CN207111115U - A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone - Google Patents

A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone Download PDF

Info

Publication number
CN207111115U
CN207111115U CN201720997388.6U CN201720997388U CN207111115U CN 207111115 U CN207111115 U CN 207111115U CN 201720997388 U CN201720997388 U CN 201720997388U CN 207111115 U CN207111115 U CN 207111115U
Authority
CN
China
Prior art keywords
slip casting
rigid body
ring rigid
dead zone
surrounding rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720997388.6U
Other languages
Chinese (zh)
Inventor
李兵磊
楼晓明
黄萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao pengte Electromechanical Equipment Co., Ltd
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201720997388.6U priority Critical patent/CN207111115U/en
Application granted granted Critical
Publication of CN207111115U publication Critical patent/CN207111115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone, including pipeline body, also include high-pressure ball valve and Grouting Pipe, the pipeline body includes the pulp portion being connected and enters slurry portion, the pulp portion includes the first ring rigid body of the multiple hollow truncated cone-shapeds set gradually vertically, the external diameter of first ring rigid body front end is less than the external diameter of the first ring rigid body rear end, the Grouting Pipe includes slip casting portion and the fixed part being connected, the fixed part includes the second ring rigid body of the multiple hollow truncated cone-shapeds set gradually vertically, the external diameter of second ring rigid body front end is more than the external diameter of the second ring rigid body rear end, one end of the high-pressure ball valve is connected into slurry portion, the other end connection slip casting portion of high-pressure ball valve.Compared with prior art, the utility model improves slip casting aperture composite pipe tightness and structural strength, can prevent the water with pressure from being sprayed from fixed part, so as to ensure construction safety, solves the problems, such as slurries waste.

Description

A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone
Technical field
A kind of slip casting orifice tube is the utility model is related to, more particularly, to a kind of slip casting for the slip casting of roadway surrounding rock dead zone Orifice tube.
Background technology
Slurries will be filled into stratum by pipeline during slip casting, and Grouting Pipe is rushed out and is injected hole during to prevent slip casting Drilling is oriented to, and to be typically referred to as orifice tube in one section of steel pipe of injected hole aperture certain depth embedded set, this section of steel pipe.
In Grouting engineering at the top of tunnel, orifice sealing is not tight during slip casting, easy spillage.After slip casting terminates, due to slurries Solidification needs the time, if poorly sealed can also occur the phenomenon that slurries pour in down a chimney.Meanwhile orifice tube needs to protect during slip casting It is fixed to keep steady, and improves its overall pulling test power.
Utility model content
The purpose of this utility model is exactly to be used for tunnel to provide one kind the defects of overcoming above-mentioned prior art to exist The slip casting orifice tube of country rock dead zone slip casting, slip casting aperture composite pipe tightness and structural strength are improved, the water with pressure can be prevented Sprayed from fixed part, so as to ensure construction safety, solve the problems, such as slurries waste.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone, including pipeline body, in addition to high-pressure ball valve and note Slurry pipe, the pipeline body include the pulp portion being connected and enter slurry portion, and the pulp portion is more including setting gradually vertically First ring rigid body of individual hollow truncated cone-shaped, the external diameter of the first ring rigid body front end are less than the first ring rigid body rear end External diameter, the Grouting Pipe includes the slip casting portion that is connected and fixed part, and the fixed part includes setting gradually vertically more Second ring rigid body of individual hollow truncated cone-shaped, the external diameter of the second ring rigid body front end are more than the second ring rigid body rear end External diameter, one end of the high-pressure ball valve is connected into slurry portion, the other end connection slip casting portion of high-pressure ball valve.
On the first ring rigid body outer wall multiple slurry outlets are provided with quincunx.
It is described enter slurry portion on be arranged with ring flange.
It is described enter slurry portion and slip casting portion use seamless steel pipe.
It is connected between the high-pressure ball valve and slip casting portion by spiral buckle.
The pulp portion and the length ratio for entering slurry portion are 4 ~ 1.5: 1.
The length of the first ring rigid body is 20 ~ 40mm.
The length ratio of the slip casting portion and fixed part is 1: 2~3.
The length of the second ring rigid body is 6 ~ 10mm.
Compared with prior art, the utility model has advantages below:
1st, while the closing of grouting port is carried out using high-pressure ball valve, on the one hand, pulp portion is using the first ring rigidity The truncated cone-shaped structure of body, after insertion, frictional force is formed with surrounding soil, ensure that pipeline body is stably fixed at roadway surrounding rock sky Area, the truncated cone-shaped of the first ring rigid body also increase slip casting space, and on the other hand, fixed part uses the circle of the second ring rigid body Platform shape structure, ensure the close connection with injection point, improve slip casting aperture composite pipe tightness and structural strength, can prevent from carrying The water of pressure sprays from fixed part, so as to ensure construction safety, solves the problems, such as slurries waste.
2nd, superposing type installation is respectively adopted in the first ring rigid body and the first ring rigid body, can be adjusted according to engineering demand Save suitable length so that slurries inject more abundant, full, effective guarantee grouting quality, suitable for the note of tunnel top dead zone Slurry, it is practical.
3rd, the slurry outlet hole position of quincunx setting is mutually in 90 °, is ensureing that it is empty that slip casting orifice tube is stably fixed at roadway surrounding rock Ensure grouting quality while in area so that slurries injection is fuller, and the structure strength after shaping is higher.
4th, it is connected between high-pressure ball valve and slip casting portion by spiral buckle, is advantageous to Grouting Pipe and unloads in time, in order to To carry out the slip casting of other pipeline bodies in time, so as to accelerating construction progress.
5th, the reasonable setting to pulp portion and the length ratio for entering slurry portion, slip casting portion and fixed part is passed through, it is ensured that whole The stability of body structure, grouting quality are good.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the structural representation of Grouting Pipe;
Fig. 3 is the schematic diagram of slurry outlet on the first ring rigid body.
In figure, 1, pulp portion, the 11, first ring rigid body, 11-1, slurry outlet, 2, enter slurry portion, 3, high-pressure ball valve, 4, note Slurry portion, 5, fixed part, the 51, second ring rigid body, 6, ring flange.
Embodiment
The utility model is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with the utility model Implemented premised on technical scheme, give detailed embodiment and specific operating process, but guarantor of the present utility model Shield scope is not limited to following embodiments.
As shown in Figure 1 and Figure 2, a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone, including pipeline body, high pressure Ball valve 3 and Grouting Pipe, pipeline body include the pulp portion 1 being sequentially connected vertically and enter slurry portion 2, and pulp portion 1 is included vertically First ring rigid body 11 of the multiple hollow truncated cone-shapeds set gradually, the external diameter of the front end of the first ring rigid body 11 are less than the The external diameter of the rear end of one ring rigid body 11, enter and ring flange 6 is arranged with slurry portion 2, Grouting Pipe includes the note being sequentially connected vertically Slurry portion 4 and fixed part 5, fixed part 5 include the second ring rigid body 51 of the multiple hollow truncated cone-shapeds set gradually vertically, The external diameter of the front end of second ring rigid body 51 is more than the external diameter of the rear end of the second ring rigid body 51, one end connection of high-pressure ball valve 3 Enter the rear end in slurry portion 2, the front end in the other end connection slip casting portion 4 of high-pressure ball valve 3.First ring rigid body 11 and the first ring are firm Property body 11 be respectively adopted superposing type installation, suitable length can be adjusted according to engineering demand so that slurries injection it is more abundant, full Full, effective guarantee grouting quality is practical suitable for the slip casting of tunnel top dead zone.
For at the top of tunnel during the slip casting of dead zone, because grouting port be located at the top in tunnel, closed bad, easily race during slip casting Slurry, causes serious waste;After slip casting terminates, if closure grouting port not in time, will also result in and noted into dead zone Slurries outflow;Therefore, terminated spillage can not be caused to compare serious situation by plug-hole in time according to aperture section running pulp and slip casting, While the closing of grouting port is carried out using high-pressure ball valve 3, on the one hand, pulp portion 1 uses the circle of the first ring rigid body 11 Platform shape structure, after insertion, frictional force is formed with surrounding soil, ensures that pipeline body is stably fixed at roadway surrounding rock dead zone, first The truncated cone-shaped of ring rigid body 11 also increases slip casting space, and on the other hand, fixed part 5 uses the round platform of the second ring rigid body 51 Shape structure, ensure the close connection with injection point, improve slip casting aperture composite pipe tightness and structural strength, can prevent with pressure The water of power sprays from fixed part 5, so as to ensure construction safety, solves the problems, such as slurries waste.
Multiple slurry outlet 11-1 are provided with quincunx on the outer wall of first ring rigid body 11, as shown in figure 3, quincunx set The slurry outlet 11-1 hole positions put are mutually in 90 °, ensure while ensureing that slip casting orifice tube is stably fixed in roadway surrounding rock dead zone Grouting quality so that slurries injection is fuller, and the structure strength after shaping is higher.
Enter slurry portion 2 and slip casting portion 4 and use seamless steel pipe, between pipeline body and high-pressure ball valve 3, pulp portion 1 with enter slurry By being welded to connect between portion 2 and between slip casting portion 4 and fixed part 5, lead between the high-pressure ball valve 3 of stainless steel and slip casting portion 4 Cross spiral buckle to be connected, be advantageous to Grouting Pipe and unload in time, so as to carry out the slip casting of other pipeline bodies in time, from And accelerating construction progress.
Pulp portion 1 and the length ratio for entering slurry portion 2 are 4 ~ 1.5:1, the length of the first ring rigid body 11 is 20 ~ 40mm. The length of slip casting portion 4 and fixed part 5 ratio is 1:2 ~ 3, the length of the second ring rigid body 51 is 6 ~ 10mm.By to length ratio The setting of example, it is ensured that integrally-built stability, grouting quality are good.In the present embodiment, the length of the first ring rigid body 11 It is 11 to spend for 35mm, correspondence number, and the length in pulp portion 1 is 385mm, and the length for entering slurry portion 2 is 180mm.Second ring is firm Property body 51 length be 7mm, corresponding number is 6, and the length in slip casting portion 4 is 16mm, and the length of fixed part 5 is 42mm, flange The thickness of disk 6 is 6mm, corresponding a diameter of 80mm, enters 2 a diameter of 32mm of slurry portion.
In use, by being installed after winding gauze or flax silk, tested by the pressure water of slip casting lush, it is ensured that slip casting aperture Manage water-tight, it is ensured that mixed cement slurry with mixer again after errorless, high-pressure ball valve 3 controls the outflow of slurries, and grouting pressure is not Regulation must be exceeded, find to shut down in time when tunnel concrete cracking, chip off-falling, bulge, race spillage and handled.After slip casting terminates, lead to Cross closing high-pressure ball valve 3, to ensure in time slip casting terminate after not spillage, when other position spillages are serious, added using cement Other accelerators are blocked.Slip casting must rinse cement mortar in Grouting Pipe well after terminating with clear water.
Can be by this section of injected hole all by setting when implementing grouting filling reinforcing to supporting section tunnel arch dead zone and country rock Meter eye position has once been constructed, and hole-specifically mounting hole pipe during slip casting, by several times or burst, subregion are implemented.

Claims (9)

1. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone, including pipeline body, it is characterised in that also including high pressure Ball valve(3)And Grouting Pipe, the pipeline body include the pulp portion being connected(1)With enter slurry portion(2), the pulp portion(1)Bag Include the first ring rigid body of the multiple hollow truncated cone-shapeds set gradually vertically(11), the first ring rigid body(11)Front end External diameter be less than the first ring rigid body(11)The external diameter of rear end, the Grouting Pipe include the slip casting portion being connected(4)And fixation Portion(5), the fixed part(5)Including the second ring rigid body of the multiple hollow truncated cone-shapeds set gradually vertically(51), Second ring rigid body(51)The external diameter of front end is more than the second ring rigid body(51)The external diameter of rear end, the high-pressure ball valve(3) One end connect into slurry portion(2), high-pressure ball valve(3)Other end connection slip casting portion(4).
2. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described First ring rigid body(11)On outer wall multiple slurry outlets are provided with quincunx(11-1).
3. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described Enter slurry portion(2)On be arranged with ring flange(6).
4. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described Enter slurry portion(2)With slip casting portion(4)Use seamless steel pipe.
5. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described High-pressure ball valve(3)With slip casting portion(4)Between be connected by spiral buckle.
6. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described Pulp portion(1)With enter slurry portion(2)Length ratio be 4 ~ 1.5: 1.
7. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described First ring rigid body(11)Length be 20 ~ 40mm.
8. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described Slip casting portion(4)And fixed part(5)Length ratio be 1: 2~3.
9. a kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone according to claim 1, it is characterised in that described Second ring rigid body(51)Length be 6 ~ 10mm.
CN201720997388.6U 2017-08-10 2017-08-10 A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone Active CN207111115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720997388.6U CN207111115U (en) 2017-08-10 2017-08-10 A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720997388.6U CN207111115U (en) 2017-08-10 2017-08-10 A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone

Publications (1)

Publication Number Publication Date
CN207111115U true CN207111115U (en) 2018-03-16

Family

ID=61578429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720997388.6U Active CN207111115U (en) 2017-08-10 2017-08-10 A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone

Country Status (1)

Country Link
CN (1) CN207111115U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882199A (en) * 2019-01-25 2019-06-14 北京瑞威世纪铁道工程有限公司 Rigid mini-valve tube component and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882199A (en) * 2019-01-25 2019-06-14 北京瑞威世纪铁道工程有限公司 Rigid mini-valve tube component and its application method

Similar Documents

Publication Publication Date Title
CN101914917B (en) Anti-seepage and leak-blocking construction method for excavation of subway foundation pit in soft soil area
CN107130979A (en) A kind of shield sky pushes through the section of jurisdiction float Structure and construction method of Tunneling by mining method
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN108625536A (en) A kind of precast concrete vertical member grouting channel design method
CN106592614B (en) The method for blocking of leakage point in foundation pit waterproof of man
CN109680675A (en) A kind of Stabilizing Grout method that can dynamically control grouting amount and harden opportunity
CN211692396U (en) Recoverable double-liquid mixed grouting hole sealing device for deep hole
CN203362181U (en) Mud jacking film bag for water resistance and leaking stoppage in tunnel construction
CN206874296U (en) A kind of tunnel hollow bolt grouting device
CN207111115U (en) A kind of slip casting orifice tube for the slip casting of roadway surrounding rock dead zone
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN105220700A (en) Foundation pit waterproof curtain reinforcement
CN206928526U (en) A kind of half grout sleeve of bar connecting
CN206972256U (en) One kind is used for wall rock grouting pipe in tunnel and only starches structure
CN102913183B (en) Multifunctional pneumatic power hole sealing device and the hole-sealing technology supporting with it
CN110469338A (en) A kind of artesian water stratum shield method of reseptance
CN205314085U (en) A biliquid slip casting system that is used for cement and water glass solution
CN104018475B (en) A kind of embedded penstock backfill grouting structure and grouting process thereof
CN206110124U (en) Bored concrete pile stake end post grouting device
CN206477349U (en) Stifled, the water blockoff structure of drainpipe through walls
CN105089548A (en) Nearly horizontal high pressure-bearing drilling sealing method and sealing structure
CN109139063B (en) Constructing tunnel film bag Grouting Pipe structure and slip casting lithification construction method
CN107338816A (en) A kind of high artesian post-cast strip is depressured leak-blocking construction method
CN209891223U (en) Anchor rod construction water leakage prevention sealing device located below underground water level
CN103195167A (en) Method for lifting concrete in ultrahigh reducing steel pipe column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200326

Address after: No.4 village, Xuejiadao office, Huangdao District, Qingdao City, Shandong Province

Patentee after: Qingdao qiankunxing Intelligent Technology Co., Ltd

Address before: Minhou County of Fuzhou City, Fujian province 350108 Street Town Road No. 2 University City School District of Fuzhou University

Patentee before: FUZHOU University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200410

Address after: 350108 No. 2 College Road, University New District, Fuzhou, Fujian, Fuzhou

Patentee after: FUZHOU University

Address before: No.4 village, Xuejiadao office, Huangdao District, Qingdao City, Shandong Province

Patentee before: Qingdao qiankunxing Intelligent Technology Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200430

Address after: 266555 No.6 Huilongshan Road, Huangdao District, Qingdao, Shandong Province

Patentee after: Qingdao pengte Electromechanical Equipment Co., Ltd

Address before: 350108 No. 2 College Road, University New District, Fuzhou, Fujian, Fuzhou

Patentee before: FUZHOU University