WO2022130488A1 - 締結具監視装置、締結具監視システム及び締結具監視方法 - Google Patents
締結具監視装置、締結具監視システム及び締結具監視方法 Download PDFInfo
- Publication number
- WO2022130488A1 WO2022130488A1 PCT/JP2020/046692 JP2020046692W WO2022130488A1 WO 2022130488 A1 WO2022130488 A1 WO 2022130488A1 JP 2020046692 W JP2020046692 W JP 2020046692W WO 2022130488 A1 WO2022130488 A1 WO 2022130488A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- fastener
- fasteners
- monitoring device
- track
- data
- Prior art date
Links
- 238000012806 monitoring device Methods 0.000 title claims abstract description 126
- 238000000034 method Methods 0.000 title claims description 59
- 238000012544 monitoring process Methods 0.000 title claims description 57
- 238000012545 processing Methods 0.000 claims abstract description 74
- 230000008569 process Effects 0.000 claims description 33
- 238000001514 detection method Methods 0.000 claims description 28
- 238000004891 communication Methods 0.000 claims description 26
- 238000004364 calculation method Methods 0.000 claims description 13
- 210000003608 fece Anatomy 0.000 claims description 8
- 238000010801 machine learning Methods 0.000 claims description 8
- 241001669679 Eleotris Species 0.000 description 21
- 238000011156 evaluation Methods 0.000 description 20
- 230000003137 locomotive effect Effects 0.000 description 8
- 230000001133 acceleration Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000003384 imaging method Methods 0.000 description 5
- 238000005401 electroluminescence Methods 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 3
- 238000007781 pre-processing Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000005070 sampling Methods 0.000 description 2
- 238000012549 training Methods 0.000 description 2
- 230000004931 aggregating effect Effects 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000004907 flux Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K9/00—Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
- B61K9/08—Measuring installations for surveying permanent way
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Alarm Systems (AREA)
Abstract
Description
14 締結具
16 通信網
20 鉄道車両
28 管理基地
30 締結具監視システム
32 走行状態取得部
40 締結状態検出部
50 締結具監視装置
52 プロセッサ
52a 締結状態判定部
52b 指標値演算部
56 記憶装置
56a プログラム
56b 走行履歴データ
56c 締結状態履歴データ
56d 軌道対応付データ
59 表示装置
70 基地側状態監視装置
72 プロセッサ
74 記憶装置
74a プログラム
74c 基準値データ
78 表示装置
80 学習済モデル
90 軌道画像
91 注意画像
94 詳細画像
Claims (17)
- 鉄道車両が走行する軌道の締結具を監視する締結具監視装置であって、
前記鉄道車両の走行データ及び前記鉄道車両の走行中における前記締結具の締結状態データに基づいて、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を、前記軌道における前記締結具の締結状態を示す指標値として演算する処理部を備える、締結具監視装置。 - 請求項1に記載の締結具監視装置であって、
前記処理部は、前記走行データ及び前記締結具の締結状態データに基づいて、単位時間当りの前記締結具の締結数又は脱落数を求め、求められた値に前記鉄道車両の速度を乗じて、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を求める、締結具監視装置。 - 請求項1又は請求項2に記載の締結具監視装置であって、
前記軌道の単位長さとして、第1の単位長さと、前記第1の単位長さよりも大きい第2の単位長さとが設定され、
前記処理部は、前記鉄道車両の走行データ及び前記鉄道車両の走行中における前記締結具の締結状態データに基づいて、前記第1の単位長さ当りの前記締結具の締結数又は脱落数を演算し、この演算結果に基づいて前記第2の単位長さ当りの前記締結具の締結数又は脱落数を演算する、締結具監視装置。 - 請求項1から請求項3のいずれか1つに記載の締結具監視装置であって、
前記処理部は、前記軌道の単位長さ当りの前記締結具の締結数を演算する、締結具監視装置。 - 請求項1から請求項4のいずれか1つに記載の締結具監視装置であって、
前記処理部は、前記軌道の単位長さ当りの前記締結具の脱落数を演算する、締結具監視装置。 - 請求項1から請求項5のいずれか1つに記載の締結具監視装置であって、
前記鉄道車両の走行中における前記締結具の締結状態が不明な状態を含む場合、前記処理部は、前記軌道の単位長さ当りの前記締結具の締結不明数を、参考情報として演算する、締結具監視装置。 - 請求項1から請求項6のいずれか1つに記載の締結具監視装置であって、
前記締結具の締結状態データと、前記締結具の締結状態の正解データとを含む学習用データを取得し、前記学習用データを用いて、前記鉄道車両の走行中における前記締結具の締結状態を推定するための学習済みモデルを生成する、締結具監視装置。 - 請求項1から請求項7のいずれか1つに記載の締結具監視装置であって、
前記処理部は、前記締結具の締結状態データが、前記締結具の締結状態を推定するための機械学習が行われた学習済モデルに入力されることで、前記締結具の有無及び脱落の有無の少なくとも一方を判定する推論部を含む、締結具監視装置。 - 請求項1から請求項8のいずれか1つに記載の締結具監視装置であって、
前記鉄道車両に設けられ、前記鉄道車両の走行状態を取得して走行データを出力する走行状態取得部と、
前記鉄道車両に設けられ、前記鉄道車両の走行中に前記締結具の締結状態を検出して、締結状態データを出力する締結状態検出部と、
を備え、
前記鉄道車両に設けられた前記処理部が、前記鉄道車両の走行中に、前記走行データと前記締結状態データとに基づいて、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を演算する、締結具監視装置。 - 請求項9に記載の締結具監視装置であって、
前記処理部による演算結果に基づいて、前記鉄道車両の走行中に前記軌道の締結状態を表示する表示装置をさらに備える、締結具監視装置。 - 請求項9又は請求項10に記載の締結具監視装置であって、
前記鉄道車両の走行データは、前記鉄道車両の走行位置情報を含み、前記処理部は、前記軌道の位置に前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を対応付けたデータを生成する、締結具監視装置。 - 請求項9から請求項11のいずれか1つに記載の締結具監視装置と、
管理基地に設けられ、前記締結具監視装置における処理結果が通信網を介して送信される基地側状態監視装置と、
を備える締結具監視システム。 - 請求項12に記載の締結具監視システムであって、
前記基地側状態監視装置は、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を、予め設定された基準値と比較することで、軌道の締結状態の良否を判定する基地側処理部を備える、締結具監視システム。 - 請求項12又は請求項13に記載の締結具監視システムであって、
前記管理基地に、前記軌道の位置に前記締結具の締結状態を対応付けた画像を表示する、締結具監視システム。 - 鉄道車両が走行する軌道の締結具を監視する締結具監視方法であって、
(a)前記鉄道車両の走行中に、前記鉄道車両の走行状態と、前記締結具の締結状態とを検出し、
(b)前記締結具の締結状態の検出結果に基づいて、前記締結具の有無及び脱落の有無の少なくとも一方を判定し、
(c)検出された前記鉄道車両の走行状態と、前記締結具の有無及び脱落の有無の少なくとも一方の判定結果に基づいて、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を、前記軌道における前記締結具の締結状態を示す指標値として演算する、締結具監視方法。 - 請求項15に記載の締結具監視方法であって、
前記処理(c)において、単位時間当りの前記締結具の締結数又は脱落数を求め、求められた値に前記鉄道車両の速度を乗じて、前記軌道の単位長さ当りの前記締結具の締結数又は脱落数を求める、締結具監視方法。 - 請求項15又は請求項16に記載の締結具監視方法であって、
前記演算処理(c)において、第1の単位長さ当りの前記締結具の締結数又は脱落数を演算し、この演算結果に基づいて前記第1の単位長さよりも大きい第2の単位長さ当りの前記締結具の締結数又は脱落数を演算する、締結具監視方法。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022539220A JP7271798B2 (ja) | 2020-12-15 | 2020-12-15 | 締結具監視装置、締結具監視システム及び締結具監視方法 |
US18/266,816 US20240043052A1 (en) | 2020-12-15 | 2020-12-15 | Fastener-monitoring device, fastener-monitoring system, and fastener-monitoring method |
PCT/JP2020/046692 WO2022130488A1 (ja) | 2020-12-15 | 2020-12-15 | 締結具監視装置、締結具監視システム及び締結具監視方法 |
AU2020481554A AU2020481554A1 (en) | 2020-12-15 | 2020-12-15 | Fastener-monitoring device, fastener-monitoring system, and fastener-monitoring method |
CA3201180A CA3201180A1 (en) | 2020-12-15 | 2020-12-15 | Fastener-monitoring device, fastener-monitoring system, and fastener-monitoring method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2020/046692 WO2022130488A1 (ja) | 2020-12-15 | 2020-12-15 | 締結具監視装置、締結具監視システム及び締結具監視方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022130488A1 true WO2022130488A1 (ja) | 2022-06-23 |
Family
ID=82057441
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2020/046692 WO2022130488A1 (ja) | 2020-12-15 | 2020-12-15 | 締結具監視装置、締結具監視システム及び締結具監視方法 |
Country Status (5)
Country | Link |
---|---|
US (1) | US20240043052A1 (ja) |
JP (1) | JP7271798B2 (ja) |
AU (1) | AU2020481554A1 (ja) |
CA (1) | CA3201180A1 (ja) |
WO (1) | WO2022130488A1 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20210397850A1 (en) * | 2019-06-19 | 2021-12-23 | Nec Corporation | Fixed state inspection apparatus, fixed state inspection system, fixed state inspection method, and program |
US11560165B2 (en) | 2018-06-01 | 2023-01-24 | Tetra Tech, Inc. | Apparatus and method for gathering data from sensors oriented at an oblique angle relative to a railway track |
US11782160B2 (en) | 2019-05-16 | 2023-10-10 | Tetra Tech, Inc. | System and method for generating and interpreting point clouds of a rail corridor along a survey path |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070217670A1 (en) * | 2006-03-02 | 2007-09-20 | Michael Bar-Am | On-train rail track monitoring system |
JP2010230527A (ja) * | 2009-03-27 | 2010-10-14 | Kawasaki Heavy Ind Ltd | 鉄道レール締結緩み検査装置及び方法 |
US20150131108A1 (en) * | 2004-06-30 | 2015-05-14 | Georgetown Rail Equipment Company | System and method for inspecting railroad ties |
JP2018179986A (ja) * | 2017-04-11 | 2018-11-15 | 公益財団法人鉄道総合技術研究所 | 異常診断装置およびプログラム |
-
2020
- 2020-12-15 US US18/266,816 patent/US20240043052A1/en active Pending
- 2020-12-15 WO PCT/JP2020/046692 patent/WO2022130488A1/ja active Application Filing
- 2020-12-15 CA CA3201180A patent/CA3201180A1/en active Pending
- 2020-12-15 AU AU2020481554A patent/AU2020481554A1/en active Pending
- 2020-12-15 JP JP2022539220A patent/JP7271798B2/ja active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150131108A1 (en) * | 2004-06-30 | 2015-05-14 | Georgetown Rail Equipment Company | System and method for inspecting railroad ties |
US20070217670A1 (en) * | 2006-03-02 | 2007-09-20 | Michael Bar-Am | On-train rail track monitoring system |
JP2010230527A (ja) * | 2009-03-27 | 2010-10-14 | Kawasaki Heavy Ind Ltd | 鉄道レール締結緩み検査装置及び方法 |
JP2018179986A (ja) * | 2017-04-11 | 2018-11-15 | 公益財団法人鉄道総合技術研究所 | 異常診断装置およびプログラム |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11560165B2 (en) | 2018-06-01 | 2023-01-24 | Tetra Tech, Inc. | Apparatus and method for gathering data from sensors oriented at an oblique angle relative to a railway track |
US11919551B2 (en) | 2018-06-01 | 2024-03-05 | Tetra Tech, Inc. | Apparatus and method for gathering data from sensors oriented at an oblique angle relative to a railway track |
US11782160B2 (en) | 2019-05-16 | 2023-10-10 | Tetra Tech, Inc. | System and method for generating and interpreting point clouds of a rail corridor along a survey path |
US20210397850A1 (en) * | 2019-06-19 | 2021-12-23 | Nec Corporation | Fixed state inspection apparatus, fixed state inspection system, fixed state inspection method, and program |
US11954911B2 (en) * | 2019-06-19 | 2024-04-09 | Nec Corporation | Fixed state inspection apparatus, fixed state inspection system, fixed state inspection method, and a non-transitory computer readable medium |
Also Published As
Publication number | Publication date |
---|---|
JP7271798B2 (ja) | 2023-05-11 |
CA3201180A1 (en) | 2022-06-23 |
US20240043052A1 (en) | 2024-02-08 |
JPWO2022130488A1 (ja) | 2022-06-23 |
AU2020481554A1 (en) | 2023-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022130488A1 (ja) | 締結具監視装置、締結具監視システム及び締結具監視方法 | |
Weston et al. | Perspectives on railway track geometry condition monitoring from in-service railway vehicles | |
CN106598695A (zh) | 用于虚拟驾驶环境中的车道边界检测的试验台 | |
JP2016140235A (ja) | 車両速度を決定するための方法およびシステム | |
CN107782564A (zh) | 一种自动驾驶车辆测评系统及方法 | |
Lee et al. | Relationships between driving style and fuel consumption in highway driving | |
JP4008082B2 (ja) | レールの締結具の脱落の検知装置及び方法、並びに、レールの位置の検知方法 | |
EP2670648A1 (en) | Rail vision system | |
RU2007114889A (ru) | Диагностика и мониторинг состояния стрелок, пересечений или стрелочных переводов, а также рельсовых стыков и неровностей пути при помощи рельсового транспортного средства | |
JP5508172B2 (ja) | 枕木変位計測システム | |
CN107566327A (zh) | 一种智能车载驾培监控系统 | |
CN102687181A (zh) | 信号机循环推断装置和信号机循环推断方法 | |
CN106339692A (zh) | 一种基于路线偏移检测的疲劳驾驶状态信息确定方法及系统 | |
WO2022130510A1 (ja) | 軌道状態監視装置、軌道状態監視システム及び軌道状態監視方法 | |
CN114527752A (zh) | 低卫星信号环境下轨道巡检机器人检测数据精确定位方法 | |
JP2009064283A (ja) | 交通情報提供システムおよび交通情報提供方法 | |
CN111315630A (zh) | 数据融合概念 | |
Kim et al. | Toward prediction of driver awareness of automotive hazards: Driving-video-based simulation approach | |
Wu et al. | A novel skateboarder-related near-crash identification method with roadside LiDAR data | |
Wang et al. | A machine vision system based on driving recorder for automatic inspection of rail curvature | |
CN106570801A (zh) | 一种用于驾驶培训的学车电子教练中心控制系统 | |
CN112214530B (zh) | 一种社会驾驶行为跟踪评价的方法及相关装置 | |
Balfe et al. | A framework for human factors analysis of railway on-train data | |
CN206520539U (zh) | 车道偏离预警装置 | |
JPH07107245B2 (ja) | 軌道状態の確認方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ENP | Entry into the national phase |
Ref document number: 2022539220 Country of ref document: JP Kind code of ref document: A |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20965876 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 3201180 Country of ref document: CA |
|
WWE | Wipo information: entry into national phase |
Ref document number: 18266816 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 2020481554 Country of ref document: AU Date of ref document: 20201215 Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20965876 Country of ref document: EP Kind code of ref document: A1 |