WO2023026607A1 - 情報配信処理の制御方法、計算機システム、および計算機 - Google Patents

情報配信処理の制御方法、計算機システム、および計算機 Download PDF

Info

Publication number
WO2023026607A1
WO2023026607A1 PCT/JP2022/020389 JP2022020389W WO2023026607A1 WO 2023026607 A1 WO2023026607 A1 WO 2023026607A1 JP 2022020389 W JP2022020389 W JP 2022020389W WO 2023026607 A1 WO2023026607 A1 WO 2023026607A1
Authority
WO
WIPO (PCT)
Prior art keywords
edge
information distribution
edge device
control device
distribution control
Prior art date
Application number
PCT/JP2022/020389
Other languages
English (en)
French (fr)
Inventor
倫太郎 片山
大介 石井
大輔 伊藤
亮介 藤原
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Publication of WO2023026607A1 publication Critical patent/WO2023026607A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/06Protocols specially adapted for file transfer, e.g. file transfer protocol [FTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/10Protocols in which an application is distributed across nodes in the network

Definitions

  • the present invention relates to a method, system, and apparatus for controlling distribution of information to edge devices.
  • Patent Document 1 discloses that “firmware update processing is executed at different timings among a plurality of groups that divide a plurality of IoT devices.
  • a firmware update system is disclosed that restricts execution of firmware update operations to unupdated residual groups.
  • the distribution sequence By collectively performing a series of information distribution processes, that is, the distribution sequence, for multiple edge devices, it is possible to distribute information to a large amount of edge devices while reducing the man-hours of workers. For example, a worker can perform a distribution sequence start operation to a plurality of edge devices at once. Also, for example, when installation of software on an edge device requires operator approval, the worker can perform approval operations on a plurality of edge devices at once.
  • the edge device does not send a notification to the effect that preparations for installing the software have been completed, approval cannot be performed and the delivery sequence fails.
  • the delivery sequence also fails when the edge device does not notify that the software has been installed. There are various factors that cause the delivery sequence to fail. For example, there is a tight communication band, disconnection of communication, command execution failure due to increased load on the edge device, installation failure due to software failure, and the like.
  • Patent Document 1 does not specify the cause of the failure.
  • An object of the present invention is to provide a method and system that identify the cause of a delivery sequence failure and provide the operator with useful information for determining whether to continue or stop the delivery sequence.
  • a representative example of the invention disclosed in the present application is as follows. That is, a method of controlling information distribution processing for edge devices executed by a computer system connected to a plurality of edge devices, wherein the computer system includes a processor, a storage device connected to the processor, and a storage device connected to the processor. and a computer having a network interface connected to the network interface, wherein the information distribution processing control method includes: the processor monitoring the state of each of the plurality of edge devices after starting the information distribution processing for the plurality of edge devices; 1, and a second step in which the processor executes a first process of identifying the edge device for which the information distribution process failed and a cause of the failure based on the result of monitoring the state of each of the plurality of edge devices. and a third step in which the processor presents an operation content regarding cancellation of the information distribution process based on the result of the first process.
  • FIG. 1 is a diagram illustrating a configuration example of a system of Example 1;
  • FIG. 3 is a diagram illustrating a configuration example of a distribution control device according to the first embodiment;
  • FIG. 3 is a diagram illustrating a configuration example of an edge device according to the first embodiment;
  • FIG. 4 is a diagram illustrating an example of the data structure of correct metric value management information of Example 1.
  • FIG. 4 is a diagram illustrating an example of the data structure of edge device management information according to the first embodiment;
  • FIG. 4 is a sequence diagram illustrating the flow of processing in the system of Example 1;
  • FIG. 4 is a sequence diagram illustrating the flow of processing in the system of Example 1;
  • FIG. 4 is a sequence diagram illustrating the flow of processing in the system of Example 1;
  • FIG. 8 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of the first embodiment; 8 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of the first embodiment; 8 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of the first embodiment;
  • FIG. 5 is a diagram showing an example of a screen displayed on the worker terminal of Example 1;
  • FIG. 5 is a diagram showing an example of a screen displayed on the worker terminal of Example 1;
  • 7 is a flowchart illustrating an example of metric confirmation processing executed by the distribution control device of the first embodiment;
  • FIG. 11 is a sequence diagram illustrating the flow of processing in the system of Example 2;
  • FIG. 12 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device according to the second embodiment
  • FIG. FIG. 12 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device according to the second embodiment
  • FIG. FIG. 12 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device according to the second embodiment
  • FIG. FIG. 11 is a diagram showing an example of a screen displayed on the worker terminal of Example 2
  • FIG. 11 is a sequence diagram illustrating the flow of processing in the system of Example 3
  • FIG. 14 is a flowchart illustrating an example of metric confirmation processing executed by the distribution control device of the third embodiment
  • FIG. 14 is a flowchart illustrating an example of metric confirmation processing executed by the distribution control device of the third embodiment;
  • FIG. FIG. 12 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of Example 3;
  • FIG. FIG. 12 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of Example 3;
  • FIG. FIG. 12 is a sequence diagram illustrating the flow of processing in the system of Example 4;
  • FIG. 12 is a sequence diagram illustrating the flow of processing in the system of Example 4;
  • FIG. 14 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device of Example 4;
  • FIG. FIG. 12 is a sequence diagram illustrating the flow of processing in the system of the modified example;
  • FIG. 12 is a sequence diagram illustrating the flow of processing in the system of the modified example;
  • FIG. 1 is a diagram showing a configuration example of the system of the first embodiment.
  • the system consists of a distribution control device 101, an edge device 102, a distribution server 103, and a worker terminal 104.
  • a distribution control device 101 , an edge device 102 , a distribution server 103 , and a worker terminal 104 are connected via a network 105 .
  • the network 105 is a WAN (Wide Area Network) and a LAN (Local Area Network), and the connection method may be either wired or wireless.
  • the edge device 102 is a device that receives information distribution, such as factory equipment, railway vehicles, and automobiles.
  • the distribution control device 101 is a computer that controls information distribution.
  • the distribution server 103 is a computer that manages software, information content, etc. to be distributed to the edge device 102 in information distribution.
  • the worker terminal 104 is a terminal operated by a worker who distributes information. The worker operates the distribution control device 101 using the worker terminal 104 .
  • the functions of the distribution server 103 and the distribution control device 101 may be implemented using a computer system composed of a plurality of computers. Moreover, each function of the distribution server 103 and the distribution control device 101 may be combined in one of the computers.
  • FIG. 2 is a diagram showing a configuration example of the distribution control device 101 of the first embodiment.
  • the distribution control device 101 has a processor 201 , a network interface 202 , a main storage device 203 and a secondary storage device 204 . Each hardware element is connected to each other via an internal bus.
  • the functions possessed by the distribution control device 101 are realized by the processor 201 executing a program stored in the main memory device 203 .
  • the processor 201 executes the program.
  • the network interface 202 communicates with external devices via a network.
  • the main storage device 203 is a storage device such as a memory, and stores programs executed by the processor 201 and information used by the programs.
  • the main storage device 203 is also used as a work area.
  • the secondary storage device 204 is a storage device such as a HDD (Hard Disk Drive) and an SSD (Solid State Drive), and permanently stores data.
  • the programs and information stored in the main memory device 203 may also be stored in the secondary memory device 204 .
  • processor 201 reads programs and information from secondary storage device 204 and loads them into main storage device 203 .
  • the main storage device 203 stores a cancellation determination program 211, a metric confirmation program 212, metric correct value management information 221, and edge device management information 222.
  • the data structures of the metric correct value management information 221 and the edge device management information 222 and the processing implemented by the program will be described later.
  • the hardware configuration of the distribution server 103 and the worker terminal 104 is the same as that of the distribution control device 101, so description thereof will be omitted.
  • FIG. 3 is a diagram showing a configuration example of the edge device 102 of the first embodiment.
  • the edge device 102 has a processor 301 , a network interface 302 , a main storage device 303 and a secondary storage device 304 . Each hardware element is connected to each other via an internal bus. Note that the edge device 102 may include hardware elements (not shown) such as a driving device.
  • the processor 301, network interface 302, main storage device 303, and secondary storage device 304 are the same hardware as the processor 201, network interface 202, main storage device 203, and secondary storage device 204.
  • the functions possessed by the edge device 102 are implemented by the processor 301 executing a program stored in the main memory device 303 .
  • the processor 301 executes the program.
  • the main storage device 303 stores a command execution program 311 and a metric transmission program 312.
  • FIG. 4 is a diagram showing an example of the data structure of the correct metric value management information 221 of the first embodiment.
  • the metric correct value management information 221 is table format information and stores entries including the metric type 401 and the correct value 402 .
  • One entry corresponds to one metric type. Note that the fields included in the entry are not limited to those described above.
  • the metric type 401 is a field that stores the type of metric that indicates the progress of information distribution.
  • the correct metric value management information 221 shown in FIG. 4 stores entries of two metric types, information content acquisition rate and information content version.
  • the correct value 402 is a field that stores the correct value of the metric corresponding to the metric type. 100% is stored as the entry correct value 402 corresponding to the information content acquisition rate, and 2.0 is stored as the entry correct value 402 corresponding to the information content version.
  • FIG. 5 is a diagram showing an example of the data structure of the edge device management information 222 of the first embodiment.
  • the edge device management information 222 is information in a table format, and stores entries including an edge device ID 501, a distribution sequence execution result 502, a defect index 503, and a group ID 504. One entry corresponds to one edge device 102 . Note that the fields included in the entry are not limited to those described above.
  • the edge device ID 501 is a field that stores the identification information of the edge device 102 .
  • the distribution sequence execution result 502 is a field that stores the execution result of the distribution sequence for the edge device 102 .
  • the distribution sequence execution result 502 stores either “success” indicating that the distribution sequence succeeded or “failure” indicating that the distribution sequence failed.
  • the defect index 503 is a field that stores information about the index used for judgment. For example, in the case of an index related to communication, the defect indicator 503 stores "connection state", and in the case of an indicator related to load, the defect indicator 503 stores "load”.
  • a group ID 504 is a field that stores identification information of a group that is an execution unit of a distribution sequence. If the worker has set a group in advance, the group ID 504 stores identification information of the group.
  • the group identification information instead of the group identification information, the version of the firmware, the type of the edge device, etc. may be stored. In this case, a group is formed whose elements are edge devices 102 having the same firmware or type.
  • 6A and 6B are sequence diagrams explaining the flow of processing in the system of the first embodiment.
  • the worker uses the worker terminal 104 to transmit a distribution sequence registration request to the distribution control device 101 (step S601). For example, by sending a delivery sequence registration request, the worker can specify the phases that make up the delivery sequence, the phases that require operator approval, the metrics that the edge device 102 sends, and the Configure the commands to run, correct values for metrics, and required materials such as software to install, information content, and application containers.
  • the worker uses the worker terminal 104 to transmit a distribution sequence start instruction to the distribution control device 101 (step S602).
  • the distribution control device 101 When the distribution control device 101 receives a distribution sequence start instruction, it starts the distribution sequence.
  • the process from step S603 to step S624 is the distribution sequence.
  • the distribution control device 101 distributes the file to the edge device 102 and also transmits a status update request (step S603).
  • the distribution control device 101 starts cancellation determination processing (step S604).
  • the edge device 102 is notified via a file of a group of phases forming a distribution sequence, metrics to be sent, commands to be executed by the edge device 102 in each phase, necessary materials, and the like.
  • the edge device 102 transmits a status update response to the distribution control device 101 in response to the file distribution and status update request (step S605).
  • the distribution control device 101 was able to receive the status update response from the edge device (A) 102, but was unable to receive the status update response from the edge device (B) 102.
  • Possible reasons why the status update response could not be received include the lack of a file/status update request and the lack of a status update response.
  • the distribution control device 101 determines the success or failure of the distribution sequence based on the reception status of the status update response, and also identifies the cause of failure.
  • the cancellation determination process is performed by the processor 201 executing the cancellation determination program 211 .
  • the cancellation determination process shown in FIG. 7 is executed for each edge device 102 .
  • the success or failure of the distribution sequence is determined based on the presence or absence of a status update response from the edge device 102, and based on the evaluation index (connection state index and load index) acquired from the edge device 102. Then, the cause of failure is identified.
  • the distribution control device 101 determines whether or not a status update response has been received from the edge device 102 within a predetermined period (step S701).
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • the distribution control device 101 determines that the distribution sequence has failed, and identifies the cause of the failure. First, the distribution control device 101 determines whether the connection state of the edge device 102 is good (step S702). Specifically, the following processing is executed.
  • connection state index The distribution control device 101 calculates an index for evaluating the connection state of the edge device 102 (connection state index).
  • the distribution control device 101 calculates whether or not the message is received as a connection state index. For example, when the edge device 102 measures an index indicating communication quality, the edge device 102 calculates the latest index or the average value of the indices as the connection state index.
  • the distribution control device 101 determines the connection state of the edge device 102 based on the connection state index.
  • the distribution control device 101 determines that the connection state of the edge device 102 is good. For example, if the latest communication quality index is greater than the threshold, the distribution control device 101 determines that the connection state of the edge device 102 is good.
  • the distribution control device 101 registers in the cancellation target list data that associates the factor "unique to the device" with the identification information of the edge device 102 (step S703). After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 determines whether the load on the edge device 102 is high (step S704).
  • the distribution control device 101 calculates an index (load index) for evaluating the load on the edge device 102, and determines whether the load on the edge device 102 is high based on the load index. For example, the distribution control device 101 periodically acquires the usage rate of the processor 301 from the edge device 102 and calculates the latest usage rate or the average value of the usage rate as the load index. If the usage rate of the processor 301 is greater than the threshold, the distribution control device 101 determines that the load on the edge device 102 is high.
  • load index index for evaluating the load on the edge device 102, and determines whether the load on the edge device 102 is high based on the load index. For example, the distribution control device 101 periodically acquires the usage rate of the processor 301 from the edge device 102 and calculates the latest usage rate or the average value of the usage rate as the load index. If the usage rate of the processor 301 is greater than the threshold, the distribution control device 101 determines that the load on the edge device 102 is high.
  • the distribution control device 101 registers data in which the cause "other" is associated with the identification information of the edge device 102 in the cancellation target list (step S705). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • the distribution control device 101 registers data in which the factor "unique to device" is associated with the identification information of the edge device 102 in the cancellation target list (step S706). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • connection status of the edge device 102 for which the distribution sequence failed is bad or if the load is high, it is recorded in the cancellation target list as a distribution sequence failure due to a factor specific to the edge device 102 . Also, when the connection state is good and the load is low, it is registered in the cancellation target list as that the distribution sequence has failed due to a factor other than the factor unique to the edge device 102 .
  • the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list. For example, the following recommended operations can be considered.
  • the distribution control device 101 proposes to the operator to stop the distribution sequence of the edge device 102 in question. In this case, the delivery sequence of other edge devices 102 continues.
  • the distribution control device 101 proposes to the operator to stop the group or the entire distribution sequence.
  • the distribution control device 101 determines the recommended operation based on the ratio of the edge devices 102 belonging to each factor. For example, when the ratio of edge devices 102 belonging to the factor “other” is high, the distribution control device 101 proposes to the worker to stop the group or the entire distribution sequence.
  • the cancellation determination process shown in FIG. 8 is executed for each edge device 102 .
  • the success or failure of the distribution sequence is determined based on whether there is a status update response from the edge device 102, and the cause of failure is specified based on the evaluation index acquired from the plurality of edge devices 102. be.
  • the distribution control device 101 uses the load index such as the usage rate of the processor 301 obtained from each edge device 102 to calculate the representative value of the load index (step S801).
  • the representative value of the load index is the average value, median value, or x-percentile (x-percentile) of the load index (eg, x is 90).
  • the distribution control device 101 uses the connection state index of each edge device 102 to calculate the representative value of the connection state index (step S802).
  • the distribution control device 101 calculates the representative value of the connection state index using the number of receptions of Keep Alive messages transmitted from each edge device 102 within a certain period or the connection state index such as communication quality.
  • a representative value of the connection state index is the mean, median, or x-percentile of the connection state index (eg, x is 90), or the like.
  • the distribution control device 101 determines whether or not a status update response has been received from the edge device 102 within a predetermined period (step S803).
  • the processing of step S803 is the same as the processing of step S701.
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • the distribution control device 101 determines whether the connection state of the edge device 102 is good (step S804). . Specifically, the following processing is executed.
  • the distribution control device 101 calculates the connection state index of the edge device 102.
  • the distribution control device 101 calculates the number of times the message is received within a certain period as a connection state index. For example, when the edge device 102 measures an index indicating communication quality, the edge device 102 calculates the latest index or the average value of the index as the connection state index.
  • the distribution control device 101 determines the connection state of the edge device 102 based on the result of comparison with the connection state index and the representative value of the connection state index.
  • the distribution control device 101 determines that the connection state of the edge device 102 is good. For example, when the connection state index is equal to or greater than the representative value of the connection state index, the distribution control device 101 determines that the connection state of the edge device 102 is good.
  • the distribution control device 101 registers in the cancellation target list data that associates the factor “unique to the device” with the identification information of the edge device 102 (step S805). After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 determines whether the load on the edge device 102 is high (step S806).
  • the distribution control device 101 calculates the load index of the edge device 102, and determines whether the load of the edge device 102 is high based on the comparison result of the load index and the representative value of the load index.
  • the distribution control device 101 periodically acquires the usage rate of the processor 301 from the edge device 102 and calculates the latest usage rate or the average usage rate as a load index. When the usage rate of the processor 301 is equal to or higher than the representative value of the load index, the distribution control device 101 determines that the load on the edge device 102 is high.
  • the distribution control device 101 registers data in which the cause "other" is associated with the identification information of the edge device 102 in the cancellation target list (step S807). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • the distribution control device 101 registers data in which the factor "unique to device" is associated with the identification information of the edge device 102 in the cancellation target list (step S808). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list.
  • the method of determining recommended operations is the same as the method described with reference to FIG.
  • the edge device 102 can be relatively evaluated. For example, an edge device 102 with an extremely poor connection state or an extremely high load compared to other edge devices 102 is recorded as a device-specific factor.
  • the cancellation determination process shown in FIG. 9 is executed once for all edge devices 102 .
  • the cause of failure is specified based on the comparison result between the representative value of the evaluation index obtained from each edge device 102 and the threshold.
  • the distribution control device 101 calculates the representative value of the load index (step S901) and also calculates the representative value of the connection state index (step S902).
  • the processing of steps S901 and S902 is the same as the processing of steps S801 and S802.
  • the distribution control device 101 determines whether there is an edge device 102 that has not received a status update response within a predetermined period (step S903). That is, it is determined whether or not there is an edge device 102 for which the delivery sequence failed.
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to each edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • the distribution control device 101 determines whether the representative value of the connection state index is equal to or greater than the threshold (step S904).
  • the distribution control device 101 associates the factor "common" with the identification information of the edge devices 102 for the number of edge devices 102 for which the distribution sequence failed.
  • the attached data is registered in the cancellation target list (step S905). After that, the distribution control device 101 proceeds to step S909.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 determines whether the representative value of the load index is equal to or greater than the threshold (step S906).
  • step S906 If the representative value of the load index is equal to or greater than the threshold (YES in step S906), the distribution control device 101 associates the factor “common” with the identification information of the edge devices 102 by the number of edge devices 102 for which the distribution sequence failed. The attached data is registered in the cancellation target list (step S907). After that, the distribution control device 101 proceeds to step S909.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • the distribution control device 101 associates the factor “other” with the identification information of the edge devices 102 by the number of edge devices 102 for which the distribution sequence failed.
  • the acquired data is registered in the cancellation target list (step S908). After that, the distribution control device 101 proceeds to step S909.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • step S909 the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list (step S909). After that, the distribution control device 101 ends the cancellation determination process. For example, the following recommended operations can be considered.
  • the distribution control device 101 proposes to the worker to stop the group or the entire distribution sequence.
  • the distribution control device 101 proposes to the worker to stop the distribution sequence of the edge device 102 in question. In this case, the delivery sequence of other edge devices 102 continues.
  • the distribution control device 101 determines the recommended operation based on the ratio of the edge devices 102 belonging to each factor. For example, when the ratio of edge devices 102 belonging to the factor “other” is high, the distribution control device 101 proposes to the worker to stop the group or the entire distribution sequence.
  • the entire system can be evaluated by determining the connection state and load of the edge device 102 based on the comparison result between the representative value of the evaluation index and the threshold. Further, the cancellation determination process shown in FIG. 9 can reduce the amount of calculation compared to the process for each edge device 102 as shown in FIGS.
  • the distribution control device 101 transmits the result of the cancellation determination process to the worker terminal 104 (step S606).
  • the results include edge device management information 222, recommended operations, a list of objects to be canceled, and the like.
  • the operator terminal 104 presents a screen based on the result of the cancellation determination process and accepts the operator's cancellation operation.
  • screens presented to the operator will be described.
  • 10A and 10B are diagrams showing examples of screens displayed on the worker terminal 104 of Example 1.
  • Screen 1000 includes display fields 1001 , 1002 , 1003 and selection field 1004 .
  • a display column 1001 is a column for displaying the execution result of the distribution sequence of each edge device 102 .
  • a display column 1001 displays a table 1010 generated based on the edge device management information 222 .
  • a display column 1002 is a column for displaying the identified cause of failure.
  • a display field 1002 displays the type and number of identified failure factors.
  • the operator terminal 104 performs display in the display column 1002 based on the cancellation target list.
  • a display column 1003 is a column for displaying recommended operations determined by the distribution control device 101 .
  • a selection column 1004 is a column for selecting an operation for a failed distribution sequence.
  • a selection field 1004 displays buttons for selecting operations. The operator refers to the display columns 1001, 1002, and 1003 and presses any button displayed in the selection column 1004 to instruct the termination of the distribution sequence.
  • the selection column 1004 in FIG. 10A displays buttons for canceling the delivery sequence of the failed edge device 102, canceling the delivery sequence of all the edge devices 102, and waiting. Standby is an operation for executing the cancellation determination process again after waiting for a certain period of time.
  • the selection field 1004 in FIG. 10B also displays a button for realizing an operation of canceling the distribution sequence of the edge device 102 belonging to the group including the failed edge device 102 .
  • the worker performs a cancel operation using the worker terminal 104 (step S607). Specifically, the operator presses any button displayed in the selection column 1004 .
  • the operator terminal 104 transmits a cancellation request according to the cancellation operation to the distribution control device 101 (step S608).
  • the abort request includes information about the pressed button.
  • the distribution control device 101 identifies the edge device 102 to be canceled according to the cancellation request, and transmits a cancellation instruction to the identified edge device 102 (step S609).
  • the distribution control device 10 transmits a termination instruction only to the failed edge device 102 .
  • the distribution control device 101 transmits a cancellation instruction to all edge devices 102 .
  • the distribution control device 101 refers to the edge device management information 222 to identify the group including the failed edge device 102. Then, a stop instruction is transmitted to the edge device 102 belonging to the group.
  • the distribution control device 101 executes the cancellation determination process again after a certain period of time has elapsed without transmitting a cancellation instruction.
  • step S606 If there is no edge device 102 in the cancellation target list, that is, if there is no edge device 102 for which the distribution sequence failed, the processing from step S606 to step S609 is not executed.
  • the distribution control device 101 transmits a stop instruction to the edge device (B) 102 .
  • the edge device 102 continuing the distribution sequence executes the command in a predetermined phase (step S610) and transmits a command completion notification to the distribution control device 101 (step S611).
  • the edge device 102 executes the command included in the file distributed from the distribution control device 101 in step S403.
  • the command to be executed is, for example, a command for realizing decompression of software, acquisition of information content, and the like.
  • the distribution control device 101 Upon receiving the command completion notification, the distribution control device 101 transmits an authentication request to the worker terminal 104 (step S612).
  • the worker performs an authentication operation using the worker terminal 104 (step S613), and the worker terminal 104 transmits an authentication response to the distribution control device 101 (step S614).
  • the distribution control device 101 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S615).
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S616), and executes the command (step S617).
  • the edge device 102 executes the command included in the file distributed from the distribution control device 101 in step S403.
  • the command to be executed is, for example, a command for realizing installation of software, preparation for distribution of information content, and the like.
  • the edge device 102 transmits the metric to the distribution control device 101 (step S618).
  • the edge device 102 transmits the presence or absence of an execution result file generated along with software installation, the installed software version, the information content acquisition rate, the information content version, etc. as metrics.
  • the distribution control device 101 When the distribution control device 101 receives the metric, it executes metric confirmation processing (step S619).
  • FIG. 11 is a flowchart illustrating an example of metric confirmation processing executed by the distribution control device 101 of the first embodiment.
  • Metric confirmation processing is performed by processor 201 executing metric confirmation program 212 .
  • the metric confirmation process is executed when a metric is received from the edge device 102 .
  • the distribution control device 101 refers to the metric correct value management information 221, acquires the correct value from the entry corresponding to the received metric type, and determines whether or not the received metric matches the correct value (step S1101).
  • step S1101 If the received metric does not match the correct value (NO in step S1101), the distribution control device 101 transitions to metric reception waiting (step S1104), and terminates the metric confirmation process.
  • the distribution control device 101 determines whether or not the metrics of all edge devices 102 have been checked (step S1102). That is, it is determined whether or not it is confirmed that the metrics of all the edge devices 102 match the correct value.
  • step S1102 If confirmation of metrics for all edge devices 102 has not been completed (NO in step S1102), the distribution control device 101 transitions to metric reception waiting (step S1104), and terminates the metric confirmation process.
  • the distribution control device 101 transmits an authentication request to the worker terminal 104 (steps S1103, S620), and terminates the metric confirmation process. .
  • the worker performs an authentication operation using the worker terminal 104 (step S621), and the worker terminal 104 transmits an authentication response to the distribution control device 101 (step S622).
  • the distribution control device 101 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S623).
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S624).
  • the distribution control device 101 identifies the cause of failure for the edge device 102 that does not receive a status update response after file distribution, and proposes an operation to stop the distribution sequence according to the identified cause of failure. As a result, it is possible to efficiently control the suspension of the distribution sequence, so that the number of man-hours and work hours required for the control of the distribution sequence can be reduced.
  • the second embodiment differs from the first embodiment in the execution phase of the cancellation determination process.
  • the second embodiment will be described below, focusing on the differences from the first embodiment.
  • the configuration of the system of Example 2 is the same as that of Example 1.
  • the hardware configuration and software configuration of the distribution control device 101 and the edge device 102 of the second embodiment are the same as those of the first embodiment.
  • the data structures of the correct metric value management information 221 and the edge device management information 222 of the second embodiment are the same as those of the first embodiment.
  • FIG. 12 is a sequence diagram explaining the flow of processing in the system of the second embodiment.
  • Step S1201 is the same processing as step S601.
  • Step S1202 is the same as the processing of step S602.
  • step S1203 When the distribution control device 101 receives the distribution sequence start instruction, it distributes the file to the edge device 102 and also transmits a status update request (step S1203).
  • the processing in step S1203 is the same as the processing in step S603.
  • the edge device 102 transmits a status update response to the distribution control device 101 in response to the file distribution and status update request (step S1204).
  • the processing in step S1204 is the same as the processing in step S604.
  • the distribution control device 101 After receiving the status update response, the distribution control device 101 starts the cancellation determination process (step S1205).
  • the edge device 102 executes the command in a predetermined phase (step S1206), and transmits a command completion notification to the distribution control device 101 (step S1207).
  • the processing of steps S1206 and S1207 is the same as the processing of steps S610 and S611.
  • the distribution control device 101 was able to receive the command completion notification from the edge device (A) 102, but was unable to receive the command completion notification from the edge device (B) 102.
  • Reasons why the command completion notification could not be received include failure of command execution, lengthening of command execution time, lack of command completion notification, and the like.
  • 13, 14, and 15 are flowcharts illustrating an example of the cancellation determination process executed by the distribution control device 101 of the second embodiment.
  • the cancellation determination process is performed by the processor 201 executing the cancellation determination program 211 .
  • the cancellation determination process shown in FIG. 13 is executed for each edge device 102 .
  • the success or failure of the distribution sequence is determined based on the presence or absence of the command completion notification from the edge device 102, and the cause of failure is specified based on the evaluation index acquired from the edge device 102.
  • the distribution control device 101 determines whether or not a command completion notification has been received from the edge device 102 within a predetermined period (step S1301).
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • step S1302 determines whether the connection state of the edge device 102 is good (step S1302).
  • the processing in step S1302 is the same as the processing in step S702.
  • the distribution control device 101 registers in the cancellation target list data in which the factor "unique to the device" is associated with the identification information of the edge device 102 (step S1303). After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • step S1302 If the connection state of the edge device 102 is good (YES in step S1302), the distribution control device 101 determines whether the load on the edge device 102 is high (step S1304).
  • the processing in step S1304 is the same as the processing in step S704.
  • the distribution control device 101 registers data in which the cause "other" is associated with the identification information of the edge device 102 in the cancellation target list (step S1305). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • the distribution control device 101 registers data in which the factor "unique to device" is associated with the identification information of the edge device 102 in the cancellation target list (step S1306). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • connection status of the edge device 102 for which the distribution sequence failed is bad or if the load is high, it is recorded in the cancellation target list as a distribution sequence failure due to a factor specific to the edge device 102 . Also, when the connection state is good and the load is low, it is registered in the cancellation target list as that the distribution sequence has failed due to a factor other than the factor unique to the edge device 102 .
  • the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list. Among the recommended operations, the method of determining the operation for canceling the distribution sequence is the same as in the first embodiment. In Example 2, the content of the authentication operation is also determined. For example, an operation to authenticate only edge devices 102 that continue the distribution sequence, an operation to authenticate all or a group of edge devices 102, and the like are determined.
  • the cancellation determination process shown in FIG. 14 is executed for each edge device 102 .
  • the success or failure of the distribution sequence is determined based on the presence or absence of the command completion notification from the edge device 102, and the cause of failure is specified based on the evaluation index acquired from the plurality of edge devices 102. be.
  • the distribution control device 101 calculates the representative value of the load index (step S1401).
  • the processing in step S1401 is the same as the processing in step S801.
  • the distribution control device 101 calculates the representative value of the connection status index (step S1402).
  • the processing in step S1402 is the same as the processing in step S802.
  • the distribution control device 101 determines whether or not a command completion notification has been received from the edge device 102 within a predetermined period (step S1403).
  • the processing in step S1403 is the same as the processing in step S1301.
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • step S1403 determines whether the connection state of the edge device 102 is good. .
  • the processing in step S1404 is the same as the processing in step S804.
  • the distribution control device 101 registers in the cancellation target list data that associates the factor "unique to the device" with the identification information of the edge device 102 (step S1405). After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • step S1404 the distribution control device 101 determines whether the load on the edge device 102 is high (step S1406).
  • the processing in step S1406 is the same as the processing in step S806.
  • the distribution control device 101 registers data in which the cause "other" is associated with the identification information of the edge device 102 in the cancellation target list (step S1407). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • the distribution control device 101 registers data in which the cause "unique to device" is associated with the identification information of the edge device 102 in the cancellation target list (step S1408). . After that, the distribution control device 101 ends the cancellation determination process.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 in the edge device management information 222. Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list.
  • the method of determining the recommended operation is the same as the method described with reference to FIG.
  • the edge device 102 can be relatively evaluated. For example, an edge device 102 with an extremely poor connection state or an extremely high load compared to other edge devices 102 is recorded as a device-specific factor.
  • the cancellation determination process shown in FIG. 15 is executed once for all edge devices 102 .
  • the cause of failure is specified based on the result of comparison between the representative value of the evaluation index acquired from each edge device 102 and the threshold.
  • the distribution control device 101 calculates the representative value of the load index (step S1501), and also calculates the representative value of the connection state index (step S1502).
  • the processing of steps S1501 and S1502 is the same as the processing of steps S801 and S802.
  • the distribution control device 101 determines whether there is an edge device 102 that has not received a command completion notification within a predetermined period (step S1503).
  • the distribution control device 101 terminates the cancellation determination process. At this time, the distribution control device 101 updates the entry corresponding to each edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “success”.
  • the distribution control device 101 determines whether the representative value of the connection status index is equal to or greater than the threshold (step S1504).
  • the distribution control device 101 associates the factor “common” with the identification information of the edge devices 102 by the number of edge devices 102 for which the distribution sequence failed.
  • the attached data is registered in the cancellation target list (step S1505). After that, the distribution control device 101 proceeds to step S1509.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 determines whether or not the representative value of the load index is greater than or equal to the threshold (step S1506).
  • step S1506 If the representative value of the load index is equal to or greater than the threshold (YES in step S1506), the distribution control device 101 associates the factor "common" with the identification information of the edge devices 102 by the number of edge devices 102 for which the distribution sequence failed. The attached data is registered in the cancellation target list (step S1507). After that, the distribution control device 101 proceeds to step S1509.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • step S1506 If the representative value of the load index is smaller than the threshold (NO in step S1506), the distribution control device 101 associates the factor “other” with the identification information of the edge devices 102 by the number of edge devices 102 for which the distribution sequence failed. The acquired data is registered in the cancellation target list (step S1508). After that, the distribution control device 101 proceeds to step S1509.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • step S1509 the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list (step S1509). After that, the distribution control device 101 ends the cancellation determination process.
  • the method of determining operations related to canceling the distribution sequence is the same as in the first embodiment.
  • the authentication operation is also determined. For example, an operation to authenticate only edge devices 102 that continue the distribution sequence, an operation to authenticate all or a group of edge devices 102, and the like are determined.
  • the entire system can be evaluated by determining the connection state and load of the edge device 102 based on the comparison result between the representative value of the evaluation index and the threshold. Further, the cancellation determination process shown in FIG. 15 can reduce the amount of calculation compared to the process for each edge device 102 as shown in FIGS. 13 and 14 .
  • the distribution control device 101 transmits the result of the cancellation determination process and the authentication request to the worker terminal 104 (step S1208).
  • the results include edge device management information 222, recommended operations, a list of objects to be canceled, and the like.
  • the operator terminal 104 presents a screen based on the result of the cancellation determination process, and accepts the operator's authentication operation and cancellation operation.
  • screens presented to the operator will be described.
  • FIG. 16 is a diagram showing an example of a screen displayed on the worker terminal 104 according to the second embodiment.
  • Screen 1600 includes display fields 1601 , 1602 , 1603 and selection field 1604 .
  • Display columns 1601 , 1602 , 1603 and selection column 1604 are the same as display columns 1001 , 1002 , 1003 and selection column 1004 .
  • a selection field 1604 also displays a button for instructing an operation combining an operation for a failed delivery sequence and an operation for authentication of the delivery sequence. For example, if the delivery sequence of some edge devices 102 has failed, the message "Abort delivery sequence of failed edge devices and authenticate delivery sequence of other edge devices" is displayed, indicating that there are edge devices 102 that have failed. If not, "Authenticate distribution sequence for all edge devices" is displayed.
  • the worker uses the worker terminal 104 to perform authentication and cancellation operations (step S1209). Specifically, the operator presses any button displayed in the selection field 1604 . The worker terminal 104 transmits an authentication response and a cancellation request to the distribution control device 101 (step S1210). Here, it is assumed that the operator has selected "stop delivery sequence of failed edge device and authenticate delivery sequence of other edge device".
  • the distribution control device 101 transmits a cancellation instruction to the edge device 102 to be canceled (step S1211). Also, the distribution control device 101 transmits a status update request to the edge device 102 to be continued (step S1212). In the sequence diagram shown in FIG. 12, a stop instruction is transmitted to the edge device (B) 102 and a status update request is transmitted to the edge device (A) 102 .
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S1213), and executes the command (step S1214).
  • the edge device 102 transmits the metric to the distribution control device 101 (step S1215).
  • the processing in steps S1213, S1214, and S1215 is the same as the processing in steps S616, S617, and S618.
  • the distribution control device 101 When the distribution control device 101 receives the metric, it executes metric confirmation processing (step S1216) and transmits an authentication request to the worker terminal 104 (step S1217).
  • the metric confirmation process of the second embodiment is the same as that of the first embodiment.
  • the worker performs an authentication operation using the worker terminal 104 (step S1218), and the worker terminal 104 transmits an authentication response to the distribution control device 101 (step S1219).
  • the processing of steps S1218 and S1219 is the same as the processing of steps S621 and S622.
  • step S1220 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S1220).
  • the processing of step S1220 is the same as the processing of step S623.
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S1221).
  • the processing of step S1221 is the same as the processing of step S624.
  • step S1208 If there is no failed edge device 102, only an authentication request is sent in step S1208, only an authentication operation is performed in step S1209, and only an authentication response is performed in step S11210. Also, no stop instruction is sent.
  • the distribution control device 101 identifies the cause of failure for the edge device 102 that does not have a command completion notification, and proposes an operation to cancel the distribution sequence and an authentication operation according to the identified cause of failure.
  • it is possible to efficiently control the suspension of the distribution sequence, so that the number of man-hours and work hours required for the control of the distribution sequence can be reduced.
  • the third embodiment differs from the first embodiment in the execution phase of the cancellation determination process.
  • the third embodiment will be described below, focusing on the differences from the first embodiment.
  • the configuration of the system of Example 3 is the same as that of Example 1.
  • the hardware configuration and software configuration of the distribution control device 101 and the edge device 102 of the third embodiment are the same as those of the first embodiment.
  • the data structures of the metric correct value management information 221 and the edge device management information 222 of the third embodiment are the same as those of the first embodiment.
  • FIG. 17 is a sequence diagram explaining the flow of processing in the system of the third embodiment.
  • Step S1701 is the same processing as step S601.
  • Step S1702 is the same as the processing in step S602.
  • step S1703 When the distribution control device 101 receives the distribution sequence start instruction, it distributes the file to the edge device 102 and also transmits a status update request (step S1703).
  • the processing in step S1703 is the same as the processing in step S603.
  • the edge device 102 transmits a status update response to the distribution control device 101 in response to the file distribution and status update request (step S1704).
  • the processing in step S1704 is the same as the processing in step S604.
  • the edge device 102 executes the command in a predetermined phase (step S1705), and transmits a command completion notification to the distribution control device 101 (step S1706).
  • the processing of steps S1705 and S1706 is the same as the processing of steps S610 and S611.
  • step S1707 Upon receiving the command completion notification, the distribution control device 101 transmits an authentication request to the worker terminal 104 (step S1707).
  • the processing in step S1707 is the same as the processing in step S612.
  • the worker uses the worker terminal 104 to perform an authentication operation (step S1708), and transmits an authentication response to the distribution control device 101 (step S1709).
  • the processing of steps S1708 and S1709 is the same as the processing of steps S613 and S614.
  • step S1710 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S1710).
  • the processing of step S1710 is the same as the processing of step S615.
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S1711), and executes the command (step S1712).
  • the edge device 102 transmits the metric to the distribution control device 101 (step S1713).
  • the processes of steps S1711, S1712, and S1713 are the same as the processes of steps S616, S617, and S618.
  • the distribution control device 101 When the distribution control device 101 receives the metric, it executes metric confirmation processing (step S1714). In Example 3, the cause of failure is specified in the metric confirmation process.
  • 18A and 18B are flowcharts illustrating an example of metric confirmation processing executed by the distribution control device 101 of the third embodiment.
  • Metric confirmation processing is performed by processor 201 executing metric confirmation program 212 .
  • the metric confirmation process is executed when a metric is received from the edge device 102 .
  • the distribution control device 101 refers to the metric correct value management information 221, acquires the correct value from the entry corresponding to the received metric type, and determines whether or not the received metric matches the correct value (step S1801).
  • step S1804 If the received metric does not match the correct value (NO in step S1801), the distribution control device 101 proceeds to step S1804.
  • the distribution control device 101 determines whether or not the metrics of all edge devices 102 have been checked (step S1802).
  • step S1804 If confirmation of metrics for all edge devices 102 has not been completed (NO in step S1802), the distribution control device 101 proceeds to step S1804.
  • the distribution control device 101 transmits the determination result and the authentication request to the worker terminal 104 (steps S1803 and S1715), and performs metric confirmation processing. exit.
  • step S1804 the distribution control device 101 determines whether or not a certain period of time has elapsed (step S1804).
  • step S1804 If the predetermined time has not elapsed (NO in step S1804), the distribution control device 101 transitions to waiting for metric reception (step S1805), and terminates the metric confirmation process.
  • step S1804 the distribution control device 101 executes cancellation determination processing (step S1806), and then proceeds to step S1803. That is, the distribution control device 101 identifies the edge device 102 whose metric did not match the correct value within a certain period of time as the edge device 102 whose distribution sequence failed as the cause of failure.
  • the distribution control device 101 executes different cancellation determination processes depending on the type of metric.
  • 19 and 20 are flowcharts illustrating an example of the cancellation determination process executed by the distribution control device 101 of the third embodiment.
  • the cancellation determination process is performed by the processor 201 executing the cancellation determination program 211 .
  • the cancellation determination process shown in FIG. 19 is executed once for the edge device 102 whose metric value does not match the correct value at the start of the cancellation determination process.
  • the cause of the failure is specified based on the load index acquired from the edge device 102 .
  • the distribution control device 101 calculates the representative value of the load index (step S1901).
  • the processing in step S1901 is the same as the processing in step S801.
  • the distribution control device 101 determines whether the representative value of the load index is greater than or equal to the threshold (step S1902).
  • the distribution control device 101 identifies the edge devices 102 with the factor "common" as many as the number of edge devices 102 whose metrics do not match the correct value.
  • the data associated with the information is registered in the cancellation target list (step S1903). After that, the distribution control device 101 advances to step S1905.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • step S1902 If the representative value of the load index is equal to or less than the threshold (NO in step S1902), the distribution control device 101 adds the factor "other" and the identification information of the edge devices 102 by the number of edge devices 102 whose metrics do not match the correct value. is registered in the cancellation target list (step S1904). After that, the distribution control device 101 advances to step S1905.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • step S1905 the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list (step S1905). After that, the distribution control device 101 ends the cancellation determination process.
  • the method of determining operations related to canceling the distribution sequence is the same as in the first embodiment.
  • the authentication operation is also determined. For example, an operation to authenticate only edge devices 102 that continue the distribution sequence, an operation to authenticate all or a group of edge devices 102, and the like are determined.
  • the cancellation determination process shown in FIG. 20 is executed once for the edge device 102 whose metric value does not match the correct value at the start of the cancellation determination process.
  • the cause of the failure is specified based on the result of comparison between the representative values of the load index and the connection state index acquired from each edge device 102 and the threshold.
  • the distribution control device 101 calculates the representative value of the load index (step S2001), and also calculates the representative value of the connection state index (step S2002).
  • the processing of steps S2001 and S2002 is the same as the processing of steps S801 and S802.
  • the distribution control device 101 determines whether the representative value of the connection status index is equal to or greater than the threshold (step S2003).
  • the distribution control device 101 identifies the edge devices 102 with the factor "common" as many as the number of edge devices 102 whose metric does not match the correct value.
  • the data associated with the information is registered in the cancellation target list (step S2004). After that, the distribution control device 101 proceeds to step S2008.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 determines whether or not the representative value of the load index is greater than or equal to the threshold (step S2005).
  • the distribution control device 101 identifies the edge devices 102 with the factor "common" as many as the number of edge devices 102 whose metric does not match the correct value.
  • the data associated with the information is registered in the cancellation target list (step S2006). After that, the distribution control device 101 proceeds to step S2008.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “load”.
  • step S2005 If the representative value of the load index is smaller than the threshold (NO in step S2005), the distribution control device 101 adds the factor “other” and the identification information of the edge devices 102 by the number of edge devices 102 whose metrics do not match the correct value. is registered in the cancellation target list (step S2007). After that, the distribution control device 101 proceeds to step S2008.
  • the distribution control device 101 updates the entry corresponding to the edge device 102 registered in the cancellation target list in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “other”.
  • step S2008 the distribution control device 101 determines recommended operations to be presented to the worker based on the cancellation target list (step S2008). After that, the distribution control device 101 ends the cancellation determination process.
  • the method of determining operations related to canceling the distribution sequence is the same as in the first embodiment.
  • the authentication operation is also determined. For example, an operation to authenticate only edge devices 102 that continue the distribution sequence, an operation to authenticate all or a group of edge devices 102, and the like are determined.
  • the distribution control device 101 selects the cancellation determination process to be executed according to the type of metric. For example, if the metric is the presence or absence of an execution result file associated with software installation, or if the metric is the version of the information content, a command problem or a high load on the edge device 102 may be the cause of the metric discrepancy. Therefore, the cancellation determination process shown in FIG. 19 is executed. If the metric is the acquisition rate of the information content, the cause of the metric discrepancy may be a poor network connection, a high load on the edge device 102, or the like, so the cancellation determination process shown in FIG. 20 is executed.
  • the worker uses the worker terminal 104 to perform an authentication operation and a cancellation operation (step S1716), and transmits an authentication response and a cancellation request to the distribution control device 101 (step S1717).
  • an authentication operation and a cancellation operation step S1716
  • transmits an authentication response and a cancellation request to the distribution control device 101 step S1717.
  • the operator has selected "stop delivery sequence of failed edge device and authenticate delivery sequence of other edge device".
  • the distribution control device 101 transmits a cancellation instruction to the edge device 102 to be canceled (step S1718).
  • the distribution control device 101 also transmits a status update request to the edge device 102 to be continued (step S1719).
  • a stop instruction is transmitted to the edge device (B) 102 and a status update request is transmitted to the edge device (A) 102 .
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S1720).
  • step S1715 only an authentication request is sent in step S1715, only an authentication operation is performed in step S1716, and only an authentication response is performed in step S1716. Also, no stop instruction is sent.
  • the distribution control device 101 identifies the cause of failure for the edge device 102 whose metric does not match the correct value, and proposes a cancellation operation of the distribution sequence and an authentication operation according to the identified cause of failure. .
  • it is possible to efficiently control the suspension of the distribution sequence, so that the number of man-hours and work hours required for the control of the distribution sequence can be reduced.
  • Example 4 the cancellation determination process is executed before starting the distribution sequence.
  • the fourth embodiment will be described below, focusing on the differences from the first embodiment.
  • the configuration of the system of Example 4 is the same as that of Example 1.
  • the hardware configuration and software configuration of the distribution control device 101 and the edge device 102 of the fourth embodiment are the same as those of the first embodiment.
  • the data structures of the correct metric value management information 221 and the edge device management information 222 of the fourth embodiment are the same as those of the first embodiment.
  • 21A and 21B are sequence diagrams explaining the flow of processing in the system of the fourth embodiment.
  • Step S2101 The worker uses the worker terminal 104 to transmit a distribution sequence registration request to the distribution control device 101 (step S2101).
  • Step S2101 is the same processing as step S601.
  • Step S2102 The worker uses the worker terminal 104 to send a distribution sequence start instruction to the distribution control device 101 (step S2102).
  • Step S2102 is the same as the processing in step S602.
  • the distribution control device 101 When the distribution control device 101 receives the distribution sequence start instruction, it measures the bandwidth of each edge device 102 (step S2103). For example, the distribution control device 101 measures the bandwidth using a ping transmission function or the like.
  • the distribution control device 101 executes cancellation determination processing based on the band measurement result (step S2104).
  • FIG. 22 is a flowchart illustrating an example of a cancellation determination process executed by the distribution control device 101 of the fourth embodiment.
  • the cancellation determination process is performed by the processor 201 executing the cancellation determination program 211 .
  • the cancellation determination process shown in FIG. 22 is executed once for all edge devices 102 .
  • the distribution control device 101 determines whether the size of the file to be transmitted to the edge device 102 is equal to or larger than the threshold (step S2201).
  • the file transmitted to the edge device 102 is the file transmitted from the distribution control device 101 at the start of the distribution sequence.
  • the size of the software and information content may also be taken into account.
  • the distribution control device 101 terminates the cancellation determination process.
  • the distribution control device 101 starts loop processing of the edge device 102 (step S2202).
  • the distribution control device 101 selects one edge device 102 from the edge devices 102 targeted for execution of the distribution sequence.
  • the distribution control device 101 determines whether the bandwidth of the selected edge device 102 is equal to or greater than the threshold (step S2203).
  • step S2203 If the bandwidth of the selected edge device 102 is equal to or greater than the threshold (YES in step S2203), the distribution control device 101 proceeds to step S2205.
  • the distribution control device 101 registers the edge device 102 in the cancellation target list (step S2204), and then proceeds to step S2205.
  • step S2205 the distribution control device 101 determines whether or not processing has been completed for all edge devices 102 targeted for execution of the distribution sequence (step S2205).
  • step S2205 If processing has not been completed for all the edge devices 102 targeted for execution of the distribution sequence (NO in step S2205), the distribution control device 101 returns to step S2202 and executes similar processing.
  • the distribution control device 101 determines the ratio of the edge devices 102 targeted for termination to the number of edge devices 102 targeted for execution of the distribution sequence. is greater than or equal to the threshold (step S2206).
  • the distribution control device 101 determines a recommended operation according to the "common" factor (step S2207). After that, the distribution control device 101 ends the cancellation determination process. For example, the distribution control device 101 determines to stop execution of the distribution sequence for all edge devices 102 targeted for execution of the distribution sequence.
  • the distribution control device 101 determines a recommended operation according to the factor "unique to device" (step S2208). After that, the distribution control device 101 ends the cancellation determination process. For example, the distribution control device 101 determines to stop execution of the distribution sequence for the edge devices 102 registered in the stop target list.
  • the distribution control device 101 transmits the result of the cancellation determination process to the worker terminal 104 (step S2105).
  • the results include a recommended operation, a list of objects to be canceled, and the like.
  • step S2106 The worker performs a cancel operation using the worker terminal 104.
  • step S2106 The processing in step S2106 is the same as the processing in step S607.
  • the worker terminal 104 transmits a cancellation request according to the worker's operation to the distribution control device 101 (step S2107).
  • the abort request includes information on the operated button.
  • the distribution control device 101 identifies the edge device 102 to be canceled according to the cancellation request, distributes the file to the edge devices 102 other than the identified edge device 102, and transmits a status update request (step S2108). ).
  • the distribution control device 10 When the execution of the distribution sequence of a specific edge device 102 is selected to be stopped, the distribution control device 10 distributes the file to edge devices 102 other than the specific edge device 102 and also transmits a status update request. At this time, the distribution control device 101 updates the entry corresponding to the specific edge device 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 If it is selected to stop executing the distribution sequence of all edge devices 102 , the distribution control device 101 does not transmit anything to all edge devices 102 . At this time, the distribution control device 101 updates entries corresponding to all edge devices 102 in the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 refers to the edge device management information 222, identifies a group including a specific edge device 102, distributes the file to the edge devices 102 other than the edge devices 102 belonging to the group, It also requests status updates. At this time, the distribution control device 101 updates the entry corresponding to the edge device 102 belonging to the group of the edge device management information 222 . Specifically, the distribution control device 101 sets the distribution sequence execution result 502 to “failure” and sets the defect index 503 to “connection state”.
  • the distribution control device 101 distributes the file to all edge devices 102 and requests status update.
  • step S2105 the processing from step S2105 to step S2107 is not executed.
  • the distribution control device 101 distributes the file only to the edge device (A) 102 and transmits the status update request.
  • the edge device 102 transmits a status update response to the distribution control device 101 in response to the file distribution and status update request (step S2109).
  • the edge device 102 executes the command in a predetermined phase (step S2110), and transmits a command completion notice to the distribution control device 101 (step S2111).
  • the distribution control device 101 Upon receiving the command completion notification, the distribution control device 101 transmits an authentication request to the worker terminal 104 (step S2112).
  • the worker uses the worker terminal 104 to perform an authentication operation (step S2113), and transmits an authentication response to the distribution control device 101 (step S2114).
  • the distribution control device 101 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S2115).
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S2116), and executes the command (step S2117).
  • the edge device 102 transmits the metric to the distribution control device 101 (step S2118).
  • the distribution control device 101 executes metric confirmation processing (step S2119) and transmits an authentication request to the worker terminal 104 (step S2120).
  • the worker uses the worker terminal 104 to perform an authentication operation (step S2121), and transmits an authentication response to the distribution control device 101 (step S2122).
  • the distribution control device 101 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S2123).
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S2124).
  • step S2110 to step S2124 is the same as the processing from step S610 to step S624.
  • the distribution control device 101 identifies the edge device 102 with insufficient bandwidth as the edge device 102 that may cause the distribution sequence to fail.
  • the distribution sequence can be efficiently controlled, so that the man-hours and work hours required for the control of the distribution sequence can be reduced.
  • Example 1 Each example of Example 1 to Example 4 can also be combined.
  • Example 2 and Example 4 are combined will be described.
  • FIGS. 23A and 23B are sequence diagrams explaining the flow of processing in the system of the modification.
  • Step S2301 is the same processing as step S601.
  • Step S2302 is the same as the processing in step S602.
  • step S2303 When the distribution control device 101 receives the distribution sequence start instruction, it measures the bandwidth of each edge device 102 (step S2303).
  • the processing in step S2303 is the same as the processing in step S2103.
  • the distribution control device 101 executes cancellation determination processing based on the band measurement result (step S2304).
  • the processing in step S2304 is the same as the processing in step S2104.
  • the distribution control device 101 transmits the result of the cancellation determination process to the worker terminal 104 (step S2305).
  • the processing in step S2305 is the same as the processing in step S2105.
  • step S2306 The worker performs a cancel operation using the worker terminal 104 (step S2306).
  • the processing in step S2306 is the same as the processing in step S607.
  • the operator terminal 104 transmits a cancellation request according to the operator's operation to the distribution control device 101 (step S2307).
  • the processing in step S2307 is the same as the processing in step S2107.
  • the distribution control device 101 identifies the edge device 102 to be canceled according to the cancellation request, distributes the file to the edge devices 102 other than the identified edge device 102, and transmits a status update request (step S2308). ).
  • the processing in step S2308 is the same as the processing in step S2108.
  • step S2305 the processing from step S2305 to step S2307 is not executed.
  • the edge device 102 does not exist in the cancellation target list. Accordingly, the file is distributed to each of edge device (A) 102 and edge device (B) 102, and a status update request is sent.
  • the edge device 102 transmits a status update response to the distribution control device 101 in response to the file distribution and status update request (step S2309).
  • the processing in step S2309 is the same as the processing in step S604.
  • the distribution control device 101 After receiving the status update response, the distribution control device 101 starts the cancellation determination process (step S2310).
  • the edge device 102 continuing the distribution sequence executes the command in a predetermined phase (step S2311) and transmits a command completion notice to the distribution control device 101 (step S2312).
  • the processing of steps S2311 and S2312 is the same as the processing of steps S610 and S611.
  • the distribution control device 101 executes cancellation determination processing based on the reception status of the command completion notification. Since the cancellation determination process is the same as the process described in the second embodiment, description thereof is omitted.
  • the distribution control device 101 transmits the result of the cancellation determination process and the authentication request to the worker terminal 104 (step S2313).
  • the processing in step S2313 is the same as the processing in step S1208.
  • the worker uses the worker terminal 104 to perform an authentication operation and a cancellation operation (step S2314), and transmits an authentication response and a cancellation request to the distribution control device 101 (step S2315).
  • the processing of steps S2314 and S2315 is the same as the processing of steps S1209 and S1210.
  • the distribution control device 101 transmits a cancellation instruction to the edge device 102 to be canceled (step S2316). Also, the distribution control device 101 transmits a status update request to the edge device 102 to be continued (step S2317).
  • the processing of steps S2316 and S2317 is the same as the processing of steps S1211 and S1212.
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S2318), and executes the command (step S2319).
  • the edge device 102 transmits the metric to the distribution control device 101 (step S2320).
  • the processing of steps S2318, S2319, and S2320 is the same as the processing of steps S616, S617, and S618.
  • the distribution control device 101 executes metric confirmation processing (step S2321) and transmits an authentication request to the worker terminal 104 (step S2322).
  • the metric confirmation process is the same as in the first embodiment.
  • the worker uses the worker terminal 104 to perform an authentication operation (step S2323), and transmits an authentication response to the distribution control device 101 (step S2324).
  • the processing of steps S2323 and S2324 is the same as the processing of steps S621 and S622.
  • step S2325 After receiving the authentication response, the distribution control device 101 transmits a status update request to the edge device 102 (step S2325).
  • the processing of step S2325 is the same as the processing of step S623.
  • the edge device 102 transmits a status update response to the distribution control device 101 (step S2326).
  • the processing of step S2326 is the same as the processing of step S624.
  • the command completion notification could not be received from the edge device (B) 102, so the distribution control device 101 transmits a stop instruction to the edge device (B) 102.
  • the present invention is not limited to the above-described embodiments, and includes various modifications. Further, for example, the above-described embodiments are detailed descriptions of the configurations for easy understanding of the present invention, and are not necessarily limited to those having all the described configurations. Moreover, it is possible to add, delete, or replace a part of the configuration of each embodiment with another configuration.
  • part or all of the above configurations, functions, processing units, processing means, etc. may be realized by hardware, for example, by designing them with an integrated circuit.
  • the present invention can also be implemented by software program code that implements the functions of the embodiments.
  • a computer is provided with a storage medium recording the program code, and a processor included in the computer reads the program code stored in the storage medium.
  • the program code itself read from the storage medium implements the functions of the above-described embodiments, and the program code itself and the storage medium storing it constitute the present invention.
  • Examples of storage media for supplying such program code include flexible disks, CD-ROMs, DVD-ROMs, hard disks, SSDs (Solid State Drives), optical disks, magneto-optical disks, CD-Rs, magnetic tapes, A nonvolatile memory card, ROM, or the like is used.
  • program code that implements the functions described in this embodiment can be implemented in a wide range of programs or script languages, such as assembler, C/C++, perl, Shell, PHP, Python, and Java.
  • the program code of the software that realizes the functions of the embodiment can be stored in storage means such as a hard disk or memory of a computer or in a storage medium such as a CD-RW or CD-R.
  • a processor provided in the computer may read and execute the program code stored in the storage means or the storage medium.
  • control lines and information lines indicate those that are considered necessary for explanation, and not all the control lines and information lines are necessarily indicated on the product. All configurations may be interconnected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Computer And Data Communications (AREA)

Abstract

計算機システムは、複数のエッジ機器と接続し、複数のエッジ機器に対する情報配信処理の開始後、複数のエッジ機器の各々の状態を監視し、複数のエッジ機器の各々の状態の監視結果に基づいて、情報配信処理が失敗したエッジ機器および失敗要因を特定する処理を実行し、処理の結果に基づいて、情報配信処理の中止に関する操作内容を提示する。

Description

情報配信処理の制御方法、計算機システム、および計算機 参照による取り込み
 本出願は、2021年8月26日に出願された日本特許出願第2021-137894号の優先権を主張し、その内容を参照することにより、本出願に取り込む。
 本発明は、エッジ機器に対する情報の配信を制御する方法、システム、および装置に関するものである。
 近年、工場機器、鉄道車両、および自動車等のエッジ機器のデジタル化の進展に伴って、ネットワークを介してエッジ機器にソフトウェア、情報コンテンツ、アプリケーション、および機能等の情報の配信/配備が行われる。以下の説明では、ネットワークを介したエッジ機器に対する情報の配信/配備を情報配信と記載する。
 情報配信の失敗に対応する技術として特許文献1に記載の技術が知られている。特許文献1には、「ファームウェアの更新処理を、複数のIoT機器を区分する複数のグループ間にて互いに異なるタイミングにて実行する。そして、ウェア更新処理に失敗したグループが発生した場合は、ファームウェア未更新の残余のグループに対するファームウェア更新処理の実行を制限する」ファームウェア更新システムが開示されている。
特開2020-154634号公報
 情報配信の一連の処理、すなわち配信シーケンスを、複数のエッジ機器に対して一括して行うことによって、作業者の工数を抑えながら、大量のエッジ機器への情報配信が可能となる。例えば、作業者は、複数のエッジ機器への配信シーケンス開始操作を一度に行うことができる。また、例えば、ソフトウェアのエッジ機器へのインストール等に伴って作業者の承認が必要な場合、作業者は、複数のエッジ機器への承認操作を一度に行うことができる。
 しかし、上記の方式では、エッジ機器からソフトウェアのインストールの準備が完了した旨の通知が届かない場合、承認が行えず、配信シーケンスが失敗する。また、エッジ機器からソフトウェアのインストールが完了した旨の通知が届かない場合にも配信シーケンスが失敗する。配信シーケンスの失敗要因は様々存在する。例えば、通信帯域の逼迫、通信の切断、エッジ機器の負荷増大によるコマンド実行の失敗、ソフトウェアの不具合によるインストールの失敗等がある。
 配信シーケンスの失敗要因に関する情報は作業者にとって有益であり、作業者は、失敗要因に応じて配信シーケンスを継続および中止の判断を行うことができる。特許文献1では失敗要因は特定されていない。
 本発明の目的は、配信シーケンスの失敗要因を特定し、作業者に配信シーケンスの継続および中止の判断に有用な情報を提供する方法およびシステムを提供する。
 本願において開示される発明の代表的な一例を示せば以下の通りである。すなわち、複数のエッジ機器と接続する計算機システムが実行する、前記エッジ機器に対する情報配信処理の制御方法であって、前記計算機システムは、プロセッサ、前記プロセッサに接続される記憶装置、および前記プロセッサに接続されるネットワークインタフェースを有する計算機を含み、前記情報配信処理の制御方法は、前記プロセッサが、前記複数のエッジ機器に対する前記情報配信処理の開始後、前記複数のエッジ機器の各々の状態を監視する第1のステップと、前記プロセッサが、前記複数のエッジ機器の各々の状態の監視結果に基づいて、前記情報配信処理が失敗した前記エッジ機器および失敗要因を特定する第1処理を実行する第2のステップと、前記プロセッサが、前記第1処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示する第3のステップと、を含む。
 本発明によれば、配信シーケンスの失敗要因を特定し、作業者に配信シーケンスの継続および中止の判断に有用な情報を提供できる。上記した以外の課題、構成および効果は、以下の実施例の説明により明らかにされる。
実施例1のシステムの構成例を示す図である。 実施例1の配信制御装置の構成例を示す図である。 実施例1のエッジ機器の構成例を示す図である。 実施例1のメトリック正解値管理情報のデータ構造の一例を示す図である。 実施例1のエッジ機器管理情報のデータ構造の一例を示す図である。 実施例1のシステムにおける処理の流れを説明するシーケンス図である。 実施例1のシステムにおける処理の流れを説明するシーケンス図である。 実施例1の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例1の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例1の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例1の作業者用端末に表示される画面の一例を示す図である。 実施例1の作業者用端末に表示される画面の一例を示す図である。 実施例1の配信制御装置が実行するメトリック確認処理の一例を説明するフローチャートである。 実施例2のシステムにおける処理の流れを説明するシーケンス図である。 実施例2の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例2の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例2の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例2の作業者用端末に表示される画面の一例を示す図である。 実施例3のシステムにおける処理の流れを説明するシーケンス図である。 実施例3の配信制御装置が実行するメトリック確認処理の一例を説明するフローチャートである。 実施例3の配信制御装置が実行するメトリック確認処理の一例を説明するフローチャートである。 実施例3の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例3の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 実施例4のシステムにおける処理の流れを説明するシーケンス図である。 実施例4のシステムにおける処理の流れを説明するシーケンス図である。 実施例4の配信制御装置が実行する中止判定処理の一例を説明するフローチャートである。 変形例のシステムにおける処理の流れを説明するシーケンス図である。 変形例のシステムにおける処理の流れを説明するシーケンス図である。
 以下、本発明の実施例を、図面を用いて説明する。ただし、本発明は以下に示す実施例の記載内容に限定して解釈されるものではない。本発明の思想ないし趣旨から逸脱しない範囲で、その具体的構成を変更し得ることは当業者であれば容易に理解される。
 以下に説明する発明の構成において、同一または類似する構成または機能には同一の符号を付し、重複する説明は省略する。
 本明細書等における「第1」、「第2」、「第3」等の表記は、構成要素を識別するために付するものであり、必ずしも、数または順序を限定するものではない。
 図面等において示す各構成の位置、大きさ、形状、および範囲等は、発明の理解を容易にするため、実際の位置、大きさ、形状、および範囲等を表していない場合がある。したがって、本発明では、図面等に開示された位置、大きさ、形状、および範囲等に限定されない。
 図1は、実施例1のシステムの構成例を示す図である。
 システムは、配信制御装置101、エッジ機器102、配信サーバ103、および作業者用端末104から構成される。配信制御装置101、エッジ機器102、配信サーバ103、および作業者用端末104は、ネットワーク105を介して接続される。ネットワーク105は、WAN(Wide Area Network)およびLAN(Local Area Network)であり、接続方式は有線および無線のいずれでもよい。
 エッジ機器102は、情報配信を受ける機器であり、例えば、工場機器、鉄道車両、および自動車等である。配信制御装置101は、情報配信を制御する計算機である。配信サーバ103は、情報配信において、エッジ機器102に配信するソフトウェアおよび情報コンテンツ等を管理する計算機である。作業者用端末104は、情報配信を行う作業者が操作する端末である。作業者は、作業者用端末104を用いて、配信制御装置101を操作する。
 なお、配信サーバ103および配信制御装置101が有する機能は、複数の計算機から構成される計算機システムを用いて実現してもよい。また、配信サーバ103および配信制御装置101の各々の機能をいずれかの計算機にまとめてもよい。
 図2は、実施例1の配信制御装置101の構成例を示す図である。
 配信制御装置101は、プロセッサ201、ネットワークインタフェース202、主記憶装置203、および副記憶装置204を有する。各ハードウェア要素は内部バスを介して互いに接続される。
 配信制御装置101が有する機能は、プロセッサ201が主記憶装置203に格納されるプログラムを実行することによって実現される。以下で説明において、配信制御装置101を主語に処理を説明する場合、プロセッサ201がプログラムを実行していることを示す。
 ネットワークインタフェース202は、ネットワークを介して外部装置と通信する。
 主記憶装置203は、メモリ等の記憶装置であり、プロセッサ201が実行するプログラムおよびプログラムが使用する情報を格納する。また、主記憶装置203は、ワークエリアとしても用いられる。
 副記憶装置204は、HDD(Hard Disk Drive)およびSSD(Solid State Drive)等の記憶装置であり、データを永続的に格納する。主記憶装置203に格納されるプログラムおよび情報は、副記憶装置204に格納されてもよい。この場合、プロセッサ201が副記憶装置204からプログラムおよび情報を読み出し、主記憶装置203にロードする。
 主記憶装置203は、中止判定プログラム211、メトリック確認プログラム212、メトリック正解値管理情報221、およびエッジ機器管理情報222を格納する。メトリック正解値管理情報221およびエッジ機器管理情報222のデータ構造、ならびにプログラムによって実現される処理については後述する。
 配信サーバ103および作業者用端末104のハードウェア構成は、配信制御装置101と同一であるため、説明は省略する。
 図3は、実施例1のエッジ機器102の構成例を示す図である。
 エッジ機器102は、プロセッサ301、ネットワークインタフェース302、主記憶装置303、および副記憶装置304を有する。各ハードウェア要素は内部バスを介して互いに接続される。なお、エッジ機器102は、駆動装置等、図示しないハードウェア要素を含んでもよい。
 プロセッサ301、ネットワークインタフェース302、主記憶装置303、および副記憶装置304は、プロセッサ201、ネットワークインタフェース202、主記憶装置203、および副記憶装置204と同一のハードウェアである。
 エッジ機器102が有する機能は、プロセッサ301が主記憶装置303に格納されるプログラムを実行することによって実現される。以下で説明において、エッジ機器102を主語に処理を説明する場合、プロセッサ301がプログラムを実行していることを示す。
 主記憶装置303は、コマンド実行プログラム311およびメトリック送信プログラム312を格納する。
 図4は、実施例1のメトリック正解値管理情報221のデータ構造の一例を示す図である。
 メトリック正解値管理情報221は、テーブル形式の情報であり、メトリック種別401および正解値402を含むエントリを格納する。一つのエントリが一つのメトリック種別に対応する。なお、エントリに含まれるフィールドは前述したものに限定されない。
 メトリック種別401は、情報配信の進捗状態を示すメトリックの種別を格納するフィールドである。図4に示すメトリック正解値管理情報221には、情報コンテンツの取得率および情報コンテンツのバージョンの二つのメトリック種別のエントリが格納される。
 正解値402は、メトリック種別に対応するメトリックの正解値を格納するフィールドである。情報コンテンツの取得率に対応するエントリの正解値402には100%が格納され、情報コンテンツのバージョンに対応するエントリの正解値402には2.0が格納される。
 図5は、実施例1のエッジ機器管理情報222のデータ構造の一例を示す図である。
 エッジ機器管理情報222は、テーブル形式の情報であり、エッジ機器ID501、配信シーケンス実行結果502、不良指標503、およびグループID504を含むエントリを格納する。一つのエントリが一つのエッジ機器102に対応する。なお、エントリに含まれるフィールドは前述したものに限定されない。
 エッジ機器ID501は、エッジ機器102の識別情報を格納するフィールドである。
 配信シーケンス実行結果502は、エッジ機器102に対する配信シーケンスの実行結果を格納するフィールドである。配信シーケンス実行結果502には、配信シーケンスが成功したことを示す「成功」および配信シーケンスが失敗したことを示す「失敗」のいずれかが格納される。
 不良指標503は、判定に用いた指標に関する情報を格納するフィールドである。例えば、通信に関する指標の場合、不良指標503には「接続状態」が格納され、負荷に関する指標の場合、不良指標503には「負荷」が格納される。
 グループID504は、配信シーケンスの実行単位であるグループの識別情報を格納するフィールドである。作業者が予めグループを設定している場合、グループID504にはグループの識別情報が格納される。
 なお、グループの識別情報の代わりに、ファームウェアのバージョン、または、エッジ機器の種別等が格納されてもよい。この場合、ファームウェアまたは種別が同一のエッジ機器102を要素とするグループが構成される。
 図6Aおよび図6Bは、実施例1のシステムにおける処理の流れを説明するシーケンス図である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス登録要求を送信する(ステップS601)。例えば、作業者は、配信シーケンス登録要求を送信することによって、配信シーケンスを構成するフェーズ群、作業者の承認を必要とするフェーズ、エッジ機器102が送信するメトリック、各フェーズでエッジ機器102が実行するコマンド、メトリックの正解値、ならびに、インストールするソフトウェア、情報コンテンツ、およびアプリケーションコンテナ等の必要資材を設定する。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス開始指示を送信する(ステップS602)。
 配信制御装置101は、配信シーケンス開始指示を受信した場合、配信シーケンスを開始する。ステップS603からステップS624までの処理が配信シーケンスである。まず、配信制御装置101は、エッジ機器102に対してファイルを配布し、また、ステータス更新要求を送信する(ステップS603)。また、配信制御装置101は、中止判定処理を開始する(ステップS604)。エッジ機器102には、ファイルを介して、配信シーケンスを構成するフェーズ群、送信するメトリック、各フェーズでエッジ機器102が実行するコマンド、および必要資材等が通知される。
 エッジ機器102は、ファイル配布およびステータス更新要求に対して、配信制御装置101にステータス更新応答を送信する(ステップS605)。
 本実施例では、配信制御装置101は、エッジ機器(A)102からのステータス更新応答を受信できたが、エッジ機器(B)102からのステータス更新応答を受信できなかったものとする。ステータス更新応答を受信できなかった要因としては、ファイル/ステータス更新要求の欠落、およびステータス更新応答の欠落等が考えられる。
 配信制御装置101は、中止判定処理では、ステータス更新応答の受信状態に基づいて配信シーケンスの成否を判定し、また、失敗要因を特定する。ここで、中止判定処理の詳細について説明する。図7、図8、および図9は、実施例1の配信制御装置101が実行する中止判定処理の一例を説明するフローチャートである。中止判定処理は、中止判定プログラム211を実行するプロセッサ201によって行われる。
 まず、図7に示す中止判定処理について説明する。図7に示す中止判定処理は、エッジ機器102ごとに実行される。図7に示す中止判定処理では、エッジ機器102からのステータス更新応答の有無に基づいて、配信シーケンスの成否が判定され、エッジ機器102から取得される評価指標(接続状態指標および負荷指標)に基づいて、失敗要因が特定される。
 配信制御装置101は、所定期間内にエッジ機器102からステータス更新応答を受信したか否かを判定する(ステップS701)。
 所定期間内にエッジ機器102からステータス更新応答を受信した場合(ステップS701がYES)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にエッジ機器102からステータス更新応答を受信していない場合(ステップS701がNO)、配信制御装置101は、配信シーケンスの失敗と判定し、失敗要因を特定する。まず、配信制御装置101は、エッジ機器102の接続状態が良好であるか否かを判定する(ステップS702)。具体的には、以下のような処理が実行される。
 (S702-1)配信制御装置101は、エッジ機器102の接続状態を評価する指標(接続状態指標)を算出する。
 例えば、エッジ機器102が周期的に配信制御装置101にKeep Aliveメッセージを送信している場合、配信制御装置101は、当該メッセージの受信の有無を接続状態指標として算出する。例えば、エッジ機器102が通信品質を示す指標を計測している場合、エッジ機器102は、最新の指標または指標の平均値等を接続状態指標として算出する。
 (S702-2)配信制御装置101は、接続状態指標に基づいて、エッジ機器102の接続状態を判定する。
 例えば、最新のKeep Aliveメッセージを受信している場合、配信制御装置101は、エッジ機器102の接続状態が良好である、と判定する。例えば、最新の通信品質の指標が閾値より大きい場合、配信制御装置101は、エッジ機器102の接続状態が良好である、と判定する。
 以上がステップS702の処理の説明である。
 エッジ機器102の接続状態が良好でない場合(ステップS702がNO)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS703)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 エッジ機器102の接続状態が良好である場合(ステップS702がYES)、配信制御装置101は、エッジ機器102の負荷が高いか否かを判定する(ステップS704)。
 具体的には、配信制御装置101は、エッジ機器102の負荷を評価する指標(負荷指標)を算出し、負荷指標に基づいて、エッジ機器102の負荷が高いか否かを判定する。例えば、配信制御装置101は、周期的に、エッジ機器102からプロセッサ301の使用率を取得し、最新の使用率または使用率の平均値等を負荷指標として算出する。プロセッサ301の使用率が閾値より大きい場合、配信制御装置101は、エッジ機器102の負荷が高い、と判定する。
 エッジ機器102の負荷が高くない場合(ステップS704がNO)、配信制御装置101は、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS705)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 エッジ機器102の負荷が高い場合(ステップS704がYES)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS706)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 配信シーケンスが失敗したエッジ機器102の接続状態が不良の場合、または負荷が高い場合、エッジ機器102固有の要因によって配信シーケンスの失敗が生じたものとして中止対象リストに記録される。また、接続状態が良好かつ負荷が低い場合、エッジ機器102固有の要因以外の要因によって配信シーケンスの失敗が生じたものとして中止対象リストに登録される。
 全てのエッジ機器102について中止判定処理が終了した後、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する。例えば、以下のような推奨操作が考えられる。
 (1)エッジ機器102固有の要因によって配信シーケンスが失敗したエッジ機器102が存在する場合、配信制御装置101は、当該エッジ機器102の配信シーケンスの中止を作業者に提案する。この場合、他のエッジ機器102の配信シーケンスは継続する。
 (2)エッジ機器102固有の要因以外の要因で配信シーケンスが失敗したエッジ機器102が存在する場合、他のエッジ機器102にも配信シーケンスの失敗が生じる可能性がある。そこで、配信制御装置101は、グループまたは全体の配信シーケンスの中止を作業者に提案する。
 (3)配信シーケンスが失敗したエッジ機器102の要因が混在する場合、配信制御装置101は、各要因に属するエッジ機器102の比率に基づいて推奨操作を決定する。例えば、要因「その他」に属するエッジ機器102の比率が高い場合、配信制御装置101は、グループまたは全体の配信シーケンスの中止を作業者に提案する。
 このように、配信シーケンスの失敗要因とともに、推奨する操作を提案することによって、配信シーケンスの効率的な制御を実現できる。これによって、配信シーケンスの制御に要する作業者の工数および作業時間を削減することができる。
 次に、図8に示す中止判定処理について説明する。図8に示す中止判定処理は、エッジ機器102ごとに実行される。図8に示す中止判定処理では、エッジ機器102からのステータス更新応答の有無に基づいて、配信シーケンスの成否が判定され、複数のエッジ機器102から取得される評価指標に基づいて失敗要因が特定される。
 配信制御装置101は、各エッジ機器102から取得したプロセッサ301の使用率等の負荷指標を用いて、負荷指標の代表値を算出する(ステップS801)。
 負荷指標の代表値は、負荷指標の平均値、中央値、またはxパーセント値(x-パーセンタイル)(例えば、xは90)等である。
 配信制御装置101は、各エッジ機器102の接続状態指標を用いて、接続状態指標の代表値を算出する(ステップS802)。
 例えば、配信制御装置101は、一定期間内に各エッジ機器102から送信されるKeep Aliveメッセージの受信回数、または、通信品質等の接続状態指標を用いて、接続状態指標の代表値を算出する。接続状態指標の代表値は、接続状態指標の平均値、中央値、またはxパーセント値(x-パーセンタイル)(例えば、xは90)等である。
 配信制御装置101は、所定期間内にエッジ機器102からステータス更新応答を受信したか否かを判定する(ステップS803)。ステップS803の処理はステップS701の処理と同一である。
 所定期間内にエッジ機器102からステータス更新応答を受信した場合(ステップS803がYES)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にエッジ機器102からステータス更新応答を受信していない場合(ステップS803がNO)、配信制御装置101は、エッジ機器102の接続状態が良好であるか否かを判定する(ステップS804)。具体的には、以下のような処理が実行される。
 (S804-1)配信制御装置101は、エッジ機器102の接続状態指標を算出する。
 例えば、エッジ機器102が周期的に配信制御装置101にKeep Aliveメッセージを送信している場合、配信制御装置101は、一定期間内の当該メッセージの受信回数等を接続状態指標として算出する。例えば、エッジ機器102が通信品質を示す指標を計測している場合、エッジ機器102は、最新の当該指標または当該指標の平均値等を接続状態指標として算出する。
 (S804-2)配信制御装置101は、接続状態指標および接続状態指標の代表値との比較結果に基づいて、エッジ機器102の接続状態を判定する。
 例えば、一定期間内に受信したKeep Aliveメッセージの受信回数が接続状態指標の代表値以上の場合、配信制御装置101は、エッジ機器102の接続状態が良好である、と判定する。例えば、接続状態指標が接続状態指標の代表値以上の場合、配信制御装置101は、エッジ機器102の接続状態が良好である、と判定する。
 エッジ機器102の接続状態が良好でない場合(ステップS804がNO)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS805)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 エッジ機器102の接続状態が良好である場合(ステップS804がYES)、配信制御装置101は、エッジ機器102の負荷が高いか否かを判定する(ステップS806)。
 具体的には、配信制御装置101は、エッジ機器102の負荷指標を算出し、負荷指標および負荷指標の代表値の比較結果に基づいて、エッジ機器102の負荷が高いか否かを判定する。
 例えば、配信制御装置101は、周期的に、エッジ機器102からプロセッサ301の使用率を取得し、最新の使用率または使用率の平均値等を負荷指標として算出する。プロセッサ301の使用率が負荷指標の代表値以上の場合、配信制御装置101は、エッジ機器102の負荷が高い、と判定する。
 エッジ機器102の負荷が高くない場合(ステップS806がNO)、配信制御装置101は、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS807)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 エッジ機器102の負荷が高い場合(ステップS806がYES)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS808)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 全てのエッジ機器102について中止判定処理が終了した後、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する。推奨操作の決定方法は図7で説明した方法と同一である。
 エッジ機器102の評価指標と、評価指標の代表値との比較結果に基づいて、エッジ機器102の接続状態および負荷を判定することによって、エッジ機器102を相対的に評価できる。例えば、他のエッジ機器102と比較して、極端に接続状態が悪い、または、極端に負荷が高いエッジ機器102については機器特有の要因として記録する。
 次に、図9に示す中止判定処理について説明する。図9に示す中止判定処理は、全エッジ機器102に対して1回実行される。図9に示す中止判定処理では、各エッジ機器102から取得される評価指標の代表値と閾値との比較結果に基づいて失敗要因が特定される。
 配信制御装置101は、負荷指標の代表値を算出し(ステップS901)、また、接続状態指標の代表値を算出する(ステップS902)。ステップS901およびステップS902の処理は、ステップS801およびステップS802の処理と同一である。
 配信制御装置101は、所定期間内にステータス更新応答を受信していないエッジ機器102が存在するか否かを判定する(ステップS903)。すなわち、配信シーケンスが失敗したエッジ機器102が存在するか否かが判定される。
 所定期間内にステータス更新応答を受信していないエッジ機器102が存在しない場合(ステップS903がNO)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222の各エッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にステータス更新応答を受信していないエッジ機器102が存在する場合(ステップS903がYES)、配信制御装置101は、接続状態指標の代表値が閾値以上であるか否かを判定する(ステップS904)。
 接続状態指標の代表値が閾値より小さい場合(ステップS904がNO)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS905)。その後、配信制御装置101はステップS909に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 接続状態指標の代表値が閾値以上である場合(ステップS904がYES)、配信制御装置101は、負荷指標の代表値が閾値以上であるか否かを判定する(ステップS906)。
 負荷指標の代表値が閾値以上である場合(ステップS906がYES)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS907)。その後、配信制御装置101はステップS909に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 負荷指標の代表値が閾値より小さい場合(ステップS906がNO)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS908)。その後、配信制御装置101はステップS909に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 ステップS909では、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する(ステップS909)。その後、配信制御装置101は中止判定処理を終了する。例えば、以下のような推奨操作が考えられる。
 (1)要因が「共通」であるエッジ機器102が存在する場合、配信制御装置101は、グループまたは全体の配信シーケンスの中止を作業者に提案する。
 (2)要因が「その他」であるエッジ機器102が存在する場合、配信制御装置101は、当該エッジ機器102の配信シーケンスの中止を作業者に提案する。この場合、他のエッジ機器102の配信シーケンスは継続する。
 (3)配信シーケンスが失敗したエッジ機器102の要因が混在する場合、配信制御装置101は、各要因に属するエッジ機器102の比率に基づいて推奨操作を決定する。例えば、要因「その他」に属するエッジ機器102の比率が高い場合、配信制御装置101は、グループまたは全体の配信シーケンスの中止を作業者に提案する。
 評価指標の代表値と、閾値との比較結果に基づいて、エッジ機器102の接続状態および負荷を判定することによって、システム全体を評価できる。また、図9に示す中止判定処理は、図7および図8に示すようなエッジ機器102単位の処理より計算量を削減できる。
 以上が中止判定処理の説明である。図6Aの説明に戻る。
 配信制御装置101は、作業者用端末104に中止判定処理の結果を送信する(ステップS606)。当該結果には、エッジ機器管理情報222、推奨操作、および中止対象リスト等が含まれる。
 作業者用端末104は、中止判定処理の結果に基づいて画面を提示し、作業者の中止操作を受け付ける。ここで、作業者に提示される画面について説明する。図10Aおよび図10Bは、実施例1の作業者用端末104に表示される画面の一例を示す図である。
 画面1000は、表示欄1001、1002、1003および選択欄1004を含む。
 表示欄1001は、各エッジ機器102の配信シーケンスの実行結果を表示する欄である。表示欄1001には、エッジ機器管理情報222に基づいて生成されるテーブル1010が表示される。
 表示欄1002は、特定された失敗要因を表示する欄である。表示欄1002には、特定された失敗要因の種別および数が表示される。作業者用端末104は、中止対象リストに基づいて表示欄1002への表示を行う。
 表示欄1003は、配信制御装置101が決定した推奨操作を表示する欄である。
 選択欄1004は、失敗した配信シーケンスに対する操作を選択するための欄である。選択欄1004には、操作を選択するためのボタンが表示される。作業者は、表示欄1001、1002、1003を参照し、選択欄1004に表示されるいずれかのボタンを押下することによって、配信シーケンスの中止を指示する。
 図10Aの選択欄1004には、失敗したエッジ機器102の配信シーケンスを中止する操作、全てのエッジ機器102の配信シーケンスを中止する操作、および待機を実現するボタンが表示される。待機は一定時間待機した後、再度中止判定処理を実行させるための操作である。図10Bの選択欄1004には、さらに、失敗したエッジ機器102を含むグループに所属するエッジ機器102の配信シーケンスを中止する操作を実現するボタンが表示される。
 以上が画面の説明である。図6Aの説明に戻る。
 作業者は、作業者用端末104を用いて中止操作を行う(ステップS607)。具体的には、作業者は選択欄1004に表示されたいずれかのボタンを押下する。作業者用端末104は、中止操作に応じた中止要求を配信制御装置101に送信する(ステップS608)。中止要求には、押下されたボタンの情報が含まれる。
 配信制御装置101は、中止要求にしたがって中止対象のエッジ機器102を特定し、特定されたエッジ機器102に中止指示を送信する(ステップS609)。
 失敗したエッジ機器102の配信シーケンスの中止が選択された場合、配信制御装置10は、失敗したエッジ機器102のみに中止指示を送信する。全てのエッジ機器102の配信シーケンスの中止が選択された場合、配信制御装置101は、全てのエッジ機器102に中止指示を送信する。失敗したエッジ機器102を含むグループに所属するエッジ機器102の配信シーケンスの中止が選択された場合、配信制御装置101は、エッジ機器管理情報222を参照して、失敗したエッジ機器102を含むグループを特定し、当該グループに所属するエッジ機器102に中止指示を送信する。待機が選択された場合、配信制御装置101は、中止指示を送信せずに、一定時間経過した後、再度、中止判定処理を実行する。
 グループ単位で配信シーケンスを中止することによって、例えば、配信シーケンスがファームウェア更新である場合、グループ内のエッジ機器102のファームウェアのバージョンが異なる事態を回避できる。
 なお、中止対象リストにエッジ機器102が存在しない場合、すなわち、配信シーケンスが失敗したエッジ機器102が存在しない場合、ステップS606からステップS609までの処理は実行されない。
 ここでは、配信シーケンスが失敗したエッジ機器(B)102の配信シーケンスの中止が要求されたものとする。この場合、配信制御装置101は、エッジ機器(B)102に中止指示を送信する。
 配信シーケンスを継続しているエッジ機器102は、所定のフェーズでコマンドを実行し(ステップS610)、コマンド完了通知を配信制御装置101に送信する(ステップS611)。
 具体的には、エッジ機器102は、ステップS403において配信制御装置101から配布されたファイルに含まれるコマンドを実行する。実行されるコマンドは、例えば、ソフトウェアの解凍および情報コンテンツの取得等を実現するためのコマンドである。
 配信制御装置101は、コマンド完了通知を受信した場合、作業者用端末104に認証要求を送信する(ステップS612)。
 作業者は、作業者用端末104を用いて認証操作を行い(ステップS613)、作業者用端末104は、認証応答を配信制御装置101に送信する(ステップS614)。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS615)。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信し(ステップS616)、また、コマンドを実行する(ステップS617)。
 具体的には、エッジ機器102は、ステップS403において配信制御装置101から配布されたファイルに含まれるコマンドを実行する。実行されるコマンドは、例えば、ソフトウェアのインストールおよび情報コンテンツの配信準備等を実現するためのコマンドである。
 エッジ機器102は、配信制御装置101にメトリックを送信する(ステップS618)。
 例えば、エッジ機器102は、ソフトウェアのインストールに伴って生成される実行結果ファイルの有無、インストールされたソフトウェアのバージョン、情報コンテンツの取得率、および情報コンテンツのバージョン等をメトリックとして送信する。
 配信制御装置101は、メトリックを受信した場合、メトリック確認処理を実行する(ステップS619)。
 ここで、メトリック確認処理について説明する。図11は、実施例1の配信制御装置101が実行するメトリック確認処理の一例を説明するフローチャートである。メトリック確認処理は、メトリック確認プログラム212を実行するプロセッサ201によって行われる。また、メトリック確認処理は、エッジ機器102からメトリックを受信した場合に実行される。
 配信制御装置101は、メトリック正解値管理情報221を参照して、受信したメトリックの種別に対応するエントリから正解値を取得し、受信したメトリックが正解値に一致するか否かを判定する(ステップS1101)。
 受信したメトリックが正解値に一致しない場合(ステップS1101がNO)、配信制御装置101は、メトリック受信待ちに遷移し(ステップS1104)、メトリック確認処理を終了する。
 受信したメトリックが正解値に一致する場合(ステップS1101がYES)、配信制御装置101は、全てのエッジ機器102のメトリックについて確認が完了したか否かを判定する(ステップS1102)。すなわち、全てのエッジ機器102のメトリックが正解値に一致したことを確認したか否かが判定される。
 全てのエッジ機器102のメトリックについて確認が完了していない場合(ステップS1102がNO)、配信制御装置101は、メトリック受信待ちに遷移し(ステップS1104)、メトリック確認処理を終了する。
 全てのエッジ機器102のメトリックについて確認が完了した場合(ステップS1102がYES)、配信制御装置101は、作業者用端末104に認証要求を送信し(ステップS1103、S620)、メトリック確認処理を終了する。
 以上がメトリック確認処理の説明である。図6Bに戻る。
 作業者は、作業者用端末104を用いて認証操作を行い(ステップS621)、作業者用端末104は、認証応答を配信制御装置101に送信する(ステップS622)。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS623)。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信する(ステップS624)。
 実施例1によれば、配信制御装置101は、ファイル配布後のステータス更新応答が無いエッジ機器102について失敗要因を特定し、特定された失敗要因に応じて配信シーケンスの中止操作について提案を行う。これによって、配信シーケンスの中止を効率的に制御できるため、配信シーケンスの制御に要する作業者の工数および作業時間を削減することができる。
 実施例2では、中止判定処理の実行フェーズが実施例1と異なる。以下、実施例1との差異を中心に実施例2について説明する。
 実施例2のシステムの構成は実施例1と同一である。実施例2の配信制御装置101およびエッジ機器102のハードウェア構成およびソフトウェア構成は、実施例1と同一である。実施例2のメトリック正解値管理情報221およびエッジ機器管理情報222のデータ構造は実施例1と同一である。
 図12は、実施例2のシステムにおける処理の流れを説明するシーケンス図である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス登録要求を送信する(ステップS1201)。ステップS1201はステップS601と同一の処理である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス開始指示を送信する(ステップS1202)。ステップS1202はステップS602の処理と同一である。
 配信制御装置101は、配信シーケンス開始指示を受信した場合、エッジ機器102に対してファイルを配布し、また、ステータス更新要求を送信する(ステップS1203)。ステップS1203の処理はステップS603の処理と同一である。
 エッジ機器102は、ファイル配布およびステータス更新要求に対して、配信制御装置101にステータス更新応答を送信する(ステップS1204)。ステップS1204の処理はステップS604の処理と同一である。
 配信制御装置101は、ステータス更新応答を受信した後、中止判定処理を開始する(ステップS1205)。
 エッジ機器102は、所定のフェーズでコマンドを実行し(ステップS1206)、コマンド完了通知を配信制御装置101に送信する(ステップS1207)。ステップS1206およびステップS1207の処理は、ステップS610およびステップS611の処理と同一である。
 本実施例では、配信制御装置101は、エッジ機器(A)102からのコマンド完了通知を受信できたが、エッジ機器(B)102からのコマンド完了通知を受信できなかったものとする。コマンド完了通知を受信できなかった要因としては、コマンド実行の失敗、コマンドの実行時間が長くなること、コマンド完了通知の欠落等が考えられる。
 ここで、中止判定処理の詳細について説明する。図13、図14、および図15は、実施例2の配信制御装置101が実行する中止判定処理の一例を説明するフローチャートである。中止判定処理は、中止判定プログラム211を実行するプロセッサ201によって行われる。
 まず、図13に示す中止判定処理について説明する。図13に示す中止判定処理は、エッジ機器102ごとに実行される。図13に示す中止判定処理では、エッジ機器102からのコマンド完了通知の有無に基づいて、配信シーケンスの成否が判定され、エッジ機器102から取得される評価指標に基づいて失敗要因が特定される。
 配信制御装置101は、所定期間内にエッジ機器102からコマンド完了通知を受信したか否かを判定する(ステップS1301)。
 所定期間内にエッジ機器102からコマンド完了通知を受信した場合(ステップS1301がYES)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にエッジ機器102からコマンド管理用通知を受信していない場合(ステップS1301がNO)、配信制御装置101は、配信シーケンスの失敗と判定し、失敗要因を特定する。まず、配信制御装置101は、エッジ機器102の接続状態が良好であるか否かを判定する(ステップS1302)。ステップS1302の処理はステップS702の処理と同一である。
 エッジ機器102の接続状態が良好でない場合(ステップS1302がNO)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1303)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 エッジ機器102の接続状態が良好である場合(ステップS1302がYES)、配信制御装置101は、エッジ機器102の負荷が高いか否かを判定する(ステップS1304)。ステップS1304の処理はステップS704の処理と同一である。
 エッジ機器102の負荷が高くない場合(ステップS1304がNO)、配信制御装置101は、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1305)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 エッジ機器102の負荷が高い場合(ステップS1304がYES)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1306)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 配信シーケンスが失敗したエッジ機器102の接続状態が不良の場合、または負荷が高い場合、エッジ機器102固有の要因によって配信シーケンスの失敗が生じたものとして中止対象リストに記録される。また、接続状態が良好かつ負荷が低い場合、エッジ機器102固有の要因以外の要因によって配信シーケンスの失敗が生じたものとして中止対象リストに登録される。
 全てのエッジ機器102について中止判定処理が終了した後、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する。推奨操作のうち、配信シーケンスの中止に関する操作の決定方法は実施例1と同一である。実施例2では、認証操作の内容も決定される。例えば、配信シーケンスを継続するエッジ機器102のみを認証する操作、全てまたはグループのエッジ機器102を認証する操作等が決定される。
 次に、図14に示す中止判定処理について説明する。図14に示す中止判定処理は、エッジ機器102ごとに実行される。図14に示す中止判定処理では、エッジ機器102からのコマンド完了通知の有無に基づいて、配信シーケンスの成否が判定され、複数のエッジ機器102から取得される評価指標に基づいて失敗要因が特定される。
 配信制御装置101は、負荷指標の代表値を算出する(ステップS1401)。ステップS1401の処理はステップS801の処理と同一である。
 配信制御装置101は、接続状態指標の代表値を算出する(ステップS1402)。ステップS1402の処理はステップS802の処理と同一である。
 配信制御装置101は、所定期間内にエッジ機器102からコマンド完了通知を受信したか否かを判定する(ステップS1403)。ステップS1403の処理はステップS1301の処理と同一である。
 所定期間内にエッジ機器102からコマンド完了通知を受信した場合(ステップS1403がYES)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にエッジ機器102からコマンド完了通知を受信していない場合(ステップS1403がNO)、配信制御装置101は、エッジ機器102の接続状態が良好であるか否かを判定する(ステップS1404)。ステップS1404の処理はステップS804の処理と同一である。
 エッジ機器102の接続状態が良好でない場合(ステップS1404がNO)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1405)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 エッジ機器102の接続状態が良好である場合(ステップS1404がYES)、配信制御装置101は、エッジ機器102の負荷が高いか否かを判定する(ステップS1406)。ステップS1406の処理はステップS806の処理と同一である。
 エッジ機器102の負荷が高くない場合(ステップS1406がNO)、配信制御装置101は、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1407)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 エッジ機器102の負荷が高い場合(ステップS1406がYES)、配信制御装置101は、要因「機器特有」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1408)。その後、配信制御装置101は中止判定処理を終了する。
 このとき、配信制御装置101は、エッジ機器管理情報222のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 全てのエッジ機器102について中止判定処理が終了した後、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する。推奨操作の決定方法は図13で説明した方法と同一である。
 エッジ機器102の評価指標と、評価指標の代表値との比較結果に基づいて、エッジ機器102の接続状態および負荷を判定することによって、エッジ機器102を相対的に評価できる。例えば、他のエッジ機器102と比較して、極端に接続状態が悪い、または、極端に負荷が高いエッジ機器102については機器特有の要因として記録する。
 次に、図15に示す中止判定処理について説明する。図15に示す中止判定処理は、全エッジ機器102に対して1回実行される。図15に示す中止判定処理では、各エッジ機器102から取得される評価指標の代表値と閾値との比較結果に基づいて失敗の要因が特定される。
 配信制御装置101は、負荷指標の代表値を算出し(ステップS1501)、また、接続状態指標の代表値を算出する(ステップS1502)。ステップS1501およびステップS1502の処理は、ステップS801およびステップS802の処理と同一である。
 配信制御装置101は、所定期間内にコマンド完了通知を受信していないエッジ機器102が存在するか否かを判定する(ステップS1503)。
 所定期間内にコマンド完了通知を受信していないエッジ機器102が存在しない場合(ステップS1503がNO)、配信制御装置101は中止判定処理を終了する。このとき、配信制御装置101は、エッジ機器管理情報222の各エッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「成功」を設定する。
 所定期間内にコマンド完了通知を受信していないエッジ機器102が存在する場合(ステップS1503がYES)、配信制御装置101は、接続状態指標の代表値が閾値以上であるか否かを判定する(ステップS1504)。
 接続状態指標の代表値が閾値より小さい場合(ステップS1504がNO)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1505)。その後、配信制御装置101はステップS1509に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 接続状態指標の代表値が閾値以上である場合(ステップS1504がYES)、配信制御装置101は、負荷指標の代表値が閾値以上であるか否かを判定する(ステップS1506)。
 負荷指標の代表値が閾値以上である場合(ステップS1506がYES)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1507)。その後、配信制御装置101はステップS1509に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 負荷指標の代表値が閾値より小さい場合(ステップS1506がNO)、配信制御装置101は、配信シーケンスが失敗したエッジ機器102の数だけ、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1508)。その後、配信制御装置101はステップS1509に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 ステップS1509では、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する(ステップS1509)。その後、配信制御装置101は中止判定処理を終了する。
 推奨操作のうち、配信シーケンスの中止に関する操作の決定方法は実施例1と同一である。実施例2では、認証操作についても決定される。例えば、配信シーケンスを継続するエッジ機器102のみを認証する操作、全てまたはグループのエッジ機器102を認証する操作等が決定される。
 評価指標の代表値と、閾値との比較結果に基づいて、エッジ機器102の接続状態および負荷を判定することによって、システム全体を評価できる。また、図15に示す中止判定処理は、図13および図14に示すようなエッジ機器102単位の処理より計算量を削減できる。
 以上が中止判定処理の説明である。図12の説明に戻る。
 配信制御装置101は、作業者用端末104に中止判定処理の結果および認証要求を送信する(ステップS1208)。当該結果には、エッジ機器管理情報222、推奨操作、中止対象リスト等が含まれる。
 作業者用端末104は、中止判定処理の結果に基づいて画面を提示し、作業者の認証操作および中止操作を受け付ける。ここで、作業者に提示される画面について説明する。図16は、実施例2の作業者用端末104に表示される画面の一例を示す図である。
 画面1600は、表示欄1601、1602、1603および選択欄1604を含む。表示欄1601、1602、1603および選択欄1604は、表示欄1001、1002、1003および選択欄1004と同一のものである。
 ただし、実施例2の表示欄1602には、失敗した配信シーケンスに対する操作だけではなく、配信シーケンスの認証に関する操作も表示される。また、選択欄1604には、失敗した配信シーケンスに対する操作および配信シーケンスの認証に関する操作を組み合わせた操作を指示するボタンが表示される。例えば、一部のエッジ機器102の配信シーケンスが失敗している場合、「失敗したエッジ機器の配信シーケンスの中止および他のエッジ機器の配信シーケンスの認証」が表示され、失敗したエッジ機器102が存在しない場合、「全てのエッジ機器の配信シーケンスの認証」が表示される。
 以上が画面の説明である。図12の説明に戻る。
 作業者は、作業者用端末104を用いて、認証操作および中止操作を行う(ステップS1209)。具体的には、作業者は選択欄1604に表示されたいずれかのボタンを押下する。作業者用端末104は、認証応答および中止要求を配信制御装置101に送信する(ステップS1210)。ここでは、作業者によって「失敗したエッジ機器の配信シーケンスの中止および他のエッジ機器の配信シーケンスの認証」が選択されたものとする。
 配信制御装置101は、中止対象のエッジ機器102に中止指示を送信する(ステップS1211)。また、配信制御装置101は、継続対象のエッジ機器102にステータス更新要求を送信する(ステップS1212)。図12に示すシーケンス図では、エッジ機器(B)102に中止指示が送信され、エッジ機器(A)102にステータス更新要求が送信される。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信し(ステップS1213)、また、コマンドを実行する(ステップS1214)。エッジ機器102は、配信制御装置101にメトリックを送信する(ステップS1215)。ステップS1213、ステップS1214、およびステップS1215の処理は、ステップS616、ステップS617、およびステップS618の処理と同一である。
 配信制御装置101は、メトリックを受信した場合、メトリック確認処理を実行し(ステップS1216)、作業者用端末104に認証要求を送信する(ステップS1217)。実施例2のメトリック確認処理は実施例1と同一である。
 作業者は、作業者用端末104を用いて認証操作を行い(ステップS1218)、作業者用端末104は、認証応答を配信制御装置101に送信する(ステップS1219)。ステップS1218およびステップS1219の処理はステップS621およびステップS622の処理と同一である。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS1220)。ステップS1220の処理はステップS623の処理と同一である。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信する(ステップS1221)。ステップS1221の処理はステップS624の処理と同一である。
 なお、失敗したエッジ機器102が存在しない場合、ステップS1208では認証要求のみが送信され、ステップS1209では、認証操作のみが行われ、ステップS11210では認証応答のみが行われる。また、中止指示は送信されない。
 実施例2によれば、配信制御装置101は、コマンド完了通知が無いエッジ機器102について失敗要因を特定し、特定された失敗要因に応じて配信シーケンスの中止操作および認証操作について提案を行う。これによって、配信シーケンスの中止を効率的に制御できるため、配信シーケンスの制御に要する作業者の工数および作業時間を削減することができる。
 実施例3では、中止判定処理の実行フェーズが実施例1と異なる。以下、実施例1との差異を中心に実施例3について説明する。
 実施例3のシステムの構成は実施例1と同一である。実施例3の配信制御装置101およびエッジ機器102のハードウェア構成およびソフトウェア構成は、実施例1と同一である。実施例3のメトリック正解値管理情報221およびエッジ機器管理情報222のデータ構造は実施例1と同一である。
 図17は、実施例3のシステムにおける処理の流れを説明するシーケンス図である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス登録要求を送信する(ステップS1701)。ステップS1701はステップS601と同一の処理である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス開始指示を送信する(ステップS1702)。ステップS1702はステップS602の処理と同一である。
 配信制御装置101は、配信シーケンス開始指示を受信した場合、エッジ機器102に対してファイルを配布し、また、ステータス更新要求を送信する(ステップS1703)。ステップS1703の処理はステップS603の処理と同一である。
 エッジ機器102は、ファイル配布およびステータス更新要求に対して、配信制御装置101にステータス更新応答を送信する(ステップS1704)。ステップS1704の処理はステップS604の処理と同一である。
 エッジ機器102は、所定のフェーズでコマンドを実行し(ステップS1705)、コマンド完了通知を配信制御装置101に送信する(ステップS1706)。ステップS1705およびステップS1706の処理は、ステップS610およびステップS611の処理と同一である。
 配信制御装置101は、コマンド完了通知を受信した場合、作業者用端末104に認証要求を送信する(ステップS1707)。ステップS1707の処理はステップS612の処理と同一である。
 作業者は、作業者用端末104を用いて、認証操作を行い(ステップS1708)、認証応答を配信制御装置101に送信する(ステップS1709)。ステップS1708およびステップS1709の処理は、ステップS613およびステップS614の処理と同一である。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS1710)。ステップS1710の処理はステップS615の処理と同一である。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信し(ステップS1711)、また、コマンドを実行する(ステップS1712)。エッジ機器102は、配信制御装置101にメトリックを送信する(ステップS1713)。ステップS1711、ステップS1712、およびステップS1713の処理は、ステップS616、ステップS617、およびステップS618の処理と同一である。
 配信制御装置101は、メトリックを受信した場合、メトリック確認処理を実行する(ステップS1714)。実施例3では、メトリック確認処理において失敗要因が特定される。
 ここで、メトリック確認処理について説明する。図18Aおよび図18Bは、実施例3の配信制御装置101が実行するメトリック確認処理の一例を説明するフローチャートである。メトリック確認処理は、メトリック確認プログラム212を実行するプロセッサ201によって行われる。また、メトリック確認処理は、エッジ機器102からメトリックを受信した場合に実行される。
 配信制御装置101は、メトリック正解値管理情報221を参照して、受信したメトリックの種別に対応するエントリから正解値を取得し、受信したメトリックが正解値に一致するか否かを判定する(ステップS1801)。
 受信したメトリックが正解値に一致しない場合(ステップS1801がNO)、配信制御装置101はステップS1804に進む。
 受信したメトリックが正解値に一致する場合(ステップS1801がYES)、配信制御装置101は、全てのエッジ機器102のメトリックについて確認が完了したか否かを判定する(ステップS1802)。
 全てのエッジ機器102のメトリックについて確認が完了していない場合(ステップS1802がNO)、配信制御装置101はステップS1804に進む。
 全てのエッジ機器102のメトリックについて確認が完了した場合(ステップS1802がYES)、配信制御装置101は、作業者用端末104に判定結果および認証要求を送信し(ステップS1803、S1715)、メトリック確認処理を終了する。
 ステップS1804では、配信制御装置101は、一定時間経過しているか否かを判定する(ステップS1804)。
 一定時間経過していない場合(ステップS1804がNO)、配信制御装置101は、メトリック受信待ちに遷移し(ステップS1805)、メトリック確認処理を終了する。
 一定時間経過している場合(ステップS1804がYES)、配信制御装置101は、中止判定処理を実行し(ステップS1806)、その後、ステップS1803に進む。すなわち、配信制御装置101は、一定期間内に、メトリックが正解値に一致しなかったエッジ機器102を、配信シーケンスが失敗したエッジ機器102として失敗要因が特定する。
 ここで、メトリック確認処理において実行される中止判定処理について説明する。配信制御装置101は、メトリックの種別に応じて異なる中止判定処理を実行する。図19および図20は、実施例3の配信制御装置101が実行する中止判定処理の一例を説明するフローチャートである。中止判定処理は、中止判定プログラム211を実行するプロセッサ201によって行われる。
 まず、図19に示す中止判定処理について説明する。図19に示す中止判定処理は、中止判定処理の開始時にメトリックの値が正解値に一致していないエッジ機器102に対して1回実行される。図19に示す中止判定処理では、エッジ機器102から取得される負荷指標に基づいて失敗の要因が特定される。
 配信制御装置101は、負荷指標の代表値を算出する(ステップS1901)。ステップS1901の処理はステップS801の処理と同一である。
 配信制御装置101は、負荷指標の代表値が閾値以上であるか否かを判定する(ステップS1902)。
 負荷指標の代表値が閾値以上である場合(ステップS1902がYES)、配信制御装置101は、メトリックが正解値に一致していないエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1903)。その後、配信制御装置101はステップS1905に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 負荷指標の代表値が閾値以下の場合(ステップS1902がNO)、配信制御装置101は、メトリックが正解値に一致していないエッジ機器102の数だけ、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS1904)。その後、配信制御装置101はステップS1905に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 ステップS1905では、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する(ステップS1905)。その後、配信制御装置101は中止判定処理を終了する。
 推奨操作のうち、配信シーケンスの中止に関する操作の決定方法は実施例1と同一である。実施例3では、認証操作についても決定される。例えば、配信シーケンスを継続するエッジ機器102のみを認証する操作、全てまたはグループのエッジ機器102を認証する操作等が決定される。
 次に、図20に示す中止判定処理について説明する。図20に示す中止判定処理は、中止判定処理の開始時にメトリックの値が正解値に一致していないエッジ機器102に対して1回実行される。図20に示す中止判定処理では、各エッジ機器102から取得される負荷指標および接続状態指標の代表値と閾値との比較結果に基づいて失敗の要因が特定される。
 配信制御装置101は、負荷指標の代表値を算出し(ステップS2001)、また、接続状態指標の代表値を算出する(ステップS2002)。ステップS2001およびステップS2002の処理は、ステップS801およびステップS802の処理と同一の処理である。
 配信制御装置101は、接続状態指標の代表値が閾値以上であるか否かを判定する(ステップS2003)。
 接続状態指標の代表値が閾値より小さい場合(ステップS2003がNO)、配信制御装置101は、メトリックが正解値と一致していないエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS2004)。その後、配信制御装置101はステップS2008に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「接続状態」を設定する。
 接続状態指標の代表値が閾値以上である場合(ステップS2003がYES)、配信制御装置101は、負荷指標の代表値が閾値以上であるか否かを判定する(ステップS2005)。
 負荷指標の代表値が閾値以上である場合(ステップS2005がYES)、配信制御装置101は、メトリックが正解値と一致していないエッジ機器102の数だけ、要因「共通」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS2006)。その後、配信制御装置101はステップS2008に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「負荷」を設定する。
 負荷指標の代表値が閾値より小さい場合(ステップS2005がNO)、配信制御装置101は、メトリックが正解値と一致していないエッジ機器102の数だけ、要因「その他」とエッジ機器102の識別情報とを対応付けたデータを中止対象リストに登録する(ステップS2007)。その後、配信制御装置101はステップS2008に進む。
 このとき、配信制御装置101は、エッジ機器管理情報222の、中止対象リストに登録されたエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」を設定し、不良指標503に「その他」を設定する。
 ステップS2008では、配信制御装置101は、中止対象リストに基づいて、作業者に提示する推奨操作を決定する(ステップS2008)。その後、配信制御装置101は中止判定処理を終了する。
 推奨操作のうち、配信シーケンスの中止に関する操作の決定方法は実施例1と同一である。実施例3では、認証操作についても決定される。例えば、配信シーケンスを継続するエッジ機器102のみを認証する操作、全てまたはグループのエッジ機器102を認証する操作等が決定される。
 配信制御装置101は、メトリックの種別に応じて実行する中止判定処理を選択する。例えば、メトリックがソフトウェアのインストールに伴う実行結果ファイルの有無、またはメトリックが情報コンテンツのバージョンである場合、メトリックの不一致の原因としては、コマンドの問題またはエッジ機器102の負荷が高いこと等が考えられるため、図19に示す中止判定処理が実行される。メトリックが情報コンテンツの取得率の場合、メトリックの不一致の原因としては、ネットワーク接続の不良またはエッジ機器102の負荷が高いこと等が考えられるため、図20に示す中止判定処理が実行される。
 以上がメトリック確認処理の説明である。図17に戻る。
 作業者は、作業者用端末104を用いて、認証操作および中止操作を行い(ステップS1716)、認証応答および中止要求を配信制御装置101に送信する(ステップS1717)。ここでは、作業者によって「失敗したエッジ機器の配信シーケンスの中止および他のエッジ機器の配信シーケンスの認証」が選択されたものとする。
 配信制御装置101は、中止対象のエッジ機器102に中止指示を送信する(ステップS1718)。また、配信制御装置101は、継続対象のエッジ機器102にステータス更新要求を送信する(ステップS1719)。図17に示すシーケンス図では、エッジ機器(B)102に中止指示が送信され、エッジ機器(A)102にステータス更新要求が送信される。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信する(ステップS1720)。
 なお、中止判定処理が実行されなかった場合、ステップS1715では認証要求のみが送信され、ステップS1716では、認証操作のみが行われ、ステップS1716では認証応答のみが行われる。また、中止指示は送信されない。
 実施例3によれば、配信制御装置101は、メトリックが正解値に一致しないエッジ機器102について失敗要因を特定し、特定された失敗要因に応じて配信シーケンスの中止操作および認証操作について提案を行う。これによって、配信シーケンスの中止を効率的に制御できるため、配信シーケンスの制御に要する作業者の工数および作業時間を削減することができる。
 実施例4では、配信シーケンスの開始前に中止判定処理が実行される。以下、実施例1との差異を中心に実施例4について説明する。
 実施例4のシステムの構成は実施例1と同一である。実施例4の配信制御装置101およびエッジ機器102のハードウェア構成およびソフトウェア構成は、実施例1と同一である。実施例4のメトリック正解値管理情報221およびエッジ機器管理情報222のデータ構造は実施例1と同一である。
 図21Aおよび図21Bは、実施例4のシステムにおける処理の流れを説明するシーケンス図である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス登録要求を送信する(ステップS2101)。ステップS2101はステップS601と同一の処理である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス開始指示を送信する(ステップS2102)。ステップS2102はステップS602の処理と同一である。
 配信制御装置101は、配信シーケンス開始指示を受信した場合、各エッジ機器102の帯域を計測する(ステップS2103)。例えば、配信制御装置101は、ping送信機能等を用いて帯域を計測する。
 配信制御装置101は、帯域の計測結果に基づいて中止判定処理を実行する(ステップS2104)。
 ここで、中止判定処理の詳細について説明する。図22は、実施例4の配信制御装置101が実行する中止判定処理の一例を説明するフローチャートである。中止判定処理は、中止判定プログラム211を実行するプロセッサ201によって行われる。図22に示す中止判定処理は、全エッジ機器102に対して1回実行される。
 配信制御装置101は、エッジ機器102に送信されるファイルのサイズが閾値以上であるか否かを判定する(ステップS2201)。
 ここで、エッジ機器102に送信されるファイルとは、配信シーケンスの開始時に配信制御装置101から送信されるファイルである。なお、配信サーバ103からソフトウェアおよび情報コンテンツを取得する配信シーケンスの場合、当該ソフトウェアおよび情報コンテンツのサイズも加味してもよい。
 ファイルのサイズが閾値より小さい場合(ステップS2201がNO)、配信制御装置101は中止判定処理を終了する。
 ファイルのサイズが閾値以上である場合(ステップS2201がYES)、配信制御装置101は、エッジ機器102のループ処理を開始する(ステップS2202)。配信制御装置101は、配信シーケンスの実行対象のエッジ機器102の中から一つのエッジ機器102を選択する。
 配信制御装置101は、選択されたエッジ機器102の帯域が閾値以上であるか否かを判定する(ステップS2203)。
 選択されたエッジ機器102の帯域が閾値以上である場合(ステップS2203がYES)、配信制御装置101はステップS2205に進む。
 選択されたエッジ機器102の帯域が閾値より小さい場合(ステップS2203がNO)、配信制御装置101は、当該エッジ機器102を中止対象リストに登録し(ステップS2204)、その後、ステップS2205に進む。
 ステップS2205では、配信制御装置101は、配信シーケンスの実行対象の全てのエッジ機器102について処理が完了したか否かを判定する(ステップS2205)。
 配信シーケンスの実行対象の全てのエッジ機器102について処理が完了していない場合(ステップS2205がNO)、配信制御装置101は、ステップS2202に戻り、同様の処理を実行する。
 配信シーケンスの実行対象の全てのエッジ機器102について処理が完了した場合(ステップS2205がYES)、配信制御装置101は、配信シーケンスの実行対象のエッジ機器102の数に対する中止対象のエッジ機器102の割合が閾値以上であるか否かを判定する(ステップS2206)。
 割合が閾値以上である場合(ステップS2206がYES)、配信制御装置101は、要因「共通」に応じた推奨操作を決定する(ステップS2207)。その後、配信制御装置101は中止判定処理を終了する。例えば、配信制御装置101は、配信シーケンスの実行対象の全てのエッジ機器102に対する配信シーケンスの実行中止を決定する。
 割合が閾値より小さい場合(ステップS2206がNO)、配信制御装置101は、要因「機器特有」に応じた推奨操作を決定する(ステップS2208)。その後、配信制御装置101は中止判定処理を終了する。例えば、配信制御装置101は、中止対象リストに登録されているエッジ機器102に対する配信シーケンスの実行中止を決定する。
 以上が中止判定処理の説明である。図21Aの説明に戻る。
 配信制御装置101は、作業者用端末104に中止判定処理の結果を送信する(ステップS2105)。当該結果には、推奨操作および中止対象リスト等が含まれる。
 作業者は、作業者用端末104を用いて中止操作を行う(ステップS2106)。ステップS2106の処理はステップS607の処理と同一である。
 作業者用端末104は、作業者の操作に応じた中止要求を配信制御装置101に送信する(ステップS2107)。中止要求には、操作されたボタンの情報が含まれる。
 配信制御装置101は、中止要求にしたがって中止対象のエッジ機器102を特定し、特定されたエッジ機器102を除くエッジ機器102に対してファイルを配布し、また、ステータス更新要求を送信する(ステップS2108)。
 特定のエッジ機器102の配信シーケンスの実行中止が選択された場合、配信制御装置10は、特定のエッジ機器102以外のエッジ機器102にファイルを配布し、また、ステータス更新要求を送信する。このとき、配信制御装置101は、エッジ機器管理情報222の特定のエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」、不良指標503に「接続状態」を設定する。
 全てのエッジ機器102の配信シーケンスの実行中止が選択された場合、配信制御装置101は、全てのエッジ機器102に対して何も送信しない。このとき、配信制御装置101は、エッジ機器管理情報222の全てのエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」、不良指標503に「接続状態」を設定する。
 なお、特定のエッジ機器102を含むグループに所属するエッジ機器102の配信シーケンスの実行中止を指示できるようにしてもよい。この場合、配信制御装置101は、エッジ機器管理情報222を参照して、特定のエッジ機器102を含むグループを特定し、当該グループに所属するエッジ機器102を除くエッジ機器102にファイルを配布し、また、ステータス更新を要求する。このとき、配信制御装置101は、エッジ機器管理情報222のグループに所属するエッジ機器102に対応するエントリを更新する。具体的には、配信制御装置101は、配信シーケンス実行結果502に「失敗」、不良指標503に「接続状態」を設定する。
 待機が選択された場合、配信制御装置101は、全てのエッジ機器102にファイルを配布し、また、ステータス更新を要求する。
 なお、中止対象リストにエッジ機器102が存在しない場合、ステップS2105からステップS2107までの処理は実行されない。
 ここでは、エッジ機器(B)102の配信シーケンスの実行中止が要求されたものとする。したがって、配信制御装置101は、エッジ機器(A)102にのみファイルを配布し、ステータス更新要求を送信する。
 エッジ機器102は、ファイル配布およびステータス更新要求に対して、配信制御装置101にステータス更新応答を送信する(ステップS2109)。
 エッジ機器102は、所定のフェーズでコマンドを実行し(ステップS2110)、コマンド完了通知を配信制御装置101に送信する(ステップS2111)。
 配信制御装置101は、コマンド完了通知を受信した場合、作業者用端末104に認証要求を送信する(ステップS2112)。
 作業者は、作業者用端末104を用いて、認証操作を行い(ステップS2113)、認証応答を配信制御装置101に送信する(ステップS2114)。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS2115)。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信し(ステップS2116)、また、コマンドを実行する(ステップS2117)。エッジ機器102は、配信制御装置101にメトリックを送信する(ステップS2118)。
 配信制御装置101は、メトリックを受信した場合、メトリック確認処理を実行し(ステップS2119)、作業者用端末104に認証要求を送信する(ステップS2120)。
 作業者は、作業者用端末104を用いて、認証操作を行い(ステップS2121)、認証応答を配信制御装置101に送信する(ステップS2122)。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS2123)。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信する(ステップS2124)。
 なお、ステップS2110からステップS2124までの処理は、ステップS610からステップS624までの処理と同一の処理である。
 実施例4によれば、配信制御装置101は、配信シーケンスの開始前に、帯域に余裕がないエッジ機器102を、配信シーケンスが失敗する可能性があるエッジ機器102として特定する。これによって、配信シーケンスを効率的に制御できるため、配信シーケンスの制御に要する作業者の工数および作業時間を削減することができる。
 (変形例)
 実施例1から実施例4の各実施例は組み合わせることもできる。ここで、実施例2および実施例4を組み合わせた実施例について述べる。
 図23Aおよび図23Bは、変形例のシステムにおける処理の流れを説明するシーケンス図である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス登録要求を送信する(ステップS2301)。ステップS2301はステップS601と同一の処理である。
 作業者は、作業者用端末104を用いて、配信制御装置101に配信シーケンス開始指示を送信する(ステップS2302)。ステップS2302はステップS602の処理と同一である。
 配信制御装置101は、配信シーケンス開始指示を受信した場合、各エッジ機器102の帯域を計測する(ステップS2303)。ステップS2303の処理はステップS2103の処理と同一である。
 配信制御装置101は、帯域の計測結果に基づいて中止判定処理を実行する(ステップS2304)。ステップS2304の処理はステップS2104の処理と同一である。
 配信制御装置101は、作業者用端末104に中止判定処理の結果を送信する(ステップS2305)。ステップS2305の処理はステップS2105の処理と同一である。
 作業者は、作業者用端末104を用いて中止操作を行う(ステップS2306)。ステップS2306の処理はステップS607の処理と同一である。
 作業者用端末104は、作業者の操作に応じた中止要求を配信制御装置101に送信する(ステップS2307)。ステップS2307の処理はステップS2107の処理と同一である。
 配信制御装置101は、中止要求にしたがって中止対象のエッジ機器102を特定し、特定されたエッジ機器102を除くエッジ機器102に対してファイルを配布し、また、ステータス更新要求を送信する(ステップS2308)。ステップS2308の処理はステップS2108の処理と同一である。
 なお、中止対象リストにエッジ機器102が存在しない場合、ステップS2305からステップS2307までの処理は実行されない。ここでは、中止対象リストにエッジ機器102が存在しなかったものとする。したがって、エッジ機器(A)102およびエッジ機器(B)102の各々にファイルが配布され、ステータス更新要求が送信される。
 エッジ機器102は、ファイル配布およびステータス更新要求に対して、配信制御装置101にステータス更新応答を送信する(ステップS2309)。ステップS2309の処理はステップS604の処理と同一である。
 配信制御装置101は、ステータス更新応答を受信した後、中止判定処理を開始する(ステップS2310)。
 配信シーケンスを継続しているエッジ機器102は、所定のフェーズでコマンドを実行し(ステップS2311)、コマンド完了通知を配信制御装置101に送信する(ステップS2312)。ステップS2311およびステップS2312の処理は、ステップS610およびステップS611の処理と同一である。
 配信制御装置101は、コマンド完了通知の受信状態に基づいて中止判定処理を実行する。中止判定処理は実施例2で説明した処理と同一であるため説明を省略する。
 配信制御装置101は、作業者用端末104に中止判定処理の結果および認証要求を送信する(ステップS2313)。ステップS2313の処理はステップS1208の処理と同一である。
 作業者は、作業者用端末104を用いて、認証操作および中止操作を行い(ステップS2314)、認証応答および中止要求を配信制御装置101に送信する(ステップS2315)。ステップS2314およびステップS2315の処理はステップS1209およびステップS1210の処理と同一である。
 配信制御装置101は、中止対象のエッジ機器102に中止指示を送信する(ステップS2316)。また、配信制御装置101は、継続対象のエッジ機器102にステータス更新要求を送信する(ステップS2317)。ステップS2316およびステップS2317の処理はステップS1211およびステップS1212の処理と同一である。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信し(ステップS2318)、また、コマンドを実行する(ステップS2319)。エッジ機器102は、配信制御装置101にメトリックを送信する(ステップS2320)。ステップS2318、ステップS2319、およびステップS2320の処理は、ステップS616、ステップS617、およびステップS618の処理と同一である。
 配信制御装置101は、メトリックを受信した場合、メトリック確認処理を実行する(ステップS2321)、作業者用端末104に認証要求を送信する(ステップS2322)。メトリック確認処理は実施例1と同一である。
 作業者は、作業者用端末104を用いて、認証操作を行い(ステップS2323)、認証応答を配信制御装置101に送信する(ステップS2324)。ステップS2323およびステップS2324の処理はステップS621およびステップS622の処理と同一である。
 配信制御装置101は、認証応答を受信した後、エッジ機器102にステータス更新要求を送信する(ステップS2325)。ステップS2325の処理はステップS623の処理と同一である。
 エッジ機器102は、配信制御装置101にステータス更新応答を送信する(ステップS2326)。ステップS2326の処理はステップS624の処理と同一である。
 図23Aおよび図23Bに示す例では、エッジ機器(B)102からコマンド完了通知が受信できなかったため、配信制御装置101は、エッジ機器(B)102に中止指示を送信している。
 なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。また、例えば、上記した実施例は本発明を分かりやすく説明するために構成を詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、各実施例の構成の一部について、他の構成に追加、削除、置換することが可能である。
 また、上記の各構成、機能、処理部、処理手段等は、それらの一部または全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、本発明は、実施例の機能を実現するソフトウェアのプログラムコードによっても実現できる。この場合、プログラムコードを記録した記憶媒体をコンピュータに提供し、そのコンピュータが備えるプロセッサが記憶媒体に格納されたプログラムコードを読み出す。この場合、記憶媒体から読み出されたプログラムコード自体が前述した実施例の機能を実現することになり、そのプログラムコード自体、およびそれを記憶した記憶媒体は本発明を構成することになる。このようなプログラムコードを供給するための記憶媒体としては、例えば、フレキシブルディスク、CD-ROM、DVD-ROM、ハードディスク、SSD(Solid State Drive)、光ディスク、光磁気ディスク、CD-R、磁気テープ、不揮発性のメモリカード、ROMなどが用いられる。
 また、本実施例に記載の機能を実現するプログラムコードは、例えば、アセンブラ、C/C++、perl、Shell、PHP、Python、Java等の広範囲のプログラムまたはスクリプト言語で実装できる。
 さらに、実施例の機能を実現するソフトウェアのプログラムコードを、ネットワークを介して配信することによって、それをコンピュータのハードディスクやメモリ等の記憶手段またはCD-RW、CD-R等の記憶媒体に格納し、コンピュータが備えるプロセッサが当該記憶手段や当該記憶媒体に格納されたプログラムコードを読み出して実行するようにしてもよい。
 上述の実施例において、制御線や情報線は、説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。全ての構成が相互に接続されていてもよい。

Claims (15)

  1.  複数のエッジ機器と接続する計算機システムが実行する、前記エッジ機器に対する情報配信処理の制御方法であって、
     前記計算機システムは、プロセッサ、前記プロセッサに接続される記憶装置、および前記プロセッサに接続されるネットワークインタフェースを有する計算機を含み、
     前記情報配信処理の制御方法は、
     前記プロセッサが、前記複数のエッジ機器に対する前記情報配信処理の開始後、前記複数のエッジ機器の各々の状態を監視する第1のステップと、
     前記プロセッサが、前記複数のエッジ機器の各々の状態の監視結果に基づいて、前記情報配信処理が失敗した前記エッジ機器および失敗要因を特定する第1処理を実行する第2のステップと、
     前記プロセッサが、前記第1処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示する第3のステップと、を含むことを特徴とする情報配信処理の制御方法。
  2.  請求項1に記載の情報配信処理の制御方法であって、
     前記失敗要因は、前記エッジ機器固有の要因である第1失敗要因、および前記複数のエッジ機器に共通する要因である第2失敗要因を含むことを特徴とする情報配信処理の制御方法。
  3.  請求項2に記載の情報配信処理の制御方法であって、
     前記第2のステップは、
     前記プロセッサが、前記複数のエッジ機器から、前記エッジ機器の通信品質を示す指標、および前記エッジ機器の負荷を示す指標の少なくともいずれかを評価指標として取得するステップと、
     前記プロセッサが、前記評価指標を用いて、前記情報配信処理が失敗した前記エッジ機器の失敗要因を特定するステップと、を含むことを特徴とする情報配信処理の制御方法。
  4.  請求項3に記載の情報配信処理の制御方法であって、
     前記第1のステップは、前記プロセッサが、前記複数のエッジ機器の各々からの応答の有無を監視するステップを含み、
     前記第2のステップは、前記プロセッサが、応答がない前記エッジ機器を前記情報配信処理が失敗した前記エッジ機器として特定するステップを含むことを特徴とする情報配信処理の制御方法。
  5.  請求項3に記載の情報配信制御方法であって、
     前記複数のエッジ機器から前記情報配信の進捗状態を示すメトリックの正解値を管理し、
     前記第1のステップは、前記プロセッサが、前記複数のエッジ機器から前記メトリックを取得するステップを含み、
     前記第2のステップは、前記プロセッサが、期間内に、取得された前記メトリックが正解値と一致しなかった前記エッジ機器を前記情報配信処理が失敗した前記エッジ機器として特定するステップを含むことを特徴とする情報配信処理の制御方法。
  6.  請求項3に記載の情報配信処理の制御方法であって、
     前記第3のステップは、
     前記プロセッサが、前記第1失敗要因で前記情報配信処理が失敗した前記エッジ機器が存在する場合、当該エッジ機器の前記情報配信処理の中止を推奨する提示を行うステップと、
     前記プロセッサが、前記第2失敗要因で前記情報配信処理が失敗した前記エッジ機器が存在する場合、前記複数のエッジ機器の前記情報配信処理の中止を推奨する提示を行うステップと、を含むことを特徴とする情報配信処理の制御方法。
  7.  請求項6に記載の情報配信処理の制御方法であって、
     前記情報配信処理は、前記複数のエッジ機器から構成されるグループ単位で実行され、
     前記第3のステップは、前記プロセッサが、前記第1失敗要因で前記情報配信処理が失敗した前記エッジ機器が存在する場合、当該エッジ機器の前記情報配信処理の中止、および、当該エッジ機器を含む前記グループに所属する前記複数のエッジ機器の前記情報配信処理の中止の少なくともいずれかを推奨する提示を行うステップを含むことを特徴とする情報配信処理の制御方法。
  8.  請求項2に記載の情報配信処理の制御方法であって、
     前記プロセッサが、前記情報配信の開始前に、前記複数のエッジ機器の帯域を計測するステップと、
     前記プロセッサが、前記帯域と閾値との比較の結果に基づいて、前記情報配信処理が失敗する可能性がある前記エッジ機器を特定する第2処理を実行するステップと、
     前記プロセッサが、前記第2処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示するステップと、を含むことを特徴とする情報配信処理の制御方法。
  9.  情報配信処理が実行される、複数のエッジ機器と接続する計算機システムであって、
     プロセッサ、前記プロセッサに接続される記憶装置、および前記プロセッサに接続されるネットワークインタフェースを有する計算機を備え、
     前記プロセッサは、
     前記複数のエッジ機器に対する前記情報配信処理の開始後、前記複数のエッジ機器の各々の状態を監視し、
     前記複数のエッジ機器の各々の状態の監視結果に基づいて、前記情報配信処理が失敗した前記エッジ機器および失敗要因を特定する第1処理を実行し、
     前記第1処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示し、
     前記失敗要因は、前記エッジ機器固有の要因である第1失敗要因、および前記複数のエッジ機器に共通する要因である第2失敗要因を含むことを特徴とする計算機システム。
  10.  請求項9に記載の計算機システムであって、
     前記プロセッサは、
     前記複数のエッジ機器から、前記エッジ機器の通信品質を示す指標、および前記エッジ機器の負荷を示す指標の少なくともいずれかを評価指標として取得し、
     前記評価指標を用いて、前記情報配信処理が失敗した前記エッジ機器の失敗要因を特定することを特徴とする計算機システム。
  11.  請求項9に記載の計算機システムであって、
     前記プロセッサは、
     前記複数のエッジ機器の各々からの応答の有無を監視し、
     応答がない前記エッジ機器を前記情報配信処理が失敗した前記エッジ機器として特定することを特徴とする計算機システム。
  12.  請求項9に記載の計算機システムであって、
     前記複数のエッジ機器から前記情報配信の進捗状態を示すメトリックの正解値を管理し、
     前記プロセッサは、
     前記複数のエッジ機器から前記メトリックを取得し、
     期間内に、取得された前記メトリックが正解値と一致しなかった前記エッジ機器を前記情報配信処理が失敗した前記エッジ機器として特定することを特徴とする計算機システム。
  13.  請求項9に記載の計算機システムであって、
     前記プロセッサは、
     前記第1失敗要因で前記情報配信処理が失敗した前記エッジ機器が存在する場合、当該エッジ機器の前記情報配信処理の中止を推奨する提示を行い、
     前記第2失敗要因で前記情報配信処理が失敗した前記エッジ機器が存在する場合、前記複数のエッジ機器の前記情報配信処理の中止を推奨する提示を行うことを特徴とする計算機システム。
  14.  請求項9に記載の計算機システムであって、
     前記プロセッサは、
     前記情報配信の開始前に、前記複数のエッジ機器の帯域を計測し、
     前記帯域と閾値との比較の結果に基づいて、前記情報配信処理が失敗する可能性がある前記エッジ機器を特定する第2処理を実行し、
     前記第2処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示することを特徴とする計算機システム。
  15.  情報配信処理が実行される、複数のエッジ機器と接続する計算機であって、
     プロセッサ、前記プロセッサに接続される記憶装置、および前記プロセッサに接続されるネットワークインタフェースを備え、
     前記プロセッサは、
     前記複数のエッジ機器に対する前記情報配信処理の開始後、前記複数のエッジ機器の各々の状態を監視し、
     前記複数のエッジ機器の各々の状態の監視結果に基づいて、前記情報配信処理が失敗した前記エッジ機器および失敗要因を特定する処理を実行し、
     前記処理の結果に基づいて、前記情報配信処理の中止に関する操作内容を提示し、
     前記失敗要因は、前記エッジ機器固有の要因である第1失敗要因、および前記複数のエッジ機器に共通する要因である第2失敗要因を含むことを特徴とする計算機。
PCT/JP2022/020389 2021-08-26 2022-05-16 情報配信処理の制御方法、計算機システム、および計算機 WO2023026607A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-137894 2021-08-26
JP2021137894A JP2023032033A (ja) 2021-08-26 2021-08-26 情報配信処理の制御方法、計算機システム、および計算機

Publications (1)

Publication Number Publication Date
WO2023026607A1 true WO2023026607A1 (ja) 2023-03-02

Family

ID=85321755

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/020389 WO2023026607A1 (ja) 2021-08-26 2022-05-16 情報配信処理の制御方法、計算機システム、および計算機

Country Status (2)

Country Link
JP (1) JP2023032033A (ja)
WO (1) WO2023026607A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006520975A (ja) * 2003-03-20 2006-09-14 パッチリンク コーポレーション 非侵入な自動オフサイト・パッチ・フィンガプリンティングおよびアップデーティングシステム、および方法
JP2008034923A (ja) * 2006-07-26 2008-02-14 Ricoh Co Ltd 画像読取装置
JP2015152941A (ja) * 2014-02-10 2015-08-24 株式会社日立製作所 アップデート方法および配信装置
JP2020154634A (ja) 2019-03-19 2020-09-24 株式会社ウフル ファームウェア更新システム、ファームウェア更新方法及びコンピュータプログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006520975A (ja) * 2003-03-20 2006-09-14 パッチリンク コーポレーション 非侵入な自動オフサイト・パッチ・フィンガプリンティングおよびアップデーティングシステム、および方法
JP2008034923A (ja) * 2006-07-26 2008-02-14 Ricoh Co Ltd 画像読取装置
JP2015152941A (ja) * 2014-02-10 2015-08-24 株式会社日立製作所 アップデート方法および配信装置
JP2020154634A (ja) 2019-03-19 2020-09-24 株式会社ウフル ファームウェア更新システム、ファームウェア更新方法及びコンピュータプログラム

Also Published As

Publication number Publication date
JP2023032033A (ja) 2023-03-09

Similar Documents

Publication Publication Date Title
US8782189B2 (en) Dynamic service level agreement for cloud computing services
JP5028469B2 (ja) 情報処理装置、リソーススケジュール方法、リソーススケジュールプログラム
JP5513018B2 (ja) 周辺装置及び画像読取装置
EP2897368B1 (en) Interactive personal/internet protocol television subscription system, and subscription plan management method and device
CN102339372B (zh) 图像形成装置以及图像形成方法
US8705084B2 (en) Image processing system, image processing apparatus and method for controlling the same
CN103218185B (zh) 管理设备、信息处理系统及管理方法
WO2020116154A1 (ja) 情報処理装置および方法
CN105450601A (zh) 共享许可证的方法和装置
CN1564980A (zh) 备份恢复系统及权限管理服务器
US20180097958A1 (en) Device, software installation method, and storage medium
WO2010073606A1 (en) Program distribution server, image forming apparatus, program distribution system, and contract document integration method
CN106095593B (zh) 一种前、后景应用程序行为同步方法及装置
US20050198185A1 (en) Equipment management system, equipment management method and equipment management unit
EP2523091B1 (en) System management server, and management method and program
WO2023026607A1 (ja) 情報配信処理の制御方法、計算機システム、および計算機
WO2009118994A1 (en) Information processing limitation system and information processing limitation device
JP4405357B2 (ja) デジタルコンテンツ再生装置、デジタルコンテンツ再生方法、デジタルコンテンツ再生プログラムおよびデジタルコンテンツ再生プログラムを記録する記録媒体
JP6144960B2 (ja) システム、情報処理装置、情報処理方法、及びプログラム
JP2007172593A (ja) ライセンス管理装置、ライセンス管理方法およびライセンス管理プログラム
JP5404251B2 (ja) 画像処理装置及びその制御方法
JP6618368B2 (ja) 配信システム及びその配信方法
US20160162233A1 (en) Electronic apparatus, management system, and recording medium
JP2016081162A (ja) 管理装置、情報処理装置、管理装置の制御方法、情報処理装置の制御方法、及びプログラム
JP2015144323A (ja) 放送録画システム、放送録画サーバおよび放送録画方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22860904

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2022860904

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2022860904

Country of ref document: EP

Effective date: 20240326