WO2022176246A1 - 支援装置、支援方法およびプログラム - Google Patents

支援装置、支援方法およびプログラム Download PDF

Info

Publication number
WO2022176246A1
WO2022176246A1 PCT/JP2021/034452 JP2021034452W WO2022176246A1 WO 2022176246 A1 WO2022176246 A1 WO 2022176246A1 JP 2021034452 W JP2021034452 W JP 2021034452W WO 2022176246 A1 WO2022176246 A1 WO 2022176246A1
Authority
WO
WIPO (PCT)
Prior art keywords
equipment
information
production line
list
unit
Prior art date
Application number
PCT/JP2021/034452
Other languages
English (en)
French (fr)
Inventor
光宏 米田
Original Assignee
オムロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by オムロン株式会社 filed Critical オムロン株式会社
Publication of WO2022176246A1 publication Critical patent/WO2022176246A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q41/00Combinations or associations of metal-working machines not directed to a particular result according to classes B21, B23, or B24
    • B23Q41/08Features relating to maintenance of efficient operation
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing

Definitions

  • the present disclosure relates to support devices, support methods, and programs.
  • Patent Document 1 discloses a system that supports the generation of a manufacturing BOM necessary for production from a product design BOM (Bills of Materials).
  • Patent Document 1 does not consider such problems.
  • the present disclosure has been made in view of the above problems, and an object thereof is to provide a support device, a support method, and a program capable of shortening the time required to start up a production line for increased production. .
  • the reception unit receives designation of one or more processes that constitute the production line.
  • the extraction unit extracts, for each process, one or more pieces of equipment candidate information corresponding to each of one or more processes from a first list containing one or more pieces of equipment candidate information indicating equipment candidates for realizing the process.
  • the identifying unit identifies one or more combinations of equipment candidates that realize one or more processes based on the extraction result of the extracting unit.
  • Each of the one or more pieces of equipment candidate information includes first information identifying equipment included in the equipment constructed in the past to realize the corresponding process, and second information indicating the performance of the equipment regarding the target evaluation item. ,including.
  • the search unit searches for a device corresponding to the first information included in each of the extracted one or more pieces of facility candidate information from a second list showing a list of devices that are not in operation.
  • the first presentation unit presents whether or not a production line can be constructed using non-operating equipment based on the search result by the search unit for each of the one or more combinations.
  • the second presentation unit for each of the one or more combinations, based on the second information included in the facility candidate information of each of the one or more facility candidates included in the combination, when the production line is constructed by the combination. Present the scores for the target endpoints.
  • the user can grasp whether or not it is possible to construct a production line using equipment that is not in operation (idle equipment).
  • the user can adopt a combination that allows the production line to be started using idle equipment.
  • the user selects the target evaluation items from among the multiple combinations in consideration of the scores of the target evaluation items presented by the second presentation unit. You can select the combination that is superior to the score of Alternatively, when the score of the target evaluation item is emphasized, the user may select a combination that does not allow construction of a production line using idle equipment.
  • the information presented by the support device helps build the production line. Therefore, the time required to start up the production line for increased production is shortened.
  • the search unit searches the second list for devices of a model that match the model of the device identified by the first information.
  • the search unit searches the second list for a device having performance equal to or higher than that of the device identified by the first information.
  • the target evaluation items include at least one of the number of production per unit time, the variation in the number of production per unit time, the defect rate, the cost required for the equipment, and the cost required for designing the equipment.
  • the user can start the production line considering the scores of these items.
  • a support method for supporting construction of a production line includes first to sixth steps.
  • the first step is a step of receiving designation of one or more processes that constitute the production line.
  • a second step extracts one or more facility candidate information corresponding to each of one or more processes from a first list including one or more facility candidate information indicating facility candidates for realizing the process for each process. is a step.
  • the third step is a step of identifying one or more combinations of equipment candidates that realize one or more processes based on the extraction result.
  • Each of the one or more pieces of equipment candidate information includes first information identifying equipment included in the equipment constructed in the past to realize the corresponding process, and second information indicating the performance of the equipment regarding the target evaluation item. ,including.
  • a fourth step is a step of searching for a device corresponding to the first information included in each of the extracted one or more pieces of facility candidate information from the second list showing the list of devices that are not in operation.
  • a fifth step is a step of presenting whether or not a production line can be constructed using equipment that is not in operation based on the search results for each of the one or more combinations.
  • a sixth step is, for each of the one or more combinations, based on the second information included in the facility candidate information of each of the one or more facility candidates included in the combination, when the production line is constructed by the combination Presenting a score for the target endpoint.
  • the program causes the computer to execute the above support method.
  • FIG. 1 is a schematic diagram showing the overall configuration of a support system 1 including a support device 100 according to an embodiment
  • FIG. 2 is a schematic diagram showing a hardware configuration example of the support device 100
  • FIG. It is a figure which shows an example of the production line in operation.
  • 4 is a diagram showing an example of a facility candidate list 20
  • FIG. 3 is a diagram showing an example of an idle device list 30
  • FIG. 2 is a block diagram showing an example of a functional configuration of the support device 100
  • FIG. 6 is a diagram showing a list of combinations specified by the specifying unit 13
  • FIG. 4 is a diagram showing content presented by the support device 100
  • FIG. 6 is a flowchart showing the flow of search processing according to the embodiment
  • FIG. 11 is a schematic diagram showing the overall configuration of a support system 1A according to Modification 1;
  • FIG. 11 is a schematic diagram showing the overall configuration of a support system 1B according to Modification 2;
  • 6 is a diagram showing an example of a device information list 60;
  • FIG. 10 is a flowchart showing a flow of search processing according to modification 2;
  • FIG. 14 is a flow chart showing the flow of processing of a subroutine of step S12 shown in FIG. 13;
  • FIG. 1 is a schematic diagram showing the overall configuration of a support system 1 including a support device 100 according to an embodiment.
  • the support system 1 includes a support device 100 and a terminal 200.
  • FIG. Support device 100 and terminal 200 are, for example, general-purpose computers.
  • Support device 100 and terminal 200 are managed, for example, by a company that has a production line.
  • Support device 100 and terminal 200 are connected via a known communication network.
  • the support device 100 supports construction of the production line in response to a request from the terminal 200.
  • the support device 100 stores a facility candidate list 20 and an idle device list 30 and includes an information processing section 10 that performs information processing using the facility candidate list 20 and the idle device list 30 .
  • the equipment candidate list 20 includes one or more pieces of equipment candidate information indicating equipment candidates for realizing each process that can be included in the production line.
  • the facility candidate information includes, for example, information about facilities constructed in the past by a company that manages the support device 100 and the terminal 200 .
  • each of the one or more facility candidate information includes configuration information identifying one or more devices included in the facility constructed in the past to realize the corresponding process, and the facility related to the target evaluation item. and performance information indicating performance.
  • the idle device list 30 shows a list of devices that are not in operation. Specifically, the idle device list 30 is a list of devices (idle devices) that are owned by the company that manages the support device 100 and the terminal 200 but are not currently in operation.
  • the user When it becomes necessary to start up a production line equivalent to the production line in operation in order to deal with increased production, the user operates the terminal 200 to transmit a production line construction support request to the support device 100 .
  • the information processing section 10 executes the following processes (1) to (6).
  • the information processing section 10 receives from the terminal 200 designation of one or more processes that constitute the production line.
  • the information processing section 10 extracts from the facility candidate list 20 one or more facility candidate information corresponding to each of the designated one or more processes.
  • the information processing section 10 Based on the extraction result, the information processing section 10 identifies one or more combinations of facility candidates that realize one or more designated processes.
  • the information processing unit 10 searches the idle device list 30 for a device corresponding to the configuration information included in each of the extracted one or more pieces of facility candidate information. (5) For each of the identified one or more combinations, the information processing unit 10 informs the terminal 200 whether or not a production line can be constructed using devices that are not in operation (idle devices) based on the search results. Present. (6) For each of the one or more combinations, the information processing section 10 builds a production line based on the performance information included in the facility candidate information of each of the one or more facility candidates included in the combination. The terminal 200 is presented with the score of the target evaluation item at the time.
  • the user can ascertain whether or not the idle equipment can be used to start up the production line by checking the presented contents. If the production line needs to be started up quickly, the user should adopt a combination that allows the production line to be started up using idle equipment. When there are multiple combinations in which the idle equipment can be used to start up the production line, the user considers the presented scores for the target evaluation items and selects the best score for the target evaluation item from among the multiple combinations. You can choose any combination.
  • the user may select a combination that does not allow the production line to be started using idle equipment.
  • the information presented by the support device 100 helps build the production line. Therefore, the time required to start up the production line for increased production is shortened.
  • FIG. 2 is a schematic diagram showing a hardware configuration example of the support device 100. As shown in FIG. The support device 100 is typically composed of a general-purpose computer.
  • the support device 100 includes a CPU (Central Processing Unit) 102 , a ROM (Read Only Memory) 104 , a RAM (Random Access Memory) 106 and a hard disk (HDD) 108 . These components are connected via bus 120 .
  • CPU Central Processing Unit
  • ROM Read Only Memory
  • RAM Random Access Memory
  • HDD hard disk
  • the CPU 102 executes various programs including the OS.
  • the ROM 104 stores BIOS and various data.
  • RAM 106 provides a work area for storing data necessary for program execution by CPU 102 .
  • HDD 108 non-volatilely stores programs executed by CPU 102 .
  • HDD 108 stores a support program 130 that supports construction of a production line.
  • the HDD 108 stores a facility candidate list 20 and an idle device list 30 necessary for executing the support program 130 .
  • the support device 100 further includes an operation unit 113 including a keyboard 110 and a mouse 111, and a display 114. Operation unit 113 and display 114 constitute a user interface.
  • the support device 100 includes an optical recording medium reader 116 for reading the support program 130 and general-purpose applications from the recording medium 150 .
  • the support program 130 may be installed from a memory card, distribution server, or the like.
  • the communication interface 118 controls data exchange with external devices via a known communication network such as a LAN (Local Area Network).
  • Support device 100 communicates with terminal 200 via communication interface 118 .
  • FIG. 2 shows a configuration example in which necessary functions are provided by a processor such as the CPU 102 executing a program. , ASIC or FPGA).
  • a processor such as the CPU 102 executing a program. , ASIC or FPGA.
  • virtualization technology may be used to execute a plurality of OSs with different purposes in parallel, and necessary applications may be executed on each OS.
  • FIG. 3 is a diagram showing an example of a production line in operation.
  • the production line 2 illustrated in FIG. 3 is composed of a processing process 2a, a soldering process 2b, and an assembly process 2c.
  • the processing step 2a the housing of the product is processed using a robot equipped with a processing tool.
  • soldering step 2b solder is applied to the board using a robot equipped with a soldering tool.
  • the assembly process a robot is used to pick the substrates and install them in the enclosure.
  • the user When it becomes necessary to construct a production line equivalent to the production line 2 in order to respond to increased production of products, the user operates the terminal 200 to perform the processing process 2a, the soldering process 2b, and the assembly process composing the production line 2.
  • a support request specifying step 2c is sent to the support device 100 . Note that the user may input the support request to the operation unit 113 of the support device 100 .
  • FIG. 4 is a diagram showing an example of the facility candidate list 20. As shown in FIG.
  • the facility candidate list 20 includes one or more facility candidate information 21 indicating facility candidates for realizing the process for each process.
  • the facility candidate list 20 exemplified in FIG. 4 includes three pieces of facility candidate information 21 for the "processing process".
  • the facility candidate list 20 includes configuration information 22.
  • the configuration information 22 indicates the configuration of facilities constructed in the past to realize the corresponding process.
  • the configuration information 22 includes information identifying one or more devices included in the facility. "Facilities built in the past" include not only facilities that were actually installed on the production line, but also facilities that were installed only on the trial production line, and facilities that were designed during the trial production stage but were installed on the production line. It may also include facilities that were not there before.
  • the configuration information "configuration aa1" indicates the types of the integrated controller 40, servo mechanism 41 and robot 42 that make up the facility.
  • the servomechanism 41 is incorporated in a transport device that transports a housing to be processed.
  • a processing tool is attached to the tip of the arm of the robot 42 .
  • the robot 42 processes the housing transported by the transport device using a processing tool.
  • Integrated controller 40 controls servo mechanism 41 and robot 42 . Since the servomechanism 41 and the robot 42 are controlled by a single integrated controller 40, the operation of the transfer device and the operation of the robot 42 are synchronized.
  • the model of the integrated controller 40 is "A-1".
  • the configuration information "configuration aa2" indicates the types of the two controllers 43, the servo mechanism 41 and the robot 42 that make up the facility.
  • One of the two controllers 43 controls the servomechanism 41 and the other controls the robot 42 .
  • By synchronizing the timers of the two controllers 43, the operation of the transfer device and the operation of the robot 42 are synchronized.
  • the configuration of each of one or more facilities constructed in the past to realize the machining process is registered in advance as the configuration information 22.
  • the facility candidate information 21 includes performance information 23 indicating the performance of the facility regarding the evaluation target item.
  • the performance information 23 indicates the average number of production per unit time, variations in the number of production per unit time, defect rate, equipment cost, and design cost.
  • equipment costs and design costs are represented by relative ranking. However, equipment costs and design costs may be represented by the actual values required when constructing the equipment.
  • the equipment cost is the cost required for the equipment that makes up the facility.
  • Equipment costs typically include the purchase price of the equipment.
  • the equipment cost may include equipment availability.
  • Equipment with a low operating rate is less likely to deteriorate due to use. Therefore, by checking the equipment cost, it becomes possible to preferentially adopt idle equipment with less deterioration from idle equipment.
  • the design cost is the cost required to design the equipment, and the cost required to assemble the equipment and start up the equipment.
  • the design cost also includes the cost required to create a user program to be installed in the device, the cost required to set the network connection configuration of a plurality of devices that make up the facility, and the like.
  • FIG. 5 is a diagram showing an example of the idle device list 30. As shown in FIG. As shown in FIG. 5, the idle device list 30 indicates, for each device, the model, the number of devices in operation, and the number of devices that are not in operation (number of idle devices). In the example shown in FIG. 5, the idle device list 30 shows a list of controllers.
  • FIG. 6 is a block diagram showing an example of the functional configuration of the support device 100.
  • the support device 100 includes an information processing section 10 and a storage section 70 .
  • the information processing unit 10 is realized by executing the support program 130 by the CPU 102 shown in FIG.
  • Storage unit 70 is implemented by ROM 104 , RAM 106 and HDD 108 .
  • the information processing section 10 includes a reception section 11 , an extraction section 12 , a specification section 13 , a search section 14 , a first presentation section 15 and a second presentation section 16 .
  • the reception unit 11 receives designation of one or more processes that make up the production line. For example, in the case of the production line 2 shown in FIG. 3, the reception unit 11 receives designation of "processing process”, "soldering process” and "assembly process”.
  • the extraction unit 12 extracts one or more facility candidate information 21 corresponding to each of the designated one or more processes from the facility candidate list 20 .
  • the configuration information 22 indicating the “configuration aa1”, the “configuration aa2”, and the “configuration aa3” is included from the facility candidate list 20 shown in FIG. Three pieces of facility candidate information 21 are extracted.
  • the identifying unit 13 identifies one or more combinations of facility candidates that implement one or more designated processes based on the extraction result of the extracting unit 12 .
  • FIG. 7 is a diagram showing a list of combinations specified by the specifying unit 13.
  • FIG. FIG. 7 shows an example of combinations when three pieces of equipment candidate information 21 are extracted for each of the specified "processing process", "soldering process” and "assembly process". Specifically, three pieces of facility candidate information 21 each including configuration information 22 indicating "configuration aa1", “configuration aa2", and “configuration aa3" are extracted for the "processing step”. For the "soldering process”, three pieces of facility candidate information 21 each including configuration information 22 indicating "configuration bb1", “configuration bb2" and “configuration bb3" are extracted.
  • the search unit 14 searches the idle device list 30 for devices corresponding to the configuration information 22 included in each of the extracted one or more facility candidate information 21 .
  • the idle device list 30 is searched for a device whose number is one or more.
  • the first presentation unit 15 presents whether or not a production line can be constructed using devices that are not in operation (idle devices) based on the search result by the search unit 14 for each of the identified one or more combinations. do.
  • the first presentation unit 15 reads out the idle number of found devices from the idle device list 30 .
  • the first presentation unit 15 enables construction of a production line using the idle equipment when the number of idle equipment found is equal to or greater than the number of the equipment required for constructing the production line of the target combination. I judge.
  • the second presentation unit 16 for each of the specified one or more combinations, based on the performance information 23 included in the facility candidate information 21 of each of the one or more facility candidates included in the combination, the production line presents the score when the is constructed.
  • the second presentation unit 16 displays the minimum value of the production quantity per unit time included in the equipment candidate information 21 of each of the one or more equipment candidates, and the production quantity per unit time in the production line. Presented as the score shown.
  • the second presentation unit 16 presents the sum of variations in the production numbers per unit time included in the facility candidate information 21 of each of the one or more facility candidates as a score indicating variations in the production numbers per unit time on the production line. do.
  • the second presentation unit 16 presents the sum of the defect rates included in the facility candidate information 21 of each of the one or more facility candidates as a score indicating the defect rate in the production line.
  • the second presentation unit 16 presents the sum of the equipment costs included in the equipment candidate information 21 of each of the one or more equipment candidates as a score indicating the equipment cost of the production line.
  • the second presentation unit 16 presents the sum of the design costs included in the facility candidate information 21 of each of the one or more facility candidates as a score indicating the design cost of the production line.
  • first presentation unit 15 and the second presentation unit 16 When the first presentation unit 15 and the second presentation unit 16 receive a support request from the terminal 200, they output presentation content to the terminal 200. When receiving a support request from operation unit 113 , first presentation unit 15 and second presentation unit 16 display presentation content on display 114 .
  • FIG. 8 is a diagram showing the content presented by the support device 100.
  • the first presentation unit 15 determines whether or not a production line can be constructed using non-operating devices (idle devices) for each of the one or more combinations specified by the specifying unit 13.
  • Information 50 indicating is presented.
  • the second presentation unit 16 presents the score 52 of each evaluation item for each of the identified one or more combinations when the production line is constructed by the combination.
  • FIG. 9 is a flowchart showing the flow of search processing according to the embodiment.
  • the searching unit 14 selects one of the one or more combinations specified by the specifying unit 13 (step S1).
  • the search unit 14 searches the idle device list 30 for a device that matches the type of the device that constitutes the facility candidate and that has one or more idle units. (step S2).
  • the first presentation unit 15 determines whether or not a production line can be constructed using equipment that is not in operation (idle equipment) for the selected combination (step S3). Specifically, the first presentation unit 15 reads out the idle number of found devices from the idle device list 30 . The first presentation unit 15 determines that a production line can be constructed using the idle equipment when the number of idle equipment found is greater than or equal to the number of equipment required to construct the selected combination of production lines. to decide.
  • the search unit 14 determines whether there is an unselected combination (step S4). If there is an unselected combination (YES in step S4), the search unit 14 returns the search process to step S1. If there is no unselected combination (NO in step S4), the search unit 14 terminates the search process.
  • FIG. 10 is a schematic diagram showing the overall configuration of a support system 1A according to Modification 1. As shown in FIG. As shown in FIG. 10, the support system 1A differs from the support system 1 shown in FIG. 1 in that it includes a support device 100A and a terminal 200A instead of the support device 100 and the terminal 200, respectively.
  • the support device 100A differs from the support device 100 shown in FIG. 1 in that the idle device list 30 is not stored.
  • the support device 100A is managed, for example, by an equipment vendor that provides equipment for equipment that constitutes a production line. Equipment vendors usually do not know the operational status of equipment in companies that have production lines. Therefore, the support device 100A does not store the idle device list 30.
  • FIG. 1 An equipment vendor that provides equipment for equipment that constitutes a production line. Equipment vendors usually do not know the operational status of equipment in companies that have production lines. Therefore, the support device 100A does not store the idle device list 30.
  • the support device 100A may store the facility candidate list 20 created based on information regarding facilities constructed in the past by each of a plurality of companies.
  • the facility candidate list 20 includes facility candidate information 21 corresponding to facilities implemented in the past by the first company, facility candidate information 21 corresponding to facilities implemented in the past by the second company, and may include
  • the terminal 200A is managed, for example, by a company that has a production line. Therefore, the terminal 200A stores an idle device list 30 showing a list of devices that are not in operation.
  • the user When it becomes necessary to start up a production line equivalent to the production line in operation in order to deal with increased production, the user operates the terminal 200A to transmit a production line construction support request to the support device 100A.
  • the information processing section 10 executes the following processes (1a) to (7a).
  • (1a) The information processing section 10 receives designation of one or more processes that constitute a production line from the terminal 200A.
  • the information processing section 10 acquires the idle device list 30 from the terminal 200A.
  • the information processing section 10 extracts from the facility candidate list 20 one or more facility candidate information corresponding to each of the designated one or more processes.
  • the information processing section 10 Based on the extraction result, the information processing section 10 identifies one or more combinations of equipment candidates that realize one or more processes that constitute the production line.
  • the information processing unit 10 searches the idle device list 30 for a device corresponding to the configuration information 22 included in each of the extracted one or more facility candidate information 21 .
  • the information processing unit 10 informs the terminal 200A of whether or not a production line can be constructed using non-operating devices (idle devices) based on the search results for each of the identified one or more combinations. Present.
  • the information processing section 10 has constructed a production line based on the performance information included in the facility candidate information of each of the one or more facility candidates included in the combination.
  • the terminal 200A is presented with the score of the target evaluation item at the time.
  • FIG. 11 is a schematic diagram showing the overall configuration of a support system 1B according to Modification 2.
  • the support system 1B differs from the support system 1 shown in FIG. 1 in that it includes a support device 100B instead of the support device 100.
  • the support device 100B differs from the support device 100 in that it includes an information processing section 10B instead of the information processing section 10 and stores a device information list 60 .
  • the information processing section 10B differs from the information processing section 10B shown in FIG. 6 in that it includes a searching section 14B instead of the searching section 14.
  • FIG. 11 omits illustration of functional configurations (accepting unit 11, extracting unit 12, identifying unit 13, first presenting unit 15, and second presenting unit 16) other than search unit 14B.
  • the user When it becomes necessary to start up a production line equivalent to the production line in operation in order to respond to increased production, the user operates the terminal 200 to send a production line construction support request to the support device 100B.
  • the information processing section 10B executes the above processes (1) to (7).
  • the information processing section 10B searches for a device corresponding to the facility candidate information 21 using not only the idle device list 30 but also the device information list 60 in the process (4) above.
  • FIG. 12 is a diagram showing an example of the device information list 60.
  • the device information list 60 indicates the model and performance for each device.
  • FIG. 12 shows a device information list 60 relating to a PLC (Programmable Logic Controller), which is an example of a device. Therefore, the device information list 60 includes, as the performance of each device, the minimum control cycle that can be set, the number of servo mechanisms that can be controlled synchronously (the number of motion synchronization axes), the number of robot controllers that can be controlled synchronously (robot synchronization number of controllers), the number of other controllers capable of synchronous control (the number of synchronized controllers), and the program capacity.
  • the device information list 60 may include, as the performance of each device, the type of communication network with the host device and the type of communication network with the device.
  • FIG. 13 is a flowchart showing the flow of search processing according to Modification 2. As shown in FIG.
  • the search unit 14B selects one of the one or more combinations specified by the specifying process (3) (step S11).
  • the search unit 14B For each of the one or more facility candidates included in the selected combination, the search unit 14B has a performance equal to or higher than the performance of the equipment that constitutes the facility candidate (hereinafter referred to as "target equipment"), and is idle.
  • the idle device list 30 is searched for devices whose number is one or more (step S12).
  • the first presentation unit 15 determines whether or not a production line can be constructed using equipment that is not in operation (idle equipment) for the selected combination (step S13).
  • the details of step S13 are the same as those of step S3 described above.
  • the search unit 14B determines whether or not there is an unselected combination (step S14). If there is an unselected combination (YES in step S14), the search unit 14B returns the search process to step S11. If there is no unselected combination (NO in step S14), the search unit 14B terminates the search process.
  • FIG. 14 is a flow chart showing the processing flow of the subroutine of step S12 shown in FIG.
  • the search unit 14B selects one device (idle device) whose number of idle devices is 1 or more from the idle device list 30 (step S121).
  • the search unit 14B reads the minimum control cycle of the target device and the minimum control cycle of the selected idle device from the device information list 60. Then, the searching unit 14B determines whether or not the minimum control cycle of the idle device is equal to or less than the minimum control cycle of the target device (step S122).
  • step S122 the search unit 14B reads the number of motion synchronization axes of the target device and the number of motion synchronization axes of the selected idle device from the device information list 60. Then, the searching unit 14B determines whether or not the number of motion synchronization axes of the idle device is greater than or equal to the number of motion synchronization axes of the target device (step S123).
  • step S123 the searching unit 14B reads out the synchronous number of robots of the target device and the number of synchronous robots of the selected idle device from the device information list 60. Then, the searching unit 14B determines whether or not the number of synchronous robots of the idle device is greater than or equal to the number of synchronous robots of the target device (step S124).
  • step S124 the searching unit 14B reads from the device information list 60 the number of synchronized controllers of the target device and the number of synchronized controllers of the selected idle device. Then, the searching unit 14B determines whether or not the number of synchronized controllers of the idle device is greater than or equal to the number of synchronized controllers of the target device (step S125).
  • step S125 the search unit 14B reads the program capacity of the target device and the program capacity of the selected idle device from the device information list 60. Then, the searching unit 14B determines whether or not the program capacity of the idle device is greater than or equal to the program capacity of the target device (step S126).
  • step S126 the search unit 14B determines that the idle device selected in step S1 is available (step S127).
  • step S127 the search unit 14B shifts the search process to step S128. Also, if NO in any of steps S122 to S126, the search unit 14B moves the search process to step S128.
  • step S1208 the search unit 14B determines whether or not there is an unselected idle device in the idle device list 30. If there is an unselected idle device (YES in step S128), the search process proceeds to step S121. If there is no unselected idle device (NO in step S128), the information processing section 10B returns the process to step S14. Note that the searching unit 14B performs the processing of steps S121 to S128 for each target device that constitutes the facility candidate.
  • the information processing unit 10B can determine that an idle device with performance higher than that of the target device can be used as a device included in the facility candidates even if the model does not match. As a result, utilization of idle equipment is promoted.
  • Each of the one or more facility candidate information (21) includes first information (22) that identifies equipment included in equipment that was built in the past to realize the corresponding process, and equipment related to the target evaluation item.
  • the support device (1, 1A, 1B) further A search unit for searching for a device corresponding to the first information (22) included in each of the extracted one or more facility candidate information (21) from a second list (30) showing a list of non-operating devices. (14, 14B, 102) and A first presentation presenting whether or not the production line (2) can be constructed using equipment that is not in operation, based on the search result of the search unit (14, 102) for each of the one or more combinations. a part (15, 102); For each of the one or more combinations, the production line ( A support device (1, 1A, 1B) comprising a second presentation unit (16, 102) that presents the score of the target evaluation item when 2) is constructed.
  • ⁇ Configuration 3> The support device according to configuration 1, wherein the search unit (14B, 102) searches the second list (30) for a device having performance equal to or higher than that of the device identified by the first information (22). (1B).
  • the target evaluation item includes at least one of the number of production per unit time, the variation in the number of production per unit time, the defect rate, the cost required for equipment, and the cost required for designing equipment.
  • a support method for supporting construction of a production line (2) comprising: a step of accepting designation of one or more processes (2a to 2c) constituting the production line (2); One or more corresponding to each of the one or more steps (2a to 2c) from a first list (20) containing one or more facility candidate information (21) indicating facility candidates for realizing the process for each process a step of extracting equipment candidate information (21); identifying one or more combinations of equipment candidates that realize the one or more steps (2a to 2c) based on the extraction result;
  • Each of the one or more facility candidate information (21) includes first information (22) that identifies equipment included in equipment that was built in the past to realize the corresponding process, and equipment related to the target evaluation item.
  • the support method further comprises: a step of searching for a device corresponding to the first information (22) included in each of the extracted one or more facility candidate information (21) from a second list (30) showing a list of non-operating devices; , presenting whether or not the production line (2) can be constructed using non-operating equipment for each of the one or more combinations, based on the search results; For each of the one or more combinations, the production line ( 2) presenting the score of the target evaluation item when building.
  • 1, 1A, 1B support system 2 production line, 2a processing process, 2b soldering process, 2c assembly process, 10, 10B information processing unit, 11 reception unit, 12 extraction unit, 13 identification unit, 14, 14B search unit, 15 first presentation unit, 16 second presentation unit, 20 facility candidate list, 21 facility candidate information, 22 configuration information, 23 performance information, 30 idle device list, 40 integrated controller, 41 servo mechanism, 42 robot, 43 controller, 50 Information, 52 score, 60 device information list, 70 storage unit, 100, 100A, 100B support device, 102 CPU, 104 ROM, 106 RAM, 110 keyboard, 111 mouse, 113 operation unit, 114 display, 116 optical recording medium reader , 118 communication interface, 120 bus, 130 support program, 150 recording medium, 200, 200A terminal.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Manufacturing & Machinery (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Automation & Control Theory (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

支援装置は、生産ラインを構成する1以上の工程の指定を受け付け、指定された1以上の工程の各々について、過去に構築された設備に含まれる機器を識別する第1情報と対象評価項目に関する当該設備の実績を示す第2情報とを含む1以上の設備候補情報を抽出する。支援装置は、稼働していない機器の一覧を示すリストから、抽出された第1情報に対応する機器を探索し、探索結果に基づいて、稼働していない機器を用いて生産ラインが構築可能か否かを提示する。さらに、支援装置は、抽出された第2情報に基づいて、生産ラインを構築したときの対象評価項目のスコアを提示する。

Description

支援装置、支援方法およびプログラム
 本開示は、支援装置、支援方法およびプログラムに関する。
 特開2018-36899号公報(特許文献1)には、製品の設計BOM(Bills of Materials)から生産に必要な製造BOMの生成を支援するシステムが開示されている。
特開2018-36899号公報
 製造対象の商品の需要変動により、急な増産対応が必要となるケースが有り得る。しかしながら、生産ラインを新規で構築するために新しい設備を導入しようとすると、生産ラインの立ち上げに時間がかかる。その結果、需要に対して即座に対応できない。特許文献1に開示のシステムは、このような問題を考慮していない。
 本開示は、上記の問題に鑑みてなされたものであり、その目的は、増産対応のための生産ラインの立ち上げに要する時間を短縮可能な支援装置、支援方法およびプログラムを提供することである。
 本開示の一例によれば、生産ラインの構築を支援する支援装置は、受付部と、抽出部と、特定部と、探索部と、第1提示部と、第2提示部と、を備える。受付部は、生産ラインを構成する1以上の工程の指定を受け付ける。抽出部は、工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報を含む第1リストから、1以上の工程の各々に対応する1以上の設備候補情報を抽出する。特定部は、抽出部による抽出結果に基づいて、1以上の工程を実現する設備候補の1以上の組み合わせを特定する。1以上の設備候補情報の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報と、対象評価項目に関する当該設備の実績を示す第2情報と、を含む。探索部は、稼働していない機器の一覧を示す第2リストから、抽出された1以上の設備候補情報の各々に含まれる第1情報に対応する機器を探索する。第1提示部は、1以上の組み合わせの各々について、探索部による探索結果に基づいて、稼働していない機器を用いて生産ラインが構築可能か否かを提示する。第2提示部は、1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の設備候補情報に含まれる第2情報に基づいて、当該組み合わせによって生産ラインを構築したときの対象評価項目のスコアを提示する。
 この開示によれば、ユーザは、第1提示部によって提示された内容を確認することにより、稼働していない機器(遊休機器)を用いて生産ラインの構築が可能か否かを把握できる。
 たとえば、生産ラインを早期に立ち上げる必要がある場合、ユーザは、遊休機器を用いて生産ラインの立ち上げが可能な組み合わせを採用することができる。遊休機器を用いて生産ラインの立ち上げが可能な組み合わせが複数存在する場合、ユーザは、第2提示部によって提示された対象評価項目のスコアを考慮して、複数の組み合わせの中から対象評価項目のスコアに優れた組み合わせを選択することができる。あるいは、対象評価項目のスコアを重視する場合、ユーザは、遊休機器を用いて生産ラインの構築ができない組み合わせを選択してもよい。
 このように、上記の開示によれば、支援装置から提示される情報は、生産ラインの構築の助けとなる。そのため、増産対応のための生産ラインの立ち上げに要する時間が短縮される。
 上述の開示において、探索部は、第2リストから、第1情報によって識別される機器の型式と一致する型式の機器を探索する。
 この開示によれば、過去に構築された設備に含まれる機器と同じ型式の機器が遊休機器として存在しているか否かを容易に把握できる。
 上述の開示において、探索部は、第2リストから、第1情報によって識別される機器の性能以上の性能を有する機器を探索する。
 この開示によれば、過去に構築された設備に含まれる機器の性能以上の性能を有する機器が遊休機器として存在しているか否かを容易に把握できる。このような遊休機器は、生産ラインに利用できる。そのため、遊休機器の利用が促進される。
 上述の開示において、対象評価項目は、単位時間当たりの生産数、単位時間当たりの生産数のばらつき、不良率、機器に要するコスト、および、設備の設計に要するコストの少なくとも1つを含む。
 この開示によれば、ユーザは、これらの項目のスコアを考慮して、生産ラインを立ち上げることができる。
 本開示の別の一例によれば、生産ラインの構築を支援する支援方法は、第1~第6のステップを備える。第1のステップは、生産ラインを構成する1以上の工程の指定を受け付けるステップである。第2のステップは、工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報を含む第1リストから、1以上の工程の各々に対応する1以上の設備候補情報を抽出するステップである。第3のステップは、抽出結果に基づいて、1以上の工程を実現する設備候補の1以上の組み合わせを特定するステップである。1以上の設備候補情報の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報と、対象評価項目に関する当該設備の実績を示す第2情報と、を含む。第4のステップは、稼働していない機器の一覧を示す第2リストから、抽出された1以上の設備候補情報の各々に含まれる第1情報に対応する機器を探索するステップである。第5のステップは、1以上の組み合わせの各々について、探索結果に基づいて、稼働していない機器を用いて生産ラインが構築可能か否かを提示するステップである。第6のステップは、1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の設備候補情報に含まれる第2情報に基づいて、当該組み合わせによって生産ラインを構築したときの対象評価項目のスコアを提示するステップである。
 本開示の別の一例によれば、プログラムは、上記の支援方法をコンピュータに実行させる。
 これらの開示によっても、増産対応のための生産ラインの立ち上げに要する時間を短縮できる。
 本開示によれば、増産対応のための生産ラインの立ち上げに要する時間を短縮できる。
実施の形態に係る支援装置100を含む支援システム1の全体構成を示す概略図である。 支援装置100のハードウェア構成例を示す模式図である。 稼働中の生産ラインの一例を示す図である。 設備候補リスト20の一例を示す図である。 遊休機器リスト30の一例を示す図である。 支援装置100の機能構成の一例を示すブロック図である。 特定部13によって特定された組み合わせの一覧を示す図である。 支援装置100によって提示される内容を示す図である。 実施の形態に係る探索処理の流れを示すフローチャートである。 変形例1に係る支援システム1Aの全体構成を示す概略図である。 変形例2に係る支援システム1Bの全体構成を示す概略図である。 機器情報リスト60の一例を示す図である。 変形例2に係る探索処理の流れを示すフローチャートである。 図13に示すステップS12のサブルーチンの処理の流れを示すフローチャートである。
 以下、図面を参照しつつ、本発明に従う各実施の形態について説明する。以下の説明では、同一の部品および構成要素には同一の符号を付してある。それらの名称および機能も同じである。したがって、これらについての詳細な説明は繰り返さない。なお、以下で説明される各実施の形態および各変形例は、適宜選択的に組み合わせてもよい。
 §1.適用例
 本実施の形態にかかる支援装置の概略について説明する。図1は、実施の形態に係る支援装置100を含む支援システム1の全体構成を示す概略図である。図1に示されるように、支援システム1は、支援装置100と、端末200と、を備える。支援装置100および端末200は、たとえば汎用のコンピュータである。支援装置100および端末200は、たとえば、生産ラインを有している企業によって管理される。支援装置100および端末200は、公知の通信ネットワークを介して接続される。
 支援装置100は、端末200からの要求に応じて、生産ラインの構築を支援する。支援装置100は、設備候補リスト20および遊休機器リスト30を記憶しており、設備候補リスト20および遊休機器リスト30を用いた情報処理を行なう情報処理部10を含む。
 設備候補リスト20は、生産ラインに含まれる得る工程毎に当該工程を実現する設備候補を示す1以上の設備候補情報を含む。設備候補情報は、たとえば支援装置100および端末200を管理する企業が過去に構築した設備に関する情報を含む。具体的には、1以上の設備候補情報の各々は、対応する工程を実現するために過去に構築された設備に含まれる1以上の機器を識別する構成情報と、対象評価項目に関する当該設備の実績を示す実績情報と、を含む。
 遊休機器リスト30は、稼働していない機器の一覧を示す。具体的には、遊休機器リスト30は、支援装置100および端末200を管理する企業が所有しているものの、現在稼働していない機器(遊休機器)のリストである。
 増産対応のために稼働中の生産ラインと同等の生産ラインの立ち上げが必要となった場合、ユーザは、端末200を操作して、生産ラインの構築の支援要求を支援装置100に送信する。支援要求を受けた支援装置100では、情報処理部10が以下の(1)~(6)の処理を実行する。
(1)情報処理部10は、端末200から、生産ラインを構成する1以上の工程の指定を受け付ける。
(2)情報処理部10は、設備候補リスト20から、指定された1以上の工程の各々に対応する1以上の設備候補情報を抽出する。
(3)情報処理部10は、抽出結果に基づいて、指定された1以上の工程を実現する設備候補の1以上の組み合わせを特定する。
(4)情報処理部10は、遊休機器リスト30から、抽出された1以上の設備候補情報の各々に含まれる構成情報に対応する機器を探索する。
(5)情報処理部10は、特定された1以上の組み合わせの各々について、探索結果に基づいて、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを端末200に提示する。
(6)情報処理部10は、1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の設備候補情報に含まれる実績情報に基づいて、当該組み合わせによって生産ラインを構築したときの対象評価項目のスコアを端末200に提示する。
 (1)~(6)の処理によれば、ユーザは、提示された内容を確認することにより、遊休機器を用いて生産ラインの立ち上げが可能か否かを把握できる。生産ラインを早期に立ち上げる必要がある場合、ユーザは、遊休機器を用いて生産ラインの立ち上げが可能な組み合わせを採用すればよい。遊休機器を用いて生産ラインの立ち上げが可能な組み合わせが複数存在する場合、ユーザは、提示された対象評価項目のスコアを考慮して、複数の組み合わせの中から対象評価項目のスコアに優れた組み合わせを選択できる。
 あるいは、対象評価項目のスコアを重視する場合、ユーザは、遊休機器を用いて生産ラインの立ち上げができない組み合わせを選択してもよい。
 このように、本実施の形態によれば、支援装置100から提示される情報は、生産ラインの構築の助けとなる。そのため、増産対応のための生産ラインの立ち上げに要する時間が短縮される。
 §2.具体例
 <A.支援装置100のハードウェア構成>
 図2は、支援装置100のハードウェア構成例を示す模式図である。支援装置100は、典型的には、汎用のコンピュータで構成される。
 支援装置100は、CPU(Central Processing Unit)102と、ROM(Read Only Memory)104と、RAM(Random Access Memory)106と、ハードディスク(HDD)108と、を含む。これらのコンポーネントは、バス120を介して接続される。
 CPU102は、OSを含む各種プログラムを実行する。ROM104は、BIOSや各種データを記憶する。RAM106は、CPU102でのプログラムの実行に必要なデータを格納するための作業領域を提供する。HDD108は、CPU102で実行されるプログラムなどを不揮発的に記憶する。具体的には、HDD108は、生産ラインの構築を支援する支援プログラム130を記憶する。さらに、HDD108には、支援プログラム130の実行に必要な、設備候補リスト20および遊休機器リスト30が格納される。
 支援装置100は、さらに、キーボード110およびマウス111を含む操作部113と、ディスプレイ114と、を含む。操作部113およびディスプレイ114は、ユーザインターフェイスを構成する。
 支援装置100は、記録媒体150から支援プログラム130および汎用アプリケーションを読み取るための光学記録媒体読取装置116を含む。なお、支援プログラム130は、メモリカード、配信サーバなどからインストールされてもよい。
 通信インターフェイス118は、LAN(Local Area Network)などの公知の通信ネットワークを介して、外部の装置とのデータの遣り取りを制御する。支援装置100は、通信インターフェイス118を介して端末200と通信する。
 図2には、CPU102等のプロセッサがプログラムを実行することで必要な機能が提供される構成例を示したが、これらの提供される機能の一部または全部を、専用のハードウェア回路(例えば、ASICまたはFPGAなど)を用いて実装してもよい。この場合には、仮想化技術を用いて、用途の異なる複数のOSを並列的に実行させるとともに、各OS上で必要なアプリケーションを実行させるようにしてもよい。
 <B.生産ラインの一例>
 図3は、稼働中の生産ラインの一例を示す図である。図3に例示される生産ライン2は、加工工程2aと、はんだ付け工程2bと、組立工程2cと、によって構成される。加工工程2aでは、加工器具が取り付けられたロボットを用いて、製品の筐体が加工される。はんだ付け工程2bでは、はんだ付け器具が取り付けられたロボットを用いて、基板にはんだが付けられる。組立工程では、ロボットを用いて、基板がピッキングされ、筐体内に取り付けられる。
 製品の増産対応のために生産ライン2と同等の生産ラインの構築が必要となった場合、ユーザは、端末200を操作して、生産ライン2を構成する加工工程2a、はんだ付け工程2bおよび組立工程2cを指定した支援要求を支援装置100に送信する。なお、ユーザは、当該支援要求を支援装置100の操作部113に入力してもよい。
 <C.設備候補リストの一例>
 図4は、設備候補リスト20の一例を示す図である。設備候補リスト20は、工程毎に当該工程を実現する設備候補を示す1つ以上の設備候補情報21を含む。図4に例示される設備候補リスト20は、「加工工程」に対して3つの設備候補情報21を含む。
 設備候補リスト20は、構成情報22を含む。構成情報22は、対応する工程を実現するために過去に構築された設備の構成を示す。具体的には、構成情報22は、設備に含まれる1以上の機器を識別する情報を含む。なお、「過去に構築された設備」には、生産ラインに実際に導入された設備だけでなく、試作用のラインにのみ導入された設備、試作段階において設計されたが生産ラインには導入されなかった設備なども含まれ得る。
 たとえば、図4に示されるように、構成情報「構成aa1」は、設備を構成する統合コントローラ40、サーボ機構41およびロボット42の型式を示す。サーボ機構41は、加工対象となる筐体を搬送する搬送装置に組み込まれる。ロボット42のアーム先端には、加工器具が取り付けられる。ロボット42は、搬送装置によって搬送された筐体に対して、加工工具を用いて加工する。統合コントローラ40は、サーボ機構41とロボット42とを制御する。サーボ機構41とロボット42とが1台の統合コントローラ40によって制御されるため、搬送装置の動作とロボット42の動作とが同期される。統合コントローラ40の型式は、「A-1」である。
 構成情報「構成aa2」は、設備を構成する2つのコントローラ43、サーボ機構41およびロボット42の型式を示す。2つのコントローラ43のうちの一方は、サーボ機構41を制御し、他方は、ロボット42を制御する。2つのコントローラ43が有するタイマを同期させることにより、搬送装置の動作とロボット42の動作とが同期される。
 このように、設備候補リスト20には、加工工程を実現するために過去に構築された1以上の設備の各々の構成が構成情報22として予め登録される。
 さらに、設備候補情報21は、評価対象項目に関する設備の実績を示す実績情報23を含む。
 たとえば、図4に示されるように、実績情報23は、単位時間当たりの生産数の平均、単位時間辺りの生産数のばらつき、不良率、機器コスト、および設計コストを示す。図4では、機器コストおよび設計コストは、相対的な順位によって表される。ただし、機器コストおよび設計コストは、設備を構築したときに要した実値によって表されてもよい。
 機器コストは、設備を構成する機器に要するコストである。典型的には、機器コストには、機器の購入時の金額が含まれる。さらに、機器コストには、機器の稼働率が含まれてもよい。稼働率が低い機器では、使用による劣化が少ない。そのため、機器コストを確認することにより、遊休機器の中から劣化の少ない遊休機器を優先的に採用することが可能となる。
 設計コストは、設備の設計に要するコストであり、機器を組み立てて、設備を立ち上げるために必要なコストである。設計コストには、機器にインストールされるユーザプログラムの作成に要するコスト、設備を構成する複数の機器のネットワーク接続構成の設定に要するコストなども含まれる。
 <D.遊休機器リストの一例>
 図5は、遊休機器リスト30の一例を示す図である。図5に示されるように、遊休機器リスト30は、各機器について、型式と、稼働している台数と、稼働していない台数(遊休台数)と、を示す。図5に示す例では、遊休機器リスト30は、コントローラのリストを示す。
 <E.支援装置の機能構成>
 図6は、支援装置100の機能構成の一例を示すブロック図である。図6に示されるように、支援装置100は、情報処理部10と、記憶部70と、を備える。情報処理部10は、図2に示すCPU102が支援プログラム130を実行することにより実現される。記憶部70は、ROM104、RAM106およびHDD108によって実現される。
 情報処理部10は、受付部11と、抽出部12と、特定部13と、探索部14と、第1提示部15と、第2提示部16と、を含む。
 受付部11は、生産ラインを構成する1以上の工程の指定を受け付ける。たとえば、図3に示す生産ライン2の場合、受付部11は、「加工工程」、「はんだ付け工程」および「組立工程」の指定を受け付ける。
 抽出部12は、設備候補リスト20から、指定された1以上の工程の各々に対応する1以上の設備候補情報21を抽出する。たとえば、抽出部12は、「加工工程」の指定を受け付けた場合、図4の示す設備候補リスト20から、「構成aa1」、「構成aa2」および「構成aa3」を示す構成情報22をそれぞれ含む3つの設備候補情報21を抽出する。
 特定部13は、抽出部12による抽出結果に基づいて、指定された1以上の工程を実現する設備候補の1以上の組み合わせを特定する。
 図7は、特定部13によって特定された組み合わせの一覧を示す図である。図7には、指定された「加工工程」、「はんだ付け工程」および「組立工程」の各々について、3つの設備候補情報21が抽出されたときの組み合わせの例が示される。具体的には、「加工工程」に対して、「構成aa1」、「構成aa2」および「構成aa3」を示す構成情報22をそれぞれ含む3つの設備候補情報21が抽出される。「はんだ付け工程」に対して、「構成bb1」、「構成bb2」および「構成bb3」を示す構成情報22をそれぞれ含む3つの設備候補情報21が抽出される。「組立工程」に対して、「構成cc1」、「構成cc2」および「構成cc3」を示す構成情報22をそれぞれ含む3つの設備候補情報21が抽出される。このとき、特定部13は、3×3×3=27通りの組み合わせを特定する。
 探索部14は、遊休機器リスト30から、抽出された1以上の設備候補情報21の各々に含まれる構成情報22に対応する機器を探索する。
 具体的には、探索部14は、設備候補情報21に含まれる構成情報22が図4に示す「構成aa1」を示す場合、統合コントローラ40の型式「A-1」と一致し、かつ、遊休台数が1台以上である機器を遊休機器リスト30から探索する。
 第1提示部15は、特定された1以上の組み合わせの各々について、探索部14による探索結果に基づいて、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを提示する。第1提示部15は、探索された機器の遊休台数を遊休機器リスト30から読み出す。第1提示部15は、探索された遊休機器の遊休台数が対象となる組み合わせの生産ラインを構築するために必要な当該機器の台数以上である場合に、遊休機器を用いて生産ラインが構築可能と判断する。
 第2提示部16は、特定された1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の設備候補情報21に含まれる実績情報23に基づいて、当該組み合わせによって生産ラインを構築したときのスコアを提示する。
 具体的には、第2提示部16は、1以上の設備候補の各々の設備候補情報21に含まれる単位時間当たりの生産数のうちの最小値を、生産ラインにおける単位時間当たりの生産数を示すスコアとして提示する。第2提示部16は、1以上の設備候補の各々の設備候補情報21に含まれる単位時間当たりの生産数のばらつきの和を、生産ラインにおける単位時間当たりの生産数のばらつきを示すスコアとして提示する。第2提示部16は、1以上の設備候補の各々の設備候補情報21に含まれる不良率の和を、生産ラインにおける不良率を示すスコアとして提示する。第2提示部16は、1以上の設備候補の各々の設備候補情報21に含まれる機器コストの和を、生産ラインの機器コストを示すスコアとして提示する。第2提示部16は、1以上の設備候補の各々の設備候補情報21に含まれる設計コストの和を、生産ラインの設計コストを示すスコアとして提示する。
 第1提示部15および第2提示部16は、支援要求を端末200から受けた場合、提示内容を端末200に出力する。第1提示部15および第2提示部16は、支援要求を操作部113から受けた場合、提示内容をディスプレイ114に表示する。
 図8は、支援装置100によって提示される内容を示す図である。図8に示されるように、第1提示部15は、特定部13によって特定された1以上の組み合わせの各々について、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを示す情報50を提示する。さらに、第2提示部16は、特定された1以上の組み合わせの各々について、当該組み合わせによって生産ラインを構築したときの各評価項目のスコア52を提示する。
 <F.探索処理の流れ>
 次に、図1の(4)探索処理の流れについて説明する。図9は、実施の形態に係る探索処理の流れを示すフローチャートである。
 探索部14は、特定部13によって特定された1以上の組み合わせのうちの1つを選択する(ステップS1)。
 探索部14は、選択した組み合わせに含まれる1以上の設備候補の各々について、当該設備候補を構成する機器の型式と一致し、かつ、遊休台数が1以上である機器を遊休機器リスト30から探索する(ステップS2)。
 第1提示部15は、選択した組み合わせについて、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを判断する(ステップS3)。具体的には、第1提示部15は、探索された機器の遊休台数を遊休機器リスト30から読み出す。第1提示部15は、探索された遊休機器の遊休台数が選択した組み合わせの生産ラインを構築するために必要な当該機器の台数以上である場合に、遊休機器を用いて生産ラインが構築可能と判断する。
 探索部14は、未選択の組み合わせがあるか否かを判断する(ステップS4)。未選択の組み合わせがある場合(ステップS4でYES)、探索部14は、探索処理をステップS1に戻す。未選択の組み合わせがない場合(ステップS4でNO)、探索部14は、探索処理を終了する。
 <G.変形例>
 (G-1.変形例1)
 図10は、変形例1に係る支援システム1Aの全体構成を示す概略図である。図10に示されるように、支援システム1Aは、図1に示す支援システム1と比較して、支援装置100および端末200の代わりに支援装置100Aおよび端末200Aをそれぞれ備える点で相違する。
 支援装置100Aは、図1に示す支援装置100と比較して、遊休機器リスト30を記憶していない点で相違する。支援装置100Aは、たとえば、生産ラインを構成する設備の機器を提供する機器ベンダによって管理される。機器ベンダは、通常、生産ラインを有している企業における機器の稼働状況を把握していない。そのため、支援装置100Aは、遊休機器リスト30を記憶していない。
 機器ベンダは、機器を様々な企業に提供し得る。そのため、支援装置100Aは、複数の企業の各々によって過去に構築された設備に関する情報に基づいて作成された設備候補リスト20を記憶していてもよい。たとえば、設備候補リスト20は、加工工程について、第1企業によって過去に実現された設備に対応する設備候補情報21と、第2企業によって過去に実現された設備に対応する設備候補情報21と、を含んでもよい。
 端末200Aは、たとえば、生産ラインを有している企業によって管理される。そのため、端末200Aに、稼働していない機器の一覧を示す遊休機器リスト30が格納される。
 増産対応のために稼働中の生産ラインと同等の生産ラインの立ち上げが必要となった場合、ユーザは、端末200Aを操作して、生産ラインの構築の支援要求を支援装置100Aに送信する。支援要求を受けた支援装置100Aでは、情報処理部10が以下の(1a)~(7a)の処理を実行する。
(1a)情報処理部10は、端末200Aから、生産ラインを構成する1以上の工程の指定を受け付ける。
(2a)情報処理部10は、端末200Aから、遊休機器リスト30を取得する。
(3a)情報処理部10は、設備候補リスト20から、指定された1以上の工程の各々に対応する1以上の設備候補情報を抽出する。
(4a)情報処理部10は、抽出結果に基づいて、生産ラインを構成する1以上の工程を実現する設備候補の1以上の組み合わせを特定する。
(5a)情報処理部10は、遊休機器リスト30から、抽出された1以上の設備候補情報21の各々に含まれる構成情報22に対応する機器を探索する。
(6a)情報処理部10は、特定された1以上の組み合わせの各々について、探索結果に基づいて、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを端末200Aに提示する。
(7a)情報処理部10は、1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の設備候補情報に含まれる実績情報に基づいて、当該組み合わせによって生産ラインを構築したときの対象評価項目のスコアを端末200Aに提示する。
 (G-2.変形例2)
 図11は、変形例2に係る支援システム1Bの全体構成を示す概略図である。図11に示されるように、支援システム1Bは、図1に示す支援システム1と比較して、支援装置100の代わりに支援装置100Bを備える点で相違する。支援装置100Bは、支援装置100と比較して、情報処理部10の代わりに情報処理部10Bを備えるとともに、機器情報リスト60を記憶する点で相違する。情報処理部10Bは、図6に示す情報処理部10Bと比較して、探索部14の代わりに探索部14Bを含む点で相違する。なお、図11では、探索部14B以外の機能構成(受付部11、抽出部12、特定部13、第1提示部15、および第2提示部16)の図示を省略している。
 増産対応のために稼働中の生産ラインと同等の生産ラインの立ち上げが必要となった場合、ユーザは、端末200を操作して、生産ラインの構築の支援要求を支援装置100Bに送信する。支援要求を受けた支援装置100Bでは、情報処理部10Bが上記の(1)~(7)の処理を実行する。ただし、情報処理部10Bは、上記の(4)の処理において、遊休機器リスト30だけでなく機器情報リスト60を用いて、設備候補情報21に対応する機器を探索する。
 図12は、機器情報リスト60の一例を示す図である。図12に示されるように、機器情報リスト60は、機器毎に型式および性能を示す。図12には、機器の一例であるPLC(Programmable Logic Controller)に関する機器情報リスト60が示される。そのため、機器情報リスト60は、各機器の性能として、設定可能な最小の制御周期、同期制御が可能なサーボ機構の個数(モーション同期軸数)、同期制御が可能なロボットコントローラの個数(ロボット同期台数)、同期制御が可能な他のコントローラの台数(コントローラ同期台数)、プログラム容量を示す。なお、機器情報リスト60は、各機器の性能として、上位機器との通信ネットワークの種別、デバイスとの通信ネットワークの種別を含んでもよい。
 次に、図11の(4)探索処理の流れについて説明する。図13は、変形例2に係る探索処理の流れを示すフローチャートである。
 探索部14Bは、(3)の特定処理によって特定された1以上の組み合わせのうちの1つを選択する(ステップS11)。
 探索部14Bは、選択した組み合わせに含まれる1以上の設備候補の各々について、当該設備候補を構成する機器(以下、「対象機器」と称する。)の性能以上の性能を有し、かつ、遊休台数が1以上である機器を遊休機器リスト30から探索する(ステップS12)。
 第1提示部15は、選択した組み合わせについて、稼働していない機器(遊休機器)を用いて生産ラインが構築可能か否かを判断する(ステップS13)。ステップS13の詳細は、上記のステップS3と同じである。
 探索部14Bは、未選択の組み合わせがあるか否かを判断する(ステップS14)。未選択の組み合わせがある場合(ステップS14でYES)、探索部14Bは、探索処理をステップS11に戻す。未選択の組み合わせがない場合(ステップS14でNO)、探索部14Bは、探索処理を終了する。
 図14は、図13に示すステップS12のサブルーチンの処理の流れを示すフローチャートである。
 まず、探索部14Bは、遊休機器リスト30から、遊休台数が1台以上である1つの機器(遊休機器)を選択する(ステップS121)。
 探索部14Bは、対象機器の最小制御周期と選択した遊休機器の最小制御周期とを機器情報リスト60から読み出す。それから、探索部14Bは、遊休機器の最小制御周期が対象機器の最小制御周期以下であるか否かを判断する(ステップS122)。
 ステップS122でYESの場合、探索部14Bは、対象機器のモーション同期軸数と選択した遊休機器のモーション同期軸数とを機器情報リスト60から読み出す。それから、探索部14Bは、遊休機器のモーション同期軸数が対象機器のモーション同期軸数以上であるか否かを判断する(ステップS123)。
 ステップS123でYESの場合、探索部14Bは、対象機器のロボット同期台数と選択した遊休機器のロボット同期台数とを機器情報リスト60から読み出す。それから、探索部14Bは、遊休機器のロボット同期台数が対象機器のロボット同期台数以上であるか否かを判断する(ステップS124)。
 ステップS124でYESの場合、探索部14Bは、対象機器のコントローラ同期台数と選択した遊休機器のコントローラ同期台数とを機器情報リスト60から読み出す。それから、探索部14Bは、遊休機器のコントローラ同期台数が対象機器のコントローラ同期台数以上であるか否かを判断する(ステップS125)。
 ステップS125でYESの場合、探索部14Bは、対象機器のプログラム容量と選択した遊休機器のプログラム容量とを機器情報リスト60から読み出す。それから、探索部14Bは、遊休機器のプログラム容量が対象機器のプログラム容量以上であるか否かを判断する(ステップS126)。
 ステップS126でYESの場合、探索部14Bは、ステップS1において選択した遊休機器を利用可能と決定する(ステップS127)。
 ステップS127の後、探索部14Bは、探索処理をステップS128に移す。また、ステップS122~S126のいずれかにおいてNOの場合も、探索部14Bは、探索処理をステップS128に移す。
 ステップS128において、探索部14Bは、遊休機器リスト30の中に未選択の遊休機器があるか否かを判断する。未選択の遊休機器がある場合(ステップS128でYES)、探索処理をステップS121に移す。未選択の遊休機器がない場合(ステップS128でNO)、情報処理部10Bは、処理をステップS14に戻す。なお、探索部14Bは、設備候補を構成する対象機器毎に、ステップS121~S128の処理を行なう。
 変形例2によれば、情報処理部10Bは、型式が一致しなくても、対象機器の性能以上の性能を有する遊休機器を、設備候補に含まれる機器として利用可能と判断できる。その結果、遊休機器の利用が促進される。
 §3.付記
 以上のように、上記の実施の形態および変形例による開示は以下のような開示を含む。
 <構成1>
 生産ライン(2)の構築を支援する支援装置(1,1A,1B)であって、
 前記生産ライン(2)を構成する1以上の工程(2a~2c)の指定を受け付ける受付部(11,102)と、
 工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報(21)を含む第1リスト(20)から、前記1以上の工程(2a~2c)の各々に対応する1以上の設備候補情報(21)を抽出する抽出部(12,102)と、
 前記抽出部(12,102)による抽出結果に基づいて、前記1以上の工程(2a~2c)を実現する設備候補の1以上の組み合わせを特定する特定部(13,102)と、を備え、
 前記1以上の設備候補情報(21)の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報(22)と、対象評価項目に関する当該設備の実績を示す第2情報(23)と、を含み、
 前記支援装置(1,1A,1B)は、さらに、
 稼働していない機器の一覧を示す第2リスト(30)から、抽出された1以上の設備候補情報(21)の各々に含まれる前記第1情報(22)に対応する機器を探索する探索部(14,14B,102)と、
 前記1以上の組み合わせの各々について、前記探索部(14,102)による探索結果に基づいて、稼働していない機器を用いて前記生産ライン(2)が構築可能か否かを提示する第1提示部(15,102)と、
 前記1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の前記設備候補情報(21)に含まれる前記第2情報(23)に基づいて、当該組み合わせによって前記生産ライン(2)を構築したときの前記対象評価項目のスコアを提示する第2提示部(16,102)と、を備える、支援装置(1,1A,1B)。
 <構成2>
 前記探索部(14,102)は、前記第2リスト(30)から、前記第1情報(22)によって識別される機器の型式と一致する型式の機器を探索する、構成1に記載の支援装置(1,1A)。
 <構成3>
 前記探索部(14B,102)は、前記第2リスト(30)から、前記第1情報(22)によって識別される機器の性能以上の性能を有する機器を探索する、構成1に記載の支援装置(1B)。
 <構成4>
 前記対象評価項目は、単位時間当たりの生産数、単位時間当たりの生産数のばらつき、不良率、機器に要するコスト、および、設備の設計に要するコストの少なくとも1つを含む、構成1から3のいずれか1項に記載の支援装置(1,1A,1B)。
 <構成5>
 生産ライン(2)の構築を支援する支援方法であって、
 前記生産ライン(2)を構成する1以上の工程(2a~2c)の指定を受け付けるステップと、
 工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報(21)を含む第1リスト(20)から、前記1以上の工程(2a~2c)の各々に対応する1以上の設備候補情報(21)を抽出するステップと、
 抽出結果に基づいて、前記1以上の工程(2a~2c)を実現する設備候補の1以上の組み合わせを特定するステップと、を備え、
 前記1以上の設備候補情報(21)の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報(22)と、対象評価項目に関する当該設備の実績を示す第2情報(23)と、を含み、
 前記支援方法は、さらに、
 稼働していない機器の一覧を示す第2リスト(30)から、抽出された1以上の設備候補情報(21)の各々に含まれる前記第1情報(22)に対応する機器を探索するステップと、
 前記1以上の組み合わせの各々について、探索結果に基づいて、稼働していない機器を用いて前記生産ライン(2)が構築可能か否かを提示するステップと、
 前記1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の前記設備候補情報(21)に含まれる前記第2情報(23)に基づいて、当該組み合わせによって前記生産ライン(2)を構築したときの前記対象評価項目のスコアを提示するステップと、を備える、支援方法。
 <構成6>
 構成5に記載の支援方法をコンピュータに実行させるプログラム(130)。
 今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した説明ではなく、請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。また、実施の形態および各変形例において説明された発明は、可能な限り、単独でも、組み合わせても、実施することが意図される。
 1,1A,1B 支援システム、2 生産ライン、2a 加工工程、2b はんだ付け工程、2c 組立工程、10,10B 情報処理部、11 受付部、12 抽出部、13 特定部、14,14B 探索部、15 第1提示部、16 第2提示部、20 設備候補リスト、21 設備候補情報、22 構成情報、23 実績情報、30 遊休機器リスト、40 統合コントローラ、41 サーボ機構、42 ロボット、43 コントローラ、50 情報、52 スコア、60 機器情報リスト、70 記憶部、100,100A,100B 支援装置、102 CPU、104 ROM、106 RAM、110 キーボード、111 マウス、113 操作部、114 ディスプレイ、116 光学記録媒体読取装置、118 通信インターフェイス、120 バス、130 支援プログラム、150 記録媒体、200,200A 端末。

Claims (6)

  1.  生産ラインの構築を支援する支援装置であって、
     前記生産ラインを構成する1以上の工程の指定を受け付ける受付部と、
     工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報を含む第1リストから、前記1以上の工程の各々に対応する1以上の設備候補情報を抽出する抽出部と、
     前記抽出部による抽出結果に基づいて、前記1以上の工程を実現する設備候補の1以上の組み合わせを特定する特定部と、を備え、
     前記1以上の設備候補情報の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報と、対象評価項目に関する当該設備の実績を示す第2情報と、を含み、
     前記支援装置は、さらに、
     稼働していない機器の一覧を示す第2リストから、抽出された1以上の設備候補情報の各々に含まれる前記第1情報に対応する機器を探索する探索部と、
     前記1以上の組み合わせの各々について、前記探索部による探索結果に基づいて、稼働していない機器を用いて前記生産ラインが構築可能か否かを提示する第1提示部と、
     前記1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の前記設備候補情報に含まれる前記第2情報に基づいて、当該組み合わせによって前記生産ラインを構築したときの前記対象評価項目のスコアを提示する第2提示部と、を備える、支援装置。
  2.  前記探索部は、前記第2リストから、前記第1情報によって識別される機器の型式と一致する型式の機器を探索する、請求項1に記載の支援装置。
  3.  前記探索部は、前記第2リストから、前記第1情報によって識別される機器の性能以上の性能を有する機器を探索する、請求項1に記載の支援装置。
  4.  前記対象評価項目は、単位時間当たりの生産数、単位時間当たりの生産数のばらつき、不良率、機器に要するコスト、および、設備の設計に要するコストの少なくとも1つを含む、請求項1から3のいずれか1項に記載の支援装置。
  5.  生産ラインの構築を支援する支援方法であって、
     前記生産ラインを構成する1以上の工程の指定を受け付けるステップと、
     工程毎に、当該工程を実現する設備候補を示す1以上の設備候補情報を含む第1リストから、前記1以上の工程の各々に対応する1以上の設備候補情報を抽出するステップと、
     抽出結果に基づいて、前記1以上の工程を実現する設備候補の1以上の組み合わせを特定するステップと、を備え、
     前記1以上の設備候補情報の各々は、対応する工程を実現するために過去に構築された設備に含まれる機器を識別する第1情報と、対象評価項目に関する当該設備の実績を示す第2情報と、を含み、
     前記支援方法は、さらに、
     稼働していない機器の一覧を示す第2リストから、抽出された1以上の設備候補情報の各々に含まれる前記第1情報に対応する機器を探索するステップと、
     前記1以上の組み合わせの各々について、探索結果に基づいて、稼働していない機器を用いて前記生産ラインが構築可能か否かを提示するステップと、
     前記1以上の組み合わせの各々について、当該組み合わせに含まれる1以上の設備候補の各々の前記設備候補情報に含まれる前記第2情報に基づいて、当該組み合わせによって前記生産ラインを構築したときの前記対象評価項目のスコアを提示するステップと、を備える、支援方法。
  6.  請求項5に記載の支援方法をコンピュータに実行させるプログラム。
PCT/JP2021/034452 2021-02-16 2021-09-21 支援装置、支援方法およびプログラム WO2022176246A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021022709A JP2022124838A (ja) 2021-02-16 2021-02-16 支援装置、支援方法およびプログラム
JP2021-022709 2021-02-16

Publications (1)

Publication Number Publication Date
WO2022176246A1 true WO2022176246A1 (ja) 2022-08-25

Family

ID=82931320

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/034452 WO2022176246A1 (ja) 2021-02-16 2021-09-21 支援装置、支援方法およびプログラム

Country Status (2)

Country Link
JP (1) JP2022124838A (ja)
WO (1) WO2022176246A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06277991A (ja) * 1993-03-26 1994-10-04 Matsushita Electric Works Ltd 生産計画作成方法
JP2003162313A (ja) * 2001-11-26 2003-06-06 Kawasaki Heavy Ind Ltd 生産システム計画方法および生産システム計画装置
JP2013030019A (ja) * 2011-07-28 2013-02-07 Mitsubishi Heavy Ind Ltd 生産計画立案装置、生産計画立案方法および生産計画立案プログラム
JP2020095440A (ja) * 2018-12-12 2020-06-18 株式会社日立製作所 情報処理装置、生産指示支援方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06277991A (ja) * 1993-03-26 1994-10-04 Matsushita Electric Works Ltd 生産計画作成方法
JP2003162313A (ja) * 2001-11-26 2003-06-06 Kawasaki Heavy Ind Ltd 生産システム計画方法および生産システム計画装置
JP2013030019A (ja) * 2011-07-28 2013-02-07 Mitsubishi Heavy Ind Ltd 生産計画立案装置、生産計画立案方法および生産計画立案プログラム
JP2020095440A (ja) * 2018-12-12 2020-06-18 株式会社日立製作所 情報処理装置、生産指示支援方法

Also Published As

Publication number Publication date
JP2022124838A (ja) 2022-08-26

Similar Documents

Publication Publication Date Title
US7802082B2 (en) Methods and systems to dynamically configure computing apparatuses
CN101004689A (zh) 用于自动安装系统专用驱动程序的方法和系统
TWI434550B (zh) 用於資訊處置系統訂製應用軟體訂購與安裝之系統與方法
JP2009119599A (ja) 注文製造環境におけるコンピュータシステムの製造システムおよび組立て方法
CN101395605A (zh) 比较性web搜索
JP7246267B2 (ja) 組立計画装置、組立計画方法、及び組立計画プログラム
US7788273B2 (en) User interface for faceted exploration
KR20030069856A (ko) 네트워크 마스터 하드 디스크 드라이브 복제기
US8838947B2 (en) Manufacturing information handling systems
WO2022176246A1 (ja) 支援装置、支援方法およびプログラム
EP2645316A1 (en) Information processing method, program, medium, and system
EP2985662A1 (en) Automatic creation of hardware configuration in a distributed control system
EP3032362B1 (en) Automatic generation of hardware configuration for an automation system
JP7073654B2 (ja) 情報処理システム、情報処理装置およびプログラム
JP4629646B2 (ja) アプリケーションプログラムを生成するための装置、方法、及びプログラム
US6671789B1 (en) Method and apparatus for determining unknown relationships between storage devices and storage device enclosures
JP4371903B2 (ja) プロジェクト管理プログラム及びプロジェクト管理システム
US20220343378A1 (en) Quotation system, quotation method, and quotation program
JP4583260B2 (ja) 汎用計算機の操作手順作成装置、プログラム、及び記憶媒体
JP3468437B2 (ja) 商品販売登録データ処理装置
JP7139976B2 (ja) ログ可視化装置、ログ可視化方法およびログ可視化プログラム
US20060221964A1 (en) Data relay method and data relay apparatus
EP2908194A1 (en) Method and device for configuring hardware devices in an industrial automation system
CN101894126B (zh) 用于在数据库中存储卷属性的方法和系统
JP2007200222A (ja) ファイル管理サーバ、ファイル管理方法、およびそのためのプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21926675

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21926675

Country of ref document: EP

Kind code of ref document: A1