Prior art keywords
grout
storage bag
pile
grouting
pipe
Prior art date
Application number
PCT/CN2022/094671
Other languages
French (fr)
Chinese (zh)
Inventor
高永光
高云飞
Original Assignee
高永光
高云飞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高永光, 高云飞 filed Critical 高永光
Publication of WO2023016034A1 publication Critical patent/WO2023016034A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present application relates to the technical field of foundations, and relates in particular to a pile end bottom grouting apparatus, a cast-in-place pile and a construction method therefor, aimed at solving the defect in the prior art that grouting cavity rupture timing and condition control is difficult. The pile end bottom grouting apparatus comprises a fixing plate; a grout storage bag, fixed on the fixing plate, wherein the grout storage bag forms an accommodating cavity suitable for accommodating grout, or the grout storage bag and the fixing plate define an accommodating cavity suitable for accommodating grout. The grout storage bag has a filled state in which the inside is filled with grout to bear a pile body, and a collapsed state in which the inside is hollow. The grout storage bag is preset with a fixed limit pressure-bearing strength value, and is fixed in volume in the filled state.

Description

桩端底部注浆装置、灌注桩及其施工方法Bottom grouting device at pile end, cast-in-place pile and construction method thereof 技术领域technical field
本申请涉及地基基础技术领域,具体涉及一种桩端底部注浆装置、灌注桩及其施工方法。The present application relates to the technical field of foundations, in particular to a grouting device at the bottom of a pile tip, a cast-in-place pile and a construction method thereof.
背景技术Background technique
目前在地基基础领域,灌注桩端后注浆主要有开式注浆和闭式注浆两种。其中,闭式注浆多采用钢板胶囊注浆,如公告号为CN110896646B、名称为“桩底注浆装置及使用方法与灌注桩体及其施工方法”的发明专利所述,包括注浆胶囊、注浆管及固定板,灌注桩灌注完毕后通过注浆管向注浆胶囊内注浆,以形成桩底扩大头。但是,注浆胶囊随压力增加而膨胀,其与注浆压力和注浆量的关系以及闭式注浆腔内的扩大头的容积皆很难掌握,从而导致注浆胶囊破裂的时机和条件很难控制,进而影响灌注桩的承载能力。At present, in the foundation field, there are mainly two types of grouting after pouring pile ends: open grouting and closed grouting. Among them, closed grouting mostly adopts steel plate capsule grouting, as described in the invention patent with the announcement number CN110896646B and the name "pile bottom grouting device and its use method and pouring pile body and its construction method", including grouting capsule, The grouting pipe and the fixing plate are grouted into the grouting capsule through the grouting pipe after the cast-in-situ pile is poured to form the enlarged head at the bottom of the pile. However, the grouting capsule expands with the increase of pressure, and the relationship between the grouting pressure and the grouting volume and the volume of the expanding head in the closed grouting cavity are difficult to grasp, resulting in very difficult timing and conditions for the grouting capsule to rupture. It is difficult to control, which in turn affects the bearing capacity of cast-in-place piles.
发明内容Contents of the invention
因此,本申请要解决的技术问题在于克服现有技术中注浆腔破裂时机和条件控制较难的缺陷,从而提供一种能够准确把控注浆腔破裂时机和条件的桩端底部注浆装置、灌注桩及其施工方法。Therefore, the technical problem to be solved in this application is to overcome the defects in the prior art that the timing and conditions of grouting cavity rupture are difficult to control, so as to provide a pile end bottom grouting device that can accurately control the timing and conditions of grouting cavity rupture , cast-in-place pile and its construction method.
为解决上述技术问题,本申请提供的一种桩端底部注浆装置,包括:In order to solve the above technical problems, the application provides a bottom grouting device for pile ends, including:
固定板;fixed plate;
储浆袋,固定在所述固定板上,所述储浆袋形成适于容置浆液的容置腔或所述储浆袋与所述固定板围成适于容置浆液的容置腔,所述储浆袋具有内部填充浆液以承载桩体的充盈状态和内部中空的收拢状态,所述储浆袋预设固定的极限承压强度值且在充盈状态下容积固定。a slurry storage bag fixed on the fixing plate, the slurry storage bag forms an accommodating cavity suitable for accommodating slurry or the slurry storage bag and the fixing plate enclose an accommodating cavity suitable for accommodating slurry, The slurry storage bag has a filled state in which the interior is filled with grout to carry the pile body and a collapsed state in which the interior is hollow. The slurry storage bag is preset with a fixed ultimate compressive strength value and has a fixed volume in the filled state.
可选的,所述储浆袋由化学合成纤维布料或塑料薄膜制成。Optionally, the pulp storage bag is made of chemical synthetic fiber cloth or plastic film.
可选的,所述储浆袋上设有薄弱区域,所述薄弱区域的承压强度小于所述储浆袋其他部位的承压强度以在受压时形成出浆区域。Optionally, the pulp storage bag is provided with a weak area, and the pressure bearing strength of the weak area is smaller than that of other parts of the pulp storage bag so as to form a pulp outlet area under pressure.
可选的,还包括:Optionally, also include:
注浆管,与所述储浆袋的内腔相连通,适于向所述储浆袋内注浆;The grouting pipe communicates with the inner cavity of the grout storage bag and is suitable for grouting into the grout storage bag;
第一单向阀,设于所述注浆管与所述储浆袋的连通位置,适于阻挡所述储浆袋内的堵塞物进入所述注浆管。The first one-way valve is located at the communication position between the grouting pipe and the grout storage bag, and is suitable for blocking the blockage in the grout storage bag from entering the grouting pipe.
可选的,所述注浆管的管壁上开设有第一出浆孔,所述第一单向阀包括:Optionally, a first grout hole is opened on the wall of the grouting pipe, and the first one-way valve includes:
第一止水胶带,缠绕于所述注浆管开设有第一出浆孔的部位;The first water-stop tape is wound around the part where the grouting pipe is provided with the first grouting hole;
第一胶套,直接或间接套于所述第一止水胶带外侧;The first rubber sleeve is directly or indirectly placed on the outside of the first waterproof tape;
所述第一止水胶带和所述第一胶套具有向靠近所述注浆管方向收紧的密封状态,以 及受所述注浆管内压力作用与所述注浆管形成间隙的打开状态;The first water-stop tape and the first rubber sleeve have a sealing state tightened toward the grouting pipe, and an open state forming a gap with the grouting pipe due to the pressure inside the grouting pipe;
第一硬质片,夹于所述第一止水胶带与所述第一胶套之间,且对应所述第一出浆孔设置。The first hard sheet is sandwiched between the first waterproof tape and the first rubber sleeve, and is arranged corresponding to the first slurry outlet.
可选的,所述注浆管包括:Optionally, the grouting pipe includes:
第一出浆部,位于所述储浆袋内腔中;The first pulp outlet is located in the cavity of the pulp storage bag;
接口,穿过所述固定板且与所述第一出浆部连通;an interface passing through the fixing plate and communicating with the first pulp outlet;
进浆管,与所述接口密封连通。The slurry feeding pipe is in sealing communication with the interface.
可选的,所述固定板为环形板,所述储浆袋为与所述环形板适配的环形结构。Optionally, the fixing plate is an annular plate, and the pulp storage bag is an annular structure adapted to the annular plate.
可选的,所述固定板的内环边缘设有延伸至所述储浆袋内环的环形挡件。Optionally, the edge of the inner ring of the fixing plate is provided with an annular stopper extending to the inner ring of the slurry storage bag.
可选的,还包括:Optionally, also include:
补浆管,与所述环形挡件内部区域相连通,适于向桩孔内注浆;The grout filling pipe communicates with the inner area of the annular stopper and is suitable for grouting into the pile hole;
第二单向阀,设于所述补浆管与所述环形挡件内部区域的连通位置,适于阻挡所述桩孔内的堵塞物进入所述补浆管。The second one-way valve is located at the communication position between the grout replenishing pipe and the inner area of the annular stopper, and is suitable for preventing blockages in the pile hole from entering the grout replenishing pipe.
可选的,所述补浆管的管壁上开设有第二出浆孔,所述第二单向阀包括:Optionally, a second slurry outlet hole is opened on the wall of the slurry replenishing pipe, and the second one-way valve includes:
第二止水胶带,缠绕于所述补浆管开设有第二出浆孔的部位;The second water-stop tape is wrapped around the part where the second grout hole is opened in the grout filling pipe;
第二胶套,直接或间接套于所述第二止水胶带外侧;The second rubber sleeve is directly or indirectly placed on the outside of the second waterproof tape;
所述第二止水胶带和第二胶套皆具有向靠近所述补浆管方向收紧的密封状态,以及受所述补浆管内压力作用与所述补浆管形成间隙的打开状态;Both the second water-stop tape and the second rubber sleeve have a sealed state tightened towards the grout filling pipe, and an open state forming a gap with the grout filling pipe due to the internal pressure of the grout filling pipe;
第二硬质片,夹于所述第二止水胶带与所述第二胶套之间,且对应所述第二出浆孔设置。The second hard sheet is sandwiched between the second waterproof tape and the second rubber sleeve, and is arranged corresponding to the second slurry outlet.
可选的,所述补浆管具有延伸至所述环形挡件内部区域的第二出浆部,所述第二出浆部为沿所述环形挡件内壁延伸的环形管路。Optionally, the grout replenishing pipe has a second slurry outlet extending to the inner area of the annular baffle, and the second slurry outlet is an annular pipeline extending along the inner wall of the annular baffle.
可选的,所述固定板上设有检测口,所述检测口适于向所述储浆袋内充入介质。Optionally, a detection port is provided on the fixing plate, and the detection port is suitable for filling the pulp storage bag with medium.
可选的,还包括:Optionally, also include:
保护罩,与所述固定板可拆卸连接,且适于在施工前罩设在所述储浆袋的外侧。The protective cover is detachably connected with the fixing plate, and is suitable for covering the outside of the slurry storage bag before construction.
本申请还提供一种灌注桩,包括:The application also provides a cast-in-place pile, comprising:
前述的桩端底部注浆装置;The aforementioned pile end bottom grouting device;
钢筋笼,与所述桩端底部注浆装置的固定板相连。The reinforcement cage is connected with the fixed plate of the grouting device at the bottom of the pile end.
本申请还提供一种上述灌注桩的施工方法,依次包括如下步骤:The application also provides a construction method for the above-mentioned cast-in-place pile, which comprises the steps in turn:
S1.形成桩孔,对所述桩孔内的沉渣进行清理;S1. forming a pile hole, and cleaning the sediment in the pile hole;
S2.将下端安装有所述桩端底部注浆装置的钢筋笼下沉至所述桩孔的底部;S2. Sinking the steel cage with the bottom grouting device at the bottom of the pile installed at the lower end to the bottom of the pile hole;
S3.向所述桩孔内灌注混凝土,以形成灌注桩;S3. Pouring concrete into the pile hole to form a cast-in-situ pile;
S4.向所述储浆袋内注浆,形成桩底扩大头。S4. Injecting grout into the grout storage bag to form a pile bottom expansion head.
可选的,在步骤S4中,根据形成桩孔的土壤性质进行控制:若为砂性土,控制实际注浆量和注浆压力皆大于所述储浆袋的预设值,以使储浆袋破裂;若为黏性土,控制实际注浆量和注浆压力小于所述储浆袋的预设值,避免储浆袋破裂。Optionally, in step S4, control is performed according to the properties of the soil forming the pile hole: if it is sandy soil, control the actual grouting amount and grouting pressure to be greater than the preset value of the grout storage bag, so that the grout storage Bag rupture; if it is cohesive soil, control the actual grouting volume and grouting pressure to be less than the preset value of the grout storage bag to avoid the grout storage bag rupture.
本申请技术方案,具有如下优点:The technical solution of the present application has the following advantages:
1.本申请提供的桩端底部注浆装置,用储浆袋代替了现有的注浆胶囊,其在充盈状态下的容积固定,不会随着内部压力的增大而膨胀,且预设固定的极限承压强度值。实际注浆时,如果需要其破裂,就控制实际注浆量和注浆压力大于储浆袋的预设值即可;如果不需其破裂,就控制实际注浆量和注浆压力小于储浆袋的预设值即可。这样可以准确的把控储浆袋破裂的时机和条件,从而更加准确的掌握桩底扩大头的容积和形状,把控注浆过程和效果,最终有效消除桩底沉降,大幅度提高灌注桩的极限承载力,降低工程造价。1. The pile end bottom grouting device provided by this application replaces the existing grouting capsule with a grout storage bag, which has a fixed volume in the filled state and will not expand with the increase of internal pressure, and the preset Fixed ultimate compressive strength value. In actual grouting, if it needs to be broken, just control the actual grouting volume and grouting pressure to be greater than the preset value of the grout storage bag; The preset value of the bag is enough. In this way, the timing and conditions of the rupture of the grout bag can be accurately controlled, so that the volume and shape of the enlarged head at the bottom of the pile can be more accurately grasped, the process and effect of grouting can be controlled, and finally the settlement of the pile bottom can be effectively eliminated, and the durability of the cast-in-situ pile can be greatly improved. Ultimate bearing capacity, lower project cost.
2.本申请提供的桩端底部注浆装置,在储浆袋上设置有薄弱区域,薄弱区域的承压强度小于储浆袋其他部位的承压强度。实际注浆时,薄弱区域会首先受压撑破形成出浆区域。如此,可将薄弱区域设置在储浆袋不同的部位,或将薄弱区域设置成不同的形状,以满足不同施工场景的需要。2. In the grouting device at the bottom of the pile end provided by this application, a weak area is provided on the slurry storage bag, and the bearing strength of the weak area is lower than that of other parts of the slurry storage bag. During actual grouting, the weak area will be crushed first to form a grout area. In this way, the weak areas can be set at different positions of the slurry storage bag, or the weak areas can be set in different shapes to meet the needs of different construction scenarios.
3.本申请提供的桩端底部注浆装置,针对出浆孔开设在管壁上的情况,设计有一种特定的单向阀结构,包括止水胶带、硬质片及胶套。当管内压力大于止水胶带的极限承压强度时,止水胶带在管内压力的作用下向远离管壁的方向移动,以使止水胶带与管壁之间形成出浆间隙,并且管内压力同时克服胶套的弹力作用,使其跟随止水胶带转变为打开状态,完成出浆;当管内压力小于或等于止水胶带的极限承压强度时,管内压力不足以撑开止水胶带,止水胶带在胶套的弹力作用下紧贴在管壁上,胶套转变为密封状态,此状态下能够阻止管外的浆液回流至管内,从而起到单向阀的作用。另外,硬质片能够避免胶套由于负压,局部通过出浆孔被吸入管内,造成密封性能的破坏。3. The bottom grouting device at the pile end provided by this application is designed with a specific one-way valve structure for the case where the grout hole is set on the pipe wall, including a water-stop tape, a hard sheet and a rubber sleeve. When the pressure inside the pipe is greater than the ultimate pressure bearing strength of the waterstop tape, the waterstop tape moves away from the pipe wall under the action of the pressure inside the pipe, so that a slurry outlet gap is formed between the waterstop tape and the pipe wall, and the pressure inside the pipe simultaneously Overcome the elastic effect of the rubber sleeve, make it follow the water-stop tape into an open state, and complete the pulping; when the pressure in the pipe is less than or equal to the ultimate pressure bearing strength of the water-stop tape, the pressure in the pipe is not enough to stretch the water-stop tape, and the water-stop Under the action of the elastic force of the rubber sleeve, the adhesive tape is tightly attached to the pipe wall, and the rubber sleeve turns into a sealed state. In this state, the slurry outside the pipe can be prevented from flowing back into the pipe, thus playing the role of a one-way valve. In addition, the hard sheet can prevent the rubber sleeve from being partially sucked into the pipe through the slurry outlet due to negative pressure, causing damage to the sealing performance.
4.本申请提供的桩端底部注浆装置,固定板设为环形板,在整个装置沿桩孔下沉的过程中,桩孔内的泥浆水和空气等会经通过孔从而进入桩底注浆装置上方,不会在桩底注浆装置和桩孔之间形成破坏孔壁的涡流,进而有效地避免下降过程中由于泥浆水等无法排出在桩孔中形成破坏孔壁的涡流的问题,避免回旋于固定板边缘和桩孔之间的泥浆水流冲刷并扰动桩孔孔壁,有效地防止桩孔的孔壁坍塌、孔底沉渣超标以及断桩的问题,有效地提高了灌注桩体的施工质量和进度。4. For the bottom grouting device at the pile end provided by this application, the fixed plate is set as an annular plate. When the whole device sinks along the pile hole, the mud water and air in the pile hole will pass through the hole and enter the pile bottom grouting device. Above the grouting device, no vortex that damages the hole wall will be formed between the grouting device at the bottom of the pile and the pile hole, thereby effectively avoiding the problem that the vortex that destroys the hole wall will be formed in the pile hole due to the failure of mud water to be discharged during the descent. Avoid the mud flow between the edge of the fixed plate and the pile hole from scouring and disturbing the wall of the pile hole, effectively prevent the hole wall of the pile hole from collapsing, the sediment at the bottom of the hole exceeds the standard, and the pile is broken, and effectively improve the safety of the cast-in-place pile. Construction quality and progress.
5.本申请提供的灌注桩,由于具有前述方案任一项所述的桩端底部注浆装置,所以其具有前述任一项所述的优点。5. The cast-in-place pile provided by the present application has the advantages described in any one of the foregoing solutions because it has the pile end bottom grouting device described in any one of the preceding solutions.
6.本申请提供的施工方法,能够根据土壤的性质,结合储浆袋的预设容量及预设极限承压强度,确定实际注浆量和注浆压力,从而能够准确控制储浆袋破裂的时机和条件,进而更准确的控制扩大头的形状和容积,保证充足的承载力。6. The construction method provided by this application can determine the actual grouting volume and pressure according to the nature of the soil, combined with the preset capacity and preset limit bearing strength of the grout storage bag, so that the rupture of the grout storage bag can be accurately controlled. Timing and conditions, and then more accurately control the shape and volume of the expanding head to ensure sufficient bearing capacity.
附图说明Description of drawings
为了更清楚地说明本申请具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本申请的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的 前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present application or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the description of the specific embodiments or prior art. Obviously, the accompanying drawings in the following description The drawings are some implementations of the present application, and those skilled in the art can obtain other drawings based on these drawings without creative work.
图1为本申请桩端底部注浆装置一种实施结构的示意图;Fig. 1 is the schematic diagram of a kind of implementation structure of the pile end bottom grouting device of the present application;
图2为本申请桩端底部注浆装置另一种实施结构的示意图;Fig. 2 is the schematic diagram of another kind of implementation structure of the pile end bottom grouting device of the present application;
图3为本申请桩端底部注浆装置的俯视示意图;Fig. 3 is the top view schematic diagram of the grouting device at the bottom of the pile end of the present application;
图4为本申请单向阀的结构示意图;Fig. 4 is the structural representation of check valve of the present application;
图5为本申请灌注桩的结构示意图;Fig. 5 is the structural representation of the application cast-in-place pile;
图6为本申请旨在体现补浆管结构的示意图;Fig. 6 is the schematic diagram that the present application aims to embody the structure of the grouting pipe;
图7为本申请多边形的储浆袋的俯视图。Fig. 7 is a top view of the polygonal pulp storage bag of the present application.
附图标记说明:Explanation of reference signs:
1、固定板;2、储浆袋;21、检测口;3、注浆管;31、第一出浆部;311、第一出浆孔;32、接口;33、进浆管;4、第一单向阀;41、第一止水胶带;42、第一胶套;43、第一硬质片;5、环形挡件;6、补浆管;61、第二出浆部;611、第二出浆孔;7、第二单向阀;71、第二止水胶带;72、第二胶套;73、第二硬质片;8、钢筋笼。1. Fixed plate; 2. Slurry storage bag; 21. Detection port; 3. Grouting pipe; 31. First slurry outlet; 311. First slurry outlet; 32. Interface; 33. Slurry inlet pipe; 4. The first one-way valve; 41. The first water-stop tape; 42. The first rubber sleeve; 43. The first hard piece; , the second slurry outlet; 7, the second one-way valve; 71, the second water-stop tape; 72, the second rubber sleeve; 73, the second hard sheet; 8, the reinforcement cage.
具体实施方式Detailed ways
下面将结合附图对本申请的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The technical solutions of the present application will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are some of the embodiments of the present application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.
在本申请的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should be noted that unless otherwise specified and limited, the terms "installation", "connection", and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it may be mechanically connected or electrically connected; it may be directly connected or indirectly connected through an intermediary, and it may be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in this application according to specific situations.
此外,下面所描述的本申请不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present application described below may be combined as long as they do not constitute a conflict with each other.
本申请提供一种桩端底部注浆装置,参照图1-图3,包括固定板1和储浆袋2,具体如下:The application provides a bottom grouting device at the pile end, referring to Fig. 1-Fig. 3, including a fixing plate 1 and a grout storage bag 2, the details are as follows:
固定板1,可选用金属或高强度塑料板或硬质硅胶或其他常用的硬度能满足使用需求的材料制成。固定板1的制作可采用常规机械加工或3D打印一体成型皆可。固定板1的形状不做要求,根据桩孔的横截面形状确定固定板1的形状即可。The fixing plate 1 can be made of metal or high-strength plastic plate or hard silica gel or other commonly used materials whose hardness can meet the requirements of use. The fixed plate 1 can be fabricated by conventional machining or 3D printing. The shape of the fixed plate 1 is not required, and the shape of the fixed plate 1 can be determined according to the cross-sectional shape of the pile hole.
储浆袋2,固定在固定板1上,储浆袋2形成适于容置浆液的容置腔或储浆袋2与固定板1围成适于容置浆液的容置腔。储浆袋2可以是单独的一个整体然后固定在固定板1上;也可以是敞口结构然后与固定板1密封连接形成容置腔。储浆袋2充盈后可以是球形(如图2所示)或长方体(如图1所示)形或多边形(如图7所示)或其他常见形状,本领域人员容易根据桩孔横截面形状确定储浆袋2充盈后的形状。储浆袋2可以 是对称结构,也可以是非对称结构。储浆袋2可以采用编织或纺织或吹压等方式一体成型;也可以裁剪后用缝纫、粘连等方法成型。储浆袋2与固定板1的连接可以采用如下方式:在固定板1的边缘开设凹槽,凹槽内设有针孔,将储浆袋2边缘置于该凹槽中,利用凹槽和针孔用缝纫技术将储浆袋2装订到固定板1上;当然,储浆袋2与固定板1也可采用铆钉或化学胶粘或其他常见连接方式进行连接。储浆袋2具有内部填充浆液以承载桩体的充盈状态和内部中空的收拢状态,储浆袋2预设固定的承压强度值且在充盈状态下容积固定。这里所谓的充盈状态即储浆袋2内部填满浆液,表皮撑紧的状态;收拢状态是指内部未填充浆液或者未填充满浆液,表皮未完全撑紧的状态。“充盈状态下容积固定”,即储浆袋不具有弹性伸缩量,内部浆液充满后容积是固定的,这主要是相对现有技术中的注浆胶囊而言的,现有注浆胶囊处于充盈状态下,随着内部浆液压力增大,其仍会继续膨胀,本申请中的储浆袋2在充盈状态下容积是固定的。“预设固定的承压强度值”即制作储浆袋2时,已经设计好其受压破裂时的承压强度值,此值为一固定值。现有注浆胶囊,因为其随内部浆液压力增大而变大,并且膨胀后易收到外界桩孔壁等的干扰,其破裂时的承压强度值并不是一固定值。The slurry storage bag 2 is fixed on the fixed plate 1, and the slurry storage bag 2 forms an accommodating cavity suitable for accommodating slurry or the slurry storage bag 2 and the fixed plate 1 enclose an accommodating cavity suitable for accommodating slurry. The pulp storage bag 2 can be a separate whole and then fixed on the fixing plate 1; it can also be an open structure and then be sealed and connected with the fixing plate 1 to form an accommodating cavity. After the slurry storage bag 2 is filled, it can be spherical (as shown in Figure 2) or cuboid (as shown in Figure 1) or polygonal (as shown in Figure 7) or other common shapes. Determine the shape of the pulp storage bag 2 after filling. Pulp storage bag 2 can be symmetrical structure, also can be asymmetrical structure. The pulp storage bag 2 can be integrally formed by means of weaving, weaving or blowing; it can also be formed by sewing, bonding and other methods after cutting. The connection between the pulp storage bag 2 and the fixed plate 1 can be in the following manner: a groove is provided on the edge of the fixed plate 1, a pinhole is provided in the groove, the edge of the pulp storage bag 2 is placed in the groove, and the groove and the The pulp storage bag 2 is bound to the fixing plate 1 by sewing technology for the pinhole; of course, the pulp storage bag 2 and the fixing plate 1 can also be connected by rivets or chemical glue or other common connection methods. The slurry storage bag 2 has a filling state in which the interior is filled with grout to carry the pile body and a collapsed state in which the interior is hollow. The slurry storage bag 2 is preset with a fixed pressure-bearing strength value and has a fixed volume in the filling state. The so-called filling state here refers to the state in which the inside of the slurry storage bag 2 is filled with slurry and the skin is stretched tightly; the folded state refers to the state in which the inside is not filled with slurry or not filled with slurry, and the skin is not fully stretched. "The volume is fixed in the filling state", that is, the grout storage bag does not have elastic expansion and contraction, and the volume is fixed after the internal grout is filled. This is mainly compared with the grouting capsules in the prior art. The existing grouting capsules are full In the state, as the internal slurry pressure increases, it will continue to expand, and the volume of the slurry storage bag 2 in the present application is fixed in the filled state. The "preset and fixed pressure-bearing strength value" means that when the pulp storage bag 2 is made, the pressure-bearing strength value when it is ruptured under pressure has been designed, and this value is a fixed value. The existing grouting capsule, because it becomes larger with the increase of the internal grout pressure, and is easily disturbed by the external pile hole wall after expansion, the bearing strength value when it ruptures is not a fixed value.
本申请的桩端底部注浆装置,采用了充盈状态下容积不变的储浆袋2,储浆袋2的极限承压强度和极限容积是确定的,不会像现有注浆胶囊那样不断发生变化,所以,可根据储浆袋2的预设极限容积和极限承压强度确定实际注浆压力和注浆量,从而准确的控制储浆袋2的破裂时机和破裂条件。The bottom grouting device at the pile end of the present application adopts a grout storage bag 2 with a constant volume under the filling state. The ultimate compressive strength and limit volume of the grout storage bag 2 are determined, and will not be continuously filled like the existing grouting capsules. Therefore, the actual grouting pressure and grouting amount can be determined according to the preset limit volume and limit bearing strength of the grout storage bag 2, so as to accurately control the rupture timing and rupture conditions of the grout storage bag 2.
优选的,储浆袋2可以由化学合成纤维布料制成,例如涤纶、锦纶、腈纶等;也可以由塑料薄膜制成,例如聚氯乙烯、聚乙烯、聚丙烯等。具体的,塑料薄膜和化学合成纤维的强度得能满足填充混凝土浆液的要求,这是本领域人员清楚的最基本的条件。当然,其他实施例中,储浆袋2也可采用其他常见材料制成,但得能适合容置混凝土浆液,并且充盈状态下容积固定。具体的,储浆袋2可以是单层也可以是多层结构。Preferably, the slurry storage bag 2 can be made of chemical synthetic fiber cloth, such as polyester, nylon, acrylic fiber, etc.; it can also be made of plastic film, such as polyvinyl chloride, polyethylene, polypropylene, etc. Specifically, the strength of the plastic film and the chemical synthetic fiber must be able to meet the requirements of filling the concrete slurry, which is the most basic condition known to those skilled in the art. Of course, in other embodiments, the slurry storage bag 2 can also be made of other common materials, but it must be suitable for accommodating concrete slurry, and the volume is fixed in a filled state. Specifically, the pulp storage bag 2 can be a single layer or a multi-layer structure.
作为进一步改进方案,储浆袋2上设有薄弱区域,薄弱区域的承压强度小于储浆袋2其他部位的承压强度以在受压时形成出浆区域。薄弱区域可以是条状或是圆形或是其他任意形状,这主要根据需要迸浆的形式决定。As a further improvement, a weak area is provided on the pulp storage bag 2, and the pressure bearing strength of the weak area is smaller than that of other parts of the pulp storage bag 2 to form a pulp outlet area under pressure. The weak area can be a strip or a circle or any other shape, which is mainly determined by the form of the required slurry.
具有如下效果:薄弱区域的设置能够更加精确的控制在储浆袋2的哪个具体位置迸浆,以什么形式进行迸浆,这样进一步提高了储浆袋2破裂的可控性,能够满足多种不同施工场景的需要。It has the following effects: the setting of the weak area can more accurately control which specific position of the slurry storage bag 2 is to be injected, and in what form the slurry is injected, which further improves the controllability of the rupture of the slurry storage bag 2 and can meet various requirements. The needs of different construction scenarios.
当然,其他实施例中,储浆袋2也可以是均匀的,即不设置薄弱区域。Of course, in other embodiments, the pulp storage bag 2 may also be uniform, that is, no weak area is provided.
作为进一步改进方案,参照图1和图2,桩端底部注浆装置还包括:As a further improvement, referring to Figure 1 and Figure 2, the bottom grouting device at the pile end also includes:
注浆管3,与储浆袋2的内腔相连通,适于向储浆袋2内注浆;The grouting pipe 3 communicates with the inner cavity of the grout storage bag 2 and is suitable for grouting into the grout storage bag 2;
第一单向阀4,设于注浆管3与储浆袋2的连通位置,适于阻挡储浆袋2内的堵塞物进入注浆管3。The first one-way valve 4 is located at the communication position between the grouting pipe 3 and the grout storage bag 2 , and is suitable for preventing blockages in the grout storage bag 2 from entering the grouting pipe 3 .
具有如下效果:第一单向阀4的设置能够保证浆液的正常输出,同时也能够阻挡外界的泥沙、沉渣等堵塞物进入注浆管3内。It has the following effects: the setting of the first one-way valve 4 can ensure the normal output of the slurry, and can also prevent blockages such as external sediment and sediment from entering the grouting pipe 3 .
优选的,参照图4,注浆管3的管壁上开设有第一出浆孔311,第一单向阀4包括:Preferably, referring to Fig. 4, a first grout hole 311 is provided on the pipe wall of the grouting pipe 3, and the first one-way valve 4 includes:
第一止水胶带41,缠绕于注浆管3开设有第一出浆孔311的部位;The first water-stop tape 41 is wound around the part of the grouting pipe 3 where the first grouting hole 311 is opened;
第一胶套42,直接套于第一止水胶带41外侧,第一胶套42采用橡皮或软硅胶等具有弹性的材料即可;The first rubber sleeve 42 is directly placed on the outside of the first waterproof tape 41, and the first rubber sleeve 42 can be made of elastic materials such as rubber or soft silica gel;
第一止水胶带41和第一胶套42皆具有向靠近注浆管3方向收紧的密封状态,以及受注浆管3内压力作用与注浆管3形成间隙的打开状态;密封状态下第一止水胶带41在第一胶套42的收紧作用下紧贴注浆管3,打开状态下第一止水胶带41与注浆管3之间形成间隙,注浆管3内部的浆液可通过所述间隙排出;Both the first water-stop tape 41 and the first rubber sleeve 42 have a sealed state that is tightened toward the direction of the grouting pipe 3, and an open state where a gap is formed between the grouting pipe 3 and the grouting pipe 3 by the pressure in the grouting pipe 3; in the sealed state The first water-stop tape 41 is tightly attached to the grouting pipe 3 under the tightening effect of the first rubber sleeve 42. In the opened state, a gap is formed between the first water-stop tape 41 and the grouting pipe 3, and the grout inside the grouting pipe 3 can be discharged through said gap;
第一硬质片43,夹于第一止水胶带41与第一胶套42之间,且对应第一出浆孔311设置;第一硬质片43采用金属片或硬质塑料或其他硬质材料制成。The first hard sheet 43 is sandwiched between the first waterproof tape 41 and the first rubber sleeve 42, and is set corresponding to the first slurry outlet 311; the first hard sheet 43 is made of metal sheet or hard plastic or other hard Made of high quality material.
具有以下效果:第一止水胶带41的止水效果较好,可提高单向阀的密封性能;第一胶套42具有较好的弹性,一方面能够保证第一止水胶带41的复位,另一方面也能够提供足够的收紧力,以确保第一止水胶带41在密封状态下紧密贴合在注浆管3的管壁上;第一硬质片43的硬度较高,能够抵抗负压,避免柔性的第一胶套42和第一止水胶带41通过第一出浆孔311被局部吸入管内,造成结构的破坏以及密封性能的破坏。It has the following effects: the water-stopping effect of the first water-stopping tape 41 is better, which can improve the sealing performance of the one-way valve; the first rubber sleeve 42 has good elasticity, which can ensure the reset of the first water-stopping tape 41 on the one hand, On the other hand, sufficient tightening force can also be provided to ensure that the first waterproof tape 41 is closely attached to the wall of the grouting pipe 3 in a sealed state; the hardness of the first hard sheet 43 is relatively high, and can resist Negative pressure prevents the flexible first rubber sleeve 42 and the first waterproof tape 41 from being partially sucked into the pipe through the first slurry outlet 311, causing structural damage and damage to the sealing performance.
作为上述技术方案的一种改进结构,可在第一止水胶带41与第一硬质片43之间增设一层胶套,即第一胶套42通过增设的胶套间接套在第一止水胶带41上,这样相对于前述结构而言,第一止水胶带41与所增设的胶套完全接触,胶套对第一止水胶带41的锁紧效果更好。As an improved structure of the above technical solution, a layer of rubber sleeve can be added between the first waterproof adhesive tape 41 and the first hard sheet 43, that is, the first rubber sleeve 42 is indirectly sleeved on the first stopper through the added rubber sleeve. On the water-stop adhesive tape 41, so compared with the aforementioned structure, the first water-stop adhesive tape 41 is in full contact with the added rubber sleeve, and the rubber sleeve has a better locking effect on the first water-stop adhesive tape 41.
优选的,参照图1-图3,注浆管3包括:Preferably, referring to Fig. 1-Fig. 3, the grouting pipe 3 includes:
第一出浆部31,位于所述储浆袋2内腔中;第一出浆部31的形状可根据储浆袋2的形状确定,例如储浆袋2为环形结构,则将第一出浆部31对应设为与储浆袋2适配的环形管状,这样能够延伸至储浆袋2的不同位置,使得注浆更加均匀;The first slurry outlet 31 is located in the cavity of the slurry storage bag 2; the shape of the first slurry outlet 31 can be determined according to the shape of the slurry storage bag 2, for example, the slurry storage bag 2 is an annular structure, and the first slurry outlet The grout part 31 is correspondingly configured as an annular tubular shape adapted to the grout storage bag 2, so that it can extend to different positions of the grout storage bag 2, so that the grouting is more uniform;
接口32,穿过固定板1且与第一出浆部31连通;The interface 32 passes through the fixed plate 1 and communicates with the first slurry outlet 31;
进浆管33,与接口32密封连通。The slurry feeding pipe 33 is in sealing communication with the interface 32 .
接口32与进浆管33的连接可以是螺纹连接、法兰连接、焊接连接、承插连接或管道黏合连接等皆可。The connection between the interface 32 and the slurry inlet pipe 33 can be threaded connection, flange connection, welding connection, socket connection or pipeline adhesive connection, etc.
具有以下效果:注浆时,浆液从进浆管33进入,通过接口32到达第一出浆部31,从而进入储浆袋2中,注浆更加方便。It has the following effects: during grouting, the grout enters from the grout inlet pipe 33, reaches the first grout outlet 31 through the interface 32, and then enters the grout storage bag 2, making grouting more convenient.
优选的,参照图3,固定板1为环形板,储浆袋2为与环形板适配的环形结构。这里的“环形”优选采用圆环,但不局限于圆环,根据桩孔形状确定环形的具体形状,例如桩孔为方形,则采用方环结构。“环形”的内孔位置优选采用与环形外缘同轴的中心位置,但不局限于该位置,也可以是偏心布置。Preferably, referring to FIG. 3 , the fixing plate 1 is an annular plate, and the pulp storage bag 2 is an annular structure adapted to the annular plate. The "ring" here is preferably a circular ring, but not limited to a circular ring. The specific shape of the ring is determined according to the shape of the pile hole. For example, if the pile hole is square, a square ring structure is used. The position of the "annular" inner hole is preferably a center position coaxial with the outer edge of the ring, but it is not limited to this position, and can also be arranged eccentrically.
具有以下效果:环形的固定板1和储浆袋2结构,使得桩端底部注浆装置朝向桩孔孔底下沉的过程中,桩孔内的泥浆水和空气等会经过环形内孔从而进入桩端底部注浆装置的上方,不会在桩端底部注浆装置与桩孔之间形成破坏孔壁的涡流,进而有效的避免 了桩端底部注浆装置下降过程中由于泥浆水等无法排出在桩孔中形成破坏孔壁的涡流的问题,避免回旋于固定板1边缘和桩孔之间的泥浆水流冲刷并扰动孔壁,有效地防止桩孔的孔壁坍塌、孔底沉渣超标以及断桩的问题,有效地提高了灌注桩的施工质量和进度。It has the following effects: the ring-shaped fixing plate 1 and the grout storage bag 2 structure make the grouting device at the bottom of the pile tip sink toward the bottom of the pile hole, and the mud water and air in the pile hole will pass through the annular inner hole and enter the pile Above the grouting device at the bottom of the pile end, no vortex that destroys the hole wall will be formed between the grouting device at the bottom of the pile end and the pile hole, thereby effectively avoiding that the mud water cannot be discharged in the pile during the descent of the bottom grouting device at the pile end. The problem of vortex that destroys the hole wall is formed in the pile hole, avoiding the mud flow between the edge of the fixed plate 1 and the pile hole to scour and disturb the hole wall, effectively preventing the hole wall of the pile hole from collapsing, the sediment at the bottom of the hole exceeding the standard, and the pile from breaking problems, effectively improving the construction quality and progress of cast-in-place piles.
作为进一步改进方案,参照图1和图2,固定板1的内环边缘设有延伸至储浆袋2内环的环形挡件5。可选用金属或高强度塑料板或硬质硅胶或其他常用的硬度能满足使用需求的材料制成。环形挡件5可固定在固定板1的内环边缘;也可与固定板1一体成型。当储浆袋2位敞口结构时,储浆袋2可与固定板1和环形挡件5同时密封连接以形成容置腔。储浆袋2与环形挡件5的连接可以采用如下方式:在环形挡件5的边缘开设凹槽,凹槽内设有针孔,将储浆袋2边缘置于该凹槽中,利用凹槽和针孔用缝纫技术将储浆袋2装订到环形挡件5上;当然,储浆袋2与环形挡件5也可采用铆钉或化学胶粘或其他常见连接方式进行连接。As a further improvement, referring to FIG. 1 and FIG. 2 , the inner ring edge of the fixing plate 1 is provided with an annular stopper 5 extending to the inner ring of the slurry storage bag 2 . It can be made of metal or high-strength plastic plate or hard silica gel or other commonly used materials whose hardness can meet the needs of use. The annular stopper 5 can be fixed on the inner ring edge of the fixed plate 1 ; it can also be integrally formed with the fixed plate 1 . When the slurry storage bag 2 is in an open structure, the slurry storage bag 2 can be sealed and connected with the fixing plate 1 and the ring stopper 5 at the same time to form an accommodating cavity. The connection between the pulp storage bag 2 and the annular stopper 5 can be in the following manner: a groove is provided on the edge of the annular stopper 5, and a pinhole is provided in the groove, and the edge of the slurry storage bag 2 is placed in the groove, and the edge of the slurry storage bag 2 is placed in the groove, The grooves and pinholes are used to bind the pulp storage bag 2 to the ring stopper 5 by sewing technology; of course, the pulp storage bag 2 and the ring stopper 5 can also be connected by rivets or chemical glue or other common connection methods.
具有如下效果:在灌注桩的施工过程中,需要向安装有桩端底部注浆装置的钢筋笼8灌注混凝土以形成灌注桩,上述环形挡件5可以有效地在通过孔边缘形成一个将混凝土和储浆袋2分隔开的阻挡件,以防止在朝向钢筋笼8内灌注混凝土时,混凝土通过上述固定板1内孔包裹储浆袋2的问题,避免储浆袋2因被混凝土包裹影响灌注桩后注浆效果的问题。It has the following effects: in the construction process of cast-in-place piles, it is necessary to pour concrete into the reinforcement cage 8 installed with the bottom grouting device at the pile end to form cast-in-place piles, and the above-mentioned annular stopper 5 can effectively form a gap between the concrete and the cast-in-place pile at the edge of the hole. The barriers separated by the slurry storage bag 2 are used to prevent the concrete from wrapping the slurry storage bag 2 through the inner hole of the fixing plate 1 when pouring concrete towards the reinforcement cage 8, so as to prevent the slurry storage bag 2 from being affected by the concrete wrapping. The problem of post-pile grouting effect.
作为进一步的改进方案,参照图1和图2,桩端底部注浆装置还包括:As a further improvement, referring to Figure 1 and Figure 2, the bottom grouting device at the pile end also includes:
补浆管6,与环形挡件5内部区域相连通,适于向桩孔内注浆;The grouting pipe 6 communicates with the inner area of the annular stopper 5 and is suitable for grouting into the pile hole;
第二单向阀7,设于补浆管6与环形挡件5内部区域的连通位置,适于阻挡桩孔内的堵塞物进入补浆管6。The second one-way valve 7 is located at the communication position between the grout replenishing pipe 6 and the inner area of the annular stopper 5 , and is suitable for preventing blockages in pile holes from entering the grout replenishing pipe 6 .
具有如下效果:通过补浆管6可以简单方便的向环形挡件5内部区域注浆,消除因落差太大造成桩底部位的混凝土离析形成的虚尖和干碴石,有效地填充环形挡件5内部区域从而增强桩底强度。第二单向阀7的设置能够保证浆液的正常输出,同时也能够阻挡外界的泥沙、沉渣等堵塞物进入注浆管3内。It has the following effects: through the grouting pipe 6, the inner area of the ring stopper 5 can be simply and conveniently grouted, eliminating the virtual tip and dry ballast formed by the concrete segregation at the bottom of the pile due to the large drop, and effectively filling the ring stopper 5 The internal area thus enhances the strength of the pile bottom. The setting of the second one-way valve 7 can ensure the normal output of the grout, and can also prevent blockages such as external silt and sediment from entering the grouting pipe 3 .
优选的,参照图4,补浆管6的管壁上开设有第二出浆孔611,第二单向阀7包括:Preferably, referring to Fig. 4, a second slurry outlet hole 611 is opened on the wall of the slurry replenishing pipe 6, and the second one-way valve 7 includes:
第二止水胶带71,缠绕于补浆管6开设有第二出浆孔611的部位;The second water-stop adhesive tape 71 is wound around the part where the grout filling pipe 6 is provided with the second grout hole 611;
第二胶套72,直接套于第二止水胶带71外侧,第二胶套72采用橡皮或软硅胶等具有弹性的材料即可;The second rubber sleeve 72 is directly placed on the outside of the second waterproof tape 71, and the second rubber sleeve 72 can be made of elastic materials such as rubber or soft silica gel;
第二止水胶带71和第二胶套72皆具有向靠近补浆管6方向收紧的密封状态,以及受补浆管6内压力作用与补浆管6形成间隙的打开状态;密封状态下第二止水胶带71在第二胶套72的收紧作用下紧贴补浆管6,打开状态下第二止水胶带71与补浆管6之间形成间隙,补浆管6内部的浆液可通过所述间隙排出;Both the second water-stop tape 71 and the second rubber sleeve 72 have a sealed state that is tightened toward the direction of the grout replenishing pipe 6, and an open state where a gap is formed between the grout replenishing pipe 6 and the grout replenishing pipe 6 under the sealed state. The second water-stop tape 71 is tightly attached to the grout filling pipe 6 under the tightening effect of the second rubber sleeve 72. In the opened state, a gap is formed between the second water-stop tape 71 and the grout filling pipe 6, and the grout inside the grout pipe 6 can be discharged through said gap;
第二硬质片73,夹于第二止水胶带71与第二胶套72之间,且对应第二出浆孔611设置;第一硬质片43采用金属片或硬质塑料或其他硬质材料制成。The second hard sheet 73 is sandwiched between the second waterproof tape 71 and the second rubber sleeve 72, and is set corresponding to the second slurry outlet 611; the first hard sheet 43 is made of metal sheet or hard plastic or other hard Made of high quality material.
具有以下效果:第二止水胶带71的止水效果较好,可提高单向阀的密封性能;第 二胶套72具有较好的弹性,一方面能够保证第二止水胶带71的复位,另一方面也能够提供足够的收紧力,以确保第二止水胶带71在密封状态下紧密贴合在补浆管6的管壁上;第二硬质片73的硬度较高,能够抵抗负压,避免柔性的第二胶套72和第二止水胶带71通过第二出浆孔611被局部吸入管内,造成结构的破坏以及密封性能的破坏。It has the following effects: the second water-stop tape 71 has a better water-stop effect, which can improve the sealing performance of the one-way valve; the second rubber sleeve 72 has better elasticity, which can ensure the reset of the second water-stop tape 71 on the one hand, On the other hand, sufficient tightening force can also be provided to ensure that the second waterproof tape 71 is tightly attached to the wall of the grouting pipe 6 in a sealed state; the hardness of the second hard sheet 73 is relatively high, and can resist The negative pressure prevents the flexible second rubber sleeve 72 and the second water-stop tape 71 from being partially sucked into the pipe through the second slurry outlet 611, causing damage to the structure and sealing performance.
作为上述技术方案的一种改进结构,可在第二止水胶带71与第二硬质片73之间增设一层胶套,即第二胶套72通过增设的胶套间接套在第二止水胶带71上,这样相对于前述结构而言,第二止水胶带71与所增设的胶套完全接触,胶套对第二止水胶带71的锁紧效果更好。As an improved structure of the above technical solution, a layer of rubber sleeve can be added between the second waterproof adhesive tape 71 and the second hard sheet 73, that is, the second rubber sleeve 72 is indirectly sleeved on the second stopper through the added rubber sleeve. On the water-stop adhesive tape 71, so compared with the aforementioned structure, the second water-stop adhesive tape 71 is in full contact with the added rubber sleeve, and the rubber sleeve has a better locking effect on the second water-stop adhesive tape 71.
优选的,参照图1和图2,补浆管6具有延伸至环形挡件5内部区域的第二出浆部61,第二出浆部61为沿环形挡件5内壁延伸的环形管路。当然,在其他实施例中,补浆管6也可以是单根管结构,如图6所示;亦或者两根管等其他容易想到的替换结构。Preferably, referring to FIG. 1 and FIG. 2 , the grout feeding pipe 6 has a second slurry outlet 61 extending to the inner area of the annular baffle 5 , and the second slurry outlet 61 is an annular pipeline extending along the inner wall of the annular baffle 5 . Certainly, in other embodiments, the grout feeding pipe 6 may also be a single pipe structure, as shown in FIG. 6 ; or other easily conceivable alternative structures such as two pipes.
具有以下效果:第二出浆部61设置成环形管路,能够更好的适应环形挡件5内部区域,将浆液输送至该区域的不同位置,使得补浆更加均匀。It has the following effects: the second slurry outlet 61 is set as an annular pipeline, which can better adapt to the inner area of the annular stopper 5, and transport the slurry to different positions in the area, so that the slurry replenishment is more uniform.
作为上述技术方案的进一步改进,参照图1和图2,固定板1上设有检测口21,检测口21适于向储浆袋2内充入介质,以验证储浆袋2是否发生泄漏和/或可以承受的压力大小。As a further improvement of the above-mentioned technical solution, with reference to Fig. 1 and Fig. 2, a detection port 21 is provided on the fixed plate 1, and the detection port 21 is suitable for filling the medium into the pulp storage bag 2 to verify whether the pulp storage bag 2 leaks and /or the amount of pressure that can be tolerated.
具有如下效果:检测口21的设置可通过试验得出储浆袋2的极限容积和极限承压强度,这样便于得出更准确的预设值,从而利于后续施工对于储浆袋2破裂时机和条件的准确控制。It has the following effects: the setting of the detection port 21 can obtain the limit volume and limit bearing strength of the slurry storage bag 2 through tests, which is convenient for obtaining more accurate preset values, thereby facilitating follow-up construction for the timing and timing of the slurry storage bag 2 rupture. Accurate control of conditions.
作为上述技术方案的进一步改进,桩端底部注浆装置还包括:As a further improvement of the above technical solution, the bottom grouting device at the pile end also includes:
保护罩,与所述固定板1可拆卸连接,且适于在施工前罩设在所述储浆袋2的外侧。保护罩可采用铝箔或硬质塑料或硬质硅胶等制成,主要用于在施工前保护储浆袋2,避免磕碰损伤储浆袋2;施工时,需将该保护罩从固定板1上拆下。The protective cover is detachably connected with the fixing plate 1 and is suitable for covering the outside of the slurry storage bag 2 before construction. The protective cover can be made of aluminum foil, hard plastic or hard silica gel, etc., and is mainly used to protect the slurry storage bag 2 before construction, so as to avoid bumping and damaging the slurry storage bag 2; remove.
本申请还提供一种灌注桩,参照图5,包括前述的桩端底部注浆装置和钢筋笼8,钢筋笼8与桩端底部注浆装置的固定板1相连。The present application also provides a cast-in-place pile, referring to FIG. 5 , which includes the aforementioned bottom grouting device at the pile end and a reinforcement cage 8, and the reinforcement cage 8 is connected to the fixing plate 1 of the bottom grouting device at the pile end.
具体实施时,可将进浆管33和补浆管6与钢筋笼8固定连接,以实现固定。During specific implementation, the grout feeding pipe 33 and the grout replenishing pipe 6 can be fixedly connected with the reinforcement cage 8 to realize fixation.
细节的,本申请中的固定板1、注浆管3、环形挡件5及补浆管6皆可采用高强度塑料制成。具体可采用注塑或3D打印一次成型。In detail, the fixing plate 1, the grouting pipe 3, the annular stopper 5 and the grouting pipe 6 in this application can all be made of high-strength plastics. Specifically, injection molding or 3D printing can be used for one-time molding.
本申请的灌注桩,由于具有前述的任意一种桩端底部注浆装置,所以具有前述任一桩端底部注浆装置的效果。The cast-in-place pile of the present application has the effect of any one of the aforementioned pile end bottom grouting devices because it has any one of the aforementioned pile end bottom grouting devices.
本申请还提供一种上述灌注桩的施工方法,依次包括如下步骤:The application also provides a construction method for the above-mentioned cast-in-place pile, which comprises the steps in turn:
S1.形成桩孔,对桩孔内的沉渣进行清理;S1. form the pile hole, and clean up the sediment in the pile hole;
S2.将下端安装有桩端底部注浆装置的钢筋笼8下沉至桩孔的底部;S2. Sink the reinforcement cage 8 equipped with the bottom grouting device at the bottom end of the pile to the bottom of the pile hole;
S3.向桩孔内灌注混凝土,以形成灌注桩;S3. Pour concrete into the pile hole to form a cast-in-situ pile;
S4.向储浆袋2内注浆,形成桩底扩大头。S4. Inject grout into the grout storage bag 2 to form a pile bottom expansion head.
在步骤S4中,根据形成桩孔的土壤性质进行控制。若为砂性土,控制实际注浆量 和注浆压力皆大于储浆袋2的预设值(预设值包括两个:一个是制作储浆袋2时设计好的储浆袋2充盈状态下的容积值,另一个是所预设固定的承压强度值),以使储浆袋2破裂,从而使储浆袋2内的水泥浆液溢出,对桩底周围的砂性土渗透固结,并使桩端扩大头与周围地层紧密的胶结为一个整体。若为黏性土,控制实际注浆量和注浆压力小于储浆袋2的预设值,避免储浆袋2破裂;使用时,要通过注浆压力和注浆量使桩端底部形成的扩大头尽量的大,从而大幅度提高灌注桩的极限承载力并减少沉降;随后,注浆装置中的补浆管6可以直接向桩底地层注浆,此时,已形成的扩大头可阻挡浆液上返,促使补浆向地层纵深发展,使桩底地基加固范围扩大。当然,其他实施例中,若为砂性土,也可控制储浆袋2不破裂;若为黏性土,也可控制储浆袋2破裂。In step S4, control is performed according to the properties of the soil forming the pile hole. If it is sandy soil, control the actual grouting amount and grouting pressure to be greater than the preset value of the grout storage bag 2 (the preset value includes two: one is the filling state of the grout storage bag 2 designed when making the grout storage bag 2 the lower volume value, and the other is the preset fixed bearing strength value), so that the slurry storage bag 2 is broken, so that the cement slurry in the slurry storage bag 2 overflows, and the sandy soil around the bottom of the pile is infiltrated and consolidated. , and make the enlarged head of the pile end and the surrounding stratum tightly cemented as a whole. If it is cohesive soil, control the actual grouting amount and grouting pressure to be less than the preset value of the grouting bag 2, so as to avoid the rupture of the grouting bag 2; The expansion head should be as large as possible, thereby greatly improving the ultimate bearing capacity of the cast-in-situ pile and reducing settlement; then, the grouting pipe 6 in the grouting device can directly grout the pile bottom stratum, at this time, the formed expansion head can block The upward return of the grout promotes the development of the grout to the depth of the stratum and expands the scope of foundation reinforcement at the bottom of the pile. Certainly, in other embodiments, if it is sandy soil, the slurry storage bag 2 can also be controlled not to rupture; if it is clayey soil, the slurry storage bag 2 can also be controlled to rupture.
具有如下效果:本施工方法利用前述独特的桩端底部注浆装置,能够根据不同土壤性质和储浆袋2的预设值,准确的选择是否破裂,以及破裂的时机和条件,从而能够适应性的提高灌注桩的承载能力。It has the following effects: this construction method utilizes the above-mentioned unique pile end bottom grouting device, and can accurately select whether to rupture, as well as the timing and conditions of the rupture according to different soil properties and the preset value of the grout storage bag 2, so as to be able to adapt Improve the bearing capacity of cast-in-place piles.
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Apparently, the above-mentioned embodiments are only examples for clear description, rather than limiting the implementation. For those of ordinary skill in the art, other changes or changes in different forms can be made on the basis of the above description. It is not necessary and impossible to exhaustively list all the implementation manners here. And the obvious changes or changes derived therefrom are still within the scope of protection of the present invention.

Claims (16)

  1. 一种桩端底部注浆装置,包括:A pile end bottom grouting device, comprising:
    固定板(1);fixed plate (1);
    其特征在于,还包括:It is characterized in that it also includes:
    储浆袋(2),固定在所述固定板(1)上,所述储浆袋(2)形成适于容置浆液的容置腔或所述储浆袋(2)与所述固定板(1)围成适于容置浆液的容置腔,所述储浆袋(2)具有内部填充浆液以承载桩体的充盈状态和内部中空的收拢状态,所述储浆袋(2)预设固定的极限承压强度值且在充盈状态下容积固定。A slurry storage bag (2), fixed on the fixed plate (1), the slurry storage bag (2) forms an accommodating cavity suitable for accommodating slurry or the slurry storage bag (2) and the fixed plate (1) Enclosing an accommodating cavity suitable for accommodating grout, the grout storage bag (2) has a filling state in which the grout is filled inside to carry the pile body and a collapsed state in which the inside is hollow, and the grout storage bag (2) is prefabricated A fixed ultimate compressive strength value is set and the volume is fixed in the filling state.
  2. 根据权利要求1所述的桩端底部注浆装置,其特征在于,所述储浆袋(2)由化学合成纤维布料或塑料薄膜制成。The pile end bottom grouting device according to claim 1, characterized in that, the grout storage bag (2) is made of chemical synthetic fiber cloth or plastic film.
  3. 根据权利要求1或2所述的桩端底部注浆装置,其特征在于,所述储浆袋(2)上设有薄弱区域,所述薄弱区域的承压强度小于所述储浆袋(2)其他部位的承压强度以在受压时形成出浆区域。The pile end bottom grouting device according to claim 1 or 2, characterized in that, the slurry storage bag (2) is provided with a weak area, and the pressure bearing strength of the weak area is smaller than that of the slurry storage bag (2). ) the bearing strength of other parts to form a slurry area when under pressure.
  4. 根据权利要求1所述的桩端底部注浆装置,其特征在于,还包括:The pile end bottom grouting device according to claim 1, further comprising:
    注浆管(3),与所述储浆袋(2)的内腔相连通,适于向所述储浆袋(2)内注浆;The grouting pipe (3) communicates with the inner cavity of the grout storage bag (2), and is suitable for grouting into the grout storage bag (2);
    第一单向阀(4),设于所述注浆管(3)与所述储浆袋(2)的连通位置,适于阻挡所述储浆袋(2)内的堵塞物进入所述注浆管(3)。The first one-way valve (4) is located at the communication position between the grouting pipe (3) and the grout storage bag (2), and is suitable for blocking the blockage in the grout storage bag (2) from entering the Grouting pipe (3).
  5. 根据权利要求4所述的桩端底部注浆装置,其特征在于,所述注浆管(3)的管壁上开设有第一出浆孔(311),所述第一单向阀(4)包括:The pile end bottom grouting device according to claim 4, characterized in that, a first grout hole (311) is opened on the pipe wall of the grouting pipe (3), and the first one-way valve (4 )include:
    第一止水胶带(41),缠绕于所述注浆管(3)开设有第一出浆孔(311)的 部位;The first water-stop adhesive tape (41), wound around the position where the grouting pipe (3) is provided with the first grouting hole (311);
    第一胶套(42),直接或间接套于所述第一止水胶带(41)外侧;The first rubber sleeve (42) is directly or indirectly placed on the outside of the first waterproof tape (41);
    所述第一止水胶带(41)和所述第一胶套(42)具有向靠近所述注浆管(3)方向收紧的密封状态,以及受所述注浆管(3)内压力作用与所述注浆管(3)形成间隙的打开状态;The first water-stop tape (41) and the first rubber sleeve (42) have a tight sealing state towards the grouting pipe (3), and are subject to the internal pressure of the grouting pipe (3). Acting in an open state forming a gap with the grouting pipe (3);
    第一硬质片(43),夹于所述第一止水胶带(41)与所述第一胶套(42)之间,且对应所述第一出浆孔(311)设置。The first hard sheet (43) is sandwiched between the first waterproof adhesive tape (41) and the first rubber sleeve (42), and is arranged corresponding to the first pulp outlet hole (311).
  6. 根据权利要求4或5所述的桩端底部注浆装置,其特征在于,所述注浆管(3)包括:The pile end bottom grouting device according to claim 4 or 5, wherein the grouting pipe (3) comprises:
    第一出浆部(31),位于所述储浆袋(2)内腔中;The first pulp outlet (31) is located in the inner cavity of the pulp storage bag (2);
    接口(32),穿过所述固定板(1)且与所述第一出浆部(31)连通;An interface (32), which passes through the fixed plate (1) and communicates with the first slurry outlet (31);
    进浆管(33),与所述接口(32)密封连通。The slurry feeding pipe (33) is in sealing communication with the interface (32).
  7. 根据权利要求1所述的桩端底部注浆装置,其特征在于,所述固定板(1)为环形板,所述储浆袋(2)为与所述环形板适配的环形结构。The pile end bottom grouting device according to claim 1, characterized in that, the fixing plate (1) is an annular plate, and the slurry storage bag (2) is an annular structure adapted to the annular plate.
  8. 根据权利要求7所述的桩端底部注浆装置,其特征在于,所述固定板(1)的内环边缘设有延伸至所述储浆袋(2)内环的环形挡件(5)。The pile end bottom grouting device according to claim 7, characterized in that, the inner ring edge of the fixing plate (1) is provided with an annular stopper (5) extending to the inner ring of the slurry storage bag (2) .
  9. 根据权利要求8所述的桩端底部注浆装置,其特征在于,还包括:The pile end bottom grouting device according to claim 8, further comprising:
    补浆管(6),与所述环形挡件(5)内部区域相连通,适于向桩孔内注浆;The grout filling pipe (6) communicates with the inner area of the annular stopper (5), and is suitable for grouting into the pile hole;
    第二单向阀(7),设于所述补浆管(6)与所述环形挡件(5)内部区域的连通位置,适于阻挡所述桩孔内的堵塞物进入所述补浆管(6)。The second one-way valve (7) is located at the communication position between the grout replenishing pipe (6) and the inner area of the annular stopper (5), and is suitable for blocking the blockage in the pile hole from entering the grout replenishment Tube (6).
  10. 根据权利要求9所述的桩端底部注浆装置,其特征在于,所述补浆管(6)的管壁上开设有第二出浆孔(611),所述第二单向阀(7)包括:The pile end bottom grouting device according to claim 9, characterized in that, a second grout hole (611) is opened on the pipe wall of the grout filling pipe (6), and the second one-way valve (7 )include:
    第二止水胶带(71),缠绕于所述补浆管(6)开设有第二出浆孔(611)的部位;The second water-stop adhesive tape (71) is wound around the position where the second grout hole (611) is opened in the grout filling pipe (6);
    第二胶套(72),直接或间接套于所述第二止水胶带(71)外侧;The second rubber sleeve (72) is directly or indirectly placed on the outside of the second waterproof tape (71);
    所述第二止水胶带(71)和第二胶套(72)皆具有向靠近所述补浆管(6)方向收紧的密封状态,以及受所述补浆管(6)内压力作用与所述补浆管(6)形成间隙的打开状态;Both the second water-stop tape (71) and the second rubber sleeve (72) have a sealing state that is tightened toward the direction of the grout replenishing pipe (6), and are affected by the internal pressure of the grout replenishing pipe (6). An open state that forms a gap with the grout filling pipe (6);
    第二硬质片(73),夹于所述第二止水胶带(71)与所述第二胶套(72)之间,且对应所述第二出浆孔(611)设置。The second hard sheet (73) is sandwiched between the second waterproof adhesive tape (71) and the second rubber sleeve (72), and is arranged corresponding to the second slurry outlet hole (611).
  11. 根据权利要求9或10所述的桩端底部注浆装置,其特征在于,所述补浆管(6)具有延伸至所述环形挡件(5)内部区域的第二出浆部(61),所述第二出浆部(61)为沿所述环形挡件(5)内壁延伸的环形管路。The pile end bottom grouting device according to claim 9 or 10, characterized in that, the grout filling pipe (6) has a second grout outlet (61) extending to the inner area of the annular stopper (5) , the second slurry outlet (61) is an annular pipeline extending along the inner wall of the annular stopper (5).
  12. 根据权利要求1所述的桩端底部注浆装置,其特征在于,所述固定板(1)上设有检测口(21),所述检测口(21)适于向所述储浆袋(2)内充入介质。The pile end bottom grouting device according to claim 1, characterized in that, the fixed plate (1) is provided with a detection port (21), and the detection port (21) is suitable for feeding to the slurry storage bag ( 2) filled with medium.
  13. 根据权利要求1所述的桩端底部注浆装置,其特征在于,还包括:The pile end bottom grouting device according to claim 1, further comprising:
    保护罩,与所述固定板(1)可拆卸连接,且适于在施工前罩设在所述储浆袋(2)的外侧。The protective cover is detachably connected with the fixing plate (1), and is suitable for covering the outside of the slurry storage bag (2) before construction.
  14. 一种灌注桩,其特征在于,包括:A cast-in-place pile, characterized in that it comprises:
    权利要求1至13中任一项所述的桩端底部注浆装置;The pile end bottom grouting device according to any one of claims 1 to 13;
    钢筋笼(8),与所述桩端底部注浆装置的固定板(1)相连。The reinforcement cage (8) is connected with the fixed plate (1) of the grouting device at the bottom of the pile end.
  15. 一种权利要求14所述的灌注桩的施工方法,其特征在于,依次包括如下步骤:A construction method for cast-in-place piles according to claim 14, characterized in that, comprising the steps in turn:
    S1.形成桩孔,对所述桩孔内的沉渣进行清理;S1. forming a pile hole, and cleaning the sediment in the pile hole;
    S2.将下端安装有所述桩端底部注浆装置的钢筋笼(8)下沉至所述桩孔的底部;S2. sinking the reinforcement cage (8) with the grouting device at the bottom of the pile end installed at the lower end to the bottom of the pile hole;
    S3.向所述桩孔内灌注混凝土,以形成灌注桩;S3. Pouring concrete into the pile hole to form a cast-in-place pile;
    S4.向所述储浆袋(2)内注浆,形成桩底扩大头。S4. Injecting grout into the grout storage bag (2) to form a pile bottom expansion head.
  16. 根据权利要求15所述的施工方法,其特征在于,在步骤S4中,根据形成桩孔的土壤性质进行控制:若为砂性土,控制实际注浆量和注浆压力皆大于所述储浆袋(2)的预设值,以使储浆袋(2)破裂;若为黏性土,控制实际注浆量和注浆压力小于所述储浆袋(2)的预设值,避免储浆袋(2)破裂。The construction method according to claim 15, characterized in that, in step S4, control is performed according to the properties of the soil forming the pile hole: if it is sandy soil, control the actual grouting amount and grouting pressure to be greater than the stored grout The preset value of the bag (2), so that the grout storage bag (2) ruptures; if it is clayey soil, control the actual grouting amount and grouting pressure to be less than the preset value of the grout storage bag (2) to avoid storage The slurry bag (2) is broken.
PCT/CN2022/094671 2021-08-09 2022-05-24 Pile end bottom grouting apparatus, cast-in-place pile and construction method therefor WO2023016034A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN202110906032.8 2021-08-09
CN202110906032 2021-08-09
CN202111162217.9 2021-09-30
CN202111162217.9A CN113737786A (en) 2021-08-09 2021-09-30 Pile end bottom grouting device, cast-in-place pile and construction method thereof

Publications (1)

Publication Number Publication Date
WO2023016034A1 true WO2023016034A1 (en) 2023-02-16

Family

ID=78725907

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/094671 WO2023016034A1 (en) 2021-08-09 2022-05-24 Pile end bottom grouting apparatus, cast-in-place pile and construction method therefor

Country Status (2)

Country Link
CN (2) CN113737786A (en)
WO (1) WO2023016034A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113737786A (en) * 2021-08-09 2021-12-03 高永光 Pile end bottom grouting device, cast-in-place pile and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214438A (en) * 2000-02-02 2001-08-07 East Japan Railway Co Method for construction cast-in-place concrete pile, and preload device onto ground under bottom of cast-in- place concrete pile.
JP2005194766A (en) * 2004-01-07 2005-07-21 East Japan Railway Co Construction method of tip-reinforced cast-in-place concrete pile, injection bag, and steel frame
JP2006138100A (en) * 2004-11-11 2006-06-01 East Japan Railway Co Constructing method for tip-reinforcing cast-in-place pile
CN103469792A (en) * 2013-09-09 2013-12-25 广东省第二建筑工程公司 Method for conducting grouting construction at back of pile bottom of cast-in-place pile
CN203514303U (en) * 2013-10-30 2014-04-02 南京工业大学 Post-grouting enlarged-toe uplift micropile
CN106759277A (en) * 2016-11-16 2017-05-31 上海市建工设计研究院有限公司 Grouting device, bottom-enlarging prefabricated pile tube, bottom-enlarging filling pile and its construction method
CN107780308A (en) * 2017-09-27 2018-03-09 中铁十局集团第三建设有限公司 A kind of application process of Bag Grouting Pile in Soft Railway
CN108411920A (en) * 2018-01-25 2018-08-17 天津大学 A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN110896646A (en) * 2018-12-25 2020-03-20 高永光 Pile bottom grouting cavity and using method thereof, cast-in-place pile body and construction method thereof
CN113737786A (en) * 2021-08-09 2021-12-03 高永光 Pile end bottom grouting device, cast-in-place pile and construction method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001214438A (en) * 2000-02-02 2001-08-07 East Japan Railway Co Method for construction cast-in-place concrete pile, and preload device onto ground under bottom of cast-in- place concrete pile.
JP2005194766A (en) * 2004-01-07 2005-07-21 East Japan Railway Co Construction method of tip-reinforced cast-in-place concrete pile, injection bag, and steel frame
JP2006138100A (en) * 2004-11-11 2006-06-01 East Japan Railway Co Constructing method for tip-reinforcing cast-in-place pile
CN103469792A (en) * 2013-09-09 2013-12-25 广东省第二建筑工程公司 Method for conducting grouting construction at back of pile bottom of cast-in-place pile
CN203514303U (en) * 2013-10-30 2014-04-02 南京工业大学 Post-grouting enlarged-toe uplift micropile
CN106759277A (en) * 2016-11-16 2017-05-31 上海市建工设计研究院有限公司 Grouting device, bottom-enlarging prefabricated pile tube, bottom-enlarging filling pile and its construction method
CN107780308A (en) * 2017-09-27 2018-03-09 中铁十局集团第三建设有限公司 A kind of application process of Bag Grouting Pile in Soft Railway
CN108411920A (en) * 2018-01-25 2018-08-17 天津大学 A kind of the multiple spot bellows grouting device and its method of control soil deformation
CN110896646A (en) * 2018-12-25 2020-03-20 高永光 Pile bottom grouting cavity and using method thereof, cast-in-place pile body and construction method thereof
CN113737786A (en) * 2021-08-09 2021-12-03 高永光 Pile end bottom grouting device, cast-in-place pile and construction method thereof

Also Published As

Publication number Publication date
CN113737786A (en) 2021-12-03
CN218990144U (en) 2023-05-09

Similar Documents

Publication Publication Date Title
WO2020133992A1 (en) Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same
WO2023016034A1 (en) Pile end bottom grouting apparatus, cast-in-place pile and construction method therefor
WO2020024740A1 (en) Pile bottom grouting cavity and use method, and poured pile body and construction method of poured pile body
CN207739264U (en) A kind of Grouting Pipe
CN107761753A (en) A kind of foundation ditch water burst rapid rescue slip casting method for blocking
CN112832279B (en) Waterproof structure and method for dewatering well of underground foundation pit
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN109139059A (en) A kind of osmotic grouting suitable for shield tunnel integrates stick and construction method
CN114457790B (en) Pile forming device and pile forming method for cast-in-place piles in karst areas
CN110896646B (en) Pile bottom grouting device and using method thereof, cast-in-place pile body and construction method thereof
CN210395360U (en) Pile bottom grouting cavity and cast-in-place pile body
CN111188350A (en) Confined water dewatering well structure and dewatering method
CN107816041B (en) Non-dumping hole-forming prestressed anchor rod, anchor hole leakage-proof structure and construction method thereof
JPH0734521A (en) Remade basin and sanitary sewage pipeline
CN109555140A (en) Foundation pit and Tunnel Base spring pump drainage method for blocking and device
CN214272102U (en) Waterproof construction of underground foundation ditch precipitation well
CN212896306U (en) Collapsible foundation membrane bag grouting control system
JP2004285801A (en) Water cut off joining method and structure between members
CN107419721B (en) Improve the method for the pre-buried sound detecting pipe survival rate of bored concrete pile and the Sound Surveillance System of bored concrete pile
KR960005718Y1 (en) Anchoring-bolt structure with provisions for grouting
CN206941656U (en) A kind of structure that injected hole is reserved using gas cell
CN209243728U (en) A kind of OPT interlocking pile slip casting around pile pipe device
CN207111115U (en) A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone
CN219621838U (en) Plugging device
JPH073863A (en) Remade pit and sewage pipeline

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22855020

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2024/0117.1

Country of ref document: KZ

Ref document number: 2401000790

Country of ref document: TH

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112024002640

Country of ref document: BR

NENP Non-entry into the national phase

Ref country code: DE