を塔屋119、120に固着しており、さらに塔
屋119、120における立上り部分に縦カバー材12
3(仮想線で図示)を施工して縦方向の躯体間隙を被閉
していた。
Further, FIG. 11 shows a building 113 and a building 114 of the same height. Parapets 117 and 118 are provided around roofs 115 and 116, respectively, and tower houses 119 and 12 are provided.
0 is set up. In this case, the lateral cover material 121 is straddled over the parapets 117 and 118, and at the same time, a notch is formed on the outer surface of the towers 119 and 120 with which the lateral cover material 121 abuts, and one end of the lateral cover material 121 is inserted. Then, the horizontal cover material 121 is fixed to the towers 119 and 120 by caulking 122, and the vertical cover material 12 is attached to the rising portions of the towers 119 and 120.
3 (illustrated by an imaginary line) was installed to close the longitudinal body gap.

【0005】[0005]

【発明が解決しようとする課題】本来、このようにして
ジョイントを施工することにより、建物の変動を確実に
吸収すると共に、躯体間隙への雨水の侵入を防止するこ
とができるはずであるにも関わらず、上記のように横カ
バー材の一端部が塔屋等の外側面に当接する場合は、防
水上この外側面の一部に形成した切欠部に横カバー材の
一端部を挿入しコーキング処理をして固着する必要があ
るため、ジョイントが十分に機能しないという問題点が
あった。
Originally, by constructing the joint in this way, it should be possible to surely absorb the fluctuation of the building and prevent rainwater from entering the body gap. Regardless, as mentioned above, if one end of the horizontal cover material comes into contact with the outer surface of the tower or the like, insert one end of the horizontal cover material into the notch formed in a part of this outer surface for waterproofing and caulking treatment. There is a problem in that the joint does not function sufficiently because it has to be fixed by fixing.

【0006】つまり、図11に示す如く、両建物11
3、114の躯体間にxーx方向の変動が生じた場合、
横カバー材121は一端部が塔屋119、120に固着
してあるため、その変動を吸収することができず、ま
た、yーy方向の変動を生じれば横カバー材121自体
が破損してしまい、いずれにしても十分に機能しないと
いう問題点があったのである。
That is, as shown in FIG. 11, both buildings 11
When a variation in the xx direction occurs between the 3 and 114 frames,
Since one end of the horizontal cover material 121 is fixed to the tower houses 119 and 120, the variation cannot be absorbed, and if the variation in the yy direction occurs, the horizontal cover material 121 itself is damaged. In any case, there was a problem that it did not function sufficiently.

【0007】さらにまた、縦カバー材123の下端部は
横カバー材121の上面に当接してあるに過ぎないた
め、両カバー材同士の隙間から雨水が侵入してしまい、
この場合、縦カバー材123の内側部分に位置する横カ
バー材121の一端部に、若干高さの立上げ部を形成し
て雨水の侵入を阻止することもできるが、立上げ部の高
さをあまり高くはできないため、結局十分な防水効果は
得られなかった。
Furthermore, since the lower end portion of the vertical cover member 123 is only in contact with the upper surface of the horizontal cover member 121, rainwater intrudes through the gap between the cover members,
In this case, it is possible to form a rising portion with a slight height at one end portion of the horizontal cover material 121 located inside the vertical cover material 123 to prevent rainwater from entering. Since it cannot be set too high, it was not possible to obtain a sufficient waterproof effect.

【0008】そこで、図12及び図13に示したよう
に、横カバー材121と縦カバー材123との間に水切
り部材124を介在させ、かつ、水切り部材124と横
カバー材121との間にコーキング処理125を施すと
共に、縦カバー材123と水切り部材124とにコーキ
ング処理126を施す方法も採られていた。しかし、こ
の場合は水切り部材124が塔屋119及び120に固
定されてしまうため、結果として横カバー材121によ
り建物の変動を吸収することはできなかった。
Therefore, as shown in FIGS. 12 and 13, a draining member 124 is interposed between the horizontal cover member 121 and the vertical cover member 123, and between the draining member 124 and the horizontal cover member 121. A method of performing the caulking process 125 and the caulking process 126 on the vertical cover material 123 and the draining member 124 has been adopted. However, in this case, since the draining member 124 is fixed to the tower houses 119 and 120, as a result, the lateral cover material 121 cannot absorb the fluctuation of the building.

【0009】以上のように、上記従来の施工方法により
入隅部の形成された隣接する建物の躯体間隙に施工され
るジョイントは、建物の変動に対する十分な追従性を発
揮することができないため、建物の変動を吸収すること
ができず、しかも、躯体間隙の防水効果が損なわれやす
いという重大な問題点があった。
As described above, since the joint constructed in the frame gap of the adjoining building in which the corner is formed by the above-mentioned conventional construction method cannot exhibit sufficient followability to the fluctuation of the building, There is a serious problem that it is not possible to absorb the fluctuation of the building, and the waterproof effect of the body gap is easily impaired.

【0010】本発明は、こうした従来の施工方法によっ
て発生する様々な問題点を解消すべくなされたものであ
り、その目的とする所は、ジョイントを上記のような入
隅部の形成された隣接する建物の躯体間隙に施工する場
合でも、その基本的な機能、すなわち建物の変動を吸収
する機能及び躯体間隙への雨水の侵入を防止する防水機
能を十分に発揮することを可能とするジョイントの入隅
部用施工方法を提供せんとするものである。
The present invention has been made to solve various problems caused by such a conventional construction method, and an object of the present invention is to provide a joint with an adjoining corner portion having the above-described entry corner portion. Even if it is installed in the structure gap of a building, it is possible to sufficiently perform the basic functions of the joint, that is, the function of absorbing the fluctuation of the building and the waterproof function of preventing rainwater from entering the structure gap. It is intended to provide a construction method for a corner portion.

【0011】[0011]

【課題を解決するための手段】上記課題を解決するため
に、本発明は、一方又は両方の躯体部分に入隅部が形成
された隣接躯体の躯体間隙を、この入隅部において縦横
交差方向に被閉するジョイントを施工する場合におい
て、横方向の躯体間隙を被閉する横カバー材を隣接両躯
体に跨がって配設する一方、縦方向の躯体間隙の一方の
躯体側から上記横カバー材をその巾方向に跨ぐ縦方向の
張出壁を形成し、この張出壁先端側と他方の躯体側との
間に縦方向の開口部を形成し、この縦方向の開口部に張
出壁先端側と他方の躯体側に対して変動自在に支持され
た縦カバー材を配設するようにしたジョイントの入隅部
用施工方法を特徴とするものである。
In order to solve the above-mentioned problems, according to the present invention, a frame gap of an adjacent skeleton in which a corner portion is formed in one or both of the skeleton portions is defined by vertical and horizontal crossing directions at the corner portion. In the case of constructing a joint that is to be closed, the horizontal cover material that closes the lateral frame gap is placed across both adjacent skeletons, while A vertical overhanging wall that straddles the cover material in its width direction is formed, and a vertical opening is formed between the tip end side of this overhanging wall and the other side of the body, and the vertical opening is extended over this vertical opening. The present invention is characterized by a joint corner installation method in which a vertical cover member is movably supported on the tip end side of the outlet wall and on the other side of the body.

【0012】また、一方の躯体部分に入隅部が形成され
ている場合は、横方向の躯体間隙を被閉する横カバー材
を入隅部のない躯体側に固着すると共に、この横カバー
材を入隅部のある躯体側の天端部に被着する一方、上記
横カバー材を固着した躯体側から上記横カバー材をその
巾方向に跨ぐ縦方向の張出壁を形成し、張出壁下端と横
カバー材間は密封し、この張出壁先端側と他方の躯体側
との間に横カバー材の長手方向に開口巾を有した縦方向
の開口部を形成し、この縦方向の開口部に張出壁先端側
と他方の躯体側に対して変動自在に支持された縦カバー
材を配設するようにしたジョイントの入隅部用施工方法
とすることができる。
Further, in the case where the inner corner portion is formed in one of the body parts, a lateral cover material for closing the lateral body gap is fixed to the body side having no inner corner portion, and the lateral cover material is also provided. Is applied to the top end on the side of the body with the inside corners, while forming a vertically extending wall that spans the width of the horizontal cover material from the side of the body to which the horizontal cover material is fixed, and A space between the lower end of the wall and the horizontal cover material is sealed, and a vertical opening having an opening width in the longitudinal direction of the horizontal cover material is formed between this tip of the overhanging wall and the other side of the body. It is possible to provide a construction method for a corner portion of a joint in which a vertical cover member that is movably supported on the tip end side of the overhanging wall and the other side of the body is disposed in the opening of the joint.

【0013】さらに、両方の躯体部分に入隅部が形成さ
れている場合は、横方向の躯体間隙を被閉する横カバー
材を隣接両躯体に跨がって配設する一方、縦方向の躯体
間隙を挟む一方の躯体側からは袖壁を張出し形成した上
で、この袖壁から上記横カバー材をその巾方向に跨ぐ縦
方向の張出壁を形成し、少なくとも張出壁下端と横カバ
ー材間は密封し、この張出壁先端側と他方の躯体側との
間に横カバー材の長手方向に開口巾を有した縦方向の開
口部を形成し、この縦方向の開口部に張出壁先端側と他
方の躯体側に対して変動自在に支持された縦カバー材を
配設するようにしたジョイントの入隅部用施工方法とす
ることができる。
Further, when the inner corner portions are formed in both the skeleton portions, a horizontal cover material for closing the skeleton gap in the lateral direction is arranged so as to straddle both adjacent skeleton bodies, while the horizontal cover material is provided in the longitudinal direction. After forming a sleeve wall from one side of the body that sandwiches the body gap, form a vertical extension wall that spans the horizontal cover material in the width direction from this sleeve wall, and at least the lower end of the extension wall and the horizontal side. The cover materials are hermetically sealed, and a vertical opening having an opening width in the longitudinal direction of the horizontal cover material is formed between the tip end side of the overhanging wall and the other side of the body. A construction method for a corner portion of a joint in which a vertical cover member movably supported on the tip end side of the overhanging wall and the other body side can be provided.

【0014】[0014]

【作用】一方の躯体側から突設した張出壁及び袖壁とは
共に躯体と一体であり、両者共に当該躯体の動きに追従
する。したがって、張出壁と他方の躯体側との間に形成
された縦方向の開口部を被閉すべく施工された縦カバー
材は、一方の躯体側と他方の躯体側との変動を確実に吸
収することができる。しかも、当該張出壁或いは袖壁の
下端と横カバー材との間は密封してあるため、確実に躯
体間隙を防水することができる。
The bulging wall and the sleeve wall protruding from one of the skeletons are integral with the skeleton, and both follow the movement of the skeleton. Therefore, the vertical cover material constructed to close the vertical opening formed between the overhanging wall and the other side of the body reliably absorbs the fluctuation between the one side of the body and the other side of the body. can do. Moreover, since the lower end of the overhanging wall or sleeve wall and the lateral cover member are sealed, it is possible to reliably waterproof the body gap.

【0015】[0015]

【実施例】以下、本発明によるジョイントの入隅部用施
工方法により施工した場合の実施例について、図面を用
いて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment in which the method for applying a corner of a joint according to the present invention is used will be described below with reference to the drawings.

【0016】図1〜図3は、本発明の施工方法により、
入隅部の形成された躯体間隙を被閉すべくジョイントを
施工した状態の一例を示したものである。すなわち、図
1〜図3は、屋上1にパラペット2を周設すると共に、
塔屋3を立設した建物4と、屋上1より外壁面5の方が
高くなっている建物6とが横方向の間隔Aを隔てて隣接
している場合に、両建物4、6の躯体間隙を縦横交差方
向に被閉すべくジョイント8等を施工した状態を図示し
たものである。
1 to 3 show the construction method of the present invention.
It is an example of a state in which a joint is constructed so as to close the body gap in which the corner portion is formed. That is, in FIGS. 1 to 3, while the parapet 2 is provided around the rooftop 1,
When a building 4 with a tower 3 and a building 6 whose outer wall surface 5 is higher than the roof 1 are adjacent to each other with a lateral gap A, the building space between the two buildings 4, 6 is It shows the state in which the joint 8 and the like have been installed so as to close the vertical crosswise direction.

【0017】このジョイント8は、建物6の外壁面5か
ら横方向に向けてパラペット2の天端部分にまで達する
ように突設した張出壁9と、同様にして塔屋3の外壁面
7から突設した張出壁10との間に形成された縦方向の
開口部を被閉すべく変動自在に施工したものであり、様
々な構成のものとして施工することができる。その内の
一例として図2及び図5に示したものについては後述す
る。
The joint 8 extends from the outer wall surface 5 of the building 6 in a lateral direction to a projecting wall 9 that reaches the top end portion of the parapet 2, and similarly from the outer wall surface 7 of the tower building 3. It is variably constructed so as to close the longitudinal opening formed between the projecting wall 10 and the projecting wall 10, and can be constructed in various configurations. What is shown in FIGS. 2 and 5 as an example will be described later.

【0018】張出壁9は、C型鋼材11を建物6の外壁
面5に固定し、続いて外壁面5から突出するように鋼材
11の外側端面にスチール製ベース材12を固定すると
共に、ベース材12の外側端面にC型鋼材13を固定
し、その上で外側全体を覆うように、アルミ板を適宜折
曲したアルミパネル14を固着することにより、壁とし
て突設したものである。また、張出壁9を突設する際に
は、図4に示すように、パラペット2の上面との間に後
述の横カバー材19を挿入し得える隙間aを持たせてあ
る。なお、張出壁9は、上記の如く鋼材11等によら
ず、外壁面5と一体的に鉄筋コンクリート製にしておく
こともできる。
The overhanging wall 9 fixes the C-shaped steel material 11 to the outer wall surface 5 of the building 6, and subsequently fixes the steel base material 12 to the outer end surface of the steel material 11 so as to project from the outer wall surface 5. A C-shaped steel material 13 is fixed to the outer end surface of the base material 12, and an aluminum panel 14 formed by appropriately bending an aluminum plate is fixed so as to cover the entire outer surface of the C-shaped steel material 13 so as to project as a wall. Further, when the projecting wall 9 is provided, as shown in FIG. 4, there is provided a gap a between the upper surface of the parapet 2 and a lateral cover material 19 which will be described later. Note that the overhang wall 9 may be made of reinforced concrete integrally with the outer wall surface 5 instead of the steel material 11 or the like as described above.

【0019】張出壁10は、C型鋼材15を外壁面7に
固定し、続いて外壁面7から突出するように鋼材15の
外側端面にスチール製ベース材16を固定すると共に、
さらにベース材16の外側端面にC型鋼材17を固定
し、その上で外側全体を覆うようにアルミ板をL字に折
曲したアルミパネル18を固着することにより、張出壁
9の如く突設したもので、張出壁9と同様に、パラペッ
ト2の上面との間には隙間aを持たせてある。もちろ
ん、外壁面7と一体となった鉄筋コンクリート製にする
こともできる。
The overhanging wall 10 fixes the C-shaped steel material 15 to the outer wall surface 7, and subsequently fixes the steel base material 16 to the outer end surface of the steel material 15 so as to project from the outer wall surface 7.
Further, a C-shaped steel material 17 is fixed to the outer end surface of the base material 16, and an aluminum panel 18 in which an aluminum plate is bent into an L shape so as to cover the entire outer surface is fixed thereon, so that a protrusion like the overhanging wall 9 is formed. Like the overhanging wall 9, a gap a is provided between the parapet 2 and the upper surface of the parapet 2. Of course, it may be made of reinforced concrete that is integrated with the outer wall surface 7.

【0020】上記の隙間aは、横カバー材19等からな
るジョイント20を施工するために設けたものである。
このジョイント20は、建物4または6の変動を吸収可
能に閉塞する任意の構成のものであり、外壁面5の一部
に形成した切欠部21に固定した受部材に一端部を把持
させるようにして横カバー材19を外壁面5に固着する
と共に、パラペット2の天端部に対して摺動自在となる
ように被着させ、横カバー材19で両建物4、6の横方
向の躯体間隙を被閉すべく施工したものである。また、
横カバー材19は張出壁9の下端と横カバー材19との
隙間を密封するため、少なくとも、アルミパネル14の
下端に至る部分まで挿入してある。
The gap a is provided for constructing the joint 20 composed of the lateral cover material 19 and the like.
The joint 20 has an arbitrary configuration that can block fluctuations of the building 4 or 6 so as to be able to absorb the fluctuation, and one end of the joint 20 is held by a receiving member fixed to a notch 21 formed in a part of the outer wall surface 5. The lateral cover member 19 is fixed to the outer wall surface 5 and is attached to the top end of the parapet 2 so as to be slidable. It was constructed to close the. Also,
In order to seal the gap between the lower end of the overhanging wall 9 and the horizontal cover member 19, the horizontal cover member 19 is inserted at least up to the lower end of the aluminum panel 14.

【0021】また、張出壁9の下端と横カバー材19と
の隙間には、これを密封すべくコーキング処理22をし
てあるが、切欠部21と受部材との隙間にもコーキング
処理23をして密封してある。こうして張出壁9と横カ
バー材19とは、共に外壁面5に固定されたことになる
ため、両者は建物6と一体となって動くことになり、同
様に張出壁10は、建物4と一体となって動くことにな
る。
In addition, a caulking process 22 is performed in the gap between the lower end of the overhanging wall 9 and the lateral cover material 19 in order to seal it, but a caulking process 23 is also performed in the gap between the notch 21 and the receiving member. And sealed. Since both the overhanging wall 9 and the lateral cover member 19 are fixed to the outer wall surface 5 in this manner, both of them move together with the building 6, and similarly, the overhanging wall 10 includes the building 4 and the building 4. It will move together with.

【0022】ジョイント8は、上記のように様々な構成
のものを施工できるが、そのうちの一例を図2及び図5
に示してある。すなわち、ジョイント8は、後述の縦カ
バー材30の平板部30aに裏側から当接し得る起曲部
24bを、平板部24aの両端に形成した長尺平板状の
縦カバー材24と、断面コの字形或いはZ字形を有し、
縦カバー材24の裏面側に固着すると共に後述の掛止金
具26を掛止し得る構成とした支持材25と、支持材2
5に掛止して固着し得る断面L字形の掛止金具26と、
掛止金具26に軸着するボルト挿通孔を有する軸着部2
7aを平板の一端部に形成し、後述の受金具29の上面
に固着する軸着金具27と、長尺平板を短手方向に適宜
折曲し、後述の縦カバー材30に裏側から固着すると共
に後述の受金具29に枢着し得る枢着凸部28aを設け
てなるS字状金具28と、枢着凸部28aを枢着し得る
枢着凹部29aを長尺平板の上面に形成してその一端部
に止水シート止着部29bを形成し、アルミパネル14
或いは18に上側から固着する受金具29と、長尺平板
を適宜折曲して縦カバー材24の平板部24aに表側か
ら当接する起曲部30bを平板部30aの一端部に形成
すると共に、他端部にバネ体30cを固着した縦カバー
材30とを、主たる構成要素としたものである。
The joint 8 can be constructed in various configurations as described above, one example of which is shown in FIGS.
It is shown in. That is, the joint 8 has a long flat plate-shaped vertical cover member 24 formed at both ends of the flat plate member 24a with bent portions 24b which can come into contact with the flat plate member 30a of the vertical cover member 30 described below from the back side, and a cross section of the joint. Have a letter or Z shape,
A support member 25 that is fixed to the back surface of the vertical cover member 24 and has a structure in which a later-described hook metal 26 can be hooked, and the support member 2.
5, a hook metal fitting 26 having an L-shaped cross section, which can be hooked and fixed to
Shaft mounting part 2 having a bolt insertion hole for shaft mounting to the latching metal 26
7a is formed at one end of a flat plate, and a shaft mounting metal fitting 27 fixed to the upper surface of a receiving metal fitting 29 described later and a long flat plate are appropriately bent in the lateral direction, and fixed to a vertical cover material 30 described below from the back side. At the same time, an S-shaped metal fitting 28 provided with a pivoting convex portion 28a that can be pivotally attached to a receiving metal fitting 29, which will be described later, and a pivotal attachment concave portion 29a that can pivotally attach the pivotal attachment convex portion 28a are formed on the upper surface of the long flat plate. A water blocking sheet fastening part 29b is formed at one end of the aluminum panel 14
Alternatively, a bracket 29 that is fixed to 18 from above and a bent portion 30b that appropriately bends a long flat plate and contacts the flat plate portion 24a of the vertical cover member 24 from the front side are formed at one end of the flat plate portion 30a. The vertical cover member 30 having the spring body 30c fixed to the other end is the main constituent element.

【0023】施工後の構成を詳細に説明すると、ジョイ
ント8は、受金具29、29を止水シート止着部29b
が対向するようにしてアルミパネル14或いは18に対
し上側からそれぞれビス止めし、そしてそれぞれの上側
には軸着部27aを突出させて軸着金具27、27をビ
ス止めし、さらに、S字状金具28の枢着凸部28a、
28aを受金具29、29の枢着凹部29a、29aに
枢着自在に嵌合わせ、
The construction after construction will be described in detail. In the joint 8, the metal fittings 29, 29 are attached to the water blocking sheet fastening portion 29b.
To the aluminum panel 14 or 18 such that they face each other, and the shaft fittings 27a are projected on the respective upper sides to fix the metal fittings 27 and 27 with screws. The pivotal protrusion 28a of the metal fitting 28,
28a is pivotally fitted into the fitting recesses 29a, 29a of the receiving fittings 29, 29,

【0024】次に、支持材25を裏側から縦カバー材2
4に固定し、さらに支持材25に掛止金具26、26を
掛止して固着し、掛止金具26、26の外側から軸着部
27a、27aにビス止めして掛止金具26、26を軸
着金具27、27に対して軸着し、そして、バネ体30
c、30cが両端に配置するように起曲部30b、30
bを縦カバー材24の表側から平板部24aに当接する
と共に、縦カバー材24の起曲部24b、24bを縦カ
バー材30の裏側から平板部30aに当接してカバー材
30を設置し、その外側からS字状金具28、28にビ
ス止めして縦カバー材30をS字状金具28、28に固
定し、
Next, the support member 25 is attached to the vertical cover member 2 from the back side.
4 and further, hooking metal fittings 26, 26 are hooked and fixed to the support member 25, and the metal fittings 26, 26 are screwed to the shaft fitting portions 27a, 27a from the outside of the metal fittings 26, 26. The shaft fittings 27, 27 and the spring body 30.
bending portions 30b and 30 so that c and 30c are arranged at both ends.
b is brought into contact with the flat plate portion 24a from the front side of the vertical cover member 24, and the bent portions 24b, 24b of the vertical cover member 24 are brought into contact with the flat plate portion 30a from the back side of the vertical cover member 30 to install the cover member 30, From the outside, fix the vertical cover member 30 to the S-shaped metal fittings 28, 28 with screws,

【0025】さらに、縦カバー材30とアルミパネル1
4との隙間にコーキング処理31をすると共に、縦カバ
ー材30と外壁面7との隙間にはコーキング処理32を
して施工してある。
Further, the vertical cover member 30 and the aluminum panel 1
The caulking process 31 is performed in the gap between the vertical cover member 30 and the outer wall surface 7, and the caulking process 32 is performed in the gap between the vertical cover member 30 and the outer wall surface 7.

【0026】このジョイント8は、軸着金具27が掛止
金具26に対してビス止めして軸着され、また、S字状
金具28と受金具29とが枢着自在に嵌め合わされてい
るため図1のXーX方向の変動を吸収し、縦カバー材2
4と、縦カバー材30、30とが互いに起曲部同士を当
接しているため、YーY方向の変動を吸収すると共に、
ZーZ方向の変動も吸収することができる。
In this joint 8, a shaft fitting metal fitting 27 is screwed to the hook fitting metal fitting 26 so as to be axially mounted, and an S-shaped metal fitting 28 and a receiving metal fitting 29 are pivotally fitted to each other. Vertical cover material 2 that absorbs fluctuations in the XX direction of FIG.
4 and the vertical cover members 30 and 30 have their bent portions abutting each other, so that the fluctuations in the YY direction are absorbed and
Variations in the Z-Z direction can also be absorbed.

【0027】このようにしてジョイント8を、張出壁9
と張出壁10とにより形成された縦方向の開口部を被閉
すべく施工したことにより、張出壁9が建物6と一体と
なってその動きに追従し、張出壁10が建物4と一体と
なってその動きに追従するため、ジョイント8は両張出
壁9、10間の変動、つまり、両建物4、6の変動を吸
収することができる。またジョイント20は、横方向の
躯体間隙を被閉すると共にその本来の可動性能を発揮
し、建物6とパラペット2との上下動に追従し、両者の
変動を吸収することができる。
In this way, the joint 8 is attached to the overhanging wall 9
By constructing so as to close the vertical opening formed by the projecting wall 10 and the projecting wall 10, the projecting wall 9 integrally follows the movement of the building 6 and the projecting wall 10 becomes the building 4. Since the joint 8 integrally follows the movement, the joint 8 can absorb the variation between the two overhanging walls 9 and 10, that is, the variation of both the buildings 4 and 6. Further, the joint 20 closes the lateral body gap and exhibits its original movable performance, can follow the vertical movement of the building 6 and the parapet 2, and can absorb the fluctuation of both.

【0028】しかも、ジョイント8、20及び張出壁
9、10はコーキング処理22、23、31、32によ
り隙間を密封して防水処理を施してあるため、両建物
4、6の躯体間隙に水が侵入するおそれは皆無である。
なお、以上の施工方法におけるジョイント8、ジョイン
ト20及び張出壁9、10の施工の順序は問わず、いず
れを先にして施工するかは任意である。また、隙間の密
封のためには、コーキング処理をする代わりにパッキン
グを挿入して密封することもできる。
Moreover, since the joints 8 and 20 and the overhanging walls 9 and 10 are waterproofed by sealing the gaps by caulking treatments 22, 23, 31 and 32, the gaps between the skeletons of both buildings 4 and 6 are covered with water. There is no danger of invading.
It should be noted that the order of construction of the joint 8, the joint 20, and the overhanging walls 9 and 10 in the above construction method does not matter, and which one is constructed first is arbitrary. Further, in order to seal the gap, packing can be inserted and sealed instead of caulking.

【0029】以上のジョイント8を施工する際には、張
出壁10を塔屋3の外壁面7から突設したが、この張出
壁10を突設せずに図6に示すジョイント33を施工す
ることもできる。このジョイント33は、張出壁9の外
側面と、外壁面7との間に現れる縦方向の開口部を被閉
すべく、L字型のコーナーカバー材34をバネ体35を
介して施工したものであり、両建物4、6間の変動はバ
ネ体35の作用により確実に吸収することができる。
When constructing the joint 8 as described above, the projecting wall 10 was projected from the outer wall surface 7 of the tower 3. However, the projecting wall 10 was not projecting and the joint 33 shown in FIG. 6 was constructed. You can also do it. In this joint 33, an L-shaped corner cover member 34 is installed via a spring body 35 so as to close the vertical opening appearing between the outer surface of the overhanging wall 9 and the outer wall surface 7. Therefore, the fluctuation between the buildings 4 and 6 can be reliably absorbed by the action of the spring body 35.

【0030】また、この場合もジョイント8を施工した
場合の如く、張出壁9の下側には横方向の躯体間隙を横
カバー材19により被閉すべくジョイント20(図示せ
ず)を施工してあり、しかも、張出壁9と横カバー材1
9との間は密封してあるため、両建物の間隙を確実に防
水することができる。
Also in this case, as in the case where the joint 8 is installed, a joint 20 (not shown) is installed on the lower side of the overhanging wall 9 in order to close the lateral frame gap by the horizontal cover member 19. In addition, the overhanging wall 9 and the horizontal cover material 1
Since the space between 9 and 9 is sealed, the gap between both buildings can be surely waterproofed.

【0031】一方、図7は、同一高さの建物36及び建
物37であって、それぞれの屋上38、39にパラペッ
ト40、41を周設すると共に、塔屋42、43を立設
したものに対し、両建物36、37の躯体間隙を被閉す
べく上記ジョイント8と同一構成を有するジョイント4
4等を施工した状態を図示したものである。
On the other hand, FIG. 7 shows a building 36 and a building 37 of the same height, in which parapets 40 and 41 are provided around roofs 38 and 39, respectively, and tower roofs 42 and 43 are erected. , A joint 4 having the same structure as the joint 8 in order to close the body gap between the two buildings 36, 37.
4 is a diagram showing a state in which 4 and the like are constructed.

【0032】詳細に説明すると、建物36或いは建物3
7のいずれか一方の外壁面(図示したものは建物37の
外壁面45)に対し、パラペット40、41との間に後
述の横カバー材46等からなるジョイント47を挿入し
得る隙間を持たせて袖壁48を突設すると共に、袖壁4
8の先端外側面からは張出壁49を横方向に突設し、さ
らに、もう一方の建物の外壁面(図示したものは建物3
6の外壁面50)に対して上記張出壁49の如き張出壁
51を突設し、
Explaining in detail, the building 36 or the building 3
There is a gap between one of the outer wall surfaces of 7 (the outer wall surface 45 of the building 37 is shown) between the parapets 40 and 41 so that a joint 47 composed of a lateral cover member 46 described later can be inserted. The sleeve wall 48 and the sleeve wall 4
An overhanging wall 49 is laterally projected from the outer side surface of the tip of 8, and the outer wall surface of the other building (the one shown is the building 3
6, an overhanging wall 51 such as the overhanging wall 49 is protruded from the outer wall surface 50) of 6.

【0033】その上で、張出壁49と張出壁51との間
に形成された縦方向の開口部を被閉すべくジョイント4
4を施工し、さらに、袖壁48及び張出壁49とパラペ
ット40、41との隙間には横方向の躯体間隙を被閉す
べく、横カバー材46をパラペット40、41を跨がせ
てジョイント47を施工し、
Then, in order to close the vertical opening formed between the overhanging wall 49 and the overhanging wall 51, the joint 4 is closed.
4 and further, in order to close the lateral body gap in the gap between the sleeve wall 48 and the overhanging wall 49 and the parapets 40 and 41, the lateral cover member 46 is joined across the parapets 40 and 41. 47 construction,

【0034】さらに、横カバー材46と、袖壁48及び
張出壁49との隙間を密封すべくコーキング処理52を
すると共に、ジョイント44と張出壁49との隙間にコ
ーキング処理53をし、さらにまたジョイント44と張
出壁51との隙間にコーキング処理54したものを図示
したものである。
Further, a caulking process 52 is performed to seal the gap between the lateral cover member 46 and the sleeve wall 48 and the overhanging wall 49, and a caulking process 53 is performed on the gap between the joint 44 and the overhanging wall 49. In addition, the gap between the joint 44 and the overhang wall 51 is shown by caulking 54.

【0035】袖壁48は外壁面45から突設した鉄筋コ
ンクリート製の壁であり、張出壁49は上記張出壁9の
如くC型鋼材等により袖壁48の先端外側面から横方向
に突設した壁であり、袖壁48及び張出壁49により全
体がL字形状をなすようにしてある。また、張出壁51
は張出壁49と同じくC型鋼材等により外壁面50から
突設した壁である。袖壁48、張出壁49、51はいず
れもC型鋼材等により突設した壁にすることもできる
し、袖壁48と張出壁49とを鉄筋コンクリート製とし
て一体的に突設したり、もちろん、張出壁51を鉄筋コ
ンクリート製とすることもできる。
The sleeve wall 48 is a reinforced concrete wall projecting from the outer wall surface 45, and the projecting wall 49 is laterally projected from the outer surface of the tip end of the sleeve wall 48 by a C-shaped steel material or the like like the projecting wall 9. The wall is provided, and the sleeve wall 48 and the overhanging wall 49 form an L shape as a whole. Also, the overhang wall 51
Like the overhanging wall 49, is a wall protruding from the outer wall surface 50 by a C-type steel material or the like. Each of the sleeve wall 48 and the overhanging walls 49, 51 may be a wall protruding from a C-type steel material or the like, or the sleeve wall 48 and the overhanging wall 49 may be integrally formed by reinforced concrete, Of course, the overhang wall 51 may be made of reinforced concrete.

【0036】ジョイント47は、図8に示すようにC型
鋼材を中心部分で適宜折り曲げたベース体55を、ボル
ト56、57を挿通してパラペット40、41に対して
上下の変動を吸収できるようにして固定し、このベース
体55の外側から横カバー材46を被覆させて施工した
ものである。ベース体55の底面部分には、図9に示す
ように、ボルト挿通孔55a、55bを設けてあり、袖
壁48を突設してない建物36側の55aは長孔とし、
これに対して55bは通常のボルト挿通孔としてある。
したがって、ジョイント47は、パラペット41に対し
て固定状態になると同時にパラペット40に対しては自
由となり、結果として建物37と一体となってその動き
に追従することになる。
As shown in FIG. 8, the joint 47 has a base body 55, which is formed by appropriately bending a C-shaped steel material at its central portion, through which bolts 56 and 57 are inserted so that the vertical movement of the parapets 40 and 41 can be absorbed. Then, the horizontal cover member 46 is coated from the outside of the base body 55 to be applied. As shown in FIG. 9, bolt insertion holes 55a and 55b are provided in the bottom surface portion of the base body 55, and 55a on the side of the building 36 where the sleeve wall 48 does not project is a long hole.
On the other hand, 55b is a normal bolt insertion hole.
Therefore, the joint 47 is fixed to the parapet 41 and is free to the parapet 40 at the same time, and as a result, the joint 47 and the building 37 follow the movement.

【0037】こうして建物36、37にジョイント4
4、47を施工した場合も、ジョイント44は、張出壁
49と張出壁51との突設により現れた縦方向の開口部
を被閉することにより、建物36、37間の縦方向の躯
体間隙を被閉すると共に、両建物36、37の変動を確
実に吸収することができる。その他、張出壁51を突設
せずに張出壁49と、外壁面50とに対してジョイント
33の如き構成のジョイントを施工し、確実に縦方向の
躯体間隙を被閉することもできる。
Thus, the joints 4 are attached to the buildings 36 and 37.
Even when 4, 47 are constructed, the joint 44 closes the vertical opening between the buildings 36, 37 by closing the vertical opening that appears due to the protruding wall 49 and the protruding wall 51. It is possible to close the frame gap and surely absorb the fluctuations of both buildings 36 and 37. Besides, it is also possible to construct a joint such as the joint 33 on the overhanging wall 49 and the outer wall surface 50 without projecting the overhanging wall 51, and securely close the longitudinal body gap. .

【0038】また、横方向の躯体間隙を被閉すべくパラ
ペット40、41を跨ぐ横カバー材46と、袖壁48及
び張出壁49との隙間を密封してあるため、躯体間隙の
防水効果も良好であると共に、ジョイント47は両建物
36、37間の変動を確実に吸収することができる。
Further, since the gap between the lateral cover member 46 straddling the parapets 40 and 41 and the sleeve wall 48 and the overhanging wall 49 is sealed to close the lateral body gap, the body gap is also waterproofed. In addition to being good, the joint 47 can reliably absorb the fluctuation between the buildings 36 and 37.

【0039】[0039]

【発明の効果】本発明の施工方法によると、縦カバー材
が一方の建物から突設した張出壁と、他方の塔屋等の外
側面から突設した張出壁或いは当該外側面とに対して縦
方向の躯体間隙を被閉すべく施工されるため、縦カバー
材等からなるジョイントは十分な可動性能を発揮し、両
建物の変動を確実に吸収することができ、さらに、横カ
バー材が横方向の躯体間隙を被閉すべく施工されると共
に、横カバー材と張出壁或いは袖壁との間は密封してあ
るため躯体間隙を確実に防水することできる。
According to the construction method of the present invention, with respect to the overhanging wall in which the vertical cover material projects from one building, and the overhanging wall or the outside surface projecting from the outer surface of the other tower or the like. Since it is constructed so as to cover the vertical body gap, the joint consisting of vertical cover materials etc. can exert sufficient movable performance, can reliably absorb the fluctuation of both buildings, and the horizontal cover material Since the construction is performed so as to close the lateral body gap, and the lateral cover material and the overhanging wall or the sleeve wall are hermetically sealed, the body gap can be reliably waterproofed.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の施工方法によるジョイント施工後の一
例を示す斜視図である。
FIG. 1 is a perspective view showing an example after joint construction by a construction method of the present invention.

【図2】図1の平面図である。FIG. 2 is a plan view of FIG.

【図3】図1のIII ーIII 線断面図である。3 is a sectional view taken along line III-III in FIG.

【図4】本発明の施工方法による張出壁の施工途中を示
す斜視図である。
FIG. 4 is a perspective view showing a process of constructing an overhanging wall by a construction method of the present invention.

【図5】本発明で使用するジョイントの一例を示す要部
拡大斜視図である。
FIG. 5 is an enlarged perspective view of an essential part showing an example of a joint used in the present invention.

【図6】本発明の施工方法により図2とは別構成のジョ
イント施工後の一例を示す平面図である。
FIG. 6 is a plan view showing an example after the joint construction of a structure different from that of FIG. 2 by the construction method of the present invention.

【図7】本発明の別の施工方法によるジョイント施工後
を示す斜視図である。
FIG. 7 is a perspective view showing after joint construction by another construction method of the present invention.

【図8】図7のVIIIーVIII線断面図である。8 is a sectional view taken along line VIII-VIII of FIG.

【図9】ベース体を示す斜視図である。FIG. 9 is a perspective view showing a base body.

【図10】従来の施工方法によるジョイント施工後を示す
斜視図である。
FIG. 10 is a perspective view showing a state after the joint construction by the conventional construction method.

【図11】従来の別の施工方法によるジョイント施工後を
示す斜視図である。
[Fig. 11] Fig. 11 is a perspective view showing a state after joint construction by another conventional construction method.

【図12】従来のさらに別の施工方法によるジョイント施
工後を示す斜視図である。
[Fig. 12] Fig. 12 is a perspective view showing a state after joint construction by another conventional construction method.

【図13】図12のXIIIーXIII線断面図である。13 is a sectional view taken along line XIII-XIII in FIG.

【符号の説明】[Explanation of symbols]

1 屋上 2 パラペット 3 塔屋 4,6 建物 5,7 外壁面 8 ジョイント 9,10 張出壁 19 横カバー材 20,33 ジョイント 24,30 縦カバー材 36,37 建物 42,43 塔屋 44、47 ジョイント 46 横カバー材 48 袖壁 49,51 張出壁 1 Roof 2 Parapet 3 Tower 4,6 Building 5,7 Exterior wall 8 Joint 9,10 Overhang 19 Horizontal cover 20,33 Joint 24,30 Vertical cover 36,37 Building 42,43 Tower 44, 47 Joint 46 Horizontal cover material 48 Sleeve wall 49,51 Overhang wall

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 一方又は両方の躯体部分に入隅部が形成
された隣接躯体の躯体間隙を、この入隅部において縦横
交差方向に被閉するエキスパンションジョイントの施工
方法であって、横方向の躯体間隙を被閉する横カバー材
を隣接両躯体に跨がって配設する一方、縦方向の躯体間
隙の一方の躯体側から上記横カバー材をその巾方向に跨
ぐ縦方向の張出壁を形成し、この張出壁先端側と他方の
躯体側との間に縦方向の開口部を形成し、この縦方向の
開口部に張出壁先端側と他方の躯体側に対して変動自在
に支持された縦カバー材を配設するようにしたことを特
徴とするエキスパンションジョイントの入隅部用施工方
法。
1. A method for constructing an expansion joint in which a frame gap of an adjacent skeleton having an entry corner formed in one or both skeletons is closed in a vertical and horizontal crossing direction at the entry corner. A horizontal cover material that closes the frame gap is arranged across both adjacent frames, while a vertical overhang wall that spans the horizontal cover material in the width direction from one frame side of the vertical frame gap. A vertical opening is formed between the tip of the overhanging wall and the side of the other body, and the opening in the vertical direction is variable with respect to the tip of the overhanging wall and the side of the other body. A vertical cover member supported by the above is arranged, and a construction method for an entering corner portion of an expansion joint.
【請求項2】 一方の躯体部分に入隅部が形成された隣
接躯体の躯体間隙を、この入隅部において縦横交差方向
に被閉するエキスパンションジョイントの施工方法であ
って、横方向の躯体間隙を被閉する横カバー材を入隅部
のない躯体側に固着すると共に、この横カバー材を入隅
部のある躯体側の天端部に被着する一方、上記横カバー
材を固着した躯体側から上記横カバー材をその巾方向に
跨ぐ縦方向の張出壁を形成し、張出壁下端と横カバー材
間は密封し、この張出壁先端側と他方の躯体側との間に
横カバー材の長手方向に開口巾を有した縦方向の開口部
を形成し、この縦方向の開口部に張出壁先端側と他方の
躯体側に対して変動自在に支持された縦カバー材を配設
するようにしたことを特徴とするエキスパンションジョ
イントの入隅部用施工方法。
2. A method of constructing an expansion joint in which a frame gap of an adjacent skeleton in which a corner portion is formed on one frame portion is closed in the vertical and horizontal crossing directions at the corner portion. While fixing the horizontal cover material that closes the body to the side of the body that does not have an inside corner, and while applying this horizontal cover material to the top end of the side of the body that has the inside corner, the body to which the above horizontal cover material is attached From the side to form a vertical bulging wall that straddles the lateral cover material in the width direction, and seal between the lower end of the bulging wall and the lateral cover material, and between the tip of the bulging wall and the other side of the body. A vertical cover member having a vertical opening having an opening width in the longitudinal direction of the horizontal cover member and movably supported by the vertical opening on the tip end side of the overhanging wall and the other side of the body. For the corners of the expansion joint, which is characterized in that Construction method.
【請求項3】 両方の躯体部分に入隅部が形成された隣
接躯体の躯体間隙を、この入隅部において縦横交差方向
に被閉するエキスパンションジョイントの施工方法であ
って、横方向の躯体間隙を被閉する横カバー材を隣接両
躯体に跨がって配設する一方、縦方向の躯体間隙を挟む
一方の躯体側からは袖壁を張出し形成した上で、この袖
壁から上記横カバー材をその巾方向に跨ぐ縦方向の張出
壁を形成し、少なくとも張出壁下端と横カバー材間は密
封し、この張出壁先端側と他方の躯体側との間に横カバ
ー材の長手方向に開口巾を有した縦方向の開口部を形成
し、この縦方向の開口部に張出壁先端側と他方の躯体側
に対して変動自在に支持された縦カバー材を配設するよ
うにしたことを特徴とするエキスパンションジョイント
の入隅部用施工方法。
3. A method of constructing an expansion joint in which the frame gaps of adjacent skeletons having the corners formed in both frame parts are closed in the vertical and horizontal crossing directions at the corners. The horizontal cover material that closes the body is arranged across both adjacent skeletons, while a sleeve wall is formed to extend from one skeleton side that sandwiches the skeleton in the vertical direction, and the horizontal cover is formed from this sleeve wall. Form a vertical overhanging wall that straddles the material in its width direction, seal at least between the lower end of the overhanging wall and the horizontal cover material, and insert the horizontal cover material between the tip side of the overhanging wall and the other side of the body. A vertical opening having an opening width in the longitudinal direction is formed, and a vertical cover member is movably supported on the tip end of the overhanging wall and the other skeleton side in the vertical opening. Construction method for the inside corner of the expansion joint characterized in that .
JP23742394A 1994-09-30 1994-09-30 Construction method for corner of expansion joint Expired - Lifetime JP2747229B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23742394A JP2747229B2 (en) 1994-09-30 1994-09-30 Construction method for corner of expansion joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23742394A JP2747229B2 (en) 1994-09-30 1994-09-30 Construction method for corner of expansion joint

Publications (2)

Publication Number Publication Date
JPH08100465A true JPH08100465A (en) 1996-04-16
JP2747229B2 JP2747229B2 (en) 1998-05-06

Family

ID=17015141

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23742394A Expired - Lifetime JP2747229B2 (en) 1994-09-30 1994-09-30 Construction method for corner of expansion joint

Country Status (1)

Country Link
JP (1) JP2747229B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002097726A (en) * 2000-09-25 2002-04-05 Nippon Alum Co Ltd Expansion joint device
JP2017214700A (en) * 2016-05-30 2017-12-07 ドーエイ外装有限会社 Joint device
WO2023092745A1 (en) * 2021-11-26 2023-06-01 中铁十局集团青岛工程有限公司 Expansion joint construction structure and expansion joint construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002097726A (en) * 2000-09-25 2002-04-05 Nippon Alum Co Ltd Expansion joint device
JP2017214700A (en) * 2016-05-30 2017-12-07 ドーエイ外装有限会社 Joint device
WO2023092745A1 (en) * 2021-11-26 2023-06-01 中铁十局集团青岛工程有限公司 Expansion joint construction structure and expansion joint construction method

Also Published As

Publication number Publication date
JP2747229B2 (en) 1998-05-06

Similar Documents

Publication Publication Date Title
JP2747229B2 (en) Construction method for corner of expansion joint
JP2747249B2 (en) Renovated windows
KR100569578B1 (en) Joint of metal curtain wall
JPS6351547A (en) Seal structure of outer wall panel
JP3380094B2 (en) Building wall structure
JP3322825B2 (en) Outer wall joint waterproof structure
JP2536183Y2 (en) Balcony mounting structure
JPH0232424B2 (en)
JP2000179056A (en) Expansion joint structure
JP2002242396A (en) Barge constitution body
JPH0711226Y2 (en) Eaves
JPH0112895B2 (en)
JPH0446413Y2 (en)
JPS6231532Y2 (en)
JPH0418096B2 (en)
JPH0328697Y2 (en)
JPS6133159Y2 (en)
JPS609296Y2 (en) Lighting window rain shutter structure
JP3226494B2 (en) Exterior structure
JPS6133160Y2 (en)
JPS6040740Y2 (en) insulated envelope
JPH0629289Y2 (en) Fixtures for building protection members
JP3007250U (en) Mounting structure for metal exterior materials
JP3381754B2 (en) Building wall structure
JP2747197B2 (en) Skylight

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090213

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090213

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100213

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110213

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120213

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120213

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130213

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140213

Year of fee payment: 16

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term