WO2023079737A1 - アーク炉設備 - Google Patents
アーク炉設備 Download PDFInfo
- Publication number
- WO2023079737A1 WO2023079737A1 PCT/JP2021/040981 JP2021040981W WO2023079737A1 WO 2023079737 A1 WO2023079737 A1 WO 2023079737A1 JP 2021040981 W JP2021040981 W JP 2021040981W WO 2023079737 A1 WO2023079737 A1 WO 2023079737A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- arc
- scrap
- data
- electrode
- arc furnace
- Prior art date
Links
- 238000002844 melting Methods 0.000 claims abstract description 38
- 230000008018 melting Effects 0.000 claims abstract description 38
- 238000010891 electric arc Methods 0.000 claims abstract description 7
- 230000010365 information processing Effects 0.000 claims abstract description 6
- 238000000034 method Methods 0.000 claims description 41
- 238000005070 sampling Methods 0.000 claims description 32
- 230000008569 process Effects 0.000 claims description 18
- 238000012545 processing Methods 0.000 claims description 15
- 230000002265 prevention Effects 0.000 claims description 7
- 238000009434 installation Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 15
- 238000011156 evaluation Methods 0.000 description 12
- 230000006870 function Effects 0.000 description 11
- 238000003384 imaging method Methods 0.000 description 9
- 239000002184 metal Substances 0.000 description 9
- 229910052751 metal Inorganic materials 0.000 description 9
- 239000000155 melt Substances 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000013480 data collection Methods 0.000 description 3
- 238000003066 decision tree Methods 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 238000012417 linear regression Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 239000002436 steel type Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 238000009499 grossing Methods 0.000 description 2
- 238000010309 melting process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 241001270131 Agaricus moelleri Species 0.000 description 1
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000004090 dissolution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000005674 electromagnetic induction Effects 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000007637 random forest analysis Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B3/00—Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
- F27B3/10—Details, accessories, or equipment peculiar to hearth-type furnaces
- F27B3/28—Arrangement of controlling, monitoring, alarm or the like devices
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05B—ELECTRIC HEATING; ELECTRIC LIGHT SOURCES NOT OTHERWISE PROVIDED FOR; CIRCUIT ARRANGEMENTS FOR ELECTRIC LIGHT SOURCES, IN GENERAL
- H05B7/00—Heating by electric discharge
- H05B7/02—Details
- H05B7/144—Power supplies specially adapted for heating by electric discharge; Automatic control of power, e.g. by positioning of electrodes
- H05B7/148—Automatic control of power
- H05B7/152—Automatic control of power by electromechanical means for positioning of electrodes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Definitions
- the present disclosure relates to arc furnace equipment that melts scrap using heat generated by arc discharge between steel billets (scrap) and electrodes.
- the electric furnace supplies electricity to heat and melt the scrap inserted into the furnace.
- Electric furnaces include a resistance furnace that heats scrap with Joule heat, an induction furnace that induces an electric current in scrap by electromagnetic induction and heats it with its own resistance heat, and an arc furnace that uses heat generated by arcs and electrodes.
- electric arc furnaces have the advantages of being able to use cheap iron scrap as the main raw material, being able to operate and stop operations easily and having flexibility in facility operation, and being able to produce relatively large quantities with less investment than blast furnaces. .
- Patent Literature 1 discloses that impedance constant control is performed to control the elevation position of an electrode in order to stably generate an arc.
- the operator may raise and lower the electrode separately from automatic control.
- the electrode may be moved far away from the scrap by some factor by the operator. For example, when the electrode and the scrap come close to each other and the current value exceeds the allowable range. If the electrode is not lifted even though the current value exceeds the allowable range, overcurrent will occur and a short circuit will occur between the electrode and the scrap. If a short circuit occurs, the circuit breaker is normally disconnected. Here, this phenomenon is called arc breakage.
- the amount of scrap to be charged is determined by the operating conditions, but the state of scrap charging, such as the degree of coarseness and the unevenness of scrap at the time of charging, cannot be manipulated.
- the lid is closed in order to maintain the temperature inside the furnace and prevent the molten metal from scattering to the surroundings. Therefore, the operator cannot grasp the state inside the furnace during melting.
- Patent Document 2 discloses predicting the length of the electrode consumed by melting and appropriately capturing the distance between the scrap and the electrode. However, this only predicts the length of the electrode and cannot prevent shutdown due to unsteady factors such as scrap collapse.
- Patent Document 3 discloses an operating method in which thermometers are installed at various places on the furnace wall and the state inside the furnace is grasped from the outer temperature of the furnace. According to this, it is possible to visualize the state inside the furnace from the melting point of the steel type of the scrap to be charged and the temperature of the entire furnace. However, the state of the scrap in the vicinity of the outer circumference of the furnace and the temperature history information of the melted scrap are only obtained, and the state of the scrap during melting cannot necessarily be grasped. Therefore, it is difficult to prevent stoppages due to non-stationary factors such as scrap collapse.
- An object of the present disclosure is to provide an arc furnace facility capable of predicting the occurrence of circuit breaker disconnection (arc disconnection) caused by a short circuit due to the collapse of scrap during melting.
- the first aspect relates to arc furnace installations.
- the arc furnace equipment includes an arc furnace, a camera, and an information processing device.
- the arc furnace melts the scrap using heat generated by arc discharge between the scrap and the electrodes.
- the camera photographs the scrap put into the arc furnace.
- the information processing device includes a memory and a processor.
- the memory stores information including image data obtained from the camera at the time of inserting the scrap, actual control data regarding the electrode after the start of melting, and an arc break prediction model.
- the processor processes the information stored in the memory.
- the processor inputs the arrangement and density state of the scrap based on the image data and the control result data into the arc interruption prediction model, and predicts the occurrence of arc interruption due to a short circuit between the scrap and the electrode. It is configured to perform prediction processing to
- the second aspect further has the following features in addition to the first aspect.
- the placement and density of the scraps are based on the lightness index of each pixel of the image data.
- the control performance data includes operation time-series data and operation attribute data.
- the operation time-series data includes current values, voltage values, and lifting speed values relating to the electrodes at each sampling time.
- the operation attribute data includes an input time and an input amount of the scrap.
- the third aspect further has the following features in addition to the second aspect.
- the memory stores learning data.
- the learning data includes the image data, the operation time-series data, the operation attribute data, and an arc cut occurrence label regarding scraps that have been mined from the arc furnace in the past.
- the arc breakage occurrence label indicates the occurrence of arc breakage associated with the sampling time at which the current value is higher than the short circuit correlation value for each sampling time of the operation time-series data.
- the processor is configured to perform a learning process for constructing the arc break prediction model based on the learning data.
- the fourth aspect further has the following features in addition to any one of the first to third aspects.
- the camera takes three-dimensional images of the scrap that is put into the arc furnace.
- the image data includes a brightness index and a height index for each pixel.
- the arrangement and density of the scraps are based on the brightness index and height index of each pixel of the image data.
- the fifth aspect further has the following features in addition to any one of the first to fourth aspects.
- the processor is configured to perform a short-circuit prevention process of outputting a command to raise the electrode when the prediction process predicts that arc interruption will occur.
- the arc furnace equipment obtains information on the placement and density of scraps at the time of scrap input from the image data acquired from the camera.
- the arc furnace equipment can predict the occurrence of arc breakage from the information and the current control performance data after the start of melting. According to this, the arc furnace equipment can predict the occurrence of circuit breaker disconnection (arc disconnection) caused by a short circuit due to the collapse of scrap during melting.
- FIG. 1 is a diagram for explaining a configuration example of an arc furnace facility according to Embodiment 1;
- FIG. 4 is a diagram showing an imaging range of the scrap photographing camera according to Embodiment 1;
- FIG. 2 is a block diagram illustrating an overview of functions of the arc breakage prediction device according to Embodiment 1;
- FIG. 2 is a diagram showing an outline of operation time-series data and operation attribute data according to Embodiment 1;
- FIG. 5 is a flowchart for explaining a procedure for acquiring scrap image data in a camera image acquisition unit according to Embodiment 1;
- 4 is a diagram showing an example of scrap image data according to Embodiment 1;
- FIG. 4 is a diagram showing an outline of saving brightness indexes of scrap image data according to Embodiment 1;
- FIG. 4 is a flowchart for explaining a procedure for constructing an arc breakage prediction model in an arc breakage learning unit according to Embodiment 1;
- FIG. 5 is a flow chart for explaining a procedure for assigning an arc break label in an arc break learning unit according to Embodiment 1;
- FIG. 7 is a diagram for explaining a procedure for assigning an arc break label in an arc break learning unit according to Embodiment 1;
- 4 is a diagram showing an overview of input values in Embodiment 1.
- FIG. 4 is a flowchart for explaining an arc-out prediction procedure in an arc-out prediction unit according to Embodiment 1;
- FIG. 10 is a diagram showing an outline of brightness indices and height indices of scrap image data according to Embodiment 2;
- FIG. FIG. 11 is a block diagram illustrating an overview of functions of an arc breakage prediction device according to Embodiment 3; It is a conceptual diagram which shows the hardware structural example of the processing circuit which an arc interruption prediction apparatus has.
- FIG. 1 is a diagram for explaining a configuration example of an arc furnace facility 1 according to a first embodiment.
- the arc furnace melts steel billets (scrap 2) containing various alloys put into the furnace to form molten metal 3.
- the arc furnace has a furnace main body 4 for storing the melted metal 3, a lid 5 for removing heat during melting and preventing the molten metal 3 from scattering to the surroundings, and the molten metal 3 being discharged. It has a tap hole 6 for
- the refractory bricks are attached to the inner surfaces of the furnace body 4 and the lid 5.
- a hole is provided in the lid 5 and an electrode 7 for generating an arc is inserted into the furnace body 4 .
- the electrodes 7 are made of carbon and are provided in plurality.
- the output device 10 includes, for example, a power supply and a circuit breaker.
- the command values such as the current and voltage for obtaining the power to be supplied to the electrode 7 and the lifting speed for obtaining the lifting position of the electrode 7 are based on information such as the steel type of the scrap 2 and the amount of the scrap 2 input.
- is set to Automatic operation is also possible based on these settings, but as described above, arc generation is unstable, so manual operation is usually added by the operator each time. This manual operation is mainly given to the lifting speed that changes the lifting position of the electrode 7 .
- performance information during the actual melting operation may be taken into the control device 9 and used for feedback control and the like.
- a melting number is set for each molten metal 3 produced in one charge from the initial introduction of scrap 2 to the discharge of molten metal 3, and is used for product management and quality control.
- the arc furnace facility 1 further includes a camera (scrap photography camera 20) for photographing the interior of the furnace body 4, and an information processing device (arc interruption prediction device 30) for predicting arc interruption. .
- FIG. 2 shows the imaging range of the scrap photography camera 20 .
- the scrap camera 20 is desirably arranged directly above the furnace body 4 so that the entire inside of the furnace can be photographed as shown in FIG.
- the scrap camera 20 preferably has a water cooling mechanism.
- steam and gas generated by melting can rise directly above, it is desirable that the scrap photography camera 20 be placed at a distance from the furnace body 4 to the extent that it is not affected by the vapor or gas.
- FIG. 3 is a block diagram illustrating an overview of the functions of the arc break prediction device 30 according to the first embodiment.
- the configuration shown in FIG. 3 is an example, and is not limited to this.
- the arc breakage predicting device 30 predicts arc breakage based on the charging state of the scrap 2 obtained each time the scrap 2 is charged and the operation data during melting, and outputs the result.
- the operation data collection unit 31 collects control performance data.
- the control performance data includes operation time-series data and operation attribute data.
- the operation time-series data is information on the control output during melting.
- the operation time-series data includes, for example, a flag signal indicating whether or not the setting and actual current value, actual voltage value, lifting speed reference value, and actual current value of each electrode 7 have reached the level of overcurrent. Further, the operation time-series data includes a flag signal indicating whether or not there was manual operation by the operator, an up/down speed command value, a flag signal for turning on/off the circuit breaker due to troubles such as arc interruption, and the like.
- the operation time-series data is data at each sampling point (sampling time) obtained by acquiring these J signals at a constant sampling interval ⁇ t.
- Operation attribute data is information that accompanies other melting operations.
- the operation attribute data includes, for example, the time and amount of scrap 2 input, the consumption state of the electrode 7, the temperature in the furnace after melting, the steel type and composition of the scrap 2 input, the amount of elements input during composition adjustment, and so on.
- Operation attribute data is information summarizing the melting situation.
- the information collected by the operation data collection unit 31 is stored in the database 33 by linking the operation time-series data and operation attribute data with the melting number and the start time of each process, as shown in FIG.
- the camera image acquisition unit 32 acquires image data (image data) obtained by photographing the throwing state of the scraps 2 (arrangement and density of the scraps 2) from the scrap photographing camera 20. FIG. After that, the camera image acquisition unit 32 generates scrap image data for use by the arc break learning unit 34 and the arc break prediction unit 35 .
- FIG. 5 is a flowchart for explaining the procedure for generating scrap image data in the camera image acquisition unit 32.
- step S ⁇ b>100 the camera image acquisition unit 32 determines whether or not it is time to put the scrap 2 into the furnace body 4 . If it is not the timing when the scrap 2 is put in, the camera image acquisition unit 32 waits for the timing of putting in the scrap.
- the camera image acquisition unit 32 acquires image data (image data) at the time of throwing in the scrap from the scrap photographing camera 20 in step S110.
- step S120 the camera image acquisition unit 32 grayscales the captured data.
- grayscaling the brightness representing the coarseness and fineness of the scrap 2 at the time of introduction is obtained.
- Examples of grayscaling methods include the following conversion methods.
- img is a numerical array of the color space of the imaging data.
- w is the number of pixels in the horizontal direction of the image.
- h is the number of pixels in the vertical direction of the image.
- I is a pixel value at a horizontal pixel position x and a vertical pixel unit y.
- img_gray is a numeric array after grayscale.
- I'(x, y) is the pixel value after grayscale at the pixel position x in the horizontal direction and the pixel position y in the vertical direction.
- each coefficient for calculating I'(x, y) is based on ITU-R BT.601 (Studio encoding parameters of digital television for standard 4:3 and wide screen 16:9 aspect ratios (International Telecommunication Union), and may be based on other standards.
- the grayscale image obtained by the above-described processing may be obtained from the average value at each pixel position (equation ( 5)).
- N cap is the number of acquisitions of imaging data acquired before the lid 5 is closed after the scrap is thrown.
- step S130 the camera image acquisition section 32 changes the number of pixels of the grayscale data.
- the camera image acquisition unit 32 adjusts the number of pixels (the number of data) to a predetermined number of pixels (number of data) used by the arc break learning unit 34 and the arc break prediction unit 35, and scrap image data.
- the Gaussian filter weights neighboring pixel values with a Gaussian distribution g to smooth the image (equation (6)).
- img_resize is the numerical array of the smoothed image.
- x is the horizontal pixel position of the smoothed image.
- y is the vertical pixel position of the smoothed image.
- ⁇ is the magnification.
- the symbol [] is for rounding.
- R is the smoothed pixel value (lightness index).
- w' is the number of pixels in the horizontal direction of the smoothed image.
- h' is the number of pixels in the vertical direction of the smoothed image.
- FIG. 6 is a diagram showing an example of scrap image data.
- step S140 the camera image acquisition unit 32 stores the scrap image data in the database 33.
- Numerical arrays of scrap image data are stored in the database 33 as brightness indices.
- the scrap image data is stored in association with the dissolution number and the photographing date and time, as shown in FIG.
- the arc breakage learning unit 34 constructs an arc breakage prediction model based on the learning data and the evaluation data stored in the database 33 .
- the learning data and the evaluation data include scrap image data, operation time-series data, operation attribute data, and arc break occurrence labels regarding the scrap 2 discharged from the arc furnace in the past.
- the arc break occurrence label indicates the occurrence of arc break associated with the sampling time at which the current value is higher than the short circuit correlation value for each sampling time of the operation time-series data.
- FIG. 8 is a flow chart for explaining the procedure for constructing an arc breakage prediction model in the arc breakage learning unit 34. As shown in FIG.
- step S200 the arc break learning unit 34 determines whether or not the total number of melting numbers stored in the database 33, that is, the number of charges M charge is greater than the number of times M Learning required for model learning.
- step S210 the arc break learning unit 34 acquires operation time series data, operation attribute data, and scrap image data from the database 33 based on the melting number and date/time.
- M charge is less than or equal to M Learning , the amount of data used for learning the arc breakage prediction model is not sufficient, so the arc breakage learning unit 34 re-executes the process of step S200 after the current charge is completed. do.
- step S220 the arc break learning unit 34 acquires an arc break label.
- the procedure for assigning the arc break label in step S220 will be described.
- FIG. 9 is a flow chart for explaining the sequence of assigning an arc break label in the arc break learning unit 34. As shown in FIG. The processing of FIG. 9 is executed for each operation time-series data stored in the database 33 .
- the arc cut learning unit 34 acquires operation time-series data.
- step S310 the arc break learning unit 34 determines whether or not the actual current value I Act(n) of the data at the sampling point n of the acquired operation time-series data is smaller than the predetermined current value I ARC . If I Act(n) is less than I ARC , the process of step S320 is performed.
- step S320 the arc break learning unit 34 determines whether or not the circuit breaker ON/OFF signal SVCB(n) of the data at the sampling point n is off. If SVCB(n) is off, the process of step S330 is executed.
- step S330 the arc cutoff learning unit 34 determines whether or not the signal SMAN(n) indicating whether or not there has been a manual operation by the operator is off. If SMAN (n) is off, the process of step S340 is executed. That is, when all the determination conditions of steps S310 to S330 are satisfied, the process of step S340 is executed.
- step S340 the arc break learning section 34 obtains the number of sampling points ( n ⁇ N OC , n ⁇ N OC +1, n ⁇ N OC +2, . , n, n+1, . . . , n+ NOC- 2, n+ NOC -1, n+ NOC ).
- the predetermined number of sampling points NOC at sampling point n is a predetermined number of points specifying a short range within the melting process of the operational time series data.
- the arc interruption label is calculated by equation (8) based on the desired time T aim for predicting arc interruption and the sampling interval ⁇ t. is given at a sampling point that is traced back by the number of sampling points N aim . That is, the arc break learning unit 34 marks the arc break label L ARC(n-Naim) of the sampling point n-N aim .
- the marked arc break label is called an arc break occurrence label.
- the above-described method of assigning an arc-out label is just an example, and the arc-break label may be generated according to other conditions or procedures, or the operator may generate an arc-break label from some input terminal.
- the arc break label is stored in the database 33 in association with the melting number and sampling point of the operation time series data.
- step S220 the arc breakage label stored in the database 33 is obtained by the process of FIG. 9 described above.
- step S230 the arc cut learning unit 34 determines whether or not the arc cut label total number N Label is greater than a predetermined number of arc cut occurrences N Label '.
- the arc break label total number N Label is the total number of arc break occurrences at each sampling point of the operation time-series data for the charge number M charge .
- the arc break learning unit 34 acquires learning data from the database 33 in step S240.
- the learning data is a part of a set of scrap image data, operation time-series data, operation attribute data, and arc break label stored in the database 33 .
- N Label is equal to or less than N Label ′, the amount of data used for learning the arc breakage prediction model is not sufficient, so the arc breakage learning unit 34 re-executes the process of step S210 after the current charge is completed. do.
- step S250 the arc breakage learning unit 34 learns an arc breakage prediction model, which will be described later, using the acquired learning data.
- step S ⁇ b>260 the arc cut learning unit 34 acquires evaluation data from the database 33 .
- the evaluation data is a part of the data group consisting of sets of scrap image data, operation time-series data, operation attribute data, and arc break labels stored in the database 33, excluding the learning data.
- step S270 the arc breakage learning unit 34 uses the evaluation data to evaluate an arc breakage prediction model, which will be described later.
- step S280 the arc breakage learning unit 34 determines whether or not to apply the arc breakage prediction model. If the evaluation value is equal to or greater than the predetermined value, the arc break prediction model is stored in database 33 . On the other hand, if the evaluation value is less than the predetermined value, the accuracy of the learned arc breakage prediction model is not sufficient, and the arc breakage learning unit 34 re-executes the process of step S210 after the current charging ends.
- step S290 the arc breakage learning unit 34 updates or saves the arc breakage prediction model. If there is already a learned arc breakage prediction model, the arc breakage learning unit 34 may update it or store it.
- the arc break prediction model is stored in database 33 .
- step S250 A more specific description will be given of the learning of the arc break prediction model in step S250 and the evaluation of the arc break prediction model in step S270.
- the arc break prediction model can be represented by the following linear regression model as an example.
- L pred is the arc cutoff prediction
- I pred is the predicted current value
- X is the explanatory variable (input value) of the prediction model
- ⁇ is the coefficient
- ⁇ is the disturbance term
- NL is the total number of learning data
- p is the explanatory variable.
- the arc break prediction model is constructed by determining ⁇ and ⁇ so as to satisfy Expressions (10) and (11) using learning data. The arc break prediction model is then evaluated using evaluation data and equation (12). The arc break prediction model is desirably constructed such that the learning data and the evaluation data minimize Equation (12). where NV is the total number of data used for evaluation. In step S280 described above, an evaluation value based on equation (12) can be used.
- a linear regression model is an example, and a non-linear model such as machine learning may be used to construct an arc break prediction model.
- a classifier based on XGBoost Extreme Gradient Boosting
- XGBoost Extreme Gradient Boosting
- XGBoost obtains predicted values by ensemble the results of multiple parallelized decision trees.
- the predicted value y pred i obtained for the input value X i is obtained by the following equation.
- yi is the target value
- l is the residual between the predicted value and the target value
- ⁇ is the regularization term
- ⁇ and ⁇ are the parameters.
- a model that minimizes the loss function L( ⁇ ) is sought.
- the predicted value y pred i is taken as the arc cutoff prediction L pred .
- the predicted value y pred i may be taken as the predicted current value I pred , and the condition of equation (9) may be used to determine whether the arc is broken.
- explanatory variables to be input to the arc breakage prediction model to output the arc breakage prediction L pred i at the sampling point i can be taken, for example, as follows.
- Rw'h ' is the brightness index of the scrap image data
- PK is the operation attribute data
- N Buff is a short range score within the melting process as shown in FIG.
- Operation time-series data corresponding to the date and time data linked to the lightness index Rw'h ' of the scrap image data and the operation attribute data PK are acquired. That is, when the arc break prediction model is a linear regression model, p (the number of explanatory variables) in Equation (10), for example, is expressed as follows.
- the arc breakage prediction unit 35 inputs the arrangement and density state of the scraps 2 based on the scrap image data and the control result data into the arc breakage prediction model, and predicts the occurrence of arc breakage due to the short circuit between the scraps 2 and the electrode 7. Predict.
- FIG. 12 is a flowchart for explaining the arc-out prediction procedure in the arc-out prediction unit 35.
- step S400 the arc cutoff prediction unit 35 determines whether or not it is the timing at which the scrap 2 is introduced into the furnace body 4. If it is not the timing when the scrap 2 is input, the arc break prediction unit 35 waits for the timing of scrap input.
- scrap image data is generated by the camera image acquisition unit 32 before the start of melting by the same processing as in FIG. 5 described above.
- the arc cut prediction unit 35 acquires the latest scrap image data.
- the scrap image data may be obtained directly from the camera image obtaining section 32 or may be obtained after being stored in the database 33 .
- step S420 the arc cutoff prediction unit 35 determines whether or not melting has started. If the melting has not started, the arc cutoff predictor 35 waits for the start of melting.
- the arc cutoff prediction unit 35 acquires operation time-series data and operation attribute data for the current charge.
- the operational time-series data collected by the operational data collecting unit 31 may be obtained directly from the operational data collecting unit 31 every moment according to the sampling cycle, or may be obtained after being stored in the database 33.
- step S440 the scrap image data, the operation time-series data, and the operation attribute data are used as input values, and arc breakage is predicted using an arc breakage prediction model.
- the input value of the arc breakage prediction model is an explanatory variable (equation (15)) as in the model construction. Therefore, sampling points that are N Buff points back from the latest sampling point n Now are acquired as operation time-series data.
- the input values (explanatory variables) of the arc breakage prediction model obtained here are input to the arc breakage prediction model stored in the database 33 to predict arc breakage.
- step S450 the arc break prediction unit 35 outputs the arc break prediction result for the latest sampling point n Now .
- arc break prediction results are stored in the database 33 .
- the arc breakage forecast output unit 36 issues an arc breakage occurrence forecast by video, sound, vibration, or the like.
- the operator who received the notification can carry out an operation to raise the electrode 7 so as to avoid arc breakage. As a result, shutdown time due to circuit breaker trips can be reduced.
- the arc cutoff prediction unit 35 determines whether or not the melting has ended. If the melting has not ended, the arc break prediction unit 35 returns to the process of step S430 again and predicts arc break based on the latest control performance data.
- the arc interruption predicting device 30 it is possible to predict the occurrence of circuit breaker disconnection (arc interruption) caused by a short circuit due to the collapse of scrap during melting. Further, by issuing an arc breakage forecast, the operator can raise the electrode 7 so as to prevent a short circuit due to contact between the scrap 2 and the electrode 7 . Therefore, stoppage of operation due to circuit breaker tripping can be avoided.
- the arc breakage prediction unit 35 predicts the occurrence of arc breakage using the arc breakage prediction model built in the arc breakage learning unit 34. .
- the arc cut-out prediction unit 35 may use that prediction model to predict the occurrence of arc cut-out. This point also applies to the following embodiments.
- the arc breakage forecast output unit 36 is arranged outside the arc breakage prediction device 30 , but it may be included in the arc breakage prediction device 30 .
- Embodiment 2 of the present disclosure will be described with reference to FIG. A description that overlaps with the above embodiment will be omitted.
- the height of the pixel is used in addition to the brightness of the pixel as an index indicating the state of insertion of the scrap 2.
- the arrangement and density of the scraps 2 are represented based on the brightness index and height index of each pixel of the scrap image data.
- the scrap photographing camera 20 according to Embodiment 2 can photograph an object in three dimensions.
- the arrangement of the scrap photography camera 20 is the same as in the first embodiment described above.
- the imaging data of the scrap photographing camera 20 includes information on the height at the time of throwing in the scrap.
- Types of cameras that can shoot in 3D include, for example, the stereo camera system, the ToF (Time of Flight) system, and the projector system.
- the stereo camera method a plurality of cameras are used, and the distance between the object and the stereo cameras is derived from the respective installation intervals, focal lengths, and imaging differences (parallax).
- the ToF method the distance between the object and the camera is derived from the reflection speed of the pulsed light or continuous light emitted from the camera.
- the height difference of the object is derived from the distortion of the striped pattern projected onto the object.
- the three-dimensional imaging method shown here is for explaining the principle, and either method may be used. Also, a system not shown here may be used as long as it is capable of three-dimensional imaging. If there is information about the structure of the furnace main body 4 and the place where the scrap photographing camera 20 is installed, the scrap 2 in the furnace can be detected based on the information on the height of the three-dimensional camera after the scrap is inserted and the height difference between the scrap 2. height information can be obtained.
- the brightness numerical array img_resize according to the scrap loading state and the height numerical array img_height of the scrap loading state can be obtained, for example, as follows.
- H is the height numerical value (height index) in the number of pixels in the horizontal direction w' and the number of pixels in the vertical direction h'.
- the camera image acquisition unit 32 stores scrap image data including these pieces of information in the database 33 in the format shown in FIG. 13, as in the first embodiment.
- an arc breakage prediction model is constructed in the same manner as in Embodiment 1, and the arc breakage is predicted using the prediction model.
- the input values (explanatory variables) used for the construction of the arc break prediction model and the prediction are configured as follows.
- the information including the brightness index and the height index is used as the explanatory variable of the arc interruption prediction model.
- the height index By adding the height index, occurrence of arc interruption can be predicted with higher accuracy than in the first embodiment.
- Embodiment 3 Next, Embodiment 3 will be described with reference to FIG. A description that overlaps with the above embodiment will be omitted.
- Embodiment 3 is characterized by having a short-circuit prevention output section 37 in addition to an arc interruption forecast output section 36 that issues an arc interruption forecast when arc interruption is predicted to occur.
- the short-circuit prevention output unit 37 automatically raises and lowers the electrode when it is predicted that an arc breakage will occur, thereby preventing disconnection of the circuit breaker caused by a short circuit due to contact between the scrap and the electrode.
- Embodiment 3 may be either Embodiment 1 or Embodiment 2.
- FIG. 3 When the arc interruption prediction L pred becomes 1 in the arc interruption prediction section 35 , the short circuit prevention output section 37 outputs a command value for raising the electrode 7 .
- the command value is output to the control device 9 to raise the electrode 7 to a predetermined avoidance height. Therefore, disconnection of the circuit breaker can be prevented without waiting for operation by the operator.
- the short-circuit prevention output unit 37 is arranged outside the arc interruption prediction device 30 in FIG. 14, it may be included in the arc interruption prediction device 30.
- FIG. 15 is a conceptual diagram showing a hardware configuration example of a processing circuit included in the arc interruption prediction device 30 according to each of the above-described embodiments. 3 and 14 show part of the functions in the arc interruption predicting device 30, and each function is realized by a processing circuit.
- the processing circuitry comprises at least one processor 91 and at least one memory 92 .
- the processing circuitry comprises at least one piece of dedicated hardware 93 .
- each function is implemented by software, firmware, or a combination of software and firmware. At least one of software and firmware is written as a program. At least one of software and firmware is stored in memory 92 .
- the processor 91 implements each function by reading and executing programs and various data stored in the memory 92 .
- Memory 92 includes a main memory and an auxiliary memory. The memory 92 stores various data saved in the database 33 .
- the processing circuit may be, for example, a single circuit, multiple circuits, a programmed processor, or a combination thereof. Each function is realized by a processing circuit.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- Plasma & Fusion (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
アーク炉設備は、アーク炉と、カメラと、情報処理装置とを備える。アーク炉は、スクラップと電極との間のアーク放電により発生した熱を利用して前記スクラップを溶解する。カメラは、アーク炉内に投入されたスクラップを撮影する。情報処理装置は、カメラから取得した画像データに基づくスクラップの配置および粗密状態と、電極に関する溶解開始後の制御実績データとを、アーク切れ予測モデルに入力して、溶解中のスクラップの崩落によるスクラップと電極との短絡によるアーク切れの発生を予測する。
Description
本開示は、鋼片(スクラップ)と電極間のアーク放電により発生した熱を利用してスクラップを溶解するアーク炉設備に関する。
電気炉は、炉内に挿入されたスクラップを、電力を供給して加熱し、溶解させる。電気炉には、ジュール熱によりスクラップを加熱する抵抗炉や、電磁誘導作用によりスクラップに電流を誘起し、それ自身の抵抗発熱で加熱する誘導炉、アークならびに電極に発生する熱を利用するアーク炉がある。
特にアーク炉は、安価な鉄屑を主原料として利用できる、容易に稼働・休止ができ設備稼働に柔軟性がある、高炉に比べて少ない投資額で比較的大量生産ができる、という利点がある。
アーク炉は、スクラップと電極の間、または電極間にアークを発生させ、その熱によりスクラップを溶解する。電極に供給される電力と、電極とスクラップ間の距離とを操作することで、アークを発生させることができる。特許文献1には、アークを安定的に発生させるために、インピーダンス一定制御を行い、電極の昇降位置を制御することが開示されている。
スクラップの投入から溶解されたスクラップ(溶湯)を排出するまでには、通常、2
~3回のスクラップの追加投入と、その後に成分調整などの工程を経る。この一連の動作をチャージと呼ぶ。スクラップの追加投入では、アーク炉の操業者が、経験則に基づいて炉内状況を想像しながら、予め決められたタイミングで、予め決められた量のスクラップを投入している。
~3回のスクラップの追加投入と、その後に成分調整などの工程を経る。この一連の動作をチャージと呼ぶ。スクラップの追加投入では、アーク炉の操業者が、経験則に基づいて炉内状況を想像しながら、予め決められたタイミングで、予め決められた量のスクラップを投入している。
また、アークを安定的に発生させるために、自動制御とは別に、操業者により電極の昇降がなされることもある。溶解の操業中に、何らかの要因により操業者によって電極がスクラップから大きく離されることがある。例えば、電極とスクラップが近接してしまい、電流値が許容範囲を超えた場合などである。電流値が許容範囲を超えても電極の上昇操作がなされなかった場合、過電流となり、電極とスクラップ間で短絡が生じてしまう。短絡が発生した場合、通常は遮断機が切断される。ここでは、この現象を、アーク切れとよぶ。
いったん遮断機が切断されると、その復旧に時間がかかるため、操業停止となり、生産量が低下してしまう。操業者は、これを防ぐため、経験則に基づいて電極を昇降操作している。
電流値が許容範囲を超える要因の一つに、投入されたスクラップの投入状態が不明確であること挙げられる。スクラップの投入量は、操業条件から決定されるが、粗密具合や、投入されたときのスクラップの偏りなどのスクラップ投入状態は、操作できない。また、スクラップ投入後は、炉内部温度の保持や周辺への溶湯の飛散防止のために蓋が閉じられる。そのため、操業者は溶解中の炉内部の状態を把握することはできない。
スクラップの投入状態によっては、溶解中にスクラップの一部が崩落し、電極に接触することがある。この場合、予期しない短絡によりアーク切れが発生するため、現状では予防する術がない。このように、スクラップの投入状態や、溶解中の炉内部の状態を把握、または、スクラップの崩落のような非定常な現象の発生を予測、回避する方法が求められている。
炉内部の状態を把握する方法として、例えば、特許文献2には、溶解により消費される電極の長さを予測して、スクラップと電極の間の距離を適切に捉えることが開示されている。しかし、これは電極の長さを予測するものにすぎず、スクラップの崩落のような非定常な要因による操業停止は防ぐことができない。
また、炉内部の状態を把握する方法として、例えば、特許文献3には、炉壁各所に温度計を設置し、炉外周温度から炉内部状態を把握する操業方法が開示されている。これによれば、投入されるスクラップの鋼種の融点と炉全体の温度から炉内部の状態を可視化することが可能である。しかしながら、炉外周近傍のスクラップの状態と、溶融したスクラップの温度履歴情報を得るのみで、必ずしも、溶解中のスクラップの状態が把握できるわけではない。そのため、スクラップの崩落のような非定常な要因による操業停止の予防は難しい。
本開示は、上述のような課題を解決するためになされた。本開示は、溶解中のスクラップの崩落による短絡を起因とした遮断機の切断(アーク切れ)の発生を予測することのできるアーク炉設備を提供することを目的とする。
第1の観点は、アーク炉設備に関連する。
アーク炉設備は、アーク炉と、カメラと、情報処理装置とを備える。
前記アーク炉は、スクラップと電極との間のアーク放電により発生した熱を利用して前記スクラップを溶解する。
前記カメラは、前記アーク炉内に投入された前記スクラップを撮影する。
前記情報処理装置は、メモリと、プロセッサとを備える。
前記メモリは、前記カメラから取得したスクラップ投入時の画像データと、前記電極に関する溶解開始後の制御実績データと、アーク切れ予測モデルとを含む情報を格納する。
前記プロセッサは、前記メモリに格納された前記情報を処理する。
前記プロセッサは、前記画像データに基づく前記スクラップの配置および粗密状態と、前記制御実績データとを、前記アーク切れ予測モデルに入力して、前記スクラップと前記電極との短絡によるアーク切れの発生を予測する予測処理を行うように構成されている。
アーク炉設備は、アーク炉と、カメラと、情報処理装置とを備える。
前記アーク炉は、スクラップと電極との間のアーク放電により発生した熱を利用して前記スクラップを溶解する。
前記カメラは、前記アーク炉内に投入された前記スクラップを撮影する。
前記情報処理装置は、メモリと、プロセッサとを備える。
前記メモリは、前記カメラから取得したスクラップ投入時の画像データと、前記電極に関する溶解開始後の制御実績データと、アーク切れ予測モデルとを含む情報を格納する。
前記プロセッサは、前記メモリに格納された前記情報を処理する。
前記プロセッサは、前記画像データに基づく前記スクラップの配置および粗密状態と、前記制御実績データとを、前記アーク切れ予測モデルに入力して、前記スクラップと前記電極との短絡によるアーク切れの発生を予測する予測処理を行うように構成されている。
第2の観点は、第1の観点に加えて、次の特徴を更に有する。
前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標に基づく。
前記制御実績データは、操業時系列データと操業属性データとを含む。
前記操業時系列データは、各サンプリング時刻における前記電極に関する電流値と電圧値と昇降速度値とを含む。
前記操業属性データは、前記スクラップの投入時刻と投入量とを含む。
前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標に基づく。
前記制御実績データは、操業時系列データと操業属性データとを含む。
前記操業時系列データは、各サンプリング時刻における前記電極に関する電流値と電圧値と昇降速度値とを含む。
前記操業属性データは、前記スクラップの投入時刻と投入量とを含む。
第3の観点は、第2の観点に加えて、次の特徴を更に有する。
前記メモリは、学習用データを格納する。
前記学習用データは、前記アーク炉から過去に出鉱されたスクラップに関する、前記画像データと、前記操業時系列データと、前記操業属性データと、アーク切れ発生ラベルとを含む。前記アーク切れ発生ラベルは、前記操業時系列データの各サンプリング時刻について電流値が短絡相関値よりも高いサンプリング時刻に関連付けられたアーク切れの発生を示す。
前記プロセッサは、前記学習用データに基づいて、前記アーク切れ予測モデルを構築する学習処理を行うように構成されている。
前記メモリは、学習用データを格納する。
前記学習用データは、前記アーク炉から過去に出鉱されたスクラップに関する、前記画像データと、前記操業時系列データと、前記操業属性データと、アーク切れ発生ラベルとを含む。前記アーク切れ発生ラベルは、前記操業時系列データの各サンプリング時刻について電流値が短絡相関値よりも高いサンプリング時刻に関連付けられたアーク切れの発生を示す。
前記プロセッサは、前記学習用データに基づいて、前記アーク切れ予測モデルを構築する学習処理を行うように構成されている。
第4の観点は、第1乃至第3の観点のいずれかに加えて、次の特徴を更に有する。
前記カメラは、前記アーク炉内に投入された前記スクラップを3次元で撮影する。
前記画像データは、各画素について明度指標および高さ指標を含む。
前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標および高さ指標に基づく。
前記カメラは、前記アーク炉内に投入された前記スクラップを3次元で撮影する。
前記画像データは、各画素について明度指標および高さ指標を含む。
前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標および高さ指標に基づく。
第5の観点は、第1乃至第4の観点のいずれかに加えて、次の特徴を更に有する。
前記プロセッサは、前記予測処理によりアーク切れが発生すると予測された場合に、前記電極の上昇指令を出力する短絡予防処理を行うように構成されている。
前記プロセッサは、前記予測処理によりアーク切れが発生すると予測された場合に、前記電極の上昇指令を出力する短絡予防処理を行うように構成されている。
本開示によれば、アーク炉設備は、カメラから取得した画像データからスクラップ投入時のスクラップの配置および粗密状態の情報を得る。アーク炉設備は、溶解開始後に当該情報と現在の制御実績データとからアーク切れの発生を予測できる。これによれば、アーク炉設備は、溶解中のスクラップの崩落による短絡を起因とした遮断機の切断(アーク切れ)の発生を予測することができる。
以下、図面を参照して本開示の実施の形態について詳細に説明する。尚、各図において共通する要素には、同一の符号を付して重複する説明を省略する。
実施の形態1.
1.アーク炉
図1は、実施の形態1に係るアーク炉設備1の構成例を説明するための図である。
アーク炉は、炉内に投入した様々な合金を含む鋼片(スクラップ2)を溶解して溶湯3を形成する。アーク炉は、スクラップ2を投入し、溶解した溶湯3を貯留する炉本体4と、溶解時の抜熱や周辺への溶湯3の飛散を防止するための蓋体5と、溶湯3を排出するためのタップ孔6を備える。
1.アーク炉
図1は、実施の形態1に係るアーク炉設備1の構成例を説明するための図である。
アーク炉は、炉内に投入した様々な合金を含む鋼片(スクラップ2)を溶解して溶湯3を形成する。アーク炉は、スクラップ2を投入し、溶解した溶湯3を貯留する炉本体4と、溶解時の抜熱や周辺への溶湯3の飛散を防止するための蓋体5と、溶湯3を排出するためのタップ孔6を備える。
溶解時の炉内は鋼片(スクラップ2)を溶かすほどの高温のため、炉本体4や蓋体5の内面には、耐火レンガが貼り付けられている。蓋体5には穴が設けられ、アークを発生させるための電極7が炉本体4内部へ挿入される。一般的に、電極7は、炭素で形成され、複数設けられている。
これらの電極7に電力が供給され、電極7と、内部に投入されたスクラップ2との間でアークを発生させ、その熱でスクラップ2を溶解させて溶湯3を得る。電極7は、スクラップ2との間でアークを発生させるために適切な距離をとるため、電極昇降装置8により、昇降操作される。電極7に供給される電力や、電極7の昇降位置は、制御装置9により制御される。出力装置10は、例えば電源および遮断器を含む。
このとき、電極7に供給する電力を得るための電流や電圧、電極7の昇降位置を得るための昇降速度などの、指令値は、スクラップ2の鋼種やスクラップ2の投入量といった情報をもとに設定される。これらの設定を基に自動操業も可能であるが、上記の通り、アークの発生は不安定であるため、通常は、操業者により都度、手動操作が加わる。この手動操作は、主に、電極7の昇降位置を変更する昇降速度に与えられる。
また、実際に溶解操業しているときの実績情報は、制御装置9に取り込まれ、フィードバック制御などに用いられることもある。
スクラップ2の初期投入から溶解された溶湯3を排出するまでの1つのチャージで製造される溶湯3ごとに、溶解番号が設定され、製品管理、品質管理に用いられる。
本実施形態に係るアーク炉設備1は、さらに、炉本体4の内部を撮影するためのカメラ(スクラップ撮影カメラ20)と、アーク切れを予測する情報処理装置(アーク切れ予測装置30)とを備える。
2.スクラップ撮影カメラ
スクラップ撮影カメラ20は、スクラップ2の投入毎に、スクラップ2の投入状態を撮影する。スクラップ撮影カメラ20の撮像範囲を、図2に示す。スクラップ撮影カメラ20は、図2に示すように炉内すべてを撮影できるように、炉本体4の直上に配置されることが望ましい。溶解中は炉本体4の内部が高温となり、その輻射熱が外部にも伝わるため、スクラップ撮影カメラ20は、水冷機構を備えることが望ましい。さらに、溶解により発生する蒸気やガスは直上へ立ち込めるため、スクラップ撮影カメラ20は、その影響を受けない程度に炉本体4から距離を空けて配置されることが望ましい。
スクラップ撮影カメラ20は、スクラップ2の投入毎に、スクラップ2の投入状態を撮影する。スクラップ撮影カメラ20の撮像範囲を、図2に示す。スクラップ撮影カメラ20は、図2に示すように炉内すべてを撮影できるように、炉本体4の直上に配置されることが望ましい。溶解中は炉本体4の内部が高温となり、その輻射熱が外部にも伝わるため、スクラップ撮影カメラ20は、水冷機構を備えることが望ましい。さらに、溶解により発生する蒸気やガスは直上へ立ち込めるため、スクラップ撮影カメラ20は、その影響を受けない程度に炉本体4から距離を空けて配置されることが望ましい。
また、スクラップ2の投入状態を撮影するにあたり、コントラストや明るさ、露出などを調整して、スクラップ2を適切に視認できるようにしておくことが望ましい。これらの調整は、スクラップ撮影カメラ20にて処理されてもよいし、後述するカメラ画像取得部32にて処理されてもよい。
3.アーク切れ予測装置
図3は、実施の形態1に係るアーク切れ予測装置30が有する機能の概要を例示するブロック図である。図3に示す構成は一例であり、これに限定されるものではない。アーク切れ予測装置30は、スクラップ2の投入毎に得られるスクラップ2の投入状態と、溶解時の操業のデータから、アーク切れを予測して、その結果を出力する。
図3は、実施の形態1に係るアーク切れ予測装置30が有する機能の概要を例示するブロック図である。図3に示す構成は一例であり、これに限定されるものではない。アーク切れ予測装置30は、スクラップ2の投入毎に得られるスクラップ2の投入状態と、溶解時の操業のデータから、アーク切れを予測して、その結果を出力する。
(操業データ収集部)
操業データ収集部31は、制御実績データを収集する。制御実績データは、操業時系列データと操業属性データを含む。
操業データ収集部31は、制御実績データを収集する。制御実績データは、操業時系列データと操業属性データを含む。
操業時系列データは、溶解時の制御出力の情報である。操業時系列データは、例えば、各電極7の、設定および実績電流値、実績電圧値、昇降速度基準値、実績電流値が過電流の水準に達したか否かを表すフラグ信号を含む。さらに操業時系列データは、操業者による手動操作があったか否かを表すフラグ信号、またその昇降速度指令値、アーク切れ発生などのトラブル発生に伴う遮断機の入切のフラグ信号、などを含む。操業時系列データは、これらJ個の信号を一定のサンプリング間隔Δtで取得した各サンプリング点(サンプリング時刻)のデータである。
操業属性データは、その他の溶解の操業に付随する情報である。操業属性データは、例えば、スクラップ2の投入時刻と投入量、電極7の消耗状態、溶解後の炉内温度、投入されたスクラップ2の鋼種、組成の他、成分調整時に投入した元素の量、などを含む。操業属性データは、溶解の状況を総括した情報である。
操業データ収集部31で収集した情報は、例えば、図4に示すように、操業時系列データおよび操業属性データを、溶解番号や各工程の開始時刻により紐づけて、データベース33へ格納される。
(カメラ画像取得部)
カメラ画像取得部32は、スクラップ撮影カメラ20から、スクラップ2の投入状態(スクラップ2の配置および粗密状態)を撮影した画像データ(撮像データ)を取得する。その後、カメラ画像取得部32は、アーク切れ学習部34およびアーク切れ予測部35で使用するためのスクラップ画像データを生成する。
カメラ画像取得部32は、スクラップ撮影カメラ20から、スクラップ2の投入状態(スクラップ2の配置および粗密状態)を撮影した画像データ(撮像データ)を取得する。その後、カメラ画像取得部32は、アーク切れ学習部34およびアーク切れ予測部35で使用するためのスクラップ画像データを生成する。
図5は、カメラ画像取得部32におけるスクラップ画像データの生成手順について説明するためのフローチャートである。
ステップS100において、カメラ画像取得部32は、炉本体4にスクラップ2が投入されたタイミングであるか否かを判定する。スクラップ2が投入されたタイミングでない場合は、カメラ画像取得部32はスクラップ投入タイミングを待つ。
一方、スクラップ2が投入されたタイミングである場合は、ステップS110において、カメラ画像取得部32は、スクラップ撮影カメラ20からスクラップ投入時の画像データ(撮像データ)取得する。
ステップS120において、カメラ画像取得部32は、撮像データをグレースケール化する。グレースケール化により、スクラップ2の投入時の粗密の状態を表す明度を得る。グレースケール化の方法として、例えば、以下のような変換方法がある。
ここで、imgは、撮像データの色空間の数値配列である。wは、画像の横方向の画素数である。hは、画像の縦方向の画素数である。Iは、横方向画素位置x、縦方向画素装置yにおける画素値である。img_grayは、グレースケール後の数値配列である。I’(x,y)は、横方向画素位置x、縦方向画素位置yにおけるグレースケール後の画素値である。
一例として、I(x,y)の色空間をRGB空間にて記述しているが、この限りではない。また、I’(x,y)を算出するための各係数は、アナログ信号とデジタル信号の変換に係る国際規格であるITU-R BT.601(Studio encoding parameters of digital television for standard 4:3 and wide screen 16:9 aspect ratios International Telecommunication Union)にて定められたものであり、他の規格に依ってもよい。
設備環境によっては、スクラップ2が常に視認できるとは限らない。そのため、スクラップ投入後、蓋体5を閉じる前に、複数回撮像データを得た後に、上述の処理にて得たグレースケール画像を、各画素位置での平均値から得てもよい(式(5))。
ここで、Ncapは、スクラップ投入後、蓋体5を閉じる前に取得した撮像データの取得数である。
次にステップS130において、カメラ画像取得部32は、グレースケールデータの画素数を変更する。
カメラ画像取得部32は、グレースケール化された画像を、平滑化した後に、アーク切れ学習部34およびアーク切れ予測部35にて利用する所定の画素数(データ数)へ調整し、スクラップ画像データを得る。例えば、ガウシアンフィルタは、ガウス分布gにより近傍画素値に重みづけをして、画像を平滑化する(式(6))。
これは、一例であって、平均値フィルタリングやメディアンフィルタリングによる平滑化も可能である。平滑化した画像に対して画素数を調整する。以下の手順で画素数を調整できる(式(7))。
ここで、img_resizeは、平滑化された画像の数値配列である。xは、平滑化された画像の横方向画素位置である。yは、平滑化された画像の縦方向画素位置である。αは、倍率である。記号[]は、四捨五入である。Rは、平滑化された画素数値(明度指標)である。w’は、平滑化された画像の横方向画素数である。h’は、平滑化された画像の縦方向画素数である。
スクラップ2の投入状態を示す指標として画素の明度が用いられる。スクラップ2の配置および粗密状態は、スクラップ画像データの各画素の明度指標に基づいて表される。図6は、スクラップ画像データの一例を示す図である。
ステップS140において、カメラ画像取得部32は、スクラップ画像データをデータベース33に格納する。スクラップ画像データの数値配列は、明度指標として、データベース33に格納される。スクラップ画像データは、図7のように、溶解番号および撮影日時に紐づけて保存される。
(アーク切れ学習部)
次にアーク切れ学習部34について説明する。
アーク切れ学習部34は、データベース33へ格納された学習用データおよび評価用データに基づいて、アーク切れ予測モデルを構築する。学習用データおよび評価用データは、アーク炉から過去に出鉱されたスクラップ2に関する、スクラップ画像データと、操業時系列データと、操業属性データと、アーク切れ発生ラベルとを含む。アーク切れ発生ラベルは、操業時系列データの各サンプリング時刻について電流値が短絡相関値よりも高いサンプリング時刻に関連付けられたアーク切れの発生を示す。図8を参照してアーク切れ予測モデルの構築手順について説明する。
次にアーク切れ学習部34について説明する。
アーク切れ学習部34は、データベース33へ格納された学習用データおよび評価用データに基づいて、アーク切れ予測モデルを構築する。学習用データおよび評価用データは、アーク炉から過去に出鉱されたスクラップ2に関する、スクラップ画像データと、操業時系列データと、操業属性データと、アーク切れ発生ラベルとを含む。アーク切れ発生ラベルは、操業時系列データの各サンプリング時刻について電流値が短絡相関値よりも高いサンプリング時刻に関連付けられたアーク切れの発生を示す。図8を参照してアーク切れ予測モデルの構築手順について説明する。
図8は、アーク切れ学習部34におけるアーク切れ予測モデルの構築手順について説明するためのフローチャートである。
ステップS200において、アーク切れ学習部34は、データベース33へ格納された溶解番号の総数、つまり、チャージ数Mchargeが、モデル学習に必要な回数MLearningより多いか否かを判定する。
MchargeがMLearningより多い場合、ステップS210において、アーク切れ学習部34は、溶解番号や日時に基づいてデータベース33から、操業時系列データ、操業属性データ、スクラップ画像データを取得する。一方、MchargeがMLearning以下である場合、アーク切れ予測モデルの学習に使用するデータ数が十分ではないため、アーク切れ学習部34は、現在のチャージが終了した後にステップS200の処理を再実行する。
ステップS220において、アーク切れ学習部34は、アーク切れラベルを取得する。ここで、図9を参照し、ステップS220におけるアーク切れラベルの付与手順について説明する。図9は、アーク切れ学習部34におけるアーク切れラベルの付与手順について説明するためのフローチャートである。図9の処理は、データベース33に記憶された操業時系列データ毎に実行される。
図9のステップS300において、アーク切れ学習部34は、操業時系列データを取得する。
ステップS310において、アーク切れ学習部34は、取得した操業時系列データのサンプリング点nにおけるデータの、実績電流値IAct(n)が所定の電流値IARCよりも小さいか否かを判定する。IAct(n)がIARCよりも小さい場合はステップS320の処理が実行される。
ステップS320において、アーク切れ学習部34は、サンプリング点nにおけるデータの遮断機の入切信号SVCB(n)がオフであるか否かを判定する。SVCB(n)がオフである場合はステップS330の処理が実行される。
ステップS330において、アーク切れ学習部34は、操業者による手動操作があったか否かを表す信号SMAN(n)がオフであるか否かを判定する。SMAN(n)がオフである場合はステップS340の処理が実行される。すなわち、ステップS310~ステップS330のすべての判定条件が成立する場合は、ステップS340の処理が実行される。
ステップS340において、アーク切れ学習部34は、サンプリング点nから所定のサンプリング点数NOCだけ前後したサンプリング点数分(n-NOC,n-NOC+1,n-NOC+2,…,n-1,n,n+1,…,n+NOC-2,n+NOC-1,n+NOC)の操業時系列データを取得する。
ステップS350において、アーク切れ学習部34は、ステップS340で取得した操業時系列データにおいて実績電流値が過電流(短絡相関値)の水準に達したか否かを表す信号SOvercurrentがオンとなっている時刻があるか否かを判定する。SOvercurrentがオンとなっている時刻がある場合、アーク切れ学習部34は、アーク切れラベルLARCにマークをする(LARC=1)。
サンプリング点nにおける所定のサンプリング点数NOCは、操業時系列データの溶解工程内の短い範囲を指定する、あらかじめ決めた点数である。そして、このとき、アーク切れが発生する前にこの予兆を捉える必要があるので、アーク切れラベルは、アーク切れを予測する所望の時刻Taimとサンプリング間隔Δtを元に式(8)で算出されるサンプリング点数Naim分だけ遡ったサンプリング点にて付与される。つまり、アーク切れ学習部34は、サンプリング点n-Naimのアーク切れラベルLARC(n-Naim)にマークをする。
すなわち、ステップS310~ステップS350のすべての判定条件を満たす場合、ステップS360において、アーク切れ学習部34は、アーク切れラベルLARC(n-Naim)にマークをする(LARC(n-Naim)=1)。マークされたアーク切れラベルをアーク切れ発生ラベルとよぶ。一方、ステップS310~ステップS350のいずれかの判定条件を満たさない場合、ステップS370において、アーク切れ学習部34は、アーク切れラベルLARC(n-Naim)にマークをしない(LARC(n-Naim)=0)。
上述したアーク切れラベルの付与の方法は、一例であって、他の条件や手順によってアーク切れラベルを生成してもよいし、操業者が何らかの入力端末からアーク切れラベルを生成してもよい。アーク切れラベルは、操業時系列データの溶解番号とサンプリング点とに関連付けられて、データベース33に格納される。
図8に戻りアーク切れ予測モデルの構築手順について説明を続ける。
ステップS220において、上述した図9の処理によりデータベース33に格納されたアーク切れラベルが取得される。
ステップS220において、上述した図9の処理によりデータベース33に格納されたアーク切れラベルが取得される。
ステップS230において、アーク切れ学習部34は、アーク切れラベル総数NLabelが、所定のアーク切れ発生回数NLabel’より多いか否かを判定する。アーク切れラベル総数NLabelは、チャージ数Mcharge分の操業時系列データの各サンプリング点においてアーク切れが発生した総数である。
NLabelがNLabel’より多い場合、ステップS240において、アーク切れ学習部34は、データベース33から学習用データを取得する。学習用データは、データベース33に格納された、スクラップ画像データと操業時系列データと操業属性データとアーク切れラベルの組の一部である。一方、NLabelがNLabel’以下の場合、アーク切れ予測モデルの学習に使用するデータ数が十分ではないため、アーク切れ学習部34は、現在のチャージが終了した後にステップS210の処理を再実行する。
ステップS250において、アーク切れ学習部34は、取得した学習用データを用いて後述するアーク切れ予測モデルを学習する。
ステップS260において、アーク切れ学習部34は、データベース33から評価用データを取得する。評価用データは、データベース33に格納された、スクラップ画像データと操業時系列データと操業属性データとアーク切れラベルの組からなるデータ群のうち、学習用データを除いた一部である。
ステップS270において、アーク切れ学習部34は、評価用データを用いて後述するアーク切れ予測モデルを評価する。
ステップS280において、アーク切れ学習部34は、アーク切れ予測モデルを適用するか否かを判定する。評価値が所定値以上である場合、アーク切れ予測モデルはデータベース33へ保存される。一方、評価値が所定値未満である場合、学習したアーク切れ予測モデルの精度が十分ではないため、アーク切れ学習部34は、現在のチャージが終了した後にステップS210の処理を再実行する。
ステップS290において、アーク切れ学習部34は、アーク切れ予測モデルを更新または保存する。既に学習済みのアーク切れ予測モデルがある場合、アーク切れ学習部34は、これを更新してもよいしそれぞれ保存してもよい。アーク切れ予測モデルは、データベース33に格納される。
上述したステップS250におけるアーク切れ予測モデルの学習と、ステップS270におけるアーク切れ予測モデルの評価について、より具体的に説明する。
アーク切れ予測モデルは、一例として次のような線形回帰モデルで表すことができる。
ここで、Lpredはアーク切れ予測、Ipredは予測電流値、Xは予測モデルの説明変数(入力値)、βは係数、εは擾乱項、NLは学習用データ総数、pは説明変数の個数である。式(9)において、サンプリング点iにおけるアーク切れ予測Lpred i=1であることは、式(8)に示すサンプリング点数Naim経過後の時刻i+Naimにおいてアーク切れが発生することを予測している。
アーク切れ予測モデルは、学習用データを用いて式(10)および式(11)を満たすように、β、εを決定することで構築される。その後、アーク切れ予測モデルは、評価用データおよび式(12)を用いて評価される。アーク切れ予測モデルは、学習用データおよび評価用データにて式(12)が最小となるように構築されることが望ましい。ここで、NVは評価に使用するデータ総数である。上述したステップS280では、式(12)に基づく評価値を用いることができる。
線形回帰モデルは一例であり、機械学習のような非線形モデルを用いてアーク切れ予測モデルを構築してもよい。例えば、アーク切れモデルとして、決定木によるアンサンブル学習モデルである、XGBoost(Extreme Gradient Boosting)による分類器や、同様の、Random Forestなどを適用してもよい。ここでは、一例として、XGBoostの概念を以下に示す。XGBoostでは、並列化された複数の決定木の結果をアンサンブルすることで予測値を得る。入力値Xiに対して得られる予測値ypred iは、次式により得られる。
ここでXiは入力値、Kは木の数、Tは葉の数、ωは葉の重み、Fは回帰木空間である。モデル構築の初期段階では、木の数K=1である。得られた予測値と目的値の差が最小となるとき、精度の良いモデルとなる。モデルの精度は、次式のような損失関数L(φ)を計算することで評価される。
ここで、yiは目的値、lは予測値と目的値の残差、Ωは正則化項、γおよびλはパラメータである。損失関数L(φ)が最小となるモデルを求めていく。損失関数L(φ)が最小となるモデルを生成するために、Gradient Boostingにより決定木を増やすことでL(φ)の最小化を目指す。このような分類器を用いる場合には、予測値ypred iをアーク切れ予測Lpredととる。あるいは、電流値を予測する回帰モデルとする場合には、予測値ypred iを予測電流値Ipredととって、さらに式(9)のような条件によってアーク切れを判定してもよい。
サンプリング点iにおけるアーク切れ予測Lpred iを出力するためにアーク切れ予測モデルへ入力する説明変数は、例えば以下のようにとることができる。
ここで、Rw’h’はスクラップ画像データの明度指標、PKは操業属性データ、Oi(j)はサンプリング点iの操業時系列データのj成分(j=1,2,…,J)である。操業時系列データは、サンプリング点iの成分のみ説明変数にとってもよいし、サンプリング点iから所定のサンプリング点NBuff分だけ遡ったサンプリング点分の成分を説明変数に加えてもよい。NBuffは、図11に示すような溶解工程内の短い範囲の点数である。スクラップ画像データの明度指標Rw’h’と操業属性データPKに紐づけられた日時データに相当する操業時系列データが取得される。つまり、アーク切れ予測モデルを、線形回帰モデルとした場合、例えば、式(10)内のp(説明変数の個数)は、以下のように表される。
(アーク切れ予測部)
次にアーク切れ予測部35について説明する。
アーク切れ予測部35は、スクラップ画像データに基づくスクラップ2の配置および粗密状態と、制御実績データとを、アーク切れ予測モデルに入力して、スクラップ2と電極7との短絡によるアーク切れの発生を予測する。
次にアーク切れ予測部35について説明する。
アーク切れ予測部35は、スクラップ画像データに基づくスクラップ2の配置および粗密状態と、制御実績データとを、アーク切れ予測モデルに入力して、スクラップ2と電極7との短絡によるアーク切れの発生を予測する。
図12は、アーク切れ予測部35におけるアーク切れ予測手順について説明するためのフローチャートである。
ステップS400において、アーク切れ予測部35は、炉本体4にスクラップ2が投入されたタイミングであるか否かを判定する。スクラップ2が投入されたタイミングでない場合は、アーク切れ予測部35はスクラップ投入タイミングを待つ。
一方、スクラップ2が投入されたタイミングである場合、上述した図5と同様の処理により、溶解開始前に、カメラ画像取得部32によりスクラップ画像データが生成される。
ステップS410において、アーク切れ予測部35は、最新のスクラップ画像データを取得する。スクラップ画像データは、カメラ画像取得部32から直接取得されてもよいし、データベース33に格納された後に取得されてもよい。
ステップS420において、アーク切れ予測部35は、溶解が開始されたか否かを判定する。溶解が開始されていない場合、アーク切れ予測部35は溶解開始を待つ。
溶解が開始された後、ステップS430において、アーク切れ予測部35は、現在のチャージにおける操業時系列データおよび操業属性データを取得する。操業データ収集部31にて収集された操業時系列データは、操業データ収集部31から直接、時々刻々、サンプリング周期に従って取得されてもよいし、データベース33に格納された後に取得されてもよい。
ステップS440において、スクラップ画像データと操業時系列データと操業属性データとを入力値とし、アーク切れ予測モデルを用いてアーク切れを予測する。アーク切れ予測モデルの入力値は、モデル構築時と同様に説明変数である(式(15))。したがって、最新のサンプリング点nNowよりNBuff点だけ遡ったサンプリング点分を、操業時系列データとして取得する。ここで得られたアーク切れ予測モデルの入力値(説明変数)を、データベース33に保存したアーク切れ予測モデルに入力して、アーク切れを予測する。
ステップS450において、アーク切れ予測部35は、最新のサンプリング点nNowについてのアーク切れ予測結果を出力する。例えば、アーク切れ予測結果はデータベース33へ格納される。ここで、アーク切れ予測Lpredが1となった場合、アーク切れ予報出力部36は、映像、音、振動などにより、アーク切れの発生予報を発報する。発報を受けた操業者は、アーク切れを回避するよう、電極7を上昇させる操作を実施できる。これにより、遮断機のトリップによる操業停止時間を削減できる。
ステップS460において、アーク切れ予測部35は、溶解が終了したか否かを判定する。溶解が終了していない場合は、アーク切れ予測部35は、再びステップS430の処理に戻り、最新の制御実績データに基づいてアーク切れを予測する。
4.効果
以上説明したように、本実施の形態に係るアーク切れ予測装置30によれば、溶解中のスクラップの崩落による短絡を起因とした遮断機の切断(アーク切れ)の発生を予測できる。またアーク切れの発生予報を発報することで、操業者は、スクラップ2と電極7の接触による短絡を防ぐよう電極7を上昇させることができる。そのため、遮断機のトリップによる操業停止を回避できる。
以上説明したように、本実施の形態に係るアーク切れ予測装置30によれば、溶解中のスクラップの崩落による短絡を起因とした遮断機の切断(アーク切れ)の発生を予測できる。またアーク切れの発生予報を発報することで、操業者は、スクラップ2と電極7の接触による短絡を防ぐよう電極7を上昇させることができる。そのため、遮断機のトリップによる操業停止を回避できる。
5.変形例
ところで、上述した実施の形態1に係るアーク炉設備1においては、アーク切れ予測部35は、アーク切れ学習部34において構築されたアーク切れ予測モデルを利用してアーク切れの発生を予測する。しかしながら、予め適切なアーク切れ予測モデルが存在する場合には、アーク切れ予測部35は、その予測モデルを利用してアーク切れの発生を予測することとしてもよい。なお、この点は以下の実施の形態でも同様である。
ところで、上述した実施の形態1に係るアーク炉設備1においては、アーク切れ予測部35は、アーク切れ学習部34において構築されたアーク切れ予測モデルを利用してアーク切れの発生を予測する。しかしながら、予め適切なアーク切れ予測モデルが存在する場合には、アーク切れ予測部35は、その予測モデルを利用してアーク切れの発生を予測することとしてもよい。なお、この点は以下の実施の形態でも同様である。
なお、図3では、アーク切れ予報出力部36は、アーク切れ予測装置30の外に配置されているが、アーク切れ予測装置30に含めることとしてもよい。
実施の形態2.
次に、図13を参照して本開示の実施の形態2について説明する。上述した実施の形態と重複する説明は省略する。
次に、図13を参照して本開示の実施の形態2について説明する。上述した実施の形態と重複する説明は省略する。
実施の形態2では、スクラップ2の投入状態を示す指標として、画素の明度に加えて高さを用いる。スクラップ2の配置および粗密状態は、スクラップ画像データの各画素の明度指標および高さ指標に基づいて表される。これにより、アーク切れ予測モデルの説明変数として、より正確なスクラップ2の投入状態が与えられ、精度高くアーク切れが発生するか否かを予測することができる。
実施の形態2に係るスクラップ撮影カメラ20は、物体を3次元で撮影可能である。スクラップ撮影カメラ20の配置は、上述した実施の形態1と同様である。スクラップ撮影カメラ20の撮像データには、スクラップ投入時の高さの情報が含まれる。
3次元で撮影可能なカメラの種類として、例えば、ステレオカメラ方式、ToF(Time of Flight)方式、プロジェクタ方式などがある。ステレオカメラ方式では、複数台のカメラを用いて、それぞれの設置間隔や、焦点距離、撮像の差異(視差)によって、対象物と、ステレオカメラの距離を導出する。ToF方式では、同カメラから照射されるパルス光や連続光の、対象物からの反射の速度によって、対象物とカメラの距離を導出する。プロジェクタ方式では、対象物に照射された縞模様の歪みによって、対象物の高低差を導出する。
ここで示した3次元撮影方法は、その原理を説明するものであって、いずれの方式を利用してもよい。また、ここに示していない方式であっても、3次元で撮影可能であればよい。炉本体4の構造と、スクラップ撮影カメラ20を設置する場所の情報があれば、スクラップ投入後の3次元カメラと、スクラップ2の高低差からなる高さの情報を元に、炉内のスクラップ2の高さの情報を得ることができる。
上述したスクラップの投入状態による明度数値配列imgresizeと、スクラップの投入状態の高さ数値配列imgheightは、例えば以下のように得ることができる。
ここで、Hは、横方向画素数w’、縦方向画素数h’における高さ数値(高さ指標)である。カメラ画像取得部32は、これらの情報を含むスクラップ画像データを実施の形態1と同様に、図13に示す形式でデータベース33へ格納する。
こうして得られたスクラップ画像データを元に、実施の形態1と同様に、アーク切れ予測モデルを構築し、その予測モデルを使用して、アーク切れを予測する。このとき、アーク切れ予測モデルの構築や、予測に用いられる入力値(説明変数)は、以下のような構成になる。
以上説明したように、実施の形態2に係るアーク炉設備1によれば、明度指標および高さ指標を含む情報をアーク切れ予測モデルの説明変数とする。高さ指標を加えることで、実施の形態1に比してより精度高くアーク切れの発生を予測できる。
実施の形態3.
次に、図14を参照して実施の形態3について説明する。上述した実施の形態と重複する説明は省略する。
次に、図14を参照して実施の形態3について説明する。上述した実施の形態と重複する説明は省略する。
実施の形態3は、アーク切れが発生すると予測された場合にアーク切れの予報を発報するアーク切れ予報出力部36に加え、短絡予防出力部37を有することを特徴とする。短絡予防出力部37は、アーク切れが発生すると予測された場合に、電極の昇降を自動操作することで、スクラップと電極の接触に伴う短絡を起因とした遮断機の切断を予防する。
実施の形態3における入力値は、実施の形態1または実施の形態2のいずれ形態であってもよい。アーク切れ予測部35において、アーク切れ予測Lpredが1となった場合、短絡予防出力部37では、電極7の上昇指令値を出力する。指令値は、制御装置9へ出力され、電極7を予め定めた回避高さまで上昇させる。そのため、操業者による操作を待たずに遮断器の切断を予防できる。
なお、図14では、短絡予防出力部37は、アーク切れ予測装置30の外に配置されているが、アーク切れ予測装置30に含めることとしてもよい。
(ハードウェア構成例)
図15は、上述した各実施の形態に係るアーク切れ予測装置30が有する処理回路のハードウェア構成例を示す概念図である。図3および図14のアーク切れ予測装置30内の各部は機能の一部を示し、各機能は処理回路により実現される。一態様として、処理回路は、少なくとも1つのプロセッサ91と少なくとも1つのメモリ92とを備える。他の態様として、処理回路は、少なくとも1つの専用のハードウェア93を備える。
図15は、上述した各実施の形態に係るアーク切れ予測装置30が有する処理回路のハードウェア構成例を示す概念図である。図3および図14のアーク切れ予測装置30内の各部は機能の一部を示し、各機能は処理回路により実現される。一態様として、処理回路は、少なくとも1つのプロセッサ91と少なくとも1つのメモリ92とを備える。他の態様として、処理回路は、少なくとも1つの専用のハードウェア93を備える。
処理回路がプロセッサ91とメモリ92とを備える場合、各機能は、ソフトウェア、ファームウェア、又はソフトウェアとファームウェアとの組み合わせにより実現される。ソフトウェアおよびファームウェアの少なくとも一方は、プログラムとして記述される。ソフトウェアおよびファームウェアの少なくとも一方は、メモリ92に格納される。プロセッサ91は、メモリ92に記憶されたプログラムおよび各種データを読み出して実行することにより、各機能を実現する。メモリ92は、主記憶装置および補助記憶装置を含む。メモリ92は、データベース33に保存される各種データを格納する。
処理回路が専用のハードウェア93を備える場合、処理回路は、例えば、単一回路、複合回路、プログラム化したプロセッサ、又はこれらを組み合わせたものである。各機能は処理回路で実現される。
以上、本開示の実施の形態について説明したが、本開示は、上記の実施の形態に限定されるものではなく、本開示の趣旨を逸脱しない範囲で種々変形して実施することができる。上述した実施の形態において各要素の個数、数量、量、範囲等の数に言及した場合、特に明示した場合や原理的に明らかにその数に特定される場合を除いて、その言及した数にこの発明が限定されるものではない。また、上述した実施の形態において説明する構造等は、特に明示した場合や明らかに原理的にそれに特定される場合を除いて、この発明に必ずしも必須のものではない。
1 アーク炉設備
2 スクラップ
3 溶湯
4 炉本体
5 蓋体
6 タップ孔
7 電極
8 電極昇降装置
9 制御装置
10 出力装置
20 スクラップ撮影カメラ
30 アーク切れ予測装置
31 操業データ収集部
32 カメラ画像取得部
33 データベース
34 アーク切れ学習部
35 アーク切れ予測部
36 アーク切れ予報出力部
37 短絡予防出力部
91 プロセッサ
92 メモリ
93 ハードウェア
2 スクラップ
3 溶湯
4 炉本体
5 蓋体
6 タップ孔
7 電極
8 電極昇降装置
9 制御装置
10 出力装置
20 スクラップ撮影カメラ
30 アーク切れ予測装置
31 操業データ収集部
32 カメラ画像取得部
33 データベース
34 アーク切れ学習部
35 アーク切れ予測部
36 アーク切れ予報出力部
37 短絡予防出力部
91 プロセッサ
92 メモリ
93 ハードウェア
Claims (5)
- スクラップと電極との間のアーク放電により発生した熱を利用して前記スクラップを溶解するアーク炉設備であって、
アーク炉内に投入された前記スクラップを撮影するカメラと、
前記カメラから取得したスクラップ投入時の画像データと、前記電極に関する溶解開始後の制御実績データと、アーク切れ予測モデルとを含む情報が格納されたメモリと、前記メモリに格納された前記情報を処理するプロセッサと、を含む情報処理装置と、を備え、
前記プロセッサは、
前記画像データに基づく前記スクラップの配置および粗密状態と、前記制御実績データとを、前記アーク切れ予測モデルに入力して、前記スクラップと前記電極との短絡によるアーク切れの発生を予測する予測処理を行うように構成されていること、
を特徴とするアーク炉設備。 - 前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標に基づき、
前記制御実績データは、操業時系列データと操業属性データとを含み、
前記操業時系列データは、各サンプリング時刻における前記電極に関する電流値と電圧値と昇降速度値とを含み、
前記操業属性データは、前記スクラップの投入時刻と投入量とを含むこと、
を特徴とする請求項1に記載のアーク炉設備。 - 前記メモリは、学習用データを格納し、
前記学習用データは、前記アーク炉から過去に出鉱されたスクラップに関する、前記画像データと、前記操業時系列データと、前記操業属性データと、前記操業時系列データの各サンプリング時刻について電流値が短絡相関値よりも高いサンプリング時刻に関連付けられたアーク切れの発生を示すアーク切れ発生ラベルと、を含み、
前記プロセッサは、前記学習用データに基づいて、前記アーク切れ予測モデルを構築する学習処理を行うように構成されていること、
を特徴とする請求項2に記載のアーク炉設備。 - 前記カメラは、前記アーク炉内に投入された前記スクラップを3次元で撮影し、
前記画像データは、各画素について明度指標および高さ指標を含み、
前記スクラップの配置および粗密状態は、前記画像データの各画素の明度指標および高さ指標に基づくこと、
を特徴とする請求項1乃至3のいずれか1項に記載のアーク炉設備。 - 前記プロセッサは、前記予測処理によりアーク切れが発生すると予測された場合に、前記電極の上昇指令を出力する短絡予防処理を行うように構成されていること、
を特徴とする請求項1乃至4のいずれか1項に記載のアーク炉設備。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202180075490.XA CN116530213A (zh) | 2021-11-08 | 2021-11-08 | 电弧炉设备 |
PCT/JP2021/040981 WO2023079737A1 (ja) | 2021-11-08 | 2021-11-08 | アーク炉設備 |
JP2023518529A JP7552883B2 (ja) | 2021-11-08 | 2021-11-08 | アーク炉設備 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2021/040981 WO2023079737A1 (ja) | 2021-11-08 | 2021-11-08 | アーク炉設備 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2023079737A1 true WO2023079737A1 (ja) | 2023-05-11 |
Family
ID=86240928
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2021/040981 WO2023079737A1 (ja) | 2021-11-08 | 2021-11-08 | アーク炉設備 |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP7552883B2 (ja) |
CN (1) | CN116530213A (ja) |
WO (1) | WO2023079737A1 (ja) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05174965A (ja) * | 1991-12-25 | 1993-07-13 | Fuji Electric Co Ltd | アーク炉投入電力制御装置 |
JP2017216216A (ja) * | 2016-06-02 | 2017-12-07 | 東芝三菱電機産業システム株式会社 | 電極昇降装置 |
JP2018070926A (ja) * | 2016-10-27 | 2018-05-10 | Jfe条鋼株式会社 | 電気炉の運転制御システムおよび電気炉ならびに電気炉の運転制御方法 |
-
2021
- 2021-11-08 JP JP2023518529A patent/JP7552883B2/ja active Active
- 2021-11-08 CN CN202180075490.XA patent/CN116530213A/zh active Pending
- 2021-11-08 WO PCT/JP2021/040981 patent/WO2023079737A1/ja active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05174965A (ja) * | 1991-12-25 | 1993-07-13 | Fuji Electric Co Ltd | アーク炉投入電力制御装置 |
JP2017216216A (ja) * | 2016-06-02 | 2017-12-07 | 東芝三菱電機産業システム株式会社 | 電極昇降装置 |
JP2018070926A (ja) * | 2016-10-27 | 2018-05-10 | Jfe条鋼株式会社 | 電気炉の運転制御システムおよび電気炉ならびに電気炉の運転制御方法 |
Also Published As
Publication number | Publication date |
---|---|
CN116530213A (zh) | 2023-08-01 |
JP7552883B2 (ja) | 2024-09-18 |
JPWO2023079737A1 (ja) | 2023-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111372704B (zh) | 模具温度异常预兆检测装置以及存储介质 | |
DE60007492T2 (de) | Verfahren zur Minimierung des Schlackenüberlaufs während der Stahlproduktion | |
US20100045798A1 (en) | Electronic camera | |
CN104392213B (zh) | 一种适用于熔炼过程中的图像信息状态识别系统 | |
CN107241549A (zh) | 双摄像头的成像方法和成像装置 | |
WO2023079737A1 (ja) | アーク炉設備 | |
JP6327236B2 (ja) | 高炉における溶銑温度予測方法 | |
CN106027917A (zh) | 摄像设备及其控制方法 | |
KR20240019361A (ko) | 용접 현상의 거동의 계측 방법, 계측 장치, 용접 시스템, 및 프로그램 | |
CN103900712A (zh) | 热像选择装置和热像选择方法 | |
CN112828275A (zh) | 一种自动扒渣方法、装置及系统 | |
CN111014709A (zh) | 一种确定等离子弧火焰长度的方法及装置 | |
CN115950250A (zh) | 隧道炉控制方法、系统、电子设备及存储介质 | |
JP2005291984A (ja) | 鋼材から成る構造物の発錆状況判定装置、方法及びプログラム | |
CN115997096A (zh) | 用于监测和控制炉的系统和方法 | |
JPWO2013100069A1 (ja) | 炉内撮像方法、炉内撮像システムおよびガラス物品の製造方法 | |
CN104651557A (zh) | 一种高炉喷煤速率设定方法 | |
FI121443B (fi) | Menetelmä ja järjestely kipinöinnin valvomiseksi | |
JP3868304B2 (ja) | 灰溶融炉の運転管理システム | |
CN111014708B (zh) | 一种确定等离子弧火焰直径的方法及装置 | |
JPH0577015A (ja) | モ−ルド内ボイル検出方法 | |
CN111014710B (zh) | 一种检测等离子弧火焰直径的装置及控制方法 | |
US20220350294A1 (en) | Video analysis-based algorithm for triggering power cutback in vacuum arc remelting | |
JP2000304232A (ja) | 溶融スラグ流の画像認識方法 | |
JP2011030093A (ja) | ビデオカメラ |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 2023518529 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 202317032509 Country of ref document: IN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 202180075490.X Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 21963330 Country of ref document: EP Kind code of ref document: A1 |